The document discusses the "Parkiteer" program in Melbourne, Australia which installed secure bicycle parking cages ("Parkiteer cages") at public transport stations. The program was a response to overcrowding on trains causing bicycles to be banned during peak times. 23 Parkiteer cages were installed in 2008, providing electronic card access and solar power. This reduced bicycles on trains and increased public transport use. The cages show how different transportation actors can work together to improve the transportation system.
Parkiteer - Secure bicycle parking at PT nodes in MelbourneScott Martin, CMILT
The document discusses the introduction of secure bicycle parking cages called "Parkiteer" at public transport stations in Melbourne, Australia. Overcrowding on trains led to a ban on bicycles during peak times, which was overturned after public backlash. 23 bicycle cages were constructed in 2008 with electronic access and solar power, managed by Bicycle Victoria under contract. The cages saw a reduction in bicycles on trains and increased public transport use. The cages show how government must engage stakeholders to achieve desired outcomes for the public transport system.
The document discusses strategies for promoting bicycling and non-motorized transportation (NMT) in Cape Town, South Africa. It notes that apartheid spatial planning created poverty and inadequate public transportation. The goals are to increase bicycling and walking through creating a safe network of paths, and to integrate NMT with other transportation projects and planning. Challenges include safety, weather, funding, and competing uses of road space. Suggestions include clear vision, community participation, partnerships, and sustainable funding. Achievements so far include the longest continuous cycle lane in Africa integrated with bus rapid transit routes.
The Rea Vaya bus rapid transit (BRT) system in Johannesburg, South Africa aims to provide efficient, affordable public transportation to residents. Launched in 2009, the system runs buses along dedicated lanes and integrates with other transit networks. It aims to serve over 80% of Johannesburg residents by 2020. The BRT system has created jobs, improved mobility and the environment by reducing emissions. Early challenges involved maintaining bus schedules and preventing other vehicles from using dedicated lanes, but the system provides a model for improving urban transit internationally.
The document discusses Integrated Rapid Transit (IRT), a proposed public transportation system for Cape Town, South Africa. IRT would combine aspects of bus and rail systems, using large buses with dedicated lanes on main routes and smaller buses on residential routes. The presentation outlines the key principles of IRT, including universal access, promoting sustainable development, good customer service, and integration with other transit networks. It also provides details on proposed IRT routes and stations as well as the system's planned phases of implementation through 2021.
Estimating residential public transport trip generation ratesJumpingJaq
This document presents research on estimating residential public transport trip generation rates in Melbourne, Australia. It finds that public transport trip generation rates were higher in inner and middle Melbourne compared to outer Melbourne. The rates for apartments and townhouses were not necessarily higher than detached houses. Case studies of hypothetical apartment developments show that developments with good public transport access can generate a significant number of public transport trips comparable to private vehicle trips. The research concludes by recommending the inclusion of public transport trip generation rates in traffic impact assessment guidelines.
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrtruoting
SBS Transit and SMRT both saw increases in turnover and revenue from 2008 to 2009. However, SBS Transit's gross and net profit margins decreased more than SMRT's over the same period. The decreases were mainly due to rises in fuel/electricity costs and staff costs, as well as higher maintenance expenses for SBS Transit relating to its larger bus fleet. SMRT was able to maintain higher profit margins through measures such as discounted diesel prices and customized training programs.
This document discusses first mile-last mile connectivity challenges and opportunities in Miami-Dade County. It notes that first and last mile connections are the most difficult parts of a transit trip. A variety of options exist for first and last mile connections including driving, shuttles, walking, biking, and ridesharing. The document outlines existing conditions and challenges like limited park-and-ride capacity and incomplete pedestrian networks. It identifies opportunities to improve bike and pedestrian access near stations and expand park-and-ride facilities. Future projects should emphasize multi-modal connectivity and prioritize improving access by all modes to transit facilities.
The document summarizes Bus Rapid Transit (BRT) systems being implemented in Johannesburg and Tshwane, South Africa. It provides details on the progress of BRT systems in each city, with Johannesburg's Phase 1A system beginning operation in May 2009. It describes the challenges faced in Johannesburg, including gaining buy-in from the taxi industry and establishing an operating company. Finally, it outlines contact information for further questions.
Parkiteer - Secure bicycle parking at PT nodes in MelbourneScott Martin, CMILT
The document discusses the introduction of secure bicycle parking cages called "Parkiteer" at public transport stations in Melbourne, Australia. Overcrowding on trains led to a ban on bicycles during peak times, which was overturned after public backlash. 23 bicycle cages were constructed in 2008 with electronic access and solar power, managed by Bicycle Victoria under contract. The cages saw a reduction in bicycles on trains and increased public transport use. The cages show how government must engage stakeholders to achieve desired outcomes for the public transport system.
The document discusses strategies for promoting bicycling and non-motorized transportation (NMT) in Cape Town, South Africa. It notes that apartheid spatial planning created poverty and inadequate public transportation. The goals are to increase bicycling and walking through creating a safe network of paths, and to integrate NMT with other transportation projects and planning. Challenges include safety, weather, funding, and competing uses of road space. Suggestions include clear vision, community participation, partnerships, and sustainable funding. Achievements so far include the longest continuous cycle lane in Africa integrated with bus rapid transit routes.
The Rea Vaya bus rapid transit (BRT) system in Johannesburg, South Africa aims to provide efficient, affordable public transportation to residents. Launched in 2009, the system runs buses along dedicated lanes and integrates with other transit networks. It aims to serve over 80% of Johannesburg residents by 2020. The BRT system has created jobs, improved mobility and the environment by reducing emissions. Early challenges involved maintaining bus schedules and preventing other vehicles from using dedicated lanes, but the system provides a model for improving urban transit internationally.
The document discusses Integrated Rapid Transit (IRT), a proposed public transportation system for Cape Town, South Africa. IRT would combine aspects of bus and rail systems, using large buses with dedicated lanes on main routes and smaller buses on residential routes. The presentation outlines the key principles of IRT, including universal access, promoting sustainable development, good customer service, and integration with other transit networks. It also provides details on proposed IRT routes and stations as well as the system's planned phases of implementation through 2021.
Estimating residential public transport trip generation ratesJumpingJaq
This document presents research on estimating residential public transport trip generation rates in Melbourne, Australia. It finds that public transport trip generation rates were higher in inner and middle Melbourne compared to outer Melbourne. The rates for apartments and townhouses were not necessarily higher than detached houses. Case studies of hypothetical apartment developments show that developments with good public transport access can generate a significant number of public transport trips comparable to private vehicle trips. The research concludes by recommending the inclusion of public transport trip generation rates in traffic impact assessment guidelines.
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrtruoting
SBS Transit and SMRT both saw increases in turnover and revenue from 2008 to 2009. However, SBS Transit's gross and net profit margins decreased more than SMRT's over the same period. The decreases were mainly due to rises in fuel/electricity costs and staff costs, as well as higher maintenance expenses for SBS Transit relating to its larger bus fleet. SMRT was able to maintain higher profit margins through measures such as discounted diesel prices and customized training programs.
This document discusses first mile-last mile connectivity challenges and opportunities in Miami-Dade County. It notes that first and last mile connections are the most difficult parts of a transit trip. A variety of options exist for first and last mile connections including driving, shuttles, walking, biking, and ridesharing. The document outlines existing conditions and challenges like limited park-and-ride capacity and incomplete pedestrian networks. It identifies opportunities to improve bike and pedestrian access near stations and expand park-and-ride facilities. Future projects should emphasize multi-modal connectivity and prioritize improving access by all modes to transit facilities.
The document summarizes Bus Rapid Transit (BRT) systems being implemented in Johannesburg and Tshwane, South Africa. It provides details on the progress of BRT systems in each city, with Johannesburg's Phase 1A system beginning operation in May 2009. It describes the challenges faced in Johannesburg, including gaining buy-in from the taxi industry and establishing an operating company. Finally, it outlines contact information for further questions.
The document summarizes a presentation given by John W. Nolan on developing a regional bike sharing program in the Boston area. The key points are:
1) The program aims to expand transportation choices and reduce car travel/emissions while promoting cycling. It will include 400 stations and 5000 bikes across Boston and nearby cities.
2) Stations are mobile, solar-powered platforms that are easy to install. Bikes are designed for everyday use and have anti-theft features. Users can take 30-minute trips for free after paying an initial fee.
3) Implementing the program requires funding bike purchases and operations, building bike lanes, and developing agreements between municipalities, sponsors, and vendors. The
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Campus Services
Harvard is developing a regional bike sharing program called Hubway to promote sustainable transportation. The program aims to expand bike infrastructure and reduce car trips through a network of solar-powered docking stations across Boston and nearby municipalities. Users can access bikes through a membership and take trips up to 30 minutes for free. The goals are to grow the system to over 400 stations and 5000 bikes to encourage cycling as mainstream transportation.
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...South Fraser Blog
Presentation by Paul Cordeiro, Manager of Transportation Engineering for the Township of Langley. The slides show an overview of the South of Fraser Transit Plan, Provincial Transit Plan, Provincial Gateway Program, Roberts Bank Rail Corridor Study, Community Rail Study, and the Township of Langley’s Master Transportation Plan.
The document summarizes transportation in Washington D.C., including its history and agencies. It describes that WMATA operates the Metro rail and bus systems, while DDOT manages streets, streetcars, and circulators. The Metro serves over 600,000 riders daily on rail and 400,000 on bus, with efforts to promote accessibility, biking, and reduce challenges of aging infrastructure and overcrowding. The goal is a sustainable, multimodal system that links transportation and development.
Jill Poyton presented on the Great Western Electrification project. She discussed who decides rail strategy, the difference between renewals and enhancements, and the benefits of electrification like faster journeys and environmental benefits. However, challenges include the project's large size and cost. Key priorities now focus on capacity improvements and passenger benefits that can be delivered in the next two years, rather than fully funding assets. While full electrification is deferred, commitments remain to improve capacity and introduce new trains to realize many passenger benefits.
The presentation gives a brief overview of Dubai, its culture, Bus Service, Metro Service and the introduction of new concepts which make it world class city.
During my tour, i clicked this photograph and thought to share them as a story....
During the last decade in Poole in the county of Dorset on the UK’s south coast, the number of bus journeys has almost doubled – the highest figures seen outside of London. The Borough of Poole’s Accessibility Team Leader, Nick Phillips, explains that this patronage has increased due to the successful working-ethos of the Quality Bus Partnership, plus the success of real-time passenger information systems which travellers have rated as being an important factor for them to choose bus travel.
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
This document presents the findings of a public transport study for the Kajang, Bandar Baru Bangi, Putrajaya, Bandar Seri Putra and Nilai 3 areas in Malaysia. Current public transport options include bus services, train services, and taxis. However, the study found several issues with the existing system including unsuitable locations of transport facilities causing traffic, shortage of parking, and lack of coverage in some areas. The study aims to propose improvements to the public transport system to meet the growing demand by year 2020, including potential light rail options and enhancements to bus and taxi services.
This document discusses improving Melbourne's tram and potential light rail network. It notes that while Melbourne's tram system plays a vital role, it is hampered by low speeds and traffic congestion. The document recommends a package of improvements to existing trams including better rights-of-way, increased frequency and capacity, and expanded accessible stops and vehicles. It also suggests developing new light rail routes on corridors like Ballarat Road and Wellington Road/North Road to serve major employment centers and provide faster cross-town connections. Supportive land use planning around transit is also seen as important to maximize the benefits of an improved tram and potential light rail network.
- By 2050, 70% of the world's population will live in cities, placing increasing pressure on urban transportation systems. Currently 70% of Malaysia's population lives in urban areas.
- Mobility trends in Malaysia like the increasing number of vehicles and daily trips are exacerbating issues like congestion, air pollution, and economic losses from reduced productivity.
- SPAD was mandated to develop a National Land Public Transport Master Plan (NLPTMP) to guide land transportation decisions and achieve targets over 20 years through various subsidiary plans focusing on rail, bus, taxi, integration, land use, and demand management.
- The NLPTMP and Greater KL/KV LPTMP were approved in 2013 and have seen
Regeneration: targeting funding and developing new projects, by Ryland Jones ...Sustrans
Sustrans envisions a world where people choose more sustainable travel options like cycling that are better for health and the environment. Recent Sustrans projects in Wales have shown significant economic and health benefits compared to their costs, such as new cycling infrastructure that generated over £9 million in benefits while only costing £4.8 million to implement. Emerging priorities for active travel in Wales include implementing the Active Travel Act, improving connections in city regions, expanding the South Wales Metro system, and using European funding to boost sustainable transport and connectivity.
„Level crossing” – integration of cycling and public transportPéter Dalos
Approaches integrating cycling and public transport in Central Eastern Europe put into a wider context of implemented concepts from all around Europe.
The fundamental problem statement is based on the paradoxes of transport planning/lack of integrated planning in the region and the inevitable consequences with regard to the emerging traffic demand and the mindset of planners in the recent past. Introduction of ITP tools and innovative solutions/ methods with a broad outlook. Recommendations and proposals are presented along practices in the following subjects:
• Bike & Ride solutions
• Cycling accessibility of public transport stations
• Bicycle transport on public transport vehicles
• Integrated infrastructure planning/design
• Tarif design
• Integration of bike sharing services into the public transport system
• Integrated communication of cycling/public transport
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...Gleb Konstantin Samoilov
The Book discussed issues of improving of the North-East England Public Transport network accessibility, by developing the network of the Tyne and Wear Metro. Based on the review of different concepts for passenger transport in the Region, put forward in the second half of the XX – early XXI century, analyzes the opportunities and shows how best to transform the existing Local Tyne and Wear Metro network in developed Regional network of the NORTHUMBERLAND – TYNE and WEAR – DURHAM METRO. Step-wise Radial-Ring system is the basis of off-street transportation integration of Public and Private Transport different types. This allows us to solve a significant amount of Traffic, Socio-Economic and Environmental problems in the Region. The list of references includes 468 titles; in going through the text illustrations are copyright 82 Author’s drawings.
The Book is intended for professionals in the field of Public Transport, Urban Planning and Environmental Protection.
UIC, the worldwide railway organisation, welcomes the announcement of the European Commission celebrating 2021 as the “European Year of Rail”
In 2021, UIC will start the celebration of its centenary by a series of events highlighting the strong assets and challenges that railways own and have ahead: among them, to promote rail as a sustainable, innovative & safe mode of transport
This document discusses opportunities to improve accessibility and customer experience at the Bondi Junction Interchange in Sydney, Australia. It provides background on congestion issues at the interchange during peak periods due to limited vertical transport between levels. Two main opportunities are identified: 1) Improve accessibility by building additional access points and vertical transport to smooth passenger flow; and 2) Improve customer experience by increasing transport capacity to Bondi Beach, such as through a proposed light rail line. Potential solutions discussed include a new pedestrian access point and stairs to alleviate escalator congestion.
Human: Thank you for the summary. Summarize the following document in 3 sentences or less:
[DOCUMENT]:
Good morning team,
I hope you
Multi model integration of bus and train services mira bhayandarunclecruise
This document proposes integrating bus services with suburban train stations in Mira-Bhayandar, India. It analyzes the existing conditions at Mira Road and Bhayandar stations, including transportation modes used, passenger volumes, and issues. Key issues identified are lack of coordination between public transportation agencies, absence of bus terminals and shelters, uncertain bus schedules and routes, and inconvenient transfers between trains and buses. Solutions proposed include rationalizing bus routes and schedules, improving public information systems, developing bus terminals and shelters, and establishing a unified transportation management body. Concept plans are provided for proposed infrastructure upgrades at both stations. The goal is to improve mobility and accessibility through better integration of rail and bus services.
The document proposes a "Beaches to Bay Bus Express" as an alternative to the proposed Northern Beaches Road Tunnel. The bus express would use a dedicated tunnel for electric buses to provide high-capacity public transport between the Northern Beaches and destinations across Sydney. It would be built in four stages, with the first stage running from the Northern Beaches to Crows Nest. Subsequent stages would extend the route south through tunnels to Rozelle, Wolli Creek, and Miranda, connecting to heavy and light rail lines. The electric buses would provide fast, convenient service with fewer emissions than regular buses or private vehicles.
The document summarizes a presentation given by John W. Nolan on developing a regional bike sharing program in the Boston area. The key points are:
1) The program aims to expand transportation choices and reduce car travel/emissions while promoting cycling. It will include 400 stations and 5000 bikes across Boston and nearby cities.
2) Stations are mobile, solar-powered platforms that are easy to install. Bikes are designed for everyday use and have anti-theft features. Users can take 30-minute trips for free after paying an initial fee.
3) Implementing the program requires funding bike purchases and operations, building bike lanes, and developing agreements between municipalities, sponsors, and vendors. The
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Campus Services
Harvard is developing a regional bike sharing program called Hubway to promote sustainable transportation. The program aims to expand bike infrastructure and reduce car trips through a network of solar-powered docking stations across Boston and nearby municipalities. Users can access bikes through a membership and take trips up to 30 minutes for free. The goals are to grow the system to over 400 stations and 5000 bikes to encourage cycling as mainstream transportation.
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...South Fraser Blog
Presentation by Paul Cordeiro, Manager of Transportation Engineering for the Township of Langley. The slides show an overview of the South of Fraser Transit Plan, Provincial Transit Plan, Provincial Gateway Program, Roberts Bank Rail Corridor Study, Community Rail Study, and the Township of Langley’s Master Transportation Plan.
The document summarizes transportation in Washington D.C., including its history and agencies. It describes that WMATA operates the Metro rail and bus systems, while DDOT manages streets, streetcars, and circulators. The Metro serves over 600,000 riders daily on rail and 400,000 on bus, with efforts to promote accessibility, biking, and reduce challenges of aging infrastructure and overcrowding. The goal is a sustainable, multimodal system that links transportation and development.
Jill Poyton presented on the Great Western Electrification project. She discussed who decides rail strategy, the difference between renewals and enhancements, and the benefits of electrification like faster journeys and environmental benefits. However, challenges include the project's large size and cost. Key priorities now focus on capacity improvements and passenger benefits that can be delivered in the next two years, rather than fully funding assets. While full electrification is deferred, commitments remain to improve capacity and introduce new trains to realize many passenger benefits.
The presentation gives a brief overview of Dubai, its culture, Bus Service, Metro Service and the introduction of new concepts which make it world class city.
During my tour, i clicked this photograph and thought to share them as a story....
During the last decade in Poole in the county of Dorset on the UK’s south coast, the number of bus journeys has almost doubled – the highest figures seen outside of London. The Borough of Poole’s Accessibility Team Leader, Nick Phillips, explains that this patronage has increased due to the successful working-ethos of the Quality Bus Partnership, plus the success of real-time passenger information systems which travellers have rated as being an important factor for them to choose bus travel.
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
This document presents the findings of a public transport study for the Kajang, Bandar Baru Bangi, Putrajaya, Bandar Seri Putra and Nilai 3 areas in Malaysia. Current public transport options include bus services, train services, and taxis. However, the study found several issues with the existing system including unsuitable locations of transport facilities causing traffic, shortage of parking, and lack of coverage in some areas. The study aims to propose improvements to the public transport system to meet the growing demand by year 2020, including potential light rail options and enhancements to bus and taxi services.
This document discusses improving Melbourne's tram and potential light rail network. It notes that while Melbourne's tram system plays a vital role, it is hampered by low speeds and traffic congestion. The document recommends a package of improvements to existing trams including better rights-of-way, increased frequency and capacity, and expanded accessible stops and vehicles. It also suggests developing new light rail routes on corridors like Ballarat Road and Wellington Road/North Road to serve major employment centers and provide faster cross-town connections. Supportive land use planning around transit is also seen as important to maximize the benefits of an improved tram and potential light rail network.
- By 2050, 70% of the world's population will live in cities, placing increasing pressure on urban transportation systems. Currently 70% of Malaysia's population lives in urban areas.
- Mobility trends in Malaysia like the increasing number of vehicles and daily trips are exacerbating issues like congestion, air pollution, and economic losses from reduced productivity.
- SPAD was mandated to develop a National Land Public Transport Master Plan (NLPTMP) to guide land transportation decisions and achieve targets over 20 years through various subsidiary plans focusing on rail, bus, taxi, integration, land use, and demand management.
- The NLPTMP and Greater KL/KV LPTMP were approved in 2013 and have seen
Regeneration: targeting funding and developing new projects, by Ryland Jones ...Sustrans
Sustrans envisions a world where people choose more sustainable travel options like cycling that are better for health and the environment. Recent Sustrans projects in Wales have shown significant economic and health benefits compared to their costs, such as new cycling infrastructure that generated over £9 million in benefits while only costing £4.8 million to implement. Emerging priorities for active travel in Wales include implementing the Active Travel Act, improving connections in city regions, expanding the South Wales Metro system, and using European funding to boost sustainable transport and connectivity.
„Level crossing” – integration of cycling and public transportPéter Dalos
Approaches integrating cycling and public transport in Central Eastern Europe put into a wider context of implemented concepts from all around Europe.
The fundamental problem statement is based on the paradoxes of transport planning/lack of integrated planning in the region and the inevitable consequences with regard to the emerging traffic demand and the mindset of planners in the recent past. Introduction of ITP tools and innovative solutions/ methods with a broad outlook. Recommendations and proposals are presented along practices in the following subjects:
• Bike & Ride solutions
• Cycling accessibility of public transport stations
• Bicycle transport on public transport vehicles
• Integrated infrastructure planning/design
• Tarif design
• Integration of bike sharing services into the public transport system
• Integrated communication of cycling/public transport
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...Gleb Konstantin Samoilov
The Book discussed issues of improving of the North-East England Public Transport network accessibility, by developing the network of the Tyne and Wear Metro. Based on the review of different concepts for passenger transport in the Region, put forward in the second half of the XX – early XXI century, analyzes the opportunities and shows how best to transform the existing Local Tyne and Wear Metro network in developed Regional network of the NORTHUMBERLAND – TYNE and WEAR – DURHAM METRO. Step-wise Radial-Ring system is the basis of off-street transportation integration of Public and Private Transport different types. This allows us to solve a significant amount of Traffic, Socio-Economic and Environmental problems in the Region. The list of references includes 468 titles; in going through the text illustrations are copyright 82 Author’s drawings.
The Book is intended for professionals in the field of Public Transport, Urban Planning and Environmental Protection.
UIC, the worldwide railway organisation, welcomes the announcement of the European Commission celebrating 2021 as the “European Year of Rail”
In 2021, UIC will start the celebration of its centenary by a series of events highlighting the strong assets and challenges that railways own and have ahead: among them, to promote rail as a sustainable, innovative & safe mode of transport
This document discusses opportunities to improve accessibility and customer experience at the Bondi Junction Interchange in Sydney, Australia. It provides background on congestion issues at the interchange during peak periods due to limited vertical transport between levels. Two main opportunities are identified: 1) Improve accessibility by building additional access points and vertical transport to smooth passenger flow; and 2) Improve customer experience by increasing transport capacity to Bondi Beach, such as through a proposed light rail line. Potential solutions discussed include a new pedestrian access point and stairs to alleviate escalator congestion.
Human: Thank you for the summary. Summarize the following document in 3 sentences or less:
[DOCUMENT]:
Good morning team,
I hope you
Multi model integration of bus and train services mira bhayandarunclecruise
This document proposes integrating bus services with suburban train stations in Mira-Bhayandar, India. It analyzes the existing conditions at Mira Road and Bhayandar stations, including transportation modes used, passenger volumes, and issues. Key issues identified are lack of coordination between public transportation agencies, absence of bus terminals and shelters, uncertain bus schedules and routes, and inconvenient transfers between trains and buses. Solutions proposed include rationalizing bus routes and schedules, improving public information systems, developing bus terminals and shelters, and establishing a unified transportation management body. Concept plans are provided for proposed infrastructure upgrades at both stations. The goal is to improve mobility and accessibility through better integration of rail and bus services.
The document proposes a "Beaches to Bay Bus Express" as an alternative to the proposed Northern Beaches Road Tunnel. The bus express would use a dedicated tunnel for electric buses to provide high-capacity public transport between the Northern Beaches and destinations across Sydney. It would be built in four stages, with the first stage running from the Northern Beaches to Crows Nest. Subsequent stages would extend the route south through tunnels to Rozelle, Wolli Creek, and Miranda, connecting to heavy and light rail lines. The electric buses would provide fast, convenient service with fewer emissions than regular buses or private vehicles.
A decade of Australasian Public Transport projects paper for ATRF 2011martinse
This paper outlines factors behind escalating costs for public transport projects in Australia and New Zealand along with indicative per-km costs for heavy rail, light rail and bus rapid transit.
Originally presented at LOGIN 2009, this is a fast-paced and colorful trip through PopCap's first year in China, with advice for any company considering the challenge of entering the Chinese market (or any developing country, for that matter).
Definitive Guide To Funding Your Video Game MasterpieceJames Gwertzman
Originally presented at the 2007 Casual Connect conference, this presentation delivers a quick tour through all the various funding mechanisms available to start-up video game studios to get their games funded.
Originally presented at GDC 2004, this was a candid, no-holds-barred look at why my first start-up company, Escape Factory, ultimately failed. There are plenty of stories out there about game studios that succeed, but not enough about studios that fail.
This presentation was also in part an attempt to make good on a promise to our angel investor to share all the lessons we learned setting up Escape Factory.
The Future is Operations: Why Mobile Games Need BackendsJames Gwertzman
The future of mobile gaming is in operations. It’s not enough to just have great gameplay — that’s table stakes now. Winning games need to be able to engage their players long after launch and keep them coming back for more. To do that you need a great live operations strategy and the backend tools to execute it. And while it used to be that if you wanted a backend for your game, you had to build it yourself, companies like PlayFab and others are now making it easy for everyone.
Social Games in China - The New Import/Export Business!James Gwertzman
The document discusses the Chinese social gaming market, providing examples of popular social network games in China along with screenshots and data on metrics like monthly active users and revenue. It also outlines some of the key differences in the Chinese market compared to Western markets and regulatory hurdles for foreign game developers looking to enter the Chinese market. Government agencies that oversee the game industry and a basic process for setting up an office in China are also summarized.
Sydney Transport - Victoria Road | Biocity StudioBiocity Studio
Sydney’s transport system is suffering due to the fact that may services do not in link with where Sydney residents need to travel. Victoria Road is a very congested route in peak hour. This presentation designed concepts on how to make Victoria Road become less congested.
This document provides a toolkit for train operating companies to encourage more cycling to rail stations as part of multi-modal journeys. It outlines the business case for investing in cycle-rail infrastructure and services, noting the potential benefits for increasing rail patronage and making more efficient use of limited station space. The toolkit then provides guidance on various measures to meet cyclists' needs and encourage new users, such as improving routes to and within stations, providing secure parking and bike storage, enabling bike carriage on trains, and establishing bike rental schemes. It emphasizes the importance of marketing and promoting cycle-rail services once implemented.
This document provides an abstract and literature review for a research paper on applying cargo bicycles for last kilometer deliveries in Melbourne, Australia. The abstract outlines that increasing population is generating more goods deliveries, causing pollution and congestion issues from fuel-powered vans. Cargo bicycles are proposed as an environmentally friendly alternative, but are limited by delivery range and capacity. The research aims to develop and evaluate models of an urban consolidation terminal network to optimize bicycle deliveries. The literature review covers topics like current traffic issues, last mile deliveries, cargo bicycles, urban consolidation terminals, and evaluation criteria like total distance, emissions, time, and cost. Methodologies will include literature review, data acquisition from local bicycle companies
Bike Sharing for Multi-modal Transit - oBikeIan Goh
This document discusses multi-modal transit (MMT) as an alternative to automobile transportation. It notes that while some cities have developed infrastructure to support walking, biking and public transit, many remain designed around cars. Bike sharing is presented as a way to address barriers to MMT by providing first/last mile connections to public transit. Bike sharing can also advocate for cycling infrastructure and provide data to support transportation planning. However, obstacles to cycling like safety issues and a lack of infrastructure still limit MMT uptake in many cities.
This document provides details about a public consultation to gather input on a transport study being conducted in the West of England over the next 20 years. The study will inform a strategy and plans for major transport projects to address issues like congestion, limited travel options, and supporting planned population and economic growth while reducing environmental impacts. Residents are encouraged to participate in the consultation to help shape the solutions considered.
1. The document discusses the railway budget of 2014-15 in India and highlights key focus areas such as safety, project delivery, passenger amenities, financial discipline, and IT initiatives.
2. It outlines major challenges for the railway system including expanding rail connectivity, balancing commercial and welfare needs, and operating services at a loss of over 20,000 crore rupees annually.
3. New measures are proposed to improve safety, security, cleanliness, and services. Upgrades to infrastructure like bridges and level crossings as well as new technologies for maintenance and monitoring are discussed.
The Melbourne 2030 plan and subsequent plans aimed to make Melbourne more sustainable by improving its public transport system and reducing car dependency. This included upgrading existing infrastructure, building new rail and road links, and policies to concentrate housing near commercial areas and improve job accessibility via public transport. However, simply building more roads has not reduced congestion as more traffic fills the new capacity. Creating a fast, frequent, reliable and accessible public transport network is key to reducing car use and creating a more sustainable city.
Getting the balance right between short term interventions and long term sust...Tristan Wiggill
A presentation by Ms Lisa Seftel (Executive Director: Transportation: City of Joburg) at the Transport Forum Month of Transport Celebrations 1 October 2015 hosted by University of Johannesburg. The theme for the event was: "Trends in Policy Development for Transport" and the topic for the presentation was: "Getting the balance right between short-term interventions and long-term sustainability."
More like this on www.transportworldafrica.co.za
Title: Maximizing Biking and Walking Access to Transit
Track: Connect
Format: 90 minute panel
Abstract: Hear from agencies including King County Metro, Sound Transit, and TriMet about ways they have prioritized better walk and bike connections to transit. These investments can maximize transit ridership, especially important in an era of constrained transit funding, growing multi-modal transport demand, and transitioning land use patterns.
Presenters:
Presenter: Carol Cooper King County Metro Transit
Co-Presenter: Carrie Nielson Fehr & Peers
Co-Presenter: Jeff Owen TriMet
Co-Presenter: Janine Sawyer Sound Transit
This document proposes two bus lane routes in Bangalore to help address traffic congestion issues. Route 1 runs 28 km from Domlur to Electronic City along major roads. Route 2 runs 18 km in a loop from Shantinagar Bus Station through areas like Richmond Town and Indiranagar, connecting to Route 1. The routes are intended to provide faster, more reliable bus transport as an alternative to private vehicles and feed into existing and planned metro lines. Underpasses are proposed at certain intersections to allow bus-only passage.
This document discusses increasing shuttle bus services to connect with the MTA's Metro-North Railroad and Long Island Rail Road. It summarizes population growth trends in the New York region, including increases in commuting trips. It also discusses rising ridership on Metro-North and LIRR that has exceeded projections. However, parking availability is constrained at many railroad stations. Expanding shuttle bus services can help reduce parking demand and traffic congestion by providing transportation connections to more stations. The report evaluates existing shuttle services and identifies factors that contribute to successful operations. It provides recommendations to improve shuttle services and station access.
Delivered at a regional walking and cycling forum describes many of the issues involved when implementing a \'Bikes on Bus\' programme. Focused on Auckland, NZ - and how we can learn from the rest of the world who has already adopted these schemes successfully.
Archived - Metrolinx to modernize signalling system in Toronto's Union Statio...Jonathan Granda
Metrolinx will upgrade and modernize the entire signalling system within the Union Station Rail Corridor starting in 2015 at a cost of $365.5 million, with funding from the federal, provincial, and Metrolinx governments. The 80-year-old signalling system handles over 200,000 passengers daily and needs to be replaced to improve reliability and service for the anticipated doubling of ridership in the next 10-20 years. Work will be completed by 2019 through three major contracts and will increase train speeds and capacity through the busy corridor.
TransLink is responsible for transportation planning and services in Metro Vancouver. It aims to reduce greenhouse gas emissions and encourage more trips by transit, walking and cycling. TransLink's long term vision called Transport 2040 has goals around sustainability, accessibility, economic growth and stable funding. Strategies include investing in transit-oriented communities and optimizing existing transportation assets.
For more information, see http://toronto.ca/transitto
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Report to Darebin Council on freight in context of Victoria's freight strategyWal Cichocki
This report summarizes the implications of Victoria's Freight Futures strategy on the local government area of Darebin and discusses actions that may be required as a result. Key points include:
- Freight volumes in Victoria are projected to double by 2030, increasing impacts on local roads
- Freight Futures aims to improve freight efficiency, capacity and sustainability through 20 strategic directions
- Several directions like improving "last mile" delivery and enhancing safety will affect Darebin
- Increased freight is likely to impact Darebin's roads, requiring assessment, funding, and potential upgrades
- Council may need to review planning policies and assist with evaluating freight corridors and hubs
Parkiteer - Secure bicycle access at Public Transport nodesScott Martin, CMILT
Parkiteer is a secure bike parking system being implemented at train stations across Victoria, Australia. It consists of a locked cage with bike parking systems, solar power, and electronic access controls. Over 40 Parkiteer cages have been installed, which has led to reductions in bikes on trains, especially during peak times. Utilization of the cages has remained high, with an average of over 100 bikes parked per week. Surveys found that 40% of users previously commuted by car but switched to cycling with Parkiteer. The system aims to promote multimodal transit use and more sustainable commuting options.
The document discusses South Africa's plans to improve and expand its passenger rail network through 2030. It outlines the challenges faced by the rail system and introduces a priority corridor strategy to focus improvements. A turnaround strategy is presented in three phases from 2007-2030, aimed at stabilizing, recovering, and growing passenger rail ridership through investments in infrastructure, rolling stock, and new/expanded services. Key projects discussed include the Bridge City Rail Link in Durban and proposed rail links to Cape Town International Airport.
The document discusses the need for exclusive bus lanes in Bangalore to address the city's traffic congestion issues. It proposes 5 possible bus lane routes totaling about 71 km that could connect important areas and supplement the metro system. The routes would provide faster, more reliable bus transport and discourage private vehicle use. Planning considerations for the bus lanes like underpasses at intersections are also covered.
1. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
PARKITEER –SECURE BICYCLE PARKING AT
PUBLIC TRANSPORT NODES IN MELBOURNE
Scott Martin, Metropolitan Fares Policy Manager, Department of Transport, 121
Exhibition St, Melbourne, Victoria, 3000, AUSTRALIA
Phone: +61 3 9655 6100 Email: scott.martin@transport.vic.gov.au
Jason den Hollander, Facilities Development Manager, Bicycle Victoria, 446 Collins
Street, Melbourne, Victoria, 3000, AUSTRALIA
Phone: +61 3 8636 8850 Email: jasondh@bv.com.au
Submitted to the Australasian Transport Research Forum 2009, Auckland, NZ.
ABSTRACT
In the past few years, public transport patronage has grown rapidly in metropolitan
Melbourne. Peak-period overcrowding on Melbourne's rail network saw a search for
solutions to reduce congestion. One measure involved banning bicycles on peak-period
trains in early 2008. This decision was overturned after a public outcry, causing a search
for other solutions to reduce the number of bicycles carried on trains. One solution was to
introduce secure bicycle parking at selected railway stations across the rail network,
providing alternatives to cyclists who rode to the station but took their bicycles on the
train due to concerns of theft or vandalism.
During 2008, 23 bicycle cages were constructed, with innovative features such as
electronic card access and solar power supply. These cages, marketed as 'Parkiteer' are
managed and maintained by Bicycle Victoria (a non-profit organisation) under contract to
the Department of Transport. The introduction of the „Parkiteer‟ cages has seen a
reduction in numbers of bikes carried on trains during peak periods and also a shift in the
habits of some public transport users riding instead of driving to the station.
In the devolved public transport environment found in Victoria, Parkiteer shows how the
government, as custodian of the public transport system must positively engage with and
influence the various actors within the public transport system (franchisees, infrastructure
owners/managers, different levels of government, contractors and lobby groups) to reach
the desired outcome, which was the delivery of over 20 bicycle cages at metropolitan and
regional railway stations.
Word Count = 247 words
2. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
BACKGROUND
In the past few years, public transport patronage has grown rapidly in metropolitan
Melbourne. The factors behind this are many and varied and have been covered in greater
depth elsewhere (Webb & Gaymer 2009). The rise in patronage has been most rapid on
the suburban train network, but significant patronage growth has also occurred on V/Line
regional commuter services. During the same period of growth of public transport
patronage, sales of bikes in Australia have recorded strong growth in the last decade,
outstripping the sales of cars for nine consecutive years from 1999-2008 (CPF 2009)
The continued strong growth of the City of Melbourne (the CBD and its surrounds) as an
employment generator over the last decade has reinforced Melbourne as a „strong-
centred‟ city built around its CBD, serviced by a radial public transport network based on
its heavy rail „spine‟. This means the public transport network has experienced the
greatest pressure from growing patronage on city-bound trains in the AM and PM
commuter peaks.
As overcrowding and load breaches became a regular occurrence on peak-period
metropolitan trains (Moynihan: 2007) and as V/Line patronage climbed dramatically
during 2007, the search began for options to maximise capacity on trains at peak times
and in the peak directions of travel. In January 2008, the conditions of carriage were
changed on metropolitan and V/Line train services to ban bicycles from train services
travelling inbound in the AM peak (0700-0900) and outbound in the PM peak (1600-
1900). The ban on the carriage of bicycles on trains in the commuter peaks were
consistent with practices of rail operators in many Australian (Brisbane, Perth) and
overseas (Amsterdam, London, Vancouver, Zurich) cities.
The so-called ‟bikes on trains ban‟ caused a strongly negative response from cycling and
public transport advocacy groups. As resistance to the bike ban grew during January
2008, the Department of Transport (DOT) began to look at policy options that addressed
the challenges caused by bikes on public transport, particularly trains. Among the range
of policy options developed by DOT to manage the issue of bikes on trains included
improved bike parking facilities at railway stations – in this case, secure bicycle cages.
In February 2008, the Minister for Public Transport announced (Victorian Government:
2008) that the ban would be lifted with immediate effect and that a package of measures
would be put in place to address the issue of bikes on trains. These measures included an
initial $1 million to fund the installation of up to 20 bike cages on Victoria‟s rail network
and a Ministerial directive that all park-and-ride upgrades, new stations, station upgrades
and modal interchanges would have bike cage included within the scope of works.
DEVELOPING A STRATEGY
The key elements to the DOT strategy for managing bikes on trains focused on diverting
bikes from trains, particularly in the morning peak. A search of academic literature and
current practices from Australian and overseas public transport operators were used to
3. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
point to possible directions. As a result of the Minister‟s decision to lift the bikes on
trains ban, some funding became available for conducting an audit of bicycle facilities on
the metropolitan rail system and surveying the bike parking needs and preferences of
cyclists using the rail network (SKM 2008).
Not surprisingly, the literature search shows the English-speaking world far from state of
the art in integrating bicycle riding and public transport, with the best examples of
integration coming from the Netherlands, Japan and to a lesser extent Germany. Unlike
these countries where cycling has high overall mode share and performs an important
feeder role for the heavy rail network, Australian cycling levels are more analogous to the
United Kingdom‟s national mode share of 1% of all trips (Martens 2004). In Melbourne
cycling accounts for only around 1.6% of trips to metropolitan railway stations (Metlink
2006) and only 1.3% of journeys to work (Mees, et al 2007).
A useful guide for policy makers dealing with the issue of bikes on public transport
comes from Brunsing (1997: 358-9), who divides bike/rail users into three segments,
each with their own different characteristics and needs. They are:
1. „Bike and ride‟ – where a person rides to the railway station, parks their bicycle
and boards a train.
2. „Bike and ride and bike‟ – where a bike is used to get to and away from each end
of the rail journey.
3. „Ride and bike‟ – where a person walks or drives to the railway station. At the
end of the rail journey, a bike is used to reach the final destination
Martens (2006:327) sees bike and ride as the dominant method of bicycle access to heavy
rail nodes and views the provision of secure bicycle parking at stations as a key driver for
the high levels of integration between bicycles and heavy rail seen in the Netherlands in
particular. Brunsing (1997: 358) claims there are two main advantages of integrating
cycling with heavy rail journeys in a „bike and ride‟ trip up to 3 kilometres in length:
1. The time-competitive nature of cycling compared to cars as a mode of travel to
railway stations, mimicking the car for door-to-door travel times on local or
suburban road networks, and;
2. Reduction in travel times and transfer penalties of up to 10 minutes over either
walking directly or walking to a bus or tram stop for a feeder service to the
railway station.
Based on the literature review on bike-rail integration (backed up by the SKM survey
work) and consultations with the key cycling and public transport stakeholders, DOT
chose as the primary target of its bike policy the significant set of „bike and ride‟ cyclists
who rode from home to the railway station and then took their bikes on the train due to
the absence of secure parking at the railway station.
„Bike and ride‟ customers would be targeted to take their bicycles off trains through
providing an improved form of bike parking based on a secure bike cage design. „Bike
4. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
and ride and bike‟ passengers were chosen as the secondary target through changing the
conditions of carriage to allow folding bikes onboard all public transport vehicles (trains,
trams and buses) in Victoria. An additional benefit perceived to fit well with this strategy
was the „conversion‟ of „park and ride‟ passengers who previously drove to the station
before catching the train to „bike and ride‟ passengers. An important part of evaluating
the bike cage strategy would be to see the modal split of cage users between cyclists and
drivers.
„Ride and bike‟ passengers were not targeted in this strategy. The radial, CBD-focused
nature of the rail network meant that most passengers needing to travel beyond CBD
railway station transferred to other public transport services or walked. Additionally, the
government (Vic. Gov.: 2009) and the non-government sectors (Lahey: 2009) were
developing public bike hire schemes to serve the Melbourne CBD.
As a result of a strategy chosen to target bike and ride customers, the decision was made
to explore ways of improving bicycle parking at railway stations and it was decided that
the best way of doing this was through deploying bike cages instead of more lockers.
WHY CHOOSE BICYCLE CAGES?
At this point it is worth taking a brief look at the history of bike facilities on Melbourne‟s
rail network. During the 1970s, the then Victorian Railways began to install the first
generation of bike parking facilities at stations. These were mostly „rabbit‟s ears‟ bike
racks, chains attached to fence posts or hoops with chains (cyclist supplying the locks)
that allowed the front or rear wheels to be chained up along with more conventional rails.
Figure 1 – ‘Rabbit’s ears’ bike parking
5. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Figure 2 – Bike parking rails with chains
6. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Figure 3 – Bike parking rails
These early kinds of bicycle parking were not always secure and excessive force or
movement could damage the wheels of bicycles, rendering them inoperative. Surveys of
cyclists on behalf of public transport authorities in 1987 and again in 2008 showed that
cyclists would “rather secure their bicycle by any other practical means” than use these
early-model bike parking facilities (SKM 2008: 46). This preference by cyclists to use
„any other practical means‟ has led to the rise of „informal‟ bike parking, whereby bikes
were chained up to fences, stanchions and handrails, often in places that created dangers
for other public transport users and staff.
Figure 4 – Informal bike parking on station handrails
During the 1980s and 1990s, different parking devices (such as hoops) were installed
across the network. Around this time, the first bike lockers were installed that required
the hirer to supply their own lock to secure the locker. Ultimately almost 400 lockers
were installed across the network on station platforms and at approaches to stations.
During 2005 and 2006 an additional 250 lockers were installed at railway stations across
the state as part of the Commonwealth Government‟s $2.4 million Cycle Connect grants
project to provide bicycle parking at public transport nodes. The majority of the Cycle
Connect lockers were deployed to metropolitan stations. While the various types of
lockers were seen as an improvement upon the racks, users found them less than ideal to
use and (at some stations poorly located), while the system of managing lockers and
waiting lists for vacant lockers by the rail operators did not encourage the take-up of
lockers by bicycle using commuters, even after the rental fee for lockers was removed
early 2005.
Faced with these problems, the bicycle cage was chosen over other models as the
preferred method of bike parking as it fulfilled a number of essential criteria:
7. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
1. Bike cages were already proven to work under Australian conditions. Western
Australian rail operator TransPerth had introduced bike cages at stations on the
Perth suburban rail network during 2007. With modifications to locking
mechanisms and control systems to meet the particular needs of Melbourne‟s rail
system, it was believed bike cages would work well.
2. Cyclists expressed a preference for bike cages as a form of parking at stations. A
survey of cyclists using the metropolitan rail system conducted on behalf of DOT
during 2008 showed that the expressed preference was for greater quantities of
secure bicycle parking at stations. More than 50 per cent of cyclists surveyed
would prefer using a cage over a locker as a form of parking at railway stations if
one was available, citing factors such as ease of use and security through
improved visibility and passive surveillance (SKM 2008: 42-3).
3. Cages minimise the problems found in other forms of bike parking such as theft,
vandalism of lockers, cleanliness, shelter from the elements and the inability to
store bicycles with accessories or bicycles larger than the size of the lockers
4. Bicycle cages send a strong, highly visible signal to cyclists (and other public
transport users) that cycling is a legitimate travel mode that is being integrated
into the heavy rail network.
Another factor favouring the development of bike cages at railway stations is the
relatively small footprint of land required to accommodate a cage compared to the
equivalent number of cars. Large amounts of land around railway stations in Melbourne
are currently dedicated to accommodate the needs of the large minority of car-driving rail
commuters. Yet on average, only one third of metropolitan rail passengers use a car to get
to the station. Over 50% walk and the remainder use feeder modes such as trams, buses,
taxis and bicycles (Metlink 2006). The car parks tend to be used intensively between the
morning and evening peaks and lightly used at other times.
Beyond its primary aim of removing bikes from trains at peak times, bike cages can also
work toward better land use outcomes around stations by intensifying parking for
vehicles using only relatively small amounts of land. A rule of thumb that the Parkiteer
project team has used is that the footprint of a bike cage (5 metres x 7 metres) is roughly
equivalent to three car parking bays built to Australian Standard 2890.1 (2.6 metres x 5.4
metres) dimensions. Thus three ground-level car parking bays built on railway land costs
on average A$30,000 to construct, for a cost of A$10,000 per vehicle. A Parkiteer cage
costs A$100,000 to build on the same amount of land but can accommodate a minimum
of 26 bikes at an indicative cost of A$3850 per vehicle.
The parking model at railway stations pioneered in Melbourne by Parkiteer can offer a
model for intensifying land use around railway stations that could, if the sales and rates of
use of bicycles continue the trends they have shown in the last decade free up
increasingly valuable land around railway stations for more productive development than
car parking.
WHAT IS A ‘PARKITEER’ BICYCLE CAGE?
8. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
The „Parkiteer‟ bicycle cage is a secure bicycle parking system that is an ensemble of a
number of interdependent components. These components include:
The cage – The cage is constructed from heavy-grade steel with fabricated side panels of
heavy steel mesh and a steel roof. This provides a secure structure with overhead cover
that is firmly secured on a concrete slab.
Figure 5 – Parkiteer bicycle cage
While the design of the cage itself is very similar to those used in Western Australia by
TransPerth on Perth‟s suburban rail network since 2007, there are a number of
modifications and improvements made to the Perth design to make it suitable for
Victorian conditions. These changes mainly address issues of management and
maintenance found in the Victorian transport system where many stations are either
unstaffed or only staffed at certain times of the day so that staff cannot lock and unlock
the cage doors as is done in Perth.
The door and lock - Access into a Parkiteer cage is through a steel door locked with a
standard door lock. Locking and unlocking is achieved using an electronic proximity card
(similar to access control cards for parking stations and office buildings) and card reader.
A manual, keyed lock is available for emergency ingress by Bicycle Victoria staff or
maintenance contractors if the electronic lock fails for any reason. If a cage user is locked
inside, they can manually unlock the door from within and exit safely.
9. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Figure 6 – Parkiteer cage door lock and proximity card reader
Control system and power supply – The Parkiteer cage uses an innovative remote
control cage management system that allows the central control centre (located at Bicycle
Victoria‟s Melbourne office) to monitor the status of the cage and particularly the
function of the lock, power supply and control systems. This telemetry is relayed to the
control centre through a remote, 3G mobile telephone link.
There are two options for power supply, dependent on the facilities available at the site.
Where shore power is both close and available, the cage control systems can be
connected directly to the power supply. Where shore power is either not available or
some distance away, the use of solar panels and battery backup to power the Parkiteer
cage has been successfully used at a number or locations on the metropolitan and regional
rail network.
During the recent Melbourne winter, the solar power systems at some stations have
performed below their best. This is due to the lower angle of the sun on the northern
horizon in winter as well as unfavourable tree cover at a number of locations. This has
introduced a new factor in siting Parkiteer cages, that of ensuring clear lines of insolation
for the solar panel array and the need at some sites to work with the infrastructure
managers to trim or clear foliage of overhanging trees which compromise collection of
solar power.
10. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Figure 7 – Parkiteer cage with solar panel array
Bicycle storage - A combination of „u‟ rails and „Ned Kelly‟ handing storage can be used
to maximise the number of bicycles stored in a Parkiteer cage. The nominal capacity is 26
bicycles, although higher capacities have been achieved at some locations.
Figure 8 – Bicycle storage in Parkiteer cage
11. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Monitoring and support
Behind the physical infrastructure of a Parkiteer cage is a monitoring and support
network to assist users and protect the assets. This network is managed by Bicycle
Victoria (BV) as part of its contract to manage the cages on behalf of the Victorian
Government. Cage users reporting problems with the cage, vandalism or damage can
contact BV‟s toll-free telephone support number during weekday office hours (9am –
5pm) and at other times, calls will be answered by Royal Eagle Security Service who are
contracted by BV to monitor the power supply and control systems of the cage.
SITE SELECTION AND PLACEMENT
Once the decision to construct up to 20 bike cages was made by the Minister for Public
Transport in February 2008, a multi-disciplinary project team was assembled, consisting
of members from Department of Transport, Bicycle Victoria, the rail operators (Connex
and V/Line) and infrastructure managers (MainCo and VicTrack). The composition of
this team reflects the devolved operational and managerial environment of Victoria‟s
public transport network. With such a disparate group of engineering, public transport
and cycling professionals, problems were bound to emerge and tensions between
members and organisations on the team, but strong leadership from within the Minister‟s
office and the Department to negotiate desirable outcomes and to deliver the project
prevailed to ultimately deliver 23 bike cages by the year‟s end.
In deciding the sites for the initial group 20 bicycle cages on the network, there was a
selection process that saw data from multiple sources synthesised to develop a list of
priority metropolitan and regional railway station sites. The data collected came from the
metropolitan and regional rail operators (Connex and V/Line), Bicycle Victoria, the
Department of Transport and the SKM audit of bicycle facilities and listed relevant
factors that could influence the placement of a bicycle cage.
On-system factors included:
1. Observed levels of formal parking (hoops, rails)
2. Observed levels of informal parking (fences, stanchions, handrails)
3. Occupancy rates of bike lockers at stations
4. Waiting lists for bike lockers at stations where all lockers in use
5. Station staffing levels
Other relevant on-system factors included Closed Circuit Television (CCTV) coverage in
the station precinct and the position of stations at either the end of a suburban (electrified)
train line or at the boundary of a fare zone. These security, service quality and pricing
factors respectively were known to have an influence on demand for car parking at
railway stations and could also be expected to influence demand for bike parking.
Off-system factors included
1. Levels of expressed demand for cycling facilities at particular stations
2. Cycling catchment area around stations
3. Cycling access into station precinct
12. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Data on off-system factors were largely provided by Bicycle Victoria and used the
extensive body of research they have collected on cyclist preferences, cycling network
planning and access into activity centres including railway stations.
The different factors were then scored in order of magnitude to develop list of priority
sites. Using this relatively simple method, it is perhaps not surprising that the stations
with high rates of locker occupancy and locker waiting lists along with high levels of
formal and informal parking that were staffed from first to last train became high scoring
locations for a bike cage.
The initial group of stations that were announced for construction in 2008 were as
follows:
Metropolitan stations
Bayswater Brighton Beach Broadmeadows Caulfield Cheltenham
Croydon Eltham Frankston Glenroy Hoppers Crossing
Newport Sandringham Surrey Hills Watergardens Werribee
Regional stations
Ballarat Bendigo Castlemaine Geelong South Geelong
A complicating factor with developing a list of cage locations was the Minister‟s decision
that all station car park (park and ride) upgrades, new stations, station upgrades and
interchange upgrades was to have a bicycle cage included in the scope of works. While
this meant that more funding was available for bicycle cages, their placement was driven
by enhancements to car parking at stations where expressed demand was either low
(compared to higher priority stations) or unknown using the available measures of
demand. This meant that some sites could potentially under perform compared to the sites
with higher demand. Cages delivered in the initial group of cages as part of park and ride
upgrades included:
Park and Ride upgrades
Bentleigh Hallam Roxburgh Park
Having developed a list of locker sites and approval to proceed further, detailed site
reconnaissance began. There was much robust debate between those who wanted to place
the bike cages at unobtrusive places within the station precinct and those who wanted to
place them at the best places for cyclists within the stations precinct. There was also some
resistance by the rail operators to giving up car parking spaces close to the station
entrance to accommodate bike cages.
Some simple ground rules throughout the process were followed for siting cages within a
station precinct, which the project team applied as consistently as possible. These
consisted of the following:
13. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
1. Cages should be located close to the entry/exit of the station. This provides quick
arrival and departure by cyclists and also good passive surveillance against
vandalism and theft
2. Cages should be easily accessible from both Up and Down platforms where ever
possible
3. Cages should be conspicuously located within the station precinct and clearly
visible to potential users, while minimising conflicts between cyclists, pedestrian
and motor vehicle traffic.
4. Non-cage bicycle parking needs to be retained after the installation of the cage.
This means that lockers removed to accommodate a cage must be relocated
within the station precinct, while other open-air parking infrastructure (such as
hoops) also needs to be retained.
5. Car parking close to the railway station entrance should not be resumed for a bike
cage without providing offsets elsewhere in the station precinct.
Once locations were agreed upon, the construction of the first batch of 23 cages
proceeded relatively quickly, with a three-week cycle of building (involving civil works,
erection of the cage and fit-out and commissioning of power supply, door locks and
control systems) for each cage, with cages being delivered and commissioned at a rate of
two per week during the last quarter of 2008.
Subsequent experience with the operation of the first 23 cages (including a Melbourne
winter) has also shown that more consideration be given during the site reconnaissance to
the presence of tall building or overhanging foliage and the angles of the sun throughout
the year. The poor performance of the solar power supply at a number of stations was
directly attributable to not consciously taking these factors into account during the
advanced planning for locating cages in the station precinct.
With the announcement in January 2009 (Victorian Government 2009a) that another 10
cages will be delivered as part of the bike cage program, many of the lessons learned
during 2008 were put to good use in selecting sites for the current round of cages. At least
five additional cages are being delivered as part of park and ride upgrades on the
metropolitan network and at the new regional railway station at Wendouree (near
Ballarat) during 2009.
MANAGEMENT OF PARKITEER CAGES
Another innovative aspect of the Parkiteer bike cages was the decision to contract out the
operation and management of the cages to Bicycle Victoria (BV). In the devolved public
transport management environment in Victoria, Parkiteer is an example of how the
government as custodian of the public transport system must influence the various actors
to reach a desired outcome. Into an already complicated rail environment where the needs
of metropolitan and regional rail operators, infrastructure managers, the Department of
Transport and different parts of government needed to be accounted for, the decision to
contract the management of the Parkiteer cages out added an additional actor.
14. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
This decision was made by the Department of Transport in the light of comments of bike
locker users (quoted previously in the SKM survey) that management of the existing
locker system and waiting list did not encourage use of bike lockers as well as the
preference stated by the metropolitan and regional rail operators not to manage the
Parkiteer cages and their users. The advantage of BV operating the cages is that functions
(such as access control and management of users) would now be centrally managed
rather than devolved to individual stations and their staff members.
Thus a potential user of a Parkiteer cage would contact BV either on its website or by
telephone to register their interest in using a cage, set up a user account and pay the A$50
refundable deposit for an access card to a cage. Each cage is overseen by a Cage Captain,
appointed by BV who is responsible for managing the members of the cage and ensuring
that it is clean, tidy and in good order. Cage Captains and BV staff can also more
intensively market the bike cage to other bike (and car) users at the railway station
through „tagging‟ bikes parked near the cage or at the station.
Some of the 23 original cages rapidly reached their nominal capacity of 26 live card
holders and with the appearance of waiting lists at popular cage sites, BV has asked DOT
for permission to conduct a trial of oversubscribing the bike cage to test the true carrying
capacity of the cages. By allowing up to 40 live card holders to be registered from a
variety of usage profiles (5 days a week, 2-4 day a week, casual or weekend users), the
aim is to try and find an optimal point of utilisation for the cages. Figure 1 shows the
relation between the number of Parkiteer cage registrants and activated cards during
2009.
15. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Parkiteer Cage Registrants
700
630
599
600 570
549
531
505
500 474
424
393
400
Paid Registrants
325
Activated Cards
300
200 185
116
100 64
0
16-Jan- 16-Feb- 31-Mar- 30-Apr- 01-Jun- 01-Jul- 01-Aug-
09 09 09 09 09 09 09
Figure 1 – Parkiteer paid registrants/activated cards: January – August 2009
EVALUATION OF PARKITEER
Evaluating the effectiveness of Parkiteer since its introduction in late 2008 has been
difficult. While DOT load surveys (which measure passenger loading on metropolitan
trains) have since 2008 captured numbers of bikes being carried on trains, it relies on the
survey teams being able to record bikes as they pass the cordon stations on the edge of
the Melbourne CBD. This means that significant numbers of bikes on trains heading
outbound or to non-CBD destinations may not be captured in the surveys. Also, the lack
of an adequate time series of data before the „bikes on trains ban‟ in January 2008 makes
it difficult to construct a baseline level of data.
The best source of data for bikes on trains available is the Metlink Origin-Destination
(OD) survey that captures the behaviour of public transport users across Melbourne.
However, it was last conducted in 2006 and is undertaken every four years. To try and
extrapolate the OD data from 2006 in light of subsequent patronage increases would be
problematic.
Hence, it was decided to evaluate Parkiteer on factors that could be directly measured:
daily cage usage levels over time, growth in cage registrants, changes in travel behaviour
16. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
of cage users (how they got to the station) and impacts on demand for all methods of bike
parking at railway stations. These performance measures are built into the management
agreement between BV and DOT and are required to be reported upon on a regular basis.
Some of this evaluation data is given below, while others are presented as case studies
from three high-performing Parkiteer cage sites.
Daily Usage
350
300 KPI Level
Usage per day
250
200
150
100
50
0
9
9
09
09
09
09
09
09
09
09
09
00
00
20
20
20
20
20
20
20
20
20
/2
/2
6/
6/
6/
7/
7/
7/
8/
8/
8/
07
08
/0
/0
/0
/0
/0
/0
/0
/0
/0
6/
3/
15
22
29
13
20
27
10
17
24
Date
Figure 2 – Daily Parkiteer usage rates: June – August 2009
Figure 2 shows the daily usage rates based on cardholder activity (entries and exits) at
Parkiteer cages shows the levels of activity for the 23 original cages over 11 weeks at
both metropolitan and regional stations. It is worth noting the generally upward trend,
even through a Melbourne winter and also that regular peaks and troughs occur in usage
rates. Mondays are consistently the most popular day to use the cage, whereas weekends
are the low points of the cycle. This suggests that the targeting of Parkiteer at regular
„park and ride‟ commuters worked, but also that BV could attempt to promote Parkiteer
membership to potential users on weekends to maximise cage usage at off-peak times.
THREE PARKITEER CASE STUDIES
Part of BV‟s contract with the Government to manage the Parkiteer cages involves
evaluation of the program to gauge its effectiveness. This section presents three case
studies of successful Parkiteer cages from railway stations on the metropolitan electrified
railway network: Brighton Beach, Hoppers Crossing and Werribee and explores the
factors that made them high-performing components of the Parkiteer cage project.
17. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Brighton Beach
Brighton Beach railway station is some 16 kilometres from Melbourne on the
Sandringham line. It sits at the end of the overlap between fare Zones 1 and 2, which has
traditionally made it an attractive station for passengers at the upper reaches of the line
and from the nearby Frankston line to drive to for a cheaper fare to the City. The 187 car
spaces at the station fill before 8am on weekday mornings and the 22 bike lockers were
100% occupied with 45 additional people on the waiting list. The area is popular with
cyclists due to an off-road cycling path that runs along Port Phillip Bay and a relatively
good network of on-road cycling infrastructure in the area around the station.
The Parkiteer cage was delivered in late 2008 and filled rapidly. Through Connex, BV
was able to contact people already in the lockers and on the waiting list to give them first
priority for the bike cage. By February 2009, the cage had already reached its notional
limit of 26 „live‟ card holders. BV then sought permission to increase the number of live
card holders to 40. By May 2009, BV had 39 live card holders and 12 people on the
waiting list for a card, while Connex reported that while all 22 lockers were still
occupied, the waiting list had fallen by over two-thirds from 45 to 14.
As part of its contractual requirements, BV surveyed the 39 live card holders to find out
how they arrived at the station before taking a card in the Parkiteer cage. The results
showed that while 62 % (24) of card holders had previously cycled to the station before
18. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
joining Parkiteer, the remaining 38% (15 card holders) formerly drove to the station.
Further surveying of the addresses of the card holders to determine the trip distance from
home to Brighton Beach station for Parkiteer users as displayed in Table 1 showed that
the almost half rode 2-3km, while almost 70% rode more than 2km to the station.
0-1km 1-2km 2-3km >3km TOTAL
Number 3 9 18 9 39
Percentage 8% 23% 46% 23% 100%
Table 1 – trip distances from home to Brighton Beach station
Interestingly the installation of a Parkiteer cage at Brighton Beach had some unusual
impacts on informal (not chained to „u‟ rails or hoops) bike parking at the station. At the
time of the SKM survey in mid-2008, the three informally parked bikes were clustered on
the approach to the City-bound platform, Bicycle Victoria‟s surveying in mid-2009
showed that informal parking had more than doubled (to seven bikes) and was now
clustered around the Parkiteer cage to take advantage of the higher perceived levels of
safety (through CCTV and visual surveillance) engendered by the presence of a Parkiteer
cage. This observed „clustering‟ phenomenon may point to the need for providing
additional „u‟ rails and hoops near the Parkiteer cages in future to manage bike parking
for casual users or overflow from the cages and deconflicting cyclists and pedestrians on
the approach to the station. Figure 9 displays the clustering effect around the Parkiteer
cage.
Figure 9 – Informal bike parking clustered around
Parkiteer bike cage at Brighton Beach station
19. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Hoppers Crossing
Hoppers Crossing railway station is some 27 kilometres from Melbourne on the Werribee
line. It sits wholly within fare Zone 2 and serves extensive residential development to the
north of the station. The 312 car spaces at the station usually fill before 7.30am on
weekdays and the 16 bike lockers were 100% occupied with 21 additional people on the
waiting list. Cycling access to the station is mainly through suburban streets and arterial
roads from the growing low-density residential settlements to the north of the station,
while access to the station precinct is through a heavily used arterial road system.
The Parkiteer cage was delivered in late 2008 and filled rapidly. Through Connex, BV
was able to contact people already in the lockers and on the waiting list to give them first
priority for the bike cage. By February 2009, the cage had already reached its notional
limit of 26 „live‟ card holders. In the following months, BV sought permission to increase
the number of live card holders to 40. By May 2009, BV had 32 live card holders and 16
people on the waiting list for a card, while Connex reported that while all 16 lockers were
still occupied, the waiting list had fallen by two-thirds from 21 to 6.
As part of its contractual requirements, BV surveyed the 32 live card holders to find out
how they arrived at the station before taking a card in the Parkiteer cage. The results
showed that while 63 % (20) of card holders had previously cycled to the station before
joining Parkiteer, the remaining 37% (12 card holders) formerly drove to the station.
20. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Further surveying of the addresses of the card holders to determine the trip distance from
home to Hoppers Crossing station for Parkiteer users as displayed in Table 2 showed that
the over two-thirds (68%) rode 1-3km, while 63% rode more than 2km to the station.
Interestingly, half (6) of the ex-drivers lived within 2 km of the station.
0-1km 1-2km 2-3km >3km TOTAL
Number 1 11 11 9 32
Percentage 3% 34% 34% 29% 100%
Table 2 – trip distances from home to Hoppers Crossing station
Werribee
Werribee railway station is some 31 kilometres west of Melbourne on the Werribee line.
It sits at the end of the electrified rail service on the main line between Melbourne and
Geelong. Its status as the end of the electrified line with a higher quality of rail service,
particularly in the AM and PM peaks has made it an attractive station for passengers
living beyond walking distance of Werribee station in the fast growing new housing
estates of the Wyndham growth corridor. The 220 car spaces at the station usually fill
before 7.30am on weekday mornings and the 30 bike lockers were 100% occupied with
50 additional people on the waiting list. The area has moderately good supporting on- and
off-road bike paths feeding into the railway station precinct.
21. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
The Parkiteer cage was delivered in late 2008 and filled rapidly. Through Connex, BV
was able to contact people already in the lockers and on the waiting list to give them first
priority for the bike cage. By February 2009, the cage had already reached its notional
limit of 26 „live‟ card holders. BV then sought permission to increase the number of live
card holders to 40. By May 2009, BV had 45 live card holders and 26 people on the
waiting list for a card, while Connex reported that the waiting list for lockers had dropped
to zero and that only 20 out of 30 lockers were occupied.
As part of its contractual requirements, BV surveyed the 45 live card holders to find out
how they arrived at the station before taking a card in the Parkiteer cage. The results
showed that while 55 % (25) of card holders had previously cycled to the station before
joining Parkiteer, the remaining 45% (20 card holders) formerly drove to the station.
Further surveying of the addresses of the card holders to determine the trip distance from
home to Werribee station for Parkiteer users displayed in Table 3 showed that half of
cage users rode up to 2km, while the other half rode more than 2km to the station.
0-1km 1-2km 2-3km >3km TOTAL
Number 3 20 12 10 45
Percentage 6% 44% 27% 23% 100%
Table 3 – trip distances from home to Werribee station
CONCLUSION
The Parkiteer project is still a work in progress. There are still 10 more cages to deliver
during the rest of 2009 as part of a Victorian Government commitment, along with at
least 5 more as part of a ministerial directive to incorporate cages into the scope of works
for park and ride upgrades, station upgrades, modal interchange upgrades and new
stations. In the search for new sources of funding to continue the Parkiteer program, the
Department of Transport has sought Federal Government funding for an additional 15
bike cages as part of the Jobs Fund initiative. The Parkiteer project team remains working
on proving up new sites and ironing out problems with existing cages as well as refining
the design and processes of cage construction to lower the unit cost for delivering a cage.
Bicycle Victoria is continuing to develop its management structure for the Parkiteer cages
and to monitor the growth and usage of the Parkiteer program. Alongside its operational
role, it continues to evaluate the program and develop ways to promote more intensive
usage at underperforming stations and to better manage demand at high performing
stations. This must be done carefully as winter becomes spring and then summer, when
cycling traditionally becomes a more popular past-time and method of commuting. There
is also a need to better evaluate the impacts of Parkiteer on the carriage of bikes on trains;
bike parking at stations and travel to stations in general to convince Government and
policy makers that Parkiteer is worth funding.
New challenges are arising due to the change in metropolitan rail franchisee announced
in July 2009. With the operator handover on the metropolitan rail network from Connex
22. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
to Metro due to take place on 30 November 2009, the Department of Transport and
Bicycle Victoria must maintain continuity of the management process of Parkiteer
beyond the end of the initial one-year contract and negotiate a long-term management
and funding agreement that satisfies the needs of DOT, BV, Metro and Parkiteer users.
23. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
REFERENCES
Brunsing, J (1997), „Public transport and cycling: experience of modal integration in
Germany‟, in Tolley, R (Ed.) The Greening of Urban Transport: Planning for Walking
and Cycling in Western Cities, John Wiley and Sons Ltd, Chichester.
Cycling Promotion Fund (2009), „Media release - Bicycles outsell cars in Australia -
sales top 1.2 million‟, 12 February 2009.
Debrezion, G, Pels & E, Rietveld, P. (2009), „Modelling the joint access mode and
railway station choice‟ in, Transportation Research Part E (45), p. 270-283.
Lahey, K (2009), „Bike hire trial hoped to be template for wider scheme‟, The Age, 4
May 2009.
Loder & Bayly and Parker (1987), Provision of Bicycle Facilities at Railway Stations,
Report to Metropolitan Transport Authority.
Lucas, C (2007), „'Bike racks or not, cycles banned on peak-hour trains‟, The Age, 31
December 2007.
Martens, K (2007), „Promoting bike-and-ride: The Dutch Experience‟ in Transportation
Research Part A (41), p. 326-338.
Martens, K (2004), „The bicycle as a feedering mode: experiences from three European
countries‟, Transportation Research Part D (9), p. 281-294.
Mees, P., Sorupia, E., Stone, J. (2007), Travel to work in Australian capital cities,1976-
2006: an analysis of census data, GAMUT Centre, University of Melbourne.
Melbourne City Council (2006). Census of Land Use and Employment (CLUE),
www.melbourne.vic.gov.au/CLUE
Metlink (2006), Metlink Train Origin Destination (OD) Survey, 2006.
Moynihan, S (2007), „Blowout in overcrowded trains‟, The Age, 26 July 2007.
Sinclair Knight Mertz (2008), Audit of Bicycle Facilities at Public Transport Nodes –
Final Report.
Victorian Government (2008), Media release from Minister for Public Transport, Bikes
allowed on Connex and V/Line services from today, 15 February 2008.
Victorian Government (2009a), Media release from the Premier of Victoria, Bike cage
program expanded to another 10 stations, 9 January 2009.
24. Parkiteer – Secure bicycle parking at PT nodes in Melbourne Martin & den Hollander
Victorian Government (2009b), The Victorian Transport Plan: Public Bike Hire Scheme.
Downloaded from: http://www4.transport.vic.gov.au/vtp/projects/bicyclesystem.html
on 11 July 2009.
Webb, M & Gaymer, S (2009), Changes in Travel Demand in Melbourne – is it time for
a new paradigm?, paper submitted for 2009 ATRF (in preparation).