This document provides an outline and classification system for constructions and construction services in India. It includes sections on various types of buildings (residential, industrial, commercial), civil engineering works (highways, bridges, tunnels), waterworks (dams, irrigation), and long-distance pipelines and power lines. Each section breaks down the types of constructions and services into multiple sub-categories and provides codes to classify them.