PMBOK and Scrum:
   Can we live together,
    happily ever after?

  Silvana Wasitova, PMP, CSM, CSP, ACP
            Scrum Day Asia
       Bandung, 24 November 2012
About me


           Waterfall



2
            Scrum
3
A Little bit of history….




                            4
History of PMBOK

       • 1969: PMI established,
         foremost advocate for the
         project management profession

       • 1987: First PMBOK
         Established a standard and a lexicon
         Introduced formal planning & control




5
History of “Waterfall”
• Waterfall Model
    – Originated in manufacturing
      and construction industries
    – Highly structured physical environments
      => after-the-fact changes are
      prohibitively costly

• 1970: Winston Royce article
    – Showed waterfall as an example of a flawed,
      non-working model
6
Winston Royce’s “Grandiose” Model
                                                       “Single Pass” phased model
                                                       to cope with US DoD
                                                       regulatory requirements




“I believe in this concept, but the
implementation is risky and invites failure.”

Winston W. Royce, “Managing the development of large
software systems”, Aug 1970


  7
Winston Royce’s “Problem” Model




Problem:
Testing phase, at the end of Development
cycle, is the first time the integrated
components are “experienced”.

Failure may require a major redesign,
or modifying the requirements.

Can expect up to 100% schedule and/or cost overrun.
    8
Winston Royce’s Recommendation
                  Iterations between phases, hopefully
                  confined to successive steps




9
History of Scrum
1993 – Jeff Sutherland @ Easel Corporation
     • Vertical-licing
     • January 1994: first Scrum, self-organized team, half-
       day planning, Monthly Demo to the CEO
     • February: added “daily Scrums”
     • March: pairing, “swarming” on top priorities

1995 – Scrum paper at OOPSLA,
 Ken Schwaber and Jeff Sutherland

10
The Agile Manifesto - 2001
We are uncovering better ways of developing software.
Through this work we have come to value:

•    Working software over comprehensive documentation
•    Individuals and interactions over processes and tools
•    Customer collaboration over contract negotiation
•    Responding to change over following a plan

That is, while there is value in the items on the right,
  we value the items on the left more.

11                                                           11
PMBOK and Scrum: Similarities


• Deliver the right thing          Scope
  (on time, on budget)



                            Time           Budget




 12
The biggest danger in
Project and Product
Management:

      Building
        the
       wrong
       thing!
                        Page #
 13
PMBOK and Scrum: Similarities


• Deliver the right thing
• Communicate, communicate, communicate




 14
From http://www.projectcartoon.com/
• Collaborate with clients and users
     • Many mistakes are avoidable




16
PMBOK and Scrum: Similarities


• Deliver the right thing
• Communicate, communicate, communicate
• Progressive elaboration




 17
Continuous Evolution of Product Backlog
  Initial       Refined       Ready       End of S1
                                      S           S
                                      1           2
            R             R           S           S
            1             1
                                      2           3
                                      S           S
                                      3           4

                                      S
                                      4           R
            R             R                       2
            2             2           R
                                      2
            R             R                       R
            3                         R           3
                          3
                                      3
PMBOK and Scrum: Similarities


•        Deliver the right thing
•        Communicate, communicate, communicate
•        Progressive elaboration
•        Cyclical: Plan, Execute, Monitor & Control



    19
SURPRISE!
• Agile practices are aligned with PMBOK process
  groups: initiating, planning, executing, monitoring,
  controlling, closing

• In each iteration:
   – Planning, executing,
       monitoring, controlling
     – Manage: Scope, time,
       cost and quality
20
The Scrum Framework




21
PMBOK and Scrum: Differences


• Agile Focus: Minimize Waste (“Muda” in Lean)
• “Heavy” vs. “Light” process, umpteen checklists




 22
PMBOK Processes




23
Scrum Framework: Summary




• Product Owner   • Product Backlog     •   Product Planning
• Team            • Sprint Backlog      •   Sprint Planning
• Scrum Master    • Potentially         •   Daily Standup (Scrum)
                    Shippable Product   •   Sprint Review
                  • Burn-down Chart     •   Sprint Retrospective



24
PMBOK and Scrum: Differences


• Agile Focus: Minimize Waste (“Muda” in Lean)
• “Heavy” vs. “Light” process, umpteen checklists
• Maximize “work not done”




 25
64% implemented features are
                               rarely or never used
                                                     Focusing on customer needs ensures:
                                                       the right features are built
              Sometimes      Rarely                    not wasting effort (and resources) on
                16%           19%
  Often                                                features that are not needed
  13%

Always
  7%
                              Never                  While the figures may vary by
                               45%
                                                     company, principle remains:
                                                     Only build the features that the
                                                     client/users need
     Ref: Jim Johnson, Chairman of Standish Group, quoted in 2006 in:
         http://www.infoq.com/articles/Interview-Johnson-Standish-CHAOS
         Sample: government and commercial organizations, no vendors, suppliers or consultants

26
PMBOK and Scrum: Differences

•        Agile Focus: Minimize Waste (“Muda” in Lean)
•        “Heavy” vs. “Light” process, umpteen checklists
•        Maximize “work not done”
•        BDUF vs. build in increments, vertical slices
•        Adaptability!
•        Fail fast, inspect and adapt, keep learning
         -> creates a “learning organization”

    27
Waterfall, Agile and Scrum:
                      Characteristics
                    Waterfall                 Agile : Iterative Development

                                                                               Scrum
Specifications   Upfront, Detailed    Emergent Design
                                                                • Daily “standup” status checks ≤ 15mins
                                                                • Delivery rhythm in iterations (Sprints)
                                                                • Demo & Retrospective at end of ea. Sprint
                 Linear hand-offs:    Cross-functional &           Continuous Improvement
Teamwork         Dev then QA          collaborative: Dev & QA

                                                                       XP: eXtreme
Change           Formal process,      Welcomed,
Requests         implemented at end   prioritized vs. backlog          Programming
                                                                • Automated Tests
                                                                • Pair Programming
Customer / User At beginning and                                • Automated / Continuous Builds
                                                                • TDD: Test-Driven Development
Involvement     at delivery           Throughout cycle          • Continuous Deployment




            Scrum is the most popular Agile method:                RUP                      DSDM
            74% of Agile practitioners (2009)                                                             28

  28
Scrum vs. Waterfall
                             Waterfall                                           Scrum
Approach             Freezes scope, estimates schedule           Freezes schedule, estimates scope

Client Involvement   At beginning and end                        Frequent collaboration

Scope                Build “everything in the specs”             Build what client really needs, by priority

Design               Design all features up front                Emergent design of few features per iteration

Development          Linear path across phases                   Iterative, incorporate learning

Delivery             “Big Bang” at end                           Frequent, small increments
                                                                 Continuous functional & unit testing inside
Testing              Separate phase, after development           iterations

Cost of Change       High                                        Low

Requirements         Defined up front, rigid                     Allow changes up to “last responsible moment”

Documentation        Up front and exhaustive                     Document only what is built, as needed
                                     © Itecor all rights reserved                                              29
Team Communication   At phase-handoffs                            Continuous, cross-functional
 29
Project Management:
                   Agile vs. Waterfall approach

                            Waterfall                               Agile
Work Assignment     Project Manager               Self-organizing team

Responsibilities    Delineated                    Shared

Task Ownership      Separated                     Shared: all for one, one for all

Status reports      By Project Manager            Transparency, shared knowledge

Requirements        Defined up-front, signed-of   High level, detailed in collaborations

Plans               Detailed plans upfront        Evolutionary planning

Changes             Not welcome                   Allow changes up to “last responsible moment”,
                                                  prioritized




 30
Agile deals with

        Ziv’s Law:        • Specifications will never be fully understood


                          • The user will never be sure of what they want
     Humphrey’s Law:        until they see the system in production (if then)


        Wegner’s          • An interactive system can never be fully specified,
        Lemma:              nor can it ever be fully tested


        Langdon’s         • Software evolves more rapidly as it approaches
         Lemma:             chaotic regions (without spilling into chaos)



                Wicked Problems, Righteous Solutions, Peter deGrace, Leslie Hulet
31
Agile Solutions to Common Problems




32
Lean, Agile, Scrum: How they relate
Two things in common: Eliminate Waste & Increase Customer Value
Waste: anything which does not advance the process, or add value
Value: any action or process that a customer would be willing to pay for


           Lean                                      Agile                                Scrum

• A production practice that           •Agile is a group of methodologies        •Scrum is the most popular Agile
  considers the expenditure of          based on iterative and incremental        methodology used in software
  resources for any goal other          delivery, where requirements and          development.
  than the creation of value for        solutions evolve through collaboration
  the end-customer to be                between clients and self-organizing,     •Scrum emphasizes iterative
  wasteful, and thus a target for       cross-functional teams.                   approach to building
  elimination.                                                                    incremental business value.
                                       •Agile practices include:
• Agile practices are rooted in lean
                                        Scrum, Kanban, XP (eXtreme
  philosophy.
                                        Programming), TDD (Test Driven
                                        Development), RUP (Rational Unified
                                        Process from IBM).




33
3 MONTHS

             Scrum vs. Waterfall: Time To Market
                                        Faster Time to Market
                                                  Higher Quality
                                                  Satisfied Customer
    Scrum

                                                       Collaborative
                              Develop & QA            Results-Oriented
                      Spec


                                 6-10 MONTHS
                                 9 weeks
    Waterfall                   3 months

               Spec               Develop & QA                Updates
                                   12 weeks                   3-6 wks
                      x wks                         y wks
                               6-10 months
                                                          Sequential
                                                       Process-Oriented
© Silvana Wasitova
Yahoo-Eurosport: 2008 Event Schedule

                                      TDF

                                               Euro
      Paris-Dakar                                                          Tour de France




 January              February     March              April          May               June




            Rugby 6 Nations                Rolland Garros                  Wimbledon


                         FOOT:                           Moto GP                       Boxing
                         Olympic Games qualifiers        Golf, Athletics, Cycling      Horse Racing
                         World Cup qualifiers            Basketball                    Hockey, etc

35
     35
          25-Nov-12
Fundamental Difference




36
PMBOK Strengths

Process oriented
 Clear project kickoff & administrative initiation
 Enumeration of stakeholders,
  formalized communication plan
 More explicitly calls for cost management
 Risk management formalized: identification,
  qualitative and quantitative analysis,
  response planning


37
Agile Strengths
Empowered, self-organizing team
     Collaboration, cross-fertilization, disciplined,
     shared responsibilities & commitments
Welcomes adjustments and learnings
     Produces better results
Risk mitigation practices
     Smaller units of work  more accurate
     Frequent checks  fewer surprises & delays
Welcomes voice of the customer
     Build the right thing
38
Use the right tool for the job
 39
Decision Criteria: Scrum vs. Waterfall

         Criteria          Scrum Candidate       Waterfall Candidate

     What To Build or       Iterate to clarify
                                                   Both are known
     How to Build it       direction / details
     Market or User
                        Want Market/User input   User/Market input
     Feedback and
                         to improve usability       not needed
      Involvement
 Time to Market vs.
                         Flexible about Scope    Flexible about Time
  Feature Content




40
Scrum Process
          Key Practices
           Self-directed; self-organizing teams
           (preferably co-located)
           15 minute daily stand up meeting
           with 3 special questions
           30-calendar day iterations
           Iterative Adaptive planning
           Stakeholder/Customer
           Involvement
           Team measures progress daily
           Each iteration delivers tested,
           fully-functional software for
           demonstration
           Iterative Retrospective Process
           Always 30-days from
           potential production release
PMI Agile Certification
• Wonderful development, recognition of real need
• Available May 2011
• Like PMP, requires experience:
     o 1,500 hours working in Agile project teams
       (any role) or in Agile methodologies in last 2 yrs
     o 2,000 hours general PM experience in last 5 yrs (or PMP)
     o 21 hours Training in Agile project management topics


• More info: http://www.pmi.org/en/Agile/
  Agile-Certification-Eligibility-Requirements.aspx

42
Stay
     relevant




43
44   It does not have to hurt
It’s a brave
     new world
45
     out there
PMBOK and Scrum:
           Can we live together,
            happily ever after?


            Not a marriage, but:
     Yes - Good, respectful, neighbours

46
PMBOK and PMP:
                   why keep them?

     •   Large Enterprises often have PMBoK-based
         practices in place, PMOs

     •   It helps to “speak the language”, to do the
         common mapping

47
Silvana Wasitova, PMP, CSM, CSP, ACP




                           Lausanne, Switzerland
                           wasitova@yahoo.com
                                +41 79 558 05 09
                        slideshare.com/wasitova
48
Skype Beta Program


                 Unparalleled Global Beta Testing Program

                 Unique experiences from world-leading
                 SW Company

                 Access to Skype information system

                 Various incentive programs for beta testers
Skype Beta Program: Registration

Pre-requisites:
       •    Intermediate level of English (Read & Write)
            + Native Language
       •    Skype experience at least 1 year
       •    Curiosity for IT technology
Contact :
            Beom Soo Park, Program Manager for APAC
            beomsoo.park@skype.net
51
References
•    Jeff Sutherland’s blog - http://scrum.jeffsutherland.com/
•    “The New New Product Development Game” Takeuchi and Nonaka. Harvard Business Review,
     January 1986
•    “The PMBOK and Agile: Friends or Foes?”, Mary Gerush and Dave West, Forrester 2009
•    “Five Myths of Agile Development”, Robert Holler, VersionOne, 2006
•    Winston W. Royce, “Managing the development of large software systems”, Aug 1970
     http://www.valucon.de/documents/managing_softwareprojects.pdf
•    “Diagnosing and Changing Organizational Culture”, Cameron and Quinn, 2006
•    “Living with Complexity”, Norman, Donald (2011), Cambridge, MA: MIT Press
•    “Leading Change”, John Kotter
•    http://www.stickyminds.com/pop_print.asp?ObjectId=10365&ObjectType=COL
•    “Project Management Body of Knowledge” (PMBOK), 2004
•    http://agile101.net/2009/08/18/agile-estimation-and-the-cone-of-uncertainty/
•    http://www.mountaingoatsoftware.com
•    http://www.agilealliance.org
•    http://www.c-spin.net/2009/cspin20090204AgileTransformationAtBorland.pdf
•    Primavera – PMISV presentation by Bob Schatz, Primavera VP of Development, 2005
•    Why Agile Works http://www.slideshare.net/yourpmpartner/agile-secrets-revealed-whitepaper



    52
Key Success Factors
       Sufficient Motivation to change (Pain)
       Team Rooms
       Feature Budgeting
       Build Process
       Town Hall Project Meetings
       Project Manager role transition
       Information Radiators
       No OT / Weekend work
       Test-Driven Development
       Rotating “ScrumMaster” Responsibilities
       Best Team Performance Awards
       Team-based bonus component
       Sprint Defect Limits
       Customer Webex Sprint Reviews
       Commitment to Learning!


 project success = business success TM
Scrum Adoption at
 Ref: http://agilesoftwaredevelopment.com/blog/artem/lessons-yahoos-scrum-adoption
     VP of Product Development experimented with scrum in 2004
     Senior§ Director of Agile Development started in 2005
     In 2008:
                3 coaches, each coaching approx. 10 scrum teams/year
                200 scrum teams world wide, of about 1500+ employees

 Results in 2008:
    Average Team Velocity increase estimated at +35% / year,
    in some cases 300% - 400%
           Development cost reduction over USD 1 million / year
           ROI on transition and trainings about 100% in first year

 Note: 15-20% of people consistently DID NOT like Scrum

54

PMBoK and Scrum: can we be friends?

  • 1.
    PMBOK and Scrum: Can we live together, happily ever after? Silvana Wasitova, PMP, CSM, CSP, ACP Scrum Day Asia Bandung, 24 November 2012
  • 2.
    About me Waterfall 2 Scrum
  • 3.
  • 4.
    A Little bitof history…. 4
  • 5.
    History of PMBOK • 1969: PMI established, foremost advocate for the project management profession • 1987: First PMBOK Established a standard and a lexicon Introduced formal planning & control 5
  • 6.
    History of “Waterfall” •Waterfall Model – Originated in manufacturing and construction industries – Highly structured physical environments => after-the-fact changes are prohibitively costly • 1970: Winston Royce article – Showed waterfall as an example of a flawed, non-working model 6
  • 7.
    Winston Royce’s “Grandiose”Model “Single Pass” phased model to cope with US DoD regulatory requirements “I believe in this concept, but the implementation is risky and invites failure.” Winston W. Royce, “Managing the development of large software systems”, Aug 1970 7
  • 8.
    Winston Royce’s “Problem”Model Problem: Testing phase, at the end of Development cycle, is the first time the integrated components are “experienced”. Failure may require a major redesign, or modifying the requirements. Can expect up to 100% schedule and/or cost overrun. 8
  • 9.
    Winston Royce’s Recommendation Iterations between phases, hopefully confined to successive steps 9
  • 10.
    History of Scrum 1993– Jeff Sutherland @ Easel Corporation • Vertical-licing • January 1994: first Scrum, self-organized team, half- day planning, Monthly Demo to the CEO • February: added “daily Scrums” • March: pairing, “swarming” on top priorities 1995 – Scrum paper at OOPSLA, Ken Schwaber and Jeff Sutherland 10
  • 11.
    The Agile Manifesto- 2001 We are uncovering better ways of developing software. Through this work we have come to value: • Working software over comprehensive documentation • Individuals and interactions over processes and tools • Customer collaboration over contract negotiation • Responding to change over following a plan That is, while there is value in the items on the right, we value the items on the left more. 11 11
  • 12.
    PMBOK and Scrum:Similarities • Deliver the right thing Scope (on time, on budget) Time Budget 12
  • 13.
    The biggest dangerin Project and Product Management: Building the wrong thing! Page # 13
  • 14.
    PMBOK and Scrum:Similarities • Deliver the right thing • Communicate, communicate, communicate 14
  • 15.
  • 16.
    • Collaborate withclients and users • Many mistakes are avoidable 16
  • 17.
    PMBOK and Scrum:Similarities • Deliver the right thing • Communicate, communicate, communicate • Progressive elaboration 17
  • 18.
    Continuous Evolution ofProduct Backlog Initial Refined Ready End of S1 S S 1 2 R R S S 1 1 2 3 S S 3 4 S 4 R R R 2 2 2 R 2 R R R 3 R 3 3 3
  • 19.
    PMBOK and Scrum:Similarities • Deliver the right thing • Communicate, communicate, communicate • Progressive elaboration • Cyclical: Plan, Execute, Monitor & Control 19
  • 20.
    SURPRISE! • Agile practicesare aligned with PMBOK process groups: initiating, planning, executing, monitoring, controlling, closing • In each iteration: – Planning, executing, monitoring, controlling – Manage: Scope, time, cost and quality 20
  • 21.
  • 22.
    PMBOK and Scrum:Differences • Agile Focus: Minimize Waste (“Muda” in Lean) • “Heavy” vs. “Light” process, umpteen checklists 22
  • 23.
  • 24.
    Scrum Framework: Summary •Product Owner • Product Backlog • Product Planning • Team • Sprint Backlog • Sprint Planning • Scrum Master • Potentially • Daily Standup (Scrum) Shippable Product • Sprint Review • Burn-down Chart • Sprint Retrospective 24
  • 25.
    PMBOK and Scrum:Differences • Agile Focus: Minimize Waste (“Muda” in Lean) • “Heavy” vs. “Light” process, umpteen checklists • Maximize “work not done” 25
  • 26.
    64% implemented featuresare rarely or never used Focusing on customer needs ensures: the right features are built Sometimes Rarely not wasting effort (and resources) on 16% 19% Often features that are not needed 13% Always 7% Never While the figures may vary by 45% company, principle remains: Only build the features that the client/users need Ref: Jim Johnson, Chairman of Standish Group, quoted in 2006 in: http://www.infoq.com/articles/Interview-Johnson-Standish-CHAOS Sample: government and commercial organizations, no vendors, suppliers or consultants 26
  • 27.
    PMBOK and Scrum:Differences • Agile Focus: Minimize Waste (“Muda” in Lean) • “Heavy” vs. “Light” process, umpteen checklists • Maximize “work not done” • BDUF vs. build in increments, vertical slices • Adaptability! • Fail fast, inspect and adapt, keep learning -> creates a “learning organization” 27
  • 28.
    Waterfall, Agile andScrum: Characteristics Waterfall Agile : Iterative Development Scrum Specifications Upfront, Detailed Emergent Design • Daily “standup” status checks ≤ 15mins • Delivery rhythm in iterations (Sprints) • Demo & Retrospective at end of ea. Sprint Linear hand-offs: Cross-functional &  Continuous Improvement Teamwork Dev then QA collaborative: Dev & QA XP: eXtreme Change Formal process, Welcomed, Requests implemented at end prioritized vs. backlog Programming • Automated Tests • Pair Programming Customer / User At beginning and • Automated / Continuous Builds • TDD: Test-Driven Development Involvement at delivery Throughout cycle • Continuous Deployment Scrum is the most popular Agile method: RUP DSDM 74% of Agile practitioners (2009) 28 28
  • 29.
    Scrum vs. Waterfall Waterfall Scrum Approach Freezes scope, estimates schedule Freezes schedule, estimates scope Client Involvement At beginning and end Frequent collaboration Scope Build “everything in the specs” Build what client really needs, by priority Design Design all features up front Emergent design of few features per iteration Development Linear path across phases Iterative, incorporate learning Delivery “Big Bang” at end Frequent, small increments Continuous functional & unit testing inside Testing Separate phase, after development iterations Cost of Change High Low Requirements Defined up front, rigid Allow changes up to “last responsible moment” Documentation Up front and exhaustive Document only what is built, as needed © Itecor all rights reserved 29 Team Communication At phase-handoffs Continuous, cross-functional 29
  • 30.
    Project Management: Agile vs. Waterfall approach Waterfall Agile Work Assignment Project Manager Self-organizing team Responsibilities Delineated Shared Task Ownership Separated Shared: all for one, one for all Status reports By Project Manager Transparency, shared knowledge Requirements Defined up-front, signed-of High level, detailed in collaborations Plans Detailed plans upfront Evolutionary planning Changes Not welcome Allow changes up to “last responsible moment”, prioritized 30
  • 31.
    Agile deals with Ziv’s Law: • Specifications will never be fully understood • The user will never be sure of what they want Humphrey’s Law: until they see the system in production (if then) Wegner’s • An interactive system can never be fully specified, Lemma: nor can it ever be fully tested Langdon’s • Software evolves more rapidly as it approaches Lemma: chaotic regions (without spilling into chaos) Wicked Problems, Righteous Solutions, Peter deGrace, Leslie Hulet 31
  • 32.
    Agile Solutions toCommon Problems 32
  • 33.
    Lean, Agile, Scrum:How they relate Two things in common: Eliminate Waste & Increase Customer Value Waste: anything which does not advance the process, or add value Value: any action or process that a customer would be willing to pay for Lean Agile Scrum • A production practice that •Agile is a group of methodologies •Scrum is the most popular Agile considers the expenditure of based on iterative and incremental methodology used in software resources for any goal other delivery, where requirements and development. than the creation of value for solutions evolve through collaboration the end-customer to be between clients and self-organizing, •Scrum emphasizes iterative wasteful, and thus a target for cross-functional teams. approach to building elimination. incremental business value. •Agile practices include: • Agile practices are rooted in lean Scrum, Kanban, XP (eXtreme philosophy. Programming), TDD (Test Driven Development), RUP (Rational Unified Process from IBM). 33
  • 34.
    3 MONTHS Scrum vs. Waterfall: Time To Market  Faster Time to Market  Higher Quality  Satisfied Customer Scrum Collaborative Develop & QA Results-Oriented Spec 6-10 MONTHS 9 weeks Waterfall 3 months Spec Develop & QA Updates 12 weeks 3-6 wks x wks y wks 6-10 months Sequential Process-Oriented © Silvana Wasitova
  • 35.
    Yahoo-Eurosport: 2008 EventSchedule TDF Euro Paris-Dakar Tour de France January February March April May June Rugby 6 Nations Rolland Garros Wimbledon FOOT: Moto GP Boxing Olympic Games qualifiers Golf, Athletics, Cycling Horse Racing World Cup qualifiers Basketball Hockey, etc 35 35 25-Nov-12
  • 36.
  • 37.
    PMBOK Strengths Process oriented Clear project kickoff & administrative initiation  Enumeration of stakeholders, formalized communication plan  More explicitly calls for cost management  Risk management formalized: identification, qualitative and quantitative analysis, response planning 37
  • 38.
    Agile Strengths Empowered, self-organizingteam Collaboration, cross-fertilization, disciplined, shared responsibilities & commitments Welcomes adjustments and learnings Produces better results Risk mitigation practices Smaller units of work  more accurate Frequent checks  fewer surprises & delays Welcomes voice of the customer Build the right thing 38
  • 39.
    Use the righttool for the job 39
  • 40.
    Decision Criteria: Scrumvs. Waterfall Criteria Scrum Candidate Waterfall Candidate What To Build or Iterate to clarify Both are known How to Build it direction / details Market or User Want Market/User input User/Market input Feedback and to improve usability not needed Involvement Time to Market vs. Flexible about Scope Flexible about Time Feature Content 40
  • 41.
    Scrum Process Key Practices  Self-directed; self-organizing teams (preferably co-located)  15 minute daily stand up meeting with 3 special questions  30-calendar day iterations  Iterative Adaptive planning  Stakeholder/Customer Involvement  Team measures progress daily  Each iteration delivers tested, fully-functional software for demonstration  Iterative Retrospective Process  Always 30-days from potential production release
  • 42.
    PMI Agile Certification •Wonderful development, recognition of real need • Available May 2011 • Like PMP, requires experience: o 1,500 hours working in Agile project teams (any role) or in Agile methodologies in last 2 yrs o 2,000 hours general PM experience in last 5 yrs (or PMP) o 21 hours Training in Agile project management topics • More info: http://www.pmi.org/en/Agile/ Agile-Certification-Eligibility-Requirements.aspx 42
  • 43.
    Stay relevant 43
  • 44.
    44 It does not have to hurt
  • 45.
    It’s a brave new world 45 out there
  • 46.
    PMBOK and Scrum: Can we live together, happily ever after? Not a marriage, but: Yes - Good, respectful, neighbours 46
  • 47.
    PMBOK and PMP: why keep them? • Large Enterprises often have PMBoK-based practices in place, PMOs • It helps to “speak the language”, to do the common mapping 47
  • 48.
    Silvana Wasitova, PMP,CSM, CSP, ACP Lausanne, Switzerland wasitova@yahoo.com +41 79 558 05 09 slideshare.com/wasitova 48
  • 49.
    Skype Beta Program Unparalleled Global Beta Testing Program Unique experiences from world-leading SW Company Access to Skype information system Various incentive programs for beta testers
  • 50.
    Skype Beta Program:Registration Pre-requisites: • Intermediate level of English (Read & Write) + Native Language • Skype experience at least 1 year • Curiosity for IT technology Contact : Beom Soo Park, Program Manager for APAC beomsoo.park@skype.net
  • 51.
  • 52.
    References • Jeff Sutherland’s blog - http://scrum.jeffsutherland.com/ • “The New New Product Development Game” Takeuchi and Nonaka. Harvard Business Review, January 1986 • “The PMBOK and Agile: Friends or Foes?”, Mary Gerush and Dave West, Forrester 2009 • “Five Myths of Agile Development”, Robert Holler, VersionOne, 2006 • Winston W. Royce, “Managing the development of large software systems”, Aug 1970 http://www.valucon.de/documents/managing_softwareprojects.pdf • “Diagnosing and Changing Organizational Culture”, Cameron and Quinn, 2006 • “Living with Complexity”, Norman, Donald (2011), Cambridge, MA: MIT Press • “Leading Change”, John Kotter • http://www.stickyminds.com/pop_print.asp?ObjectId=10365&ObjectType=COL • “Project Management Body of Knowledge” (PMBOK), 2004 • http://agile101.net/2009/08/18/agile-estimation-and-the-cone-of-uncertainty/ • http://www.mountaingoatsoftware.com • http://www.agilealliance.org • http://www.c-spin.net/2009/cspin20090204AgileTransformationAtBorland.pdf • Primavera – PMISV presentation by Bob Schatz, Primavera VP of Development, 2005 • Why Agile Works http://www.slideshare.net/yourpmpartner/agile-secrets-revealed-whitepaper 52
  • 53.
    Key Success Factors  Sufficient Motivation to change (Pain)  Team Rooms  Feature Budgeting  Build Process  Town Hall Project Meetings  Project Manager role transition  Information Radiators  No OT / Weekend work  Test-Driven Development  Rotating “ScrumMaster” Responsibilities  Best Team Performance Awards  Team-based bonus component  Sprint Defect Limits  Customer Webex Sprint Reviews  Commitment to Learning! project success = business success TM
  • 54.
    Scrum Adoption at Ref: http://agilesoftwaredevelopment.com/blog/artem/lessons-yahoos-scrum-adoption VP of Product Development experimented with scrum in 2004 Senior§ Director of Agile Development started in 2005 In 2008: 3 coaches, each coaching approx. 10 scrum teams/year 200 scrum teams world wide, of about 1500+ employees Results in 2008: Average Team Velocity increase estimated at +35% / year, in some cases 300% - 400% Development cost reduction over USD 1 million / year ROI on transition and trainings about 100% in first year Note: 15-20% of people consistently DID NOT like Scrum 54

Editor's Notes

  • #8 Winston W. Royce,Managing the development of large software systemsProc. IEEE WESCON, Aug 1970Royce developed the phased delivery model to cope with regulatory requirements set out in the US DoD STD-2167 document, which was so byzantine and bureaucratic that the waterfall was the only way to cope with it;
  • #9 http://www.techdarkside.com/is-there-really-any-rigor-in-waterfallIt is sad that software development philosophies and practices developed in a world of government regulation, punch cards, and very expensive computer time still have such a strong a hold on today’s commercial software development.Ben Simohttp://QuestioningSoftware.com
  • #10 Winston W. Royce,Managing the development of large software systemsProc. IEEE WESCON, Aug 1970Royce’s Son:http://usability.typepad.com/confusability/2006/02/index.html
  • #11 Reduce hierarchy
  • #14 Can be on time, on budget, on scope, But still built the wrong product that no one needs.
  • #19 Progressive elaboration
  • #38 Discipline:Structured approach,Plan aheadmodel itself progresses linearly through discrete, easily understandable and explainable phases and thus is easy to understand; it also provides easily markable milestones in the development process.Steve McConnell, in Code Complete, (a book that criticizes widespread use of the waterfall model) refers to design as a "wicked problem"—a problem whose requirements and limitations cannot be entirely known before completion. The implication of this is that it is impossible to perfect one phase of software development, thus it is impossible if using the waterfall model to move on to the next phase.David Parnas, in A Rational Design Process: How and Why to Fake It, writes:[5]“Many of the [system's] details only become known to us as we progress in the [system's] implementation. Some of the things that we learn invalidate our design and we must backtrack.”The idea behind the waterfall model may be "measure twice; cut once," and those opposed to the waterfall model argue that this idea tends to fall apart when the problem constantly changes due to requirement modifications and new realizations about the problem itself. A potential solution is for an experienced developer to spend time up front on refactoring to consolidate the software, and to prepare it for a possible update, no matter if such is planned already. Another approach is to use a design targeting modularity with interfaces, to increase the flexibility of the software with respect to the design.[edit] Modified modelsIn response to the perceived problems with the pure waterfall model, many modified waterfall models have been introduced. These models may address some or all of the criticisms of the pure waterfall model.[citation needed] Many different models are covered by Steve McConnell in the "lifecycle planning" chapter of his book Rapid Development: Taming Wild Software Schedules.
  • #39 Discipline: rhythm, daily scrum, work agreements, consistentAgile approach is Great Risk Management:Risk of not pleasing the customerRisk of poor estimation and planningRisk of festering issues and delaysRisk of over-commitmentRisk of not being able to ship
  • #43 Recognition of real need for the professionWill bestow PMI credibility and supportAgile is best learned by practicing. I'm not too particular on how one learns, but putting the learning into practice in a team environment with frequent and effective retrospectives to adjust your process is key to internalizing agile. Hopefully the experience qualification ensures real agile project experience, not just observing agile teams. Experience requirement: working on Agile project teams, may be other role than Project Manager.
  • #45 Plan-driven software methodologies use a command-and-control approach to projectmanagement. A project plan is created that lists all known tasks. The project manager’sjob then becomes one of enforcing the plan. Changes to the plan are typically handledthrough “change control boards” that either reject most changes or they institute enoughbureaucracy that the rate of change is slowed to the speed that the plan-drivenmethodology can accommodate. There can be no servant-leadership in this model.Project managers manage: they direct, administer and supervise.Agile project management, on the other hand, is much more about leadership than aboutmanagement. Rather than creating a highly detailed plan showing the sequence of allactivities the agile project manager works with the customer to layout a common set ofunderstandings from which emergence, adaptation and collaboration can occur. The agileproject manager lays out a vision and then nurtures the project team to do the bestpossible to achieve the plan. Inasmuch as the manager represents the project to thoseoutside the project he or she is the project leader. However, the project manager serves anequally important role within the project while acting as a servant to the team, removingtheir impediments, reinforcing the project vision through words and actions, battlingorganizational dysfunctionality, and doing everything possible to ensure the success ofthe team. The agile project manager is a true coach and friend to the project teams.
  • #46 Old solutions may no longer work for new challenges
  • #50 Global bet testing program – Europe, Asia, Americas. It’s closed and invitation based. In Asia we have 4 countries running the program (Japan, Korea, Taiwan, China) and we are eager to add more countriesBenefits – gain unique experiences how SW is developing and testing, direct communication with Skype engineers provided with dedicated access to internal information system incentive program beta testers’ high involvement in developing Skype – Bug fix, Quality testing, Localizations
  • #51 Send mail to Beom that you are interested in participating the program and he will give further info.
  • #52 Change Management expense http://drdobbs.com/tools/229401451 Gartner estimates that worldwide IT spending last year was $1.6 trillion, with IT services at $816 billion as the largest component of that figure. Typically, 3% to 10% of the IT services budget allocations can be associated with pro­cess improvement initiatives, so we can estimate that $17 billion in spending is doomed to not deliver the intended results (70% of $24.5 billion). And that doesn't include opportunity costs associated with failed process improvement and costs associated with lost productivity during the change. Gartner estimates that worldwide IT spending last year was $1.6 trillion, with IT services at $816 billion as the largest component of that figure. Typically, 3% to 10% of the IT services budget allocations can be associated with pro­cess improvement initiatives, so we can estimate that $17 billion in spending is doomed to not deliver the intended results (70% of $24.5 billion). And that doesn't include opportunity costs associated with failed process improvement and costs associated with lost productivity during the change. A Pragmatic ApproachOne approach, which I call SDLC 3.0, provides a pragmatic, experience-based approach for integrating the fragmented methodology landscape by using practices that are methodology agnostic. It focuses on yielding a useful, context-specific set of standard work advice for real product development. It also integrates the software development part of IT with the broader enter­prise and functions such as enterprise architecture, IT service management, and project and portfolio management. Using lean as the overarching set of principles, SDLC 3.0 starts with the customer and ends with the accrual of value within IT operations. This focus makes sure that small groups don't try to optimize only their piece of the process, based only on what they know about their roles. Rather, a coherent big-picture view enables traditionally siloed communities to constructively participate rather than get bogged down in in-fighting.
  • #53 http://academic.research.microsoft.com/Publication/4327025/historical-roots-of-agile-methods-where-did-agile-thinking-come-fromBoehm http://academic.research.microsoft.com/Publication/3167904/guidelines-for-verifying-and-validating-software-requirements-and-design-specifications