Using pre-stressed precast hollow core walls and slabs can save a minimum of 30% construction time in greenfield projects. This technology allows work to begin on casting floors before the entire site is acquired or foundations are fully complete. It provides advantages like faster construction, higher quality, and more flexibility in scheduling compared to cast-in-place concrete. Adopting this proven precast technology can help fast-track major infrastructure projects in sectors like power, steel, and warehousing.