Attachment D – E8K & F13K Compression Project
SCOPEOFPROJECT
TYPE OF CONTRACT
Joint Venture (JV) Partner Sarawak Shell Berhad (SSB) and
PETRONAS
TYPE OF
CONFIGURATION
E8K & F13K Compression Modules
COUNTRY Miri, Malaysia
JOINT VENTURE
PARTNER
Petronas Malaysia
CONTRACTORS
Brown-Field offshore works – Petra Energy
Green-Field onshore Compression Modules fabrication
– Kencana Petroleum
Offshore Scope of Work:
The E8K Compression Module and F13K Compression Module are intended to be installed at the
same time on E11P-B Main Deck. This single lift strategy will be used to minimize offshore work
and shutdown duration.
E8K Compression Module associated modifications to the existing facilities at E11P-B, which
include condensate pumps and associated pipe work, power and control systems will be installed in
the existing gas process Module 2 on the E11P-B Platform.
F13K Compression Module associated modifications to the existing facilities at E11P-B that
include condensate pumps for F13K and associated pipe work, power, and control systems will be
installed in the existing gas process Module 3 on the E11P-B Platform.
The new compressors will be installed downstream of the inlet separator / slug catcher and
upstream of the Glycol Contactors of the two process modules (E8 and F13) both located on E11P-
B Platform.
A number of shared facilities for E8K & F13K will be required to be installed at the same time as
the compression facilities. The most significant of these is an additional gas turbine driven
generator and associated switchgear, to be installed in the existing Module 1 of the E11P-B
Platform. This is required to provide sufficient power for the new electrically driven equipment in
the compression facilities. Other shared facilities comprise of shared back-up fuel gas supply lines,
potable water systems, and fire water systems.
Onshore Scope of Work:
Fabrication of 2 compression modules,
• Discharge Coolers
• Gas Turbine Compressors
• Gasunie Cyclone Scrubbers
• Pressure Vessels
• Fuel Gas Packages
• Seal Gas Condition Skid
• Air Compressor Packages, which includes Instrument Air Dryer package with Nitrogen Generation
Package.
• Choke & Control Valves, Relief Valves, Check Valves, Gate/Globe Valves, (large sizes)
• Distributed Control System (To match existing system)
• Instrumented Protective System/Fire and Gas System (To match existing system)
• Telecommunication Equipment Package
• Antisurge and cold gas bypass valves

More Related Content

What's hot

On demand boiler system fujifilm hunt chemicals
On demand boiler system   fujifilm hunt chemicalsOn demand boiler system   fujifilm hunt chemicals
On demand boiler system fujifilm hunt chemicals
TNenergy
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
Craig Heal
 

What's hot (20)

Hydro Power Library - Overview
Hydro Power Library - OverviewHydro Power Library - Overview
Hydro Power Library - Overview
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
 
ramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatiaramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatia
 
Enhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recoveryEnhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recovery
 
Siemens - Power Generation Power Plants
Siemens - Power Generation Power PlantsSiemens - Power Generation Power Plants
Siemens - Power Generation Power Plants
 
Juliet Joseph
Juliet JosephJuliet Joseph
Juliet Joseph
 
Power plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap SinghPower plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap Singh
 
Pro per energy services/ Gas Turbine Operation and Maintenance
Pro per energy services/ Gas Turbine Operation and MaintenancePro per energy services/ Gas Turbine Operation and Maintenance
Pro per energy services/ Gas Turbine Operation and Maintenance
 
Practical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh JaisalmerPractical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh Jaisalmer
 
On demand boiler system fujifilm hunt chemicals
On demand boiler system   fujifilm hunt chemicalsOn demand boiler system   fujifilm hunt chemicals
On demand boiler system fujifilm hunt chemicals
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 
AEV Burners of Alstom GT26/24
AEV Burners of Alstom GT26/24AEV Burners of Alstom GT26/24
AEV Burners of Alstom GT26/24
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
 
Cycling is bane for power utilities-pkr
Cycling is bane for power utilities-pkrCycling is bane for power utilities-pkr
Cycling is bane for power utilities-pkr
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Powergen off grid power supply
Powergen off grid power supplyPowergen off grid power supply
Powergen off grid power supply
 
INVISTA
INVISTAINVISTA
INVISTA
 
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
 
Unit2 diesel engine power plant
Unit2 diesel engine power plantUnit2 diesel engine power plant
Unit2 diesel engine power plant
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 

Similar to Page7 E8F13

Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen Barkwitch
 
CS0018 - BF4 Rebuild VSDs
CS0018 - BF4 Rebuild VSDsCS0018 - BF4 Rebuild VSDs
CS0018 - BF4 Rebuild VSDs
Guy Black
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
Paul McDermott
 
ETOGAS company presentation Dr. Karl Maria Grünauer
ETOGAS company presentation Dr. Karl Maria GrünauerETOGAS company presentation Dr. Karl Maria Grünauer
ETOGAS company presentation Dr. Karl Maria Grünauer
Dr. Karl Maria Grünauer
 
prakash_final
prakash_finalprakash_final
prakash_final
Prakash B
 
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
Exergia SA
 

Similar to Page7 E8F13 (20)

11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
Az Zour EPP08
Az Zour EPP08Az Zour EPP08
Az Zour EPP08
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Virtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing PerformanceVirtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing Performance
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
1 80 fineshed
1 80 fineshed1 80 fineshed
1 80 fineshed
 
CS0018 - BF4 Rebuild VSDs
CS0018 - BF4 Rebuild VSDsCS0018 - BF4 Rebuild VSDs
CS0018 - BF4 Rebuild VSDs
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
 
ETOGAS company presentation Dr. Karl Maria Grünauer
ETOGAS company presentation Dr. Karl Maria GrünauerETOGAS company presentation Dr. Karl Maria Grünauer
ETOGAS company presentation Dr. Karl Maria Grünauer
 
A Modular C2 Splitter - Hydrocarbon Engineering April 2017
A Modular C2 Splitter - Hydrocarbon Engineering April 2017A Modular C2 Splitter - Hydrocarbon Engineering April 2017
A Modular C2 Splitter - Hydrocarbon Engineering April 2017
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
prakash_final
prakash_finalprakash_final
prakash_final
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
 
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEEDDEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
 

Page7 E8F13

  • 1. 7 | P a g e Attachment D – E8K & F13K Compression Project SCOPEOFPROJECT TYPE OF CONTRACT Joint Venture (JV) Partner Sarawak Shell Berhad (SSB) and PETRONAS TYPE OF CONFIGURATION E8K & F13K Compression Modules COUNTRY Miri, Malaysia JOINT VENTURE PARTNER Petronas Malaysia CONTRACTORS Brown-Field offshore works – Petra Energy Green-Field onshore Compression Modules fabrication – Kencana Petroleum Offshore Scope of Work: The E8K Compression Module and F13K Compression Module are intended to be installed at the same time on E11P-B Main Deck. This single lift strategy will be used to minimize offshore work and shutdown duration. E8K Compression Module associated modifications to the existing facilities at E11P-B, which include condensate pumps and associated pipe work, power and control systems will be installed in the existing gas process Module 2 on the E11P-B Platform. F13K Compression Module associated modifications to the existing facilities at E11P-B that include condensate pumps for F13K and associated pipe work, power, and control systems will be installed in the existing gas process Module 3 on the E11P-B Platform. The new compressors will be installed downstream of the inlet separator / slug catcher and upstream of the Glycol Contactors of the two process modules (E8 and F13) both located on E11P- B Platform. A number of shared facilities for E8K & F13K will be required to be installed at the same time as the compression facilities. The most significant of these is an additional gas turbine driven generator and associated switchgear, to be installed in the existing Module 1 of the E11P-B Platform. This is required to provide sufficient power for the new electrically driven equipment in the compression facilities. Other shared facilities comprise of shared back-up fuel gas supply lines, potable water systems, and fire water systems. Onshore Scope of Work: Fabrication of 2 compression modules, • Discharge Coolers • Gas Turbine Compressors • Gasunie Cyclone Scrubbers • Pressure Vessels • Fuel Gas Packages • Seal Gas Condition Skid • Air Compressor Packages, which includes Instrument Air Dryer package with Nitrogen Generation Package. • Choke & Control Valves, Relief Valves, Check Valves, Gate/Globe Valves, (large sizes) • Distributed Control System (To match existing system) • Instrumented Protective System/Fire and Gas System (To match existing system) • Telecommunication Equipment Package • Antisurge and cold gas bypass valves