Que. 1: What is your recommended sourcing strategy in this case? Please support your
decision with quantitative and qualitative evidence gathered during the case analysis. Also,
present your plan to reduce any risks associated with your sourcing decision.
Pacific Systems can single source their DVD drives and try to build a good relationship with the supplier.
DVD’s are new in market and not only computer industry but also other electronic industries are looking
forward for this product. For uninterrupted supply, leverage the Just in time, it will be better to have a
single supplier with a long term contract.
Sourcing strategy is a practical approach to collect data and to use it to find the best possible values in
the market. As a quantitative analysis, we placed all 4 suppliers with their offering under the below
drawn table
Detailed analysis of above data, we came to conclusion that E-drive Systems is the best supplier choice
according to our requirements. E-drive commits excellent on time delivery performance stands them
out from other suppliers. E – Drive Systems meets the highest quality metric of 99.5% with on time
delivery and with facility capacity that enable a lead time of 2 weeks. Even though their Quote unit price
is a bit higher compared with other two suppliers but their local presence is given priority over the price
because as in some cases Low price does not guarantee success.
Plan to reduce risk in sourcing decision: The biggest step to reduce risks in supply to show belief on
your supplier and make him understood that we are with you and will do a great business together, this
faith will increase supplier’s confidence and they will try to exceed its limits. Other than this we can
work with our supplier and can do the cross functional risk planning for such situations. A
demand/supply forecast will also help to understand supplier’s capability and whether supplier can cop
up with us if at times demands exceed their limits and according to that we can plan our financials for
the situations where we might have to face situations like customer penalties.
Reference- https://scm.ncsu.edu/scm-articles/article/risk-reduction-mechanisms-a-managerial-
framework-for-reducing-the-impact-of
Factors Elecom Sure Tech E-drive Park
Quoted price(per
unit)
$127 $144 $140 $132
Delivery Lead time 8 weeks 3 weeks 2 weeks 10 weeks
Supplier Quality 9500 PPM
defects
10,500 PPM
defects
7500 PPM
defects
4000 PPM
defects
On time delivery
record
95% 97% 99.5% 99%
Tooling cost $2.73 $3.18 $2.95 $1.20
Frequency of
Shipment
Monthly Weekly Every other
day
Monthly
Ramp up time 4 months 5 months 4 months 4 months
Denomination of
Contract
Yen Dollars Dollars Dollars
Que. 2: This case provided the data necessary to perform a cursory supplier financial analysis.
In reality, cross-functional sourcing teams must often obtain this data during their
assessment of potential suppliers. Discuss possible sources of supplier financial information.
What may impact a purchaser's ability to obtain supplier financial data?
Our case provides us with all the required data to do a financial analysis [Appendix-3], but every time
the case will not be the same.
 There are number of websites which provides companies financial standings, such kind of
databases are rich sources for collecting data.
 Purchasers can refer to eclectic companies with whom suppliers had worked or working and ask
for performance review.
 Buyer can refer B2B resources which are a good source of information for such situations.
 With all above solutions purchasers should try to maximize their reach and look for as many
sources as possible to gather information about supplier with whom they are looking forward
for a deal
The most critical factor which affects a purchaser’s capability to obtain supplier’s financial data is the
kind of relationship they have. If Purchaser has good terms with supplier they can work on the things
which suppliers usually do not prefer like sharing (Financial Data).
Que. 3: A sourcing decision of the magnitude highlighted in this case requires a serious
commitment of resources and time. Do all sourcing decisions require similar commitments of
time and effort? If not, describe the types of sourcing decisions that justify this effort.
Describe the types of sourcing decisions that do not justify or require the level of effort and
analysis required in this case.
We feel that not all sourcing decisions require similar commitments of time and effort due to the
variety of suppliers that are available locally and globally. Something like a DVD drive and monitors or
printed circuit boards that are key components to the finished product do take more time and resources
to procure. You have to take into account if they are financially stable to supply consistent high quality
and reliable material with zero defects. A company whose strategic goals match closely what you intend
to do usually helps in building a long term relationship in which it is mutually beneficial. The type of
sourcing for this company that does not justify the level of effort and analysis are fasteners for the
computer, poly bags to keep the product protected from dust or one time buys that are not critical to
the end user.
Que. 4: How important is the issue of supplier capacity in this case? How did your group
evaluate supplier capacity? What level of attention or importance should supplier capacity
receive during the sourcing decision? Why?
This is a booming market and is on the verge of increasing demand due to the revitalized economy
and end of the recession. Technology is a big area that quickly changes either in demand or innovation.
We need a supplier that has the capacity not only to source spikes in demand but have capacity to take
on new projects and prototypes. They need to be stable enough to absorb increase in demand or a new
product line that will need a quick response to be able to capitalize and gain market share. If a supplier
does not have capacity then they do not have the type of structure we are looking for to grow which
plays a big part in our decision, regardless if they can supply, we are losing out of potential customers
due to not having enough DVD drives to build our PC’s. There should be a high level of importance when
reviewing the supplier and deciding who to source from.
Que. 5: Supplier selection decisions, such as the one presented in this case, usually require
many weeks or months of analysis and discussion before reaching final agreement with a
supplier(s). Creatively identify ways that the buying company can shorten the time from
recognition of a purchase need to reaching agreement with the selected supplier. (Hint:
Consider performing certain required activities concurrently or in anticipation of a purchase
requirement).
This is also necessary due to the time to market we are looking to achieve, in order for our supplier to be
ready to ramp up and give us a full shipment by July in order for us to start production on the 55,000
units forecasted to be sold in August launch is critical. While a team is working on negotiating the price
and contract for the units, an engineering team has to work on getting a prototype approved for
production and see what materials are required to manufacture that DVD drive. What type of metal
should be used what type of characteristics does the DVD need, what type of speed and capabilities?
How well is the supply chain back up to our vendor’s suppliers? Are the components able to be sourced
or will there be issues that can cause a shortage. This can all happen prior to a purchase requirement
being agreed upon. This is why the price of the unit can change, it can get pricier or it can get cheaper
but the work must be done concurrent to the negotiation and bidding of each supplier.
Que. 6: The issue of single versus multiple sourcing is an important consideration during
supplier selection. Using the following table, identify the potential advantages and
disadvantages of single and multiple sourcing (not only as they relate to this case).
Single Sourcing:
Potential Advantages
1).Sole sourcing helps
in optimizing the
company’s supply
chain.
2).Lower production
cost and product
better value for
shareholders and
customers.
3). Downtime and
inefficiencies caused
by interoperability
issues can be reduced.
Single Sourcing:
Potential Disadvantages
1). Greater power to
the supplier
2). Failure of supplier
may cause a total
shutdown to our
production, and as a
result our customer
service may suffer very
badly.
3). Supplier may not
cop-up sudden spike or
decline in the demand.
Multiple Sourcing:
Potential Advantages
1). Drives up
competition within the
supplier base.
2). Drives down prices.
3).Display your
company’s interest and
commitment to the
economic growth of
your community.
Multiple Sourcing:
Potential Disadvantages
1). Different suppliers
need to be managed
and monitored. A
critical job for
purchasing people.
2). Low cost cannot be
leveraged as there is
no economies of scale
in production for your
suppliers.
Sources: https://scm.ncsu.edu/scm-articles/article/benefits-and-risks-of-single-sourcing
Case requirements
Que. 1: Develop a process that provides a logical order evaluating the market data and reach
recommendations regarding how to proceed with the supplier selection process. Present this
process in the form of a flow chart with key decisions points clearly identified.
The flow chart shows the necessary sequential steps to be performed for making decisions through the
supplier selection process. We’ve identified 7 key steps of decisions making.
I. Develop a cross-functional team: Cross-functional team can generate better results in
identifying and analyzing the market data. For planning the whole process and determining the
scope of project, cross-functional team can be very helpful.
II. Supplier market research and Supplier preferencing: Based on our product specification and
requirements, an initial RFI can be sent to different suppliers in the same market niche. Supplier
preferencing is basically placing the product and supplier in purchasing criticality matrix to add
better visibility in supplier selection process.
III. Solicit supplier’s info. (Bid): Based on the suppliers’ willingness and response to RFI and RFQ, a
very few supplier can be selected for bidding process (Request for proposal). Where the precise
drawing and specification are submitted to short-listed suppliers. Detailed information is
requested on payment and Inco-terms from suppliers.
IV. Conduct the thorough evaluation: There’re some techniques like AHP (Analytical hierarchy
process) and DCA (Discrete choice analysis), where suppliers’ attributes can be pair wise
compared to make the decision. These processes helps to understand what proportion of
business should be offered to a specific supplier based on its capacity analysis.
V. Contract negotiation with selected suppliers: Based on the analysis conducted, negotiation can
be done with selected suppliers. Payment terms, Inco-terms, Quality, Quantity, Delivery window
can be negotiated.
VI. Final supplier selection, monitoring and feedback: Based on the negotiation, best supplier(s)
can be selected for contract. After selecting the supplier(s), continuous monitoring of
performance is very important. Supplier relationship management (supplier reward and score-
card) plays an important role for maintaining long-term strategic relations.
Que. 2: perform the analyses designed to support the supplier evaluation and selection
decisions.
 Financial Risk Analysis (Que. 3)
Selected Financial Ratios Elecom SureTech E-Drive Park
Asset Utilization:
Asset Turnover =
Sales/Assets 1.32 1.57 1.64 1.38
Inventory Turnover = Cost
of Sales/Average
Inventory
5.20 5.43 9.06 7.005
Receivable days= Account
receivable/Sales *365 49.92 29.86 60.30 47.00
Payable Days = Accounts
payable/Sales *365 29.53 49.77 35.70 33.67
Capitalization:
Leverage = Assets/Equity
2.58 2.03 2.28 2.10
Return on Equity = Net
Income/Equity = Profit
Margin X ATO X Leverage 0.065 0.217 0.168 0.099
Long-term Debt to Equity =
Long-term Debt/Equity 0.649 0.318 0.39 0.35
Long-term Debt to Assets
= Long-term Debt/Assets 0.251 0.157 0.172 0.168
Current Ratio = Current
Assets/Current Liabilities
1.21 1.338 1.348 1.129
Quick Ratio = (Cash +
Short-term Inventory +
Accounts Receivable)/
Current Liabilities
0.62 0.73 1.05 0.74
EBIT Coverage = Earnings
Before Interest and
Taxes/Interest Expenses
0.75 5.46 2.62 1.85
Profitability Ratios:
Profit Margin = Net
Income/Sales
0.019 0.068 0.045 0.034
Conclusion and Interpretations:
 E-drive does have a good inventory turnover ratio. In more, a company’s Asset turnover is also
good. Company has good payment terms for their customers. On the other hand, company has
moderate profit margin and return on equity.
 Elecom has poor Asset turnover in compared to other suppliers. His ability of quickly paying to
his suppliers indicates its financial strength. Lacks in the profit margin and return on equity.
 Low long term debt to equity in case of Park technologies confirms that company will perform
well financially in future as they don’t have long-term loans. Company’s financial strength in
foreseeable future is very important in deciding long-term strategies.
 In short, suppliers’ long-term, &short –term debt, equity, profit margin and return on
investments are the factors need to be considered for deciding long-term business partner.
Que. 4: Total Cost Analysis. Identify the relevant additional costs beyond the unit price for
each supplier. Calculate the estimated per unit total cost from each supplier for year one.
The forecasted demand of 9000x is 500,000 units for the first year (Aug. 2003-july 2004). As demand of
DVD drive is dependant over the product 9000x, we referenced 500,000 units of DVD drive, for
calculating the estimated unit total cost from each supplier for year one.
For simplification, we’ve shown the equation for finding out tooling cost and cost of non-conformance
per unit for first year.
 Tooling cost per unit for first year =[{ Total cost of tooling (2-year contract)* total demand of
DVD drive for 2 years (forecasted)}/demand of DVD drive for 1st
year (forecasted)]…Eq.4.1
 Quality non-conformance cost per unit for first year= [defects per million*300], where $300 is
cost of non-conformance that Pacific system may end-up bearing…Eq.4.2
 Carrying cost calculation:
For domestic suppliers: Safety stock= 2 weeks, 2*9615(Stock of one week) =19,230 Units
Carrying cost per unit for domestic supplier = [{19,230 Units*Unit price*18}/ {100*500,000}]
For International suppliers: Safety stock = 4.28 weeks, 4.28*9615= 39,440 Units.
Carrying cost per unit for international supplier = [{39,440 units*Unit price*18}/ {100*500,000}]
Cost Category Elecom SureTech E-Drive Park
Quoted Unit Price $127 $144 $140 $132
Transportation 18 6 14 18
Tooling (Based on Eq.4.1) 2.73 3.18 2.95 2.5
Quality non-conformance
costs(Based on Eq.4.2)
(9500/100000
0) *300=2.85
(10,500/1000
000)
*300=3.15
(7500/100000
0) *300=2.25
(4000/100000
0) *300=1.20
Duties/customs, insurance, and
tariffs
11.50 1.50 3.00 13
Inventory safety stock carrying
charges:
1.80 0.996 0.97 1.87
Ordering, inbound receiving and
inspection costs
4.5 4 3.25 2.25
Estimated Per Unit Total Cost $168.38 $162.83 $166.42 $170.82
Conclusions and Comments:
 Even though Sure Tech has very small market share and less experience, they are offering the
lowest price from all 4 suppliers.
 The expected unit price of DVD drive should be in the range of $125-150 according to the Pacific
corporation. Knowing the fact that Sure Tech is a small supplier trying to expand its market
share, Pacific corp. can have better price deal with Sure Tech. Yet, their ability to respond the
spike in demand is questionable.
 E-Drive has second best offering. They are domestic supplier and have obtained a good market
share. They also could be a potential supplier from cost perspective.
Que. 5: Supplier Evaluation and Selection Analysis. Using the GE Scorecard as a model, create
and complete a scorecard for your each supplier.
The GE Scorecard for all different 4 suppliers is drawn as below. Based on the final score, we narrowed
our supplier selection process on E-Drive Systems. We considered total 8 different categories. Then
subdivided the categories in sub-categories and assign the weight to each sub-category.
Supplier: ELECOM
Category
Total/Sub
Weight
Weighted
Score
Sub-total
Quality performance 20 12,75
Total quality commitment 11 8,25
Defect performance (PPM) 9 4,5
Financial condition 10 2
Asset turnover 4 0,8
Debt structure 4 0,8
Profitability 2 0,4
Process capability 15 7
Research and development 5 3
Volume capacity 5 1
Process innovation 5 3
Management capability 10 8
Labor relations 5 3
Management and personal 5 5
Delivery performance 20 8,2
Performance to promise 7 4,2
Lead time 6 1,2
Responsiveness 7 2,8
Total costs 20 18
Costs competitiveness 10 10
Cost control 5 3
Flexibility 5 5
EDI 3 3
Others risks 2 0,6
Exchanges rates 1 0,2
Country security 1 0,4
TOTAL 59,55
Supplier: Sure Tech
Category
Total/Sub
Weight
Weighted
Score
Sub-total
Quality performance 20 16
Total quality commitment 11 13,75
Defect performance (PPM) 9 2,25
Financial condition 10 6,8
Asset turnover 4 4
Debt structure 4 1,6
Profitability 2 1,2
Process capability 15 10
Research and development 5 5
Volume capacity 5 2
Process innovation 5 3
Management capability 10 10
Labor relations 5 5
Management and personal 5 5
Delivery performance 20 15,8
Performance to promise 7 5,6
Lead time 6 6
Responsiveness 7 4,2
Total costs 20 7
Costs competitiveness 10 2
Cost control 5 3
Flexibility 5 2
EDI 3 0,6
Others risks 2 2
Exchanges rates 1 1
Country security 1 1
Total 68,2
Supplier: E-Drive
Category
Total/Sub
Weight
Weighted
Score
Sub-total
Quality performance 20 15,5
Total quality commitment 11 11
Defect performance (PPM) 9 4,5
Financial condition 10 6
Asset turnover 4 2,4
Debt structure 4 2,4
Profitability 2 1,2
Process capability 15 9
Research and development 5 3
Volume capacity 5 2
Process innovation 5 4
Management capability 10 6
Labor relations 5 3
Management and personal 5 3
Delivery performance 20 20
Performance to promise 7 7
Lead time 6 6
Responsiveness 7 7
Total costs 20 12
Costs competitiveness 10 6
Cost control 5 3
Flexibility 5 3
EDI 3 0,6
Others risks 2 2
Exchanges rates 1 1
Country security 1 1
Total 71,1
Supplier: Park Technologies.
Category
Total/Sub
Weight
Weighted
Score
Sub-total
Quality performance 20 22,25
Total quality commitment 11 11
Defect performance (PPM) 9 11,25
Financial condition 10 7,6
Asset turnover 4 3,2
Debt structure 4 3,2
Profitability 2 1,2
Process capability 15 13
Research and development 5 4
Volume capacity 5 4
Process innovation 5 5
Management capability 10 7
Labor relations 5 4
Management and personal 5 3
Delivery performance 20 6,8
Performance to promise 7 2,8
Lead time 6 1,2
Responsiveness 7 2,8
Total costs 20 12
Costs competitiveness 10 8
Cost control 5 2
Flexibility 5 2
EDI 3 0,6 0,6
Others risks 2 1,6
Exchanges rates 1 1
Country security 1 0,6
TOTAL 70,85
Que. 6: Sourcing risk Management plan. 1).identify the potential risks associated with a
sourcing decision, 2) assess the possible magnitude of each risk to operations, and 3) identify
ways to manage or reduce risk exposure.
Sourcing Risk Management Plan
Supplier: E-Drive Systems.
Potential
Concern Area
Risk or Concern Risk Reduction Plan
Management
Capability
 Internal communication between
the production and quality
departments
 Product were shipped to the
buyer, having quality issues in
past.
 Measure, manage and monitor
improvements in all
departments.
 Understand the value of the
team reports to the
organization.
 Show executive management
the impact of improvements
on the organization’s bottom
line.
Delivery
Performance
E – Drive Systems commits the highest
on-time delivery (95%) with a very short
lead time (2 weeks) and best quality.
Continuous monitoring metric must be
established and shared between both
parties.
Quality
Performance
Quality = 7,500 PPM Defects Establish a Critical to Quality
characteristics check list.
Process
Capability
Lapse in monitoring control limits Establish Lean six Sigma into all
processes
Utilization of Statistical Process
Controls
Capacity E – Drive Systems operates nearly at full
capacity (96%). Scale of our growth may
exceed their ability to meet our future
needs.
Develop a long-term relationship with
Sure Tech – Young company that has
potential to grow with us and leads in
technology.
Cost  Transportation cost are high in
regards to locality (10 miles)
 PCS - controls its own
transportation. Establish a new
shows inefficiency in logistics
 Inventory cost is a concern
$165,000,000 at 18% inventory
per unit.
rate negotiated prior to
purchase.
 Lock down date to enact JIT
delivery and mitigate inventory
levels required.
Technical Ability E- Drive Systems states that it will work
with company in future product
development.
Collaboration between both companies
R & D departments with transparent
goals and technical capacity.
Logistics None
----- ---- --- ---- --- ---- --
Financial Issues Cost of inventory – Total current
Liabilities – Long Term Debt
Constant monitoring of balance sheet.
Nurture relationships with other
suppliers to be agile.
Other
Commercial
Issues
None
Sources:
http://www.talentalign.com/it-hrknowledge-base/capability-managementcapability-index/
https://www.moresteam.com/resources/metrics.cfm
https://www.isixsigma.com/tools-templates/capability-indices-process-capability/competently-use-
capability-analysis/
Que. 7: The issue of short versus long-term contracts is also an important consideration
during supplier selection. Using the following table, identify the potential advantages and
disadvantages of short and long-term contracts.
Short-Term Contracts:
Potential Advantages
1). Greater flexibility in
terms of taking
advantage of
advancement of
technology from other
emerging and potential
suppliers.
2). It drives
competitiveness for
the supplier base. They
try to enhance their
Short-Term Contracts:
Potential Disadvantages
1). Supplier may not
be able to offer good
price because of the
uncertainty of future
business and income
stream.
2). Less likely the
suppliers are to
commit their capital
for design, build and
finance the special
Longer-Term Contracts:
Potential Advantages
1).Suppliers can be
involved during early
product development
process to get the cost-
reduction suggestions.
2). Strong relations
with supplier help
during spike and
decline of demand in
the market. Supplier
remains flexible in this
Longer-Term Contracts:
Potential Disadvantages
1). Supplier volume
uncertainty.
2).Selection of wrong
supplier.
3).Supplier volume
uncertainty
4).Buyer is
unreasonable.
own performance for
getting future
business.
demands of buyer.
3). It takes time and
effort to analyze and
evaluate different
suppliers. Increases
administration cost for
buyer.
4). Supplier
relationship
management and
vendor development
process cannot be
executed properly.
case.
3).Continuous
improvement. Joint
ventures and JIT can be
implemented.
4). Optimized and
streamlined supply
chain.
Sources: http://www2.westsussex.gov.uk/ds/cttee/ses/ses060711i6b.pdf
Purchasing and Supply Chain management book by Robert M. Monczka, Robert B Handfield.
Que. 8: Consider the following statement: Supplier evaluation and selection, which is really a
process of risk management, is one of the most important activities performed today. If your
group agrees with part or all of this statement, provide arguments and evidence as to why
your group agrees. If your group disagrees, provide arguments and evidences as to why your
group disagrees.
Our group agrees with the statement that supplier evaluation and selection; a process of risk
management that is most important activities performed today. As we know this ear is of Globalization.
To leverage the cheap labor, many buyers have started looking forward in developing nations for cheap
suppliers to remain competitive in the market. Suppliers from country like china, India, Indonesia have
gone globally, and it became impossible to compete in price by American suppliers in the same market.
On the dark side, because of the longer lead time, sourcing the material internationally is uncertain
inherently. There, the supplier risk management comes into the picture. Buyer prepares contingency
plan (risk mitigation plan). They assume bearing the calculated risk and prepare risk mitigation
techniques.
All the multi-national companies, who do have global suppliers, have developed these risk mitigation
techniques with time. And thus we believe that it is very common business practice now in the field of
supply chain.
Que. 9: Instead of conducting evaluations through formal assessment, some firms rely on
product samples as a means to validate supplier capability. What are the risks associated with
relying only on supplier samples when making a supplier selection decision? How can a
company minimize this risk?
Relying on mere sampling may not be as accurate as formal assessment, for validating supplier
capability. Samples may only indicate the quality.
Furthermore, Supplier samples do not provide holistic approach of supplier selection process. Only
quality of products can be determined. In the absence of suppliers’ major attributes like delivery
performance, payment terms, capacity utilization, Inco-terms, contractual agreement should not be
done.
To minimize such risks, a company should have cross-functional team, who can do the systematic
analysis of gathered market information. Based on the DCA (Discrete choice analysis) and AHP
(Analytical hierarchy process) techniques, a company can do the pair wise comparison of 2 suppliers at a
time over the different attributes. After that, a company can narrow their choice down to filtered
supplier for final negotiation. A visit of supplier’s company is very significant. Considering all these
factors company can minimize such risks.

More Related Content

What's hot

Supply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
Supply Chain Management Training in Powerpoint | By ex-McKinsey ConsultantsSupply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
Supply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
Aurelien Domont, MBA
 
Srm Presentation
Srm PresentationSrm Presentation
Srm Presentation
Muhammed Akgun
 
Supply chain management ch02 chopra
Supply chain management ch02 chopraSupply chain management ch02 chopra
Supply chain management ch02 chopra
Jamil Ahmed AKASH
 
Creating and Managing Supplier Relationships
Creating and Managing Supplier RelationshipsCreating and Managing Supplier Relationships
Creating and Managing Supplier Relationships
FaHaD .H. NooR
 
Supply Chain Management chap 1
Supply Chain Management chap 1Supply Chain Management chap 1
Supply Chain Management chap 1
Umair Arain
 
Vendor Selection
Vendor SelectionVendor Selection
Vendor Selection
PMG-I
 
Chopra Meindl Chapter 10
Chopra Meindl Chapter 10Chopra Meindl Chapter 10
Chopra Meindl Chapter 10
Rupam Jash l CSCA
 
Risk management in supply chain
Risk management in supply chain Risk management in supply chain
Risk management in supply chain
Indo German Training Centre mumbai
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
salagrama subrahmanya satya gopal
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
DENNY OTTARACKAL
 
The "Bullwhip" Effect
The "Bullwhip" EffectThe "Bullwhip" Effect
The "Bullwhip" Effect
Anand Subramaniam
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
UPENDRA '
 
Supply Chain Management chap 2
Supply Chain Management chap 2Supply Chain Management chap 2
Supply Chain Management chap 2
Umair Arain
 
Supply Chain Management chap 15
Supply Chain Management chap 15Supply Chain Management chap 15
Supply Chain Management chap 15
Umair Arain
 
Supply chain drivers & metrics
Supply chain drivers & metricsSupply chain drivers & metrics
Supply chain drivers & metricsujjmishra
 
What is strategic fit
What is strategic fitWhat is strategic fit
What is strategic fitAnu Vanu
 
PROCUREMENT AND SUPPLY MANAGEMENT
PROCUREMENT AND SUPPLY MANAGEMENTPROCUREMENT AND SUPPLY MANAGEMENT
PROCUREMENT AND SUPPLY MANAGEMENT
Ashish Hande
 
Supply Chain Management chap 18
Supply Chain Management chap 18Supply Chain Management chap 18
Supply Chain Management chap 18
Umair Arain
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
Vladislav Mandryka
 

What's hot (20)

Supply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
Supply Chain Management Training in Powerpoint | By ex-McKinsey ConsultantsSupply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
Supply Chain Management Training in Powerpoint | By ex-McKinsey Consultants
 
Srm Presentation
Srm PresentationSrm Presentation
Srm Presentation
 
Supply chain management ch02 chopra
Supply chain management ch02 chopraSupply chain management ch02 chopra
Supply chain management ch02 chopra
 
Creating and Managing Supplier Relationships
Creating and Managing Supplier RelationshipsCreating and Managing Supplier Relationships
Creating and Managing Supplier Relationships
 
Supply Chain Management chap 1
Supply Chain Management chap 1Supply Chain Management chap 1
Supply Chain Management chap 1
 
Chopra scm5 ch02_ge
Chopra scm5 ch02_geChopra scm5 ch02_ge
Chopra scm5 ch02_ge
 
Vendor Selection
Vendor SelectionVendor Selection
Vendor Selection
 
Chopra Meindl Chapter 10
Chopra Meindl Chapter 10Chopra Meindl Chapter 10
Chopra Meindl Chapter 10
 
Risk management in supply chain
Risk management in supply chain Risk management in supply chain
Risk management in supply chain
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
 
The "Bullwhip" Effect
The "Bullwhip" EffectThe "Bullwhip" Effect
The "Bullwhip" Effect
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply Chain Management chap 2
Supply Chain Management chap 2Supply Chain Management chap 2
Supply Chain Management chap 2
 
Supply Chain Management chap 15
Supply Chain Management chap 15Supply Chain Management chap 15
Supply Chain Management chap 15
 
Supply chain drivers & metrics
Supply chain drivers & metricsSupply chain drivers & metrics
Supply chain drivers & metrics
 
What is strategic fit
What is strategic fitWhat is strategic fit
What is strategic fit
 
PROCUREMENT AND SUPPLY MANAGEMENT
PROCUREMENT AND SUPPLY MANAGEMENTPROCUREMENT AND SUPPLY MANAGEMENT
PROCUREMENT AND SUPPLY MANAGEMENT
 
Supply Chain Management chap 18
Supply Chain Management chap 18Supply Chain Management chap 18
Supply Chain Management chap 18
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
 

Viewers also liked

American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)Prateek Mishra
 
Trabajos robados en internet
Trabajos robados en internetTrabajos robados en internet
Trabajos robados en internetAngie Moreno
 
Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !
F. Mattes
 
iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)Renson Mwenda
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna ResumeKrishna avs
 
Shroff A - AIMRADIAL 2014 - Same-day discharge
Shroff A - AIMRADIAL 2014 - Same-day dischargeShroff A - AIMRADIAL 2014 - Same-day discharge

Viewers also liked (7)

American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)
 
Trabajos robados en internet
Trabajos robados en internetTrabajos robados en internet
Trabajos robados en internet
 
YH Media Kit 2016
YH Media Kit 2016YH Media Kit 2016
YH Media Kit 2016
 
Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !
 
iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna Resume
 
Shroff A - AIMRADIAL 2014 - Same-day discharge
Shroff A - AIMRADIAL 2014 - Same-day dischargeShroff A - AIMRADIAL 2014 - Same-day discharge
Shroff A - AIMRADIAL 2014 - Same-day discharge
 

Similar to Pacific case

Chap. 4 types of consumer
Chap. 4 types of consumerChap. 4 types of consumer
Chap. 4 types of consumer
Magiel Amora
 
7steps
7steps7steps
7steps
Adams Donoso
 
Bldg accnt relation
Bldg accnt relationBldg accnt relation
Bldg accnt relationamitgurus
 
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
Running head PURCHASING ORGANIZATION METRICS REPORT              .docxRunning head PURCHASING ORGANIZATION METRICS REPORT              .docx
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
todd581
 
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
Running head PURCHASING ORGANIZATION METRICS REPORT              .docxRunning head PURCHASING ORGANIZATION METRICS REPORT              .docx
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
jeanettehully
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTSWAPAN KUMAR ROY
 
D1What are some reasons management opposes unionization Do you .docx
D1What are some reasons management opposes unionization Do you .docxD1What are some reasons management opposes unionization Do you .docx
D1What are some reasons management opposes unionization Do you .docx
randyburney60861
 
sc 4 yr Chapter two marketing strategy of business
sc 4 yr Chapter two marketing strategy of  businesssc 4 yr Chapter two marketing strategy of  business
sc 4 yr Chapter two marketing strategy of business
bahreabdella
 
TAGMfg030811
TAGMfg030811TAGMfg030811
TAGMfg030811
Melanie Brandt
 
Predictive Sourcing PowerPoint Presentation Slides
Predictive Sourcing PowerPoint Presentation SlidesPredictive Sourcing PowerPoint Presentation Slides
Predictive Sourcing PowerPoint Presentation Slides
SlideTeam
 
Executive Buyers Guide
Executive Buyers GuideExecutive Buyers Guide
Executive Buyers Guideefinver
 
Sourcing Decisions.pptx
Sourcing Decisions.pptxSourcing Decisions.pptx
Sourcing Decisions.pptx
ZeeshanMuhammadAslam1
 
exam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocxexam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocx
habtamuteferi07
 
Page 9Page 10PRINTED BY [email protected] Printing is.docx
Page 9Page 10PRINTED BY [email protected] Printing is.docxPage 9Page 10PRINTED BY [email protected] Printing is.docx
Page 9Page 10PRINTED BY [email protected] Printing is.docx
bunyansaturnina
 
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docxweek 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
melbruce90096
 
Vendordevelopment 130810044738-phpapp01
Vendordevelopment 130810044738-phpapp01Vendordevelopment 130810044738-phpapp01
Vendordevelopment 130810044738-phpapp01
shivam kumar
 
Running head TOTAL COST OF OWNERSHIP REPORT .docx
Running head TOTAL COST OF OWNERSHIP REPORT                      .docxRunning head TOTAL COST OF OWNERSHIP REPORT                      .docx
Running head TOTAL COST OF OWNERSHIP REPORT .docx
todd521
 

Similar to Pacific case (20)

Chap. 4 types of consumer
Chap. 4 types of consumerChap. 4 types of consumer
Chap. 4 types of consumer
 
7steps
7steps7steps
7steps
 
Bldg accnt relation
Bldg accnt relationBldg accnt relation
Bldg accnt relation
 
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
Running head PURCHASING ORGANIZATION METRICS REPORT              .docxRunning head PURCHASING ORGANIZATION METRICS REPORT              .docx
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
 
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
Running head PURCHASING ORGANIZATION METRICS REPORT              .docxRunning head PURCHASING ORGANIZATION METRICS REPORT              .docx
Running head PURCHASING ORGANIZATION METRICS REPORT .docx
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
D1What are some reasons management opposes unionization Do you .docx
D1What are some reasons management opposes unionization Do you .docxD1What are some reasons management opposes unionization Do you .docx
D1What are some reasons management opposes unionization Do you .docx
 
sc 4 yr Chapter two marketing strategy of business
sc 4 yr Chapter two marketing strategy of  businesssc 4 yr Chapter two marketing strategy of  business
sc 4 yr Chapter two marketing strategy of business
 
TAGMfg030811
TAGMfg030811TAGMfg030811
TAGMfg030811
 
Predictive Sourcing PowerPoint Presentation Slides
Predictive Sourcing PowerPoint Presentation SlidesPredictive Sourcing PowerPoint Presentation Slides
Predictive Sourcing PowerPoint Presentation Slides
 
Top 10 Tips
Top 10 TipsTop 10 Tips
Top 10 Tips
 
Executive Buyers Guide
Executive Buyers GuideExecutive Buyers Guide
Executive Buyers Guide
 
Sourcing Decisions.pptx
Sourcing Decisions.pptxSourcing Decisions.pptx
Sourcing Decisions.pptx
 
exam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocxexam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocx
 
Page 9Page 10PRINTED BY [email protected] Printing is.docx
Page 9Page 10PRINTED BY [email protected] Printing is.docxPage 9Page 10PRINTED BY [email protected] Printing is.docx
Page 9Page 10PRINTED BY [email protected] Printing is.docx
 
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docxweek 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
week 4 discussion 2 phi 103Explore a legendary hoax from the Mus.docx
 
Profit Point
Profit PointProfit Point
Profit Point
 
Vendordevelopment 130810044738-phpapp01
Vendordevelopment 130810044738-phpapp01Vendordevelopment 130810044738-phpapp01
Vendordevelopment 130810044738-phpapp01
 
ISC Brochure
ISC BrochureISC Brochure
ISC Brochure
 
Running head TOTAL COST OF OWNERSHIP REPORT .docx
Running head TOTAL COST OF OWNERSHIP REPORT                      .docxRunning head TOTAL COST OF OWNERSHIP REPORT                      .docx
Running head TOTAL COST OF OWNERSHIP REPORT .docx
 

More from Prateek Mishra

Negotiation Case Study
Negotiation Case StudyNegotiation Case Study
Negotiation Case StudyPrateek Mishra
 
Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Prateek Mishra
 
Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Prateek Mishra
 
American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)Prateek Mishra
 

More from Prateek Mishra (7)

Final Group Project
Final Group ProjectFinal Group Project
Final Group Project
 
Negotiation Case Study
Negotiation Case StudyNegotiation Case Study
Negotiation Case Study
 
Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]
 
Value analysis
Value analysisValue analysis
Value analysis
 
Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]Roland PPT[Prateek Mishra]
Roland PPT[Prateek Mishra]
 
American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)American Tool Works (Prateek Mishra)
American Tool Works (Prateek Mishra)
 
Value analysis
Value analysisValue analysis
Value analysis
 

Pacific case

  • 1. Purchasing INTM 543 Pacific Systems Corporation Case Instructor: Prof Herbert Shields By, Jose Sosa – A20313080 Niket Panchal –A20365666 Billy McFarland – A20078959 Ismail Bouaida –A20387720 Prateek Mishra – A20381901
  • 2. Questions Que. 1: What is your recommended sourcing strategy in this case? Please support your decision with quantitative and qualitative evidence gathered during the case analysis. Also, present your plan to reduce any risks associated with your sourcing decision. Pacific Systems can single source their DVD drives and try to build a good relationship with the supplier. DVD’s are new in market and not only computer industry but also other electronic industries are looking forward for this product. For uninterrupted supply, leverage the Just in time, it will be better to have a single supplier with a long term contract. Sourcing strategy is a practical approach to collect data and to use it to find the best possible values in the market. As a quantitative analysis, we placed all 4 suppliers with their offering under the below drawn table Detailed analysis of above data, we came to conclusion that E-drive Systems is the best supplier choice according to our requirements. E-drive commits excellent on time delivery performance stands them out from other suppliers. E – Drive Systems meets the highest quality metric of 99.5% with on time delivery and with facility capacity that enable a lead time of 2 weeks. Even though their Quote unit price is a bit higher compared with other two suppliers but their local presence is given priority over the price because as in some cases Low price does not guarantee success. Plan to reduce risk in sourcing decision: The biggest step to reduce risks in supply to show belief on your supplier and make him understood that we are with you and will do a great business together, this faith will increase supplier’s confidence and they will try to exceed its limits. Other than this we can work with our supplier and can do the cross functional risk planning for such situations. A demand/supply forecast will also help to understand supplier’s capability and whether supplier can cop up with us if at times demands exceed their limits and according to that we can plan our financials for the situations where we might have to face situations like customer penalties. Reference- https://scm.ncsu.edu/scm-articles/article/risk-reduction-mechanisms-a-managerial- framework-for-reducing-the-impact-of Factors Elecom Sure Tech E-drive Park Quoted price(per unit) $127 $144 $140 $132 Delivery Lead time 8 weeks 3 weeks 2 weeks 10 weeks Supplier Quality 9500 PPM defects 10,500 PPM defects 7500 PPM defects 4000 PPM defects On time delivery record 95% 97% 99.5% 99% Tooling cost $2.73 $3.18 $2.95 $1.20 Frequency of Shipment Monthly Weekly Every other day Monthly Ramp up time 4 months 5 months 4 months 4 months Denomination of Contract Yen Dollars Dollars Dollars
  • 3. Que. 2: This case provided the data necessary to perform a cursory supplier financial analysis. In reality, cross-functional sourcing teams must often obtain this data during their assessment of potential suppliers. Discuss possible sources of supplier financial information. What may impact a purchaser's ability to obtain supplier financial data? Our case provides us with all the required data to do a financial analysis [Appendix-3], but every time the case will not be the same.  There are number of websites which provides companies financial standings, such kind of databases are rich sources for collecting data.  Purchasers can refer to eclectic companies with whom suppliers had worked or working and ask for performance review.  Buyer can refer B2B resources which are a good source of information for such situations.  With all above solutions purchasers should try to maximize their reach and look for as many sources as possible to gather information about supplier with whom they are looking forward for a deal The most critical factor which affects a purchaser’s capability to obtain supplier’s financial data is the kind of relationship they have. If Purchaser has good terms with supplier they can work on the things which suppliers usually do not prefer like sharing (Financial Data). Que. 3: A sourcing decision of the magnitude highlighted in this case requires a serious commitment of resources and time. Do all sourcing decisions require similar commitments of time and effort? If not, describe the types of sourcing decisions that justify this effort. Describe the types of sourcing decisions that do not justify or require the level of effort and analysis required in this case. We feel that not all sourcing decisions require similar commitments of time and effort due to the variety of suppliers that are available locally and globally. Something like a DVD drive and monitors or printed circuit boards that are key components to the finished product do take more time and resources to procure. You have to take into account if they are financially stable to supply consistent high quality and reliable material with zero defects. A company whose strategic goals match closely what you intend to do usually helps in building a long term relationship in which it is mutually beneficial. The type of sourcing for this company that does not justify the level of effort and analysis are fasteners for the computer, poly bags to keep the product protected from dust or one time buys that are not critical to the end user. Que. 4: How important is the issue of supplier capacity in this case? How did your group evaluate supplier capacity? What level of attention or importance should supplier capacity receive during the sourcing decision? Why? This is a booming market and is on the verge of increasing demand due to the revitalized economy and end of the recession. Technology is a big area that quickly changes either in demand or innovation. We need a supplier that has the capacity not only to source spikes in demand but have capacity to take on new projects and prototypes. They need to be stable enough to absorb increase in demand or a new
  • 4. product line that will need a quick response to be able to capitalize and gain market share. If a supplier does not have capacity then they do not have the type of structure we are looking for to grow which plays a big part in our decision, regardless if they can supply, we are losing out of potential customers due to not having enough DVD drives to build our PC’s. There should be a high level of importance when reviewing the supplier and deciding who to source from. Que. 5: Supplier selection decisions, such as the one presented in this case, usually require many weeks or months of analysis and discussion before reaching final agreement with a supplier(s). Creatively identify ways that the buying company can shorten the time from recognition of a purchase need to reaching agreement with the selected supplier. (Hint: Consider performing certain required activities concurrently or in anticipation of a purchase requirement). This is also necessary due to the time to market we are looking to achieve, in order for our supplier to be ready to ramp up and give us a full shipment by July in order for us to start production on the 55,000 units forecasted to be sold in August launch is critical. While a team is working on negotiating the price and contract for the units, an engineering team has to work on getting a prototype approved for production and see what materials are required to manufacture that DVD drive. What type of metal should be used what type of characteristics does the DVD need, what type of speed and capabilities? How well is the supply chain back up to our vendor’s suppliers? Are the components able to be sourced or will there be issues that can cause a shortage. This can all happen prior to a purchase requirement being agreed upon. This is why the price of the unit can change, it can get pricier or it can get cheaper but the work must be done concurrent to the negotiation and bidding of each supplier. Que. 6: The issue of single versus multiple sourcing is an important consideration during supplier selection. Using the following table, identify the potential advantages and disadvantages of single and multiple sourcing (not only as they relate to this case). Single Sourcing: Potential Advantages 1).Sole sourcing helps in optimizing the company’s supply chain. 2).Lower production cost and product better value for shareholders and customers. 3). Downtime and inefficiencies caused by interoperability issues can be reduced. Single Sourcing: Potential Disadvantages 1). Greater power to the supplier 2). Failure of supplier may cause a total shutdown to our production, and as a result our customer service may suffer very badly. 3). Supplier may not cop-up sudden spike or decline in the demand. Multiple Sourcing: Potential Advantages 1). Drives up competition within the supplier base. 2). Drives down prices. 3).Display your company’s interest and commitment to the economic growth of your community. Multiple Sourcing: Potential Disadvantages 1). Different suppliers need to be managed and monitored. A critical job for purchasing people. 2). Low cost cannot be leveraged as there is no economies of scale in production for your suppliers. Sources: https://scm.ncsu.edu/scm-articles/article/benefits-and-risks-of-single-sourcing
  • 5. Case requirements Que. 1: Develop a process that provides a logical order evaluating the market data and reach recommendations regarding how to proceed with the supplier selection process. Present this process in the form of a flow chart with key decisions points clearly identified. The flow chart shows the necessary sequential steps to be performed for making decisions through the supplier selection process. We’ve identified 7 key steps of decisions making. I. Develop a cross-functional team: Cross-functional team can generate better results in identifying and analyzing the market data. For planning the whole process and determining the scope of project, cross-functional team can be very helpful. II. Supplier market research and Supplier preferencing: Based on our product specification and requirements, an initial RFI can be sent to different suppliers in the same market niche. Supplier preferencing is basically placing the product and supplier in purchasing criticality matrix to add better visibility in supplier selection process. III. Solicit supplier’s info. (Bid): Based on the suppliers’ willingness and response to RFI and RFQ, a very few supplier can be selected for bidding process (Request for proposal). Where the precise drawing and specification are submitted to short-listed suppliers. Detailed information is requested on payment and Inco-terms from suppliers.
  • 6. IV. Conduct the thorough evaluation: There’re some techniques like AHP (Analytical hierarchy process) and DCA (Discrete choice analysis), where suppliers’ attributes can be pair wise compared to make the decision. These processes helps to understand what proportion of business should be offered to a specific supplier based on its capacity analysis. V. Contract negotiation with selected suppliers: Based on the analysis conducted, negotiation can be done with selected suppliers. Payment terms, Inco-terms, Quality, Quantity, Delivery window can be negotiated. VI. Final supplier selection, monitoring and feedback: Based on the negotiation, best supplier(s) can be selected for contract. After selecting the supplier(s), continuous monitoring of performance is very important. Supplier relationship management (supplier reward and score- card) plays an important role for maintaining long-term strategic relations. Que. 2: perform the analyses designed to support the supplier evaluation and selection decisions.  Financial Risk Analysis (Que. 3) Selected Financial Ratios Elecom SureTech E-Drive Park Asset Utilization: Asset Turnover = Sales/Assets 1.32 1.57 1.64 1.38 Inventory Turnover = Cost of Sales/Average Inventory 5.20 5.43 9.06 7.005 Receivable days= Account receivable/Sales *365 49.92 29.86 60.30 47.00 Payable Days = Accounts payable/Sales *365 29.53 49.77 35.70 33.67 Capitalization: Leverage = Assets/Equity 2.58 2.03 2.28 2.10 Return on Equity = Net Income/Equity = Profit Margin X ATO X Leverage 0.065 0.217 0.168 0.099 Long-term Debt to Equity = Long-term Debt/Equity 0.649 0.318 0.39 0.35
  • 7. Long-term Debt to Assets = Long-term Debt/Assets 0.251 0.157 0.172 0.168 Current Ratio = Current Assets/Current Liabilities 1.21 1.338 1.348 1.129 Quick Ratio = (Cash + Short-term Inventory + Accounts Receivable)/ Current Liabilities 0.62 0.73 1.05 0.74 EBIT Coverage = Earnings Before Interest and Taxes/Interest Expenses 0.75 5.46 2.62 1.85 Profitability Ratios: Profit Margin = Net Income/Sales 0.019 0.068 0.045 0.034 Conclusion and Interpretations:  E-drive does have a good inventory turnover ratio. In more, a company’s Asset turnover is also good. Company has good payment terms for their customers. On the other hand, company has moderate profit margin and return on equity.  Elecom has poor Asset turnover in compared to other suppliers. His ability of quickly paying to his suppliers indicates its financial strength. Lacks in the profit margin and return on equity.  Low long term debt to equity in case of Park technologies confirms that company will perform well financially in future as they don’t have long-term loans. Company’s financial strength in foreseeable future is very important in deciding long-term strategies.  In short, suppliers’ long-term, &short –term debt, equity, profit margin and return on investments are the factors need to be considered for deciding long-term business partner. Que. 4: Total Cost Analysis. Identify the relevant additional costs beyond the unit price for each supplier. Calculate the estimated per unit total cost from each supplier for year one. The forecasted demand of 9000x is 500,000 units for the first year (Aug. 2003-july 2004). As demand of DVD drive is dependant over the product 9000x, we referenced 500,000 units of DVD drive, for calculating the estimated unit total cost from each supplier for year one.
  • 8. For simplification, we’ve shown the equation for finding out tooling cost and cost of non-conformance per unit for first year.  Tooling cost per unit for first year =[{ Total cost of tooling (2-year contract)* total demand of DVD drive for 2 years (forecasted)}/demand of DVD drive for 1st year (forecasted)]…Eq.4.1  Quality non-conformance cost per unit for first year= [defects per million*300], where $300 is cost of non-conformance that Pacific system may end-up bearing…Eq.4.2  Carrying cost calculation: For domestic suppliers: Safety stock= 2 weeks, 2*9615(Stock of one week) =19,230 Units Carrying cost per unit for domestic supplier = [{19,230 Units*Unit price*18}/ {100*500,000}] For International suppliers: Safety stock = 4.28 weeks, 4.28*9615= 39,440 Units. Carrying cost per unit for international supplier = [{39,440 units*Unit price*18}/ {100*500,000}] Cost Category Elecom SureTech E-Drive Park Quoted Unit Price $127 $144 $140 $132 Transportation 18 6 14 18 Tooling (Based on Eq.4.1) 2.73 3.18 2.95 2.5 Quality non-conformance costs(Based on Eq.4.2) (9500/100000 0) *300=2.85 (10,500/1000 000) *300=3.15 (7500/100000 0) *300=2.25 (4000/100000 0) *300=1.20 Duties/customs, insurance, and tariffs 11.50 1.50 3.00 13 Inventory safety stock carrying charges: 1.80 0.996 0.97 1.87 Ordering, inbound receiving and inspection costs 4.5 4 3.25 2.25 Estimated Per Unit Total Cost $168.38 $162.83 $166.42 $170.82
  • 9. Conclusions and Comments:  Even though Sure Tech has very small market share and less experience, they are offering the lowest price from all 4 suppliers.  The expected unit price of DVD drive should be in the range of $125-150 according to the Pacific corporation. Knowing the fact that Sure Tech is a small supplier trying to expand its market share, Pacific corp. can have better price deal with Sure Tech. Yet, their ability to respond the spike in demand is questionable.  E-Drive has second best offering. They are domestic supplier and have obtained a good market share. They also could be a potential supplier from cost perspective. Que. 5: Supplier Evaluation and Selection Analysis. Using the GE Scorecard as a model, create and complete a scorecard for your each supplier. The GE Scorecard for all different 4 suppliers is drawn as below. Based on the final score, we narrowed our supplier selection process on E-Drive Systems. We considered total 8 different categories. Then subdivided the categories in sub-categories and assign the weight to each sub-category. Supplier: ELECOM Category Total/Sub Weight Weighted Score Sub-total Quality performance 20 12,75 Total quality commitment 11 8,25 Defect performance (PPM) 9 4,5 Financial condition 10 2 Asset turnover 4 0,8 Debt structure 4 0,8 Profitability 2 0,4 Process capability 15 7 Research and development 5 3 Volume capacity 5 1 Process innovation 5 3 Management capability 10 8 Labor relations 5 3 Management and personal 5 5 Delivery performance 20 8,2
  • 10. Performance to promise 7 4,2 Lead time 6 1,2 Responsiveness 7 2,8 Total costs 20 18 Costs competitiveness 10 10 Cost control 5 3 Flexibility 5 5 EDI 3 3 Others risks 2 0,6 Exchanges rates 1 0,2 Country security 1 0,4 TOTAL 59,55 Supplier: Sure Tech Category Total/Sub Weight Weighted Score Sub-total Quality performance 20 16 Total quality commitment 11 13,75 Defect performance (PPM) 9 2,25 Financial condition 10 6,8 Asset turnover 4 4 Debt structure 4 1,6 Profitability 2 1,2 Process capability 15 10 Research and development 5 5 Volume capacity 5 2 Process innovation 5 3 Management capability 10 10 Labor relations 5 5 Management and personal 5 5 Delivery performance 20 15,8 Performance to promise 7 5,6 Lead time 6 6 Responsiveness 7 4,2
  • 11. Total costs 20 7 Costs competitiveness 10 2 Cost control 5 3 Flexibility 5 2 EDI 3 0,6 Others risks 2 2 Exchanges rates 1 1 Country security 1 1 Total 68,2 Supplier: E-Drive Category Total/Sub Weight Weighted Score Sub-total Quality performance 20 15,5 Total quality commitment 11 11 Defect performance (PPM) 9 4,5 Financial condition 10 6 Asset turnover 4 2,4 Debt structure 4 2,4 Profitability 2 1,2 Process capability 15 9 Research and development 5 3 Volume capacity 5 2 Process innovation 5 4 Management capability 10 6 Labor relations 5 3 Management and personal 5 3 Delivery performance 20 20 Performance to promise 7 7 Lead time 6 6 Responsiveness 7 7 Total costs 20 12 Costs competitiveness 10 6 Cost control 5 3
  • 12. Flexibility 5 3 EDI 3 0,6 Others risks 2 2 Exchanges rates 1 1 Country security 1 1 Total 71,1 Supplier: Park Technologies. Category Total/Sub Weight Weighted Score Sub-total Quality performance 20 22,25 Total quality commitment 11 11 Defect performance (PPM) 9 11,25 Financial condition 10 7,6 Asset turnover 4 3,2 Debt structure 4 3,2 Profitability 2 1,2 Process capability 15 13 Research and development 5 4 Volume capacity 5 4 Process innovation 5 5 Management capability 10 7 Labor relations 5 4 Management and personal 5 3 Delivery performance 20 6,8 Performance to promise 7 2,8 Lead time 6 1,2 Responsiveness 7 2,8 Total costs 20 12 Costs competitiveness 10 8 Cost control 5 2 Flexibility 5 2 EDI 3 0,6 0,6 Others risks 2 1,6
  • 13. Exchanges rates 1 1 Country security 1 0,6 TOTAL 70,85 Que. 6: Sourcing risk Management plan. 1).identify the potential risks associated with a sourcing decision, 2) assess the possible magnitude of each risk to operations, and 3) identify ways to manage or reduce risk exposure. Sourcing Risk Management Plan Supplier: E-Drive Systems. Potential Concern Area Risk or Concern Risk Reduction Plan Management Capability  Internal communication between the production and quality departments  Product were shipped to the buyer, having quality issues in past.  Measure, manage and monitor improvements in all departments.  Understand the value of the team reports to the organization.  Show executive management the impact of improvements on the organization’s bottom line. Delivery Performance E – Drive Systems commits the highest on-time delivery (95%) with a very short lead time (2 weeks) and best quality. Continuous monitoring metric must be established and shared between both parties. Quality Performance Quality = 7,500 PPM Defects Establish a Critical to Quality characteristics check list. Process Capability Lapse in monitoring control limits Establish Lean six Sigma into all processes Utilization of Statistical Process Controls Capacity E – Drive Systems operates nearly at full capacity (96%). Scale of our growth may exceed their ability to meet our future needs. Develop a long-term relationship with Sure Tech – Young company that has potential to grow with us and leads in technology. Cost  Transportation cost are high in regards to locality (10 miles)  PCS - controls its own transportation. Establish a new
  • 14. shows inefficiency in logistics  Inventory cost is a concern $165,000,000 at 18% inventory per unit. rate negotiated prior to purchase.  Lock down date to enact JIT delivery and mitigate inventory levels required. Technical Ability E- Drive Systems states that it will work with company in future product development. Collaboration between both companies R & D departments with transparent goals and technical capacity. Logistics None ----- ---- --- ---- --- ---- -- Financial Issues Cost of inventory – Total current Liabilities – Long Term Debt Constant monitoring of balance sheet. Nurture relationships with other suppliers to be agile. Other Commercial Issues None Sources: http://www.talentalign.com/it-hrknowledge-base/capability-managementcapability-index/ https://www.moresteam.com/resources/metrics.cfm https://www.isixsigma.com/tools-templates/capability-indices-process-capability/competently-use- capability-analysis/ Que. 7: The issue of short versus long-term contracts is also an important consideration during supplier selection. Using the following table, identify the potential advantages and disadvantages of short and long-term contracts. Short-Term Contracts: Potential Advantages 1). Greater flexibility in terms of taking advantage of advancement of technology from other emerging and potential suppliers. 2). It drives competitiveness for the supplier base. They try to enhance their Short-Term Contracts: Potential Disadvantages 1). Supplier may not be able to offer good price because of the uncertainty of future business and income stream. 2). Less likely the suppliers are to commit their capital for design, build and finance the special Longer-Term Contracts: Potential Advantages 1).Suppliers can be involved during early product development process to get the cost- reduction suggestions. 2). Strong relations with supplier help during spike and decline of demand in the market. Supplier remains flexible in this Longer-Term Contracts: Potential Disadvantages 1). Supplier volume uncertainty. 2).Selection of wrong supplier. 3).Supplier volume uncertainty 4).Buyer is unreasonable.
  • 15. own performance for getting future business. demands of buyer. 3). It takes time and effort to analyze and evaluate different suppliers. Increases administration cost for buyer. 4). Supplier relationship management and vendor development process cannot be executed properly. case. 3).Continuous improvement. Joint ventures and JIT can be implemented. 4). Optimized and streamlined supply chain. Sources: http://www2.westsussex.gov.uk/ds/cttee/ses/ses060711i6b.pdf Purchasing and Supply Chain management book by Robert M. Monczka, Robert B Handfield. Que. 8: Consider the following statement: Supplier evaluation and selection, which is really a process of risk management, is one of the most important activities performed today. If your group agrees with part or all of this statement, provide arguments and evidence as to why your group agrees. If your group disagrees, provide arguments and evidences as to why your group disagrees. Our group agrees with the statement that supplier evaluation and selection; a process of risk management that is most important activities performed today. As we know this ear is of Globalization. To leverage the cheap labor, many buyers have started looking forward in developing nations for cheap suppliers to remain competitive in the market. Suppliers from country like china, India, Indonesia have gone globally, and it became impossible to compete in price by American suppliers in the same market. On the dark side, because of the longer lead time, sourcing the material internationally is uncertain inherently. There, the supplier risk management comes into the picture. Buyer prepares contingency plan (risk mitigation plan). They assume bearing the calculated risk and prepare risk mitigation techniques. All the multi-national companies, who do have global suppliers, have developed these risk mitigation techniques with time. And thus we believe that it is very common business practice now in the field of supply chain. Que. 9: Instead of conducting evaluations through formal assessment, some firms rely on product samples as a means to validate supplier capability. What are the risks associated with relying only on supplier samples when making a supplier selection decision? How can a company minimize this risk? Relying on mere sampling may not be as accurate as formal assessment, for validating supplier capability. Samples may only indicate the quality.
  • 16. Furthermore, Supplier samples do not provide holistic approach of supplier selection process. Only quality of products can be determined. In the absence of suppliers’ major attributes like delivery performance, payment terms, capacity utilization, Inco-terms, contractual agreement should not be done. To minimize such risks, a company should have cross-functional team, who can do the systematic analysis of gathered market information. Based on the DCA (Discrete choice analysis) and AHP (Analytical hierarchy process) techniques, a company can do the pair wise comparison of 2 suppliers at a time over the different attributes. After that, a company can narrow their choice down to filtered supplier for final negotiation. A visit of supplier’s company is very significant. Considering all these factors company can minimize such risks.