String 2 is a full-size prototype of an LHC arc cell consisting of magnets and a cryogenic distribution line. Over 700 sensors and actuators are distributed along fieldbuses and controlled by two PLCs running 126 control loops. The cryogenic control system, instrumentation, and commissioning are described. Commissioning identified issues like sensor mismatches which were repaired. Cool-down was achieved in 2 weeks and magnets were powered to nominal currents. Additional thermometer errors were found and will inform LHC installation procedures.
Design and development of programmable controller for air sampling machineeSAT Journals
Abstract A programmable Controller is designed and developed for time pedestal controlling of Air Sampling Machine. The major purpose of the designed system is to reduce filter damage of Air Sampling Machine. The main function of the controller is to automatically switching the Air Sampling Machine with predefined On-Off time interval for 24 hours operation. This is a low cost system which is designed using locally available components and user friendly. The controlling operation is maintained by ATMEL AT89C52 microcontroller. A programmable real time clock PCF8583 is used to produce timing control signal for automatic switching of the Air Sampling Machine. Control signals generated by real time clock operate opto-isolator and an electromechanical relay for switching the Air Sampling Machine. EEPROM (M24C64) is used to store necessary data. The instruction firmware for the designed controller has been developed in BASIC platform using BASCOM-8051 software. The designed system is functioning properly and serving the purpose of the design. Keywords: Programmable Controller, AT89C52 microcontroller, RTC, EEPROM, I2C Protocol, BASCOM-8051 IDE
Reviews of Cascade Control of Dc Motor with Advance Controllerijsrd.com
The proportional- integral-derivative (PID) control is the most used algorithm to regulate the armature current and speed of cascade Control system in motor drives. The controller uses two PID controllers. One PI controller is for speed control and second PID controller for current control in cascade structure. Inner loop is for the current control which is faster than the outer loop. Outer loop is for speed control. The output of the encoder is compared with a preset reference speed. The output of the PI controller is summed and is given as the input to the current controller.
Design and development of programmable controller for air sampling machineeSAT Journals
Abstract A programmable Controller is designed and developed for time pedestal controlling of Air Sampling Machine. The major purpose of the designed system is to reduce filter damage of Air Sampling Machine. The main function of the controller is to automatically switching the Air Sampling Machine with predefined On-Off time interval for 24 hours operation. This is a low cost system which is designed using locally available components and user friendly. The controlling operation is maintained by ATMEL AT89C52 microcontroller. A programmable real time clock PCF8583 is used to produce timing control signal for automatic switching of the Air Sampling Machine. Control signals generated by real time clock operate opto-isolator and an electromechanical relay for switching the Air Sampling Machine. EEPROM (M24C64) is used to store necessary data. The instruction firmware for the designed controller has been developed in BASIC platform using BASCOM-8051 software. The designed system is functioning properly and serving the purpose of the design. Keywords: Programmable Controller, AT89C52 microcontroller, RTC, EEPROM, I2C Protocol, BASCOM-8051 IDE
Reviews of Cascade Control of Dc Motor with Advance Controllerijsrd.com
The proportional- integral-derivative (PID) control is the most used algorithm to regulate the armature current and speed of cascade Control system in motor drives. The controller uses two PID controllers. One PI controller is for speed control and second PID controller for current control in cascade structure. Inner loop is for the current control which is faster than the outer loop. Outer loop is for speed control. The output of the encoder is compared with a preset reference speed. The output of the PI controller is summed and is given as the input to the current controller.
The LayerZero Series 70 ePODs: Type-N is a Static Transfer Switch with SafePanel Distribution. Quality built in Aurora, Ohio, the LayerZero ePODs: Type-N is a PDU that is safe, reliable, highly-connected, with advanced power quality monitoring functionality.
The Universal Asynchronous Receiver/Transmitter (UART) controller is the key component of the serial communications subsystem of a computer. The UART takes bytes of data and transmits the individual bits in a sequential fashion. At the destination, a second UART re-assembles the bits into complete bytes.
Siemens Terminal Box Controller (APOGEE Automation System )CONTROLS & SYSTEMS
In This PPT we are discussed about complete details of that product (Use,Operation, Technical details, Dimensions, Wiring, and etc..)
Please Support us and Follow our other Sites
https://www.instagram.com/controlsandsystems.offical
https://twitter.com/ControlsSystems
https://automationtechplc2.blogspot.com
https://humidificationcontrol.blogspot.com
https://controlsandsystems.business.site
www.controls.systemsdm@gmail.com
If you enjoyed this article, share it with your friends and colleagues
The 7SR210 series of relays provide overcurrent and earth fault protection. These relays are typically applied to provide the main protection on feeders and interconnectors and the back-up protection on items of plant such as transformers, Relays have four current inputs and are housed in E6 or E8 cases
7SR220 series relays include for directional control of the overcurrent and earth fault functionality and are typically installed where fault current can flow in either direction i.e. on interconnected systems. Relays have five current and four voltage inputs they are housed in E6 or E8 cases.
Temperature controller controls the temperature of any device according to its requirement for
any industrial application. It also displays the temperature on an LCD displays in the range of –
55°C to +125°C. At the heart of the circuit is the microcontroller from 8051 family which controls
all its functions.
Arm Processor Based Speed Control Of BLDC MotorUday Wankar
The project is designed to control the speed of a DC motor using an ARM series processor. The speed of DC motor is directly proportional to the voltage applied across its terminals. Hence, if voltage across motor terminal is varied, then speed can also be varied. This project uses the above principle to control the speed of the motor by varying the duty cycle of the pulse applied to it (popularly known as PWM control). The project uses input button interfaced to the processor, which are used to control the speed of motor. PWM (Pulse Width Modulation) is generated at the output by the microcontroller as per the program. The program is written in Embedded C. The average voltage given or the average current flowing through the motor will change depending on the duty cycle (ON and OFF time of the pulses), so the speed of the motor will change. A motor driver IC is interfaced to the STM32 board for receiving PWM signals and delivering desired output for speed control of a small DC motor. Further the project can be enhanced by using power electronic devices such as IGBTs to achieve speed control higher capacity industrial motors.
The LayerZero Series 70 ePODs: Type-N is a Static Transfer Switch with SafePanel Distribution. Quality built in Aurora, Ohio, the LayerZero ePODs: Type-N is a PDU that is safe, reliable, highly-connected, with advanced power quality monitoring functionality.
The Universal Asynchronous Receiver/Transmitter (UART) controller is the key component of the serial communications subsystem of a computer. The UART takes bytes of data and transmits the individual bits in a sequential fashion. At the destination, a second UART re-assembles the bits into complete bytes.
Siemens Terminal Box Controller (APOGEE Automation System )CONTROLS & SYSTEMS
In This PPT we are discussed about complete details of that product (Use,Operation, Technical details, Dimensions, Wiring, and etc..)
Please Support us and Follow our other Sites
https://www.instagram.com/controlsandsystems.offical
https://twitter.com/ControlsSystems
https://automationtechplc2.blogspot.com
https://humidificationcontrol.blogspot.com
https://controlsandsystems.business.site
www.controls.systemsdm@gmail.com
If you enjoyed this article, share it with your friends and colleagues
The 7SR210 series of relays provide overcurrent and earth fault protection. These relays are typically applied to provide the main protection on feeders and interconnectors and the back-up protection on items of plant such as transformers, Relays have four current inputs and are housed in E6 or E8 cases
7SR220 series relays include for directional control of the overcurrent and earth fault functionality and are typically installed where fault current can flow in either direction i.e. on interconnected systems. Relays have five current and four voltage inputs they are housed in E6 or E8 cases.
Temperature controller controls the temperature of any device according to its requirement for
any industrial application. It also displays the temperature on an LCD displays in the range of –
55°C to +125°C. At the heart of the circuit is the microcontroller from 8051 family which controls
all its functions.
Arm Processor Based Speed Control Of BLDC MotorUday Wankar
The project is designed to control the speed of a DC motor using an ARM series processor. The speed of DC motor is directly proportional to the voltage applied across its terminals. Hence, if voltage across motor terminal is varied, then speed can also be varied. This project uses the above principle to control the speed of the motor by varying the duty cycle of the pulse applied to it (popularly known as PWM control). The project uses input button interfaced to the processor, which are used to control the speed of motor. PWM (Pulse Width Modulation) is generated at the output by the microcontroller as per the program. The program is written in Embedded C. The average voltage given or the average current flowing through the motor will change depending on the duty cycle (ON and OFF time of the pulses), so the speed of the motor will change. A motor driver IC is interfaced to the STM32 board for receiving PWM signals and delivering desired output for speed control of a small DC motor. Further the project can be enhanced by using power electronic devices such as IGBTs to achieve speed control higher capacity industrial motors.
Parameter controlling of boiler in power plants using fuzzy logic controllereSAT Journals
Abstract Boilers are used industrially both for electric power generation and for supplying process stream in thermal power plants and its control is very important in many field applications. In some situation conventional PID control technique is being used for control purpose. These conventional controllers are not well suitable for some unusual conditions like load disturbances. Fuzzy logic control technique is being used to overcome these problems. A closed loop control system incorporating fuzzy logic has been developed for a class of industrial control systems. A unique fuzzy logic controller (FLC) structured with an efficient realization and a small rule base that can be easily implemented in existing industrial controllers. Fuzzy logic control system is much closer to human thinking and natural language than traditional control systems. This paper describes a fuzzy control technique and its implementation in boiler controls. Here a PIC microcontroller is being used where fuzzy control algorithm is implemented. Keywords: Fuzzy logic control, fuzzy logic controller, boiler controls, PIC microcontroller
The article is devoted to the study and introduction of modern technologies in electro-technical branch of the industry for the purpose of increasing reliability of electric supply. Appling the latest technical developments marketed in automatic breakers Compact NS and Master pact of the company "Schneider Electric", for modernization distributing device 0,4 kV applied transformer substation is offered in it. Zhalilov Rashid"The Intellectual Automated Substation" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-3 , April 2018, URL: http://www.ijtsrd.com/papers/ijtsrd11597.pdf http://www.ijtsrd.com/engineering/electrical-engineering/11597/the-intellectual-automated-substation/zhalilov-rashid
www.envimart.vn - ĐT: 028 77727979 - sales@envimart.vn - Nền tảng cung cấp thiết bị, vật tư ngành nước và môi trường. Chuyên cung cấp vật tư cho dự án xử lý nước sạch, nước thải và môi trường. Envimart luôn đồng hành, tin cậy với đối tác nhà thầu, nhà tích hợp và người sử dụng.
We are occupied in providing Reyrolle 7SR11 The offered product is extremely admired by our patrons for its top performance and longer working life.;
Features:
High performance
Long functional life
Easy to use
Longer life service
Compact structure
1. TUAP065
physics/0112030
INSTRUMENTATION, FIELD NETWORK AND PROCESS AUTOMATION
FOR THE CRYOGENIC SYSTEM OF THE LHC TEST STRING
T. Bager, Ch. Balle, E. Blanco, J. Casas, P. Gomes, L. Serio, A. Suraci, N. Vauthier,
LHC Division, CERN 1211 Geneva 23, Switzerland
S. Pelletier, Soteb National Elektro, 60 rue Clement Ader, 01630 St Genis-Pouilly, France
Abstract
CERN is now setting up String 2 [1], a full-size proto-
type of a regular cell of the LHC arc. It is composed of
two quadrupole, six dipole magnets, and a separate
cryogenic distribution line (QRL) for the supply and
recovery of the cryogen. An electrical feed box (DFB),
with up to 38 High Temperature Superconducting (HTS)
leads, powers the magnets.
About 700 sensors and actuators are distributed along
four Profibus DP and two Profibus PA field buses. The
process automation is handled by two controllers, running
126 Closed Control Loops (CCL).
This paper describes the cryogenic control system,
associated instrumentation, and their commissioning.
1 LAYOUT
String 2 consists of two consecutive LHC half-cells,
comprising: two quadrupoles, six 15 m dipoles, their
multipole correctors, and the QRL. The chain of magnets
is terminated, on the upstream end, by the DFB and, on
the downstream end, by the Magnet Return-Box (MRB).
The QRL is terminated by its feed and return boxes
(QLISF and QLISR).
The DFB houses 3 pairs of 13 kA and 16 pairs of
600 A current leads, to feed 11 electrical circuits. The
MRB contains the short circuits and the connection to the
QRL, simulating the jumper of the following cell. A
6 kW/4.5 K refrigerator supplies and recovers the
cryogen. Fifteen power converters supply the magnets’
electrical circuits.
String 2 has a length of about 120m and follows the
tunnel curvature of the LHC machine (Figure 1). Most of
its elements are heavily instrumented for the experimental
program. String 2 is being assembled in two phases.
Phase 1 started to be commissioned in April 2001; it
comprises all elements except the three dipoles of the
second half-cell, which will be added in early 2002.
Figure 1: overview of String 2
2 PROCESS CONTROL
2.1 Structure
The String 2 cryogenic process [2] is handled by two
industrial Programmable Logic Controllers (PLC), from
Siemens (CPU-S7-414-3DP). One of them is dedicated to
the magnets and QRL cryogenics (PLC1), whereas the
other controls the DFB cryogenics (PLC2).
The refrigerator and its coupling to String 2 are
controlled by an ABB based system, not reported here.
An Engineering WorkStation (EWS) can be remotely
connected to the PLCs, through Profibus DP or Ethernet.
It is used to program the PLCs and to directly access
intelligent devices, for configuration, parameterization
and monitoring.
The cryogenic operation and data storage are
performed on an Operating WorkStation (OWS), linked
to the PLCs through Ethernet. It runs the Supervisory
Control And Data Acquisition (SCADA), which is based
on PcVue32 and was developed by BARC, India, and by
the CERN/LHC/IAS group.
Transients on some process variables are recorded by
a fast VME + LabView data acquisition system,
developed by INCAA, Netherlands, and by IAS group.
2.2 Main Program
Every 100 ms, the main program of each PLC checks
if any of the following routines is scheduled for execution
(Table 1): CCL, input acquisition, phase sequencer,
interlocks, alarms and communication. The time-stamp
associated to every call is available to the OWS.
Table 1: instrumentation and routine count per PLC
PLC1 PLC2 total
process inputs 326 290 616
process outputs 39 42 81
total I/O 365 332 697
CCLs 32+7x2=46 4+38x2=80 126
alarms always valid 16 5 21
alarms for specific phases 25 5 30
interlocks 27 6+38x2=82 109
2.3 Inputs, Outputs and CCLs
Every one of the 81 process outputs (actuators) is
handled by a CCL routine, which implements a PID
algorithm. Half of the actuators have a double PID,
whereby one out of two process inputs can be selected on
the OWS. This leads to 126 PIDs.
The process input to a PID can be filtered (first-order
low-pass) or substituted by a constant value. Two
setpoints, and their respective offsets, are selectable for
each PID; an instantaneous modification of the setpoint
value can be limited in slope.
8th International Conference on Accelerator & Large Experimental Physics Control Systems, 2001, San Jose, California
194
2. A PID can be in one of the following modes, by order
of increasing priority: automatic, forced by process,
manual or interlocked. The PID output is respectively:
calculated, forced by the process conditions, set by the
operator, or driven into a safe position.
CCLs are scheduled for execution with a rate (up to
1Hz) fixed according to the process characteristics. Some
heaters have their average power regulated by a Pulse-
Width Modulation technique (PWM). Their CCLs are
calculated every 10 s and their digital output updated
every 100 ms, leading to a 1% resolution.
The about 500 inputs not used in CCLs are read by the
acquisition routines and made available in the OWS, for
monitoring and diagnostics.
2.4 Process Phases
A process phase sequencer tests the start/stop
conditions for every operational phase, such as cool-
down, normal operation, magnet powering, quench
recovery and warm-up. Associated to each phase,
automatic actions are programmed for each actuator:
choose each of two PIDs, choose each of two setpoints,
regulate or force to close or to open, with or without
ramp. These automatic actions can be overridden by
manual or interlocked modes.
2.5 Interlocks
About 30 general interlock conditions are available, in
order to force actuators into a safe position, like:
• close valves when liquid level or pressure are high;
• power-off level indicators if no liquid is present;
• stop heaters if a risk of thermal runaway exists.
Moreover, 80 interlocks protect the HTS current leads
against excessive cooling: each valve controlling the
cooling of the current leads is interlocked with two
temperatures at the warm end of the lead.
The interlock thresholds are editable on the OWS and
the associated process values and status bit are displayed.
This status bit is also visible on each actuator’s PID
faceplate. Interlocks override automatic and manual
actions and they cannot be disabled.
For high-power heaters (>1 kW), local hardware
interlocks are activated by the actual temperature of each
heating element, independently from the PLC.
2.6 Alarms
About 20 alarm conditions are always tested, while 30
others are valid only in specific phases of the process. As
for the interlocks, the threshold for each alarm condition
is editable on the OWS and the process value and status
bit are displayed. Two enable bits are available for alarm
activation and for outgoing signal generation.
If any of the enabled alarms lasts more than 1 minute
without being acknowledged, or if the communication
with a PLC is idle for more than 5 minutes, the OWS
automatically warns the operator. A message with the
type of alarm is sent through email or cellular phone.
Additionally, when any of the enabled alarms lasts
more than 1 minute, or if either PLCs stops, a global
hardwired signal is sent to the CERN Technical Control
Room (TCR). The responsible person will then be called
after a given time. This global signal can also be
enabled/disabled/forced by software and hardware.
2.7 Communication
Specific routines exchange information between both
PLCs and receive data from other systems, such as the
refrigerator and the magnet power converter.
On the other hand, critical signals are hardwired:
• status of refrigerator, vacuum and quench detection;
• interlocks to refrigerator and power converters;
• alarm to the TCR.
3 FIELDBUS NETWORKS
Instrumentation is spread along the string over 120 m.
Most of the process inputs and outputs are accessed by
the PLCs through various fieldbus segments (Figure 2).
Figure 2: Layout and fieldbus networks
Intelligent devices are directly connected to
Profibus PA, operating at 31.25 kbit/s. Conventional
devices are connected to analog or digital modules on
remote I/O stations (ET200M®
from Siemens), which
communicate on Profibus DP, running at 1.5 Mbit/s.
3.1 Network PLC1
To cover the instrumentation distributed along the
magnets and the QRL, three DP and two PA segments
have been used.
The sensors that will be used in the LHC machine are
distributed over two DP segments, each of them 150 m
long. If one of these is down, the sensors on the other will
still be enough to run the machine. Each segment
comprises 4 remote I/O stations, housed in crates under
each dipole, as for the LHC machine.
The third DP segment, extending for about 250 m,
gathers instrumentation specific to the experimental
program of String 2. Sixteen I/O stations are accommo-
dated in ten racks behind the QRL, whereas 8 other are
directly hooked on the QRL. Also on this DP segment are
the two PA segments; they include 7 intelligent valves
and 3 pressure sensors, installed at one end of the QRL,
and 2 valves at the other end. The PLC and some I/O
stations are installed in two racks.
3.2 Network PLC2
Most of the DFB instrumentation is grouped on a
single and short DP segment: 8 I/O stations and a PA
segment that handles one intelligent valve positioner.
The 38 valves, on the cooling inlets of the current
leads, are driven by local PLC output modules. All the
I/O stations and the PLC are installed in two racks. This
configuration is representative of the LHC machine,
where the PLC and I/O stations of the DFB will be
clustered in radiation protected areas.
8th International Conference on Accelerator & Large Experimental Physics Control Systems, 2001, San Jose, California
195
3. 4 INSTRUMENTATION
4.1 Temperature
More than 400 resistive temperature sensors, of three
types, are used in String 2 (Table 2). As all of them are
non-linear, the measured resistance is converted into
temperature by an interpolation table. Each Cernox™
and
Carbon have a specific table, whereas all Platinum have
the same one.
Table 2: temperature sensors
Type Quantity range covered
Platinum 295 300 K … 30 K
Cernox™ 115 300 K … 1.6 K
Carbon 22 100 K … 1.6 K
In general, Platinum thermometers are directly read by
analog input modules as a four-wire resistor, without any
intermediate signal conditioning.
Most of the Cernox™
and Carbon thermometers are
read through linear multi-range signal conditioners
(STMS), which produce 4-20 mA magnitude and two bits
indicating the range. Logarithmic signal conditioners
(LOG) are used for sampling rates faster than a few
seconds and have a single 4-20 mA output. Both STMS
and LOG are in-house developments [3].
In the current leads, galvanic isolation up to 5 kV is
provided by:
• IPAC®
conditioners for 190 Platinum thermometers
• STMS conditioners and fuses for 6 Cernox™
.
4.2 Pressure
On pipes and vessels, absolute pressures up to
100 mbar or to 25 bar are measured by warm transducers,
with integrated electronics; three of them operate on
Profibus PA whereas 16 other have 4-20mA outputs. The
cold mass pressures are measured by 11 passive low-
voltage sensors, immersed in liquid helium; their signal
conditioners have 4-20mA outputs.
4.3 Liquid Level
The eight liquid helium levels inside the vessels and in
the superfluid heat exchanger are measured with
superconducting-wire gauges (Twickenham Scientific
Instruments). To minimize self-heating, the sensors are
read in 3s pulsed-mode. The output is 4-20 mA.
4.4 Flow
Two mass-flow controllers, ten mass-flow meters and
two cryogenic Coriolis mass flow-meters are used to
control flow rates and to assess thermal performances.
They are read via 4-20 mA current-loops.
4.5 Heaters
Electrical heaters are used to warm-up cold gaseous
helium leaving String 2, and to evaporate liquid helium in
phase separators and in the magnet cold masses.
Twenty-one low-power heaters are driven by level
modulated DC voltage. Five higher power heaters, up to
64 kW, are supplied through 220 VAC solid state relays,
via the PWM technique. Most of these are in series with
programmable relays (Sineax), activated according to the
temperature of the respective heating element.
4.6 Valves
Ten pneumatic valves with intelligent positioners
(Sipart®
PS2, from Siemens) are spread on the two
Profibus PA segments. Thirty-four classical analog valves
are driven with 4-20 mA. Five on/off valves are driven by
0-24 V digital outputs.
5 COMMISSIONING
Starting in April 2001, most of the instrumentation
and control was checked while the last components were
being assembled.
Every instrument had its signal chain verified from the
machine to the PLC and to the SCADA. This included
cabling, signal processing, coherence between PLC and
SCADA databases, and synoptic view. Phases, interlocks
and alarms were tested by changing thresholds, while the
actuators were inhibited.
Before the final closure of the vacuum vessel, several
problems were identified. They were repaired whenever
the instrument or cables were still accessible. The origin
of these issues has been traced to:
• sensor name and serial number mismatch;
• installation procedure not followed;
• broken wires, sensors failure.
All instruments required for the cooling loops were
available when cool-down from 300 K to 4.5 K started,
on August 7. The process was gradually set into auto-
matic mode, and the machine could be left unattended.
Apart from the unavoidable time spent for trouble-
shooting the components and instrumentation not
operating as expected, the overall cool-down from 300 K
to 1.9 K took just over 2 weeks, as expected. Once at
nominal temperature (1.9 K), the dipole and quadrupole
circuits were powered to nominal current (11 850 A).
Only then, the control loops were fine-tuned, and cold-
mass thermometers and pressure sensors were verified for
high accuracy.
During cool-down, the analysis of temperature pro-
files showed additional inversions and identification
errors, mainly on the current leads thermometers.
6 CONCLUSION
The installation and commissioning of String 2 cryo-
genic instrumentation and control was very educative, in
view of the methods to be implemented for LHC. The
structure of software and hardware documentation was
enhanced. Software routines were improved. In the future,
sensors installation procedures must be carefully respect-
ed, in terms of materials, positioning, and follow-up
documentation. In this way, precious time can be saved.
We wish to express our acknowledgement to the
operators team, who gave us valuable help during the
commissioning of instruments and programs.
REFERENCES
[1] F. Bordry et al., “The LHC Test String 2: Design Study”, LHC
Project Report, March 1998.
[2] L. Serio, “The Process of the Cryogenic System for String 2:
Functional Analysis”, LHC-XMS-ES-0004, LHC Engeneering
Specification, Feb 2001.
[3] J. Casas et al., “Signal Conditioning for Cryogenic Thermometry
in the LHC”, CEC/IMC99, Montreal, Canada, July 1999.
8th International Conference on Accelerator & Large Experimental Physics Control Systems, 2001, San Jose, California
196