NEW CYPRUS
Smart Territory of the Future or Mass Poverty and Social Misery
Demonstrative Intelligent Investment Project for Frail Europe: Silver Bullet



              by EIS Encyclopedic Intelligent Systems LTD
                Dr Azamat Abdoullaev (Cyprus & Russia)
                  Author of the EU Smart City Prototype

             STATUS: Under Review by Cyprus Government


INTELLIGENT NATION, ECO REGIONS AND SMART CITIES

                              EU, CYPRUS
                                  2013
AGENDA
   EUROPE 2020
   Cyprus 2020
   Smart Cyprus Stakeholders
   Smart Cyprus Trinity
   Strategic Objectives
   Smart Growth Programs
   Project Planning Stages
   Sustainable Community Architecture
   Smart Cities and Eco Regions
   EUROPEAN SMART CITY PROTOTYPE
   EU Funds
   Smart Cyprus Innovation Center and Education Program
   Smart Cyprus Projects 2012-2020
   Smart City Redevelopment Projects
   Smart Community Redevelopment Projects
   Current Situation
   Three Scenarios for Cyprus 2020
   Information Resources
   EIS Intelligent Community Brands
   Contact

                       A. Abdoullaev 2010-2013
                      EIS Intelligent Systems ltd
EUROPE 2020: A European Strategy for Smart, Sustainable
and Inclusive Growth
      Europe 2020 puts forward three mutually reinforcing priorities:
I.     Smart growth: developing an economy based on knowledge and innovation.
II.    Sustainable growth: promoting a more resource efficient, greener and more competitive economy.
III.   Inclusive growth: fostering a high-employment economy delivering social and territorial cohesion.
      The Commission proposes the following EU headline targets:
1)     75 % of the population aged 20-64 should be employed.
2)     3% of the EU's GDP should be invested in R&D.
3)     The "20/20/20" climate/energy targets should be met (including an increase to 30% of emissions reduction if the conditions are
       right).
4)     The share of early school leavers should be under 10% and at least 40% of the younger generation should have a tertiary degree.
5)     20 million less people should be at risk of poverty
      The Commission is putting forward seven flagship initiatives to catalyse progress under each priority theme:
1.     INNOVATION: "Innovation Union" to improve framework conditions and access to finance for research and innovation so as to ensure that
       innovative ideas can be turned into products and services that create growth and jobs.
2.     EDUCATION: "Youth on the move" to enhance the performance of education systems and to facilitate the entry of young people to the labour
       market.
3.     DIGITAL SOCIETY: "A digital agenda for Europe" to speed up the roll-out of high-speed internet and reap the benefits of a digital single market
       for households and firms.
4.     CLIMATE, ENERGY and MOBILITY: "Resource efficient Europe" to help decouple economic growth from the use of resources, support the
       shift towards a low carbon economy, increase the use of renewable energy sources, modernise our transport sector and promote energy
       efficiency.
5.     COMPETITIVENESS: "An industrial policy for the globalisation era" to improve the business environment, notably for SMEs, and to support the
       development of a strong and sustainable industrial base able to compete globally.
6.     EMPLOYMENT and SKILLS: "An agenda for new skills and jobs" to modernise labour markets and empower people by developing their of
       skills throughout the lifecycle with a view to increase labour participation and better match labour supply and demand, including through labour
       mobility.
7.     FIGHTING POVERTY: "European platform against poverty" to ensure social and territorial cohesion such that the benefits of growth and jobs
       are widely shared and people experiencing poverty and social exclusion are enabled to live in dignity and take an active part in society.
                                               A. Abdoullaev 2010-2012                    EIS
                                                     Intelligent Systems ltd
CYPRUS 2020
Cyprus has been developing a European Smart City Prototype for all cities and communities. The
Mediterranean island is to go through a critical stage in its long history: to bankrupt or to transform
towards a smart, sustainable, and inclusive society, to become a world-class destination for investors,
businesses, citizens and visitors. The “Smart Cyprus” Strategy aims to model Cyprus 2020 as an Eco-
Sustainable Land, Smart Country, and Inclusive Nation. Smart Cyprus is to be distinguished with the
following innovative features:
Eco Districts, Smart Cities, and Green Communities
Eco-wise National, Urban and Rural Infrastructures
Smart Utilities and National Green Energy Networks
Modern security/defense infrastructure (intelligent monitoring and measurement systems,
sensor/actuators networks, ground-based and marine, wired and wireless, data collection systems;
cybersecurity, illegal activities prevention)
Innovation/knowledge economy (industry and sustainable corporations, innovation clusters, innovation
districts, CDB, techno parks, knowledge clusters, disruptive technology/business eco-parks smart
malls, university eco campuses, seaports, airports)
Smart government, i-services to citizens, businesses, and local governments
Intelligent ICT networks and multi-play telecommunications systems, optical and wireless
Smart banking systems and financial services; sustainability in public finances; stability funds
World-class healthcare, e-health and telemedicine
Knowledge Triangle Clusters (education, R&D and business)
Sustainable living, wellbeing, quality of life, smart, green, and healthy lifestyles




                                A. Abdoullaev 2010-2013         EIS
                                      Intelligent Systems ltd
SMART CYPRUS Stakeholders
   Presidency and Council of Ministers: the President of Cyprus (Chairman)
   Church of Cyprus: Archbishop and Holy Synod
   Government Departments: Ministry of Interior, Ministry of Education and Culture, Ministry
    of Agriculture, Natural Resources and Environment, Ministry of Commerce, Industry, and
    Tourism, Ministry of Communications and Works, Ministry of Finance, Ministry of Health,
    Ministry of Foreign Affairs, Ministry of Defence, Ministry of Justice and Public Order, Ministry
    of Labour and Social Insurance, Planning Bureau, Cyprus Tourism Organization; Chamber
    of Commerce and Industry
   Municipalities: Lefkosia, Larnaka, Lemesos, Pafos, Famagusta, Kyrenia, Morphou et al.
   Local Communities: Lefkosia District, Larnaka District, Lemesos District, Pafos District,
    Famagusta District
   Political Parties and Civic Associations and NGOs
   Business Groups & Innovative SMEs
   Banking Institutions
   Public-Service State Corporations: Cyta-Vodafone, EAC Electricity Authority
   Telecom Corporations: PrimeTel, National TV stations, Cyprus Radio, etc.
   Universities: University of Cyprus (Institutes, Schools, Faculties or Departments), Open
    University of Cyprus, Cyprus University of Technology; EUC European University-Cyprus;
    Frederick University - Cyprus, University of Nicosia; Research Institutes,…
   Key Consultants: EIS Encyclopedic Intelligent Systems Ltd (Cyprus); EIS Intellectual
    Systems (Russia)



                              A. Abdoullaev 2010-2013         EIS
                                    Intelligent Systems ltd
SMART CYPRUS TRINITY
                       The TRINITY COMMUNITY of Wellbeing,
                       Quality of Life and Sustainable Growth
           Eco-                                                           I-
           CYPRUS/                                                        CYPRUS/
           Regions/                                                       Regions/
           Cities/                                                        Cities/
           Villages                                                       Villages



                                                                                     Social/Human/I‐Capital
                                       Smart                                         Innovation Ecosystems
                                       Sustainable                                   Smart Living
Physical Capital
                                       CYPRUS                                        Smart Economy
Natural Capital                                                                      Knowledge Infrastructure
Ecosystems                                                                           Smart Governance
Natural Resources                                                                    Equity, Wellbeing, QoL 
                                                                                     Knowledge Society
Renewables/RES
Green Infrastructure
Eco‐Urbanization
                                                            Information capital
Green Society                                               u‐Computation, ICT Infrastructure 
                                                            Smart Mobility
                                       Digital
                                                            Virtual Reality, Intelligent Clouds
                                       CYPRUS/
                                       Regions/             Internet of Things
                                       Cities/              Digital/Smart Society
                                       Villages

                                 A. Abdoullaev 2010-2012 EIS
                                     Intelligent Systems ltd
Strategic Objectives

   Land of Unity, Ecology, Knowledge, Innovation, Education, Technology, Wealth, and Well-Being
   Smart Growth on social intelligence, knowledge, innovation and creativity
   Sustainable Growth on resource efficiency, renewable energy technologies and competitive economy
   Inclusive Growth on social cohesion, productivity, high-skilled workforce, massive employment and wealth-
    creation
   i-government, smart public and social policy, intelligent ecological communities and cities, knowledge
    industry, ubiquitous ICT, intelligent banking systems and financial services, smart healthcare, innovative
    research and education, creative work, long life learning, and smart lifestyle.
   Integrating education and research, innovation and entrepreneurship
   Producing innovative products, smart services and intelligent processes
   Empowering people in inclusive societies with smart governance
   Creating a competitive, connected, greener and smarter economy
   Utilizing the advances of the ICT technology for digital economy, knowledge market and intelligent
    urbanization
   Convergence and integration and interdependence of regions and cities and local communities
   Implementing sustainable renewable energy policy and massive green electrification, using renewable
    energy resources: solar energy, biomass power, geothermal energy, wind power, sea waves energy
   Preserving the natural resources, biosphere reserves, natural parks, nature reserves, environmental
    protection (coastal regeneration, green forestation, flood prevention and water management, and sewer
    construction)
   Creating attractive national branding, improving the investment environment, boosting the health of the
    economy, and upgrading the quality of life.
   Creating national ecosystems and sustainable environments, social, economic, cultural, political,
    technological and ecological




                                 A. Abdoullaev 2010-2013          EIS
                                       Intelligent Systems ltd
Smart Growth Programs

 National Program of Innovative ICT and Broadband Knowledge
    Economy
   National Program of Smart Eco Territories (communities,
    villages, towns, cities, districts, and country)
   National Program of Science and Research and Innovation
    Networks
   National Program of Knowledge Parks (knowledge clusters,
    university research parks, science and technology parks,
    healthcare parks, technopolis, business park, industrial parks)
   National Program of Smart Government Agencies and State
    Corporations
   National Program of Smart Industry, Corporations and Intelligent
    Business Management
   National Program of Smart Lifestyle, Creativity and Knowledge
    and Persistent Learning


                     A. Abdoullaev 2010-2013         EIS
                           Intelligent Systems ltd
Project Planning Stages
   Smart Cyprus Project (Size and Implementation): partnership among government, civic
    associations, academia, research institutes, public sector, private corporations, and non-profit
    sector; Funding sources (EU Funding, national funding and private investment), Project Size
    (implementation costs, to be assessed)
   Current Industries: tourism, construction, cement and gypsum production, ship repair and
    refurbishment, food and beverage processing, textiles, light chemicals, metal products, wood,
    paper, stone, and clay products; collapsing financial system
   Future Cyprus Industries: Modern tourism, smart housing industry, intelligent ICT industry, green
    economy, knowledge service industry, intelligent banking system, smart gas/oil industry, intelligent
    energy
   Supporting Action Plans and Programs: The EU 2020 Strategy for Smart, Sustainable and
    Inclusive Growth; National Strategic Reference Framework Program for Cohesion Policy, 2014-
    2020; Cyprus National Reform Program 2011, 2012
   i-Cyprus Plan of Actions in three stages:
   Smart Eco Island Strategy (2013);
   Intelligent Nation Master plan (Fitting, Transforming and Adjusting Existing National Planning and
    Programs, 2013-2014);
   Intelligent Eco Island Development & Smart Municipalities and Eco Communities Projects (2013-
    2020; Conception, Design, Legislations, Promotion and Implementation)




                               A. Abdoullaev 2010-2013         EIS
                                     Intelligent Systems ltd
SUSTAINABLE
NATION/CITY/COMMUNITY
ARCHITECTURE
 Digital/ICT/Hi-Tech/Ubiquitous/Cyber/Smart Cyprus
  (Digital/Information Capital; Intelligent ICT Infrastructure, Multi-Play
  Telecom Networks, Smart Governance, Intelligent Management
  Platforms, Ubiquitous Computation, Network-integrated Buildings,
  Digital Communities, Virtual Lifestyle)
 Sustainable/Ecological/Green/Zero-Carbon/Zero-Waste/Eco
  Friendly/Eco Cyprus (Natural Capital; Natural Resources, Physical
  Capital, Green Energy Networks, Green Buildings, Eco-Environment,
  Eco Communities, Green Lifestyle)
 Knowledge/Learning/Innovation/
  /Intelligent/Science/Intellectual/LivingLab/Creative/Human/Social
  Cyprus (Knowledge or Innovation Capital; Human/Intellectual Capital,
  Social Capital and Networks, Social Cohesion, Knowledge
  Triangles/Health Triangles, Knowledge EcoSystems, nowledge
  Communities, Intelligent/Smart Lifestyle)




                       A. Abdoullaev 2010-2013         EIS
                             Intelligent Systems ltd
SMART CITIES AND ECO REGIONS
   Implementing Smart Eco City Programs: Eco Land and Territories, Eco Mobility, Environmental
    Infrastructure, Transportation and Road Networks, Green Energy and Utilities, ICT Infrastructure,
    Smart Economy, Smart Governance, Smart Mobility, Smart Environment, Smart People, Smart
    Living
   Developing Cyprus Districts as eco-regions: Comprehensive Management Plan/Regional
    Development Plan: Environmental Planning, Digital Planning, Social Planning; Green Economics,
    Green Property Developments, Environmental Infrastructures
   Initiating and Stimulating large master planned developments as smart eco-sustainable projects
   Assisting businesses to align their strategies, projects and operations with the Smart Eco-Region
    Comprehensive Management Plan and strategic policy initiatives
   Attracting to Smart Districts the EU Funding resources and sustainable/impact/socially responsible
    investment (Benefiting from the EU Structural and Cohesion Funds granted to Cyprus during the
    next 2014-2020 period)
   Re-developing Cities as Smart and Green Cities, attractive destination for Ecological, Cultural,
    Sports, and Medical Tourism
   Advancing the EU NATURA 2000 Sites of Community Importance (SCI) and Special Protection
    Area (SPA) as Eco-Sustainable Developments
   Building the Regional Operations Center/Urban Management Systems




                               A. Abdoullaev 2010-2013         EIS
                                     Intelligent Systems ltd
EUROPEAN SMART CITY
PROTOTYPE: the Smart EcoCity
    CONCEPT: The Trinity City; Smart Eco City, Intelligent Green City
    STRATEGY: The most innovative urban development strategy, as integrating the Eco City
     Strategy, Digital City Strategy and Knowledge City Strategy
    ARCHITECTURE: Integrated architecture of urban systems and services to achieve a fully
     sustainable “New City” of Eco-Intelligence
    OBJECTIVE: Prototype Model for European Smart City for other cities and communities
    DECISIONS:
1.   European Union: Presented by the European Commission as a prototype project of smart
     sustainable development at the Pan European Meeting/Conference “Smart Cities and
     Communities”, in Brussels, on Tuesday 10th of July 2012.
2.   Cyprus Presidency’s View on Smart Cities and Communities, presented by the Minister of
     Commerce, Industry and Tourism of the Republic of Cyprus, Mr. Neoklis Sylikiotis: “This
     pilot project is based on pioneering concepts for a centrally based architecture of services,
     aiming at achieving a fully sustainable “New City” of Eco-Intelligence. The objectives call for
     implementing the most innovative development strategy, with the commitment to support the
     scale-up and replication of this initiative to other cities and communities.”
    SMART TERRITORIES OF THE FUTURE: The EU Smart Communities and Cities
     Prototype: 3.0 City, from Dumb to Intelligent Cities.
    http://www.slideshare.net/ashabook/30-cityeu-prototype
1.




                               A. Abdoullaev 2010-2013         EIS
                                     Intelligent Systems ltd
EU Funds
      Programming Period 2007-2013: Strategic Development Plan (SDP); The National Strategic Reference Framework (NSRF) 2007-
       2013; The NSRF is co-financed (€612,4 mln) from the European Regional Development Fund (ERDF), the European Social Fund
       (ESF) and the Cohesion Fund (CF) of EU. By December 2011, about 3.420 mostly small projects with a total budget (eligible
       public expenditure) of €830 mln have been approved, corresponding to 113% of the OPs total budget, without any visible impact
       on the national sustainable growth.
Operational Programme: “Sustainable Development and Competitiveness”
General Objectives:
1.     Improving the attractiveness of the country, through the creation and upgrading of basic infrastructure
2.     Promoting the knowledge society and innovation and improving the productive environment
3.     Creating sustainable communities in urban and rural areas
Priority Axes:
1)     Basic Infrastructure in the Environment and Energy Sectors
2)     Basic Transport Infrastructure
3)     Knowledge Economy and Innovation
4)     Productive Environment
5)     Revitalisation of Urban and Rural Areas
Operational Programme: “Employment, Human Capital and Social Cohesion”
General Objectives:
1.     Improvement of Human Capital and Increase of the Adaptability of the Private and Public Sector
2.     Attracting and Maintaining More People in the Labour Market and Reinforcement of Social Inclusion
Priority Axes: 1. Development of Human Capital and Adaptability; 2. Expansion of Labour Market and Social Cohesion

     Programming Period 2014-2020: Smart Cyprus Strategic Development Plan 2014-2020, estimated total
     budget about EUR 4 bn, mostly for large-scale projects, national, urban and inter-communal
    Horizon 2020", the new research and innovation funding framework under the next Multiannual Financing
     Framework (MFF 2014-2020).

                                         A. Abdoullaev 2010-2013              EIS
                                               Intelligent Systems ltd
“SMART CYPRUS” INNOVATION
CENTER
SMART GROWTH STRATEGY, PROGRAMS AND PROJECTS: National, Regional, Urban and Inter-
Communal
1.   Smart Cyprus Sustainable Infrastructure
2.   Eco Regions and Sustainable Communities
3.   Smart Cities and Municipalities: EcoPolis and EcoVillage Projects
4.   Eco Development Projects, NATURA 2000 Sites Green Redevelopment
5.   Sustainable Building/Eco Construction Projects (Green Buildings, Eco Homes, Smart Villas, Intelligent Homes)

ORGANIZING SMART PUBLIC AND BUSINESS CLUSTERS of related enterprises, suppliers, and
institutions in different fields of economy, commerce, industry, or civil services
1) Knowledge Parks of Third Generation
2) Innovatiion Parks, Smart Techno-clusters; Know-how clusters; Intelligent Eco-parks, Agro-Clusters; Medical or Hospital Clusters;
sector clusters, horizontal clusters, vertical supply chain clusters
3) Maximizing the business intelligence capital, productivity and creativity
4) Stimulating innovative businesses and intelligent industry (eg, integrated operations of people, processes and technology, e-Field,
i-Field, Digital Gas/Oilfield, intelligent field, or Smart Fields of Smart Wells)
5) Driving innovation in a new field of knowledge economy, commerce or industry (Smart Property, Intelligent Infrastructure, Cloud
Computing, Intelligent Energy, Smart Gas/Oil)

HIGH-LEVEL EDUCATION PROGRAMS
1. Global Initiatives for Smart Communities: IBM’s Smarter Planet, Cisco’s Intelligent Urbanization, EIS’ Smart World, EU 2020
Strategy, and EU Initiatives on Smart Cities
2. Europe 2020 and Cyprus: Lost Decade, Sluggish Recovery or Sustainable Recovery
3. Smart City Projects across the World, or Why Smart Cities make Priorities for Global Investors and Corporations (IBM, Cisco,
Hitachi, Toshiba, Alcatel-Lucent, Siemens, Huawei, etc.)
4. Smart City as a Model Settlement, or How to Become a Smart Municipality and Green Community
5. From Greek Polis to Intelligent Eco-Polis: Launching Smart City Programs and Eco Community Projects in Cyprus




                                        A. Abdoullaev 2010-2013               EIS
                                              Intelligent Systems ltd
Smart Cyprus Projects 2012-2020
   Smart Eco Developments, Large Integrated Innovative Construction Projects: Smart Eco City
    (Neapolis) as a model of European Smart Cities
   Smart Municipality Clusters: Pafos Smart Eco District; Smart Limassol, East Eco Coast of Smart
    Municipalities: Derynea-Sotira-Paralimni-Protaras-Agia Napa; Smart Municipality Projects of
    Nicosia-Larnaka (Eco Mobility, Intelligent Traffic, Eco Districts, Eco-Neighborhoods, Eco Streets,
    Public Eco Transport, Working and Cycling, Innovative measures on buildings, local energy
    networks, transportation, ICT Networks, and social infrastructure)
   Eco Community Clusters, Green Connected Communities: West Eco Coast of Eco Villages:
    Makounta-Argaka-Gialia-Agia Marina-Nea Dimmata-Pomos-Pachyammos; Kathikas-Arodes-Ineia-
    Fasli-Androlikou-Prodromi-Neo Chorio; South Eco Coast of Eco Villages: Timi-Mandria-Kouklia
   NATURA 2000 Sites Eco-Wise Projects: Touristic Green Facilities and Eco Homes
   Nationwide Green Digital Backbone: Integrated Fibre and Green Energy Infrastructure (Installing
    Fibre Optic and Green Energy conduit infrastructures as part of new public roads construction
    projects, see EUROCITIES Green Digital Charter; see the “Fiber Optic and Green Energy Conduit
    Deployment Act of 2012” Bill Proposal)
   Nationwide Internet of Things and People (Anytime, Anywhere, Any Thing, Any One, Any Network,
    Any Service; Convergence, Computing, Connectivity, Content, Communication, Collection; the
    Future Internet PPP Business Scheme)




                               A. Abdoullaev 2010-2013         EIS
                                     Intelligent Systems ltd
Sustainable City Redevelopment
Projects
    Smart City Re-Development (Impact Investments in Low-Energy Buildings, Efficient Waste Infrastructure,
     Local Energy Infrastructure, Distributed Renewable Installations, Urban Mobility, and Social Infrastructure)
    Eco-Efficiency in Infrastructure, Housing, Public Buildings, Residential Complexes, Multi-Apartment
     Buildings, Residential Units, and Sports Facilities
    Digital/Cyber/Information City Urban Projects, new and retrofitting, advanced ICT Networks, Optical Internet
     Backbone, Municipal Wireless (WiFi) Communication Networks with open service model (tourist areas to
     start), smart ICT services for citizens, businesses and government agencies (i-government, i-learning, i-
     health, i-commerce, etc)
    Clean/Green City Projects, Green Infrastructure, Transport, Buildings, Green Energy Networks (distributed
     energy systems, green homes, ECO neighborhood, districts; smart grids, smart metering, solar gardens,
     ecological infrastructures, green facilities, and solar thermal farms)
    Creative/Intelligent/Cultural City Projects/Events/Institutions to organize territorial innovation systems, to
     nurture creativity, innovation, and talents, investing in education, arts and culture, organizing high quality
     cultural and creative events and performances, attracting talented professionals and international
     knowledge, cultural, and multi-media industries
The Project Financing methods follow the Public-Private-Citizen Partnership business models, involving the private firms,
     investment institutions, municipal governments, central government, civic organizations and individual citizens. Being
     in line with the EU Strategy 2020, the whole Initiative could utilize the EU funding opportunities, schemes, programs,
     and initiatives, like the EU Initiative on Smart Cities, as well as the national government incentives for smart urban
     growth and sustainable redevelopment.




                                      A. Abdoullaev 2010-2013            EIS
                                            Intelligent Systems ltd
Sustainable Community
Redevelopment Projects
   Community Planning and Development (Smart ECO Polis Model, Smart ECO Polis Master Plan, green community strategy, digital community
    strategy, knowledge community strategy, integrated spatial digital city planning, local development planning, sustainable land use, eco
    community standards, cross-communal ecosystem)
   Energy (eco village grid, urban renewable energy networks, clean energy systems, renewable energy technologies, biomass, solar thermal,
    ambient thermal, and geothermal applications; heat storage technologies, tri-generation and district heating/cooling systems; advanced
    metering infrastructure, energy management systems, smart domestic appliances, intelligent street lighting, solar parks/farms; EV and HEV
    charging and storage)
   Water and Waste (environmental infrastructure, quality water supply system, sustainable community drainage systems, advanced biological
    sewerage systems, rainwater harvesting, grey water treatment, green roofs, balance with nature, reduction, re-use and recycling waste)
   Real Estate, Buildings and Facilities (eco realty, green buildings, innovative insulation, net zero energy buildings, residential, commercial,
    public, special; smart community polycenter, leisure and health center, cultural center, financial center, business center, sports center)
   Local Economy (smart sustainable and inclusive growth, economic development investment, strong local economy, eco-tourism, attractive
    commercial spaces, smart outlets, innovative business, new employment opportunities, and sustainable jobs)
   Land and Environment (natural capital and resources, sustainable sites and urban landscape, productive land, living land, eco land, sea
    environment protection, coastal regeneration; green infrastructure, eco parks and zones, public spaces, integrated green areas)
   Governance and Administration (e-Participation, i-administration, common service delivery platform, digital urban management system, smart
    public services)
   Smart Transportation (eco-mobility, public transport system, bus routes, cycle lanes, sidewalks, plazas, eco streets, parks, car-free zones,
    clean transportation, sustainable road networks, intelligent transportation systems, bike installations, public benches, green parking)
   ICT (digital capital and resources, network-connected communities and eco-neighborhoods, optical Ethernet, Fiber-To-the-Home access, WiFi
    zones, smart appliances, urban operation systems, building integration platform, integration into global communication network, ICT clusters,
    smart digital services, new jobs)
   Intelligent Community (human capital and resources, knowledge city, sense of community, social cohesion, community intelligence, innovative
    and creative community, education, knowledge, innovation, entrepreneurship, knowledge triangle, knowledge-rich living, knowledge-intensive
    jobs)
   Sustainable Lifestyle (health and well-being, safety and security, meaningful social life, social safety nets, social spaces, green lifestyle,
    intelligent lifestyle, digital lifestyle, smart living)




                                           A. Abdoullaev 2010-2013                    EIS
                                                 Intelligent Systems ltd
CURRENT SITUATION: At the Edge of
National Bankruptcy
   Social Exclusion, Mass Unemployment and Poverty
   Unsustainability (in Society, Economy, and Finances)
   Unsustainable Social Model
   Absence of Knowledge/Innovation Society
   Lack of Digital Economy, Green Economy, and Innovation Economy
   Lack of Social Cohesion
   Poor Justice System
   Undeveloped Social and Human Capital, Low Quality of Life
   Poor Leadership
   Poor National Health System
   Inefficient Governance
   Low Competitiveness, Low Productivity and Employment
   Poor Mobility
   Poor Natural Capital Management
   Ecological Degradation: nonrenewable energy and CO2, unsustainable land use and buildings, transport,
    waste, water, sanitation, pollution, air/water/soil/food quality, urban expansion, soil sealing and erosion
   Commercial/Inferior Real Estate Developments (standard low-quality construction projects, absence of
    smart, ecological, or sustainable projects)
   Collapsed Financial System
Three Scenarios for New Cyprus
2020
I.   Lost Decade. Cyprus, as Europe, will have suffered a
     permanent loss in wealth and capacity for growth
II. Sluggish Recovery. Cyprus, as Europe, will have suffered a
     permanent loss in wealth and start slowly growing from the old
     basis.
III. Sustainable Recovery. Cyprus is making a full recovery and
     raise its potential and capacity to excel
 Smart Cyprus Strategy is the silver bullet, the most viable
    solution for the Sustainable Recovery
Information resources
   A. Abdoullaev. A Smart World: A Development Model for Intelligent Cities, Keynote, 11th IEEE Int. Conference on
    Computer and Information Technology (CIT- 2011): www.cs.ucy.ac.cy/CIT 2011/
   A. Abdoullaev. Intelligent Europe Center Program:
    http://ec.europa.eu/dgs/secretariat_general/eu2020/docs/intelligent_europe_center_en.pdf
   A. Abdoullaev. The Smart Eco Island: i-Cyprus 2020: http://www.scribd.com/doc/40320567/i-Cyprus
   A. Abdoullaev. Smart EcoCity™ (Intelligent EcoCity™), ISBN 978-9963-9958-1-3, 2011, Cyprus, EU
   A. Abdoullaev. Neapolis Smart EcoCity, ISBN 978-9963-9958-0-6,2011, Cyprus, EU
   A. Abdoullaev. i-EUROPE Manifesto: http://www.slideshare.net/ashabook/i-europe-title-10150491
   A. Abdoullaev. I-RUSSIA; ГОСУДАРСТВЕННАЯ ПРОГРАММА РОССИЙСКОЙ ФЕДЕРАЦИИ:
    «Интеллектуальная РОССИЯ: Эко Регионы и Умные Города», 2012, Moscow, RUSSIA:
    http://www.slideshare.net/ashabook/ss-17463288
   A. Abdoullaev. SMART TERRITORIES OF THE FUTURE: The EU Smart Communities and Cities Prototype: 3.0
    City, from Dumb to Intelligent Cities.
   http://www.slideshare.net/ashabook/30-cityeu-prototype
   A. Abdoullaev. SMART TERRITORIES OF THE FUTURE: 3.0 WORLD, from Dumb to Intelligent World
    I-WORLD™; GLOBAL SKYNET™. [The Future World Investment Projects]
   http://www.slideshare.net/ashabook/x0-world
   EUROPE 2020: A Strategy for Smart, Sustainable and Inclusive Growth. Communication from the Commission,
    European Commission, 2010, Brussels, EU
   Smart Cities and Communities Communication Launch Event (European Commission); 10 July 2012, Sheraton
    Hotel, Brussels; The Cyprus Presidency’s view on Smart Cities and Communities.
   SMART CITIES AND COMMUNITIES - EUROPEAN INNOVATION PARTNERSHIP. Communication from the
    Commission, European Commission, 10th of July, 2012, Brussels, EU:
    http://ec.europa.eu/energy/technology/initiatives/smart_cities_en.htm
   Cyprus National Reform Program 2012. Europe 2020 Strategy for Smart, Sustainable and Inclusive Growth. Planning
    Bureau. April 2012. Cyprus, EU         Abdoullaev 2010-2013
                                   EIS Intelligent Systems ltd
EIS Intelligent Community Brands
   I-WORLD™; Global SkyNet™
   Smart Sustainable Communities™;
   Smart Sustainable World ™;
   Intelligent Eco City™;
   Smart Eco City™;
   i-City Operating Systems™;
   Smart City Software™;
   i-Community Package™;
   Intelligent Urban Operating Systems;
   Smart Eco Community Operating Systems, SECOS™
   Smart Cyprus™, Intelligent EcoIsland™
   Neapolis Smart EcoCity™
   Territorial Intelligent Platform™, TIP
   Territorial Intelligent Systems™, TIS
   X.0 World ™; World X.0 ™; 3.0 World ™; World 3.0; 3.0 City ™; City 3.0 ™
   i-Europe™, Intelligent Europe™, Smart Europe™, Europe SkyNet™
   i-Russia™, Smart Russia™, Intelligent Russia™, Russia SkyNet™




                         A. Abdoullaev 2010-2013
                        EIS Intelligent Systems ltd
CONTACT
   Dr Azamat Sh. Abdoullaev
   Managing Director
   Int.: + 357 99 683 849
   E-mail: ontopaedia@gmail.com;
   Internet Sites: http://iiisyla.livejournal.com
   ООО "Энциклопедические Интеллектуальные
    Системы“(Moscow/Russia)
   Skolkovo Innovation Center Participant
   EIS Encyclopedic Intelligent Systems Ltd (Cyprus, EU)
   PROJECTS: Smart Territories of the Future
   Smart World, I-WORLD
   i-RUSSIA
   i-Europe
   i-Cyprus




                     A. Abdoullaev 2010-2012
                    EIS Intelligent Systems ltd

New Cyprus Strategy as the Presidential Program 2018-2028

  • 1.
    NEW CYPRUS Smart Territoryof the Future or Mass Poverty and Social Misery Demonstrative Intelligent Investment Project for Frail Europe: Silver Bullet by EIS Encyclopedic Intelligent Systems LTD Dr Azamat Abdoullaev (Cyprus & Russia) Author of the EU Smart City Prototype STATUS: Under Review by Cyprus Government INTELLIGENT NATION, ECO REGIONS AND SMART CITIES EU, CYPRUS 2013
  • 2.
    AGENDA  EUROPE 2020  Cyprus 2020  Smart Cyprus Stakeholders  Smart Cyprus Trinity  Strategic Objectives  Smart Growth Programs  Project Planning Stages  Sustainable Community Architecture  Smart Cities and Eco Regions  EUROPEAN SMART CITY PROTOTYPE  EU Funds  Smart Cyprus Innovation Center and Education Program  Smart Cyprus Projects 2012-2020  Smart City Redevelopment Projects  Smart Community Redevelopment Projects  Current Situation  Three Scenarios for Cyprus 2020  Information Resources  EIS Intelligent Community Brands  Contact A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 3.
    EUROPE 2020: AEuropean Strategy for Smart, Sustainable and Inclusive Growth  Europe 2020 puts forward three mutually reinforcing priorities: I. Smart growth: developing an economy based on knowledge and innovation. II. Sustainable growth: promoting a more resource efficient, greener and more competitive economy. III. Inclusive growth: fostering a high-employment economy delivering social and territorial cohesion.  The Commission proposes the following EU headline targets: 1) 75 % of the population aged 20-64 should be employed. 2) 3% of the EU's GDP should be invested in R&D. 3) The "20/20/20" climate/energy targets should be met (including an increase to 30% of emissions reduction if the conditions are right). 4) The share of early school leavers should be under 10% and at least 40% of the younger generation should have a tertiary degree. 5) 20 million less people should be at risk of poverty  The Commission is putting forward seven flagship initiatives to catalyse progress under each priority theme: 1. INNOVATION: "Innovation Union" to improve framework conditions and access to finance for research and innovation so as to ensure that innovative ideas can be turned into products and services that create growth and jobs. 2. EDUCATION: "Youth on the move" to enhance the performance of education systems and to facilitate the entry of young people to the labour market. 3. DIGITAL SOCIETY: "A digital agenda for Europe" to speed up the roll-out of high-speed internet and reap the benefits of a digital single market for households and firms. 4. CLIMATE, ENERGY and MOBILITY: "Resource efficient Europe" to help decouple economic growth from the use of resources, support the shift towards a low carbon economy, increase the use of renewable energy sources, modernise our transport sector and promote energy efficiency. 5. COMPETITIVENESS: "An industrial policy for the globalisation era" to improve the business environment, notably for SMEs, and to support the development of a strong and sustainable industrial base able to compete globally. 6. EMPLOYMENT and SKILLS: "An agenda for new skills and jobs" to modernise labour markets and empower people by developing their of skills throughout the lifecycle with a view to increase labour participation and better match labour supply and demand, including through labour mobility. 7. FIGHTING POVERTY: "European platform against poverty" to ensure social and territorial cohesion such that the benefits of growth and jobs are widely shared and people experiencing poverty and social exclusion are enabled to live in dignity and take an active part in society. A. Abdoullaev 2010-2012 EIS Intelligent Systems ltd
  • 4.
    CYPRUS 2020 Cyprus hasbeen developing a European Smart City Prototype for all cities and communities. The Mediterranean island is to go through a critical stage in its long history: to bankrupt or to transform towards a smart, sustainable, and inclusive society, to become a world-class destination for investors, businesses, citizens and visitors. The “Smart Cyprus” Strategy aims to model Cyprus 2020 as an Eco- Sustainable Land, Smart Country, and Inclusive Nation. Smart Cyprus is to be distinguished with the following innovative features: Eco Districts, Smart Cities, and Green Communities Eco-wise National, Urban and Rural Infrastructures Smart Utilities and National Green Energy Networks Modern security/defense infrastructure (intelligent monitoring and measurement systems, sensor/actuators networks, ground-based and marine, wired and wireless, data collection systems; cybersecurity, illegal activities prevention) Innovation/knowledge economy (industry and sustainable corporations, innovation clusters, innovation districts, CDB, techno parks, knowledge clusters, disruptive technology/business eco-parks smart malls, university eco campuses, seaports, airports) Smart government, i-services to citizens, businesses, and local governments Intelligent ICT networks and multi-play telecommunications systems, optical and wireless Smart banking systems and financial services; sustainability in public finances; stability funds World-class healthcare, e-health and telemedicine Knowledge Triangle Clusters (education, R&D and business) Sustainable living, wellbeing, quality of life, smart, green, and healthy lifestyles A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 5.
    SMART CYPRUS Stakeholders  Presidency and Council of Ministers: the President of Cyprus (Chairman)  Church of Cyprus: Archbishop and Holy Synod  Government Departments: Ministry of Interior, Ministry of Education and Culture, Ministry of Agriculture, Natural Resources and Environment, Ministry of Commerce, Industry, and Tourism, Ministry of Communications and Works, Ministry of Finance, Ministry of Health, Ministry of Foreign Affairs, Ministry of Defence, Ministry of Justice and Public Order, Ministry of Labour and Social Insurance, Planning Bureau, Cyprus Tourism Organization; Chamber of Commerce and Industry  Municipalities: Lefkosia, Larnaka, Lemesos, Pafos, Famagusta, Kyrenia, Morphou et al.  Local Communities: Lefkosia District, Larnaka District, Lemesos District, Pafos District, Famagusta District  Political Parties and Civic Associations and NGOs  Business Groups & Innovative SMEs  Banking Institutions  Public-Service State Corporations: Cyta-Vodafone, EAC Electricity Authority  Telecom Corporations: PrimeTel, National TV stations, Cyprus Radio, etc.  Universities: University of Cyprus (Institutes, Schools, Faculties or Departments), Open University of Cyprus, Cyprus University of Technology; EUC European University-Cyprus; Frederick University - Cyprus, University of Nicosia; Research Institutes,…  Key Consultants: EIS Encyclopedic Intelligent Systems Ltd (Cyprus); EIS Intellectual Systems (Russia) A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 6.
    SMART CYPRUS TRINITY The TRINITY COMMUNITY of Wellbeing, Quality of Life and Sustainable Growth Eco- I- CYPRUS/ CYPRUS/ Regions/ Regions/ Cities/ Cities/ Villages Villages Social/Human/I‐Capital Smart Innovation Ecosystems Sustainable  Smart Living Physical Capital CYPRUS Smart Economy Natural Capital Knowledge Infrastructure Ecosystems Smart Governance Natural Resources  Equity, Wellbeing, QoL  Knowledge Society Renewables/RES Green Infrastructure Eco‐Urbanization Information capital Green Society u‐Computation, ICT Infrastructure  Smart Mobility Digital Virtual Reality, Intelligent Clouds CYPRUS/ Regions/ Internet of Things Cities/ Digital/Smart Society Villages A. Abdoullaev 2010-2012 EIS Intelligent Systems ltd
  • 7.
    Strategic Objectives  Land of Unity, Ecology, Knowledge, Innovation, Education, Technology, Wealth, and Well-Being  Smart Growth on social intelligence, knowledge, innovation and creativity  Sustainable Growth on resource efficiency, renewable energy technologies and competitive economy  Inclusive Growth on social cohesion, productivity, high-skilled workforce, massive employment and wealth- creation  i-government, smart public and social policy, intelligent ecological communities and cities, knowledge industry, ubiquitous ICT, intelligent banking systems and financial services, smart healthcare, innovative research and education, creative work, long life learning, and smart lifestyle.  Integrating education and research, innovation and entrepreneurship  Producing innovative products, smart services and intelligent processes  Empowering people in inclusive societies with smart governance  Creating a competitive, connected, greener and smarter economy  Utilizing the advances of the ICT technology for digital economy, knowledge market and intelligent urbanization  Convergence and integration and interdependence of regions and cities and local communities  Implementing sustainable renewable energy policy and massive green electrification, using renewable energy resources: solar energy, biomass power, geothermal energy, wind power, sea waves energy  Preserving the natural resources, biosphere reserves, natural parks, nature reserves, environmental protection (coastal regeneration, green forestation, flood prevention and water management, and sewer construction)  Creating attractive national branding, improving the investment environment, boosting the health of the economy, and upgrading the quality of life.  Creating national ecosystems and sustainable environments, social, economic, cultural, political, technological and ecological A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 8.
    Smart Growth Programs National Program of Innovative ICT and Broadband Knowledge Economy  National Program of Smart Eco Territories (communities, villages, towns, cities, districts, and country)  National Program of Science and Research and Innovation Networks  National Program of Knowledge Parks (knowledge clusters, university research parks, science and technology parks, healthcare parks, technopolis, business park, industrial parks)  National Program of Smart Government Agencies and State Corporations  National Program of Smart Industry, Corporations and Intelligent Business Management  National Program of Smart Lifestyle, Creativity and Knowledge and Persistent Learning A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 9.
    Project Planning Stages  Smart Cyprus Project (Size and Implementation): partnership among government, civic associations, academia, research institutes, public sector, private corporations, and non-profit sector; Funding sources (EU Funding, national funding and private investment), Project Size (implementation costs, to be assessed)  Current Industries: tourism, construction, cement and gypsum production, ship repair and refurbishment, food and beverage processing, textiles, light chemicals, metal products, wood, paper, stone, and clay products; collapsing financial system  Future Cyprus Industries: Modern tourism, smart housing industry, intelligent ICT industry, green economy, knowledge service industry, intelligent banking system, smart gas/oil industry, intelligent energy  Supporting Action Plans and Programs: The EU 2020 Strategy for Smart, Sustainable and Inclusive Growth; National Strategic Reference Framework Program for Cohesion Policy, 2014- 2020; Cyprus National Reform Program 2011, 2012  i-Cyprus Plan of Actions in three stages:  Smart Eco Island Strategy (2013);  Intelligent Nation Master plan (Fitting, Transforming and Adjusting Existing National Planning and Programs, 2013-2014);  Intelligent Eco Island Development & Smart Municipalities and Eco Communities Projects (2013- 2020; Conception, Design, Legislations, Promotion and Implementation) A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 10.
    SUSTAINABLE NATION/CITY/COMMUNITY ARCHITECTURE  Digital/ICT/Hi-Tech/Ubiquitous/Cyber/Smart Cyprus (Digital/Information Capital; Intelligent ICT Infrastructure, Multi-Play Telecom Networks, Smart Governance, Intelligent Management Platforms, Ubiquitous Computation, Network-integrated Buildings, Digital Communities, Virtual Lifestyle)  Sustainable/Ecological/Green/Zero-Carbon/Zero-Waste/Eco Friendly/Eco Cyprus (Natural Capital; Natural Resources, Physical Capital, Green Energy Networks, Green Buildings, Eco-Environment, Eco Communities, Green Lifestyle)  Knowledge/Learning/Innovation/ /Intelligent/Science/Intellectual/LivingLab/Creative/Human/Social Cyprus (Knowledge or Innovation Capital; Human/Intellectual Capital, Social Capital and Networks, Social Cohesion, Knowledge Triangles/Health Triangles, Knowledge EcoSystems, nowledge Communities, Intelligent/Smart Lifestyle) A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 11.
    SMART CITIES ANDECO REGIONS  Implementing Smart Eco City Programs: Eco Land and Territories, Eco Mobility, Environmental Infrastructure, Transportation and Road Networks, Green Energy and Utilities, ICT Infrastructure, Smart Economy, Smart Governance, Smart Mobility, Smart Environment, Smart People, Smart Living  Developing Cyprus Districts as eco-regions: Comprehensive Management Plan/Regional Development Plan: Environmental Planning, Digital Planning, Social Planning; Green Economics, Green Property Developments, Environmental Infrastructures  Initiating and Stimulating large master planned developments as smart eco-sustainable projects  Assisting businesses to align their strategies, projects and operations with the Smart Eco-Region Comprehensive Management Plan and strategic policy initiatives  Attracting to Smart Districts the EU Funding resources and sustainable/impact/socially responsible investment (Benefiting from the EU Structural and Cohesion Funds granted to Cyprus during the next 2014-2020 period)  Re-developing Cities as Smart and Green Cities, attractive destination for Ecological, Cultural, Sports, and Medical Tourism  Advancing the EU NATURA 2000 Sites of Community Importance (SCI) and Special Protection Area (SPA) as Eco-Sustainable Developments  Building the Regional Operations Center/Urban Management Systems A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 12.
    EUROPEAN SMART CITY PROTOTYPE:the Smart EcoCity  CONCEPT: The Trinity City; Smart Eco City, Intelligent Green City  STRATEGY: The most innovative urban development strategy, as integrating the Eco City Strategy, Digital City Strategy and Knowledge City Strategy  ARCHITECTURE: Integrated architecture of urban systems and services to achieve a fully sustainable “New City” of Eco-Intelligence  OBJECTIVE: Prototype Model for European Smart City for other cities and communities  DECISIONS: 1. European Union: Presented by the European Commission as a prototype project of smart sustainable development at the Pan European Meeting/Conference “Smart Cities and Communities”, in Brussels, on Tuesday 10th of July 2012. 2. Cyprus Presidency’s View on Smart Cities and Communities, presented by the Minister of Commerce, Industry and Tourism of the Republic of Cyprus, Mr. Neoklis Sylikiotis: “This pilot project is based on pioneering concepts for a centrally based architecture of services, aiming at achieving a fully sustainable “New City” of Eco-Intelligence. The objectives call for implementing the most innovative development strategy, with the commitment to support the scale-up and replication of this initiative to other cities and communities.”  SMART TERRITORIES OF THE FUTURE: The EU Smart Communities and Cities Prototype: 3.0 City, from Dumb to Intelligent Cities.  http://www.slideshare.net/ashabook/30-cityeu-prototype 1. A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 13.
    EU Funds  Programming Period 2007-2013: Strategic Development Plan (SDP); The National Strategic Reference Framework (NSRF) 2007- 2013; The NSRF is co-financed (€612,4 mln) from the European Regional Development Fund (ERDF), the European Social Fund (ESF) and the Cohesion Fund (CF) of EU. By December 2011, about 3.420 mostly small projects with a total budget (eligible public expenditure) of €830 mln have been approved, corresponding to 113% of the OPs total budget, without any visible impact on the national sustainable growth. Operational Programme: “Sustainable Development and Competitiveness” General Objectives: 1. Improving the attractiveness of the country, through the creation and upgrading of basic infrastructure 2. Promoting the knowledge society and innovation and improving the productive environment 3. Creating sustainable communities in urban and rural areas Priority Axes: 1) Basic Infrastructure in the Environment and Energy Sectors 2) Basic Transport Infrastructure 3) Knowledge Economy and Innovation 4) Productive Environment 5) Revitalisation of Urban and Rural Areas Operational Programme: “Employment, Human Capital and Social Cohesion” General Objectives: 1. Improvement of Human Capital and Increase of the Adaptability of the Private and Public Sector 2. Attracting and Maintaining More People in the Labour Market and Reinforcement of Social Inclusion Priority Axes: 1. Development of Human Capital and Adaptability; 2. Expansion of Labour Market and Social Cohesion  Programming Period 2014-2020: Smart Cyprus Strategic Development Plan 2014-2020, estimated total budget about EUR 4 bn, mostly for large-scale projects, national, urban and inter-communal  Horizon 2020", the new research and innovation funding framework under the next Multiannual Financing Framework (MFF 2014-2020). A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 14.
    “SMART CYPRUS” INNOVATION CENTER SMARTGROWTH STRATEGY, PROGRAMS AND PROJECTS: National, Regional, Urban and Inter- Communal 1. Smart Cyprus Sustainable Infrastructure 2. Eco Regions and Sustainable Communities 3. Smart Cities and Municipalities: EcoPolis and EcoVillage Projects 4. Eco Development Projects, NATURA 2000 Sites Green Redevelopment 5. Sustainable Building/Eco Construction Projects (Green Buildings, Eco Homes, Smart Villas, Intelligent Homes) ORGANIZING SMART PUBLIC AND BUSINESS CLUSTERS of related enterprises, suppliers, and institutions in different fields of economy, commerce, industry, or civil services 1) Knowledge Parks of Third Generation 2) Innovatiion Parks, Smart Techno-clusters; Know-how clusters; Intelligent Eco-parks, Agro-Clusters; Medical or Hospital Clusters; sector clusters, horizontal clusters, vertical supply chain clusters 3) Maximizing the business intelligence capital, productivity and creativity 4) Stimulating innovative businesses and intelligent industry (eg, integrated operations of people, processes and technology, e-Field, i-Field, Digital Gas/Oilfield, intelligent field, or Smart Fields of Smart Wells) 5) Driving innovation in a new field of knowledge economy, commerce or industry (Smart Property, Intelligent Infrastructure, Cloud Computing, Intelligent Energy, Smart Gas/Oil) HIGH-LEVEL EDUCATION PROGRAMS 1. Global Initiatives for Smart Communities: IBM’s Smarter Planet, Cisco’s Intelligent Urbanization, EIS’ Smart World, EU 2020 Strategy, and EU Initiatives on Smart Cities 2. Europe 2020 and Cyprus: Lost Decade, Sluggish Recovery or Sustainable Recovery 3. Smart City Projects across the World, or Why Smart Cities make Priorities for Global Investors and Corporations (IBM, Cisco, Hitachi, Toshiba, Alcatel-Lucent, Siemens, Huawei, etc.) 4. Smart City as a Model Settlement, or How to Become a Smart Municipality and Green Community 5. From Greek Polis to Intelligent Eco-Polis: Launching Smart City Programs and Eco Community Projects in Cyprus A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 15.
    Smart Cyprus Projects2012-2020  Smart Eco Developments, Large Integrated Innovative Construction Projects: Smart Eco City (Neapolis) as a model of European Smart Cities  Smart Municipality Clusters: Pafos Smart Eco District; Smart Limassol, East Eco Coast of Smart Municipalities: Derynea-Sotira-Paralimni-Protaras-Agia Napa; Smart Municipality Projects of Nicosia-Larnaka (Eco Mobility, Intelligent Traffic, Eco Districts, Eco-Neighborhoods, Eco Streets, Public Eco Transport, Working and Cycling, Innovative measures on buildings, local energy networks, transportation, ICT Networks, and social infrastructure)  Eco Community Clusters, Green Connected Communities: West Eco Coast of Eco Villages: Makounta-Argaka-Gialia-Agia Marina-Nea Dimmata-Pomos-Pachyammos; Kathikas-Arodes-Ineia- Fasli-Androlikou-Prodromi-Neo Chorio; South Eco Coast of Eco Villages: Timi-Mandria-Kouklia  NATURA 2000 Sites Eco-Wise Projects: Touristic Green Facilities and Eco Homes  Nationwide Green Digital Backbone: Integrated Fibre and Green Energy Infrastructure (Installing Fibre Optic and Green Energy conduit infrastructures as part of new public roads construction projects, see EUROCITIES Green Digital Charter; see the “Fiber Optic and Green Energy Conduit Deployment Act of 2012” Bill Proposal)  Nationwide Internet of Things and People (Anytime, Anywhere, Any Thing, Any One, Any Network, Any Service; Convergence, Computing, Connectivity, Content, Communication, Collection; the Future Internet PPP Business Scheme) A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 16.
    Sustainable City Redevelopment Projects  Smart City Re-Development (Impact Investments in Low-Energy Buildings, Efficient Waste Infrastructure, Local Energy Infrastructure, Distributed Renewable Installations, Urban Mobility, and Social Infrastructure)  Eco-Efficiency in Infrastructure, Housing, Public Buildings, Residential Complexes, Multi-Apartment Buildings, Residential Units, and Sports Facilities  Digital/Cyber/Information City Urban Projects, new and retrofitting, advanced ICT Networks, Optical Internet Backbone, Municipal Wireless (WiFi) Communication Networks with open service model (tourist areas to start), smart ICT services for citizens, businesses and government agencies (i-government, i-learning, i- health, i-commerce, etc)  Clean/Green City Projects, Green Infrastructure, Transport, Buildings, Green Energy Networks (distributed energy systems, green homes, ECO neighborhood, districts; smart grids, smart metering, solar gardens, ecological infrastructures, green facilities, and solar thermal farms)  Creative/Intelligent/Cultural City Projects/Events/Institutions to organize territorial innovation systems, to nurture creativity, innovation, and talents, investing in education, arts and culture, organizing high quality cultural and creative events and performances, attracting talented professionals and international knowledge, cultural, and multi-media industries The Project Financing methods follow the Public-Private-Citizen Partnership business models, involving the private firms, investment institutions, municipal governments, central government, civic organizations and individual citizens. Being in line with the EU Strategy 2020, the whole Initiative could utilize the EU funding opportunities, schemes, programs, and initiatives, like the EU Initiative on Smart Cities, as well as the national government incentives for smart urban growth and sustainable redevelopment. A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 17.
    Sustainable Community Redevelopment Projects  Community Planning and Development (Smart ECO Polis Model, Smart ECO Polis Master Plan, green community strategy, digital community strategy, knowledge community strategy, integrated spatial digital city planning, local development planning, sustainable land use, eco community standards, cross-communal ecosystem)  Energy (eco village grid, urban renewable energy networks, clean energy systems, renewable energy technologies, biomass, solar thermal, ambient thermal, and geothermal applications; heat storage technologies, tri-generation and district heating/cooling systems; advanced metering infrastructure, energy management systems, smart domestic appliances, intelligent street lighting, solar parks/farms; EV and HEV charging and storage)  Water and Waste (environmental infrastructure, quality water supply system, sustainable community drainage systems, advanced biological sewerage systems, rainwater harvesting, grey water treatment, green roofs, balance with nature, reduction, re-use and recycling waste)  Real Estate, Buildings and Facilities (eco realty, green buildings, innovative insulation, net zero energy buildings, residential, commercial, public, special; smart community polycenter, leisure and health center, cultural center, financial center, business center, sports center)  Local Economy (smart sustainable and inclusive growth, economic development investment, strong local economy, eco-tourism, attractive commercial spaces, smart outlets, innovative business, new employment opportunities, and sustainable jobs)  Land and Environment (natural capital and resources, sustainable sites and urban landscape, productive land, living land, eco land, sea environment protection, coastal regeneration; green infrastructure, eco parks and zones, public spaces, integrated green areas)  Governance and Administration (e-Participation, i-administration, common service delivery platform, digital urban management system, smart public services)  Smart Transportation (eco-mobility, public transport system, bus routes, cycle lanes, sidewalks, plazas, eco streets, parks, car-free zones, clean transportation, sustainable road networks, intelligent transportation systems, bike installations, public benches, green parking)  ICT (digital capital and resources, network-connected communities and eco-neighborhoods, optical Ethernet, Fiber-To-the-Home access, WiFi zones, smart appliances, urban operation systems, building integration platform, integration into global communication network, ICT clusters, smart digital services, new jobs)  Intelligent Community (human capital and resources, knowledge city, sense of community, social cohesion, community intelligence, innovative and creative community, education, knowledge, innovation, entrepreneurship, knowledge triangle, knowledge-rich living, knowledge-intensive jobs)  Sustainable Lifestyle (health and well-being, safety and security, meaningful social life, social safety nets, social spaces, green lifestyle, intelligent lifestyle, digital lifestyle, smart living) A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 18.
    CURRENT SITUATION: Atthe Edge of National Bankruptcy  Social Exclusion, Mass Unemployment and Poverty  Unsustainability (in Society, Economy, and Finances)  Unsustainable Social Model  Absence of Knowledge/Innovation Society  Lack of Digital Economy, Green Economy, and Innovation Economy  Lack of Social Cohesion  Poor Justice System  Undeveloped Social and Human Capital, Low Quality of Life  Poor Leadership  Poor National Health System  Inefficient Governance  Low Competitiveness, Low Productivity and Employment  Poor Mobility  Poor Natural Capital Management  Ecological Degradation: nonrenewable energy and CO2, unsustainable land use and buildings, transport, waste, water, sanitation, pollution, air/water/soil/food quality, urban expansion, soil sealing and erosion  Commercial/Inferior Real Estate Developments (standard low-quality construction projects, absence of smart, ecological, or sustainable projects)  Collapsed Financial System
  • 19.
    Three Scenarios forNew Cyprus 2020 I. Lost Decade. Cyprus, as Europe, will have suffered a permanent loss in wealth and capacity for growth II. Sluggish Recovery. Cyprus, as Europe, will have suffered a permanent loss in wealth and start slowly growing from the old basis. III. Sustainable Recovery. Cyprus is making a full recovery and raise its potential and capacity to excel  Smart Cyprus Strategy is the silver bullet, the most viable solution for the Sustainable Recovery
  • 20.
    Information resources  A. Abdoullaev. A Smart World: A Development Model for Intelligent Cities, Keynote, 11th IEEE Int. Conference on Computer and Information Technology (CIT- 2011): www.cs.ucy.ac.cy/CIT 2011/  A. Abdoullaev. Intelligent Europe Center Program: http://ec.europa.eu/dgs/secretariat_general/eu2020/docs/intelligent_europe_center_en.pdf  A. Abdoullaev. The Smart Eco Island: i-Cyprus 2020: http://www.scribd.com/doc/40320567/i-Cyprus  A. Abdoullaev. Smart EcoCity™ (Intelligent EcoCity™), ISBN 978-9963-9958-1-3, 2011, Cyprus, EU  A. Abdoullaev. Neapolis Smart EcoCity, ISBN 978-9963-9958-0-6,2011, Cyprus, EU  A. Abdoullaev. i-EUROPE Manifesto: http://www.slideshare.net/ashabook/i-europe-title-10150491  A. Abdoullaev. I-RUSSIA; ГОСУДАРСТВЕННАЯ ПРОГРАММА РОССИЙСКОЙ ФЕДЕРАЦИИ: «Интеллектуальная РОССИЯ: Эко Регионы и Умные Города», 2012, Moscow, RUSSIA: http://www.slideshare.net/ashabook/ss-17463288  A. Abdoullaev. SMART TERRITORIES OF THE FUTURE: The EU Smart Communities and Cities Prototype: 3.0 City, from Dumb to Intelligent Cities.  http://www.slideshare.net/ashabook/30-cityeu-prototype  A. Abdoullaev. SMART TERRITORIES OF THE FUTURE: 3.0 WORLD, from Dumb to Intelligent World I-WORLD™; GLOBAL SKYNET™. [The Future World Investment Projects]  http://www.slideshare.net/ashabook/x0-world  EUROPE 2020: A Strategy for Smart, Sustainable and Inclusive Growth. Communication from the Commission, European Commission, 2010, Brussels, EU  Smart Cities and Communities Communication Launch Event (European Commission); 10 July 2012, Sheraton Hotel, Brussels; The Cyprus Presidency’s view on Smart Cities and Communities.  SMART CITIES AND COMMUNITIES - EUROPEAN INNOVATION PARTNERSHIP. Communication from the Commission, European Commission, 10th of July, 2012, Brussels, EU: http://ec.europa.eu/energy/technology/initiatives/smart_cities_en.htm  Cyprus National Reform Program 2012. Europe 2020 Strategy for Smart, Sustainable and Inclusive Growth. Planning Bureau. April 2012. Cyprus, EU Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 21.
    EIS Intelligent CommunityBrands  I-WORLD™; Global SkyNet™  Smart Sustainable Communities™;  Smart Sustainable World ™;  Intelligent Eco City™;  Smart Eco City™;  i-City Operating Systems™;  Smart City Software™;  i-Community Package™;  Intelligent Urban Operating Systems;  Smart Eco Community Operating Systems, SECOS™  Smart Cyprus™, Intelligent EcoIsland™  Neapolis Smart EcoCity™  Territorial Intelligent Platform™, TIP  Territorial Intelligent Systems™, TIS  X.0 World ™; World X.0 ™; 3.0 World ™; World 3.0; 3.0 City ™; City 3.0 ™  i-Europe™, Intelligent Europe™, Smart Europe™, Europe SkyNet™  i-Russia™, Smart Russia™, Intelligent Russia™, Russia SkyNet™ A. Abdoullaev 2010-2013 EIS Intelligent Systems ltd
  • 22.
    CONTACT  Dr Azamat Sh. Abdoullaev  Managing Director  Int.: + 357 99 683 849  E-mail: ontopaedia@gmail.com;  Internet Sites: http://iiisyla.livejournal.com  ООО "Энциклопедические Интеллектуальные Системы“(Moscow/Russia)  Skolkovo Innovation Center Participant  EIS Encyclopedic Intelligent Systems Ltd (Cyprus, EU)  PROJECTS: Smart Territories of the Future  Smart World, I-WORLD  i-RUSSIA  i-Europe  i-Cyprus A. Abdoullaev 2010-2012 EIS Intelligent Systems ltd