HOUSING DEPARTMENT PROVINCIAL HOUSING AUTHORITY
PROVINCIAL HOUSING AUTHORITY
ESTABLISHMENT OF PHA
 The Provincial Government established HOUSING DEPARTMENT, KHYBER
PAKHTUNKHWA in 2004. Later on PROVINCIAL HOUSING AUTHORITY (PHA) was
created through an Act called KHYBER PAKHTUNKHWA HOUSING AUTHORITY
Act, 2005, as an executing arm of the department.
FUNCTIONS OF PHA
 Facilitate provision of housing inputs, including land, finance, building materials through
institutional and legal frame work and develop indigenous and effective approaches.
 Implement parameters of the 4 national housing policy, coordinate and liaise with the
federal government and concerned departments and Government Agencies.
 Identify state and other lands for developing low income and low cost housing schemes.
 Facilitate Public and private partnership or ventures in housing and development of
recreational activities.
 Promote environment for friendly and standardized construction activities.
 Prepare guidelines, long term and short term plans for implementing the low cost housing
schemes the low cost housing schemes and programs in Khyberpakhtunkhwa.
 Facilitate land availability through various innovative measures develop a
comprehensive Land information system to cater for the planning and
development requirements for a period of five to ten Years.
 Suggest measures to check growth of slums and Katchi abady, formulate
resettlement and relocation plans.
 Propose suitable amendments in land acquisition laws to make provisions for
unified transparent and market oriented system of land acquisition.
 Formulate provincial land use policy, plan and prepare regional development
plans ( inter District spatial Planning Master Plans) for an integrated, coordinated
and systematic planning to ensure orderly growth and development of physical
infrastructure such as highways, railways, industrial zones conservation of forest
reserves and provision of electricity, telephone, sui gas, etc.
 Plan a comprehensive programme for the development of satellite, intermediate,
secondary and industrial towns to reduce migration and drift to big settlements.
 Develop Geographic information System for efficient land documentation and
information related to housing and town planning.
 Propose suitable amendments in land acquisition laws to make provisions for
unified transparent and market oriented system of land acquisition.
 Coordinate with Federal Government and, etc. for implementing the
development plans and programs pertaining to housing and town planning.
 Assist Government Agency to plan/execute Government servants housing scheme
etc in the areas of low cost housing.
 Perform such other functions as may be assigned to the Authority from time to time
by government.
OBJECTIVE of PHA
 To establish a comprehensive system of town planning at different levels in the province
to ensure systematic growth of urban and rural areas and to achieve the objective of
“housing for all “including housing for shelter less government servants.
TOP MANAGEMENT HIERARCHY PHA
MR. SALEEM KHAN
DIRECTOR GENERAL
PROVINCIAL HOUSING AUTHORITY
MR. ALAM ZEB KHAN
DIRECTOR HEAD QUARTER
PROVINCIAL HOUSING AUTHORITY
MR. PIR SALAH UD DIN KHAN
DIRECTOR TOWN PLANNING
PROVINCIAL HOUSING AUTHORITY
MR. IMRAN WAZIR
DIRECTOR FINANCE
PROVINCIAL HOUSING
AUTHORITY
ORGANIZATION STRUCTURE
LIST OF PROJECTS / ADP SCHEMES
Flats at Nasapa Payan Charsadda Road:
Construction of Flats at Civil Quarter Kohat Road:
High Rise Flats at Phase-V Hyatabad:
The Jalozai Housing Scheme:
Housing Scheme at Mullazai District Peshwar:
Model Town at Hangu:
Housing Scheme at Jerma District Kohat:
Housing Scheme at Havelian District Abbotabad:
Development of Sport City/ Model Town Peshawar.
Development of Mega City along M-1 Nowshera.
Mega City Kagh Lasht Buni District Chitral.
Mega City at Damtoor District Abbotabad.
Express Way to Model Town Peshawar.
 Construction of Boundary Pillars at Land Bank Surizai
Bala Peshawar.
 Institutional Strengthening of Housing Department:
Project Type: Construction of Flats
Project Cost: 258.551 million
Financed by: ADP
Status: 94 % Work Done
Date of Completion: June 2015
Location: Peshawar, Charsadda Rd
Out of 216 Flats 210 Flats of various categories
have been completed whereas the
Construction of 06 Nos flats in Block “J” is in
progress. The project is due for completion by
30th June, 2015.
FLATS AT NASAPA PAYAN CHARSADDA ROAD
GOOGLE MAP NASAPA PAYAN
Project Cost: 1087.63 million
Financed by: ADP
Status: 50 % Work Completed, 54 Nos Flats
are in progress under phase I of the Project.
Date of Completion: Jan 2016
Location: Kohat Road, Peshawar
Scope of Project: Feasibility Study, Planning &
Construction of flats on 303 kanal at Civil Quarters
Kohat road Peshawar. Due to security concern the
scope of work is reduced by 50% and as such 54 units
were due for completion by end of 30th June, 2015.
Construction of Phase-II will be taken up with the
Establishment Department very soon.
FLATS AT Civil Quarters
GOOGLE MAP Flats at Civil Quarter Kohat
Project Type: Construction of Flats
Project Cost: 111.126 million
Financed by: ADP
Status: Work in progress
Date of Completion: Jan 2017
Location: Hayatabad phase V, Peshawar
Detailed Planning & Designing of 140 Nos High Rise Flats
at Phase-V Hayatabad for retired Government Servants
have been completed & Revised PC-I based on MRS
2013 approved by PDWP in its meeting held on 11-11-
2013 at cost of Rs.1115.126 million. The project will be
executed on Turn Key basis.
HIGH RISE FLATS AT PHASE-V HAYATABAD
GOOGLE MAP HIGH RISE FLATS
Project Type: Housing Scheme
Project Cost: 11494.44 million
Financed by: self Financed
Status: 30 % Work Done
Date of Completion: Sept 2015
Location: Jalozai, Nowshera
The Jalozai Housing Scheme over an area of 8905
Kanal at Cherat Road District Nowshera has been
launched. The developmental works inaugurated by
Chief Minister Khyber Pakhtunkhwa on 10/04/2014.
Developmental Works on primary and secondary road
is in progress.
JALOZAI HOUSING SCHEME
GOOGLE MAP JALOZAI HOUSING SCHEME
Project Type: Housing Scheme
Project Cost: 173.215 million
Financed by: ADP
Status: 50 % Work Done
Date of Completion: June 2015
Location: Mulazai, Peshawar
Launching of Housing Scheme for Govt
Servants & General Public at Mulzai District
Peshawar over an area 190 Kanal. Basic
infrastructure almost 97% completed. Only
External Electrification is in process.
HOUSING SCHEME AT MULAZAI PESHAWAR
GOOGLE MAP MULAZAI PESHAWAR
Project Type: Housing Scheme
Project Cost: 263.515 million
Financed by: ADP
Status: 28 % Work Done
Date of Completion: HighCourt Stay Imposed
Location: Kohat
Launching of Housing Scheme for Govt
Servant & General Public at Jerma District
Kohat over an area of 300 Kanal land. The
developmental work is in progress.
JERMA HOUSING SCHEME KOHAT
GOOGLE MAP JERMA HOUSING SCHEME
Project Type: Housing Scheme
Project Cost: 145.948 million
Financed by: self Financed
Status: 50 % Work Done
Date of Completion: Dec 2015
Location: Havelian, Abbotabad
Launching of Housing Scheme for Govt
Servant & General Public at Jerma District
Kohat over an area of 300 Kanal land. The
developmental work is in progress.
HAVELIAN HOUSING SCHEME ABBOTABAD
GOOGLE MAP HAVELIAN HOUSING SCHEME
Project Type:
Project Cost:
Financed by:
Status:
Date of Completion:
Location:
Feasibility Studies and Detailed Planning &
Designing of Model Town Peshawar (Urmar)
over an area of 117000 Kanal is in progress. The
scheme is proposed to be executed on Public
Private Partnership basis with the land owners.
SPORTS CITY / MODEL TOWN Peshawar
GOOGLE MAP SPORTS CITY / MODEL TOWN
Project Type: N/A
Project Cost: N/A
Financed by: N/A
Status: Master Plan is Approved
Date of Completion: N/A
Location : Along M-I Nowshera
Feasibility Studies and Detailed Planning &
Designing Mega City along M-1 at Karnal Sher
Interchange over an area of 80,000 Kanal is in
progress. The scheme is proposed to be
executed on Public Private Partnership basis with
the land owners.
MEGA CITY ALONG M-I Nowshera
GOOGLE MAP MEGA CITY ALONG M-I Nowshera
MEGA CITY ALONG M-I Nowshera
Master Plan & Its location
MEGA CITY ALONG M-I Nowshera
MEGA CITY ALONG M-I Nowshera
North East View
MEGA CITY ALONG M-I Nowshera
C
Project Type: N/A
Project Cost: N/A
Financed by: N/A
Status: Feasibility Study in Progress
Date of Completion: N/A
Location : Kagh Lasht Chitral
Feasibility Studies and Detailed Planning &
Designing over an area of 10000 Kanal state
land is awarded to consultant and is in
progress.
MAGA CITY KAGH LASHT CHITRAL
GOOGLE MAP MAGA CITY KAGH LASHT CHITRAL
Project Type: N/A
Project Cost: N/A
Financed by: N/A
Status: Feasibility Study & Detail Planning is in Progress
Date of Completion: N/A
Location : Dhamtor, District Abbotabad
Feasibility Studies and Detailed Planning &
Designing over an area of 4000 Kanal private
land is awarded to consultant. The project will be
executed on Public Private Partnership basis.
MEGA CITY DHAMTOR ABBOTABAD
GOOGLE MAP MEGA CITY DHAMTOR ABBOTABAD
Project Type: Road Construction
Project Cost: 8.1 million
Financed by: ADP
Status: 0 % Work Done
Date of Completion: Feb 2015
Location: Peshawar
The MEINHARDT Pakistan consultant have
selected for conducting F/S and Designing of
the scheme at Cost of Rs.8.40 million. The
execution of contract agreement is in
process.
EXPRESS WAY TO MODEL TOWN PESHAWAR
GOOGLE MAP EXPRESS WAY TO MODEL TOWN PESHAWAR
Project Type: Studies, Seminars, Trainings & Capacity Building
Project Cost: 50 million
Financed by: ADP
Status: 50 % Work Done
Date of Completion: June 2015
Location: Provincial Housing Authority, Peshawar
Under the project “Institutional Strengthening Housing Department &
Conducting Various Studies/Seminars/ Planning of different Housing
activities in Khyber Pakhtunkhwa, various studies i.e. “Environmental
Sustainability”, “Housing Affordability”, Capacity Building for
Successful Paradigm shift” and “Research and Development” have
been awarded to consultant and in progress. In IT field in house
development is in progress with full zeal. The Official website ,
including several major software’s and MIS systems have been
develop to shift from old manual working environment to the stat of
art computerization in Housing Dept and Provincial housing authority
(PHA) KPK.
INSTITUTIONAL STRENGTHENING OF HOUSING DEPARTMENT
STUDIES
1. Capacity Building For Succesful Paradigm Shift
2. Environmental Sustainability
ISHD : STUDIES
1. Housing Affordability
2. Research And Development
ISHD : SOFTWARE DEVELOPED
1. ETENDER SYSTEM
2. FINANCE SOFTWARES
GOOGLE MAP INSTITUTIONAL STRENGTHENING OF HOSUING DEPARTMENT
Project Type:
Project Cost:
Financed by:
Status:
Date of Completion:
Description :
Feasibility Study and Detailed Planning &
Designing over an area of 10000 Kanal state
land is awarded to consultant and is in
progress.
MODEL TOWN HANGU
GOOGLE MAP MODEL TOWN HANGU
PHA LAND BANKS
Dheri Zardad, Charsadda
 Behram Dheri,Tangi Charsadda
Dangram, Swat
Surizai, Peshawar
Swawe, Buner
 Arkot, Swat
Hangu
Rakhzandani, D.I.Khan
Land Title: In The Name of PHA
Land Possession: With PHA Encumbrance Free
Location: M-I (DheriZardad, Charsadda)
Approach: 9.8 km from Nissatta Interchange
Total Area: 187 Kanal
Price: State land
NO of Plots: 748 no of 3 marlas.
DHERI ZARDAD CHARSADDA
Land Title: In The Name of PHA
Land Possession: With PHA Encumbrance Free
Location: Mandani, Charsadda
Approach: 54 km from Peshawar Interchange
Total Area: 190 Kanal
Price: State land
NO of Plots: 760 no of 3 marlas.
BEHRAM DHERI TANGI CHARSADDA
Land Title: In The Name of PHA
Land Possession: With PHA Encumbrance Free
Location: Mingora, Swat
Approach: Haji Baba Road
Total Area: 500 Kanal
NO of Plots: 2000 no of 3 marlas.
DANGRAM SWAT
Land Title: In The Name of PHA
Location: Swawe, Buner
Approach: 14 km from Salim khan rd, main
mardan swabi
Total Area: 300 Kanal
NO of Plots: 1200 no of 3 marlas.
SWAWE BUNER
Land Title: In The Name of PHA
Land Possession: With PHA Encumbrance Free
Location: Surizai Bala, Kohat Road
Approach: 27 km from Ring road Bridge
Total Area: 500 Kanal
Price: Already purchased by PHA
NO of Plots: 2000 no of 3 marlas.
SURIZAI PESHAWAR
Land Title: In The Name of PHA
Location: Mazrina Sumari
Approach: 2 km from main Hungu Kohat Rd.
Total Area: Initially 500 Kanal Appox
Price: Nill
NO of Plots: 2000 no of 3 marlas.
HANGU LAND BANK
Land Title: In The Name of PHA
Location: 4-5 km from Matta Bridge
Approach: 9.8 km from Nissatta Interchange
Total Area: 60 Kanal
NO of Plots: 240 no of 3 marlas.
ARKOT SWAT
Made by: Muhammad Kashif Ali (IT EXPERT-HOUSING DEPT / PHA)

PHA presentation

  • 1.
  • 2.
  • 3.
    ESTABLISHMENT OF PHA The Provincial Government established HOUSING DEPARTMENT, KHYBER PAKHTUNKHWA in 2004. Later on PROVINCIAL HOUSING AUTHORITY (PHA) was created through an Act called KHYBER PAKHTUNKHWA HOUSING AUTHORITY Act, 2005, as an executing arm of the department.
  • 4.
    FUNCTIONS OF PHA Facilitate provision of housing inputs, including land, finance, building materials through institutional and legal frame work and develop indigenous and effective approaches.  Implement parameters of the 4 national housing policy, coordinate and liaise with the federal government and concerned departments and Government Agencies.  Identify state and other lands for developing low income and low cost housing schemes.  Facilitate Public and private partnership or ventures in housing and development of recreational activities.  Promote environment for friendly and standardized construction activities.  Prepare guidelines, long term and short term plans for implementing the low cost housing schemes the low cost housing schemes and programs in Khyberpakhtunkhwa.
  • 5.
     Facilitate landavailability through various innovative measures develop a comprehensive Land information system to cater for the planning and development requirements for a period of five to ten Years.  Suggest measures to check growth of slums and Katchi abady, formulate resettlement and relocation plans.  Propose suitable amendments in land acquisition laws to make provisions for unified transparent and market oriented system of land acquisition.  Formulate provincial land use policy, plan and prepare regional development plans ( inter District spatial Planning Master Plans) for an integrated, coordinated and systematic planning to ensure orderly growth and development of physical infrastructure such as highways, railways, industrial zones conservation of forest reserves and provision of electricity, telephone, sui gas, etc.  Plan a comprehensive programme for the development of satellite, intermediate, secondary and industrial towns to reduce migration and drift to big settlements.
  • 6.
     Develop Geographicinformation System for efficient land documentation and information related to housing and town planning.  Propose suitable amendments in land acquisition laws to make provisions for unified transparent and market oriented system of land acquisition.  Coordinate with Federal Government and, etc. for implementing the development plans and programs pertaining to housing and town planning.  Assist Government Agency to plan/execute Government servants housing scheme etc in the areas of low cost housing.  Perform such other functions as may be assigned to the Authority from time to time by government.
  • 7.
    OBJECTIVE of PHA To establish a comprehensive system of town planning at different levels in the province to ensure systematic growth of urban and rural areas and to achieve the objective of “housing for all “including housing for shelter less government servants.
  • 8.
    TOP MANAGEMENT HIERARCHYPHA MR. SALEEM KHAN DIRECTOR GENERAL PROVINCIAL HOUSING AUTHORITY MR. ALAM ZEB KHAN DIRECTOR HEAD QUARTER PROVINCIAL HOUSING AUTHORITY MR. PIR SALAH UD DIN KHAN DIRECTOR TOWN PLANNING PROVINCIAL HOUSING AUTHORITY MR. IMRAN WAZIR DIRECTOR FINANCE PROVINCIAL HOUSING AUTHORITY
  • 9.
  • 10.
    LIST OF PROJECTS/ ADP SCHEMES Flats at Nasapa Payan Charsadda Road: Construction of Flats at Civil Quarter Kohat Road: High Rise Flats at Phase-V Hyatabad: The Jalozai Housing Scheme: Housing Scheme at Mullazai District Peshwar: Model Town at Hangu: Housing Scheme at Jerma District Kohat: Housing Scheme at Havelian District Abbotabad: Development of Sport City/ Model Town Peshawar. Development of Mega City along M-1 Nowshera. Mega City Kagh Lasht Buni District Chitral. Mega City at Damtoor District Abbotabad. Express Way to Model Town Peshawar.  Construction of Boundary Pillars at Land Bank Surizai Bala Peshawar.  Institutional Strengthening of Housing Department:
  • 11.
    Project Type: Constructionof Flats Project Cost: 258.551 million Financed by: ADP Status: 94 % Work Done Date of Completion: June 2015 Location: Peshawar, Charsadda Rd Out of 216 Flats 210 Flats of various categories have been completed whereas the Construction of 06 Nos flats in Block “J” is in progress. The project is due for completion by 30th June, 2015. FLATS AT NASAPA PAYAN CHARSADDA ROAD
  • 12.
  • 13.
    Project Cost: 1087.63million Financed by: ADP Status: 50 % Work Completed, 54 Nos Flats are in progress under phase I of the Project. Date of Completion: Jan 2016 Location: Kohat Road, Peshawar Scope of Project: Feasibility Study, Planning & Construction of flats on 303 kanal at Civil Quarters Kohat road Peshawar. Due to security concern the scope of work is reduced by 50% and as such 54 units were due for completion by end of 30th June, 2015. Construction of Phase-II will be taken up with the Establishment Department very soon. FLATS AT Civil Quarters
  • 14.
    GOOGLE MAP Flatsat Civil Quarter Kohat
  • 15.
    Project Type: Constructionof Flats Project Cost: 111.126 million Financed by: ADP Status: Work in progress Date of Completion: Jan 2017 Location: Hayatabad phase V, Peshawar Detailed Planning & Designing of 140 Nos High Rise Flats at Phase-V Hayatabad for retired Government Servants have been completed & Revised PC-I based on MRS 2013 approved by PDWP in its meeting held on 11-11- 2013 at cost of Rs.1115.126 million. The project will be executed on Turn Key basis. HIGH RISE FLATS AT PHASE-V HAYATABAD
  • 16.
    GOOGLE MAP HIGHRISE FLATS
  • 17.
    Project Type: HousingScheme Project Cost: 11494.44 million Financed by: self Financed Status: 30 % Work Done Date of Completion: Sept 2015 Location: Jalozai, Nowshera The Jalozai Housing Scheme over an area of 8905 Kanal at Cherat Road District Nowshera has been launched. The developmental works inaugurated by Chief Minister Khyber Pakhtunkhwa on 10/04/2014. Developmental Works on primary and secondary road is in progress. JALOZAI HOUSING SCHEME
  • 18.
    GOOGLE MAP JALOZAIHOUSING SCHEME
  • 19.
    Project Type: HousingScheme Project Cost: 173.215 million Financed by: ADP Status: 50 % Work Done Date of Completion: June 2015 Location: Mulazai, Peshawar Launching of Housing Scheme for Govt Servants & General Public at Mulzai District Peshawar over an area 190 Kanal. Basic infrastructure almost 97% completed. Only External Electrification is in process. HOUSING SCHEME AT MULAZAI PESHAWAR
  • 20.
  • 21.
    Project Type: HousingScheme Project Cost: 263.515 million Financed by: ADP Status: 28 % Work Done Date of Completion: HighCourt Stay Imposed Location: Kohat Launching of Housing Scheme for Govt Servant & General Public at Jerma District Kohat over an area of 300 Kanal land. The developmental work is in progress. JERMA HOUSING SCHEME KOHAT
  • 22.
    GOOGLE MAP JERMAHOUSING SCHEME
  • 23.
    Project Type: HousingScheme Project Cost: 145.948 million Financed by: self Financed Status: 50 % Work Done Date of Completion: Dec 2015 Location: Havelian, Abbotabad Launching of Housing Scheme for Govt Servant & General Public at Jerma District Kohat over an area of 300 Kanal land. The developmental work is in progress. HAVELIAN HOUSING SCHEME ABBOTABAD
  • 24.
    GOOGLE MAP HAVELIANHOUSING SCHEME
  • 25.
    Project Type: Project Cost: Financedby: Status: Date of Completion: Location: Feasibility Studies and Detailed Planning & Designing of Model Town Peshawar (Urmar) over an area of 117000 Kanal is in progress. The scheme is proposed to be executed on Public Private Partnership basis with the land owners. SPORTS CITY / MODEL TOWN Peshawar
  • 26.
    GOOGLE MAP SPORTSCITY / MODEL TOWN
  • 27.
    Project Type: N/A ProjectCost: N/A Financed by: N/A Status: Master Plan is Approved Date of Completion: N/A Location : Along M-I Nowshera Feasibility Studies and Detailed Planning & Designing Mega City along M-1 at Karnal Sher Interchange over an area of 80,000 Kanal is in progress. The scheme is proposed to be executed on Public Private Partnership basis with the land owners. MEGA CITY ALONG M-I Nowshera
  • 28.
    GOOGLE MAP MEGACITY ALONG M-I Nowshera
  • 29.
    MEGA CITY ALONGM-I Nowshera Master Plan & Its location
  • 30.
    MEGA CITY ALONGM-I Nowshera
  • 31.
    MEGA CITY ALONGM-I Nowshera North East View
  • 32.
    MEGA CITY ALONGM-I Nowshera C
  • 33.
    Project Type: N/A ProjectCost: N/A Financed by: N/A Status: Feasibility Study in Progress Date of Completion: N/A Location : Kagh Lasht Chitral Feasibility Studies and Detailed Planning & Designing over an area of 10000 Kanal state land is awarded to consultant and is in progress. MAGA CITY KAGH LASHT CHITRAL
  • 34.
    GOOGLE MAP MAGACITY KAGH LASHT CHITRAL
  • 35.
    Project Type: N/A ProjectCost: N/A Financed by: N/A Status: Feasibility Study & Detail Planning is in Progress Date of Completion: N/A Location : Dhamtor, District Abbotabad Feasibility Studies and Detailed Planning & Designing over an area of 4000 Kanal private land is awarded to consultant. The project will be executed on Public Private Partnership basis. MEGA CITY DHAMTOR ABBOTABAD
  • 36.
    GOOGLE MAP MEGACITY DHAMTOR ABBOTABAD
  • 37.
    Project Type: RoadConstruction Project Cost: 8.1 million Financed by: ADP Status: 0 % Work Done Date of Completion: Feb 2015 Location: Peshawar The MEINHARDT Pakistan consultant have selected for conducting F/S and Designing of the scheme at Cost of Rs.8.40 million. The execution of contract agreement is in process. EXPRESS WAY TO MODEL TOWN PESHAWAR
  • 38.
    GOOGLE MAP EXPRESSWAY TO MODEL TOWN PESHAWAR
  • 39.
    Project Type: Studies,Seminars, Trainings & Capacity Building Project Cost: 50 million Financed by: ADP Status: 50 % Work Done Date of Completion: June 2015 Location: Provincial Housing Authority, Peshawar Under the project “Institutional Strengthening Housing Department & Conducting Various Studies/Seminars/ Planning of different Housing activities in Khyber Pakhtunkhwa, various studies i.e. “Environmental Sustainability”, “Housing Affordability”, Capacity Building for Successful Paradigm shift” and “Research and Development” have been awarded to consultant and in progress. In IT field in house development is in progress with full zeal. The Official website , including several major software’s and MIS systems have been develop to shift from old manual working environment to the stat of art computerization in Housing Dept and Provincial housing authority (PHA) KPK. INSTITUTIONAL STRENGTHENING OF HOUSING DEPARTMENT
  • 40.
    STUDIES 1. Capacity BuildingFor Succesful Paradigm Shift 2. Environmental Sustainability
  • 41.
    ISHD : STUDIES 1.Housing Affordability 2. Research And Development
  • 42.
    ISHD : SOFTWAREDEVELOPED 1. ETENDER SYSTEM 2. FINANCE SOFTWARES
  • 43.
    GOOGLE MAP INSTITUTIONALSTRENGTHENING OF HOSUING DEPARTMENT
  • 44.
    Project Type: Project Cost: Financedby: Status: Date of Completion: Description : Feasibility Study and Detailed Planning & Designing over an area of 10000 Kanal state land is awarded to consultant and is in progress. MODEL TOWN HANGU
  • 45.
    GOOGLE MAP MODELTOWN HANGU
  • 46.
    PHA LAND BANKS DheriZardad, Charsadda  Behram Dheri,Tangi Charsadda Dangram, Swat Surizai, Peshawar Swawe, Buner  Arkot, Swat Hangu Rakhzandani, D.I.Khan
  • 47.
    Land Title: InThe Name of PHA Land Possession: With PHA Encumbrance Free Location: M-I (DheriZardad, Charsadda) Approach: 9.8 km from Nissatta Interchange Total Area: 187 Kanal Price: State land NO of Plots: 748 no of 3 marlas. DHERI ZARDAD CHARSADDA
  • 48.
    Land Title: InThe Name of PHA Land Possession: With PHA Encumbrance Free Location: Mandani, Charsadda Approach: 54 km from Peshawar Interchange Total Area: 190 Kanal Price: State land NO of Plots: 760 no of 3 marlas. BEHRAM DHERI TANGI CHARSADDA
  • 49.
    Land Title: InThe Name of PHA Land Possession: With PHA Encumbrance Free Location: Mingora, Swat Approach: Haji Baba Road Total Area: 500 Kanal NO of Plots: 2000 no of 3 marlas. DANGRAM SWAT
  • 50.
    Land Title: InThe Name of PHA Location: Swawe, Buner Approach: 14 km from Salim khan rd, main mardan swabi Total Area: 300 Kanal NO of Plots: 1200 no of 3 marlas. SWAWE BUNER
  • 51.
    Land Title: InThe Name of PHA Land Possession: With PHA Encumbrance Free Location: Surizai Bala, Kohat Road Approach: 27 km from Ring road Bridge Total Area: 500 Kanal Price: Already purchased by PHA NO of Plots: 2000 no of 3 marlas. SURIZAI PESHAWAR
  • 52.
    Land Title: InThe Name of PHA Location: Mazrina Sumari Approach: 2 km from main Hungu Kohat Rd. Total Area: Initially 500 Kanal Appox Price: Nill NO of Plots: 2000 no of 3 marlas. HANGU LAND BANK
  • 53.
    Land Title: InThe Name of PHA Location: 4-5 km from Matta Bridge Approach: 9.8 km from Nissatta Interchange Total Area: 60 Kanal NO of Plots: 240 no of 3 marlas. ARKOT SWAT
  • 54.
    Made by: MuhammadKashif Ali (IT EXPERT-HOUSING DEPT / PHA)