SlideShare a Scribd company logo
1 of 44
Download to read offline
PPPs in Power Generation


          Patricio Mansilla
       Infrastructure Director
       Chemonics International
           Washington DC
             April 2011
Agenda
 g

 1.
 1 Useful Concepts for PPPs in Power Generation

 2. Selected Case studies

 A. Chilean Case

 B. Peruvian Case

 C. Mongolian Case
1. Useful Concepts for PPPs in
        Power Generation
Energy System
•   Generation: Process of creating electricity from others forms of
    energy. It is normally generated at a power station (power plant) by
    electromechanical generators normally driven by heat engines fueled
    by chemical combustion or nuclear fission but also by kinetic energy
    or flowing water and wind. Others technologies to generate electricity
    are solar and geothermal.

•   Transmission: is the movement of energy from its place of generation
    to a location where it is applied to performing useful work.
           Watt = Joule/second = Newton*Meter/second

•   Distribution: is the final stage in the delivery of electricity (before
    retail) to end users It carries electricity from the transmission system
                   users.
    and delivers it to consumers.
Energy System
Power Station or Power Plant
• Centralized power generation is possible because
  alternating current power lines can transport electricity at
  low cost raising and lowering the voltage using power
  transformers.
• Central Stations, Power Station or Power Plant normally
                   ,                                        y
  use: coal, nuclear, natural gas, hydroelectric and
  petroleum.
• Power Plants also rely on solar energy, tidal harnesses,
                                    energy       harnesses
  wind generators and geothermal sources.
Coal-
              Coal-Fired Power Plant
•   A coal-fired power plant produces electricity by burning coal to boil water,
    producing steam which drives a steam turbine, which turns an electrical
    generator.
•   The
    Th combustion of any fuel, including coal, emits large amounts of carbon
             b ti      f     f l i l di        l    it l            t f b
    dioxide and other pollutants into the atmosphere, contributing to global
    warming.
•   The largest coal-fired power station is Kendal Power Station, South Africa
                coal fired                               Station
    and the most efficient is in Denmark.
Combined Heat and Power (CHP)
                      Plant
• Combined heat and Power (CHP) plant or Cogeneration
  Plant use heat engine or power station to simultaneously
  generate both electricity and heat.
Hydroelectric Plant
•   Hydroelectric Plants produce power through use of the gravitational force of falling or flowing
    water. Most hydroelectric power comes from the dammed water driving a water turbine and
    generator.
•   Pumped storage hydroelectricity p
         p        g y               y produces electricity to supply high p
                                                         y      pp y g peak demands by movingy        g
    water between reservoirs at different elevations. At times of low electrical demand, excess
    generation capacity is used to pump water into the thigher reservoir. When there is higher
    demand, water is release back into the lower reservoir through a turbine.
•   Hydroelectric p
      y            plants with no reservoir capacity are called run-of- the-river plants, since it is not
                                               p y                                p     ,
    then possible to store water
•   A tidal power plant makes use of the daily rise and fall if water due to tides, such sources are
    highly predictable and if conditions permit construction of reservoirs, can also be dispatchable
    to generate power during high demand periods.
       g        p           g g              p
PPP Schemes for Power Generation
•   Design, Build, Operate.
•   Design, Build, Operate and Finance.
•   Build, Operate and Finance
•   Normally different schemes of PPPs for Power Generation rely on a
    Power Purchase Agreement (PPA), were the power purchaser is a
    local utility, public service provider or operator that sell the energy to
    the market.
•   PPA is normally a long term contract with a dual payment system.
•   Dual payment system: capacity or availability charge and a usage or
    offtake charge.
     ff k h
•   In some cases there are Tolling Agreements: the purchaser delivers
    fuel to the concessionaire and it turn the fuel into electricity.
Typical PPA (1)
•   A typical PPA may contain the following:

•   (1) Preamble (2) Definitions and interpretation, (3) Conditions
        Preamble,                       interpretation
    precedent, (4) Development stage, (5) Construction period, (6)
    Commissioning and entry into commercial service, (7) Plant operation,
    maintenance and fuel management, (8) Dedication of capacity,
                                   g       ,( )                 p     y,
    availability declaration, (9) Measurement of capacity, availability and
    energy metering, (10) Capacity charge and payment provisions, (11)
    Fuel Price provisions, (12) Billing procedures, terms of payment, (13)
    Insurance, (14) Changes in tax, changes in law, (15) Force Majeure, 6)
    Termination and buy out provisions, (17) Governing law/dispute
    resolution, (18) Liability and indemnity, (19) Confidentiality, (20)
    Representations/warranties/covenants and (21) Mi
    R          t ti   /        ti /         t    d     Miscellaneous.
                                                             ll
Typical PPA (2)
• A typical PPA may contain the following Schedules:

• (1) Description of Power Station, (2) Clearances, (3)
  Development milestones, (4) Interconnection and
  transmission facilities, ( ) Commissioning and testing ( )
                         , (5)             g           g (6)
  Metering standards and testing, (7) Despatch procedures
  (8) Capacity payment and (9) Energy payments.
Options for PPPs
•   Option A: Public sector develop the project using its own resources and then
    privatizes it or prepare a PPP


•   Option B: The public sector completes the feasibility studies and invites to the
    private sector to finance, construct and operate the PPP project
                      finance


•   Option C: The private sector conducts all feasibility studies and prepare the
    project under a design, finance, construct and operate the PPP project
       j      d     d i fi                       d          h          j
Projec Cycle of HPP PPPs
    Stage                           Activities
 Site Selection            Identification of potential sites

 Prefeasibility      Scheme concept. Preliminary estimate of
                               cost and benefits
Short Feasibility    Preliminary optimization of main project
                    parameters based largely on existing data
Full Feasibility    Detailed site mapping and geological
                    investigation.
                    investigation Full Environmental Impact
                    Assesment.
Tender Design       Business model preparation and contract
                    regulation based on Short or Full Feasibility
Detailed Design     Adjudication and detailed design of each
                    element of civil works.
Risks in Power Generation PPPs
•   Site-specific nature of projects

•   Long period of construction and high construction risk

•   Capital intensive

•   Hydrological risk river flows make volatile output. Important water
                 risk,                          output
    management

•   Flow of revenues need to be predicted under real scenarios.

•   Operation risks
Risks Allocation HPP PPPs
Risk                      Allocation
Hydrology                 Temporary deficits: Conces and Gov.
                          Long Term deficits:Util-Gov
                          Flood damage: Contractor and Conces
Costruction               Cost overrun and delayed completion: Concess and
                          contractor. Unforeseen ground conditions: Util-Gov-
                          concess
Performance               Equipment and project performance: concess
                          Transmission: Utility company
Market                    Utility company through take or pay or PPA

Political                 Government

Financial                 Increasing costs: utility company or gov

Environmental
E i       t l             Land
                          L d acquisition and resetlement: G Utilit company
                                  i iti     d     tl    t Gov-Utility
Market
Failure 1    PUBLIC GOOD

Market
Failure 2      MONOPOLY


Market      EXTERNALITIES
Failure 3


Market         ASSIMETRIC
Failure 4    INFORMATION
¿Do we have a Monopoly?

                                                     ¿Is it large the loss in
               Market      no       yes
                                                       Economic efficiency
             Competition                         From First Best to Second Best?

                                                  AC                                     AC
                                    P                                      P
                                                       MgC                                     MgC

                                                       D                                      D
                                             Q               yes   no                Q


                                - Lump sum Subsidy                              ¿Regulation
                                - No Lineal Tarification                       By Competition?
                                - Price Discrimination




                                                                          no             y
                                                                                         yes

                                                                     • Demsetz Competition
                                  • Ramsey Tarification
                                                                     (bidding)
                                  • RPI-X
                                    RPI-
                                                                     • Contestable Markets
                                  • R t of Return
                                    Rate f R t
PRICE CAPS
       (RPI, RPI-X, RPI-X+K)
             RPI- RPI-X K)




Profitability or Rate of Return   Regulatory Models
  Tariffs Ramsey-Boiteaux
          Ramsey-
                                       for PPP
                                        o
  YARDSTICK Competition



   DEMSETZ Competition
            (Bidding)
Characteristics in LAC countries
Characteristics   Brazil    Chile    Peru
Capacity (
  p    y (MW)
            )     90,733    10,367   6,016



Energy (GWh)      387,451   51,640   24,267


Hydropower         80%       41%      71%

generation
Nuclear             3%       0%       0%

Generation
Large Hydropower Projects
Project           Capacity (MW)   Country
Three Gorges          18,200
                      18 200        China
Ertan                  3300         China
Caruachi               2,160      Venezuela
Porto Primavera        1,818
                        ,           Brazil
Ita                    1,450        Brazil
Serra de Mesa          1,293        Brazil
Salto Caxias           1,240        Brazil
Rio Baker-Aysen         800         Chile
A. Chilean Case
Power Systems in Chile (1)
Systems      Generation                Transmission              Distribution
             Edelnor, Electroandina,   Edelnor, Electroandina,   Emelari, Eliqsa, Elecda
SING         Celta, Norgener Gener,
             Celta Norgener, Gener     Norgener
             Gasatacama
             Arauco, Petropower,       Transelec                 Chilectra, CGE,
SIC          Gener, San Isidro,        STS                       Chilquinta, Rio Maipo,
             Endesa, Colbun,           Transnet                  Saesa, Frontel, Emec,
             Guacolda, E. Verde,
             Guacolda E Verde                                    Conafe, Emelectric
                                                                 Conafe Emelectric,
             Santiago, Pangue,         Transquillota             Emelat, Puente Alto,
             Pehuenche,                                          Copelec, Litoral, Luzagro,
             Pilmaiquen,Aconcagua,                               Emetal, Colina, Luzpar.
             Maipo, Vieja, Valpo,
             Capullo, Andes,
             Carbomet
             Edelaysen                 Edalaysen                 Edelaysen
Aysen
             Edelmag
                   g                   Edelmag
                                             g                   Edelmag
                                                                       g
Magallanes
Power System in Chile (2)
Type of Contracts                    Characteristics
Generator-Generator                  Generator without contract with distribution
                                     company or free client sell energy to the spot
                                     market at marginal cost set up by CDEC.


Generator – Free client              No regulation of transactions with clients with
                                           g
                                     capacity of 2000 kw or more. Free to negotiate
                                     prices because of the negotiation power.
                                     Codelco case.
Generator – Distribution companies
                            p        High risk for g
                                       g           generators if marginal cost of
                                                                    g
                                     operation is higher than the price. By law
                                     distribution companies must to contract
                                     through public tendering process.
Codelco-
                      Codelco-Chile (1)
•   Corporación Nacional del Cobre (or “Codelco Chile”) is the National Copper
                                         Codelco-Chile )
    Corporation that manage the cupper production in Chile as a State owned
    copper mining company. It is the largest copper producer company in the
    world.

•   Codelco decided in 2007 to tender to one or more independent power
    producers its future electricity supply requirements in Salvador, Andina,
    Ventanas and El Teniente Divisions, located in Chile´s central region and
    connected to Chile´s SIC, the central interconnected transmission Chilean grid
Codelco-
                      Codelco-Chile (2)
•   The power plants in Chile (combined cycle gas- fired thermoelectric plants)
    usually use Argentine natural gas as a fuel and because of the shortage of it
    Codelco decide to initiate the process to have safe and reliable electricity
    supply.

•   The SIC in Chile extends over 2000 kms and some 326.000 km2 with 11.700
    km of transmission lines, serving 93% of the population

•   The total capacity of SIC is 8,512 MW (2006) generating 40,334 GWh in
    2006, 55.8% is hydrolectric and 44.2% is thermal.
Codelco-
                 Codelco-Chile (3)
• The project called Long-term electricity supply for Codelco-
                     Long term                         Codelco
  Chile´s Divisions in central Chile, was recently adjudicated in
  September of this year to Colbun and it includes two contracts for
  15 and 30 years.
• The concessionaire will design, build and operate power plants of
  any kind, as well as the construction of any other investment
     y     ,                                 y
  necessary to operate them and to connect them to the trunk
  transmission system of the SIC (3-10 regions)
• The concessionaire will design, build start-up and maintain the
                           design build, start up      maintain,
  new transmission system or expansions of the existing that might
  be required to connect the power plant to the trunk transmission
  system of the SIC.
Codelco-
                 Codelco-Chile (4)
• The concessionaire will design, develop and construct a port
                            design
  terminal, if necessary, for the uploading of fuel that will be
  needed for the power plant, or otherwise, reach and agreement
  with the operator of an existing port.

• The demand to be supplied over the period of the agreement shall
                     pp              p              g
  be from 450 MW up to a capacity of approximately 900 MW.
A project with Low Risk
•   Long term contract with minimum commercial risks: Codelco has 20% of
    the total existing copper reserves in the world, around 77 million metric tons.
    Codelco accounts for 15% of the total Chilean electricity consumption.
•   Adequate credit rating: Codelco has a rating of A according to Standard &
    Poor´s.
•   Chilean Regulation: It does not contemplate any specific license, only
    construction and environmental studies.
         t ti        d    i        t l t di
•   Selling of remaining power: the concessionaire can sell to SIC the remaining
    power if the plant has excess of capacity. SIC requires annual capacity
    additions of approx. 500 MW in order to match supply and demand. Average
                  approx                                        demand
    annual growth of 6.9% in the last ten years.
•   Chile is an investment grade country: Chile is the most solid economy in
    Latin America and it is rated A by S&P.
                                       y
Bidding Characteristics
•   Free cost to be charged t C d l I
    F        tt b h         d to Codelco: Investment, operation and maintenance
                                               t   t       ti     d i t
    fixed costs does not have a maximum in the bidding process. The variable
    costs are recovered via a pass through mechanism with certain efficiency.

•   Codelco included provisions to make the project bankable: sharing the
    risks on fuels and fluctuation in the international fuel prices.

•   Option for bidders: Codelco had set-up a new special purpose company
    (Newco) that own all the studies, licenses and a project. The concessionaire
    has the option to develop its own p j or to buy Newco at a price equal to
             p              p         project         y             p     q
    the incurred costs by Codelco.
Economic Characteristics
•   Bidding Variable: Codelco ill
    Biddi V i bl C d l will pay fi d monthly charges i U it d St t
                                         fixed      thl h        in United States
    Dollars (US$) to cover the investments and the fixed operating expenses
    associated with the service.

•   Provisions: The contract will also include provisions for the transfer of
    variable costs, except hydro plants for which no variable costs will be paid, as
    well as charges for transmission fees (on a pass through basis, with certain
    efficiency signals).

•   Winner: Colbun was the winner offering a supply of up to 510 MW and
                                            g     pp y      p
    energy for 4000 GWh annually. The electricity supply will start on March 1st
    of 2013 with 328 MW and it will reach 510 MW on January 1st of 2015. The
    power stations will use coal and hydroelectricity. Investment US$7 billion.
B. Peruvian Case
Power System in Peru (1)
Generation                      Transmission                Distribution
Cahua, Edegel, Egenor, Piura,
Cahua Edegel Egenor Piura       Mantaro-Socabaya,
                                Mantaro-Socabaya            Edelnor,
                                                            Edelnor Luz del Sur Ede
                                                                            Sur, Ede,
Cahua y Electroandes            Reforzamiento Sur, Oroya,   Etevensa, Cañete, Electro Sur
                                Etecen y Etesur.




Policy                          Regulation                  Competition
Ministry of Energy              Osinerg                     Indecopi
Yuncan Hydroelectric Plant (1)
• First Intent to bid: In 2003 the bid was suspended because of a
  dispute with Pasco department authorities over ownership of the
  project. The agreement is that Pasco will receive payments from
      j    Th             i h P           ill   i            f
  the concession through a social trust fund.
• Hydro Power Plant built by the Government: The State power
    y                         y                              p
  company Egecen ( Empresa de Generación de Energía Eléctrica
  del Centro) was building the plant with 75% of the total
  investment of $262 million finance by JBIC (Japan Bank for
  International Cooperation) and in same moment it had to stop
  works because lack of funds from the 25% committed to the
  project from the Peruvian government. Finally the project was
      j f       h P     i                  Fi ll h      j
  completed in 2006. The plant has a capacity of 130 MW.
Yuncan Hydroelectric Plant (2)
• Construction companies: Skanska, Cosapi and Chizaki
• Equipment suppliers: Vatech Hydrovevey, Alstom France and
  Toshiba
  T hib
• LOM Project: The concessionaire will operate, maintain and
  usufruct the project under a lease of the power plant built by the
               p j                          p     p            y
  State power company.
• Term of Concession: 30 years since the take over of the power
  plant from the concessionaire. Egecen will transfer the plant in
                 concessionaire
  perfect operating conditions for the operation and usufruct of the
  concessionaire.
Bidding Results
•   One Bidder: Peruvian Government received just one offer from Enersur, local
    subsidiary of the Belgian energy company Tractebel.

•   Bidding mechanism: Higher payment to the Peruvian Government.

•   Result of the Bidding: Enersur offered $57.5 million paid over the first 17
    months of the concession and a semi-annual usufruct fee during the first 17
         h f h             i     d       i      l   f     f d i      h fi
    years of the contract and once the concessionaire receive the power plant from
    Egecen. The total amount is $124.5 million.

•   Social Trust Fund: In addition Enersur has to pay to the Social Trust Fund
    under a payment schedule a total of $6.9 million
Guarantees
•    Concessionaire

a) Contract Rights and first-second social payment: $10 million valid until
   15 d
      days after the reception of the power plant by the concessionaire.
            ft th         ti    f th         l t b th           i i
b) Usufruct Rights and periodic payments: $10 million valid until the last
   payment for this concept.
c) Completion: $2 million valid until 90 days after finish the contract period.
                                                                        period

•    Peruvian Government

a) Multilateral guarantee or commercial bank for $50 million valid since the first
   payment of the concessionaire and until Peruvian Government transfer to the
   concessionaire the power plant to the concessionaire.
                      p      p
b) Peruvian government assumes the performance risk of the power plant for the
   first 12 months and the concessionaire will receive a compensation.
C. Mongolian Case
CHP5 Power Plant
•   Energy in Mongolia is a relevant sector where five coal-fired cogeneration
    power plants are managed by a central power system, but it is necessary to
    prepare more projects in urban cities and rural areas that have diesel
    generators.
•   One interesting project in development is the CHP5 project which anticipates
    to implement a build, own and operate model for a cogeneration power plant
    and th modification of th existing sub stations t produce electricity and heat
       d the    difi ti    f the i ti      b t ti     to    d     l t i it    dh t
    energy for Ulan Bator.
•   The capacity of the plant must be 300 MW for power and 700 Gcal for heat
    energy.
    energy The project finally was not adjudicated this year. Mongolian
                                                         year
    government decided does not accept the unique proposal submitted by a
    Chinese corporation.
•   ADB will be supporting the new intent to adjudicate succesfully this project
                    pp     g                     j                   y     p j
Secure Fuel Supply and Bankable
                       PPA
•   Secured fuel supply and Bankable PPA

     –   Generation cost: 60% of the retail tariff
     –   Fuel cost: 60-65% of the generation cost
     –   Government’s control over prices of coal used for generation of energy,
     –   Coal mines are in bad financial shape;
     –   Long term coal supply to Darhan and Erdenet CHPs must be secured,
     –   Not clear sources of revenues
     –   Coal
         C l supply was not completely resolved i th CHP 5 t d d
                    l       t      l t l       l d in the CHP-5 tender documents t
4. Future Projects in Power
          Generation
Coal deposits
                                                                 Choir
                                                                 Ch i
    Copper and gold deposits                                   Shivee ovoo JSC
    Lime stone deposits
    Copper                                                             Dalanjargalan
                                                                               Khokh tsav
                                                                      Mongolian Gold LLC

                                                                           Mandakh
                                                                               Tsagaan suvarga
                                 Tsogt Tsetsgii                          Mongolian Gold LLC
                                                Uhaahudag
Gurvan Tes
G      T                  TAvantolgoi
                                                     Khanbogd
    Nariin Sukhait            Energy Resource LLC         Oyutolgoi
                               Erdes MGL LLC
                                                  Ivanhoe Mines Mongolia LLC
                               Tavantolgoi JSC
SGS LLC                        QGX LLC
Chinhua-MAK-Nariin Sukhait
Chi h MAK N ii S kh it LLC
Mongolian Gold MAK LLC




                                                 Minerals deposits
                                                                                              42
New Projects in Mongolia
    The ever-increasing electricity demand of the Southern Gobi shall be supplied as the
    following:

•   Construct the UB-Mandalgobi- Tavantolgoi-Oyutolgoi 670 km power and heat station
    with 220 kW, with two reinforced concrete pillars and with two linked AC-400
    transformations

•    Facilitate to build 12 mW small size power station with the private sector initiatives near
    the group of the coal mines of Tavantolgoi and implement the plan to build the power
    station with the capacity not less than 300 mW through the government integrated
    regulation and the PPP principles
Thank you
      y

More Related Content

What's hot

Renewable Energy - Norway - Sample
Renewable Energy - Norway - SampleRenewable Energy - Norway - Sample
Renewable Energy - Norway - SampleNetscribes, Inc.
 
2012 06-11 intersolar key note final version
2012 06-11 intersolar key note final version2012 06-11 intersolar key note final version
2012 06-11 intersolar key note final versionsibyllethiede
 
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021Cluster TWEED
 
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...Cluster TWEED
 
City of Berkeley Electric Vehicle Infrastructure Strategy
City of Berkeley Electric Vehicle Infrastructure StrategyCity of Berkeley Electric Vehicle Infrastructure Strategy
City of Berkeley Electric Vehicle Infrastructure StrategyRudi Halbright
 
Eng vi encontro - cpfl renováveis - miguel
Eng   vi encontro - cpfl renováveis - miguelEng   vi encontro - cpfl renováveis - miguel
Eng vi encontro - cpfl renováveis - miguelCPFL RI
 
Ninth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar ProposalNinth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar Proposalninthavenue
 
Thomas Theisen Rwe
Thomas Theisen   RweThomas Theisen   Rwe
Thomas Theisen RweNick Craig
 
ILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFIindia
 
Power Purchase Agreements Presentation To Power Gen Electrotex Conference 2...
Power Purchase Agreements   Presentation To Power Gen Electrotex Conference 2...Power Purchase Agreements   Presentation To Power Gen Electrotex Conference 2...
Power Purchase Agreements Presentation To Power Gen Electrotex Conference 2...Deoye
 
World Energy Outlook | Bruxelles - 06 février 2020
World Energy Outlook | Bruxelles - 06 février 2020World Energy Outlook | Bruxelles - 06 février 2020
World Energy Outlook | Bruxelles - 06 février 2020Cluster TWEED
 
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020Cluster TWEED
 
First Solar case study
First Solar case studyFirst Solar case study
First Solar case studyamanbhattarai
 
First Solar Inc., July 2009
First Solar Inc., July 2009First Solar Inc., July 2009
First Solar Inc., July 2009raja_lkc
 
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...Loay Ghazaleh MBA, BSc Civil Eng.
 
General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011Rameez Shaikh
 

What's hot (20)

Renewable Energy - Norway - Sample
Renewable Energy - Norway - SampleRenewable Energy - Norway - Sample
Renewable Energy - Norway - Sample
 
2012 06-11 intersolar key note final version
2012 06-11 intersolar key note final version2012 06-11 intersolar key note final version
2012 06-11 intersolar key note final version
 
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021
CCU et les nouvelles molecules de la transition energetique | 2 fevrier 2021
 
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
 
City of Berkeley Electric Vehicle Infrastructure Strategy
City of Berkeley Electric Vehicle Infrastructure StrategyCity of Berkeley Electric Vehicle Infrastructure Strategy
City of Berkeley Electric Vehicle Infrastructure Strategy
 
Fuel cell13agm
Fuel cell13agmFuel cell13agm
Fuel cell13agm
 
GCCSI Financial Model Case Study
GCCSI Financial Model Case StudyGCCSI Financial Model Case Study
GCCSI Financial Model Case Study
 
Eng vi encontro - cpfl renováveis - miguel
Eng   vi encontro - cpfl renováveis - miguelEng   vi encontro - cpfl renováveis - miguel
Eng vi encontro - cpfl renováveis - miguel
 
Ninth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar ProposalNinth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar Proposal
 
Thomas Theisen Rwe
Thomas Theisen   RweThomas Theisen   Rwe
Thomas Theisen Rwe
 
ILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on Energy
 
Tom Georgis | SolarReserve
Tom Georgis | SolarReserveTom Georgis | SolarReserve
Tom Georgis | SolarReserve
 
Power Purchase Agreements Presentation To Power Gen Electrotex Conference 2...
Power Purchase Agreements   Presentation To Power Gen Electrotex Conference 2...Power Purchase Agreements   Presentation To Power Gen Electrotex Conference 2...
Power Purchase Agreements Presentation To Power Gen Electrotex Conference 2...
 
World Energy Outlook | Bruxelles - 06 février 2020
World Energy Outlook | Bruxelles - 06 février 2020World Energy Outlook | Bruxelles - 06 février 2020
World Energy Outlook | Bruxelles - 06 février 2020
 
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
 
First Solar case study
First Solar case studyFirst Solar case study
First Solar case study
 
First Solar Inc., July 2009
First Solar Inc., July 2009First Solar Inc., July 2009
First Solar Inc., July 2009
 
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...
Driving Clean Energy in MENA / GCC Region - 2nd kuwait Investment Summit – Fe...
 
General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011
 
Emerging Africa Infrastructure Fund
Emerging Africa Infrastructure FundEmerging Africa Infrastructure Fund
Emerging Africa Infrastructure Fund
 

Viewers also liked

Patricio Mansilla - PPP in Perú: Callao Port
Patricio Mansilla - PPP in Perú: Callao PortPatricio Mansilla - PPP in Perú: Callao Port
Patricio Mansilla - PPP in Perú: Callao PortPublic-PrivatePartnership
 
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...Public-PrivatePartnership
 
Unicef australia who we are and what we do 2009
Unicef australia   who we are and what we do 2009Unicef australia   who we are and what we do 2009
Unicef australia who we are and what we do 2009Rickard Vikstrom
 
Sitem pemerintahan indonesia
Sitem pemerintahan indonesiaSitem pemerintahan indonesia
Sitem pemerintahan indonesiaAmran Jaya
 
What you'll get when you get Koha 3.4
What you'll get when you get Koha 3.4What you'll get when you get Koha 3.4
What you'll get when you get Koha 3.4Liz Rea
 

Viewers also liked (7)

Patricio Mansilla - PPP in Perú: Callao Port
Patricio Mansilla - PPP in Perú: Callao PortPatricio Mansilla - PPP in Perú: Callao Port
Patricio Mansilla - PPP in Perú: Callao Port
 
Patricio Mansilla - PPP in Mongolia
Patricio Mansilla - PPP in MongoliaPatricio Mansilla - PPP in Mongolia
Patricio Mansilla - PPP in Mongolia
 
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...
Patricio Mansilla - Mongolia’s gateway logistics park in Zamyn Uud: Potential...
 
Unicef australia who we are and what we do 2009
Unicef australia   who we are and what we do 2009Unicef australia   who we are and what we do 2009
Unicef australia who we are and what we do 2009
 
Sitem pemerintahan indonesia
Sitem pemerintahan indonesiaSitem pemerintahan indonesia
Sitem pemerintahan indonesia
 
Asean kls 6
Asean kls 6Asean kls 6
Asean kls 6
 
What you'll get when you get Koha 3.4
What you'll get when you get Koha 3.4What you'll get when you get Koha 3.4
What you'll get when you get Koha 3.4
 

Similar to Patricio Mansilla - PPPs in Power Generation

Integrating renewables and enabling flexibility of households and buildings
Integrating renewables and enabling flexibility of households and buildingsIntegrating renewables and enabling flexibility of households and buildings
Integrating renewables and enabling flexibility of households and buildingsLeonardo ENERGY
 
Market 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RMarket 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RGaren Ewbank
 
Distributed generation.pptx
Distributed generation.pptxDistributed generation.pptx
Distributed generation.pptxSushma57624
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackPower Responsive
 
Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectPartha Deb
 
Power, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePower, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePMILebanonChapter
 
San Angelo’s Use of Renewable Resources
San Angelo’s Use of Renewable ResourcesSan Angelo’s Use of Renewable Resources
San Angelo’s Use of Renewable ResourcesPorts-To-Plains Blog
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 finalJohn Chowdhury
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Clean Coalition
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesCapgemini
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptssuserfdb06f
 
Metering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridMetering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridAnirudh Ramesh
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Community Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for citiesCommunity Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for citiesClean Coalition
 
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...Sean Meyn
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010Ngy Ea
 

Similar to Patricio Mansilla - PPPs in Power Generation (20)

Integrating renewables and enabling flexibility of households and buildings
Integrating renewables and enabling flexibility of households and buildingsIntegrating renewables and enabling flexibility of households and buildings
Integrating renewables and enabling flexibility of households and buildings
 
Market 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RMarket 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/R
 
Distributed generation.pptx
Distributed generation.pptxDistributed generation.pptx
Distributed generation.pptx
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full Slidepack
 
Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot Project
 
Power, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePower, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in Europe
 
San Angelo’s Use of Renewable Resources
San Angelo’s Use of Renewable ResourcesSan Angelo’s Use of Renewable Resources
San Angelo’s Use of Renewable Resources
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 final
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...
 
Kammen
KammenKammen
Kammen
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunities
 
Distributed Generation Feasibility
Distributed Generation FeasibilityDistributed Generation Feasibility
Distributed Generation Feasibility
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
 
Metering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridMetering and Regulating the Electricity Grid
Metering and Regulating the Electricity Grid
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Community Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for citiesCommunity Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for cities
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Political Economy of Energy Reforms
Political Economy of Energy ReformsPolitical Economy of Energy Reforms
Political Economy of Energy Reforms
 
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...
Demand-Side Flexibility for Reliable Ancillary Services in a Smart Grid: Elim...
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 

More from Public-PrivatePartnership

Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...
Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...
Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...Public-PrivatePartnership
 
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPP
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPPPatricio Mansilla - Chilean Experience in Economic Regulation of Roads PPP
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPPPublic-PrivatePartnership
 
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPP
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPPPatricio Mansilla - Zamyn Uud logistic park demand analysis for PPP
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPPPublic-PrivatePartnership
 
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongolia
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongoliaPatricio Mansilla - Zamyn Uud an invitation for PPP in mongolia
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongoliaPublic-PrivatePartnership
 

More from Public-PrivatePartnership (9)

Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...
Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...
Patricio Mansilla - Panorama General y Competitividad Relativa del Sector Via...
 
Patricio Mansilla - Key PPP Precepts
Patricio Mansilla - Key PPP PreceptsPatricio Mansilla - Key PPP Precepts
Patricio Mansilla - Key PPP Precepts
 
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPP
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPPPatricio Mansilla - Chilean Experience in Economic Regulation of Roads PPP
Patricio Mansilla - Chilean Experience in Economic Regulation of Roads PPP
 
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPP
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPPPatricio Mansilla - Zamyn Uud logistic park demand analysis for PPP
Patricio Mansilla - Zamyn Uud logistic park demand analysis for PPP
 
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongolia
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongoliaPatricio Mansilla - Zamyn Uud an invitation for PPP in mongolia
Patricio Mansilla - Zamyn Uud an invitation for PPP in mongolia
 
Patricio Mansilla - PPP in Urban Investment
Patricio Mansilla - PPP in Urban InvestmentPatricio Mansilla - PPP in Urban Investment
Patricio Mansilla - PPP in Urban Investment
 
Patricio Mansilla - PPP Kazakhstan
Patricio Mansilla - PPP KazakhstanPatricio Mansilla - PPP Kazakhstan
Patricio Mansilla - PPP Kazakhstan
 
Patricio Mansilla - PPP in Africa
Patricio Mansilla - PPP in AfricaPatricio Mansilla - PPP in Africa
Patricio Mansilla - PPP in Africa
 
Patricio Mansilla - Project Finance in LA
Patricio Mansilla - Project Finance in LAPatricio Mansilla - Project Finance in LA
Patricio Mansilla - Project Finance in LA
 

Recently uploaded

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 

Recently uploaded (20)

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Patricio Mansilla - PPPs in Power Generation

  • 1. PPPs in Power Generation Patricio Mansilla Infrastructure Director Chemonics International Washington DC April 2011
  • 2. Agenda g 1. 1 Useful Concepts for PPPs in Power Generation 2. Selected Case studies A. Chilean Case B. Peruvian Case C. Mongolian Case
  • 3. 1. Useful Concepts for PPPs in Power Generation
  • 4. Energy System • Generation: Process of creating electricity from others forms of energy. It is normally generated at a power station (power plant) by electromechanical generators normally driven by heat engines fueled by chemical combustion or nuclear fission but also by kinetic energy or flowing water and wind. Others technologies to generate electricity are solar and geothermal. • Transmission: is the movement of energy from its place of generation to a location where it is applied to performing useful work. Watt = Joule/second = Newton*Meter/second • Distribution: is the final stage in the delivery of electricity (before retail) to end users It carries electricity from the transmission system users. and delivers it to consumers.
  • 6. Power Station or Power Plant • Centralized power generation is possible because alternating current power lines can transport electricity at low cost raising and lowering the voltage using power transformers. • Central Stations, Power Station or Power Plant normally , y use: coal, nuclear, natural gas, hydroelectric and petroleum. • Power Plants also rely on solar energy, tidal harnesses, energy harnesses wind generators and geothermal sources.
  • 7. Coal- Coal-Fired Power Plant • A coal-fired power plant produces electricity by burning coal to boil water, producing steam which drives a steam turbine, which turns an electrical generator. • The Th combustion of any fuel, including coal, emits large amounts of carbon b ti f f l i l di l it l t f b dioxide and other pollutants into the atmosphere, contributing to global warming. • The largest coal-fired power station is Kendal Power Station, South Africa coal fired Station and the most efficient is in Denmark.
  • 8. Combined Heat and Power (CHP) Plant • Combined heat and Power (CHP) plant or Cogeneration Plant use heat engine or power station to simultaneously generate both electricity and heat.
  • 9. Hydroelectric Plant • Hydroelectric Plants produce power through use of the gravitational force of falling or flowing water. Most hydroelectric power comes from the dammed water driving a water turbine and generator. • Pumped storage hydroelectricity p p g y y produces electricity to supply high p y pp y g peak demands by movingy g water between reservoirs at different elevations. At times of low electrical demand, excess generation capacity is used to pump water into the thigher reservoir. When there is higher demand, water is release back into the lower reservoir through a turbine. • Hydroelectric p y plants with no reservoir capacity are called run-of- the-river plants, since it is not p y p , then possible to store water • A tidal power plant makes use of the daily rise and fall if water due to tides, such sources are highly predictable and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. g p g g p
  • 10. PPP Schemes for Power Generation • Design, Build, Operate. • Design, Build, Operate and Finance. • Build, Operate and Finance • Normally different schemes of PPPs for Power Generation rely on a Power Purchase Agreement (PPA), were the power purchaser is a local utility, public service provider or operator that sell the energy to the market. • PPA is normally a long term contract with a dual payment system. • Dual payment system: capacity or availability charge and a usage or offtake charge. ff k h • In some cases there are Tolling Agreements: the purchaser delivers fuel to the concessionaire and it turn the fuel into electricity.
  • 11. Typical PPA (1) • A typical PPA may contain the following: • (1) Preamble (2) Definitions and interpretation, (3) Conditions Preamble, interpretation precedent, (4) Development stage, (5) Construction period, (6) Commissioning and entry into commercial service, (7) Plant operation, maintenance and fuel management, (8) Dedication of capacity, g ,( ) p y, availability declaration, (9) Measurement of capacity, availability and energy metering, (10) Capacity charge and payment provisions, (11) Fuel Price provisions, (12) Billing procedures, terms of payment, (13) Insurance, (14) Changes in tax, changes in law, (15) Force Majeure, 6) Termination and buy out provisions, (17) Governing law/dispute resolution, (18) Liability and indemnity, (19) Confidentiality, (20) Representations/warranties/covenants and (21) Mi R t ti / ti / t d Miscellaneous. ll
  • 12. Typical PPA (2) • A typical PPA may contain the following Schedules: • (1) Description of Power Station, (2) Clearances, (3) Development milestones, (4) Interconnection and transmission facilities, ( ) Commissioning and testing ( ) , (5) g g (6) Metering standards and testing, (7) Despatch procedures (8) Capacity payment and (9) Energy payments.
  • 13. Options for PPPs • Option A: Public sector develop the project using its own resources and then privatizes it or prepare a PPP • Option B: The public sector completes the feasibility studies and invites to the private sector to finance, construct and operate the PPP project finance • Option C: The private sector conducts all feasibility studies and prepare the project under a design, finance, construct and operate the PPP project j d d i fi d h j
  • 14. Projec Cycle of HPP PPPs Stage Activities Site Selection Identification of potential sites Prefeasibility Scheme concept. Preliminary estimate of cost and benefits Short Feasibility Preliminary optimization of main project parameters based largely on existing data Full Feasibility Detailed site mapping and geological investigation. investigation Full Environmental Impact Assesment. Tender Design Business model preparation and contract regulation based on Short or Full Feasibility Detailed Design Adjudication and detailed design of each element of civil works.
  • 15. Risks in Power Generation PPPs • Site-specific nature of projects • Long period of construction and high construction risk • Capital intensive • Hydrological risk river flows make volatile output. Important water risk, output management • Flow of revenues need to be predicted under real scenarios. • Operation risks
  • 16. Risks Allocation HPP PPPs Risk Allocation Hydrology Temporary deficits: Conces and Gov. Long Term deficits:Util-Gov Flood damage: Contractor and Conces Costruction Cost overrun and delayed completion: Concess and contractor. Unforeseen ground conditions: Util-Gov- concess Performance Equipment and project performance: concess Transmission: Utility company Market Utility company through take or pay or PPA Political Government Financial Increasing costs: utility company or gov Environmental E i t l Land L d acquisition and resetlement: G Utilit company i iti d tl t Gov-Utility
  • 17. Market Failure 1 PUBLIC GOOD Market Failure 2 MONOPOLY Market EXTERNALITIES Failure 3 Market ASSIMETRIC Failure 4 INFORMATION
  • 18. ¿Do we have a Monopoly? ¿Is it large the loss in Market no yes Economic efficiency Competition From First Best to Second Best? AC AC P P MgC MgC D D Q yes no Q - Lump sum Subsidy ¿Regulation - No Lineal Tarification By Competition? - Price Discrimination no y yes • Demsetz Competition • Ramsey Tarification (bidding) • RPI-X RPI- • Contestable Markets • R t of Return Rate f R t
  • 19. PRICE CAPS (RPI, RPI-X, RPI-X+K) RPI- RPI-X K) Profitability or Rate of Return Regulatory Models Tariffs Ramsey-Boiteaux Ramsey- for PPP o YARDSTICK Competition DEMSETZ Competition (Bidding)
  • 20. Characteristics in LAC countries Characteristics Brazil Chile Peru Capacity ( p y (MW) ) 90,733 10,367 6,016 Energy (GWh) 387,451 51,640 24,267 Hydropower 80% 41% 71% generation Nuclear 3% 0% 0% Generation
  • 21. Large Hydropower Projects Project Capacity (MW) Country Three Gorges 18,200 18 200 China Ertan 3300 China Caruachi 2,160 Venezuela Porto Primavera 1,818 , Brazil Ita 1,450 Brazil Serra de Mesa 1,293 Brazil Salto Caxias 1,240 Brazil Rio Baker-Aysen 800 Chile
  • 23. Power Systems in Chile (1) Systems Generation Transmission Distribution Edelnor, Electroandina, Edelnor, Electroandina, Emelari, Eliqsa, Elecda SING Celta, Norgener Gener, Celta Norgener, Gener Norgener Gasatacama Arauco, Petropower, Transelec Chilectra, CGE, SIC Gener, San Isidro, STS Chilquinta, Rio Maipo, Endesa, Colbun, Transnet Saesa, Frontel, Emec, Guacolda, E. Verde, Guacolda E Verde Conafe, Emelectric Conafe Emelectric, Santiago, Pangue, Transquillota Emelat, Puente Alto, Pehuenche, Copelec, Litoral, Luzagro, Pilmaiquen,Aconcagua, Emetal, Colina, Luzpar. Maipo, Vieja, Valpo, Capullo, Andes, Carbomet Edelaysen Edalaysen Edelaysen Aysen Edelmag g Edelmag g Edelmag g Magallanes
  • 24. Power System in Chile (2) Type of Contracts Characteristics Generator-Generator Generator without contract with distribution company or free client sell energy to the spot market at marginal cost set up by CDEC. Generator – Free client No regulation of transactions with clients with g capacity of 2000 kw or more. Free to negotiate prices because of the negotiation power. Codelco case. Generator – Distribution companies p High risk for g g generators if marginal cost of g operation is higher than the price. By law distribution companies must to contract through public tendering process.
  • 25. Codelco- Codelco-Chile (1) • Corporación Nacional del Cobre (or “Codelco Chile”) is the National Copper Codelco-Chile ) Corporation that manage the cupper production in Chile as a State owned copper mining company. It is the largest copper producer company in the world. • Codelco decided in 2007 to tender to one or more independent power producers its future electricity supply requirements in Salvador, Andina, Ventanas and El Teniente Divisions, located in Chile´s central region and connected to Chile´s SIC, the central interconnected transmission Chilean grid
  • 26. Codelco- Codelco-Chile (2) • The power plants in Chile (combined cycle gas- fired thermoelectric plants) usually use Argentine natural gas as a fuel and because of the shortage of it Codelco decide to initiate the process to have safe and reliable electricity supply. • The SIC in Chile extends over 2000 kms and some 326.000 km2 with 11.700 km of transmission lines, serving 93% of the population • The total capacity of SIC is 8,512 MW (2006) generating 40,334 GWh in 2006, 55.8% is hydrolectric and 44.2% is thermal.
  • 27. Codelco- Codelco-Chile (3) • The project called Long-term electricity supply for Codelco- Long term Codelco Chile´s Divisions in central Chile, was recently adjudicated in September of this year to Colbun and it includes two contracts for 15 and 30 years. • The concessionaire will design, build and operate power plants of any kind, as well as the construction of any other investment y , y necessary to operate them and to connect them to the trunk transmission system of the SIC (3-10 regions) • The concessionaire will design, build start-up and maintain the design build, start up maintain, new transmission system or expansions of the existing that might be required to connect the power plant to the trunk transmission system of the SIC.
  • 28. Codelco- Codelco-Chile (4) • The concessionaire will design, develop and construct a port design terminal, if necessary, for the uploading of fuel that will be needed for the power plant, or otherwise, reach and agreement with the operator of an existing port. • The demand to be supplied over the period of the agreement shall pp p g be from 450 MW up to a capacity of approximately 900 MW.
  • 29. A project with Low Risk • Long term contract with minimum commercial risks: Codelco has 20% of the total existing copper reserves in the world, around 77 million metric tons. Codelco accounts for 15% of the total Chilean electricity consumption. • Adequate credit rating: Codelco has a rating of A according to Standard & Poor´s. • Chilean Regulation: It does not contemplate any specific license, only construction and environmental studies. t ti d i t l t di • Selling of remaining power: the concessionaire can sell to SIC the remaining power if the plant has excess of capacity. SIC requires annual capacity additions of approx. 500 MW in order to match supply and demand. Average approx demand annual growth of 6.9% in the last ten years. • Chile is an investment grade country: Chile is the most solid economy in Latin America and it is rated A by S&P. y
  • 30. Bidding Characteristics • Free cost to be charged t C d l I F tt b h d to Codelco: Investment, operation and maintenance t t ti d i t fixed costs does not have a maximum in the bidding process. The variable costs are recovered via a pass through mechanism with certain efficiency. • Codelco included provisions to make the project bankable: sharing the risks on fuels and fluctuation in the international fuel prices. • Option for bidders: Codelco had set-up a new special purpose company (Newco) that own all the studies, licenses and a project. The concessionaire has the option to develop its own p j or to buy Newco at a price equal to p p project y p q the incurred costs by Codelco.
  • 31. Economic Characteristics • Bidding Variable: Codelco ill Biddi V i bl C d l will pay fi d monthly charges i U it d St t fixed thl h in United States Dollars (US$) to cover the investments and the fixed operating expenses associated with the service. • Provisions: The contract will also include provisions for the transfer of variable costs, except hydro plants for which no variable costs will be paid, as well as charges for transmission fees (on a pass through basis, with certain efficiency signals). • Winner: Colbun was the winner offering a supply of up to 510 MW and g pp y p energy for 4000 GWh annually. The electricity supply will start on March 1st of 2013 with 328 MW and it will reach 510 MW on January 1st of 2015. The power stations will use coal and hydroelectricity. Investment US$7 billion.
  • 33. Power System in Peru (1) Generation Transmission Distribution Cahua, Edegel, Egenor, Piura, Cahua Edegel Egenor Piura Mantaro-Socabaya, Mantaro-Socabaya Edelnor, Edelnor Luz del Sur Ede Sur, Ede, Cahua y Electroandes Reforzamiento Sur, Oroya, Etevensa, Cañete, Electro Sur Etecen y Etesur. Policy Regulation Competition Ministry of Energy Osinerg Indecopi
  • 34. Yuncan Hydroelectric Plant (1) • First Intent to bid: In 2003 the bid was suspended because of a dispute with Pasco department authorities over ownership of the project. The agreement is that Pasco will receive payments from j Th i h P ill i f the concession through a social trust fund. • Hydro Power Plant built by the Government: The State power y y p company Egecen ( Empresa de Generación de Energía Eléctrica del Centro) was building the plant with 75% of the total investment of $262 million finance by JBIC (Japan Bank for International Cooperation) and in same moment it had to stop works because lack of funds from the 25% committed to the project from the Peruvian government. Finally the project was j f h P i Fi ll h j completed in 2006. The plant has a capacity of 130 MW.
  • 35. Yuncan Hydroelectric Plant (2) • Construction companies: Skanska, Cosapi and Chizaki • Equipment suppliers: Vatech Hydrovevey, Alstom France and Toshiba T hib • LOM Project: The concessionaire will operate, maintain and usufruct the project under a lease of the power plant built by the p j p p y State power company. • Term of Concession: 30 years since the take over of the power plant from the concessionaire. Egecen will transfer the plant in concessionaire perfect operating conditions for the operation and usufruct of the concessionaire.
  • 36. Bidding Results • One Bidder: Peruvian Government received just one offer from Enersur, local subsidiary of the Belgian energy company Tractebel. • Bidding mechanism: Higher payment to the Peruvian Government. • Result of the Bidding: Enersur offered $57.5 million paid over the first 17 months of the concession and a semi-annual usufruct fee during the first 17 h f h i d i l f f d i h fi years of the contract and once the concessionaire receive the power plant from Egecen. The total amount is $124.5 million. • Social Trust Fund: In addition Enersur has to pay to the Social Trust Fund under a payment schedule a total of $6.9 million
  • 37. Guarantees • Concessionaire a) Contract Rights and first-second social payment: $10 million valid until 15 d days after the reception of the power plant by the concessionaire. ft th ti f th l t b th i i b) Usufruct Rights and periodic payments: $10 million valid until the last payment for this concept. c) Completion: $2 million valid until 90 days after finish the contract period. period • Peruvian Government a) Multilateral guarantee or commercial bank for $50 million valid since the first payment of the concessionaire and until Peruvian Government transfer to the concessionaire the power plant to the concessionaire. p p b) Peruvian government assumes the performance risk of the power plant for the first 12 months and the concessionaire will receive a compensation.
  • 39. CHP5 Power Plant • Energy in Mongolia is a relevant sector where five coal-fired cogeneration power plants are managed by a central power system, but it is necessary to prepare more projects in urban cities and rural areas that have diesel generators. • One interesting project in development is the CHP5 project which anticipates to implement a build, own and operate model for a cogeneration power plant and th modification of th existing sub stations t produce electricity and heat d the difi ti f the i ti b t ti to d l t i it dh t energy for Ulan Bator. • The capacity of the plant must be 300 MW for power and 700 Gcal for heat energy. energy The project finally was not adjudicated this year. Mongolian year government decided does not accept the unique proposal submitted by a Chinese corporation. • ADB will be supporting the new intent to adjudicate succesfully this project pp g j y p j
  • 40. Secure Fuel Supply and Bankable PPA • Secured fuel supply and Bankable PPA – Generation cost: 60% of the retail tariff – Fuel cost: 60-65% of the generation cost – Government’s control over prices of coal used for generation of energy, – Coal mines are in bad financial shape; – Long term coal supply to Darhan and Erdenet CHPs must be secured, – Not clear sources of revenues – Coal C l supply was not completely resolved i th CHP 5 t d d l t l t l l d in the CHP-5 tender documents t
  • 41. 4. Future Projects in Power Generation
  • 42. Coal deposits Choir Ch i Copper and gold deposits Shivee ovoo JSC Lime stone deposits Copper Dalanjargalan Khokh tsav Mongolian Gold LLC Mandakh Tsagaan suvarga Tsogt Tsetsgii Mongolian Gold LLC Uhaahudag Gurvan Tes G T TAvantolgoi Khanbogd Nariin Sukhait Energy Resource LLC Oyutolgoi Erdes MGL LLC Ivanhoe Mines Mongolia LLC Tavantolgoi JSC SGS LLC QGX LLC Chinhua-MAK-Nariin Sukhait Chi h MAK N ii S kh it LLC Mongolian Gold MAK LLC Minerals deposits 42
  • 43. New Projects in Mongolia The ever-increasing electricity demand of the Southern Gobi shall be supplied as the following: • Construct the UB-Mandalgobi- Tavantolgoi-Oyutolgoi 670 km power and heat station with 220 kW, with two reinforced concrete pillars and with two linked AC-400 transformations • Facilitate to build 12 mW small size power station with the private sector initiatives near the group of the coal mines of Tavantolgoi and implement the plan to build the power station with the capacity not less than 300 mW through the government integrated regulation and the PPP principles