The document summarizes plans for the Pacific Northwest Rail Corridor, a 466-mile rail corridor serving 17 communities in Washington and Oregon. It discusses the history and growth of Amtrak Cascades passenger rail service, including plans to expand to 13 daily roundtrips between Seattle and Portland. Challenges include integrating passenger and freight operations, addressing the international border, and securing federal funding. Both Washington and Oregon have significantly invested in the corridor through capital projects and operating funds.
Bringing HSR a step closer: Building a Railway for the 21st CenturyScott Martin, CMILT
This paper explores an incremental approach to providing a Medium Speed Rail (MSR) network with trains operating up to 200km/h. This will allow progressive enhancements toward a HSR solution rather than the currently recommended ‘big bang’ approach. The paper identifies changes required to produce a healthy intercity rail network to complement a successful HSR network using the Sydney-Canberra corridor as a case study.
For more information, see http://scarboroughsubwayextension.ca
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Mountain View Double-Track Project May 22 PresentationSCVTA
This presentation and the slides at the end was delivered at a May 22, 2014 public input meeting. The meeting was held to gather input about the draft environmental document that VTA released on May 15
Operatioal analysis of any road is necessary for its design,planning and implementation procedure.This article mostly deals with preliminary proposal of two lane road of eastern region of Nepal.due to increased traffic condition servicabilty and level of service of koshi higway is found to be very poor hence Dharan submetropolitan city's part is analysed.
CASCADES High-Speed Rail_Pacific NW Corridor Plan_Roger BazeleyRoger Bazeley, USA
The Pacific Northwest Corridor High-Speed Incremental Passenger Rail Service and Infrastructure Plan-Proposed in 2010 with Positive Train Control Slide-Presentation for a Mineta Transportation Incremental High-Speed Passenger Rail Research Survey Project
Bringing HSR a step closer: Building a Railway for the 21st CenturyScott Martin, CMILT
This paper explores an incremental approach to providing a Medium Speed Rail (MSR) network with trains operating up to 200km/h. This will allow progressive enhancements toward a HSR solution rather than the currently recommended ‘big bang’ approach. The paper identifies changes required to produce a healthy intercity rail network to complement a successful HSR network using the Sydney-Canberra corridor as a case study.
For more information, see http://scarboroughsubwayextension.ca
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Mountain View Double-Track Project May 22 PresentationSCVTA
This presentation and the slides at the end was delivered at a May 22, 2014 public input meeting. The meeting was held to gather input about the draft environmental document that VTA released on May 15
Operatioal analysis of any road is necessary for its design,planning and implementation procedure.This article mostly deals with preliminary proposal of two lane road of eastern region of Nepal.due to increased traffic condition servicabilty and level of service of koshi higway is found to be very poor hence Dharan submetropolitan city's part is analysed.
CASCADES High-Speed Rail_Pacific NW Corridor Plan_Roger BazeleyRoger Bazeley, USA
The Pacific Northwest Corridor High-Speed Incremental Passenger Rail Service and Infrastructure Plan-Proposed in 2010 with Positive Train Control Slide-Presentation for a Mineta Transportation Incremental High-Speed Passenger Rail Research Survey Project
Virginians for High Speed Rail (VHSR), High-Speed Rail and Richmond, July 2009, presentation by Executive Director Danny Plaugher
What is High Speed Rail? Who is VHSR and what are their Goals? $1.5 billion is needed to upgrade to Emerging High Speed Rail in Virginia. What can you do?
www.VHSR.com
Transportation vancouver island economic loss dec 02 2013P. Anna Paddon
Transportation. Happy Sir John A. MacDonald Birthday. This is a Victoria, BC, confederation promise slide show. I have included two US World Globalization writers, Renner and Gardner, they propose that the US achieve the new open trade contracts from China. This is a slideshow that I am editing.
Brazil is one of the most attractive markets for infrastructure in the World today thanks to favourable macroeconomics, a competitive infrastructure sector developing fast and a pipeline with specific projects close to be a reality.
At the macro-economic level: aprox. 4% stable projected GDP growth, an increasing population (close to 200 millions people today), being one of the main recipient of forign direct investment worldwide and a rapidly increasing motorization rate, shape a bright future in the short and long term
Brazil is moving forward in Public Private Partnerships, with a lot of projects in railways, roads and ports. There are local and international players and a stable legal framework allowing an increasing number of projects being tendered. The government Accelerated Growth prgram (PAC) is making progresses despite a slow start. Current expectations are high, with investments of more than US$500 billons planned in the period 2011-14
Opportunities for investment in infrastructure in Brazil exist mainly in roads, railways, aiports, stadiums and energy. The fact that Brazil will host the two premier world sports events, FIFA World Cup 2014 (12 host cities) and Rio Olympic Games 2016 is pushing all this infrastructure development. Brazil is a relevant market for any global player in infrastructure. Are you going to miss it?
Investor groups interested in tollroad concessions are putting their pitch in Washington DC for equity to play a major role in reviving the economy. They say $180 billion is available that could generate between 600k and 2m jobs in the US.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Pacific Northwest
1. Pacific Northwest Rail Corridor
Regional Presentation
Scott L. Witt Kelly Taylor
Director, State Rail & Marine Office Administrator, Rail Division
Washington Department of Transportation Oregon Department of Transportation
Paula Hammond Steve Reinmuth
Secretary of Transportation Chief of Staff
Washington Department of Transportation Washington Department of Transportation
Seattle
May 27, 2009
2. Introduction
Pacific Northwest Rail Corridor (PNWRC)
Federally-designated High-speed Rail
Corridor
466-mile rail corridor
Serves 17 communities totaling 8
million people
Hosts 11 Amtrak Cascades trains
Hosts 6 Amtrak long-distance trains
Hosts 24 Sound Transit commuter
rail trains between Tacoma and
Everett (26 starting June 1)
Union Pacific Railroad’s (UP) tracks
between Eugene and Portland
BNSF Railway between Portland,
Seattle and Vancouver, BC
UP and BNSF policy toward
passenger service – “Keep Us
Whole”
3. Introduction
Amtrak Cascades
Jointly funded by Oregon DOT,
Washington State DOT and Amtrak
Uses Talgo, Inc. manufactured
articulated train sets
Pendular passive tilting technology
Electromotive Division (EMD) F59
locomotive
Non-powered F40 locomotive is used
as a cab car in a push-pull
configuration
Maximum of 79 miles per hour
5 inches of cant deficiency
4. PNWRC and Amtrak Cascades – A Brief History
1993, WSDOT was directed to develop “high-quality intercity passenger rail
service ... through incremental upgrading of the existing [Amtrak] service.”
1994 WSDOT funds 2nd Seattle-Portland round trip
1995 Oregon adds Portland-Eugene round trip
1995 Seattle-Vancouver, BC, round trip re-introduced
- First incremental improvements constructed
1997 WSDOT adds 3rd Seattle-Portland Round Trip
1999 Amtrak Cascades service debuts
1999 Seattle-Bellingham train added
2000 2nd Portland-Eugene train added
2006 4th Seattle-Portland round trip added
5. Annual Ridership on Amtrak Cascades
Number of Passengers
900,000
Oregon Trains
800,000 Amtrak Trains
700,000 Washington Trains
600,000
500,000
400,000
300,000
200,000
100,000
0
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Source: WSDOT State Rail and Marine Office
6. Plans for the PNWRC in Washington State
WSDOT’s Long-Range Plan
Expand intercity passenger rail service to the meet the goals of:
13 round trips per day between Seattle and Portland on one-hour headways and
in a scheduled travel time of 2:30
Four round trips per day between Seattle and Vancouver, BC, on two-hour
headways and in a scheduled travel time of 2:40
Projected to have nearly 3,000,000 riders at full build-out
Estimated to cost $6.5 to $6.7 billion, (2006$)
Amtrak Cascades Projected Future Ridership
Washington Segment Only
Corridor 2004 Mid-point 2023
Seattle to Vancouver, BC 156,872 418,100 945,700
Seattle to Portland, OR 351,426 932,100 1,916,400
Portland, OR to Vancouver, BC N/A 59,900 133,200
Total 508,298 1,410,100 2,995,300
Source: Washington State Department of Transportation State Rail & Marine Office and the
unpublished Amtrak Cascades Ridership and Revenue Forecasts Technical Paper, 2004.
7. Plans for the PNWRC in Washington State
WSDOT’s Mid-Range Plan
Expand intercity passenger rail service to the meet the goals of:
Provide 4 options for expansion of service over the next 8 years
Most expansive option increases to 8 the round trips per day between Seattle
and Portland on two-hour headways and in a scheduled travel time of 3:25
Conservatively projected to have nearly 900,000 riders by 2017
Estimated to cost $1.5 billion (2008$)
Annual Ridership Growth by Option FY2007 vs. FY2017
Washington Segment Only
1,000,000
890,000
900,000
822,000
Riders
800,000 783,000
700,000
646,130
600,000 574,202 574,202 574,202 574,202
500,000
400,000
Option 1: Option 2: Option 3: Option 4:
FY2007 FY2017
Source: Washington State Department of Transportation State Rail & Marine Office Amtrak
Cascades Mid-Range Plan 2008.
8. Incrementalism through Building Blocks
WSDOT philosophy and direction:
develop “through incremental
upgrading”
Up to 20 projects grouped into three
“building block” increments
For each of three planned
increments:
Night Photo of Amtrak Cascades trainset
- Capital construction plans and cost
estimates
- Operating plan and equipment
requirements
- Ridership and revenue forecasts
Policy makers know
– How the last increment performed
– What they will get before they
choose to fund an increment
Track Laying Machine (TLM) builds track on the
PNWRC
9. Building Blocks – How has it been going?
Used to add three increments:
Seattle-Vancouver, BC round trip
- 2 new sidings, 1 extended siding,
new storage tracks
Seattle-Bellingham round trip
- 2 yard bypasses, 1 extended siding,
2 new receiving tracks
Amtrak Cascades train passes Titlow Crossover in
Tacoma, WA.
4th Seattle-Portland round trip
- 4 universal crossovers
Current projects will add a 5th Seattle-
Portland round trip
- Vancouver - Yard Bypass & W 39th
St Bridge
- Tacoma – Bypass of Pt. Defiance
- three universal crossover projects
Turn-out track panels being unloaded at new
Centennial Crossovers in Lacey, WA.
10. Corridor Speeds
Currently, maximum 79 MPH (Class 4) on the PNWRC
Highest speeds currently planned 110 MPH (Class 6)
- Passenger-only tracks
- Rural areas only
- Maintain 79 MPH in “shared” territory
- Goal is to improved average speed
Balancing Costs, Safety and Environmental Issues
with Higher Speeds
An Amtrak Cascades train speeds along Bellingham
- Tighter curves mean less right-of-way costs Bay in Bellingham, WA
- Tighter curves results in less impacts to environment
- Reduces cost of fuel: accelerating only to slow a short
time later
11. What is needed to achieve the service goals?
Faster, More Frequent Amtrak Cascades Service
Positive Train Control
- BNSF Communications-Based Train-
Control shows promise
- Includes System Safety Plan
- Needed for both higher speeds and
more capacity
New and More Equipment for more frequent
service and faster service
An EMD F59 Locomotive Pulls an Amtrak Cascades train set
- Tilting Train Sets at up to 8 inches cant through a 2 degree curve in Burlington, WA
deficiency
- Improved Locomotives & Technologies
Low center of gravity
Faster acceleration above 79 MPH
Locomotives on both ends of trains
12. Challenges and Opportunities for the PNWRC
A shared corridor and more
Integrating Operations with Partners
- BNSF Railway
- Amtrak
- Sound Transit
- State of Oregon
- Province of British Columbia
International Border
- Freight Train Inspections A BNSF Railway freight train passes Safeco Field in Seattle, WA
- Passenger Pre-clearance
U.S. Federal Funding
- $18 Million in 14 years
- Future ARRA and PRIIA Funding
A BNSF Railway freight train switches cars in Everett, WA
13. Washington State Funding
Past and Future
Operating
$199 Million from 1994 through 2008
$29.1 Million budgeted from 2009 to 2011
Capital
$137 Million spent from 1994 through 2008
$139 Million projected from 2008 through 2013
15. Oregon’s Investment in Rail
Cascades Corridor investment $51m (94-08)
Freight rail grants & funds $12.5m (00-03)
Connect Oregon I & II, $102m (05-07)
State ARRA Highway Funds $17m (09)
Connect Oregon III (09)
TOTAL $183 million
16. Passenger Related Investment
Capital
$71.6m since 1994
13 projects
Stations, track, CTC, &
equipment
Operations
$9.5m per biennium
50% dedicated (expected
to increase to 100%)
50% general fund
17. Amtrak Cascades: Oregon Segment History
Trains Buses
1887 Through West Coast service begins 1994 Two round trip buses begin
1994 First Cascades round trip begins 2008 Third round trip bus begins
2000 Second Cascades round trip begins
18. Amtrak Cascades: Oregon Segment Ridership
Trains Buses
2 Round trips per day 3 Round trips per day
Ridership up 18% since 2007 Ridership up 48% since 2007
Ridership up 182% since 1995 Ridership up 281% since 1995
19. For more information on rail accountability, please contact:
Scott Witt, Director
State Rail and Marine Office Washington State
at (360) 705-6903 or WittS@wsdot.wa.gov. Department of Transportation
Kelly Taylor, Rail Division Administrator
Oregon Department of Transportation at
(503) 986-4125 or kelly.c.taylor@odot.state.or.us