Microsoft Project is a project management software product, developed and sold by Microsoft. It is designed to assist a project manager in developing a schedule, assigning resources to tasks, tracking progress, managing the budget, and analyzing workloads.
Microsoft Project was the company's third Microsoft Windows-based application. Within a few years after its launch, it became the dominant PC-based project management software.[citation needed] From 2015 to 2020 it was the most popular application for project management according to Project Management Zone.[3]
It is part of the Microsoft Office family but has never been included in any of the Office suites. It is available currently as a cloud-based solution with three prices levels (Plan 1, Plan 3, or Plan 5): or as a on-premises solution with three editions (Standard, Professional, and Server). Microsoft Project's proprietary file format is .mpp.
This Gantt chart outlines the schedule for a proposed 160 day office development project from January 24th to September 2nd 2022. It is broken into 7 main phases - preliminaries, site preparation, construction of the main building substructure, ground floor framework, first floor framework, blockwalls and M&E works, doors and windows subframe and finishes, final finishes, external works, and project completion. Each phase contains multiple subordinate tasks with planned start and end dates.
A Gantt chart is a type of bar chart, devised by Henry Gantt in the 1910s, that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.
For a complete set of Project and other similar documents Please do visit
www.ProjectSupportTools.com
This document contains a project schedule with multiple tasks for constructing modular containers and barges. It includes tasks for materials procurement, module construction, outfitting, and transportation. The largest module, Module 3, contains 36 containers and has over 160 tasks scheduled from August 2013 through March 2014. Other projects on the schedule include constructing a captain's bridge and power barge.
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015) Ali Yousef
This document contains a project schedule for a process build with over 120 tasks listed. It includes tasks for design, procurement, fabrication, installation, testing and completion. Key milestones include completing the design by March 2015, starting fabrication in January 2015, and project completion targeted for July 2015.
The document outlines the tasks, durations, and schedule for constructing a water pump station over 279 days. Key steps include:
1. Applying for permits over 27 days and clearing/preparing the site over 7 days.
2. Installing sheet piles over 18 days to prevent soil collapse during the 90-day excavation period.
3. Pouring the concrete mat foundation and inverse slab over 43 days after erecting formwork and reinforcement bars over 10 days. The foundation will cure for 7 days before dismantling forms over 8 days.
4. Constructing the heavy wall from elevation 72 to 95 feet over 28 days, including forming, reinforcing, pouring, and curing concrete sections.
Engineering Design Center Project ScheduleVirginia Kam
The document outlines a Gantt chart project plan for an EDC Project from January 2015 to October 2018. It includes 14 main tasks for detailed design, acquisition of permits, construction services, construction, and commissioning. Key milestones include completing the detailed design by April 2015, acquiring permits from the city and university by August 2015, and beginning construction in July 2016 to be completed by October 2018. The plan accounts for potential delays from post-economic recession conditions.
This weekly progress report summarizes the status of the Sunshine SPL Estate Pvt Ltd construction project for week 2 of December 2023. Procurement is ongoing for steel and safety training programs have been conducted. For quality, more non-conformance reports were issued than closed. Work done targets were not fully achieved for the quarter or year to date. Key milestones like the pile foundation for Tower 2C are in progress. Structural construction is ongoing across towers, with the 11th floor roof in progress for Tower 3E.
This document provides a schedule for fit out works for IHH Healthcare at 80 Bendemeer Road Phase 2. The schedule includes activities for reception and cafe area fit out, patient room fit outs, and other general works. Key activities and milestones include shop drawing approvals by December 14th, sample approvals by December 7th, authority approvals by December 28th, and completion of construction works by March 9th. The overall fit out works are scheduled to be completed by March 26th.
This Gantt chart outlines the schedule for a proposed 160 day office development project from January 24th to September 2nd 2022. It is broken into 7 main phases - preliminaries, site preparation, construction of the main building substructure, ground floor framework, first floor framework, blockwalls and M&E works, doors and windows subframe and finishes, final finishes, external works, and project completion. Each phase contains multiple subordinate tasks with planned start and end dates.
A Gantt chart is a type of bar chart, devised by Henry Gantt in the 1910s, that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.
For a complete set of Project and other similar documents Please do visit
www.ProjectSupportTools.com
This document contains a project schedule with multiple tasks for constructing modular containers and barges. It includes tasks for materials procurement, module construction, outfitting, and transportation. The largest module, Module 3, contains 36 containers and has over 160 tasks scheduled from August 2013 through March 2014. Other projects on the schedule include constructing a captain's bridge and power barge.
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015) Ali Yousef
This document contains a project schedule for a process build with over 120 tasks listed. It includes tasks for design, procurement, fabrication, installation, testing and completion. Key milestones include completing the design by March 2015, starting fabrication in January 2015, and project completion targeted for July 2015.
The document outlines the tasks, durations, and schedule for constructing a water pump station over 279 days. Key steps include:
1. Applying for permits over 27 days and clearing/preparing the site over 7 days.
2. Installing sheet piles over 18 days to prevent soil collapse during the 90-day excavation period.
3. Pouring the concrete mat foundation and inverse slab over 43 days after erecting formwork and reinforcement bars over 10 days. The foundation will cure for 7 days before dismantling forms over 8 days.
4. Constructing the heavy wall from elevation 72 to 95 feet over 28 days, including forming, reinforcing, pouring, and curing concrete sections.
Engineering Design Center Project ScheduleVirginia Kam
The document outlines a Gantt chart project plan for an EDC Project from January 2015 to October 2018. It includes 14 main tasks for detailed design, acquisition of permits, construction services, construction, and commissioning. Key milestones include completing the detailed design by April 2015, acquiring permits from the city and university by August 2015, and beginning construction in July 2016 to be completed by October 2018. The plan accounts for potential delays from post-economic recession conditions.
This weekly progress report summarizes the status of the Sunshine SPL Estate Pvt Ltd construction project for week 2 of December 2023. Procurement is ongoing for steel and safety training programs have been conducted. For quality, more non-conformance reports were issued than closed. Work done targets were not fully achieved for the quarter or year to date. Key milestones like the pile foundation for Tower 2C are in progress. Structural construction is ongoing across towers, with the 11th floor roof in progress for Tower 3E.
This document provides a schedule for fit out works for IHH Healthcare at 80 Bendemeer Road Phase 2. The schedule includes activities for reception and cafe area fit out, patient room fit outs, and other general works. Key activities and milestones include shop drawing approvals by December 14th, sample approvals by December 7th, authority approvals by December 28th, and completion of construction works by March 9th. The overall fit out works are scheduled to be completed by March 26th.
The document outlines the schedule for a minor bridge construction project over 169 days from April 2021 to December 2021. It includes tasks for substructure work like pile foundations, pile caps and abutments. It lists 4 pile caps, 4 abutments and 4 abutment caps to be constructed sequentially. Resources required and estimated costs are provided for each task.
This project schedule outlines the tasks required to complete a CNG mini plant project over 60 days from July 2015 to February 2016. It involves design engineering, procurement, fabrication, installation, testing and commissioning of gas metering and regulating equipment. Key milestones include kick off meeting, initial design review, approval for construction, site acceptance testing, commissioning and gas in, and project handover. The schedule is broken into multiple phases including project preparation, design engineering, procurement, material fabrication, instrumentation hook up, equipment assembly, quality assurance, mobilization, installation and handover.
Project Planning And Control Club house design with MSPAyush khandelwal
This document outlines the work packages, activities, and schedule for a construction project. It includes:
1. A list of 25 activities with their durations for earthwork, civil works, brickwork, electrical wiring, and plaster work.
2. A network diagram linking the activities and showing dependencies and durations.
3. Tables showing the critical path, total floats, and free floats.
4. A milestone chart listing information requirements and the ordering of major items with start and end dates.
5. A resource sheet listing the resource needs for each activity.
6. A table showing how crashing some activities by 2-10 days could reduce the project duration by at least 10 days.
This document contains a schedule for a sample construction project with the following key details:
- The project duration is 133 days from June 1, 2015 to December 2, 2015.
- It includes activities for foundation/basement work like excavation, concrete work, and reinforcement from June 9 to October 19.
- Slab work is then scheduled for the ground, first, second, third, and terrace floors from July 31 to December 2.
- The schedule provides durations, start/finish dates, and predecessors for each activity.
Quantity based Earned Value Management analysis can be done by minimum inputs and maximum monitoring aspect with conventional software. Please review and share your valuable comments.
The document outlines a 15-day site visit and presentation by a civil engineering student to observe the various stages of construction of a building, including site preparation, foundation work, construction of columns, walls, slabs, electrical and plumbing installation, and plastering. Over the course of the site visit, the student documented progress through photos and descriptions of activities like excavation, concrete work, bricklaying, and installation of infrastructure. The presentation provides an overview of the key steps and materials involved in the construction process.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSIJNSA Journal
The smart irrigation system represents an innovative approach to optimize water usage in agricultural and landscaping practices. The integration of cutting-edge technologies, including sensors, actuators, and data analysis, empowers this system to provide accurate monitoring and control of irrigation processes by leveraging real-time environmental conditions. The main objective of a smart irrigation system is to optimize water efficiency, minimize expenses, and foster the adoption of sustainable water management methods. This paper conducts a systematic risk assessment by exploring the key components/assets and their functionalities in the smart irrigation system. The crucial role of sensors in gathering data on soil moisture, weather patterns, and plant well-being is emphasized in this system. These sensors enable intelligent decision-making in irrigation scheduling and water distribution, leading to enhanced water efficiency and sustainable water management practices. Actuators enable automated control of irrigation devices, ensuring precise and targeted water delivery to plants. Additionally, the paper addresses the potential threat and vulnerabilities associated with smart irrigation systems. It discusses limitations of the system, such as power constraints and computational capabilities, and calculates the potential security risks. The paper suggests possible risk treatment methods for effective secure system operation. In conclusion, the paper emphasizes the significant benefits of implementing smart irrigation systems, including improved water conservation, increased crop yield, and reduced environmental impact. Additionally, based on the security analysis conducted, the paper recommends the implementation of countermeasures and security approaches to address vulnerabilities and ensure the integrity and reliability of the system. By incorporating these measures, smart irrigation technology can revolutionize water management practices in agriculture, promoting sustainability, resource efficiency, and safeguarding against potential security threats.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Low power architecture of logic gates using adiabatic techniquesnooriasukmaningtyas
The growing significance of portable systems to limit power consumption in ultra-large-scale-integration chips of very high density, has recently led to rapid and inventive progresses in low-power design. The most effective technique is adiabatic logic circuit design in energy-efficient hardware. This paper presents two adiabatic approaches for the design of low power circuits, modified positive feedback adiabatic logic (modified PFAL) and the other is direct current diode based positive feedback adiabatic logic (DC-DB PFAL). Logic gates are the preliminary components in any digital circuit design. By improving the performance of basic gates, one can improvise the whole system performance. In this paper proposed circuit design of the low power architecture of OR/NOR, AND/NAND, and XOR/XNOR gates are presented using the said approaches and their results are analyzed for powerdissipation, delay, power-delay-product and rise time and compared with the other adiabatic techniques along with the conventional complementary metal oxide semiconductor (CMOS) designs reported in the literature. It has been found that the designs with DC-DB PFAL technique outperform with the percentage improvement of 65% for NOR gate and 7% for NAND gate and 34% for XNOR gate over the modified PFAL techniques at 10 MHz respectively.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
The document outlines the schedule for a minor bridge construction project over 169 days from April 2021 to December 2021. It includes tasks for substructure work like pile foundations, pile caps and abutments. It lists 4 pile caps, 4 abutments and 4 abutment caps to be constructed sequentially. Resources required and estimated costs are provided for each task.
This project schedule outlines the tasks required to complete a CNG mini plant project over 60 days from July 2015 to February 2016. It involves design engineering, procurement, fabrication, installation, testing and commissioning of gas metering and regulating equipment. Key milestones include kick off meeting, initial design review, approval for construction, site acceptance testing, commissioning and gas in, and project handover. The schedule is broken into multiple phases including project preparation, design engineering, procurement, material fabrication, instrumentation hook up, equipment assembly, quality assurance, mobilization, installation and handover.
Project Planning And Control Club house design with MSPAyush khandelwal
This document outlines the work packages, activities, and schedule for a construction project. It includes:
1. A list of 25 activities with their durations for earthwork, civil works, brickwork, electrical wiring, and plaster work.
2. A network diagram linking the activities and showing dependencies and durations.
3. Tables showing the critical path, total floats, and free floats.
4. A milestone chart listing information requirements and the ordering of major items with start and end dates.
5. A resource sheet listing the resource needs for each activity.
6. A table showing how crashing some activities by 2-10 days could reduce the project duration by at least 10 days.
This document contains a schedule for a sample construction project with the following key details:
- The project duration is 133 days from June 1, 2015 to December 2, 2015.
- It includes activities for foundation/basement work like excavation, concrete work, and reinforcement from June 9 to October 19.
- Slab work is then scheduled for the ground, first, second, third, and terrace floors from July 31 to December 2.
- The schedule provides durations, start/finish dates, and predecessors for each activity.
Quantity based Earned Value Management analysis can be done by minimum inputs and maximum monitoring aspect with conventional software. Please review and share your valuable comments.
The document outlines a 15-day site visit and presentation by a civil engineering student to observe the various stages of construction of a building, including site preparation, foundation work, construction of columns, walls, slabs, electrical and plumbing installation, and plastering. Over the course of the site visit, the student documented progress through photos and descriptions of activities like excavation, concrete work, bricklaying, and installation of infrastructure. The presentation provides an overview of the key steps and materials involved in the construction process.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSIJNSA Journal
The smart irrigation system represents an innovative approach to optimize water usage in agricultural and landscaping practices. The integration of cutting-edge technologies, including sensors, actuators, and data analysis, empowers this system to provide accurate monitoring and control of irrigation processes by leveraging real-time environmental conditions. The main objective of a smart irrigation system is to optimize water efficiency, minimize expenses, and foster the adoption of sustainable water management methods. This paper conducts a systematic risk assessment by exploring the key components/assets and their functionalities in the smart irrigation system. The crucial role of sensors in gathering data on soil moisture, weather patterns, and plant well-being is emphasized in this system. These sensors enable intelligent decision-making in irrigation scheduling and water distribution, leading to enhanced water efficiency and sustainable water management practices. Actuators enable automated control of irrigation devices, ensuring precise and targeted water delivery to plants. Additionally, the paper addresses the potential threat and vulnerabilities associated with smart irrigation systems. It discusses limitations of the system, such as power constraints and computational capabilities, and calculates the potential security risks. The paper suggests possible risk treatment methods for effective secure system operation. In conclusion, the paper emphasizes the significant benefits of implementing smart irrigation systems, including improved water conservation, increased crop yield, and reduced environmental impact. Additionally, based on the security analysis conducted, the paper recommends the implementation of countermeasures and security approaches to address vulnerabilities and ensure the integrity and reliability of the system. By incorporating these measures, smart irrigation technology can revolutionize water management practices in agriculture, promoting sustainability, resource efficiency, and safeguarding against potential security threats.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Low power architecture of logic gates using adiabatic techniquesnooriasukmaningtyas
The growing significance of portable systems to limit power consumption in ultra-large-scale-integration chips of very high density, has recently led to rapid and inventive progresses in low-power design. The most effective technique is adiabatic logic circuit design in energy-efficient hardware. This paper presents two adiabatic approaches for the design of low power circuits, modified positive feedback adiabatic logic (modified PFAL) and the other is direct current diode based positive feedback adiabatic logic (DC-DB PFAL). Logic gates are the preliminary components in any digital circuit design. By improving the performance of basic gates, one can improvise the whole system performance. In this paper proposed circuit design of the low power architecture of OR/NOR, AND/NAND, and XOR/XNOR gates are presented using the said approaches and their results are analyzed for powerdissipation, delay, power-delay-product and rise time and compared with the other adiabatic techniques along with the conventional complementary metal oxide semiconductor (CMOS) designs reported in the literature. It has been found that the designs with DC-DB PFAL technique outperform with the percentage improvement of 65% for NOR gate and 7% for NAND gate and 34% for XNOR gate over the modified PFAL techniques at 10 MHz respectively.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.