PIPING DRAWINGS BASICS
N.P.TODKAR
There are two types of views used in the piping drawings:
a) Orthographic- Plans and Elevations
b) Pictorial - Isometric Views
Piping layout is developed in both plan view and elevation view
and section details are added for clarity wherever necessary.
These drawings are called the General Arrangement of Piping.
In complex piping system, especially within the unit/plant building
where orthographic views do not illustrate the details of design,
pictorial view in isometric presentation is drawn for clarity.
The Indian Standard IS10711 standardises the
drawing sheets as below:
SIZE OVERALL
DIMENSIONS in mm
A0 - 841 x 1189
A1 - 594 x 841
A2 - 420 x 594
A3 - 297 x 420
A4 - 210 x 297
HOW TO START THE PIPING GA?
•Obtain the drawings numbers and fill in the title block, with the
drawing number and title at the bottom right hand corner of the
sheet.
•Place the north arrow at the top left/right hand corner of the
sheet to indicate plant north.
•Do not plan drawing in the area above the title block of
drawing, as this is allotted for general notes, number and title of
reference drawings, brief description of changes during revision
and the bill of materials wherever applicable.
•Process equipment and piping have priority on the Piping GA.
•The piping drawings are started after fixing positions of the
equipments.
•Equipment layout is reproduced on the Piping GA to its scale
and drawn on the reverse side in case of manual drafting.
•
•In case of CAD separate layer is used. The major primary
beams and secondary beams are also shown if area covered is
indoor.
•Pertinent background details which govern piping routing,
such as floor drains, HVAC ducting, electrical and instrument
cable trays, etc. are also drawn in faint on the reverse.
•Utility stations are also established so that most convenient
utility header routing can be carried out.
Order of importance/preference of pipe lines in a piping
GA
1. Alloy steel/special material of construction.
2. Large bore piping
3. High temp/high pr. Piping
4. Lined piping
5. C. S. Process Piping
6. Utility piping
DEVELOPMENT OF PIPING GENERAL
ARRANGEMENT DRAWING
• The piping drawings should be developed in such a way
that
all the process requirements are met with.
• It is not always possible for the piping drawing to follow
exactly the logical arrangement of the P & IDs. Sometimes
lines must be routed with different junction sequence and
line numbers and subsequently the list may be changed.
•Performance and economics have to be considered in
parallel while deciding the routing.
• Piping is represented by single lines up to a size of 150NB
and double lines for sizes 200NB and above. This is to save
the time of drafting and to avoid confusion.
• In single line representation only the center line of the
pipeline is drawn using solid line and in double line
representation the actual size to scale is drawn with center
• Line numbers are shown against each line exactly in the
same way as represented in the P&I diagrams.
• The change in specification should be shown in line with
P&I diagram. This change is usually indicated
immediately to the downstream of the valve, flange or
equipment.
• Valves should be drawn to scale with identification
number from the P&ID marked thereon.
• Draw valve hand wheels to scale with stem fully
extended.
If it is lever operated, then the movement of handle
position should be marked.
• If a valve is chain operated, note the distance of the chain
from the operating floor.
• Show location of each instrument connection with
encircled instrument number taken from P&ID.
• Similar arrangement shall be shown as typical detail or
covered in a separate company standard as Instrument
Hook-up drawings.
• Draw plan view of each floor of the plant and these views
should indicate how the layout will look like between
floors as seen from top.
• Each line should be identified by line number and should
also show the insulation, tracing requirements, etc.
• Lines, if required, shall be broken to show the required
details of hidden lines without drawing other views.
• Do not draw details that can be covered by a note.
• Draw plan to a larger scale for any part needing more
details and identify it as “Detail ‘A’”, etc.
• Draw part isometrics sketches or part elevations to clarify
complex piping or piping hidden in the plan view.
•Full sections through the plant may be avoided if
isometric drawings are drawn for the lines. Part sections
where required shall be shown to clear the hidden details in
plan.
• Sections in the plan views are identified by numbers say
1-1, 2-2, etc. and details by alphabets, e.g. “Detail ‘A’”.
FIG.2: TYPICAL GENERAL ARRANGEMENT OF PIPING
FIG.3: TYPICAL PIPING ISOMETRIC DRAWING
• Isometric drawing should also include the following
information:
• Dimensions and angles.
• Reference number of P & IDs, GA Drawings, line
numbers, direction of flow, insulation and tracing.
• Equipment location and equipment identification.
• Give nozzle identification on the connected equipment.
• Give the details of flange on the equipment if the
specification is different from the connecting piping.
• Size and type of every valve/ Direction of operation.
• Size and number of control valve.
• Location, orientation and number of each equipment.
• Plant North - The direction should be so selected as to
facilitate easy checking of GA with Iso
• Field weld - preferred in all directions to take care of site
variations. Can also be covered with a general note.
• Location of high point vents and low point drains.
Covered with a standard arrangement note.
• Bill of Material.
• Requirements of stress relieving, seal welding, pickling,
coating, etc.
SPOOLS
A spool is an assembly of fittings, flanges and pipes that
may be prefabricated. It does not include bolts, gaskets,
valves or instruments. A spool sheet is an orthographic
drawing of a spool drawn either from piping GA or from
an iso sheet. Each spool sheet shows only one type of
spool and,
•Instructs welder to fabricate the spool
•Lists the cut lengths of pipe, fittings and flanges etc.
needed to make the spool
•Gives material of construction and any special treatment
of finished piping
•Indicates how many spools of the same type are required
DIMENSIONING OF DRAWINGS
• Sufficient dimensions to be given for positioning
equipment and for erecting piping.
• Duplicating dimensions in different views should be
avoided, as this may lead to errors if changes are made.
• Reserve horizontal dimensions for the plan view.
• If single pipe is to be positioned or a pipe connected to
nozzle is to be indicated, then show the centre line
elevation and mark as C .
• If several pipes are sharing a common support, show
elevation of Bottom of Pipes and mark as BOP EL. This
is more applicable to non-insulated lines.
• In case of several pipes on a pipe rack, show the
“Top of Support” elevation and mark as TOS
EL.
• In case of buried pipelines in trench, show
elevation of bottom of pipes.
• In case of drains and sewers, the Invert Elevation
of the inside of the pipe is marked as IE.
• Centre lines of the equipment and pipelines shall be
located with reference to the building column centre lines or
the co-ordinates which can be considered as a reference
base.
• The distance between the lines shall be dimensioned centre
line to centre line.
•The horizontal nozzles on the equipment shall be located
from centre to flange face in plan. For vertical nozzles show
Face of Flange elevation (FOF).
• For valves, instruments and non-standard equipments,
show the dimensions from flange face to flange face.
• Flanged valves are located with dimension to flange faces. Non-
flanged valves are dimensioned to their centres or stems.
• For flanged joints show a small gap between dimension lines to
indicate gasket. Flanged joints can also be shown without
gasket but
cover the same with a general note and include gasket thickness
in the valve or equipment dimensions.
• For Finished Floor (FF) the elevation shall be the high point of
• the floor.
• For foundation the Top of Grout (TOG) elevation is shown.
• Show dimensions outside the drawn view - do not cut
pictures.
• Draw dimension line unbroken with fine line. Write
dimension just above the horizontal line. For vertical lines
write sideways.
• The dimension lines can be terminated with arrow heads or
oblique dashes.
• If series of dimension is to be shown, string them together.
• Show overall dimension of the string of dimensions. Avoid
one of the break-up dimensions to omit repetition and error
during changes.
• Do not omit significant dimension other than fitting make
up.
• For field run piping, give only those dimensions which are
necessary to route piping clear of equipments and other
obstructions. Locate only those items which are important
to
the process.
• Underline out of scale dimensions or mark as NTS.
• Do not terminate dimensions at screwed or welded joints.
CHECKING OF PIPING DRAWINGS
Checking shall be done only on the print or the
check plot of the drawings and by coloured
pencils/pens.
A. Corrected areas and dimensions are marked yellow.
B. Areas and dimensions which are to be deleted are
marked green.
C. Areas to be corrected/incorporated on the drawing
are marked in red.
The new print after correction is “back checked” for
incorporation.
Points to be checked on the piping drawing includes:
Title of the drawing.
• Title of the drawing.
• Orientation - North arrow against plot plan.
• Inclusion of graphic scale (if drawings is to be reduced).
• Co-ordinates of equipments against equipment layout.
• Equipment numbers and their appearance on the piping
drawing.
• Correct identification on all lines in all views.
• Line specification changes.
• Reference drawing numbers and files.
• Correctness of all dimensions.
• Whether representation is correctly made in line with
the standard symbols or not.
• Location and identification of all instruments.
Requirements of upstream/downstream straight lengths.
• Insulation requirements as per P&IDs.
• Piping arrangement against P&ID requirements such as
gravity flow, seals, etc.
• Possible interference
• Floor and wall openings.
• Correctness of scale in case of General Arrangement
Drawings
• Whether all stress analysis requirements are met or not
• Adequacy of clearance from civil structures, electrical
apparatus and instrument consoles.
• Accessibility of operation and maintenance space and
provision of drop out and handling areas.
• Foundation drawings and vendor equipment requirements
• Details and section identification match.
• “Matchline” provision and accuracy.
• Presence of signatures and dates.
• Accuracy of BOM in Isometrics.
• Number of issues and revision.
********

More Related Content

What's hot

Piping interview
Piping interviewPiping interview
Piping interview
Akhilesh Kumar
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculation
sandeepkrish2712
 
Piping Design ppt.pdf
Piping Design ppt.pdfPiping Design ppt.pdf
Piping Design ppt.pdf
SyedMoazzamAliAli1
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
VenkataSivaNagaSai
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Varun Patel
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...
Madhur Mahajan
 
Detail engineering of piping systems
Detail engineering of piping systemsDetail engineering of piping systems
Detail engineering of piping systems
judithmorrison01
 
Introduction To Piping Engineering | Gaurav Singh Rajput
Introduction To Piping Engineering | Gaurav Singh RajputIntroduction To Piping Engineering | Gaurav Singh Rajput
Introduction To Piping Engineering | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
BHARAT BELLAD
 
Piping basics knowledge
Piping basics knowledgePiping basics knowledge
Piping basics knowledge
ARINDAM BANERJEE
 
Piping training-course
Piping training-coursePiping training-course
Piping training-course
pdmsguy
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
MOHAMMAD ATIF ALI
 
Basic piping
Basic pipingBasic piping
Basic piping
Vikas Suryavanshi
 
Piping Introduction
Piping IntroductionPiping Introduction
Piping Introduction
mahmoud abdulnafe
 
Piping and Instrumentation / Process Flow Diagram
Piping and Instrumentation /  Process Flow DiagramPiping and Instrumentation /  Process Flow Diagram
Piping and Instrumentation / Process Flow Diagram
Patel Ghanshyam
 
Pipeline pigging
Pipeline piggingPipeline pigging
Pipeline pigging
Mohammad Javad Ranjbar
 
Pipe rack & rack piping
Pipe rack & rack pipingPipe rack & rack piping
Pipe rack & rack piping
Martin Alvaro Ramirez Lozada
 
Process piping design & engineering per asme b 31.3
Process piping design & engineering per asme b 31.3Process piping design & engineering per asme b 31.3
Process piping design & engineering per asme b 31.3
Rajiv Kumar
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion Diagrams
Tejas Deshpande
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
hesham ismail
 

What's hot (20)

Piping interview
Piping interviewPiping interview
Piping interview
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculation
 
Piping Design ppt.pdf
Piping Design ppt.pdfPiping Design ppt.pdf
Piping Design ppt.pdf
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...
 
Detail engineering of piping systems
Detail engineering of piping systemsDetail engineering of piping systems
Detail engineering of piping systems
 
Introduction To Piping Engineering | Gaurav Singh Rajput
Introduction To Piping Engineering | Gaurav Singh RajputIntroduction To Piping Engineering | Gaurav Singh Rajput
Introduction To Piping Engineering | Gaurav Singh Rajput
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Piping basics knowledge
Piping basics knowledgePiping basics knowledge
Piping basics knowledge
 
Piping training-course
Piping training-coursePiping training-course
Piping training-course
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Basic piping
Basic pipingBasic piping
Basic piping
 
Piping Introduction
Piping IntroductionPiping Introduction
Piping Introduction
 
Piping and Instrumentation / Process Flow Diagram
Piping and Instrumentation /  Process Flow DiagramPiping and Instrumentation /  Process Flow Diagram
Piping and Instrumentation / Process Flow Diagram
 
Pipeline pigging
Pipeline piggingPipeline pigging
Pipeline pigging
 
Pipe rack & rack piping
Pipe rack & rack pipingPipe rack & rack piping
Pipe rack & rack piping
 
Process piping design & engineering per asme b 31.3
Process piping design & engineering per asme b 31.3Process piping design & engineering per asme b 31.3
Process piping design & engineering per asme b 31.3
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion Diagrams
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 

Similar to Piping Drawings Basics.pdf

Engg Drawings-CAD.ppt
Engg Drawings-CAD.pptEngg Drawings-CAD.ppt
Engg Drawings-CAD.ppt
Dr.M BALA THEJA
 
Engineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
Engineering-Drawing-Notes.pptxPart A - 2D Drawing PrinciplesEngineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
Engineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
Dr.M BALA THEJA
 
Aircraft drawingsbasics
Aircraft drawingsbasicsAircraft drawingsbasics
Aircraft drawingsbasics
Agustin Limachi
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
University of Nebraska EWB-USA Chapter
 
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptx
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptxComputer Aided Design for Coordinate Dimensioning and Tolerances.pptx
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptx
luxdam12
 
Piping Introduction.pptx
Piping Introduction.pptxPiping Introduction.pptx
Piping Introduction.pptx
SairajJakal2
 
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
khattakgreat95
 
CE Lec Slides, Setting out.pdf
CE Lec Slides, Setting out.pdfCE Lec Slides, Setting out.pdf
CE Lec Slides, Setting out.pdf
JunaidMughal34
 
ENGINEERING GRAPHICS BRIDGE COURSE.pptx
ENGINEERING GRAPHICS BRIDGE COURSE.pptxENGINEERING GRAPHICS BRIDGE COURSE.pptx
ENGINEERING GRAPHICS BRIDGE COURSE.pptx
DHAVASHANKARAN D
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
SAGAR KUMAR
 
WL 141 Unit 03
WL 141 Unit 03WL 141 Unit 03
WL 141 Unit 03
BealCollegeOnline
 
Fittings-Training PPT.pdf
Fittings-Training PPT.pdfFittings-Training PPT.pdf
Fittings-Training PPT.pdf
GowrisanthoshPalika1
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
Ankammarao Yanam
 
Unit 5
Unit 5Unit 5
SURVEY.pdf
SURVEY.pdfSURVEY.pdf
SURVEY.pdf
AbenezerGetachew11
 
Process flow sheet diagram
Process flow sheet diagramProcess flow sheet diagram
Process flow sheet diagram
Bahauddin Zakariya University lahore
 
How to read engineering drawings
How to read engineering drawingsHow to read engineering drawings
How to read engineering drawings
Akash Pandey
 
4. piping piping . piping . piping .ppt
4. piping  piping . piping . piping .ppt4. piping  piping . piping . piping .ppt
4. piping piping . piping . piping .ppt
HussamElddinKhasawne
 
Week Four.pdf geomagnetic.1presentation.
Week Four.pdf geomagnetic.1presentation.Week Four.pdf geomagnetic.1presentation.
Week Four.pdf geomagnetic.1presentation.
jiranjami46
 
BASIC ENGINEERING DRAWING.ppt
BASIC ENGINEERING DRAWING.pptBASIC ENGINEERING DRAWING.ppt
BASIC ENGINEERING DRAWING.ppt
JMAK2
 

Similar to Piping Drawings Basics.pdf (20)

Engg Drawings-CAD.ppt
Engg Drawings-CAD.pptEngg Drawings-CAD.ppt
Engg Drawings-CAD.ppt
 
Engineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
Engineering-Drawing-Notes.pptxPart A - 2D Drawing PrinciplesEngineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
Engineering-Drawing-Notes.pptxPart A - 2D Drawing Principles
 
Aircraft drawingsbasics
Aircraft drawingsbasicsAircraft drawingsbasics
Aircraft drawingsbasics
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
 
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptx
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptxComputer Aided Design for Coordinate Dimensioning and Tolerances.pptx
Computer Aided Design for Coordinate Dimensioning and Tolerances.pptx
 
Piping Introduction.pptx
Piping Introduction.pptxPiping Introduction.pptx
Piping Introduction.pptx
 
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
Engineering Drawning & Graphics-Introduction-lettering and dimension-Lecture ...
 
CE Lec Slides, Setting out.pdf
CE Lec Slides, Setting out.pdfCE Lec Slides, Setting out.pdf
CE Lec Slides, Setting out.pdf
 
ENGINEERING GRAPHICS BRIDGE COURSE.pptx
ENGINEERING GRAPHICS BRIDGE COURSE.pptxENGINEERING GRAPHICS BRIDGE COURSE.pptx
ENGINEERING GRAPHICS BRIDGE COURSE.pptx
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
 
WL 141 Unit 03
WL 141 Unit 03WL 141 Unit 03
WL 141 Unit 03
 
Fittings-Training PPT.pdf
Fittings-Training PPT.pdfFittings-Training PPT.pdf
Fittings-Training PPT.pdf
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
 
Unit 5
Unit 5Unit 5
Unit 5
 
SURVEY.pdf
SURVEY.pdfSURVEY.pdf
SURVEY.pdf
 
Process flow sheet diagram
Process flow sheet diagramProcess flow sheet diagram
Process flow sheet diagram
 
How to read engineering drawings
How to read engineering drawingsHow to read engineering drawings
How to read engineering drawings
 
4. piping piping . piping . piping .ppt
4. piping  piping . piping . piping .ppt4. piping  piping . piping . piping .ppt
4. piping piping . piping . piping .ppt
 
Week Four.pdf geomagnetic.1presentation.
Week Four.pdf geomagnetic.1presentation.Week Four.pdf geomagnetic.1presentation.
Week Four.pdf geomagnetic.1presentation.
 
BASIC ENGINEERING DRAWING.ppt
BASIC ENGINEERING DRAWING.pptBASIC ENGINEERING DRAWING.ppt
BASIC ENGINEERING DRAWING.ppt
 

Recently uploaded

Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 

Recently uploaded (20)

Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 

Piping Drawings Basics.pdf

  • 2. There are two types of views used in the piping drawings: a) Orthographic- Plans and Elevations b) Pictorial - Isometric Views Piping layout is developed in both plan view and elevation view and section details are added for clarity wherever necessary. These drawings are called the General Arrangement of Piping. In complex piping system, especially within the unit/plant building where orthographic views do not illustrate the details of design, pictorial view in isometric presentation is drawn for clarity.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. The Indian Standard IS10711 standardises the drawing sheets as below: SIZE OVERALL DIMENSIONS in mm A0 - 841 x 1189 A1 - 594 x 841 A2 - 420 x 594 A3 - 297 x 420 A4 - 210 x 297
  • 9. HOW TO START THE PIPING GA? •Obtain the drawings numbers and fill in the title block, with the drawing number and title at the bottom right hand corner of the sheet. •Place the north arrow at the top left/right hand corner of the sheet to indicate plant north. •Do not plan drawing in the area above the title block of drawing, as this is allotted for general notes, number and title of reference drawings, brief description of changes during revision and the bill of materials wherever applicable. •Process equipment and piping have priority on the Piping GA. •The piping drawings are started after fixing positions of the equipments. •Equipment layout is reproduced on the Piping GA to its scale and drawn on the reverse side in case of manual drafting. •
  • 10. •In case of CAD separate layer is used. The major primary beams and secondary beams are also shown if area covered is indoor. •Pertinent background details which govern piping routing, such as floor drains, HVAC ducting, electrical and instrument cable trays, etc. are also drawn in faint on the reverse. •Utility stations are also established so that most convenient utility header routing can be carried out.
  • 11.
  • 12. Order of importance/preference of pipe lines in a piping GA 1. Alloy steel/special material of construction. 2. Large bore piping 3. High temp/high pr. Piping 4. Lined piping 5. C. S. Process Piping 6. Utility piping
  • 13. DEVELOPMENT OF PIPING GENERAL ARRANGEMENT DRAWING • The piping drawings should be developed in such a way that all the process requirements are met with. • It is not always possible for the piping drawing to follow exactly the logical arrangement of the P & IDs. Sometimes lines must be routed with different junction sequence and line numbers and subsequently the list may be changed. •Performance and economics have to be considered in parallel while deciding the routing. • Piping is represented by single lines up to a size of 150NB and double lines for sizes 200NB and above. This is to save the time of drafting and to avoid confusion. • In single line representation only the center line of the pipeline is drawn using solid line and in double line representation the actual size to scale is drawn with center
  • 14. • Line numbers are shown against each line exactly in the same way as represented in the P&I diagrams. • The change in specification should be shown in line with P&I diagram. This change is usually indicated immediately to the downstream of the valve, flange or equipment. • Valves should be drawn to scale with identification number from the P&ID marked thereon. • Draw valve hand wheels to scale with stem fully extended. If it is lever operated, then the movement of handle position should be marked. • If a valve is chain operated, note the distance of the chain from the operating floor. • Show location of each instrument connection with encircled instrument number taken from P&ID. • Similar arrangement shall be shown as typical detail or covered in a separate company standard as Instrument Hook-up drawings.
  • 15. • Draw plan view of each floor of the plant and these views should indicate how the layout will look like between floors as seen from top. • Each line should be identified by line number and should also show the insulation, tracing requirements, etc. • Lines, if required, shall be broken to show the required details of hidden lines without drawing other views. • Do not draw details that can be covered by a note. • Draw plan to a larger scale for any part needing more details and identify it as “Detail ‘A’”, etc. • Draw part isometrics sketches or part elevations to clarify complex piping or piping hidden in the plan view. •Full sections through the plant may be avoided if isometric drawings are drawn for the lines. Part sections where required shall be shown to clear the hidden details in plan. • Sections in the plan views are identified by numbers say 1-1, 2-2, etc. and details by alphabets, e.g. “Detail ‘A’”.
  • 16. FIG.2: TYPICAL GENERAL ARRANGEMENT OF PIPING
  • 17. FIG.3: TYPICAL PIPING ISOMETRIC DRAWING
  • 18. • Isometric drawing should also include the following information: • Dimensions and angles. • Reference number of P & IDs, GA Drawings, line numbers, direction of flow, insulation and tracing. • Equipment location and equipment identification. • Give nozzle identification on the connected equipment. • Give the details of flange on the equipment if the specification is different from the connecting piping. • Size and type of every valve/ Direction of operation. • Size and number of control valve. • Location, orientation and number of each equipment. • Plant North - The direction should be so selected as to facilitate easy checking of GA with Iso
  • 19. • Field weld - preferred in all directions to take care of site variations. Can also be covered with a general note. • Location of high point vents and low point drains. Covered with a standard arrangement note. • Bill of Material. • Requirements of stress relieving, seal welding, pickling, coating, etc.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. SPOOLS A spool is an assembly of fittings, flanges and pipes that may be prefabricated. It does not include bolts, gaskets, valves or instruments. A spool sheet is an orthographic drawing of a spool drawn either from piping GA or from an iso sheet. Each spool sheet shows only one type of spool and, •Instructs welder to fabricate the spool •Lists the cut lengths of pipe, fittings and flanges etc. needed to make the spool •Gives material of construction and any special treatment of finished piping •Indicates how many spools of the same type are required
  • 25. DIMENSIONING OF DRAWINGS • Sufficient dimensions to be given for positioning equipment and for erecting piping. • Duplicating dimensions in different views should be avoided, as this may lead to errors if changes are made. • Reserve horizontal dimensions for the plan view. • If single pipe is to be positioned or a pipe connected to nozzle is to be indicated, then show the centre line elevation and mark as C . • If several pipes are sharing a common support, show elevation of Bottom of Pipes and mark as BOP EL. This is more applicable to non-insulated lines.
  • 26. • In case of several pipes on a pipe rack, show the “Top of Support” elevation and mark as TOS EL. • In case of buried pipelines in trench, show elevation of bottom of pipes. • In case of drains and sewers, the Invert Elevation of the inside of the pipe is marked as IE.
  • 27.
  • 28.
  • 29. • Centre lines of the equipment and pipelines shall be located with reference to the building column centre lines or the co-ordinates which can be considered as a reference base. • The distance between the lines shall be dimensioned centre line to centre line. •The horizontal nozzles on the equipment shall be located from centre to flange face in plan. For vertical nozzles show Face of Flange elevation (FOF). • For valves, instruments and non-standard equipments, show the dimensions from flange face to flange face.
  • 30. • Flanged valves are located with dimension to flange faces. Non- flanged valves are dimensioned to their centres or stems. • For flanged joints show a small gap between dimension lines to indicate gasket. Flanged joints can also be shown without gasket but cover the same with a general note and include gasket thickness in the valve or equipment dimensions. • For Finished Floor (FF) the elevation shall be the high point of • the floor.
  • 31.
  • 32. • For foundation the Top of Grout (TOG) elevation is shown. • Show dimensions outside the drawn view - do not cut pictures. • Draw dimension line unbroken with fine line. Write dimension just above the horizontal line. For vertical lines write sideways. • The dimension lines can be terminated with arrow heads or oblique dashes. • If series of dimension is to be shown, string them together. • Show overall dimension of the string of dimensions. Avoid one of the break-up dimensions to omit repetition and error during changes. • Do not omit significant dimension other than fitting make up.
  • 33. • For field run piping, give only those dimensions which are necessary to route piping clear of equipments and other obstructions. Locate only those items which are important to the process. • Underline out of scale dimensions or mark as NTS. • Do not terminate dimensions at screwed or welded joints.
  • 34.
  • 35. CHECKING OF PIPING DRAWINGS Checking shall be done only on the print or the check plot of the drawings and by coloured pencils/pens. A. Corrected areas and dimensions are marked yellow. B. Areas and dimensions which are to be deleted are marked green. C. Areas to be corrected/incorporated on the drawing are marked in red. The new print after correction is “back checked” for incorporation. Points to be checked on the piping drawing includes: Title of the drawing.
  • 36. • Title of the drawing. • Orientation - North arrow against plot plan. • Inclusion of graphic scale (if drawings is to be reduced). • Co-ordinates of equipments against equipment layout. • Equipment numbers and their appearance on the piping drawing. • Correct identification on all lines in all views. • Line specification changes. • Reference drawing numbers and files. • Correctness of all dimensions. • Whether representation is correctly made in line with the standard symbols or not. • Location and identification of all instruments. Requirements of upstream/downstream straight lengths. • Insulation requirements as per P&IDs. • Piping arrangement against P&ID requirements such as gravity flow, seals, etc. • Possible interference • Floor and wall openings.
  • 37. • Correctness of scale in case of General Arrangement Drawings • Whether all stress analysis requirements are met or not • Adequacy of clearance from civil structures, electrical apparatus and instrument consoles. • Accessibility of operation and maintenance space and provision of drop out and handling areas. • Foundation drawings and vendor equipment requirements • Details and section identification match. • “Matchline” provision and accuracy. • Presence of signatures and dates. • Accuracy of BOM in Isometrics. • Number of issues and revision. ********