This document provides an overview of the key steps involved in planning and designing a housing scheme, including: 1) Conducting a green belt analysis and boundary survey to determine the layout of the area. 2) Performing a topographic survey to identify natural resources and infrastructure like buildings and pipelines. 3) Distributing the land into residential, commercial, amenities, industrial, and roads. Residential areas would be further divided by income levels. 4) Ensuring basic facilities like healthcare, recreation, education, and shopping are provided within walkable distances.