Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 โ€“ 19, July 2014, Mysore, Karnataka, India
239
PART STORAGE SYSTEM (CAROUSEL) OF VTL BY LOW COST
AUTOMATION
MALATESHA S KRISHNA1
, KRISHNAMURTHY L2
, AJITH KUMAR G3
, PRAKASH K R4
1, 2, 4
(Department of Mechanical Engineering, the National Institute of Engineering, Mysore, India)
3
(Design and Development, Ace Designers Private Limited, Bangalore, India)
ABSTRACT
Part storage systems (carousel) are the enablers for unattended cell operation. Unattended time of the
manufacturing cell depends upon the ability of the storage system to store the number of unfinished part. Using
conventional methods like circular and square layouts it is difficult to increase the storage capacity. This paper mainly
addresses the concept of increasing the storage capacity of Inverted Vertical Turret Lathe by using layouts of different
shapes by using double rod cylinder with hook mechanism. It has been proposed in this paper, to employ this concept to
reduce the number of cylinders required and other hardware components which would lead to low cost automation.
Keywords: Computer Numerical Control (CNC), Part Storage System (Carousel), Vertical Turret Lathe (VTL).
I. INTRODUCTION
Computer Numerical Control (CNC) Lathes are classified into two types; Vertical and Horizontal. Many
modern horizontal CNC turning centers are of the slant bed design. Advantage of the slant bed includes: easy access for
loading and unloading and measuring; allowance for the chips to fall free; minimum floor space utilization; easy and
quickness of tool change; better strength and rigidity [1].
Vertical CNC turning centers are modern versions of the manual Vertical Turret Lathe (VTL). Although
principally designed for larger and difficult to handle work pieces, vertical turning center advanced considerably in terms
of state-of-art technology [1]. In VTLs there are two versions; a) Spindle facing upwards b) Spindle facing downwards.
At present, very few manufacturers are providing layouts in VTL. It has to be emphasized here that the use of layouts
becomes imperative since it increases the storage capacity.
Horizontal and Vertical CNC are well-known single cell manufacturing cells, which are being extensively used
in present day industries. Further, Computer Numerical Controlled machines are employed for mass production by
replacing conventional lathes to improve productivity and quality. However recently machine tool manufacturers have
found solutions for automatic loading and unloading to reduce the fatigue of labor and reduce cycle time, increasing
productivity [2].
Need for auto loading and unloading includes expensive gantry, robot with loading system, machine guarding
consisting of ladder and automatically operated by only M-codes through CNC controller [3].
Part Storage System (Carousel) is the integrated subsystems of automatic loading and unloading. The part
storage system and automatic transfer of parts between the storage system (Carousels) & the processing station are the
necessary condition for an automated cell that operates unattended for extended period of time. If all of the parts are
identical and requires the same, then unattended time UT of operation is given by [4].
INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING
AND TECHNOLOGY (IJMET)
ISSN 0976 โ€“ 6340 (Print)
ISSN 0976 โ€“ 6359 (Online)
Volume 5, Issue 9, September (2014), pp. 239-244
ยฉ IAEME: www.iaeme.com/IJMET.asp
Journal Impact Factor (2014): 7.5377 (Calculated by GISI)
www.jifactor.com
IJMET
ยฉ I A E M E
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 โ€“ 19, July 2014, Mysore, Karnataka, India
240
UT = np Tc (1)
Where np is the capacity of the part storage system, Tc = Cycle time for the given part.
In the conventional carousel systems on can use the drives and mechanism like
1. Stepper motor and Servo drives
2. CAM mechanisms
3. Indexing mechanisms like Ratchet pawl, Rack and pinion, Geneva wheel [4].
To increase the capacity of the parts storage system here is a necessity of different shaped layouts consisting of
T, L, and O shapes. The schematic representation of the layouts is shown in Fig.1, Fig.2 and Fig.3 respectively. The
rectangle indicates the pallets carrying the work piece; arrow indicates circulation of the pallets which carries the along
the shape of the layout. The cross symbol indicates the pick-up site in the layout by inverted spindle with hydraulic
chuck. Here hydraulic chuck performs two functions namely
1. Automatic pick-up of the work piece from part storage (carousel).
2. Turning operation of the work piece takes place in the same hydraulic chuck itself.
Fig. 1: T- Shaped Layout Fig. 2: L- Shaped Layout
Fig. 3: O-Shaped Layout
This paper converges to part storage system (carousel), not on the automatic loading and unloading. The shape of the
layout depends upon the storage capacity, external shape of the VTL and space availability
In this paper further discussions are carried out by taking L-shaped layout into consideration because pallets are
shifted in 6 directions which are indicated by arrows.
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 โ€“ 19, July 2014, Mysore, Karnataka, India
241
II. OBJECTIVES
The core objectives of this paper includes (a) maximize the storage capacity of the part storage system
(carousel) (b) increase the unattended time of operation (c) low cost automation by reducing the number of elements i.e.
cylinders, sensors etc..
III. METHODOLOGY
Hook is the main part of the concept. Hook is equipped with torsion spring [5]. Hook is connected to the
cylinder by link. Hook deflects in the downward direction due to torsion spring and traces the path of the external
geometrical feature like Cam and followers. (Fig. 4, 5 and 7)
Fig. 4: Hook with Torsion Spring Fig. 5: Hook Moves in Downward Direction
During one side stroke (extending/retracting) hook engages/latches the pallet (which carries the work piece but,
the work piece is not shown in Figure) as shown in Fig. 6. Hook disengages pallet during the return motion (Fig. 7).
Fig. 6: Pallet Engaged by Hook Fig. 7: Hook Disengaging Movement
The following cross-sections of layout illustrates the impression behind the concept
Fig. 8: Hook Engages/Latches the Pallet Fig. 9: Pallets are Shifted by One Pallet Length
(stroke length of cylinder) through Hook which is
connected to Cylinder
Fig. 10: Disengaging Movement
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM
Sequence of operations:
The pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which
is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw
material to the picking station is as explained below. The sequence of operation begins with the
vertical hydraulic chuck places the finished part. From
by moving the pallets in both X and Y directions.
Fig. 11(a):Placement of Finished Part after Machining
Fig. 11(c): Vertical Chuck Facilitating New
Work Piece for Machining
Fig. 11(e): Shifting of Pallets by One Pallet
Length in Y-Direction
International Conference on Current Trends in Engineering and Management ICCTEM
17 โ€“ 19, July 2014, Mysore, Karnataka, India
242
pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which
is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw
ation is as explained below. The sequence of operation begins with the
vertical hydraulic chuck places the finished part. From Fig. 11(b) to Fig. 11(j) depicts the further sequencing operations
irections.
Fig. 11(a):Placement of Finished Part after Machining Fig. 11(b): Supply of New Work Piece to Machining
Fig. 11(c): Vertical Chuck Facilitating New Fig. 11(d): Movement of Pallets in
Work Piece for Machining
Fig. 11(e): Shifting of Pallets by One Pallet Fig. 11(f): Shifting of Pallets by One Pallet
Length in X-Direction
International Conference on Current Trends in Engineering and Management ICCTEM -2014
19, July 2014, Mysore, Karnataka, India
pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which
is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw
Fig. 11(a) wherein
the further sequencing operations
Fig. 11(b): Supply of New Work Piece to Machining
Fig. 11(d): Movement of Pallets in the X-direction
Fig. 11(f): Shifting of Pallets by One Pallet
Direction
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 โ€“ 19, July 2014, Mysore, Karnataka, India
243
Fig. 11(g): Movement of Pallet in Transverse Direction Fig. 11(h): Providing Space for New Work Piece by
One Pallet Length Shift in X- Direction
Fig. 11(i): Finished Work Part Ready for Movement Fig. 11(j): New Work Piece in Position
in the Transverse Direction
It can be observed that from the above sequence of operations, the pallets moves/circulates in opposite
directions as can be seen Fig. 11(d) & Fig. 11(h), Fig. 11(e) & Fig. 11(g). Hence the portion of the layout in which pallets
move in opposite directions can be identified. Pallets moving opposite direction can be controlled by one double acting
cylinder. This arrangement is as shown in the Fig. 12 & Fig. 13. During one side motion (extending/retracting), hook on
left side of the cylinder engages the pallet and hook on the right side moves without engaging the pallet (compare Fig.
11(d) & Fig. 13). The cylinder remains in this position until pallets as shown in Fig. 11(g) get shifted by another cylinder
(cylinder is not shown in figure). During motion opposite to previous stroke, hook on right side engages the pallet and
hook on left side disengages pallet. (Compare Fig. 11(h) & Fig.13)
Fig. 12: Double Rod Cylinder with Hook Arrangement Fig. 13: Arrangement of Cylinder Below the Layout
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 โ€“ 19, July 2014, Mysore, Karnataka, India
244
In the similar way, another location of the layout in which pallets moving in opposite direction can be controlled
by one double acting cylinder (consider the doted arrows of Fig. 13).
IV. EXPERIMENTAL VERIFICATION
The cylinder selections made depend upon force requirement for worst situation. For example, consider the Fig.
11(d) in which maximum force is required to displace the 6 pallets. But the layout needs the force absorption system to
absorb the energy where minimum amount of energy required. For example, consider Fig. 11(b) and Fig. 11(f), where
energy requirement is only for two pallets. Otherwise uneven movement malfunction the operation i.e. component may
fall down from the pallet which is not desirable. Further, in order to accomplish better repeatability, cylinder has to reach
its extreme end position before it starts the next stroke. In other words cylinder has to complete its stroke. Bulky
cylinders sometimes cause problems in the alignment and positioning of the cylinder during assembly. This is very
important because incomplete stroke of the cylinder hinders the further sequencing of the cylinder.
V. RESULTS AND DISCUSSIONS
1. The space and assembly constraints can be overcome by using the rod fixing concept of the cylinder. This type of
cylinder consumes 30 to 40% times less space than the conventional cylinder because in this case the fluid enters
the cylinder through the rod and body moves instead of rod [6].
2. Absorbers have to be designed in order to absorb excess energy which can be accomplished by assembling to all
the corners of the layout.
3. Precise motion of the cylinder is essential in order to ensure timely supply of pallets for production and at the
same time guide the pallets properly. This can be enabled by providing appropriate guide and rail combination.
4. The layout is integrated to VTL which reduces the door opening and closing time and other repetitive jobs [7].
Production rate is inversely proportional to the cycle Tc time. This leads to increase in the production [4].
R c =
เซŸเซ™
เข€เข‰
pc/hr (2)
Tc = Max{Tm, Ts} + Tr (3)
Where Tm = machine time, Ts = worker service time and Tr = repositioning time of pallet
VI. CONCLUSIONS
It is clear from the above discussions that the circulation of pallets both for loading and unloading in different
directions i.e. 6 directions in this case can be controlled by 4 cylinders instead of 6 cylinders. Reduction in the number
of cylinders automatically reduces the control valves required to build the hydraulic circuit, and position sensors.
Reduction in the number of cylinders minimizes the assembly constraints; space constrains and makes the co-ordination
motion of the cylinder simple. Further it results in simplifying hydraulic, electrical circuit which in turn reduces signal
overlapping and enables smooth operation.
VII. REFERENCES
[1] William W. Luggen, computer numerical control: a first look primer Cengage Learning, 1st Edition, 1996.
[2] S. Sandeep & K. R. Prakash, (2013), Automation of loading and unloading to CNC turning center, International
Journal on Mechanical Engineering and Robotics, Volume 1, Issue-2, pp.8-12.
[3] C. H. Patel, G. C. Mohan Kumar, Vishwas Puttige, (2012), Low cost automation for CNC machining center,
International Journal of Mechanical Engineering and Technology, Volume-3, Issue-2, pp. 806-817.
[4] M P Groover, automation, production system and CIM PGI, New Delhi, 3rd
Edition, 2013.
[5] Misumi India, factory automation components,
(http://in.misumi-ec.com/asia/CategorySearchView/103_26000000_26010000_26011300.html).
[6] Anthony Esposito, fluid power with applications Prentice Hall of India, Delhi, 6th
edition, 2007.
[7] Rohan Kulkarni, S. Shivkumar and Rroopa K Rao, (2011), Productivity improvement on CNC lathe by
automatic loading and unloading of throttle valve component, International Journal of Scientific & Engineering
Research, Volume 2, Issue -12, pp. 1-7.

More Related Content

What's hot

JRK Write-up
JRK Write-upJRK Write-up
JRK Write-up
Jrk Murthy
ย 
macine design
macine designmacine design
macine design
David Rhodes
ย 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
Don W. Lewis
ย 
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
Ijcem Journal
ย 

What's hot (20)

6 bar linkage mechanism for hopper tipper hoisting
6 bar linkage mechanism for  hopper tipper hoisting6 bar linkage mechanism for  hopper tipper hoisting
6 bar linkage mechanism for hopper tipper hoisting
ย 
JRK Write-up
JRK Write-upJRK Write-up
JRK Write-up
ย 
IRJET- Static & Dynamic Analysis on Automated Car Parking Towers & Study Beha...
IRJET- Static & Dynamic Analysis on Automated Car Parking Towers & Study Beha...IRJET- Static & Dynamic Analysis on Automated Car Parking Towers & Study Beha...
IRJET- Static & Dynamic Analysis on Automated Car Parking Towers & Study Beha...
ย 
macine design
macine designmacine design
macine design
ย 
DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...
DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...
DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...
ย 
Dynamic Analysis of Machine Foundation
Dynamic Analysis of Machine FoundationDynamic Analysis of Machine Foundation
Dynamic Analysis of Machine Foundation
ย 
IRJET- Design and Optimization of Jib Crane Boom
IRJET-  	  Design and Optimization of Jib Crane BoomIRJET-  	  Design and Optimization of Jib Crane Boom
IRJET- Design and Optimization of Jib Crane Boom
ย 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
ย 
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
ย 
Li3619361944
Li3619361944Li3619361944
Li3619361944
ย 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
ย 
Statistical analysis of various sub systems of panel
Statistical analysis of various sub systems of panelStatistical analysis of various sub systems of panel
Statistical analysis of various sub systems of panel
ย 
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
Payback assessment-of-alternative-system-of-electrical-power-transmission-in-...
ย 
IRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational MethodIRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational Method
ย 
Drawing And Report
Drawing And Report Drawing And Report
Drawing And Report
ย 
Simulating Operability of Wheel Loaders: Operator Models and Quantification o...
Simulating Operability of Wheel Loaders: Operator Models and Quantification o...Simulating Operability of Wheel Loaders: Operator Models and Quantification o...
Simulating Operability of Wheel Loaders: Operator Models and Quantification o...
ย 
IRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over BridgeIRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
ย 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling System
ย 
Design, Analysis and Testing of shaft mounted speed reducer for coil winding ...
Design, Analysis and Testing of shaft mounted speed reducer for coil winding ...Design, Analysis and Testing of shaft mounted speed reducer for coil winding ...
Design, Analysis and Testing of shaft mounted speed reducer for coil winding ...
ย 
Effect of Orientation on Response Spectrum Analysis of Plan Irregular Building
Effect of Orientation on Response Spectrum Analysis of Plan Irregular BuildingEffect of Orientation on Response Spectrum Analysis of Plan Irregular Building
Effect of Orientation on Response Spectrum Analysis of Plan Irregular Building
ย 

Viewers also liked (9)

Storage devices
Storage devicesStorage devices
Storage devices
ย 
Automated storage and retrieval system
Automated storage and retrieval systemAutomated storage and retrieval system
Automated storage and retrieval system
ย 
Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)
ย 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
ย 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
ย 
Material handling
Material handling Material handling
Material handling
ย 
material-handling
material-handlingmaterial-handling
material-handling
ย 
Material Handling
Material HandlingMaterial Handling
Material Handling
ย 
Materials handling
Materials handlingMaterials handling
Materials handling
ย 

Similar to PART STORAGE SYSTEM (CAROUSEL) OF VTL BY LOW COST AUTOMATION

Senior year project report
Senior year project reportSenior year project report
Senior year project report
Pritam Solanki
ย 
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
AM Publications
ย 

Similar to PART STORAGE SYSTEM (CAROUSEL) OF VTL BY LOW COST AUTOMATION (20)

Vertical material handling system
Vertical material handling systemVertical material handling system
Vertical material handling system
ย 
A review on optimization of rotary table pallets
A review on optimization of rotary table palletsA review on optimization of rotary table pallets
A review on optimization of rotary table pallets
ย 
Senior year project report
Senior year project reportSenior year project report
Senior year project report
ย 
DESIGN & MANUFACTURING OF WHEELCHAIR LIFTER
DESIGN & MANUFACTURING OF WHEELCHAIR LIFTERDESIGN & MANUFACTURING OF WHEELCHAIR LIFTER
DESIGN & MANUFACTURING OF WHEELCHAIR LIFTER
ย 
IRJET- Robotic Filament Winding Technique (RFWT) in Industrial Application: A...
IRJET- Robotic Filament Winding Technique (RFWT) in Industrial Application: A...IRJET- Robotic Filament Winding Technique (RFWT) in Industrial Application: A...
IRJET- Robotic Filament Winding Technique (RFWT) in Industrial Application: A...
ย 
IRJET - Automation of Briquetting using Hydraulic Actuators
IRJET - Automation of Briquetting using Hydraulic ActuatorsIRJET - Automation of Briquetting using Hydraulic Actuators
IRJET - Automation of Briquetting using Hydraulic Actuators
ย 
Design & Optimization of Equipment for Insertion of Tube Bundle of Heat Excha...
Design & Optimization of Equipment for Insertion of Tube Bundle of Heat Excha...Design & Optimization of Equipment for Insertion of Tube Bundle of Heat Excha...
Design & Optimization of Equipment for Insertion of Tube Bundle of Heat Excha...
ย 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
ย 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
ย 
Application of finite element analysis in effective design of flight control ...
Application of finite element analysis in effective design of flight control ...Application of finite element analysis in effective design of flight control ...
Application of finite element analysis in effective design of flight control ...
ย 
SIX DEGREES OF FREEDOM INTEGRATION DEVICE
SIX DEGREES OF FREEDOM INTEGRATION DEVICESIX DEGREES OF FREEDOM INTEGRATION DEVICE
SIX DEGREES OF FREEDOM INTEGRATION DEVICE
ย 
Development of Single Hydraulic Cylinder Operated Sheet Metal Bending Machine
Development of Single Hydraulic Cylinder Operated Sheet Metal Bending MachineDevelopment of Single Hydraulic Cylinder Operated Sheet Metal Bending Machine
Development of Single Hydraulic Cylinder Operated Sheet Metal Bending Machine
ย 
A Constructive Solution that Can Function As a Force Machine or As a Work Mac...
A Constructive Solution that Can Function As a Force Machine or As a Work Mac...A Constructive Solution that Can Function As a Force Machine or As a Work Mac...
A Constructive Solution that Can Function As a Force Machine or As a Work Mac...
ย 
IRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing FixtureIRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing Fixture
ย 
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
DESIGN AND ANALYSIS OF AN ACTIVE TWIST ROTOR BLADES WITH D-SPAR MODEL USING C...
ย 
Design of Automated Rotory Cage Type Fixture for Cylinder Block
Design of Automated Rotory Cage Type Fixture for Cylinder BlockDesign of Automated Rotory Cage Type Fixture for Cylinder Block
Design of Automated Rotory Cage Type Fixture for Cylinder Block
ย 
Fabrication and testing of hydraulic ladder
Fabrication and testing of hydraulic ladderFabrication and testing of hydraulic ladder
Fabrication and testing of hydraulic ladder
ย 
Conveyor report
Conveyor reportConveyor report
Conveyor report
ย 
Aj34219223
Aj34219223Aj34219223
Aj34219223
ย 
IRJET - Design and Development of Axial Feed using Recirculating Ball Screw f...
IRJET - Design and Development of Axial Feed using Recirculating Ball Screw f...IRJET - Design and Development of Axial Feed using Recirculating Ball Screw f...
IRJET - Design and Development of Axial Feed using Recirculating Ball Screw f...
ย 

More from IAEME Publication

A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
IAEME Publication
ย 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
IAEME Publication
ย 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
IAEME Publication
ย 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
IAEME Publication
ย 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
IAEME Publication
ย 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
IAEME Publication
ย 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
IAEME Publication
ย 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
IAEME Publication
ย 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
IAEME Publication
ย 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
IAEME Publication
ย 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
ย 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
ย 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
ย 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
ย 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
ย 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ย 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
ย 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
ย 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
ย 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
ย 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
ย 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
ย 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ย 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
ย 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
ย 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
ย 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ย 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
ย 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
ย 
A MULTIPLE โ€“ CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE โ€“ CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE โ€“ CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE โ€“ CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
ย 

Recently uploaded

Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
dharasingh5698
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 

Recently uploaded (20)

Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 

PART STORAGE SYSTEM (CAROUSEL) OF VTL BY LOW COST AUTOMATION

  • 1. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 โ€“ 19, July 2014, Mysore, Karnataka, India 239 PART STORAGE SYSTEM (CAROUSEL) OF VTL BY LOW COST AUTOMATION MALATESHA S KRISHNA1 , KRISHNAMURTHY L2 , AJITH KUMAR G3 , PRAKASH K R4 1, 2, 4 (Department of Mechanical Engineering, the National Institute of Engineering, Mysore, India) 3 (Design and Development, Ace Designers Private Limited, Bangalore, India) ABSTRACT Part storage systems (carousel) are the enablers for unattended cell operation. Unattended time of the manufacturing cell depends upon the ability of the storage system to store the number of unfinished part. Using conventional methods like circular and square layouts it is difficult to increase the storage capacity. This paper mainly addresses the concept of increasing the storage capacity of Inverted Vertical Turret Lathe by using layouts of different shapes by using double rod cylinder with hook mechanism. It has been proposed in this paper, to employ this concept to reduce the number of cylinders required and other hardware components which would lead to low cost automation. Keywords: Computer Numerical Control (CNC), Part Storage System (Carousel), Vertical Turret Lathe (VTL). I. INTRODUCTION Computer Numerical Control (CNC) Lathes are classified into two types; Vertical and Horizontal. Many modern horizontal CNC turning centers are of the slant bed design. Advantage of the slant bed includes: easy access for loading and unloading and measuring; allowance for the chips to fall free; minimum floor space utilization; easy and quickness of tool change; better strength and rigidity [1]. Vertical CNC turning centers are modern versions of the manual Vertical Turret Lathe (VTL). Although principally designed for larger and difficult to handle work pieces, vertical turning center advanced considerably in terms of state-of-art technology [1]. In VTLs there are two versions; a) Spindle facing upwards b) Spindle facing downwards. At present, very few manufacturers are providing layouts in VTL. It has to be emphasized here that the use of layouts becomes imperative since it increases the storage capacity. Horizontal and Vertical CNC are well-known single cell manufacturing cells, which are being extensively used in present day industries. Further, Computer Numerical Controlled machines are employed for mass production by replacing conventional lathes to improve productivity and quality. However recently machine tool manufacturers have found solutions for automatic loading and unloading to reduce the fatigue of labor and reduce cycle time, increasing productivity [2]. Need for auto loading and unloading includes expensive gantry, robot with loading system, machine guarding consisting of ladder and automatically operated by only M-codes through CNC controller [3]. Part Storage System (Carousel) is the integrated subsystems of automatic loading and unloading. The part storage system and automatic transfer of parts between the storage system (Carousels) & the processing station are the necessary condition for an automated cell that operates unattended for extended period of time. If all of the parts are identical and requires the same, then unattended time UT of operation is given by [4]. INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) ISSN 0976 โ€“ 6340 (Print) ISSN 0976 โ€“ 6359 (Online) Volume 5, Issue 9, September (2014), pp. 239-244 ยฉ IAEME: www.iaeme.com/IJMET.asp Journal Impact Factor (2014): 7.5377 (Calculated by GISI) www.jifactor.com IJMET ยฉ I A E M E
  • 2. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 โ€“ 19, July 2014, Mysore, Karnataka, India 240 UT = np Tc (1) Where np is the capacity of the part storage system, Tc = Cycle time for the given part. In the conventional carousel systems on can use the drives and mechanism like 1. Stepper motor and Servo drives 2. CAM mechanisms 3. Indexing mechanisms like Ratchet pawl, Rack and pinion, Geneva wheel [4]. To increase the capacity of the parts storage system here is a necessity of different shaped layouts consisting of T, L, and O shapes. The schematic representation of the layouts is shown in Fig.1, Fig.2 and Fig.3 respectively. The rectangle indicates the pallets carrying the work piece; arrow indicates circulation of the pallets which carries the along the shape of the layout. The cross symbol indicates the pick-up site in the layout by inverted spindle with hydraulic chuck. Here hydraulic chuck performs two functions namely 1. Automatic pick-up of the work piece from part storage (carousel). 2. Turning operation of the work piece takes place in the same hydraulic chuck itself. Fig. 1: T- Shaped Layout Fig. 2: L- Shaped Layout Fig. 3: O-Shaped Layout This paper converges to part storage system (carousel), not on the automatic loading and unloading. The shape of the layout depends upon the storage capacity, external shape of the VTL and space availability In this paper further discussions are carried out by taking L-shaped layout into consideration because pallets are shifted in 6 directions which are indicated by arrows.
  • 3. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 โ€“ 19, July 2014, Mysore, Karnataka, India 241 II. OBJECTIVES The core objectives of this paper includes (a) maximize the storage capacity of the part storage system (carousel) (b) increase the unattended time of operation (c) low cost automation by reducing the number of elements i.e. cylinders, sensors etc.. III. METHODOLOGY Hook is the main part of the concept. Hook is equipped with torsion spring [5]. Hook is connected to the cylinder by link. Hook deflects in the downward direction due to torsion spring and traces the path of the external geometrical feature like Cam and followers. (Fig. 4, 5 and 7) Fig. 4: Hook with Torsion Spring Fig. 5: Hook Moves in Downward Direction During one side stroke (extending/retracting) hook engages/latches the pallet (which carries the work piece but, the work piece is not shown in Figure) as shown in Fig. 6. Hook disengages pallet during the return motion (Fig. 7). Fig. 6: Pallet Engaged by Hook Fig. 7: Hook Disengaging Movement The following cross-sections of layout illustrates the impression behind the concept Fig. 8: Hook Engages/Latches the Pallet Fig. 9: Pallets are Shifted by One Pallet Length (stroke length of cylinder) through Hook which is connected to Cylinder Fig. 10: Disengaging Movement
  • 4. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM Sequence of operations: The pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw material to the picking station is as explained below. The sequence of operation begins with the vertical hydraulic chuck places the finished part. From by moving the pallets in both X and Y directions. Fig. 11(a):Placement of Finished Part after Machining Fig. 11(c): Vertical Chuck Facilitating New Work Piece for Machining Fig. 11(e): Shifting of Pallets by One Pallet Length in Y-Direction International Conference on Current Trends in Engineering and Management ICCTEM 17 โ€“ 19, July 2014, Mysore, Karnataka, India 242 pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw ation is as explained below. The sequence of operation begins with the vertical hydraulic chuck places the finished part. From Fig. 11(b) to Fig. 11(j) depicts the further sequencing operations irections. Fig. 11(a):Placement of Finished Part after Machining Fig. 11(b): Supply of New Work Piece to Machining Fig. 11(c): Vertical Chuck Facilitating New Fig. 11(d): Movement of Pallets in Work Piece for Machining Fig. 11(e): Shifting of Pallets by One Pallet Fig. 11(f): Shifting of Pallets by One Pallet Length in X-Direction International Conference on Current Trends in Engineering and Management ICCTEM -2014 19, July 2014, Mysore, Karnataka, India pallets discussed above are positioned throughout the layout. Pallets get shifted by one pallet length which is equal to stroke length of the cylinder in each direction. This sequence of operations required to deliver the new raw Fig. 11(a) wherein the further sequencing operations Fig. 11(b): Supply of New Work Piece to Machining Fig. 11(d): Movement of Pallets in the X-direction Fig. 11(f): Shifting of Pallets by One Pallet Direction
  • 5. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 โ€“ 19, July 2014, Mysore, Karnataka, India 243 Fig. 11(g): Movement of Pallet in Transverse Direction Fig. 11(h): Providing Space for New Work Piece by One Pallet Length Shift in X- Direction Fig. 11(i): Finished Work Part Ready for Movement Fig. 11(j): New Work Piece in Position in the Transverse Direction It can be observed that from the above sequence of operations, the pallets moves/circulates in opposite directions as can be seen Fig. 11(d) & Fig. 11(h), Fig. 11(e) & Fig. 11(g). Hence the portion of the layout in which pallets move in opposite directions can be identified. Pallets moving opposite direction can be controlled by one double acting cylinder. This arrangement is as shown in the Fig. 12 & Fig. 13. During one side motion (extending/retracting), hook on left side of the cylinder engages the pallet and hook on the right side moves without engaging the pallet (compare Fig. 11(d) & Fig. 13). The cylinder remains in this position until pallets as shown in Fig. 11(g) get shifted by another cylinder (cylinder is not shown in figure). During motion opposite to previous stroke, hook on right side engages the pallet and hook on left side disengages pallet. (Compare Fig. 11(h) & Fig.13) Fig. 12: Double Rod Cylinder with Hook Arrangement Fig. 13: Arrangement of Cylinder Below the Layout
  • 6. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 โ€“ 19, July 2014, Mysore, Karnataka, India 244 In the similar way, another location of the layout in which pallets moving in opposite direction can be controlled by one double acting cylinder (consider the doted arrows of Fig. 13). IV. EXPERIMENTAL VERIFICATION The cylinder selections made depend upon force requirement for worst situation. For example, consider the Fig. 11(d) in which maximum force is required to displace the 6 pallets. But the layout needs the force absorption system to absorb the energy where minimum amount of energy required. For example, consider Fig. 11(b) and Fig. 11(f), where energy requirement is only for two pallets. Otherwise uneven movement malfunction the operation i.e. component may fall down from the pallet which is not desirable. Further, in order to accomplish better repeatability, cylinder has to reach its extreme end position before it starts the next stroke. In other words cylinder has to complete its stroke. Bulky cylinders sometimes cause problems in the alignment and positioning of the cylinder during assembly. This is very important because incomplete stroke of the cylinder hinders the further sequencing of the cylinder. V. RESULTS AND DISCUSSIONS 1. The space and assembly constraints can be overcome by using the rod fixing concept of the cylinder. This type of cylinder consumes 30 to 40% times less space than the conventional cylinder because in this case the fluid enters the cylinder through the rod and body moves instead of rod [6]. 2. Absorbers have to be designed in order to absorb excess energy which can be accomplished by assembling to all the corners of the layout. 3. Precise motion of the cylinder is essential in order to ensure timely supply of pallets for production and at the same time guide the pallets properly. This can be enabled by providing appropriate guide and rail combination. 4. The layout is integrated to VTL which reduces the door opening and closing time and other repetitive jobs [7]. Production rate is inversely proportional to the cycle Tc time. This leads to increase in the production [4]. R c = เซŸเซ™ เข€เข‰ pc/hr (2) Tc = Max{Tm, Ts} + Tr (3) Where Tm = machine time, Ts = worker service time and Tr = repositioning time of pallet VI. CONCLUSIONS It is clear from the above discussions that the circulation of pallets both for loading and unloading in different directions i.e. 6 directions in this case can be controlled by 4 cylinders instead of 6 cylinders. Reduction in the number of cylinders automatically reduces the control valves required to build the hydraulic circuit, and position sensors. Reduction in the number of cylinders minimizes the assembly constraints; space constrains and makes the co-ordination motion of the cylinder simple. Further it results in simplifying hydraulic, electrical circuit which in turn reduces signal overlapping and enables smooth operation. VII. REFERENCES [1] William W. Luggen, computer numerical control: a first look primer Cengage Learning, 1st Edition, 1996. [2] S. Sandeep & K. R. Prakash, (2013), Automation of loading and unloading to CNC turning center, International Journal on Mechanical Engineering and Robotics, Volume 1, Issue-2, pp.8-12. [3] C. H. Patel, G. C. Mohan Kumar, Vishwas Puttige, (2012), Low cost automation for CNC machining center, International Journal of Mechanical Engineering and Technology, Volume-3, Issue-2, pp. 806-817. [4] M P Groover, automation, production system and CIM PGI, New Delhi, 3rd Edition, 2013. [5] Misumi India, factory automation components, (http://in.misumi-ec.com/asia/CategorySearchView/103_26000000_26010000_26011300.html). [6] Anthony Esposito, fluid power with applications Prentice Hall of India, Delhi, 6th edition, 2007. [7] Rohan Kulkarni, S. Shivkumar and Rroopa K Rao, (2011), Productivity improvement on CNC lathe by automatic loading and unloading of throttle valve component, International Journal of Scientific & Engineering Research, Volume 2, Issue -12, pp. 1-7.