Condition Based Asset Management Program MINExpo 2008
Background 2
Newmont One Nevada Goals (2006) Overall Goal - reduce One Nevada Costs applicable to sales to $300/ounce by Jan 2008  Offset higher prices in labor, diesel, cyanide, u/g contract services costs YTD 2006 $425 YTD 2005 $327 Maintenance is a piece of this pie This project represents approx $2.00 / ounce Make this a team effort gaining best from:  Newmont (One Nevada, BatuHijau, Peru experience) Dingo Cashman / Caterpillar ConocoPhillips Other Newmont OEMS Desired relationship: Sustainable change, owned by Newmont Accountability for results on both sides Win-win Long term 3
4 Previous Experience Hours
Program Scope 5
Scope - Process 6 6-12 Months Ongoing 1 Month
Scope – Newmont Operations Surface Twin Creeks Gold Quarry Phoenix Underground Leevilee Deep Post Process Twin Creeks Mill Phoenix Mill SAL Mill 5 Mill 6 7
Scope - Programs Breakdown Avoidance Condition Intelligence KPI Measurement Weekly Meeting Troubleshooting Guides Sample Point ID’s Component Life Extension Monthly evaluation of all components:  approaching expected life  being “extended” past expected life and in critical condition. Incorporates condition monitoring data, performance tests and financial data. Monthly on-site component evaluation review with equipment group “owners”. 8
Results so far… 9
Program Results Total Benefits to June 2008 $15,111,271 Total project Payback in July 2007 Total project cost $3.5MM Cash flow breakeven in 3 months 10
Program Return on Investment $7.00 $6.00 $5.00 $4.00 Return on each $ invested Actual $3.00 $2.00 Forecast Proposed Proposed $1.00 Average 11
General Foreman comments 12 “This will allow our guys to see what is really going on with their components.  They get expert condition reports back that will give them specific instructions of what is wrong and how to fix it; vs. the Fax we get now.”   Bilbo Bessert  (Process Plants) “The program forces communication between the planners and the shop floor – they track down shop floor technicians to get feedback on actions taken as a result of the CI recommendations and work order generated. Things are going well with the CBAM program; we have made great improvement from the start.” Ken Andress  (Newmont East)
Observations 13
How is CBAM different? 14 CBAM Focus Condition Monitoring Focus ,[object Object]
Results Focus
Find Problems
Technology FocusCBAM iscomplete system which delivers results, not technology.  Condition Intelligence (find) + Action Tracking (act) produce results, measured monthly accounting of value of our service
Key Learning CBAM is an ongoing series of Daily, Weekly, Monthly, Quarterly and Annual activities In today’s dynamic environment, Mining companies struggle to maintain the disciplined routine required to ensure benefits are derived Three long term customers have decided that Dingo provides a cost effective way to ensure the benefits of CBAM, despite strong initial desire to bring totally in-house Newmont experience has been similar. Site based planners have a different career path and experience to Dingo project managers Dingo has shifted offering from Project to System in response to these trends 15
The Future 16

More Related Content

What's hot

Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4Charles Wade
 
Performance improvement in Criminal Justice using Nimbus Control
Performance improvement in Criminal Justice using Nimbus ControlPerformance improvement in Criminal Justice using Nimbus Control
Performance improvement in Criminal Justice using Nimbus Control
Improvement Skills Consulting Ltd.
 
Case Studies2
Case Studies2Case Studies2
Case Studies2
dtrumpy
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Negi
 
just in time
just in timejust in time
just in time
Shivam Gaur
 

What's hot (9)

Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4
 
Performance improvement in Criminal Justice using Nimbus Control
Performance improvement in Criminal Justice using Nimbus ControlPerformance improvement in Criminal Justice using Nimbus Control
Performance improvement in Criminal Justice using Nimbus Control
 
Case Studies2
Case Studies2Case Studies2
Case Studies2
 
Projects summary
Projects summaryProjects summary
Projects summary
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
just in time
just in timejust in time
just in time
 
Financial synergies
Financial synergiesFinancial synergies
Financial synergies
 
2012 Resume
2012 Resume2012 Resume
2012 Resume
 

Similar to Newmont Mine Expo Presentation

150110746014
150110746014150110746014
150110746014
Nikunj Rana
 
Work Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process MappingWork Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process Mapping
TKMG, Inc.
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
Phi Jack
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
shrinivas kulkarni
 
6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx
muhammadhaziqabdulgh
 
Success story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CIISuccess story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CII
Confederation of Indian Industry
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
Manas Das
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMS
eMaint Enterprises
 
vijay-resume
vijay-resumevijay-resume
vijay-resumevijay s
 
6 sigma what is it
6 sigma what is it6 sigma what is it
6 sigma what is it
Kingsley Nwagu
 
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
Lviv Startup Club
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
naveen_ncn
 
Best Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsBest Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM Projects
ARC Advisory Group
 
Building a bullet proof business case
Building a bullet proof business caseBuilding a bullet proof business case
Building a bullet proof business case
Jonathan L'Ecuyer
 
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009Krishna Muppaneni, PMP
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET Journal
 
Global awards 2010
Global awards 2010Global awards 2010
Global awards 2010
Future Strategies Inc.
 

Similar to Newmont Mine Expo Presentation (20)

0DBG 1Pager
0DBG 1Pager0DBG 1Pager
0DBG 1Pager
 
150110746014
150110746014150110746014
150110746014
 
Work Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process MappingWork Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process Mapping
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx
 
Success story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CIISuccess story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CII
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMS
 
vijay-resume
vijay-resumevijay-resume
vijay-resume
 
6 sigma what is it
6 sigma what is it6 sigma what is it
6 sigma what is it
 
Session 5
Session 5Session 5
Session 5
 
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
Mike Palladino: Making Agile Easier - Coaching the Support Organizations on A...
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
Best Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsBest Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM Projects
 
Building a bullet proof business case
Building a bullet proof business caseBuilding a bullet proof business case
Building a bullet proof business case
 
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009
Revitalization of SAP BI for better performance and User Acceptance_ASUG 2009
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
 
Global awards 2010
Global awards 2010Global awards 2010
Global awards 2010
 

Recently uploaded

Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 

Recently uploaded (20)

Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 

Newmont Mine Expo Presentation

  • 1. Condition Based Asset Management Program MINExpo 2008
  • 3. Newmont One Nevada Goals (2006) Overall Goal - reduce One Nevada Costs applicable to sales to $300/ounce by Jan 2008 Offset higher prices in labor, diesel, cyanide, u/g contract services costs YTD 2006 $425 YTD 2005 $327 Maintenance is a piece of this pie This project represents approx $2.00 / ounce Make this a team effort gaining best from: Newmont (One Nevada, BatuHijau, Peru experience) Dingo Cashman / Caterpillar ConocoPhillips Other Newmont OEMS Desired relationship: Sustainable change, owned by Newmont Accountability for results on both sides Win-win Long term 3
  • 6. Scope - Process 6 6-12 Months Ongoing 1 Month
  • 7. Scope – Newmont Operations Surface Twin Creeks Gold Quarry Phoenix Underground Leevilee Deep Post Process Twin Creeks Mill Phoenix Mill SAL Mill 5 Mill 6 7
  • 8. Scope - Programs Breakdown Avoidance Condition Intelligence KPI Measurement Weekly Meeting Troubleshooting Guides Sample Point ID’s Component Life Extension Monthly evaluation of all components: approaching expected life being “extended” past expected life and in critical condition. Incorporates condition monitoring data, performance tests and financial data. Monthly on-site component evaluation review with equipment group “owners”. 8
  • 10. Program Results Total Benefits to June 2008 $15,111,271 Total project Payback in July 2007 Total project cost $3.5MM Cash flow breakeven in 3 months 10
  • 11. Program Return on Investment $7.00 $6.00 $5.00 $4.00 Return on each $ invested Actual $3.00 $2.00 Forecast Proposed Proposed $1.00 Average 11
  • 12. General Foreman comments 12 “This will allow our guys to see what is really going on with their components.  They get expert condition reports back that will give them specific instructions of what is wrong and how to fix it; vs. the Fax we get now.” Bilbo Bessert (Process Plants) “The program forces communication between the planners and the shop floor – they track down shop floor technicians to get feedback on actions taken as a result of the CI recommendations and work order generated. Things are going well with the CBAM program; we have made great improvement from the start.” Ken Andress (Newmont East)
  • 14.
  • 17. Technology FocusCBAM iscomplete system which delivers results, not technology. Condition Intelligence (find) + Action Tracking (act) produce results, measured monthly accounting of value of our service
  • 18. Key Learning CBAM is an ongoing series of Daily, Weekly, Monthly, Quarterly and Annual activities In today’s dynamic environment, Mining companies struggle to maintain the disciplined routine required to ensure benefits are derived Three long term customers have decided that Dingo provides a cost effective way to ensure the benefits of CBAM, despite strong initial desire to bring totally in-house Newmont experience has been similar. Site based planners have a different career path and experience to Dingo project managers Dingo has shifted offering from Project to System in response to these trends 15
  • 20.
  • 21.
  • 22. Group Trend for 33 Newmont Nevada 793D Engines
  • 23. A powerful way to determine if results are abnormal for the component
  • 24. Scattergram allows easy, accurate alert limit settings18

Editor's Notes

  1. Kill this slide
  2. Kill this slide
  3. Kill this slide
  4. BP's Texas City Refinery is the second-largest oil refinery in the state and the third-largest in the United States. A major explosion occurred at the site on March 23, 2005, killing 15 workers and injuring more than 170 others. It has been noted as one of the most serious industrial incidents in the past two decades.The operators started the tower while ignoring open maintenance orders on the tower’s instrumentation system. The design of the level indicator meant that it only read a length of 3 metres; anything above that didn't register. In addition, the design was such that any level above 3 metres could show on the screen as a drop in level. There was a secondary alarm which should have gone off if liquid exceeded 2.5m, however no-one heard it; the alarm was reported as damaged before the accident and there were no records of it being fixed
  5. Discuss benefits of a single databaseAll data in one place for all OEM’sWeb accessible