Creating a checklist for predictive and preventive maintenance is vital in
keeping facility and equipment running safely and efficiently. Predictive
and preventive maintenance are both planned procedures to keep
assets running smoothly. The main difference is, predictive
maintenance tasks are usually performed when the machines are
running in production mode and preventive maintenance is done when
the machines are shut down.
Predictive maintenance directly monitors the condition and
performance of assets during normal operation to reduce the likelihood
of failures. It attempts to keep costs low by reducing the frequency of
maintenance procedures, unplanned breakdowns and getting rid of
unnecessary preventive maintenance.
Using machine learning and AI (Artificial Intelligence) can track
equipment failures and repairs in order to predict problems that may
occur in the future.
An example would be a vibration analysis of an asset. CMMS can be used
to automatically activate a work order, based on results of predictive
maintenance.
Preventive maintenance is regularly performed on an asset or location to
lessen the likelihood of it failing. It can be set up on a time-based
schedule, such as a monthly inspection, or a usage-based trigger, such as a
car that needs its oil changed every 3000 miles. While a Computerized
Maintenance Management System (CMMS) can help track corrective
maintenance, its strength comes from a well-organized and well-executed
planned maintenance process.
A maintenance checklist will depend on the type of facility and
equipment.
www.eaglecmms.com
Introduction
Safety
• Inspect personal protection equipment, including safety glasses,
gloves, respirators, and other equipment, and replace anything worn
or damaged.
• Keep all first-aid kits stocked, especially after use.
• Check and restock all eyewash stations and bottles.
• Inspect, repair, or replace any fall-protection kits.
www.eaglecmms.com
Equipment
• Ensure that machinery is clear of debris.
• Wipe machine surfaces of lubricant, dirt and other loose debris.
• Regularly inspect tools for wear.
• Routinely check all machinery fluid levels and air filters and replace
them as needed.
• Calibrate machines regularly.
• Regularly check belts for damage.
• Clean belts and other equipment in direct contact with materials and
inventory.
• Check and maintain motors and other power sources.
www.eaglecmms.com
Equipment
• Ensure that adequate space exists between equipment.
• Confirm that safety and caution areas are sufficiently marked.
• Keep walkways and other traffic areas clear of debris and any other
material.
• Guarantee that wires are properly secured and do not present a
hazard.
• Check roof, stairway and walkway railings regularly.
• Inspect structural building elements.
• Comprehensively check and repair building systems .
• Examine fire detectors and remain in compliance with local
regulations.
• Assess external grounds, including parking facilities, for hazards.
Buildings and Facilities
www.eaglecmms.com
Buildings and Facilities
Vehicles
• Check for fuel levels.
• Check fluid levels in the coolant and antifreeze by using gauges or
dipsticks.
• Ensure all safety items like the brakes, horns, and steering are
working properly.
• Schedule regular service sessions for drivability issues like a misfire
and rough idle.
• In case of accidents, refer the respective personnel to get the broken
glass and windows fixed.
• Keep track of when to repair the heaters and air conditioners of all
your vehicles.
• Inspect to get your serpentine belts changed when necessary.
• Examine the batteries and contacts in case of vehicles heating up.
www.eaglecmms.com
Vehicles
Proteus MMX is a cloud-hosted Next-Gen
Computerized Maintenance management solution,
offering all the features of a traditional solution,
preventive maintenance scheduling, work orders
and asset management combined with latest
digital trends as Enterprise Resource Planning
(ERP), Artificial Intelligence Integration, and IoT
system connectivity.
www.eaglecmms.com
To learn more about how an CMMS can improve and manage maintenance on assets and
equipment, please contact us or sign-up for a Free Trial of Proteus MMX.

Predictive and Preventive Maintenance Checklist

  • 1.
  • 2.
    Creating a checklistfor predictive and preventive maintenance is vital in keeping facility and equipment running safely and efficiently. Predictive and preventive maintenance are both planned procedures to keep assets running smoothly. The main difference is, predictive maintenance tasks are usually performed when the machines are running in production mode and preventive maintenance is done when the machines are shut down. Predictive maintenance directly monitors the condition and performance of assets during normal operation to reduce the likelihood of failures. It attempts to keep costs low by reducing the frequency of maintenance procedures, unplanned breakdowns and getting rid of unnecessary preventive maintenance. Using machine learning and AI (Artificial Intelligence) can track equipment failures and repairs in order to predict problems that may occur in the future. An example would be a vibration analysis of an asset. CMMS can be used to automatically activate a work order, based on results of predictive maintenance. Preventive maintenance is regularly performed on an asset or location to lessen the likelihood of it failing. It can be set up on a time-based schedule, such as a monthly inspection, or a usage-based trigger, such as a car that needs its oil changed every 3000 miles. While a Computerized Maintenance Management System (CMMS) can help track corrective maintenance, its strength comes from a well-organized and well-executed planned maintenance process. A maintenance checklist will depend on the type of facility and equipment. www.eaglecmms.com Introduction
  • 3.
    Safety • Inspect personalprotection equipment, including safety glasses, gloves, respirators, and other equipment, and replace anything worn or damaged. • Keep all first-aid kits stocked, especially after use. • Check and restock all eyewash stations and bottles. • Inspect, repair, or replace any fall-protection kits. www.eaglecmms.com
  • 4.
    Equipment • Ensure thatmachinery is clear of debris. • Wipe machine surfaces of lubricant, dirt and other loose debris. • Regularly inspect tools for wear. • Routinely check all machinery fluid levels and air filters and replace them as needed. • Calibrate machines regularly. • Regularly check belts for damage. • Clean belts and other equipment in direct contact with materials and inventory. • Check and maintain motors and other power sources. www.eaglecmms.com Equipment
  • 5.
    • Ensure thatadequate space exists between equipment. • Confirm that safety and caution areas are sufficiently marked. • Keep walkways and other traffic areas clear of debris and any other material. • Guarantee that wires are properly secured and do not present a hazard. • Check roof, stairway and walkway railings regularly. • Inspect structural building elements. • Comprehensively check and repair building systems . • Examine fire detectors and remain in compliance with local regulations. • Assess external grounds, including parking facilities, for hazards. Buildings and Facilities www.eaglecmms.com Buildings and Facilities
  • 6.
    Vehicles • Check forfuel levels. • Check fluid levels in the coolant and antifreeze by using gauges or dipsticks. • Ensure all safety items like the brakes, horns, and steering are working properly. • Schedule regular service sessions for drivability issues like a misfire and rough idle. • In case of accidents, refer the respective personnel to get the broken glass and windows fixed. • Keep track of when to repair the heaters and air conditioners of all your vehicles. • Inspect to get your serpentine belts changed when necessary. • Examine the batteries and contacts in case of vehicles heating up. www.eaglecmms.com Vehicles
  • 7.
    Proteus MMX isa cloud-hosted Next-Gen Computerized Maintenance management solution, offering all the features of a traditional solution, preventive maintenance scheduling, work orders and asset management combined with latest digital trends as Enterprise Resource Planning (ERP), Artificial Intelligence Integration, and IoT system connectivity. www.eaglecmms.com To learn more about how an CMMS can improve and manage maintenance on assets and equipment, please contact us or sign-up for a Free Trial of Proteus MMX.