1) The document discusses results monitoring for Phase I and Phase II of the FLEG program. It outlines challenges in Phase I monitoring due to a lack of measurable indicators and baseline data.
2) For Phase II, a detailed results framework was developed with indicators to track progress at regional, national and sub-national levels. The framework includes project development objectives (PDO) and intermediate results indicators.
3) Reporting for Phase II will include country-level, organizational-level and program-level reporting according to set frequencies and guidelines. This will allow monitoring of progress toward intended objectives.
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...Tariq A. Deen
The session will provide details on: the tool developed by the LEG for monitoring and evaluating progress, effectiveness and gaps (PEG M&E tool) and its application in the process to formulate and implement NAPs; and the best practices for developing monitoring and evaluation (M&E) systems for adaptation at the national level. It will also look at the experiences of countries in developing and applying M&E systems at their national levels.
The document discusses conducting a Public Expenditure Tracking Survey (PETS) to assess the effectiveness and efficiency of agricultural public spending in Sub-Saharan Africa. A PETS examines how funds budgeted for key agricultural programs are delivered to intended beneficiaries. It involves tracking spending through administrative levels using surveys. The methodology can range from simple to complex depending on country context. Key steps include preparatory work, sampling, data collection and analysis, and reporting findings and recommendations to improve service delivery and spending effectiveness. The timeline for a PETS is typically 5 months but may be longer for more complex surveys.
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Performance Budgeting in the Canadian Federal Government by Kiran HanspalOECD Governance
Presentation by Kiran Hanspal at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Performance Budgeting: The French Experience by Veronique FouqueOECD Governance
Presentation by Veronique Fouque at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...Tariq A. Deen
The session will provide details on: the tool developed by the LEG for monitoring and evaluating progress, effectiveness and gaps (PEG M&E tool) and its application in the process to formulate and implement NAPs; and the best practices for developing monitoring and evaluation (M&E) systems for adaptation at the national level. It will also look at the experiences of countries in developing and applying M&E systems at their national levels.
The document discusses conducting a Public Expenditure Tracking Survey (PETS) to assess the effectiveness and efficiency of agricultural public spending in Sub-Saharan Africa. A PETS examines how funds budgeted for key agricultural programs are delivered to intended beneficiaries. It involves tracking spending through administrative levels using surveys. The methodology can range from simple to complex depending on country context. Key steps include preparatory work, sampling, data collection and analysis, and reporting findings and recommendations to improve service delivery and spending effectiveness. The timeline for a PETS is typically 5 months but may be longer for more complex surveys.
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
Performance Budgeting in the Canadian Federal Government by Kiran HanspalOECD Governance
Presentation by Kiran Hanspal at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Performance Budgeting: The French Experience by Veronique FouqueOECD Governance
Presentation by Veronique Fouque at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Agriculture Public Expenditure Workshop organized by the Strengthening National Comprehensive Agricultural Public Expenditure in Sub-Saharan Africa Program
Dar es Salaam, June 2013
Accra, Ghana, April 13-14, 2011
International Food Policy Research Institute (IFPRI) organized a three days Training Workshop on ‘Monitoring and Evaluation Methods’ on 10-12 March 2014 in New Delhi, India. The workshop is part of an IFAD grant to IFPRI to partner in the Monitoring and Evaluation component of the ongoing projects in the region. The three day workshop is intended to be a collaborative affair between project directors, M & E leaders and M & E experts. As part of the workshop, detailed interaction will take place on the evaluation routines involving sampling, questionnaire development, data collection and management techniques and production of an evaluation report. The workshop is designed to better understand the M & E needs of various projects that are at different stages of implementation. Both the generic issues involved in M & E programs as well as project specific needs will be addressed in the workshop. The objective of the workshop is to come up with a work plan for M & E domains in the IFAD projects and determine the possibilities of collaboration between IFPRI and project leaders.
The document discusses strategies for effectively allocating climate finance to implement national adaptation plans (NAPs). It recommends that climate change financing frameworks (CCFFs) can be used to integrate climate change into national planning and budgeting processes in order to plan funding for NAPs. CCFFs provide a robust framework for prioritizing adaptation actions based on factors like the scale of losses and damages addressed and the effectiveness of actions in reducing losses and damages. CCFFs also allow for developing financing scenarios, building capacity for climate budgeting and tracking climate expenditures, and facilitating monitoring, reporting and review of adaptation efforts.
Annual Results and Impact Evaluation Workshop for RBF - Day Five - Simultaneo...RBFHealth
The document discusses the benefits of simultaneously designing social programs and impact evaluations through examples from Mexico, Nigeria, Zambia, and Zimbabwe. It notes that simultaneous design allows the evaluation to establish the causal impact of the program, inform improvements, ensure broad coverage for validity, and increase local ownership and political support. Close collaboration between operational and evaluation teams is emphasized, including jointly defining interventions, outcomes, and data collection to maximize learning.
This document discusses changes made to the RIMS survey tool for project design and evaluation. RIMS+ includes an expanded questionnaire to collect additional data, use of a control group for impact evaluation, increased training and supervision, and GPS to locate households. These changes provide more detailed information but also increase costs. Benefits include better understanding of farmer constraints and intermediate outcomes to improve project design. Three RIMS+ surveys in Vietnam showed these modifications can generate useful results for project implementation.
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...OECD Governance
Presentation by Greg Orencsak at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
22.0a opm managing finance nap ws manila june 2017 part 1NAP Events
Climate Change Financing Frameworks (CCFFs) can support national adaptation plan (NAP) processes in several ways:
1. CCFFs provide a robust framework for prioritizing adaptation actions based on their effectiveness in addressing climate impacts and economic costs.
2. CCFFs can be used to develop long-term financing scenarios and strategies for accessing different sources of climate funds.
3. Applying CCFFs helps enhance government capacity to integrate climate change into public planning and budgeting.
4. CCFFs promote coordination across sectors and ministries by providing a common framework for climate budgeting.
The document discusses participatory performance monitoring systems (PPMS) for evaluating Andhra Pradesh State Irrigation Development Corporation's (APSIDC) lift irrigation schemes. It outlines the methodology, indicators, and tools that would be used for comprehensive PPMS covering all schemes. Key aspects of monitoring include goal and program assessment, secondary data analysis, learning from past studies, and sample studies of existing schemes. The outcomes of implementing social engineering programs for scheme management are also summarized.
Performance Budgeting in Austria by Monika Geppl and Stefan Kranabetter OECD Governance
Presentation by Monika Geppl and Stefan Kranabetter at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, KoreaOECD Governance
Presentation by Nowook Park, Korea, at the 11th annual meeting of the OECD Senior Budget Officials Performance and Results network, OECD, 26-27 November 2015.
Monitoring and Evaluation system for PFES: Key findings and policy recommenda...CIFOR-ICRAF
This presentation by Pham Thu Thuy, Karen Bennet, Vu Tan Phuong and Le Ngoc Dung shows the key findings for M&E for Environmental Service, Social Impact, PFES contract and financial flows.
Better data for better policies for better indicatorsOpenCoesione
"Better data for better policies for better indicators:
the role of Cohesion policy in Italy"
Seminar on strengthening ESIF policy indicators
Lisbon, 27 October 2014
This presentation gives an overview of the experiences of Uganda in climate change adaptation planning. This was presented by the Ugandan Government delegation in April 2014 at the NAP-GSP Africa Regional Training Workshop (Anglophone) in Addis Ababa, Ethiopia. This event gathered Government representatives from Ministries of Environment, Planning and Finance from 15 least developed African countries to consider the NAP process, which aims to address the medium to long–term climate change adaptation challenges for Africa.
More information: http://www.undp-alm.org/nap-regional-training-workshops-african-ldcs
The Least Developed Countries Expert Group (LEG) has developed National Adaptation Plan technical guidelines. These guidelines will assist developing countries in producing their National Adaptation Plans in a comprehensive and strategic manner.
More information: http://undp-alm.org/resources/training-tools/national-adaptation-plans-technical-guidelines-nap-process
The document discusses the National Adaptation Plan (NAP) process for Least Developed Countries. It provides an overview of the following:
1. The mandate and guidelines for the NAP process, which aim to facilitate medium- and long-term planning to address climate change adaptation needs.
2. The key elements and steps of the NAP process outlined in the technical guidelines, including laying the groundwork, assessments, implementation strategies, and monitoring.
3. Resources available to support countries in undertaking the NAP process, such as the technical guidelines, presentations, and case studies accessible through the NAP Central website.
4. The current status of the NAP process, including regional trainings
Performance Budgeting: Lessons and Challenges from Korea by Jangro LeeOECD Governance
Presentation by Jangro Lee at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners OECD Governance
Presentation by Martin Kelleners at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Aligning the centre and line ministries - Mark Bussow, United StatesOECD Governance
The document discusses creating alignment between the federal government's central offices and agencies. It notes the diversity among agencies in terms of size, mission, activities, and autonomy. The central offices, like OMB, aim to promote alignment through quarterly performance reporting, priority goal-setting, strategic reviews, and regular meetings. Achieving the right balance between centralized direction and decentralized execution is key. The governance structure involves central leadership and coordination mechanisms between OMB and agency leaders.
A mitchell results & lessons learned-sep29ENPI FLEG
This document summarizes the results of the 1st Steering Committee Meeting for the FLEG I project from October 1-3, 2013 in Minsk. The project aimed to contribute to legal and sustainable forest management, strengthened rule of law, and improved local livelihoods through implementing priorities from the St. Petersburg Declaration. Key results included increased awareness, effective national and regional FLEG processes, improved capacity and collaboration. Interventions included forest policy development, certification, and training. Lessons highlighted the complexity of FLEG issues and importance of stakeholder engagement, country ownership, and program flexibility.
Monitoring and Evaluation of NAP: Brazil’s experience | Nelcilandia Pereira d...NAP Global Network
Presentation by Nelcilandia Pereira de Oliveira, Brazil's Ministry of Environment, as part of the NAP Global Network's Targeted Topics Forum held in Nadi, Fiji, in February 2018.
International Food Policy Research Institute (IFPRI) organized a three days Training Workshop on ‘Monitoring and Evaluation Methods’ on 10-12 March 2014 in New Delhi, India. The workshop is part of an IFAD grant to IFPRI to partner in the Monitoring and Evaluation component of the ongoing projects in the region. The three day workshop is intended to be a collaborative affair between project directors, M & E leaders and M & E experts. As part of the workshop, detailed interaction will take place on the evaluation routines involving sampling, questionnaire development, data collection and management techniques and production of an evaluation report. The workshop is designed to better understand the M & E needs of various projects that are at different stages of implementation. Both the generic issues involved in M & E programs as well as project specific needs will be addressed in the workshop. The objective of the workshop is to come up with a work plan for M & E domains in the IFAD projects and determine the possibilities of collaboration between IFPRI and project leaders.
The document discusses strategies for effectively allocating climate finance to implement national adaptation plans (NAPs). It recommends that climate change financing frameworks (CCFFs) can be used to integrate climate change into national planning and budgeting processes in order to plan funding for NAPs. CCFFs provide a robust framework for prioritizing adaptation actions based on factors like the scale of losses and damages addressed and the effectiveness of actions in reducing losses and damages. CCFFs also allow for developing financing scenarios, building capacity for climate budgeting and tracking climate expenditures, and facilitating monitoring, reporting and review of adaptation efforts.
Annual Results and Impact Evaluation Workshop for RBF - Day Five - Simultaneo...RBFHealth
The document discusses the benefits of simultaneously designing social programs and impact evaluations through examples from Mexico, Nigeria, Zambia, and Zimbabwe. It notes that simultaneous design allows the evaluation to establish the causal impact of the program, inform improvements, ensure broad coverage for validity, and increase local ownership and political support. Close collaboration between operational and evaluation teams is emphasized, including jointly defining interventions, outcomes, and data collection to maximize learning.
This document discusses changes made to the RIMS survey tool for project design and evaluation. RIMS+ includes an expanded questionnaire to collect additional data, use of a control group for impact evaluation, increased training and supervision, and GPS to locate households. These changes provide more detailed information but also increase costs. Benefits include better understanding of farmer constraints and intermediate outcomes to improve project design. Three RIMS+ surveys in Vietnam showed these modifications can generate useful results for project implementation.
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...OECD Governance
Presentation by Greg Orencsak at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
22.0a opm managing finance nap ws manila june 2017 part 1NAP Events
Climate Change Financing Frameworks (CCFFs) can support national adaptation plan (NAP) processes in several ways:
1. CCFFs provide a robust framework for prioritizing adaptation actions based on their effectiveness in addressing climate impacts and economic costs.
2. CCFFs can be used to develop long-term financing scenarios and strategies for accessing different sources of climate funds.
3. Applying CCFFs helps enhance government capacity to integrate climate change into public planning and budgeting.
4. CCFFs promote coordination across sectors and ministries by providing a common framework for climate budgeting.
The document discusses participatory performance monitoring systems (PPMS) for evaluating Andhra Pradesh State Irrigation Development Corporation's (APSIDC) lift irrigation schemes. It outlines the methodology, indicators, and tools that would be used for comprehensive PPMS covering all schemes. Key aspects of monitoring include goal and program assessment, secondary data analysis, learning from past studies, and sample studies of existing schemes. The outcomes of implementing social engineering programs for scheme management are also summarized.
Performance Budgeting in Austria by Monika Geppl and Stefan Kranabetter OECD Governance
Presentation by Monika Geppl and Stefan Kranabetter at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, KoreaOECD Governance
Presentation by Nowook Park, Korea, at the 11th annual meeting of the OECD Senior Budget Officials Performance and Results network, OECD, 26-27 November 2015.
Monitoring and Evaluation system for PFES: Key findings and policy recommenda...CIFOR-ICRAF
This presentation by Pham Thu Thuy, Karen Bennet, Vu Tan Phuong and Le Ngoc Dung shows the key findings for M&E for Environmental Service, Social Impact, PFES contract and financial flows.
Better data for better policies for better indicatorsOpenCoesione
"Better data for better policies for better indicators:
the role of Cohesion policy in Italy"
Seminar on strengthening ESIF policy indicators
Lisbon, 27 October 2014
This presentation gives an overview of the experiences of Uganda in climate change adaptation planning. This was presented by the Ugandan Government delegation in April 2014 at the NAP-GSP Africa Regional Training Workshop (Anglophone) in Addis Ababa, Ethiopia. This event gathered Government representatives from Ministries of Environment, Planning and Finance from 15 least developed African countries to consider the NAP process, which aims to address the medium to long–term climate change adaptation challenges for Africa.
More information: http://www.undp-alm.org/nap-regional-training-workshops-african-ldcs
The Least Developed Countries Expert Group (LEG) has developed National Adaptation Plan technical guidelines. These guidelines will assist developing countries in producing their National Adaptation Plans in a comprehensive and strategic manner.
More information: http://undp-alm.org/resources/training-tools/national-adaptation-plans-technical-guidelines-nap-process
The document discusses the National Adaptation Plan (NAP) process for Least Developed Countries. It provides an overview of the following:
1. The mandate and guidelines for the NAP process, which aim to facilitate medium- and long-term planning to address climate change adaptation needs.
2. The key elements and steps of the NAP process outlined in the technical guidelines, including laying the groundwork, assessments, implementation strategies, and monitoring.
3. Resources available to support countries in undertaking the NAP process, such as the technical guidelines, presentations, and case studies accessible through the NAP Central website.
4. The current status of the NAP process, including regional trainings
Performance Budgeting: Lessons and Challenges from Korea by Jangro LeeOECD Governance
Presentation by Jangro Lee at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners OECD Governance
Presentation by Martin Kelleners at the 10th annual meeting of the Senior Budget Officials Performance and Results Network held on 24-25 November 2014. Find more information at http://www.oecd.org/gov/budgeting
Aligning the centre and line ministries - Mark Bussow, United StatesOECD Governance
The document discusses creating alignment between the federal government's central offices and agencies. It notes the diversity among agencies in terms of size, mission, activities, and autonomy. The central offices, like OMB, aim to promote alignment through quarterly performance reporting, priority goal-setting, strategic reviews, and regular meetings. Achieving the right balance between centralized direction and decentralized execution is key. The governance structure involves central leadership and coordination mechanisms between OMB and agency leaders.
A mitchell results & lessons learned-sep29ENPI FLEG
This document summarizes the results of the 1st Steering Committee Meeting for the FLEG I project from October 1-3, 2013 in Minsk. The project aimed to contribute to legal and sustainable forest management, strengthened rule of law, and improved local livelihoods through implementing priorities from the St. Petersburg Declaration. Key results included increased awareness, effective national and regional FLEG processes, improved capacity and collaboration. Interventions included forest policy development, certification, and training. Lessons highlighted the complexity of FLEG issues and importance of stakeholder engagement, country ownership, and program flexibility.
Monitoring and Evaluation of NAP: Brazil’s experience | Nelcilandia Pereira d...NAP Global Network
Presentation by Nelcilandia Pereira de Oliveira, Brazil's Ministry of Environment, as part of the NAP Global Network's Targeted Topics Forum held in Nadi, Fiji, in February 2018.
This document summarizes the minutes from a steering committee meeting for the ENPI East Countries FLEG II Regional Workplan. The summary includes:
1) Key results from the previous FLEG I program including regional conferences, studies conducted, and celebration of the International Year of Forests.
2) Context for upcoming regional activities including important forestry conferences and events in the international calendar.
3) Examples of existing regional forestry programs in ENPI countries and their objectives to improve forest governance and management.
4) The objectives and components of the FLEG II workplan focus on implementing the 2005 St. Petersburg FLEG declaration and improving knowledge of sustainable forest management.
The document discusses monitoring and evaluation (M&E) of public health projects. It provides examples of M&E plans that include objectives, interventions, indicators, targets, data collection methods, frequencies, and responsibilities. Specifically, it shows how to develop a monitoring plan by determining what to monitor, how to collect data, who is involved, resources needed, and creating a workplan. It also distinguishes between monitoring and evaluation and provides templates to plan for monitoring achievement of outputs and progress toward objectives. The key aspects of M&E planning discussed are tying indicators to objectives and interventions, establishing data collection methods and responsibilities, and monitoring on a regular basis to track progress.
This document provides guidance on developing monitoring plans for public health projects and activities. It discusses the importance of monitoring and evaluation for demonstrating impact, accountability and improving future work. Key points covered include:
- Monitoring should track a limited number of key indicators to collect minimal but useful information. Both quantitative and qualitative data should be gathered through routine systems and field visits.
- A monitoring plan should specify what will be monitored, how through appropriate methods, who will be responsible for collection and reporting, and when through determined frequencies. Baseline data and indicators need to be established.
- Examples of monitoring plans for different types of interventions are provided, including sectoral, integrated IEC, value-added, and linked interventions.
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...NAP Events
Presented by: Thinley Namgyel
8.3 Monitoring and evaluation
The session will provide details on: the tool developed by the LEG for monitoring and evaluating progress, effectiveness and gaps (PEG M&E tool) and its application in the process to formulate and implement NAPs; and the best practices for developing monitoring and evaluation (M&E) systems for adaptation at the national level. It will also look at the experiences of countries in developing and applying M&E systems at their national levels.
The document describes a compendium of projects from the IDMP CEE project. The compendium will contain 6 chapters summarizing activities related to drought management, monitoring, reducing impacts, EU projects, and communication. Each activity will include descriptions of objectives, methods, outputs, and results. The compendium aims to share knowledge and lessons learned from the project activities.
The document describes a compendium of a drought management project in Central and Eastern Europe. The compendium will contain summaries of the project's activities and their outputs. It will have six chapters organized by theme, such as drought monitoring and forecasting, and measures to reduce drought impacts. Each activity summary will describe the activity's objective, methodology, outputs, and its contribution to drought management. The compendium aims to showcase the project's work in order to help others facing drought challenges in the region.
The document discusses biodiversity indicators for monitoring the Kunming-Montreal Global Biodiversity Framework agreed upon at COP15. It provides context on the history of biodiversity indicators in CBD discussions and lessons learned. Currently, 26 headline indicators have been agreed for the monitoring framework, but 10 still require methodology development. Issues being discussed include identifying gaps, aggregating and disaggregating data, guidance for parties, and inclusion of all stakeholders. The ad-hoc technical expert group will review existing indicators and provide recommendations to help operationalize the monitoring framework.
The document discusses biodiversity indicators for monitoring the Kunming-Montreal Global Biodiversity Framework agreed upon at COP15. It provides context on the history of biodiversity indicators in CBD discussions and lessons learned. Currently, 26 headline indicators have been agreed for the monitoring framework, but 10 still require methodology development. Issues being discussed include identifying gaps, aggregating and disaggregating data, guidance for parties, and inclusion of all stakeholders. The ad-hoc technical expert group will review existing indicators and provide recommendations to help operationalize the monitoring framework.
The document discusses the development of the WHO's 13th General Programme of Work (GPW13) Results Framework for measuring impact. It provides an update on progress, including developing 46 outcome indicators and milestones aligned with the six GPW13 themes. It outlines next steps in finalizing the framework through additional member state consultations, establishing baselines and milestones, and reporting to the Executive Board and World Health Assembly. The goal is to obtain joint commitment for implementing the framework to measure GPW13 progress and impact.
This document outlines the process for developing an Operational Programme (OP) for allocating EU structural funds. It discusses:
1) The requirements and key contents of an OP, including a SWOT analysis, strategic objectives, financial plan, and indicators.
2) The multi-stage OP preparation process, including organizing stakeholders, conducting a SWOT analysis, setting strategic goals and priorities, allocating budgets, and undergoing an ex-ante evaluation.
3) The roles of various stakeholders in the OP development and approval process, which requires coordination between the candidate country, EU, and other national and regional partners.
Application package of National Control Board AIESEC MoC 14-15 Anastasiia Isakii
The document outlines the structure and roles of a National Control Board being implemented to ensure high quality experiences for members in 2015. It describes the purpose, profiles, capacities, and job descriptions of the Quality Head Chair, Quality Head Coordinator, Local Quality Head, and Quality Experience Chair and Coordinator who will work at the national, regional, and local levels to monitor quality standards, response rates, and customer experience. Their responsibilities include tracking issues, increasing response rates, auditing quality, coordinating training, and ensuring clear communication across all levels of the organization.
E-PASS Inception Project Management and Oversightepass2015
The document discusses the Global Environmental Facility (GEF) and outlines its role in financing projects that benefit global environmental issues. It then summarizes UNDP's responsibilities in implementing GEF-funded projects, including delegation of authority, monitoring and evaluation, and reporting. The document also provides an overview of the typical project cycle from approval through closure. It emphasizes the importance of adaptive management and being responsive to changes during implementation. Key aspects of reporting progress like inception reports and annual project implementation reviews are also summarized. Finally, the document outlines UNDP's risk management system for GEF projects.
Developing National Adaptation Monitoring and Evaluation SystemsNAP Global Network
Presentation by Timo Leiter, GIZ, for the webinar "Monitoring and Evaluation (M&E) in the National Adaptation Plan (NAP) Process."
You can watch a recording of the webinar here: https://www.youtube.com/watch?v=GIqbygK6obE
Juliet Martinez, Reporting, Risk and Evaluation, FMO, Brussels
Juliet is British/Mexican and was previously working as a policy analyst in DG Regional and Urban Policy at the EC in Brussels.
She, amongst others, was responsible for the ERDF and Cohesion Fund programmes in the Czech Republic, Sweden and Finland and for the coordination of the European Semester process and the EU 2020 review.
In May 2021, the NAP Global Network conducted a review of the available NAP progress reports. The results indicate that these reports use different objectives, approaches to evaluating progress, and ways in which the results are presented and communicated. The process of developing a progress report seems to present as many challenges as it does opportunities to strengthen NAP processes.
Similar to Nina rinnerberger results monitoring and reporting (20)
The document summarizes the key results and activities of the FLEG II Country Program in Armenia from 2013 to 2016. It discusses priority areas including improving forest law and policy, building human capacity, increasing public awareness, strengthening sustainable forest management, and improving FLEG planning and monitoring. Key results included establishing public monitoring of forests to empower citizens to protect forests, training volunteers, using satellite imagery, and generating media attention. The program also introduced briquetting to reduce fuelwood consumption and donated efficient stoves. An exit strategy is to transition to a forest landscape restoration approach building on FLEG successes.
The document summarizes the 4th Steering Committee Meeting held in Brussels, Belgium on December 12-13, 2016. It provides an overview of Azerbaijan's country presentation, including key priority areas from 2013 to 2016 such as developing a young foresters' movement and strengthening staff capacity in the forest sector. It also outlines key results achieved in areas like sustainable forest management, training programs, and climate change adaptation. Ideas for future initiatives are presented, such as restoring forest landscapes and introducing information technologies to support forest management and monitoring.
Belarus' country priorities from 2013-2016 included updating forest policy and legislation, optimizing forest management systems, improving forestry training, and forest communication strategies. Key results included supporting strategic planning reforms through 2030, passing a new Forestry Code in 2016, and improving timber tracking systems. Forest managers participated in study tours and workshops on sustainable practices. FLEG helped introduce dialogue and new economic opportunities for rural communities based on forests. FLEG-supported policies will regulate ongoing forest management and strengthen international cooperation.
1) The document summarizes key results from Georgia's FLEG II Program from 2013-2016, including drafting a new Forest Code, developing supporting legislation, and building capacity of government institutions and forest users.
2) The program supported sustainable forest management practices through developing sustainable forest management plans, facilitating natural regeneration, and establishing a protected area. It also increased public awareness through educational activities.
3) A success story highlighted a video contest winner that depicted program objectives simply. Another success was reaching an agreement to manage the forests of Tusheti Protected Landscape locally, though it presented challenges of an unprecedented institutional setup and capacity building needs.
The 4th Steering Committee Meeting covered Moldova's priority areas in forest law enforcement and governance (FLEG) from 2013 to 2016. Key results included reforms to Moldova's forest institutional structure based on FLEG data, expanded forested areas, and development of a wood traceability system. Capacity building efforts trained local stakeholders in sustainable forest management. Outreach increased public awareness of FLEG through media coverage and educational events. An exit strategy was discussed to sustain FLEG progress through existing agencies like Moldsilva and projects from the World Bank and IUCN.
The document summarizes key results from Russia's participation in the FLEG II program from 2013 to 2016. The priority areas included improving FLEG planning and monitoring, building human resource capacity, facilitating actions by forest companies, safeguarding community rights, and increasing transparency. Key results included developing modular education programs, publishing recommendations to improve regulations, conducting surveys of suppliers to the EU market, and preparing maps and assessments of sustainable forest management. The exit strategy focused on delegating activities, transferring products, institutionalizing processes, and finding alternative funding. The program engaged stakeholders across Russia and in neighboring countries.
The 4th Steering Committee Meeting for Ukraine's country presentation summarized key results from 2013 to 2016 under the FLEG-2 Program. Priority areas included supporting forest policy and strategy dialogue, improving forest law enforcement and governance, and increasing transparency and public awareness. Despite challenges, the program team maintained priorities of reforming the forest sector. Key results included analytical works that informed legislative reforms, increased awareness of forest issues, and trainings on topics like GIS and forest management. An exit strategy aims to continue efforts through working groups, experts on committees, and NGO partnerships to further reforms and ensure sustainability of the FLEG-2 Program's initiatives.
The members of the "FLEG II Program - Complementary Measures for Georgia and Armenia" met in Armenia to discuss progress and plan future activities. The meeting reviewed recommendations from the main FLEG II program and the mid-term review. Country representatives from Armenia and Georgia presented updates and work plans for the coming year. The meeting approved the country work plans with some modifications. The program will continue supporting forestry policy development, sustainable forest management, and capacity building in Armenia and Georgia.
International experience in development of timber tracking systemsENPI FLEG
The document provides an overview of timber tracking systems used internationally. It describes systems used in several tropical timber exporting countries as well as some European countries. For the tropical countries, it outlines timber tracking systems that are state-mandated and aim to monitor timber flows from harvest to processing. These systems use a mix of individual log identification methods like tagging alongside balance-based monitoring of timber volumes. The systems described aim to establish oversight and legality across international supply chains for timber trade.
Analysis of legislation and practice of hunting in some EU countriesENPI FLEG
This document provides a summary of the legal hunting framework in EU countries. Key points include:
1) Hunting is primarily regulated by the EU Birds Directive (1979) and Habitats Directive (1992) which member states must comply with.
2) International conventions like CITES, CMS, and the Bern Convention also influence hunting policy.
3) The EU has established guidelines for sustainable hunting practices and collects hunting statistics to monitor bird populations.
4) Sustainable hunting is supported through the Natura 2000 protected areas network, involving hunters in habitat and species management.
Programming Foundation Models with DSPy - Meetup SlidesZilliz
Prompting language models is hard, while programming language models is easy. In this talk, I will discuss the state-of-the-art framework DSPy for programming foundation models with its powerful optimizers and runtime constraint system.
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slackshyamraj55
Discover the seamless integration of RPA (Robotic Process Automation), COMPOSER, and APM with AWS IDP enhanced with Slack notifications. Explore how these technologies converge to streamline workflows, optimize performance, and ensure secure access, all while leveraging the power of AWS IDP and real-time communication via Slack notifications.
Ivanti’s Patch Tuesday breakdown goes beyond patching your applications and brings you the intelligence and guidance needed to prioritize where to focus your attention first. Catch early analysis on our Ivanti blog, then join industry expert Chris Goettl for the Patch Tuesday Webinar Event. There we’ll do a deep dive into each of the bulletins and give guidance on the risks associated with the newly-identified vulnerabilities.
In the rapidly evolving landscape of technologies, XML continues to play a vital role in structuring, storing, and transporting data across diverse systems. The recent advancements in artificial intelligence (AI) present new methodologies for enhancing XML development workflows, introducing efficiency, automation, and intelligent capabilities. This presentation will outline the scope and perspective of utilizing AI in XML development. The potential benefits and the possible pitfalls will be highlighted, providing a balanced view of the subject.
We will explore the capabilities of AI in understanding XML markup languages and autonomously creating structured XML content. Additionally, we will examine the capacity of AI to enrich plain text with appropriate XML markup. Practical examples and methodological guidelines will be provided to elucidate how AI can be effectively prompted to interpret and generate accurate XML markup.
Further emphasis will be placed on the role of AI in developing XSLT, or schemas such as XSD and Schematron. We will address the techniques and strategies adopted to create prompts for generating code, explaining code, or refactoring the code, and the results achieved.
The discussion will extend to how AI can be used to transform XML content. In particular, the focus will be on the use of AI XPath extension functions in XSLT, Schematron, Schematron Quick Fixes, or for XML content refactoring.
The presentation aims to deliver a comprehensive overview of AI usage in XML development, providing attendees with the necessary knowledge to make informed decisions. Whether you’re at the early stages of adopting AI or considering integrating it in advanced XML development, this presentation will cover all levels of expertise.
By highlighting the potential advantages and challenges of integrating AI with XML development tools and languages, the presentation seeks to inspire thoughtful conversation around the future of XML development. We’ll not only delve into the technical aspects of AI-powered XML development but also discuss practical implications and possible future directions.
For the full video of this presentation, please visit: https://www.edge-ai-vision.com/2024/06/building-and-scaling-ai-applications-with-the-nx-ai-manager-a-presentation-from-network-optix/
Robin van Emden, Senior Director of Data Science at Network Optix, presents the “Building and Scaling AI Applications with the Nx AI Manager,” tutorial at the May 2024 Embedded Vision Summit.
In this presentation, van Emden covers the basics of scaling edge AI solutions using the Nx tool kit. He emphasizes the process of developing AI models and deploying them globally. He also showcases the conversion of AI models and the creation of effective edge AI pipelines, with a focus on pre-processing, model conversion, selecting the appropriate inference engine for the target hardware and post-processing.
van Emden shows how Nx can simplify the developer’s life and facilitate a rapid transition from concept to production-ready applications.He provides valuable insights into developing scalable and efficient edge AI solutions, with a strong focus on practical implementation.
Taking AI to the Next Level in Manufacturing.pdfssuserfac0301
Read Taking AI to the Next Level in Manufacturing to gain insights on AI adoption in the manufacturing industry, such as:
1. How quickly AI is being implemented in manufacturing.
2. Which barriers stand in the way of AI adoption.
3. How data quality and governance form the backbone of AI.
4. Organizational processes and structures that may inhibit effective AI adoption.
6. Ideas and approaches to help build your organization's AI strategy.
Have you ever been confused by the myriad of choices offered by AWS for hosting a website or an API?
Lambda, Elastic Beanstalk, Lightsail, Amplify, S3 (and more!) can each host websites + APIs. But which one should we choose?
Which one is cheapest? Which one is fastest? Which one will scale to meet our needs?
Join me in this session as we dive into each AWS hosting service to determine which one is best for your scenario and explain why!
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUpanagenda
Webinar Recording: https://www.panagenda.com/webinars/hcl-notes-und-domino-lizenzkostenreduzierung-in-der-welt-von-dlau/
DLAU und die Lizenzen nach dem CCB- und CCX-Modell sind für viele in der HCL-Community seit letztem Jahr ein heißes Thema. Als Notes- oder Domino-Kunde haben Sie vielleicht mit unerwartet hohen Benutzerzahlen und Lizenzgebühren zu kämpfen. Sie fragen sich vielleicht, wie diese neue Art der Lizenzierung funktioniert und welchen Nutzen sie Ihnen bringt. Vor allem wollen Sie sicherlich Ihr Budget einhalten und Kosten sparen, wo immer möglich. Das verstehen wir und wir möchten Ihnen dabei helfen!
Wir erklären Ihnen, wie Sie häufige Konfigurationsprobleme lösen können, die dazu führen können, dass mehr Benutzer gezählt werden als nötig, und wie Sie überflüssige oder ungenutzte Konten identifizieren und entfernen können, um Geld zu sparen. Es gibt auch einige Ansätze, die zu unnötigen Ausgaben führen können, z. B. wenn ein Personendokument anstelle eines Mail-Ins für geteilte Mailboxen verwendet wird. Wir zeigen Ihnen solche Fälle und deren Lösungen. Und natürlich erklären wir Ihnen das neue Lizenzmodell.
Nehmen Sie an diesem Webinar teil, bei dem HCL-Ambassador Marc Thomas und Gastredner Franz Walder Ihnen diese neue Welt näherbringen. Es vermittelt Ihnen die Tools und das Know-how, um den Überblick zu bewahren. Sie werden in der Lage sein, Ihre Kosten durch eine optimierte Domino-Konfiguration zu reduzieren und auch in Zukunft gering zu halten.
Diese Themen werden behandelt
- Reduzierung der Lizenzkosten durch Auffinden und Beheben von Fehlkonfigurationen und überflüssigen Konten
- Wie funktionieren CCB- und CCX-Lizenzen wirklich?
- Verstehen des DLAU-Tools und wie man es am besten nutzt
- Tipps für häufige Problembereiche, wie z. B. Team-Postfächer, Funktions-/Testbenutzer usw.
- Praxisbeispiele und Best Practices zum sofortigen Umsetzen
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfChart Kalyan
A Mix Chart displays historical data of numbers in a graphical or tabular form. The Kalyan Rajdhani Mix Chart specifically shows the results of a sequence of numbers over different periods.
Skybuffer SAM4U tool for SAP license adoptionTatiana Kojar
Manage and optimize your license adoption and consumption with SAM4U, an SAP free customer software asset management tool.
SAM4U, an SAP complimentary software asset management tool for customers, delivers a detailed and well-structured overview of license inventory and usage with a user-friendly interface. We offer a hosted, cost-effective, and performance-optimized SAM4U setup in the Skybuffer Cloud environment. You retain ownership of the system and data, while we manage the ABAP 7.58 infrastructure, ensuring fixed Total Cost of Ownership (TCO) and exceptional services through the SAP Fiori interface.
GraphRAG for Life Science to increase LLM accuracyTomaz Bratanic
GraphRAG for life science domain, where you retriever information from biomedical knowledge graphs using LLMs to increase the accuracy and performance of generated answers
5th LF Energy Power Grid Model Meet-up SlidesDanBrown980551
5th Power Grid Model Meet-up
It is with great pleasure that we extend to you an invitation to the 5th Power Grid Model Meet-up, scheduled for 6th June 2024. This event will adopt a hybrid format, allowing participants to join us either through an online Mircosoft Teams session or in person at TU/e located at Den Dolech 2, Eindhoven, Netherlands. The meet-up will be hosted by Eindhoven University of Technology (TU/e), a research university specializing in engineering science & technology.
Power Grid Model
The global energy transition is placing new and unprecedented demands on Distribution System Operators (DSOs). Alongside upgrades to grid capacity, processes such as digitization, capacity optimization, and congestion management are becoming vital for delivering reliable services.
Power Grid Model is an open source project from Linux Foundation Energy and provides a calculation engine that is increasingly essential for DSOs. It offers a standards-based foundation enabling real-time power systems analysis, simulations of electrical power grids, and sophisticated what-if analysis. In addition, it enables in-depth studies and analysis of the electrical power grid’s behavior and performance. This comprehensive model incorporates essential factors such as power generation capacity, electrical losses, voltage levels, power flows, and system stability.
Power Grid Model is currently being applied in a wide variety of use cases, including grid planning, expansion, reliability, and congestion studies. It can also help in analyzing the impact of renewable energy integration, assessing the effects of disturbances or faults, and developing strategies for grid control and optimization.
What to expect
For the upcoming meetup we are organizing, we have an exciting lineup of activities planned:
-Insightful presentations covering two practical applications of the Power Grid Model.
-An update on the latest advancements in Power Grid -Model technology during the first and second quarters of 2024.
-An interactive brainstorming session to discuss and propose new feature requests.
-An opportunity to connect with fellow Power Grid Model enthusiasts and users.
Webinar: Designing a schema for a Data WarehouseFederico Razzoli
Are you new to data warehouses (DWH)? Do you need to check whether your data warehouse follows the best practices for a good design? In both cases, this webinar is for you.
A data warehouse is a central relational database that contains all measurements about a business or an organisation. This data comes from a variety of heterogeneous data sources, which includes databases of any type that back the applications used by the company, data files exported by some applications, or APIs provided by internal or external services.
But designing a data warehouse correctly is a hard task, which requires gathering information about the business processes that need to be analysed in the first place. These processes must be translated into so-called star schemas, which means, denormalised databases where each table represents a dimension or facts.
We will discuss these topics:
- How to gather information about a business;
- Understanding dictionaries and how to identify business entities;
- Dimensions and facts;
- Setting a table granularity;
- Types of facts;
- Types of dimensions;
- Snowflakes and how to avoid them;
- Expanding existing dimensions and facts.
Threats to mobile devices are more prevalent and increasing in scope and complexity. Users of mobile devices desire to take full advantage of the features
available on those devices, but many of the features provide convenience and capability but sacrifice security. This best practices guide outlines steps the users can take to better protect personal devices and information.
National Security Agency - NSA mobile device best practices
Nina rinnerberger results monitoring and reporting
1. 1st Steering Committee Meeting
Minsk, October 1-3, 2013
Results Monitoring at Program and
Country Levels
2. Overview
1. Results Monitoring & Challenges in
Phase I
2. Lessons Learned & Results Framework
for FLEG II Program
3. Reporting on Program & Country Level
3. Results Monitoring - FLEG I
• FLEG I Program monitored progress for
seven results areas
– Tracked results in each country and regionally
– Based on qualitative assessments by the country
teams and anecdotal evidence
• No results framework with measurable
indicators was developed
4. Challenges
• How to monitor the impacts of FLEG Program
interventions?
– With hundreds of activities implemented, there is anecdotal
evidence that the impact of FLEG I has been large
– No baseline survey conducted
– Progress towards higher level outcomes is difficult to judge
quantitatively
E.g., development of forestrelated educational materials in
Azerbaijan
(“Young Foresters‟ School”)
6. Lessons Learned
Robust and comprehensive results monitoring
is key to measuring impacts and judging higher
level impacts quantitatively
7. Measuring Results for FLEG II
• New Feature for Phase II:
Detailed Results Framework developed
• Indicators track progress at regional, national, and subnational level
• Responsibility for monitoring and data collection: PCTs
and/or PMT
8. Types of Indicators
• Project Development Objective (PDO)
Indicators
– 3 Core Sector Indicators (World Bank-wide)
– 4 Custom Indicators (FLEG II Program specific)
• Intermediate Results Indicators
– 7 Custom Indicators
(FLEG II Program specific)
9. Project Development Objective Indicators
Core Sector Indicators (CSI)
1. Reforms in forest policy, legislation or other
regulations supported
2. Government institutions provided with capacity
building to improve management of forest
resources
3. Forest users trained (by gender and ethnicity)
10. Reforms in forest policy, legislation or other
regulations supported
• Linked with PDO 1 (regional level): make progress
implementing the 2005 St. Petersburg FLEG Ministerial Declaration
in the participating countries and support the participating
countries commit to a time-bound action plan to ensure its
implementation and follow-up activities.
– Measures whether a project has supported forest
sector reforms (Yes/No)
• General ongoing policy dialogue with stakeholders
should not be included
– Baseline: „No‟
– Frequency: annual
Core Sector Indicator 1
11. Government institutions provided with capacity building to
improve management of forest resources
• Linked with PDO 1 (regional level)
– Covers capacity-building aimed at strengthening
forest administration institutions to deliver services to
the forest sector
• Refers to the number of national or sub-national
institutions that have received capacity building
• Targeted institutions may be outside of the forestry
sector
– Baseline: „zero‟
– Frequency: annual
Core Sector Indicator 2
12. Forest users trained
• Linked with PDO 1 (regional level)
• Refers to the number of forest users and
community members that have received
capacity building through training
– 2 Sub-indicators by:
• gender (female)
• ethnic minority/indigenous people
– Baseline: „zero‟
– Frequency: annual
Core Sector Indicator 3
13. Custom Indicators (PDO level)
Results Framework
Project Development Objective Indicators
Cumulative Target values
Indicator Name
Credible process
toward the
implementation of the
St. Petersburg
declaration launched
Understanding and
implementation of
FLEG principles by
forest practitioners and
other stakeholders
improved
Core
Unit of
Measure
Percentage
Responsibility
Data Source/
Baseline
End Frequency Methodology for Data
YR1 YR2 YR3 YR4
Collection
Target
0.00
Percentage x% Based
of
on survey
practitioners results
100
annual
Program
reports
PCT/PMT
TBD
Twice,
baseline
and final
surveys
Repeated
perception
surveys of key
decision
makers
PMT
14. Custom Indicators (PDO level)
Results Framework
Project Development Objective Indicators
Cumulative Target values
Indicator Name
Uptake of best practice
models on sustainable
forest management
Increased awareness
of decision makers of
modern technology
and information to
improve forest law
enforcement and
governance
Core
Unit of
Measure
Yes/No
Responsibility
Data Source/
Baseline
End Frequency Methodology for Data
YR1 YR2 YR3 YR4
Collection
Target
No
Percentage x% Based
of Decision on survey
Makers
results
Yes
annual
Program
reports
PCT/PMT
TBD
Twice,
baseline
and final
surveys
Repeated
perception
surveys of key
decision
makers
PMT
16. Intermediate Results Indicators
Results Framework
Intermediate Results Indicators
Cumulative Target values
Indicator Name
Core
Unit of
Baseline
Measure
YR1 YR2 YR3 YR4
Responsibility
Data Source/
End Frequency Methodology for Data
Collection
Target
Monitoring plan for
implementation of St.
Petersburg declaration
No
designed and regularly
updated in participating
countries
Number
0.00
7.00
annual
Program
reports
PCTs
Regional studies under
the framework of the
St. Petersburg
declaration undertaken
and disseminated
Number
0.00
TBD
annual
Program
reports
PCTs, PMT
No
17. Intermediate Results Indicators
Results Framework
Intermediate Results Indicators
Cumulative Target values
Indicator Name
Unit of
Core
Baseline
Measure
YR1 YR2 YR3 YR4
Responsibility
Data Source/
End Frequency Methodology for Data
Collection
Target
EU Member States‟
forest sector knowledge
is made available to
participating countries
and knowledge exchange No
between participating
countries and EU
Member States is
ongoing
Number
0.00
TBD
(7)
annual
Program
reports
PCTs, PMT
Sustainable forest
management and
improved forest
governance best practice
No
models developed, tested
and used for
demonstration purposes
by the Program
Number
0.00
TBD
annual
Program
reports
PCTs
18. Intermediate Results Indicators
Results Framework
Intermediate Results Indicators
Indicator Name
Cumulative Target values
Responsibility
Unit of
Data Source/
Core
Baseline
End Frequency Methodology for Data
Measure
YR1 YR2 YR3 YR4
Collection
Target
Modern technology trialed
and systems to improve
No
forest governance
developed by the Program
Awareness, ownership
and capacity of key
stakeholders enhanced
Media coverage of FLEG
issues has increased
TBD
annual
Program
reports
PCTs
x%
Percentag
Based
e of
No
on
stakeholde
survey
rs
results
TBD
Twice,
baseline
and final
surveys
Repeated
perception
surveys of key
decision
makers
PMT
No
7.00
annual
Repeated
media
monitoring
PCTs
Number
Number
0.00
0.00
19. Defining End Targets
• Action needed by PCTs, PMT to determine
end targets for remaining indicators based on
– proposed country and regional activities
– planned baseline survey
• Discussion at SC meeting
END TARGETS?
20. Reporting under FLEG II Program
• Three streams of reporting:
Program-level
Reporting
• Country-level (PCT to PMT)
• Organizational-level (WWF & ICUN to WB)
• Program-level (WB to EC)
• Internal Reporting by the World Bank
21. Reporting under FLEG II Program
Country-level
Organizational
Organizationallevel
level
Program-level
PCTs
IUCN &
WWF
WB
PMT
WB
EC
Internal WB Reporting
22. Country-level Reporting
• Narrative Progress Reports
Country-level
PCTs
PMT
– Quantitative (on the basis of the
Results Framework and indicators)
– “Results Stories”, quotes
• Frequency: semi-annual
– Reports for period July to December due
January 31
– Reports for period January to June due
July 31
– Final report needs to be prepared prior to
activity completion
23. Organizational-level Reporting
Organizational
level
• Organizational Reports
• Frequency: semi-annual
– Reports for period July to December
due January 31
– Reports for period January to June due
July 31
– Final narrative report due 6 month after end
date of activity implementation, but can be
prepared at the end of activity
implementation
In accordance with the
Grant Agreements
24. Program-level Reporting
• Narrative Progress Reports:
Program-level
• Summary and Context of Project
• Activities carried out during the reporting
period
• Difficulties encountered and measures
taken to overcome challenges
• Changes introduced in implementation,
including in the procurement plan
• Final Narrative Report
In accordance with the
Administration Agreement
• 6 months after end disbursement
date
Results monitoring under the first FLEG Program focused on seven results areas, including: 1 – increased awareness and commitment of key stakeholders on FLEG2 – effective national and regional FLEG action processes in place3 – increased national ownership and capacity4 – improved regional and sub-regional collaboration and knowledge sharing5 – effective engagement of key trading partners6 – continuation of the formal official Europe-North Asia FLEG process7 – sustainable forest management practices implementedResults areas were monitored in country and regional programs based on qualitative assessments by the country teams and percentage completion of activities, as well as their success and outcome. Narrative reports were prepared to report on progress to the PMT. However, there was no actual results framework with measurable indicators.
While there were hundreds of activities with real impact, and while the impact of the Program has been large, this is based on anecdotal evidence. Overall, progress towards higher level outcomes is difficult to judge quantitatively. Example from Azerbaijan: The Ministry of Ecology and Natural Resources, as the main partner, was intensively involved during the development of forest-related educational materials (e.g. teacher support pack “Young Foresters’ School”) and other Program activities including trainings/seminars and studies. FLEG issues are a complex we of different causes and effects: e.g. addressing the issue of illegal logging simply by increasing enforcement or penalties (without addressing the root causes and underlying culture), it is likely that the impact on governance will in fact be worse than doing nothing. Because the drivers for illegal logging (such as poverty, lack of legal or alternative supply) will still be there creating the demand and so, increasing enforcement may simply create opportunities for corruption and collusion. Because of this complexity, it is difficult to select appropriate indicators.
Lessons LearnedNevertheless many achievements, which are summarized in the Final Report of the Program.
What is different in FLEG II? We now have a detailed Results Framework with indicators to track progress at the different levels – regional, national, and sub-national. Some of the indicators are directly linked to the PDO.
What is different in FLEG II? We now have a detailed Results Framework with indicators to track progress at the different levels – regional, national, and sub-national. Some of the indicators are directly linked to the PDO.
There are two sets of indictors: one on the PDO level and then Intermediate results indicatorsFirst set of indicators, i.e. PDO-level indicators include: core indicators developed Bank-wide and custom indicators
There are two sets of indictors: one on the PDO level and then Intermediate results indicatorsFirst set of indicators, i.e. PDO-level indicators include: core indicators developed Bank-wide and custom indicators.Results framework at the bottom will be used for reporting. Baseline for CSI 1 is No, Target values are tracked each year, annually. End target is yes.
CSI #1 – linked with PDO one Some Bank projects aim at supporting reforms of forest policies, forest products trade policies as well as legal and institutional frameworks in client countries. In some federal states, the Bank support to reforms may be delivered at lower, sub-sovereign level12. This indicator measures whether a project has supported forest sector reforms. This includes support to revised policies or legal and institutional reforms that have been adopted by the client. It also includes well-defined, time-bound phased action plans that have been launched with the objective of achieving such forest sector reforms. The processes have to be formalized through documented official endorsement. Adoption of reforms can be indicated by approving new legislation or by issuing implementing regulations or decrees. They also have to inclusive and consultative.13
CSI #2:This indicator covers capacity-building projects aiming at strengthening forest administration institutions and other institutions to deliver services to the forest sector. The targeted institutions may also be outside the forest sector (sensu stricto) and they may cover other public institutions or service delivery and law enforcement organizations in the rural landscape. This could include support to the implementation of trade policies during Voluntary Partnership Agreement (VPA) implementation. The baseline value for this indicator is expected to be zero. Guidance on “Government institutions provided with capacity building support to improve management of forest resources”: This refers to the number of national or sub-national institutions (e.g. forest or environmental departments at national, state or province-level) that have received capacity building as a result of the project. This includes support to training of officials, support to operations, information management or investments in physical infrastructure or other facilities. If sub-sovereign units14 are counted separately, it is essential that they have “independence” of each other. As a comparison, if forest policy implementation is piloted in two districts, but they are effectively field organizations for one agency or department, this counts as one institution supported.
CSI #3: Important indicator because one of the ways to improve forest governance and forest management is through capacity building and this indicator also will be reported at the corporate WB-level. Results from FLEG II will feed into/contribute to Bank-wide monitoring of impacts of projects. Often World Bank projects do not directly invest in the management of specific land or forest areas. Instead, these capacity-building projects aim at strengthening communities to improve forest management and their livelihood. The expected baseline value for this indicator is zero. Data must be disaggregated by ethnicity10 and gender. Guidance on “Forest users trained (number)”: This refers to the number of forest users and community members that have received capacity building through training as a result of the project. The concept may need to be adjusted according to local practice or national legislation. Training needs to be targeted to specific audience. General media or public awareness campaigns are not included. When estimating the number of people trained, it is essential to avoid double counting if same individuals have participated in a series of training events.
Custom indicators (4 in total) were developed to correspond to the three specific PDOs.
Custom indicators (4 in total) were developed to correspond to the three specific PDOs.
There are two sets of indictors: one on the PDO level and then Intermediate results indicatorsFirst set of indicators, i.e. PDO-level indicators include: core indicators developed Bank-wide and custom indicators.Results framework at the bottom will be used for reporting. Baseline for CSI 1 is No, Target values are tracked each year, annually. End target is yes.
Second set of indicators are intermediate results indicators: these include only customized indicators specific to the FLEG II Program (7 in total).
Second set of indicators are intermediate results indicators: these include only customized indicators specific to the FLEG II Program (7 in total).
Second set of indicators are intermediate results indicators: these include only customized indicators specific to the FLEG II Program (7 in total).Each country as part of their public awareness strategy will need to monitor media coverage of forestry and FLEG issues. A simple count of the number of media articles etc. can demonstrate how FLEG and Forestry coverage is rising.
Missing indicators: 2 PDO level and 5 intermediate results indicators
Content of Narrative Progress Reports same as that required for reporting to EC:Summary and Context of ProjectActivities carried out during the reporting periodBoth quantitative and narrative End date for activity implementation: IUCN and WWF: December 31, 2016 – final report due June 30, 2017 (PCTs)WB: February 28, 2017 – final report due August 31, 2017 (WB PCT) End disbursement date: June 30, 2017.
Content of Narrative Progress Reports same as that required for reporting to EC:Summary and Context of ProjectActivities carried out during the reporting periodBoth quantitative and narrative End date for activity implementation: IUCN and WWF: December 31, 2016 – final report due June 30, 2017 (PCTs)WB: February 28, 2017 – final report due August 31, 2017 (WB PCT) End disbursement date: June 30, 2017.
Narrative reports to accompany each funding request.Reports are to provide for comparison of the objectives of the Trust Fund, the results expected and obtained and the budget details for the ProjectFinal Narrative Report (due December 31, 2017)