This document presents a proposed algorithm for peer selection policies in BitTorrent-like protocols, focusing on client interaction in on-demand multimedia streaming. It highlights the importance of client behavior and introduces metrics such as temporal and spatial dispersion to enhance peer selection due to inadequate attention given to this aspect in prior research. The study concludes with insights into the challenges and future directions in adapting these protocols for improved interactive streaming experiences.