SlideShare a Scribd company logo
1 of 4
NTADOM TONY C. (RNPO) 2G, 3G & LTE (Consultant)
Address: 12, Alhaji lawal Street, Moshalashi, Alagbado, Lagos state. Nigeria.
Primary E-mail: ntadom.t@gmail.com
Home Phone: +234- 818-162-7076
Work Phone: +234- 814-132-3515
Objectives: An articulate, well structured, Proactive, process and systems addicted professional
with a multivendor and multiplatform experience in Telecoms project delivery. With a total of more
than Eight years in the telecoms industry, the last six being in RF planning and optimization, all in 2G,
3G and LTE technologies. I desire to be part of a well structured and goal driven organization for
optimum and maximum productivity.
BIO-DATA
Nationality: Nigerian
Date of Birth: 27th
August
Religion: Christianity
Gender: Male
Language: English (Basic) Others.
VENDORS: Ericsson & Huawei & Nokia Siemens Nokia.
SKILLS SUMMARY
Network Planning, Site Configuration, Site Auditing, Network Tuning, KPI Optimization and
Monitoring, Drive Testing, Post Processing Analysis, Site Survey, E-Node B Commissioning and
verification, single site and cluster optimization and field maintenance specialist .
JOBS and EXPERIENCES.
July 2010 till Date Huawei Technologies Nig. LTD (Outsourced) Nigeria
(April 2013 till Date at MTN Project Nigeria)
Key Skills and Work Experience.
Team Lead DT CQT and Field Physical Optimization. GSM, WCDMA & LTE.
LTE
• Physically optimizing antennas to improve Coverage (RSRP), quality (RSRQ) and
reduce interference Noise (SINR) and increase data throughput.
• Drive testing sites in clusters for real time information gathering, analysis of the logs
and giving recommendation for coverage and quality of service improvement.
• Analysis of drive test Logs Using both Probe and Tems Discovery to improve the
coverage foot print of Network by mapping out areas with coverage holes and
recommendations of new site as required.
• Pre and Post Drive test log analysis, to chart road map for cluster and whole network
quality of service optimization.
• Drive test and analysis of clusters for bandwidth increment on the network from
5Mhz to 10Mhz, and physically optimizing coverage to reduce pollution.
• Single Site Verification test to check single sites performance before integration in a
cluster so as to optimize effectively to augment the total network performance.
• CSFB (Circuit Switch Fall Back test). Periodically carried out to monitor users
experience switching in between LTE Data services and circuit switched voice calls.
This is to improve latency time to fall back to LTE and all its inherent services.
• Swap sector correction on site to improve quality and thereby increasing data
throughput from users access end.
• Tuning and retuning antennas for coverage penetration into difficult areas, both
indoors and outdoors.
• Improving handover between cells by detecting missing neighbors, overshooting
cells and wrong neighbor definition to reduce drops by interference and improve
quality of service.
• High Level and VIP complaint handling.
WCDMA & GSM
• Conducting cluster drive Test and coordination of the same for 6 states in Nigeria
having more than 2000 sites in total for network monitoring and QOS improvement.
• Clustered drive test and analysis for 6Sector Implementation on the network, data
gathering and recommendations for improvement.
• Physical optimization of sites by tuning antennas tilt and Azimuth. This helps in
reducing dropped calls and poor access to the network by mitigating and or totally
removing interference on the network.
• Tuning antennas with deep precision to cancel interference discovered from drive
tests log analysis showing Pilot pollution to resolve poor quality (EC/LO) issues
• Route Creation for specific job requirements. for example, during Node B rehoming,
creating a cluster route to cover all the sites needed, performing pre and post Drives
showing improvement and or Decrement in KPI’s and optimizing same for better NQI
• Regular benchmarking drive test, to improve coverage and network Quality index
within my region in comparison to other networks.
• Hand over improvement by Neighbor optimization which are, detecting missing
neighbors, over defined neighbors and coordinate verification of neighboring sites.
• Feeder and inter or intra swap Correction to improve Call Drop rate, reduce call
block rate and interference caused quality of service.
• Physically optimizing sites to reduce pilot pollution, self-interference and external
interference due to overshooting sites, this is to improve capacity on the site and HS
user traffic improvement.
• Drive test investigation for hidden network faults and resolution of same.
• Drive test and physical optimization to improve traffic balancing and thereby
improve Monitored KPI and Quality of service.
• Post processing and analysis of DT log Files for 2G, WCDMA and LTE Drive Tests done
in the whole region and outputting recommendations as the need arises.
• Physical optimization to resolve SDCCH/TCH Drop thereby improving customer
experience
• Drive test report preparation and presentation in Power point, Excel and word
formats.
Radio Frequency Optimization. 2G
• Daily monitoring of KPI, reporting and analyzing worst performing cells in the
network in terms of CSSR, Availability, Call Drop and Block call rate.
• Monitoring alarms, escalation and follow up for resolution.
• Half rate optimization to improve block call rate and also reduce TCH drops due to
congestion.
• SDCCH channel tuning optimization to improve CSSR and reduce block rate
• Frequency optimization, retuning, and re-planning for resolution of interference.
• Interference analysis and resolution to improve users experience on call quality and
eliminate call drops
• Reporting daily KPI’s under my BSC for monitoring and improvement plan
recommendation.
• 1st
level customer complaint handling and resolution.
Radio Frequency Optimization LTE
• Power control optimization reference signal power to improve throughput by
reducing the excessive load on the cell.
• ERAB CSSR Optimization, by optimizing access nodes on UU interface,
• Blinding for good CSFB and access delay improvement.
• Neighbor optimization to improve backward compatibility, and seamless handover
for retain ability.
• Power management for the reduction of failure rates, high throughput and better
QOS.
• Daily KPI parameter tuning and reporting for proactive resolution of issues that
might arise in the future.
SOFTWARE/HARWARE.
• TECHNOLOGY: 2G and 3G. Currently on LTE.
• SOFTWARE: Microsoft office advanced user(Excel, Access, Power point and Words,
(MS Project), LMT, I-Manager; M2000, U2000, Map Info , GENEX Assistant, GENEX
Probe, TEMs investigation 16.2,Discovery10.2, shell Scripting, Google Earth. ACTIX, ,.
DAMS, PRS and NEMO ETC.
ORGANISATIONAL AND SPECIAL SKILLS:
• Coordinating with different resources in the projects to achieve smooth work
performance for my projects.
• Trained project manager and Member project management institute.
• Good communicating and reporting skills, excel, PowerPoint and others.
• A team player, motivator and leader in all sense of it.
• Passionate, energetic and able to work well under pressure.
• Addicted to excellence and success, so a fast learner and good idea innovator.
ADVANCED QUALIFICATIONS & TRAININGS
Projects Management Professional (certification in view) (Trained)
Member: Project Management Institute I.D 2473874
PROJECTS involved under Huawei Technologies Nigeria co. LTD.
MTN MS Project April 2014 till Oct 2016
MTN Network Performance Improvement Project August 2013 till March 2014
Airtel Swap Project 2G & 3G. July 2011 till August 2013
Airtel Swap Project July 2010 till June 2011
HOBBIES
Swimming, travelling and reading.
EDUCATION
Bachelor of Science (Computer Science) 2008
Lagos State University.
Ojo Lagos State, Nigeria.

More Related Content

What's hot

What's hot (20)

Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
Navin kumar
Navin kumarNavin kumar
Navin kumar
 
Bhawesh Resume(1)
Bhawesh Resume(1)Bhawesh Resume(1)
Bhawesh Resume(1)
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
karunakar.u
karunakar.ukarunakar.u
karunakar.u
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
RF Engineer
RF EngineerRF Engineer
RF Engineer
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 

Viewers also liked

додаток №3 бібліотерапія
додаток №3 бібліотерапіядодаток №3 бібліотерапія
додаток №3 бібліотерапіяanastassy
 
Pautas sencillas para establecer una buena relación con
Pautas sencillas para establecer una buena relación conPautas sencillas para establecer una buena relación con
Pautas sencillas para establecer una buena relación conorientacionnmtl
 
Happy Together Tour 2016
Happy Together Tour 2016Happy Together Tour 2016
Happy Together Tour 2016Molly Cotter
 
Actividad 1 - Análisis del Cómic
Actividad 1 - Análisis del CómicActividad 1 - Análisis del Cómic
Actividad 1 - Análisis del Cómicsvillega
 
Cardiología
CardiologíaCardiología
CardiologíaEduardo R
 
книжка
книжкакнижка
книжкаanastassy
 
2) Forrest Fishel - 2016 NCL Scouting Report
2) Forrest Fishel - 2016 NCL Scouting Report2) Forrest Fishel - 2016 NCL Scouting Report
2) Forrest Fishel - 2016 NCL Scouting ReportForrest Fishel
 
Capacidades perceptivo psicomotrices
Capacidades perceptivo psicomotricesCapacidades perceptivo psicomotrices
Capacidades perceptivo psicomotricesKarime Colado
 
CVJ_39319596_20170106161239 (1)
CVJ_39319596_20170106161239 (1)CVJ_39319596_20170106161239 (1)
CVJ_39319596_20170106161239 (1)fejie baat
 
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...Resilient Systems
 

Viewers also liked (11)

додаток №3 бібліотерапія
додаток №3 бібліотерапіядодаток №3 бібліотерапія
додаток №3 бібліотерапія
 
Pautas sencillas para establecer una buena relación con
Pautas sencillas para establecer una buena relación conPautas sencillas para establecer una buena relación con
Pautas sencillas para establecer una buena relación con
 
Happy Together Tour 2016
Happy Together Tour 2016Happy Together Tour 2016
Happy Together Tour 2016
 
Actividad 1 - Análisis del Cómic
Actividad 1 - Análisis del CómicActividad 1 - Análisis del Cómic
Actividad 1 - Análisis del Cómic
 
Cardiología
CardiologíaCardiología
Cardiología
 
книжка
книжкакнижка
книжка
 
2) Forrest Fishel - 2016 NCL Scouting Report
2) Forrest Fishel - 2016 NCL Scouting Report2) Forrest Fishel - 2016 NCL Scouting Report
2) Forrest Fishel - 2016 NCL Scouting Report
 
Capacidades perceptivo psicomotrices
Capacidades perceptivo psicomotricesCapacidades perceptivo psicomotrices
Capacidades perceptivo psicomotrices
 
CVJ_39319596_20170106161239 (1)
CVJ_39319596_20170106161239 (1)CVJ_39319596_20170106161239 (1)
CVJ_39319596_20170106161239 (1)
 
ARSHAD cv with pic
ARSHAD cv with picARSHAD cv with pic
ARSHAD cv with pic
 
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...
Industrial Control Systems 101 - Why Hack The Network If You Can Shut Down Th...
 

Similar to NTADOM TONY C. (RNPO) 2G, 3G & LTE Consultant Experience

Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singhlelin singh
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey
 
Venkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and OptimizationVenkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and OptimizationVENKATESAN THIRUNAVUKKARASU
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...Zafar Iqbal
 
Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17Atul Gupta
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015Girma Yilma
 
Vaibhav chewale resume@ aug 2016
Vaibhav chewale resume@ aug 2016Vaibhav chewale resume@ aug 2016
Vaibhav chewale resume@ aug 2016vaibhav chewale
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSaroja Bhoi
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resumesunil Saini
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 AJzF
 
SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)Sanjeev Gupta
 

Similar to NTADOM TONY C. (RNPO) 2G, 3G & LTE Consultant Experience (20)

SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
Venkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and OptimizationVenkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and Optimization
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
Vaibhav chewale resume@ aug 2016
Vaibhav chewale resume@ aug 2016Vaibhav chewale resume@ aug 2016
Vaibhav chewale resume@ aug 2016
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_Saroj
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 
Devender Kumar_CV
Devender Kumar_CVDevender Kumar_CV
Devender Kumar_CV
 
SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)
 

NTADOM TONY C. (RNPO) 2G, 3G & LTE Consultant Experience

  • 1. NTADOM TONY C. (RNPO) 2G, 3G & LTE (Consultant) Address: 12, Alhaji lawal Street, Moshalashi, Alagbado, Lagos state. Nigeria. Primary E-mail: ntadom.t@gmail.com Home Phone: +234- 818-162-7076 Work Phone: +234- 814-132-3515 Objectives: An articulate, well structured, Proactive, process and systems addicted professional with a multivendor and multiplatform experience in Telecoms project delivery. With a total of more than Eight years in the telecoms industry, the last six being in RF planning and optimization, all in 2G, 3G and LTE technologies. I desire to be part of a well structured and goal driven organization for optimum and maximum productivity. BIO-DATA Nationality: Nigerian Date of Birth: 27th August Religion: Christianity Gender: Male Language: English (Basic) Others. VENDORS: Ericsson & Huawei & Nokia Siemens Nokia. SKILLS SUMMARY Network Planning, Site Configuration, Site Auditing, Network Tuning, KPI Optimization and Monitoring, Drive Testing, Post Processing Analysis, Site Survey, E-Node B Commissioning and verification, single site and cluster optimization and field maintenance specialist . JOBS and EXPERIENCES. July 2010 till Date Huawei Technologies Nig. LTD (Outsourced) Nigeria (April 2013 till Date at MTN Project Nigeria) Key Skills and Work Experience. Team Lead DT CQT and Field Physical Optimization. GSM, WCDMA & LTE. LTE • Physically optimizing antennas to improve Coverage (RSRP), quality (RSRQ) and reduce interference Noise (SINR) and increase data throughput. • Drive testing sites in clusters for real time information gathering, analysis of the logs and giving recommendation for coverage and quality of service improvement. • Analysis of drive test Logs Using both Probe and Tems Discovery to improve the coverage foot print of Network by mapping out areas with coverage holes and recommendations of new site as required. • Pre and Post Drive test log analysis, to chart road map for cluster and whole network quality of service optimization. • Drive test and analysis of clusters for bandwidth increment on the network from 5Mhz to 10Mhz, and physically optimizing coverage to reduce pollution. • Single Site Verification test to check single sites performance before integration in a cluster so as to optimize effectively to augment the total network performance.
  • 2. • CSFB (Circuit Switch Fall Back test). Periodically carried out to monitor users experience switching in between LTE Data services and circuit switched voice calls. This is to improve latency time to fall back to LTE and all its inherent services. • Swap sector correction on site to improve quality and thereby increasing data throughput from users access end. • Tuning and retuning antennas for coverage penetration into difficult areas, both indoors and outdoors. • Improving handover between cells by detecting missing neighbors, overshooting cells and wrong neighbor definition to reduce drops by interference and improve quality of service. • High Level and VIP complaint handling. WCDMA & GSM • Conducting cluster drive Test and coordination of the same for 6 states in Nigeria having more than 2000 sites in total for network monitoring and QOS improvement. • Clustered drive test and analysis for 6Sector Implementation on the network, data gathering and recommendations for improvement. • Physical optimization of sites by tuning antennas tilt and Azimuth. This helps in reducing dropped calls and poor access to the network by mitigating and or totally removing interference on the network. • Tuning antennas with deep precision to cancel interference discovered from drive tests log analysis showing Pilot pollution to resolve poor quality (EC/LO) issues • Route Creation for specific job requirements. for example, during Node B rehoming, creating a cluster route to cover all the sites needed, performing pre and post Drives showing improvement and or Decrement in KPI’s and optimizing same for better NQI • Regular benchmarking drive test, to improve coverage and network Quality index within my region in comparison to other networks. • Hand over improvement by Neighbor optimization which are, detecting missing neighbors, over defined neighbors and coordinate verification of neighboring sites. • Feeder and inter or intra swap Correction to improve Call Drop rate, reduce call block rate and interference caused quality of service. • Physically optimizing sites to reduce pilot pollution, self-interference and external interference due to overshooting sites, this is to improve capacity on the site and HS user traffic improvement. • Drive test investigation for hidden network faults and resolution of same. • Drive test and physical optimization to improve traffic balancing and thereby improve Monitored KPI and Quality of service. • Post processing and analysis of DT log Files for 2G, WCDMA and LTE Drive Tests done in the whole region and outputting recommendations as the need arises. • Physical optimization to resolve SDCCH/TCH Drop thereby improving customer experience • Drive test report preparation and presentation in Power point, Excel and word formats. Radio Frequency Optimization. 2G
  • 3. • Daily monitoring of KPI, reporting and analyzing worst performing cells in the network in terms of CSSR, Availability, Call Drop and Block call rate. • Monitoring alarms, escalation and follow up for resolution. • Half rate optimization to improve block call rate and also reduce TCH drops due to congestion. • SDCCH channel tuning optimization to improve CSSR and reduce block rate • Frequency optimization, retuning, and re-planning for resolution of interference. • Interference analysis and resolution to improve users experience on call quality and eliminate call drops • Reporting daily KPI’s under my BSC for monitoring and improvement plan recommendation. • 1st level customer complaint handling and resolution. Radio Frequency Optimization LTE • Power control optimization reference signal power to improve throughput by reducing the excessive load on the cell. • ERAB CSSR Optimization, by optimizing access nodes on UU interface, • Blinding for good CSFB and access delay improvement. • Neighbor optimization to improve backward compatibility, and seamless handover for retain ability. • Power management for the reduction of failure rates, high throughput and better QOS. • Daily KPI parameter tuning and reporting for proactive resolution of issues that might arise in the future. SOFTWARE/HARWARE. • TECHNOLOGY: 2G and 3G. Currently on LTE. • SOFTWARE: Microsoft office advanced user(Excel, Access, Power point and Words, (MS Project), LMT, I-Manager; M2000, U2000, Map Info , GENEX Assistant, GENEX Probe, TEMs investigation 16.2,Discovery10.2, shell Scripting, Google Earth. ACTIX, ,. DAMS, PRS and NEMO ETC. ORGANISATIONAL AND SPECIAL SKILLS: • Coordinating with different resources in the projects to achieve smooth work performance for my projects. • Trained project manager and Member project management institute. • Good communicating and reporting skills, excel, PowerPoint and others. • A team player, motivator and leader in all sense of it. • Passionate, energetic and able to work well under pressure. • Addicted to excellence and success, so a fast learner and good idea innovator. ADVANCED QUALIFICATIONS & TRAININGS Projects Management Professional (certification in view) (Trained) Member: Project Management Institute I.D 2473874 PROJECTS involved under Huawei Technologies Nigeria co. LTD.
  • 4. MTN MS Project April 2014 till Oct 2016 MTN Network Performance Improvement Project August 2013 till March 2014 Airtel Swap Project 2G & 3G. July 2011 till August 2013 Airtel Swap Project July 2010 till June 2011 HOBBIES Swimming, travelling and reading. EDUCATION Bachelor of Science (Computer Science) 2008 Lagos State University. Ojo Lagos State, Nigeria.