Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 1 [T
SUMMARY
Peter has 30 years’ experience as a practicing Materials and Corrosion Engineer and Consultant, 25 of which were
spent in Technical Management of Corrosion Groups in major engineering companies involved with materials
technology and corrosion control.
Peter’s experience covers all aspects of oil & gas facilities, from downhole to topside piping/vessels/equipment,
subsea and onshore pipelines, onshore processing plants and refineries. The range of projects and clients that he
has worked with have provided a fairly unique knowledge of virtually all Company Standards, International
Standards and local National requirements. His experience encompasses exploration and production projects
across the full lifecycle from initial planning stages through to production. He has worked on all stages of projects
from Conceptual Design, through Basis of Design, FEED, Detail Design, Commissioning Support and Operations
support with regards to Material Selection, Corrosion Management, Integrity Management and Failure
Investigations.
Although most of Peter’s working career has focussed on the Oil & Gas industry, he has also worked across the full
spectrum of industries including Infrastructure, Civil Construction, Chemical Process and Water, and has developed
Durability Plans for projects such as the Perth Desalination plant and the Narrows Bridge Duplication project.
Areas of Particular Expertise:
 Material Selection for Topside Facilities (Piping, Vessels, Pumps, Valves, Equipment), Subsea Pipelines
and Facilities (PLEMS, PLETS, Jumpers, Flexibles)
 Development of Corrosion Management and Asset Integrity Management Systems, Philosophies and
Procedures
 Durability planning for Roads, Rail, Bridges and Tunnels
 Corrosion Audits
 Corrosion Assessments and Corrosion Control
 Coating Selection
 Failure Investigation
 Significant experience with both ‘sweet’ (CO2) and ‘sour’ (H2S) projects and facilities
 Fully conversant with Australian Codes and Standards, DNV and other internationally-recognised Codes
and Standards, including NACE, API, ISO, ASME, ASTM, British Standards, Canadian Standards, plus
numerous company Standards, including ExxonMobil, Shell DEPs, BP, British Gas, Woodside, Water
Corporation, etc.
 Excellent presentation and report writing skills
EMPLOYMENT SUMMARY
Oct 2015 – Present Independent Materials & Corrosion Consultant
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 2 [T
2010 – Oct 2015 Subject Matter Expert / Principal Consultant - Corrosion & Integrity
Management, WorleyParsons / Advisian, Perth
2001 – 2011 Chief Engineer - Corrosion & Integrity Management, WorleyParsons, Perth
1997 – 2001 Corrosion Group Manager / National Manager (Corrosion) / Technical
Manager, Taywood Engineering Ltd, Perth
1989 – 1997 Manager (Corrosion Group) / Manager (MetallurgyGroup) / Manager (Civil &
Construction Group), CAPCIS Ltd, Manchester
EXPERIENCE DETAILS
2010 – Oct 2015 Subject Matter Expert / Principal Consultant - Corrosion & Integrity Management,
WorleyParsons / Advisian, Perth
 Lead Materials & Corrosion Engineer on the ExxonMobil Hebron Project and author of the
Materials Design Basis Memorandum (MDBM), the Materials Integrity Report (MIR) and the
Material Selection Diagrams (MSDs) for the topsides and Gravity Based Structure (GBS)
Platform. The MDBM is one of 10 Key Project Documents produced in FEED and provides
guidance to all other disciplines. The MDBM was a live document in FEED and transitioned
during Detail Design to become the Materials Integrity Report for use during Construction and
Operation.
 Lead Materials & Corrosion Engineer on the Sole Pipeline Project for SANTOS.
 Failure Investigation and Development of Corrosion Management Plans for a Closed,
Recirculating Cooling Water System on an FPSO, Offshore Ghana, on Behalf of MODEC
 Lead Materials & Corrosion Engineer on the Greater Enfield Subsea Development Project for
Woodside Energy Limited.
 Lead Engineer for Asset Integrity Management on the WorleyParsons / Advisian Due Diligence
Team for the Sale of Apache Energy Australia’s Asset on behalf of Macquarie Bank.
 Material Selection and Corrosion Management for the Arrow Bowen Coal Seam Gas Pipeline.
 Material Selection for the Hess Equus Project during Phase 2C.
 Material Selection for the Husky Liuhua 29-1 Subsea Development.
 Material Selection for the QCLNG Phase 2 Tranche 1b Coal Seam Gas Development.
 Investigation into the Cause of Corrosion in the MEG Regeneration System at the Santos
Patricia Baleen Gas Plant and the Role of Organic Acids, Plus Update of the Integrity
Management Plan for the Patricia Baleen Facility.
 Development of the Integrity Management Plan (IMP) for the Santos Mereenie Gas Plant.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 3 [T
 Review of the Implications of Mercury from New Field Developments on the Degradation of
Materials on Behalf of Esso (ExxonMobil) for the Kipper Mercury Removal Project.
 Review of the Implications of High H2S production from New Field Developments on the
Requirements for Sour Service on Behalf of Esso (ExxonMobil) for the Longford Liquids
Pipeline.
 Preparation of the Durability Plan for facilities on the Onslow Water Treatment Upgrade Project.
 ‘Sour Service’ material assessment for the Ebok Field Development offshore Nigeria for Afren
following the production of H2S after commencement of operation.
 Materials & Corrosion support on:
 Apache’s Ningaloo Vision FPSO refurbishment project.
 The Vincent FPSO refurbishment project for Woodside Energy / Maersk.
 BP Tangguh Phase 2 Field Development.
 BG India Panna Water Injection project.
 Various WorleyParsons projects worldwide.
2001 – 2011 Chief Engineer - Corrosion & Integrity Management, WorleyParsons, Perth
Work undertaken on major projects includes:
 Corrosion Assessment Study for Santos on the Moomba Raw Gas Inlet to Evaluate the Impact
of Increasing CO2 Levels up to 45% in Future Years.
 Material Selection Study for the BP Tangguh Phase 2 Development.
 Material Selection and Corrosion Management for Onshore Sour Gas Treatment Facilities and
NGL, Sour Gas and Lean Gas Facilities in Khafji on behalf of Al-Khafji Joint Operations (KJO).
 Materials Selection and Corrosion Management for the Satah Full Field Development on behalf
of ZADCO.
 Materials Selection and Corrosion Management for the Halul Oil in Water System and the
offshore water disposal pipeline on behalf of Qatar Petroleum.
 Development of the Material Selection and Corrosion Management Philosophy for the Hout
(KRL) Offshore and Onshore Oil and Gas Facilities Handling Sour Fluids on behalf of Al-Khafji
Joint Operations (KJO).
 Development of the Materials Durability Plan during FEED for the Southern Seawater
Desalination Plant (SSDP) on behalf of the Water Corporation of Western Australia.
 Development of the Preliminary Material Selection and Corrosion Management Philosophy
during Conceptual Design for the Wheatstone Development on behalf of Chevron Australia.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 4 [T
 Preparation of the Corrosion Design Basis Memorandum and Corrosion Management Plan for
the Kumang Cluster project, comprising 3 wellhead platform, three wet gas subsea pipelines, a
central processing platform and a gas export pipeline, on behalf of Petronas.
 Development of the Materials Design Basis Memorandum for the Turrum Phase 2 Development
FEED on behalf of Esso.
 Development of the Material Selection and Corrosion Management Philosophy for the
Construction of the Onshore Water Treatment Facility #3 and the Khafji Ratawi Water Injection
Facilities on behalf of Al-Khafji Joint Operations (KJO).
 Development of the Material Selection and Corrosion Management Philosophy for the Basis of
Design Phase of the North Rankin ‘B’ project on behalf of Woodside Energy Limited.
 Material Selection and Corrosion Management for the wellhead production platforms, satellite
platforms and riser platform that comprise the Sarawak Gas Development Project. Work
undertaken through Ranhill WorleyParsons on behalf of Murphy Oil.
 Corrosion Studies and Material Selection for ConocoPhillips China on the WHP-C Fuel Gas
Project.
 Lead Corrosion & Materials Engineer for the South Pars Phase 12 sour gas field development
on behalf of NIOC, including topside and pipeline corrosion studies, materials selection and
corrosion management.
 Development of the Material Selection and Corrosion Management Philosophy for the onshore
water treatment, onshore water disposal and offshore water injection facilities and pipelines on
behalf of Al Khafji Joint Operations (KJO).
 Corrosion studies and corrosion management for the West Lutong Pipelines Refurbishment
Project on behalf o Petronas Carigali, including the preparation of a Corrosion Design Basis
Memorandum and a Corrosion Management Plan.
 Corrosion studies and corrosion management for the Baram Pipelines Refurbishment Project on
behalf o Petronas Carigali, including the preparation of a Corrosion Design Basis Memorandum
and a Corrosion Management Plan.
 Corrosion studies and materials selection for the Pyrenees Pre-feasibility project on behalf of
BHPB.
 Material selection and corrosion management support to the EOS JV team on the PNG Gas
project.
 Corrosion study for the Rayong Gas Receiving Plant as part of the Detail Design on the Third
Transmission Pipeline Project on behalf of PTT.
 Corrosion studies and materials selection for the Tapti Expansion Project FEED and Detail
Design on behalf of British Gas India.
 Corrosion studies, materials selection and development of the Corrosion Design Basis
Memorandum for the Sumandak development on behalf of Petronas Carigali.
 Lead Corrosion & Materials Engineer on Woodside’s Angel Project for the FEED and Detail
Design.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 5 [T
 Corrosion studies and materials selection for the Kufpec Diesel Line to Fuel Gas conversion
project.
 Corrosion studies, materials selection and corrosion management philosophies for the Blacktip
project on behalf of Woodside Australian Energy.
 Corrosion studies and materials selection for the PM3 Northern Field WHP development on
behalf of Talisman Energy.
 Corrosion studies and materials selection for the Melut Basin Development on behalf of Ranhill
and PDOC.
 Corrosion studies and materials selection for the KUPE development on behalf of Origin Energy.
 Lead Corrosion Engineer for the Salman Oil & Gas Field Integrated Development, responsible
for materials selection and corrosion management.
 Corrosion studies and materials selection for the E11K-A facilities Front End Engineering Design
on behalf of Shell SSB.
 Corrosion studies and materials selection for the Casino development on behalf of Santos.
 Pipeline corrosion studies for ONGC on the BF-BG platform project.
 Review of the current and potential future application of composite materials for offshore oil &
gas facilities on behalf of ONGC.
 Corrosion Risk Assessment for well kick-off scenarios on the Northern Endeavour development.
 Failure investigation and material selection for a bauxite storage facility in Ireland on behalf of
Aughinish Alumina.
 Corrosion studies and materials selection for the Phu Horm Development on behalf of Amerada
Hess.
 Corrosion studies, materials selection and corrosion management philosophies for the Cliff Head
Development during FEED and Detail Design on behalf of ROC Oil.
 Expert advice in an arbitration concerning the corrosion of steel and the degradation of coatings
in a sulphur handling facility in Western Australia.
 Expert advice in an arbitration concerning the failure of duplex stainless steel condensate
heaters and exhaust stack at a rutile processing plant in Western Australia.
 Corrosion studies and materials selection for the RP Riser Platform project on behalf of Crescent
Petroleum.
 Corrosion studies and materials selection for the E8DR-A Minimum Facility Platform and the
E11P-B processing facilities on behalf of Shell SSB.
 Corrosion studies and materials selection for the South Angsi field facilities on behalf of
Talisman Energy.
 Project manager and technical lead for Corrosion Management on behalf of Chevron Offshore
(Thailand) Limited, covering topside facilities and subsea pipelines in the Benchamas and
Tantawan fields in the Gulf of Thailand.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 6 [T
 Corrosion studies, materials selection and life cycle costing for the Idd El Shargi PS-1K Platform
on behalf of Occidental Petroleum.
 Corrosion studies and materials selection for the Sole onshore Gas Plant on behalf of OMV.
 Corrosion investigations on CIL tanks at a gold extraction plant on behalf of KCGM.
 Corrosion studies and materials selection for the BR-E CO2 removal platform on behalf of
Talisman Energy.
 Preparation of the pipeline coating study report and the coating specification for the Jamnagar to
Bhopal and the Goa to Hyberabad pipelines in India on behalf of Reliance Petroleum.
 Preparation of the pipeline coating study report and the coating specification for the Mozambique
to Secunda Pipeline Project on behalf of SASOL.
 Review of coating technical aspects of pipe supply bids for the Mozambique to Secunda Pipeline
Project.
 Input into and review of CP design for the Mozambique to Secunda Pipeline Project and for the
JG & GH Pipeline Projects in India.
 Corrosion and Materials selection for the Sawan Gas Field Development, Pakistan, on behalf of
Clough Engineering and OMV.
 Downhole corrosion studies and material selection for the West Patricia oilfield on behalf of
Murphy Oil.
 Topside corrosion studies and material selection on the Benchamas Expansion Project on behalf
of Chevron Offshore Thailand.
 Offshore pipeline corrosion studies and identification of corrosion management requirements for
Block-12 and CHPS pipelines on behalf of Shell Brunei.
 Corrosion and qualitative risk assessments for propane, butane and condensate storage tanks
on behalf of Dugas.
 Evaluation of the cause of sulphur deposition and corrosion in pipework at the Cogeneration gas
plant, WA, on behalf of Burns & Row Worley.
1997 – 2001 Corrosion Group Manager / National Manager (Corrosion) / Technical Manager,
Taywood Engineering Ltd, Perth
Responsible for technical coordination and provision of specialist corrosion engineering services for
Taywood Engineering Limited’s Perth-based Corrosion Group. National responsibility for Corrosion
in Australia. Technical Manager for Corrosion throughout the Asia Pacific and Middle East, covering
TEL’s offices in Perth, Sydney, Melbourne, Singapore, Kuala Lumpur, Hong Kong and Dubai.
Major projects undertaken include:
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 7 [T
 In-house specialist for Corrosivity assessments for soils and marine environments, plus selection
of materials and corrosion control strategies for the Narrows Bridge Duplication Project, Perth,
and the M5 Motorway Project, Sydney.
 Project Manager and Lead Corrosion Engineer on downhole corrosion audit for the offshore
fields of a major Middle East based Oil Company. The project included the development of
downhole corrosion software for corrosion prediction, risk assessment, workover scheduling,
and material selection.
 Optimisation of materials requirements for Petrosea on the Kakap Gas Compression Project,
Indonesia. Work involved the prediction of corrosion rates in wet gas pipelines, subsea and
topside materials selection, and the procurement of detailed submissions for the supply of
corrosion inhibitors from chemical companies in the South East Asian region.
 Provision of corrosion and materials support to Woodside Offshore Petroleum on the Cossack
Pioneer Optimisation Project (CPOP). Work included a review of materials for the seawater
handling systems, a review of the use of insulating gaskets, assessment of boiler superheater
tube failures and the requirements for tube replacement, vendor audits and general materials
support.
 Provision of corrosion and materials support to Coflexip Stena Kenny Joint Venture (CSK) on the
Laminaria & Corallina Subsea Project. Work included reviews of materials, coatings and Project
Philosophy documents. evaluation of coatings and insulation materials for deep water, high
temperature (135ºC) application. and evaluation of sulphide stress corrosion cracking testing
requirements.
 Expert advice for Solicitors in Hong Kong in an arbitration on Pile Wrapping for a major
construction project in Thailand.
 Expert advice in an arbitration concerning the requirements for Cathodic Protection on pipelines
and buried structures at a fertiliser plant in the Gulf of Thailand.
 Expert advice in an arbitration concerning the failure of duplex stainless steel condensate
heaters and exhaust stack at a rutile processing plant in Western Australia.
1989 – 1997 Manager (Corrosion Group) / Manager (MetallurgyGroup) / Manager (Civil &
Construction Group), CAPCIS Ltd, Manchester
Responsible for the planning, administration and technical coordination of activities relating to failure
investigation, laboratory testing, R&D and corrosion engineering.
Due to client confidentiality it is not possible to provide full client and project details, but the following
provides a summary of some of the significant projects undertaken whilst at CAPCIS Ltd:
 Corrosion audit at oilfields in the Komi Region, Russia, and development of corrosion control
strategies.
 Corrosion audit at oilfields in Siberia, Russia, and provision of detailed specifications for world
Bank tendering on corrosion monitoring, Corrosion Management software, non-destructive
testing equipment and corrosion laboratory equipment.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 8 [T
 Production of a state-of-the-art review on the performance of corrosion resistant alloys (CRAs) in
aerated and chlorinated seawater.
 Corrosion predictions for the BP Forties field downhole tubulars and 36” export pipeline.
 Downhole corrosion and flow studies for BHP on the Jabiru and Challis fields.
 Corrosion assessment and materials selection for downhole tubing and casing with and without
gas lift on the Gryphon Project Development (Kerr McGee).
 Downhole corrosion study and materials selection for BHP on the Griffin Project.
 Failure investigation and galvanic corrosion testing on Statoil downhole couplings.
 Corrosion assessment and materials selection for the Yibal Butane plant, Oman.
 Corrosion assessment and materials selection for sour gas separation plants at Khatiyah, Fahihil
and Jaleha.
 Corrosion assessment, material selection and inhibitor evaluations for wellheads, flowlines,
vessels, generating station and liquid disposal system on the North Yorkshire Power Project.
Review of corrosion monitoring requirements.
 Corrosion assessment and materials selection for the Soku Flow Stations and Gas Plant.
 Corrosion analysis and materials selection study for the Minerva gas pipeline.
 Corrosion investigation of floating roof tanks at Fina Angola, plus assessment of corrosion and
process operations at the QQ terminal.
 Flow rig testing on carbon steels to determine the influence of Cu and Cr under fluctuating
oxygen conditions in seawater injection systems.
 Site investigations into the cause of internal corrosion of De-salter units at an onshore oil
processing plant.
 Failure investigations to determine the cause of corrosion of cupronickel heat exchanger tubes
at a special gas preparation plant.
 Review of documentation and drawings to assess the cause of cupro-nickel heat exchanger tube
failures at an LNG plant, Algeria.
 Failure investigation of pitted cupro-nickel Calandria tubes from a salt preparation plant.
 Technical review and evaluation of corrosion of water injection spools on Piper Bravo.
 Assessment of the corrosivity of copper ore cargo during shipment.
 Corrosion investigations and consultancy on the Great Man Made River Project, Libya.
 Failure investigations, lab testing and materials selection for a citric acid plant.
 Independent assessment of water treatment at Kemira Fertilisers.
 Project Manager and consultant on an Enabling Contract with the Nuclear Installations
Inspectorate (NII) to provide corrosion and materials support.
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 9 [T
 Technical expert in the case of lead-sheathed heating element failures in sulphuric acid cleaning
baths.
 Failure investigation to determine the cause of pitting of carbon steel heat exchanger tubes on
the Marathon Brae ‘B’ platform – the effects of sodium nitrite water treatment.
 Coaxial & pipe bundle heating medium study for the Conoco Britannia Project. Included a review
of service experience with the use of biocides and nitrite corrosion inhibitor in closed
recirculating heating/cooling systems.
 Recommendations for a programme to prevent internal corrosion of two 16” Tee assemblies
during hydrotest and lay-up on the SAGE pipeline project.
 Evaluation of the potential for internal corrosion prior commissioning of the Brae pipeline
extension project.
 Materials selection for sub-sea flowlines in the Ras Fanar field.
 Materials selection for a TEG dehydration Package on the Scott Development Project.
 Corrosion assessment and materials selection for TEG dehydration plant in Qatar.
 Failure investigation of Hastelloy C-22 gas/condensate coolers on an offshore platform in Qatar.
 Project manager for various projects on inhibitor evaluation and preferential weld corrosion
testing.
1986 – 1989 Deputy Manager (Corrosion Group), CAPCIS Ltd, Manchester
Provision of assistance the Manager for the planning, administration and coordination of the
Corrosion Group.
Project Management: Manager and technical lead on projects across the full spectrum of
industries, including Chemical Process, Water Treatment, Legal and Insurance, Manufacturing, Food
and Brewing.
Significant projects typically undertaken include:
 Manager and technical lead on a multi-client R&D project into Preferential Corrosion of Carbon-
Manganese Steel Weldments in Oil and Gas Production Systems.
 Flow rig testing of 9Cr-1Mo and 13Cr steels in CO2 / H2S environments.
 Corrosion and Water Quality audit for boilers at a sugar refinery, plus development on an
automated chemical treatment and monitoring system.
 Various brewery investigations, including corrosion and SCC of stainless steel vessels and the
effect of changing.
1986 Research Assistant (Corrosion Department), UMIST, Manchester
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 10 [T
This work was sponsored by and carried out for Shell UK. The objectives of the project were to
review the present state-of-the-art of surface coatings for the protection of the hot-section
components in gas turbines and to identify the areas where laser surface treatment may prove
beneficial to the structure and performance of a coating.
1981 - 1984 Demonstrator, UMIST, Manchester
Practical demonstrations of a wide range of Corrosion and Metallurgical related techniques to the
MSc Course at the Corrosion Department at UMIST.
1980 ENKA, Arnhem, Holland
Electrochemical research at ENKA, Arnhem, Holland. This work involved the development of new
electroplating techniques for the composite planting of diamond particles in a metallic-nickel matrix.
1979 Vocational Training, Home Office Forensic Science Laboratory, England
Analytical chemistry in the drugs and toxicology section of the Home Office Forensic Science
Laboratory, Bristol.
EDUCATION
Ph.D. Corrosion and Protection Centre, UMIST (UK), 1986
BSc (Hons) Applied Chemistry, Class 2(i), Portsmouth, 1981
REGISTRATIONS / AFFILIATIONS
Fellow – The Institute of Engineers, Australia (FIEAust)
Member of National Association of Corrosion Engineers
Member of Australasian Corrosion Australia (ACA)
Member of Institute of Corrosion (ICorr)
PUBLICATIONS/PRESENTATIONS
“Comparison of Techniques for the Separation and Pre-concentration of Metal Ions in
Aqueous Solution”
E.A. Allen, P.K.N. Bartlett and G. Ingram, Analyst, Vol. 198, pp. 1075 to 1080, August 1984.
“The Influence of Laser Surface Treatment on the High Temperature Oxidation of Cr2O3
Forming Alloys”
F.H. Stott, P.K.N. Bartlett and G.C. Wood, J. Materials Science and Engineering, 88, 1987.
“Laser Surface Treatment and its Influence on the Development of Healing Cr2O3 Scales on
Nickel-Chromium Alloys
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 11 [T
F.H. Stot, P.K.N. Bartlett t and G.C. Wood, Oxidation of Metals, Vol. 27, Nos. 1/2, 1987.
“A State-of-the-Art Review of Surface Coatings for Hot Section Components in Gas Turbine”
P.K.N. Bartlett and F.H. Stott, 1986
This 192 Page Document plus 42 Figures and 24 Tables was written for Shell UK during a
one year Post Doctoral Position with Shell at UMIST. The Document is Restricted by Shell
UK but verification can be obtained from Dr Nigel Richardson at Shell Research Centre,
Thornton, Chester, Professor F.H. Stott at The Corrosion and Protection Centre, UMIST.
Document Bound and presented in 1986.
“Preferential Corrosion of Carbon Steel Weldments in Oil and Gas Production Systems”
P.K.N. Bartlett, M.F. Gittos, T.G. Gooch and A.N. Rothwell
A Joint Venture between CAPCIS and TWI for a Group of Sponsors. Report Produced in
1989. Contact Dr D. Gearey at CAPCIS or Dr T. Gooch at TWI for verification.
“Prediction of Flow Assisted Corrosion During Design and Operation of Oil and Gas Lines”
J.L. Dawson, C.C. Shih and P.K.N. Bartlett, Proceedings of UK Corrosion 90 Conference, Sandown
Park, Vol. 3, pp 259-268, 1990.
“Assessment of Corrosion In Pipelines”
P.K.N. Bartlett, J.L. Dawson and C.C. Shih, IIR Conference, London, 1991
“Models and Predictions of CO2 Corrosion and Erosion-Corrosion Under Flowing Conditions”
J.L. Dawson, C.C. Shih and P.K.N. Bartlett, European Federation of Corrosion Conference,
Barcelona, 1992
“Operational Problems Encountered in the Control of Boiler Feed Water Quality”
P.K.N. Bartlett K. Sinclair and J.M. Leeds, Proceedings of UK Corrosion 90 Conference, Sandown
Park, 1990.
“Prediction of Internal Corrosion and Corrosion Control Under Flowing Conditions”
Co-author with J.L. Dawson, C.C. Shih, J.W. Palmer and A.N. Rothwell, Paper given at the 9th
International Conference and Exhibition on Pipe Protection, Cannes, France, 1991, and issued as an
addendum to the Conference Proceedings published by Elsevier.
“Corrosion Prevention”
P.K.N. Bartlett, Presented at the First Symposium of the Engineering Associates Group on Sour
Service Problems and Solutions, 28 and 29 November 1991, Aberdeen.
“Preferential Weld Corrosion - The Problem, The Cause, and The Control”
Co-author with C.A. Wright, Presented at the Corrosion and Protection Centre 20th Anniversary
Conference, UMIST, April 1992.
“Components and Development of Corrosion Management Strategies”
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 12 [T
P.K.N. Bartlett, Journal of Corrosion & Materials, Published by the Australasian Corrosion
Association and the Asia Pacific Materials and Corrosion Association, pp 15-22, Vol 23, No. 2-3,
June 1998.
“What Price for Corrosion Management?”
P.K.N. Bartlett, pp 35-37, Oil & Gas Australia, Energy Publications, July 1998.
Technical Presentation on “Corrosion Management”
P.K.N. Bartlett, Technical Seminar run by the Australasian Corrosion Association (ACA), 1998
“Building a Successful Corrosion Management System for Your Organisation”
P.K.N. Bartlett, IIR Conference on Implementing Cost Effective Methods for Corrosion Control, Eden
on the Park Hotel, Melbourne, 27-28 June 2000
“What is Corrosion Management and What is Involved in a Corrosion Management Strategy”
P.K.N. Bartlett, Paper 014, 40th Annual Conference of the Australasian Corrosion Association,
Auckland ,New Zealand, November 2000
“Development of a Downhole Corrosion Prediction and Material Selection Program”
C. de Waard, P.K.N. Bartlett, L.M. Smith and H.A. Cunningham (Presented by P.K.N. Bartlett)
Paper 067, 40th Annual Conference of the Australasian Corrosion Association, Auckland ,New
Zealand, November 2000
“Corrosion in Soil and Natural Waters”
P.K.N. Bartlett
Technical Seminar to industrial clients run by Taywood Engineering Limited in Melbourne and
Sydney during 2000
“Corrosion of Steel and Corrosion-resistant Alloys in Seawater and Marine Environments”
P.K.N. Bartlett, Technical Seminar to industrial clients run by Taywood Engineering Limited in
Melbourne, Sydney and Darwin during 2000
“An introduction to Cathodic Protection in Seawater”
P.K.N. Bartlett and P.A. Bundy
Technical Seminar to industrial clients run by Taywood Engineering Limited Darwin during 2000
“Corrosion of Steel Structures in Soil and Natural Waters”
P.K.N. Bartlett, Technical Seminar presented at the Annual Meeting of the Geomechanical Society of
the Institute of Engineers Australia (IEAust), Melbourne, June 2000
“Corrosion Management for Maritime Structures”
Dr. P.K.N. Bartlett, Maritime Structures 2004, Brisbane, June 2004
“The Use of Composites In Offshore And Maritime Facilities”
Peter Bartlett
28 Cressbrook Way
Carine, WA 6020
Tel.: 0468 572 954
pknbartlett@gmail.com
Resume
Barlett.Peter.doc 13 [T
Dr. P.K.N. Bartlett, Paper 34, Corrosion & Prevention 2004, Australasian Corrosion Association,
Perth, November 2004
“The Role of the Designer in Asset Management”
Dr. P.K.N. Bartlett, Australasian Corrosion Association Seminar, Melbourne, September 2008

Peter Bartlett - Personal CV (March 2016)

  • 1.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 1 [T SUMMARY Peter has 30 years’ experience as a practicing Materials and Corrosion Engineer and Consultant, 25 of which were spent in Technical Management of Corrosion Groups in major engineering companies involved with materials technology and corrosion control. Peter’s experience covers all aspects of oil & gas facilities, from downhole to topside piping/vessels/equipment, subsea and onshore pipelines, onshore processing plants and refineries. The range of projects and clients that he has worked with have provided a fairly unique knowledge of virtually all Company Standards, International Standards and local National requirements. His experience encompasses exploration and production projects across the full lifecycle from initial planning stages through to production. He has worked on all stages of projects from Conceptual Design, through Basis of Design, FEED, Detail Design, Commissioning Support and Operations support with regards to Material Selection, Corrosion Management, Integrity Management and Failure Investigations. Although most of Peter’s working career has focussed on the Oil & Gas industry, he has also worked across the full spectrum of industries including Infrastructure, Civil Construction, Chemical Process and Water, and has developed Durability Plans for projects such as the Perth Desalination plant and the Narrows Bridge Duplication project. Areas of Particular Expertise:  Material Selection for Topside Facilities (Piping, Vessels, Pumps, Valves, Equipment), Subsea Pipelines and Facilities (PLEMS, PLETS, Jumpers, Flexibles)  Development of Corrosion Management and Asset Integrity Management Systems, Philosophies and Procedures  Durability planning for Roads, Rail, Bridges and Tunnels  Corrosion Audits  Corrosion Assessments and Corrosion Control  Coating Selection  Failure Investigation  Significant experience with both ‘sweet’ (CO2) and ‘sour’ (H2S) projects and facilities  Fully conversant with Australian Codes and Standards, DNV and other internationally-recognised Codes and Standards, including NACE, API, ISO, ASME, ASTM, British Standards, Canadian Standards, plus numerous company Standards, including ExxonMobil, Shell DEPs, BP, British Gas, Woodside, Water Corporation, etc.  Excellent presentation and report writing skills EMPLOYMENT SUMMARY Oct 2015 – Present Independent Materials & Corrosion Consultant
  • 2.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 2 [T 2010 – Oct 2015 Subject Matter Expert / Principal Consultant - Corrosion & Integrity Management, WorleyParsons / Advisian, Perth 2001 – 2011 Chief Engineer - Corrosion & Integrity Management, WorleyParsons, Perth 1997 – 2001 Corrosion Group Manager / National Manager (Corrosion) / Technical Manager, Taywood Engineering Ltd, Perth 1989 – 1997 Manager (Corrosion Group) / Manager (MetallurgyGroup) / Manager (Civil & Construction Group), CAPCIS Ltd, Manchester EXPERIENCE DETAILS 2010 – Oct 2015 Subject Matter Expert / Principal Consultant - Corrosion & Integrity Management, WorleyParsons / Advisian, Perth  Lead Materials & Corrosion Engineer on the ExxonMobil Hebron Project and author of the Materials Design Basis Memorandum (MDBM), the Materials Integrity Report (MIR) and the Material Selection Diagrams (MSDs) for the topsides and Gravity Based Structure (GBS) Platform. The MDBM is one of 10 Key Project Documents produced in FEED and provides guidance to all other disciplines. The MDBM was a live document in FEED and transitioned during Detail Design to become the Materials Integrity Report for use during Construction and Operation.  Lead Materials & Corrosion Engineer on the Sole Pipeline Project for SANTOS.  Failure Investigation and Development of Corrosion Management Plans for a Closed, Recirculating Cooling Water System on an FPSO, Offshore Ghana, on Behalf of MODEC  Lead Materials & Corrosion Engineer on the Greater Enfield Subsea Development Project for Woodside Energy Limited.  Lead Engineer for Asset Integrity Management on the WorleyParsons / Advisian Due Diligence Team for the Sale of Apache Energy Australia’s Asset on behalf of Macquarie Bank.  Material Selection and Corrosion Management for the Arrow Bowen Coal Seam Gas Pipeline.  Material Selection for the Hess Equus Project during Phase 2C.  Material Selection for the Husky Liuhua 29-1 Subsea Development.  Material Selection for the QCLNG Phase 2 Tranche 1b Coal Seam Gas Development.  Investigation into the Cause of Corrosion in the MEG Regeneration System at the Santos Patricia Baleen Gas Plant and the Role of Organic Acids, Plus Update of the Integrity Management Plan for the Patricia Baleen Facility.  Development of the Integrity Management Plan (IMP) for the Santos Mereenie Gas Plant.
  • 3.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 3 [T  Review of the Implications of Mercury from New Field Developments on the Degradation of Materials on Behalf of Esso (ExxonMobil) for the Kipper Mercury Removal Project.  Review of the Implications of High H2S production from New Field Developments on the Requirements for Sour Service on Behalf of Esso (ExxonMobil) for the Longford Liquids Pipeline.  Preparation of the Durability Plan for facilities on the Onslow Water Treatment Upgrade Project.  ‘Sour Service’ material assessment for the Ebok Field Development offshore Nigeria for Afren following the production of H2S after commencement of operation.  Materials & Corrosion support on:  Apache’s Ningaloo Vision FPSO refurbishment project.  The Vincent FPSO refurbishment project for Woodside Energy / Maersk.  BP Tangguh Phase 2 Field Development.  BG India Panna Water Injection project.  Various WorleyParsons projects worldwide. 2001 – 2011 Chief Engineer - Corrosion & Integrity Management, WorleyParsons, Perth Work undertaken on major projects includes:  Corrosion Assessment Study for Santos on the Moomba Raw Gas Inlet to Evaluate the Impact of Increasing CO2 Levels up to 45% in Future Years.  Material Selection Study for the BP Tangguh Phase 2 Development.  Material Selection and Corrosion Management for Onshore Sour Gas Treatment Facilities and NGL, Sour Gas and Lean Gas Facilities in Khafji on behalf of Al-Khafji Joint Operations (KJO).  Materials Selection and Corrosion Management for the Satah Full Field Development on behalf of ZADCO.  Materials Selection and Corrosion Management for the Halul Oil in Water System and the offshore water disposal pipeline on behalf of Qatar Petroleum.  Development of the Material Selection and Corrosion Management Philosophy for the Hout (KRL) Offshore and Onshore Oil and Gas Facilities Handling Sour Fluids on behalf of Al-Khafji Joint Operations (KJO).  Development of the Materials Durability Plan during FEED for the Southern Seawater Desalination Plant (SSDP) on behalf of the Water Corporation of Western Australia.  Development of the Preliminary Material Selection and Corrosion Management Philosophy during Conceptual Design for the Wheatstone Development on behalf of Chevron Australia.
  • 4.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 4 [T  Preparation of the Corrosion Design Basis Memorandum and Corrosion Management Plan for the Kumang Cluster project, comprising 3 wellhead platform, three wet gas subsea pipelines, a central processing platform and a gas export pipeline, on behalf of Petronas.  Development of the Materials Design Basis Memorandum for the Turrum Phase 2 Development FEED on behalf of Esso.  Development of the Material Selection and Corrosion Management Philosophy for the Construction of the Onshore Water Treatment Facility #3 and the Khafji Ratawi Water Injection Facilities on behalf of Al-Khafji Joint Operations (KJO).  Development of the Material Selection and Corrosion Management Philosophy for the Basis of Design Phase of the North Rankin ‘B’ project on behalf of Woodside Energy Limited.  Material Selection and Corrosion Management for the wellhead production platforms, satellite platforms and riser platform that comprise the Sarawak Gas Development Project. Work undertaken through Ranhill WorleyParsons on behalf of Murphy Oil.  Corrosion Studies and Material Selection for ConocoPhillips China on the WHP-C Fuel Gas Project.  Lead Corrosion & Materials Engineer for the South Pars Phase 12 sour gas field development on behalf of NIOC, including topside and pipeline corrosion studies, materials selection and corrosion management.  Development of the Material Selection and Corrosion Management Philosophy for the onshore water treatment, onshore water disposal and offshore water injection facilities and pipelines on behalf of Al Khafji Joint Operations (KJO).  Corrosion studies and corrosion management for the West Lutong Pipelines Refurbishment Project on behalf o Petronas Carigali, including the preparation of a Corrosion Design Basis Memorandum and a Corrosion Management Plan.  Corrosion studies and corrosion management for the Baram Pipelines Refurbishment Project on behalf o Petronas Carigali, including the preparation of a Corrosion Design Basis Memorandum and a Corrosion Management Plan.  Corrosion studies and materials selection for the Pyrenees Pre-feasibility project on behalf of BHPB.  Material selection and corrosion management support to the EOS JV team on the PNG Gas project.  Corrosion study for the Rayong Gas Receiving Plant as part of the Detail Design on the Third Transmission Pipeline Project on behalf of PTT.  Corrosion studies and materials selection for the Tapti Expansion Project FEED and Detail Design on behalf of British Gas India.  Corrosion studies, materials selection and development of the Corrosion Design Basis Memorandum for the Sumandak development on behalf of Petronas Carigali.  Lead Corrosion & Materials Engineer on Woodside’s Angel Project for the FEED and Detail Design.
  • 5.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 5 [T  Corrosion studies and materials selection for the Kufpec Diesel Line to Fuel Gas conversion project.  Corrosion studies, materials selection and corrosion management philosophies for the Blacktip project on behalf of Woodside Australian Energy.  Corrosion studies and materials selection for the PM3 Northern Field WHP development on behalf of Talisman Energy.  Corrosion studies and materials selection for the Melut Basin Development on behalf of Ranhill and PDOC.  Corrosion studies and materials selection for the KUPE development on behalf of Origin Energy.  Lead Corrosion Engineer for the Salman Oil & Gas Field Integrated Development, responsible for materials selection and corrosion management.  Corrosion studies and materials selection for the E11K-A facilities Front End Engineering Design on behalf of Shell SSB.  Corrosion studies and materials selection for the Casino development on behalf of Santos.  Pipeline corrosion studies for ONGC on the BF-BG platform project.  Review of the current and potential future application of composite materials for offshore oil & gas facilities on behalf of ONGC.  Corrosion Risk Assessment for well kick-off scenarios on the Northern Endeavour development.  Failure investigation and material selection for a bauxite storage facility in Ireland on behalf of Aughinish Alumina.  Corrosion studies and materials selection for the Phu Horm Development on behalf of Amerada Hess.  Corrosion studies, materials selection and corrosion management philosophies for the Cliff Head Development during FEED and Detail Design on behalf of ROC Oil.  Expert advice in an arbitration concerning the corrosion of steel and the degradation of coatings in a sulphur handling facility in Western Australia.  Expert advice in an arbitration concerning the failure of duplex stainless steel condensate heaters and exhaust stack at a rutile processing plant in Western Australia.  Corrosion studies and materials selection for the RP Riser Platform project on behalf of Crescent Petroleum.  Corrosion studies and materials selection for the E8DR-A Minimum Facility Platform and the E11P-B processing facilities on behalf of Shell SSB.  Corrosion studies and materials selection for the South Angsi field facilities on behalf of Talisman Energy.  Project manager and technical lead for Corrosion Management on behalf of Chevron Offshore (Thailand) Limited, covering topside facilities and subsea pipelines in the Benchamas and Tantawan fields in the Gulf of Thailand.
  • 6.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 6 [T  Corrosion studies, materials selection and life cycle costing for the Idd El Shargi PS-1K Platform on behalf of Occidental Petroleum.  Corrosion studies and materials selection for the Sole onshore Gas Plant on behalf of OMV.  Corrosion investigations on CIL tanks at a gold extraction plant on behalf of KCGM.  Corrosion studies and materials selection for the BR-E CO2 removal platform on behalf of Talisman Energy.  Preparation of the pipeline coating study report and the coating specification for the Jamnagar to Bhopal and the Goa to Hyberabad pipelines in India on behalf of Reliance Petroleum.  Preparation of the pipeline coating study report and the coating specification for the Mozambique to Secunda Pipeline Project on behalf of SASOL.  Review of coating technical aspects of pipe supply bids for the Mozambique to Secunda Pipeline Project.  Input into and review of CP design for the Mozambique to Secunda Pipeline Project and for the JG & GH Pipeline Projects in India.  Corrosion and Materials selection for the Sawan Gas Field Development, Pakistan, on behalf of Clough Engineering and OMV.  Downhole corrosion studies and material selection for the West Patricia oilfield on behalf of Murphy Oil.  Topside corrosion studies and material selection on the Benchamas Expansion Project on behalf of Chevron Offshore Thailand.  Offshore pipeline corrosion studies and identification of corrosion management requirements for Block-12 and CHPS pipelines on behalf of Shell Brunei.  Corrosion and qualitative risk assessments for propane, butane and condensate storage tanks on behalf of Dugas.  Evaluation of the cause of sulphur deposition and corrosion in pipework at the Cogeneration gas plant, WA, on behalf of Burns & Row Worley. 1997 – 2001 Corrosion Group Manager / National Manager (Corrosion) / Technical Manager, Taywood Engineering Ltd, Perth Responsible for technical coordination and provision of specialist corrosion engineering services for Taywood Engineering Limited’s Perth-based Corrosion Group. National responsibility for Corrosion in Australia. Technical Manager for Corrosion throughout the Asia Pacific and Middle East, covering TEL’s offices in Perth, Sydney, Melbourne, Singapore, Kuala Lumpur, Hong Kong and Dubai. Major projects undertaken include:
  • 7.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 7 [T  In-house specialist for Corrosivity assessments for soils and marine environments, plus selection of materials and corrosion control strategies for the Narrows Bridge Duplication Project, Perth, and the M5 Motorway Project, Sydney.  Project Manager and Lead Corrosion Engineer on downhole corrosion audit for the offshore fields of a major Middle East based Oil Company. The project included the development of downhole corrosion software for corrosion prediction, risk assessment, workover scheduling, and material selection.  Optimisation of materials requirements for Petrosea on the Kakap Gas Compression Project, Indonesia. Work involved the prediction of corrosion rates in wet gas pipelines, subsea and topside materials selection, and the procurement of detailed submissions for the supply of corrosion inhibitors from chemical companies in the South East Asian region.  Provision of corrosion and materials support to Woodside Offshore Petroleum on the Cossack Pioneer Optimisation Project (CPOP). Work included a review of materials for the seawater handling systems, a review of the use of insulating gaskets, assessment of boiler superheater tube failures and the requirements for tube replacement, vendor audits and general materials support.  Provision of corrosion and materials support to Coflexip Stena Kenny Joint Venture (CSK) on the Laminaria & Corallina Subsea Project. Work included reviews of materials, coatings and Project Philosophy documents. evaluation of coatings and insulation materials for deep water, high temperature (135ºC) application. and evaluation of sulphide stress corrosion cracking testing requirements.  Expert advice for Solicitors in Hong Kong in an arbitration on Pile Wrapping for a major construction project in Thailand.  Expert advice in an arbitration concerning the requirements for Cathodic Protection on pipelines and buried structures at a fertiliser plant in the Gulf of Thailand.  Expert advice in an arbitration concerning the failure of duplex stainless steel condensate heaters and exhaust stack at a rutile processing plant in Western Australia. 1989 – 1997 Manager (Corrosion Group) / Manager (MetallurgyGroup) / Manager (Civil & Construction Group), CAPCIS Ltd, Manchester Responsible for the planning, administration and technical coordination of activities relating to failure investigation, laboratory testing, R&D and corrosion engineering. Due to client confidentiality it is not possible to provide full client and project details, but the following provides a summary of some of the significant projects undertaken whilst at CAPCIS Ltd:  Corrosion audit at oilfields in the Komi Region, Russia, and development of corrosion control strategies.  Corrosion audit at oilfields in Siberia, Russia, and provision of detailed specifications for world Bank tendering on corrosion monitoring, Corrosion Management software, non-destructive testing equipment and corrosion laboratory equipment.
  • 8.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 8 [T  Production of a state-of-the-art review on the performance of corrosion resistant alloys (CRAs) in aerated and chlorinated seawater.  Corrosion predictions for the BP Forties field downhole tubulars and 36” export pipeline.  Downhole corrosion and flow studies for BHP on the Jabiru and Challis fields.  Corrosion assessment and materials selection for downhole tubing and casing with and without gas lift on the Gryphon Project Development (Kerr McGee).  Downhole corrosion study and materials selection for BHP on the Griffin Project.  Failure investigation and galvanic corrosion testing on Statoil downhole couplings.  Corrosion assessment and materials selection for the Yibal Butane plant, Oman.  Corrosion assessment and materials selection for sour gas separation plants at Khatiyah, Fahihil and Jaleha.  Corrosion assessment, material selection and inhibitor evaluations for wellheads, flowlines, vessels, generating station and liquid disposal system on the North Yorkshire Power Project. Review of corrosion monitoring requirements.  Corrosion assessment and materials selection for the Soku Flow Stations and Gas Plant.  Corrosion analysis and materials selection study for the Minerva gas pipeline.  Corrosion investigation of floating roof tanks at Fina Angola, plus assessment of corrosion and process operations at the QQ terminal.  Flow rig testing on carbon steels to determine the influence of Cu and Cr under fluctuating oxygen conditions in seawater injection systems.  Site investigations into the cause of internal corrosion of De-salter units at an onshore oil processing plant.  Failure investigations to determine the cause of corrosion of cupronickel heat exchanger tubes at a special gas preparation plant.  Review of documentation and drawings to assess the cause of cupro-nickel heat exchanger tube failures at an LNG plant, Algeria.  Failure investigation of pitted cupro-nickel Calandria tubes from a salt preparation plant.  Technical review and evaluation of corrosion of water injection spools on Piper Bravo.  Assessment of the corrosivity of copper ore cargo during shipment.  Corrosion investigations and consultancy on the Great Man Made River Project, Libya.  Failure investigations, lab testing and materials selection for a citric acid plant.  Independent assessment of water treatment at Kemira Fertilisers.  Project Manager and consultant on an Enabling Contract with the Nuclear Installations Inspectorate (NII) to provide corrosion and materials support.
  • 9.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 9 [T  Technical expert in the case of lead-sheathed heating element failures in sulphuric acid cleaning baths.  Failure investigation to determine the cause of pitting of carbon steel heat exchanger tubes on the Marathon Brae ‘B’ platform – the effects of sodium nitrite water treatment.  Coaxial & pipe bundle heating medium study for the Conoco Britannia Project. Included a review of service experience with the use of biocides and nitrite corrosion inhibitor in closed recirculating heating/cooling systems.  Recommendations for a programme to prevent internal corrosion of two 16” Tee assemblies during hydrotest and lay-up on the SAGE pipeline project.  Evaluation of the potential for internal corrosion prior commissioning of the Brae pipeline extension project.  Materials selection for sub-sea flowlines in the Ras Fanar field.  Materials selection for a TEG dehydration Package on the Scott Development Project.  Corrosion assessment and materials selection for TEG dehydration plant in Qatar.  Failure investigation of Hastelloy C-22 gas/condensate coolers on an offshore platform in Qatar.  Project manager for various projects on inhibitor evaluation and preferential weld corrosion testing. 1986 – 1989 Deputy Manager (Corrosion Group), CAPCIS Ltd, Manchester Provision of assistance the Manager for the planning, administration and coordination of the Corrosion Group. Project Management: Manager and technical lead on projects across the full spectrum of industries, including Chemical Process, Water Treatment, Legal and Insurance, Manufacturing, Food and Brewing. Significant projects typically undertaken include:  Manager and technical lead on a multi-client R&D project into Preferential Corrosion of Carbon- Manganese Steel Weldments in Oil and Gas Production Systems.  Flow rig testing of 9Cr-1Mo and 13Cr steels in CO2 / H2S environments.  Corrosion and Water Quality audit for boilers at a sugar refinery, plus development on an automated chemical treatment and monitoring system.  Various brewery investigations, including corrosion and SCC of stainless steel vessels and the effect of changing. 1986 Research Assistant (Corrosion Department), UMIST, Manchester
  • 10.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 10 [T This work was sponsored by and carried out for Shell UK. The objectives of the project were to review the present state-of-the-art of surface coatings for the protection of the hot-section components in gas turbines and to identify the areas where laser surface treatment may prove beneficial to the structure and performance of a coating. 1981 - 1984 Demonstrator, UMIST, Manchester Practical demonstrations of a wide range of Corrosion and Metallurgical related techniques to the MSc Course at the Corrosion Department at UMIST. 1980 ENKA, Arnhem, Holland Electrochemical research at ENKA, Arnhem, Holland. This work involved the development of new electroplating techniques for the composite planting of diamond particles in a metallic-nickel matrix. 1979 Vocational Training, Home Office Forensic Science Laboratory, England Analytical chemistry in the drugs and toxicology section of the Home Office Forensic Science Laboratory, Bristol. EDUCATION Ph.D. Corrosion and Protection Centre, UMIST (UK), 1986 BSc (Hons) Applied Chemistry, Class 2(i), Portsmouth, 1981 REGISTRATIONS / AFFILIATIONS Fellow – The Institute of Engineers, Australia (FIEAust) Member of National Association of Corrosion Engineers Member of Australasian Corrosion Australia (ACA) Member of Institute of Corrosion (ICorr) PUBLICATIONS/PRESENTATIONS “Comparison of Techniques for the Separation and Pre-concentration of Metal Ions in Aqueous Solution” E.A. Allen, P.K.N. Bartlett and G. Ingram, Analyst, Vol. 198, pp. 1075 to 1080, August 1984. “The Influence of Laser Surface Treatment on the High Temperature Oxidation of Cr2O3 Forming Alloys” F.H. Stott, P.K.N. Bartlett and G.C. Wood, J. Materials Science and Engineering, 88, 1987. “Laser Surface Treatment and its Influence on the Development of Healing Cr2O3 Scales on Nickel-Chromium Alloys
  • 11.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 11 [T F.H. Stot, P.K.N. Bartlett t and G.C. Wood, Oxidation of Metals, Vol. 27, Nos. 1/2, 1987. “A State-of-the-Art Review of Surface Coatings for Hot Section Components in Gas Turbine” P.K.N. Bartlett and F.H. Stott, 1986 This 192 Page Document plus 42 Figures and 24 Tables was written for Shell UK during a one year Post Doctoral Position with Shell at UMIST. The Document is Restricted by Shell UK but verification can be obtained from Dr Nigel Richardson at Shell Research Centre, Thornton, Chester, Professor F.H. Stott at The Corrosion and Protection Centre, UMIST. Document Bound and presented in 1986. “Preferential Corrosion of Carbon Steel Weldments in Oil and Gas Production Systems” P.K.N. Bartlett, M.F. Gittos, T.G. Gooch and A.N. Rothwell A Joint Venture between CAPCIS and TWI for a Group of Sponsors. Report Produced in 1989. Contact Dr D. Gearey at CAPCIS or Dr T. Gooch at TWI for verification. “Prediction of Flow Assisted Corrosion During Design and Operation of Oil and Gas Lines” J.L. Dawson, C.C. Shih and P.K.N. Bartlett, Proceedings of UK Corrosion 90 Conference, Sandown Park, Vol. 3, pp 259-268, 1990. “Assessment of Corrosion In Pipelines” P.K.N. Bartlett, J.L. Dawson and C.C. Shih, IIR Conference, London, 1991 “Models and Predictions of CO2 Corrosion and Erosion-Corrosion Under Flowing Conditions” J.L. Dawson, C.C. Shih and P.K.N. Bartlett, European Federation of Corrosion Conference, Barcelona, 1992 “Operational Problems Encountered in the Control of Boiler Feed Water Quality” P.K.N. Bartlett K. Sinclair and J.M. Leeds, Proceedings of UK Corrosion 90 Conference, Sandown Park, 1990. “Prediction of Internal Corrosion and Corrosion Control Under Flowing Conditions” Co-author with J.L. Dawson, C.C. Shih, J.W. Palmer and A.N. Rothwell, Paper given at the 9th International Conference and Exhibition on Pipe Protection, Cannes, France, 1991, and issued as an addendum to the Conference Proceedings published by Elsevier. “Corrosion Prevention” P.K.N. Bartlett, Presented at the First Symposium of the Engineering Associates Group on Sour Service Problems and Solutions, 28 and 29 November 1991, Aberdeen. “Preferential Weld Corrosion - The Problem, The Cause, and The Control” Co-author with C.A. Wright, Presented at the Corrosion and Protection Centre 20th Anniversary Conference, UMIST, April 1992. “Components and Development of Corrosion Management Strategies”
  • 12.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 12 [T P.K.N. Bartlett, Journal of Corrosion & Materials, Published by the Australasian Corrosion Association and the Asia Pacific Materials and Corrosion Association, pp 15-22, Vol 23, No. 2-3, June 1998. “What Price for Corrosion Management?” P.K.N. Bartlett, pp 35-37, Oil & Gas Australia, Energy Publications, July 1998. Technical Presentation on “Corrosion Management” P.K.N. Bartlett, Technical Seminar run by the Australasian Corrosion Association (ACA), 1998 “Building a Successful Corrosion Management System for Your Organisation” P.K.N. Bartlett, IIR Conference on Implementing Cost Effective Methods for Corrosion Control, Eden on the Park Hotel, Melbourne, 27-28 June 2000 “What is Corrosion Management and What is Involved in a Corrosion Management Strategy” P.K.N. Bartlett, Paper 014, 40th Annual Conference of the Australasian Corrosion Association, Auckland ,New Zealand, November 2000 “Development of a Downhole Corrosion Prediction and Material Selection Program” C. de Waard, P.K.N. Bartlett, L.M. Smith and H.A. Cunningham (Presented by P.K.N. Bartlett) Paper 067, 40th Annual Conference of the Australasian Corrosion Association, Auckland ,New Zealand, November 2000 “Corrosion in Soil and Natural Waters” P.K.N. Bartlett Technical Seminar to industrial clients run by Taywood Engineering Limited in Melbourne and Sydney during 2000 “Corrosion of Steel and Corrosion-resistant Alloys in Seawater and Marine Environments” P.K.N. Bartlett, Technical Seminar to industrial clients run by Taywood Engineering Limited in Melbourne, Sydney and Darwin during 2000 “An introduction to Cathodic Protection in Seawater” P.K.N. Bartlett and P.A. Bundy Technical Seminar to industrial clients run by Taywood Engineering Limited Darwin during 2000 “Corrosion of Steel Structures in Soil and Natural Waters” P.K.N. Bartlett, Technical Seminar presented at the Annual Meeting of the Geomechanical Society of the Institute of Engineers Australia (IEAust), Melbourne, June 2000 “Corrosion Management for Maritime Structures” Dr. P.K.N. Bartlett, Maritime Structures 2004, Brisbane, June 2004 “The Use of Composites In Offshore And Maritime Facilities”
  • 13.
    Peter Bartlett 28 CressbrookWay Carine, WA 6020 Tel.: 0468 572 954 pknbartlett@gmail.com Resume Barlett.Peter.doc 13 [T Dr. P.K.N. Bartlett, Paper 34, Corrosion & Prevention 2004, Australasian Corrosion Association, Perth, November 2004 “The Role of the Designer in Asset Management” Dr. P.K.N. Bartlett, Australasian Corrosion Association Seminar, Melbourne, September 2008