This document provides information to draw a Program Evaluation and Review Technique (PERT) network and analyze a project. It includes activity information like optimistic, most likely, and pessimistic durations to calculate the expected duration, variance, and probability of completing within given timeframes, like having a 90% chance of finishing within the total time. It asks to: 1) Draw the PERT network, 2) Calculate the total project time, 3) Find the probability of completing within 25 and 20 weeks, and 4) Find the total time with a 90% probability.