SlideShare a Scribd company logo
 Current Practice Study
• Project Culture
• Project Standards
 System Requirement Study
 On site and Remote Assistance
 Local SME Representation
 End to End
PETRONAS PROJECT GOVERNANCE REQUIREMENTS
1
Petronas requires a System Integrator dealing with various projects and armed with the
latest technologies that can compliment most of the existing systems out in the market.
ENGAGE
ANALYSE
DESIGN
DEVELOP
DEPLOY
SUPPORT
 Stakeholders
 Identify Enterprise needs
 Suit Clients Requirements
 Customizable
 Simulation &
Pilot Phase
 Gap Analysis
 Flexible
 Best Practice
GOVERNANCE  MONITORING  COMMISSIONING
Client Customization
Network
Architecture
On-Site
Training
2
SUPPORT
& GUIDE
REVIEW &
BENCHMARK
STANDARDIZE
PLAN
IMPLEMENT
PARADIGM SHIFT APPROACH
Level 2:
DATA ANALYSIS
LEVEL 1:
OVERSIGHT & MONITORING
LEVEL 3
REPORTING
LEVEL 4
SCHEDULE & TASK MANAGEMENT
LEVEL 5
ON-SITE JOB COMPLETION
TRADITIONAL
APPROACH
TRANSFORMATIONAL
SHIFT
3
PRODUCT
SUITE
Safety Risk
Management System
(SRMS)
Operability
Development
Management
System (ODMS)
Labour,
Equipment
& Materials
Management
System
(LEMS)
Project
Governance
Management
System
Single access point
and database for all
information ensuring
standardization and
consistency.
MASTER
ASSET & TAG
MANAGER
Manage through
standards and
naming convention,
approval, revocation,
workflows and a
structured MOC
tailored to the
Enterprise Client.
Assign and track the
completion of
preservation tasks
simply by providing
information on the
equipment, tools and
consumables.
ASSET
PRESERVATION
& WARRANTY
Identify steps,
resources, tools and
documents required
to perform any job.
Develop and maintain
job and task libraries
for both asset and
work activities.
STANDARD
JOB & TASK
MODELLING
Manage project
involvement,
purchasing
information and
track scheduling for
Vendors, Suppliers
and Manufacturers.
RESOURCE
MANAGER
MOC oversees the
assigning, tracking,
reporting and approval
of action items required
to implement changes
in highly regulated
industrial environments.
MANAGEMENT
OF CHANGE
(MOC)
5 Product
Suites
The System is a comprehensive enterprise level cloud software suite that
enables an industrial enterprise to report and oversee multi-discipline
tasks being performed in real-time globally.
DOCUMENT
& DRAWING
CORE MODULE
Commissioning &
Completions
Management
System (CCMS)
Core Modules
PROJECT GOVERNANCE SYSTEM REQUIREMENT
LEVEL 1 – DASHBOARDS & BUSINESS REPORTS
 With Project Governance Management System (PGMS), it is simple.
View the right information, from the right groups, at the right time. Binding the
entire suite of applications, comprising of the Completion & Commissioning (CCMS),
Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment &
Material (LEMS) Management Systems. PGMS allows management to roll up Level 5
data for any phase or discipline of a project. Everything that is needed by the
management team to plan, estimate, execute and control project outcomes are
visible via:
 Project Summary Dashboards
 Project Performance Reporting
 Real-time Data Report
 Alerts & Intervention
 Location Alerts
4
Business Unit / Projects Lifecycle Dashboard
Monthly Executive Reports
Analysis Reports
LEVEL 1 – DASHBOARDS DESIGN
5
LEVEL 1 – ALERTS & INTERVENTION
6
User is able to drill down the information of
each project by clicking on the alerts.
Under Control
Warning
Needs intervention
Performance Summaries
Report Publication and Review
Phase Readiness Reviews / EVM Analysis
Project Reviews & Definition Rating
Reports
LEVEL 2 – ARTIFICIAL INTELLIGENCE
 Data analysis
7
 Consolidated reporting  Trending & Forecasting
LEVEL 3 – DATA ENTRY & REPORTING
 Easy data-entry
8
 Customized Reporting  Customized Workflows
and Approvals
WBS Setup
Risks / Issues / Lessons Learned
Collaboration – Contracts / RFIs
Management of Change
Procurement Estimating & Costing
KEY TAKE-AWAYS
The System Integrator will enable Petronas to :
 Gain ownership and control of all project information
 Have stringent management and full auditable governance
process
 Track responsibilities and accountabilities of project’s
stakeholders
 Detailed and reliable data from top to bottom
9
PROJECT GOVERNANCE FRAMEWORK
10

More Related Content

What's hot

Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
petroEDGE
 
Claims Management, Extension of Time (EOT) and Delays Analysis
Claims Management, Extension of Time (EOT) and Delays AnalysisClaims Management, Extension of Time (EOT) and Delays Analysis
Claims Management, Extension of Time (EOT) and Delays Analysis
Planning Engineer Est.
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Managing Risks and Changes under NEC4
Managing Risks and Changes under NEC4Managing Risks and Changes under NEC4
Managing Risks and Changes under NEC4
Sarah Fox
 
Introduction to oil and gas industry
Introduction to oil and gas industryIntroduction to oil and gas industry
Introduction to oil and gas industry
Umer Bhatti
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field developmentStatoil
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
SHAZEBALIKHAN1
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW TW Carl
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
ribby1
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125ennioeni
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
David H Moloney
 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development plan
Giuseppe Moricca
 
DCMA 14 Point Assessment by Karim Ragab.pdf
DCMA 14 Point Assessment by Karim Ragab.pdfDCMA 14 Point Assessment by Karim Ragab.pdf
DCMA 14 Point Assessment by Karim Ragab.pdf
Karim Ragab
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02Mario Fonseca
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
petroEDGE
 
Petroleum economics
Petroleum economicsPetroleum economics
Petroleum economics
Sadegh Yazdani
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation Slides
SlideTeam
 

What's hot (20)

Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Claims Management, Extension of Time (EOT) and Delays Analysis
Claims Management, Extension of Time (EOT) and Delays AnalysisClaims Management, Extension of Time (EOT) and Delays Analysis
Claims Management, Extension of Time (EOT) and Delays Analysis
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
The estimating process
The estimating processThe estimating process
The estimating process
 
Managing Risks and Changes under NEC4
Managing Risks and Changes under NEC4Managing Risks and Changes under NEC4
Managing Risks and Changes under NEC4
 
Introduction to oil and gas industry
Introduction to oil and gas industryIntroduction to oil and gas industry
Introduction to oil and gas industry
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field development
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development plan
 
DCMA 14 Point Assessment by Karim Ragab.pdf
DCMA 14 Point Assessment by Karim Ragab.pdfDCMA 14 Point Assessment by Karim Ragab.pdf
DCMA 14 Point Assessment by Karim Ragab.pdf
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
 
Petroleum economics
Petroleum economicsPetroleum economics
Petroleum economics
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation Slides
 

Viewers also liked

Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsOil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Abdul Hamzzah
 
Assignment 2
Assignment 2 Assignment 2
Assignment 2
Nur Azura
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
Easwaran Kanason
 
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenagaBab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
AlFakir Fikri AlTakiri
 
Best practices in chemical management webinar
Best practices in chemical management webinarBest practices in chemical management webinar
Best practices in chemical management webinar
SiteHawk
 
Agile Transformation Governance Model
Agile Transformation Governance ModelAgile Transformation Governance Model
Agile Transformation Governance Model
ACM
 
Chemical Safety made easy for SHO
Chemical Safety made easy for SHOChemical Safety made easy for SHO
Chemical Safety made easy for SHOMarini Ghafar
 
Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...
blackwhitecat
 
Working safely with chemicals
Working safely with chemicalsWorking safely with chemicals
Working safely with chemicals
Akshay Wilson
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challenges
Association for Project Management
 
Project governance
Project governanceProject governance
Project governance
Glen Alleman
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
Easwaran Kanason
 
PPM Global survey (with outputs)
PPM Global survey (with outputs)PPM Global survey (with outputs)
PPM Global survey (with outputs)
Association for Project Management
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance ModelConstient
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
Hussain Bandukwala
 
HAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPTHAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPT
MAHAMMED RAFI
 

Viewers also liked (17)

Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsOil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
 
Assignment 2
Assignment 2 Assignment 2
Assignment 2
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenagaBab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
 
Best practices in chemical management webinar
Best practices in chemical management webinarBest practices in chemical management webinar
Best practices in chemical management webinar
 
Agile Transformation Governance Model
Agile Transformation Governance ModelAgile Transformation Governance Model
Agile Transformation Governance Model
 
Chemical Safety made easy for SHO
Chemical Safety made easy for SHOChemical Safety made easy for SHO
Chemical Safety made easy for SHO
 
Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...
 
Working safely with chemicals
Working safely with chemicalsWorking safely with chemicals
Working safely with chemicals
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challenges
 
Project governance
Project governanceProject governance
Project governance
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
PPM Global survey (with outputs)
PPM Global survey (with outputs)PPM Global survey (with outputs)
PPM Global survey (with outputs)
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance Model
 
Project governance
Project governanceProject governance
Project governance
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
HAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPTHAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPT
 

Similar to Petronas Project Governance and Management Systems deal

Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1muneer khan
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nycspendam
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleSoftware Guru
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
Avi Kumar
 
Evolution of Software Engineering in NCTR Projects
Evolution of Software Engineering in NCTR  Projects   Evolution of Software Engineering in NCTR  Projects
Evolution of Software Engineering in NCTR Projects
Mohammed Abbas
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other SoftwareFabienne Salimi
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
Jauhari Ismail
 
Louie Relano
Louie RelanoLouie Relano
Louie Relano
Louie Paul Relano
 
Maria Managment Spectrum
Maria Managment SpectrumMaria Managment Spectrum
Maria Managment Spectrum
Federal Urdu University
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
Sonal Tiwari
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
cbb010
 
Company Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesCompany Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation Slides
SlideTeam
 
I nearshore
I nearshore I nearshore
Lecture 6 & 7.pdf
Lecture 6 & 7.pdfLecture 6 & 7.pdf
Lecture 6 & 7.pdf
RaoShahid10
 

Similar to Petronas Project Governance and Management Systems deal (20)

Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nyc
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application Lifecycle
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
 
Evolution of Software Engineering in NCTR Projects
Evolution of Software Engineering in NCTR  Projects   Evolution of Software Engineering in NCTR  Projects
Evolution of Software Engineering in NCTR Projects
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other Software
 
Software Development Life Cycle Part II
Software Development Life Cycle Part IISoftware Development Life Cycle Part II
Software Development Life Cycle Part II
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Harvinder Singh-Resume
Harvinder Singh-ResumeHarvinder Singh-Resume
Harvinder Singh-Resume
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
 
Louie Relano
Louie RelanoLouie Relano
Louie Relano
 
Maria Managment Spectrum
Maria Managment SpectrumMaria Managment Spectrum
Maria Managment Spectrum
 
CV -UmerAslam
CV -UmerAslamCV -UmerAslam
CV -UmerAslam
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
 
Saurabh Malhotra-CV
Saurabh Malhotra-CVSaurabh Malhotra-CV
Saurabh Malhotra-CV
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
 
Company Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesCompany Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation Slides
 
I nearshore
I nearshore I nearshore
I nearshore
 
Lecture 6 & 7.pdf
Lecture 6 & 7.pdfLecture 6 & 7.pdf
Lecture 6 & 7.pdf
 

Petronas Project Governance and Management Systems deal

  • 1.  Current Practice Study • Project Culture • Project Standards  System Requirement Study  On site and Remote Assistance  Local SME Representation  End to End PETRONAS PROJECT GOVERNANCE REQUIREMENTS 1 Petronas requires a System Integrator dealing with various projects and armed with the latest technologies that can compliment most of the existing systems out in the market. ENGAGE ANALYSE DESIGN DEVELOP DEPLOY SUPPORT  Stakeholders  Identify Enterprise needs  Suit Clients Requirements  Customizable  Simulation & Pilot Phase  Gap Analysis  Flexible  Best Practice GOVERNANCE  MONITORING  COMMISSIONING Client Customization Network Architecture On-Site Training
  • 2. 2 SUPPORT & GUIDE REVIEW & BENCHMARK STANDARDIZE PLAN IMPLEMENT PARADIGM SHIFT APPROACH Level 2: DATA ANALYSIS LEVEL 1: OVERSIGHT & MONITORING LEVEL 3 REPORTING LEVEL 4 SCHEDULE & TASK MANAGEMENT LEVEL 5 ON-SITE JOB COMPLETION TRADITIONAL APPROACH TRANSFORMATIONAL SHIFT
  • 3. 3 PRODUCT SUITE Safety Risk Management System (SRMS) Operability Development Management System (ODMS) Labour, Equipment & Materials Management System (LEMS) Project Governance Management System Single access point and database for all information ensuring standardization and consistency. MASTER ASSET & TAG MANAGER Manage through standards and naming convention, approval, revocation, workflows and a structured MOC tailored to the Enterprise Client. Assign and track the completion of preservation tasks simply by providing information on the equipment, tools and consumables. ASSET PRESERVATION & WARRANTY Identify steps, resources, tools and documents required to perform any job. Develop and maintain job and task libraries for both asset and work activities. STANDARD JOB & TASK MODELLING Manage project involvement, purchasing information and track scheduling for Vendors, Suppliers and Manufacturers. RESOURCE MANAGER MOC oversees the assigning, tracking, reporting and approval of action items required to implement changes in highly regulated industrial environments. MANAGEMENT OF CHANGE (MOC) 5 Product Suites The System is a comprehensive enterprise level cloud software suite that enables an industrial enterprise to report and oversee multi-discipline tasks being performed in real-time globally. DOCUMENT & DRAWING CORE MODULE Commissioning & Completions Management System (CCMS) Core Modules PROJECT GOVERNANCE SYSTEM REQUIREMENT
  • 4. LEVEL 1 – DASHBOARDS & BUSINESS REPORTS  With Project Governance Management System (PGMS), it is simple. View the right information, from the right groups, at the right time. Binding the entire suite of applications, comprising of the Completion & Commissioning (CCMS), Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment & Material (LEMS) Management Systems. PGMS allows management to roll up Level 5 data for any phase or discipline of a project. Everything that is needed by the management team to plan, estimate, execute and control project outcomes are visible via:  Project Summary Dashboards  Project Performance Reporting  Real-time Data Report  Alerts & Intervention  Location Alerts 4 Business Unit / Projects Lifecycle Dashboard Monthly Executive Reports Analysis Reports
  • 5. LEVEL 1 – DASHBOARDS DESIGN 5
  • 6. LEVEL 1 – ALERTS & INTERVENTION 6 User is able to drill down the information of each project by clicking on the alerts. Under Control Warning Needs intervention
  • 7. Performance Summaries Report Publication and Review Phase Readiness Reviews / EVM Analysis Project Reviews & Definition Rating Reports LEVEL 2 – ARTIFICIAL INTELLIGENCE  Data analysis 7  Consolidated reporting  Trending & Forecasting
  • 8. LEVEL 3 – DATA ENTRY & REPORTING  Easy data-entry 8  Customized Reporting  Customized Workflows and Approvals WBS Setup Risks / Issues / Lessons Learned Collaboration – Contracts / RFIs Management of Change Procurement Estimating & Costing
  • 9. KEY TAKE-AWAYS The System Integrator will enable Petronas to :  Gain ownership and control of all project information  Have stringent management and full auditable governance process  Track responsibilities and accountabilities of project’s stakeholders  Detailed and reliable data from top to bottom 9