Communities:
EUROPEAN INNOVATION PARTNERSHIP ON SMART COMMUNITIES AND CITIES
2014-2020
By
http:// www.slideshare.net/ashabook/eis-ltd
Smart, Sustainable, Future Communities are engines of growth, high-quality jobs and living. The “Smart City Limassol” Program
aims to transform LIMASSOL as an intelligent sustainable city: environmentally sustainable, innovative, regionally and globally
attractive for businesses, citizens, visitors and investors.
SMART LIMASSOL is projected to be managed by an open intelligent management platform as a city digital dashboard for its
critical areas and systems: Urban Land and Environment, Roads and Transportation, Energy networks and Utilities, ICT networks
and fiber telecom infrastructure, Public and residential buildings, Natural Resources, Water and Waste management, Social
infrastructure, Health and safety, Education and culture, Public administration and services.
I.
II.
III.

1)
2)
3)
4)
5)

1.
2.
3.
4.
5.
6.
7.
8.

Smar t growth: developing an economy based on knowledge and innovation (INNOVATION; EDUCATION; DIGITAL SOCIETY).
Sustainable growth: promoting a more resource efficient, greener and more competitive economy (CLIMATE, ENERGY AND
MOBILITY; COMPETITIVENESS).
Inclusive growth: fostering a high-employment economy delivering social and territorial cohesion (EMPLOYMENT AND
SKILLS; FIGHTING POVERTY).
The headline targets:
75 % of the population aged 20-64 should be employed.
3% of the EU's GDP should be invested in R&D.
The "20/20/20" climate/energy targets should be met (including an increase to 30% of emissions reduction if the conditions
are right).
The share of early school leavers should be under 10% and at least 40% of the younger generation should have a tertiary
degree.
20 million less people should be at risk of poverty
The flagship initiatives :
INNOVATION: "Innovation Union" .
EDUCATION: "Youth on the move.
DIGITAL SOCIETY: "A digital agenda for Europe" .
CLIMATE, ENERGY and MOBILITY: "Resource efficient Europe"
COMPETITIVENESS: "An industrial policy for the globalisation era".
EMPLOYMENT and SKILLS: "An agenda for new skills and jobs" .
FIGHTING POVERTY: "European platform against poverty".
EUROPE 2020: A Strategy for Smart, Sustainable and Inclusive Growth. Communication from the Commission, European
Commission, 2010, Brussels, EU
SUSTAINABLE URBAN TRINITY
of
Wellbeing, Quality of Life and Sustainable Growth

Eco-

Social

City/
Town/
Community

City/
Town/
Community

Physical Capital
Natural Capital
Ecosystems
Natural Resources
Renewables/RES
Eco Technologies
Green Infrastructure
Eco-Urbanization
Green Society
ECO-SUSTAINABLE GROWTH

Social/Human/I-Capital
Innovation Ecosystems
Smart Living
Smart Economy
Knowledge Infrastructure
i-Industry
Smart Governance
Equity, Wellbeing, QoL
Knowledge Society
SOCIAL/INCLUSIVE GROWTH

SUSTAINABLE
CITY

i-City
Platform

Digital
City/
Town/
Community

Information/Digital Capital
Smart Mobility , Smart Services
ICT Infrastructure, OTN, Optical
Networks , NG Broadband
3DTV, HDTV, CC, Intelligent Clouds
Internet of Things, u-Computation
Digital/Cyber Society
TECHNOLOGICAL/SMART GROWTH

Building Smart Cities and Communities 2013 All Rights Reserved EIS Ltd
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved















EIS ltd

Redeveloped as a Smart and Sustainable City, Limassol is to emerge as an Intelligent City of the Future of
three critical urban levels planned, managed and coordinated as integral multi-projects:
Digital/ICT/Hi-Tech/Ubiquitous/Cyber/Mobile/Smar t City (Districts, Municipalities,
Communities)
(Digital/Information Capital; Intelligent ICT Infrastructure, Multi-Play Telecom Networks, Smart Governance,
Intelligent Management Platforms, Ubiquitous Computation, Network-integrated Buildings, Digital
Communities, Digital/Virtual Lifestyle)
Sustainable/Ecological/Green/Zero-Carbon/Zero-Waste/Zero-Energy/Nature Friendly/Eco
City (Districts, Municipalities, Communities) (Natural Capital; Natural Resources, Physical Capital,
Green Energy Networks, Green Buildings, Eco-Environment, Eco Communities, Green Lifestyle)
Knowledge/Learning/Innovation/
/Intelligent/Science/Intellectual/LivingLab/Creative/Human /Social City (Districts,
Municipalities, Communities) (Knowledge or Innovation Capital; Human/Intellectual Capital, Social
Capital and Networks, Social Cohesion, Knowledge Triangles/Health Triangles, Knowledge EcoSystems,
Knowledge Communities, Intelligent/Smart Lifestyle)
The goal of the Smart Limassol Strategy is to enhance urban wealth, performance and competitiveness, and
promoting smart innovation and creativity, education, art and medicine, science and technology, industry
and commerce, transportation and mobility, social communications and public administration and
environment conservation.
In all, Sustainable City Limassol is to be renewed as cyber-physical territorial ecosystem with interdependent
urban systems: sustainable land and environment, smart people, interconnected info- and infrastructure and
intelligent government.
SMART TERRITORIES OF THE F UTURE: The EU Smar t Communities and Cities Prototype: 3.0 City, f rom Dumb to
Intelligent Cities. http://www.slideshare.net/as habook/30-cityeu-prototype
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved



1.

2.

3.
4.


Limassol Smart City activities could be cross-classified by strategies, scales, motivations (social, economic or ecological),
financial models, ownership or initiator, greenfield or brownfield, business model or driving industrial sector, or driving
technology, as:
CLASS I. Smar t City of full sustainability (PPP turnkey urban greenfield project with a global smart city plan, all
functional areas and all aspects of urban life are covered by an all-encompassing and all-inclusive Master Development Plan of
3.0 City, Types: All-Inclusive, Innovation, Eco-sustainable, Economic, Energy, Oil/Gas, Financial, Mobile, etc.);
CLASS II. IT projects of various scales (u-cities, with all-IP citywide network with comprehensive smart city platforms
intelligently connecting networked devices, machines and vehicles to create an urban Internet of Things infrastructure, no
global smart city plan, Types: all-encompassing, special and economic recovery);
CLASS III. Private or public fragmented urban projects , with no global smart city plan (Types: Innovation-centric,
Health, Education, Tourism, Mobility, Energy, etc.);
CLASS IV. Closed government-led PPP ecosystem projects , usually no comprehensive urban master plan
An IT smart city relies on information and communications technologies, including mobile networks, to improve the quality of life of its
citizens in a sustainable way. It combines and shares disparate data sets captured by intelligently-connected infrastructure, people and
vehicles, to generate new insights and provide ubiquitous services that enable citizens to access information about city services and move
around easily, improve the efficiency of city operations, enhance security, fuel economic activity and increase resilience to natural
disasters. http://www.slideshare.net/ashabook/creating-the -future-tomorrows-world










EIS ltd

IT smar t city ser vice categories and applications

■ Transpor t, including public transport, intelligent transport systems and parking, GIS;
■ Environment/Energy, Environment Management, Energy networks, such as smart grids, smart meters, smart energy-efficient buildings;
Telecom networks , all-IP core networks, ultra-high broadband access convergence networks, advanced services and applications, such as FTTx,
GPON, LTE, multi-play services, urban traffic management, building automation, lighting and energy management, access and security networks,
location-based services, trust and security platforms, multimodal user Interfaces, Anytime/any place Ubiquitous connectivity, the Internet of Things
between machines (multiple devices and sensors and actuators) and humans, M2M and M2M2H (real time data and control)
■ Municipal projects, city administration and public utilities, waste management, modernisation of water systems, smart lighting systems, public
safety and city resilience programms;
■ Public Services , Education and Health, Safety and Security, and Social Networking, Economic Stimulus projects
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved





















EIS ltd

Smar t Urban Planning and Development (Intelligent City Conception and Planning, Green City Strategy,
Digital/Intelligent City Strategy, Knowledge City Strategy, integrated digital planning, sustainable land use and smart building
development)
Smar t Governance (e-Participation, e-administration, intelligent urban management system)
Sustainable Energy (renewable energy networks, tri-generation and district heating/cooling systems; advanced metering
infrastructure, smart grid, energy management systems, smart domestic appliances, intelligent street lighting, solar power
plants)
Smar t Buildings and Facilities (green construction, smart buildings, eco hotels, energy-efficient refurbishment of public
buildings, innovative insulation, green roofs; net zero energy buildings)
Smar t Economy (innovative urban economy, smart commercial spaces, innovation, employment opportunities, green tourism
and jobs, business clusters)
Smar t Environment (coastal regeneration, seaside environment protection, green infrastructure, eco parks and zones,
advanced sewerage system, rainwater harvesting, grey water treatment, living roofs, reduction, re-use and recycling waste,
integrated green areas, urban forest and farms)
Smar t Transpor tation (public transport system, bus routes, cycle lanes, green trails networks)
ICT (smart network-connected districts, sectors and communities, optical Ethernet, Fiber-To-the-Home access, WiFi zones,
smart appliances, urban operation systems, building integration platform, cloud computing, ubiquitous computing, web farms,
ICT clusters, smart digital services, ICT jobs)
Intelligent Community (sense of community, social cohesion, innovative ecosystems and creative communities, knowledge
triangles, knowledge parks, knowledge jobs)
Sustainable Lifestyle (smart community complexes, leisure and health centers, cultural centers, athletic centers, green
lifestyle, smart lifestyle, intelligent lifestyle)
 
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved













Smart ICT, Optical Transportation, and Mobile Networks
Smart and Green Energy
Smart and Sustainable Water
Smart and Sustainable Waste
Smart Mobility and Green Transportation
Smart and Green Building and Sustainable Construction
Smart People and Knowledge Workers
Smart Government and Intelligent Administration
Smart Business and Commerce
Smart Safety and Health
Smart Culture, Education, Research and Innovation

EIS ltd
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved













Digital or Smart Community Technologies
Green or Eco Community Technologies
Social or Inclusive Community Technologies
Sustainable Community Integrating Technologies,
as Socio-Technological Open Platform,
Internet of Things,
Green ICT,
Smart Healthcare,
Social ICT,
Smart Social Technologies,
and Internet of Everything Technologies.

EIS ltd
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved


















SMART ECO CIT Y STRATEGY (Vision & Strategy & Priority Public Projects)
Scope: Smart City Branding & Full Sustainability Report;
Cost range – Negotiable as a certain percentage from the budget
SMART URBAN PROJECTS MANAGEMENT PLANNING (Work Breakdown Structure and Project
Organization Structure)
Scope: Smart Eco District Program;
Cost – Negotiable as a certain percentage from the budget
SUSTAINABLE DEVELOPMENT CERTIFICATION AND ECO-LABELING (Eco-Label Europe, Silver, Gold
or Platinum level buildings et al; Concept Design, online registration, delivery date, cost)
Scope: International Green Certification and Accreditation Systems (Certified, Silver, Gold, Platinum);
Cost Range – Negotiable as a certain percentage from the budget
DIGITAL CIT Y MANAGEMENT PLATFORM (schema, High Level Design (HLD), cost range,
implementation, delivery date)
Scope: Urban Management System;
Cost Range – Negotiable as a certain percentage from the budget
SMART CIT Y PROJECTS LISTING (of eco securities on a new public exchange, locally and internationally,
global smart companies selection as strategic investors)

Scope: Smart Investor Package

Cost Range – Negotiable as a certain percentage from the budget




EIS ltd

 
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved












On 10 July 2012, the European Commission launched the Smart Cities and Communities European Innovation Partnership under the responsibility of
Directorate-General for Communications Networks, Content and Technology, Sustainable and Secure Society, Smart Cities and Sustainability. The
partnership proposes to pool resources to support the demonstration of energy, transport and information and communication technologies (ICT) in
urban areas: C(2012)4701 final, 10.7.2012
The energy, transport and ICT industries are invited to work together with cities to combine their technologies to address cities' needs. This will enable
innovative, integrated and efficient technologies to roll out and enter the market more easily, while placing cities at the centre of innovation. The funding
will be awarded through yearly calls for proposals under "Horizon 2020", the new research and innovation funding framework under the next Multiannual
Financing Framework (MFF 2014-2020).
Communication from the Commission "Smar t Cities and Communities - European Innovation Par tnership" [COM(2012)4701.
GB: EUROPEAN COMMISSION, DIRECTORATE-GENERAL FOR COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY, DIRECTORATE-GENERAL FOR
ENERGY, DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
GB: The Smar t Cities Stakeholder Platform , a collaborative, networking and knowledge sharing tool in the domain of Smart Cities and
Communities.
GB: High Level Group (supported by its Sherpa Group): High level representatives from industry, research and cities, which are appointed by the
European Commission in their personal capacity.











EIS ltd

Definition and Goals:

Smart Cities are defined as systems of people interacting with and using flows of energy, materials, services and financing to catalyse
sustainable economic development, resilience, and high quality of life; these flows and interactions become smart through making
strategic use of information and communication infrastructure and services in a process of transparent urban planning and management
that is responsive to the social and economic needs of society.
Goals: 1. negotiate obstacles to smart cities, to co-fund demonstration projects and to help coordinate existing city initiatives and projects,
by pooling its resources together; 2. establish strategic partnerships between industry, financial institutions, and European cities to
develop the urban systems and infrastructures of tomorrow; 3. combine ICT, energy management and transport management to create
innovative solutions to the major urban environmental, societal and health challenges.
SOURCES: http://ec.europa.eu/energy/technology/initiatives/smart_cities_en.htm
http://www.eu-smartcities.eu/blog/what-exactly-are-smart-cities-and-communities-towards-eip-conference


















The Smart Limassol Strategic Planning is to cover the SIP
of the EIP on Smart Cities and Communities:
 Sustainable Urban Mobility – Alternative energies,
public transport, efficient logistics, planning;
 Sustainable Districts and Built Environment –
improving the energy efficiency of buildings and districts,
increasing the share of renewable energy sources used
and the liveability of our communities;
 Integrated Infrastructures and processes across
Energy, ICT and Transport – connecting infrastructure
assets to improve the efficiency and sustainability of
cities
The Plan puts forward eight key horizontal enablers on
the themes of Decisions, Insight, and Financing.
Eleven inter-dependent priority areas are considered to
be the most important concerning Smart Cities and
Communities, and the intersection with the areas of
energy, transport and ICT, as in the diagram, Priority
Areas.
Each priority area is to be specified against: context and
challenges; drivers and goals; and actions to perform.
Source: European Innovation Par tnership on Smar t Cities
and Communities - Strategic Implementation Plan
14.10.2013
http://eu-smartcities.eu/content/presenting-european-innovation-partnership-smart-cities-and-communities















Smart Limassol will be presented as an active member of the planned Lighthouse Projects, inviting
institutions, public bodies, industries, city networks, and academia to proactively contribute to the cause.
To deploy smart city solutions across urban mobility; districts and built environment; and integrated
infrastructures, reaching Europe's 20/20/20 energy and climate targets, the concept of Smart City
”Lighthouse Initiatives” is to be implemented, requesting collaboration between the European Commission,
Member States and Industry, as well as cities and research institutions.
Over the next 7 years, a portfolio of at least 20 - 25 lighthouse projects is to be created: each with 6-10 cities
(and partners), with the potential for Europe-wide roll out – dependent on levels of commitment, and access
to / creation of funds.
Successful lighthouse initiatives will provide a solid foundation and give confidence to other cities, in the
knowledge they can apply tested solutions (and that have already attracted investment) – that will be better,
faster, and cheaper to implement a Europe-wide deployment of Smart City concepts. .
Implementation principles to be guided: close city–industry collaboration; outcome and user-centric
approach to service design; open governance and information principles; inclusive and balanced SME
participation; integration of physical and digital infrastructures; actively seek to innovate, learn, and share
knowledge; collaborative governance.
Source: European Innovation Par tner ship on Smar t Cities and Communities - Strategic
Implementation Plan 14.10.2013
http://eu-smartcities.eu/content/presenting-european-innovation-partnership-smart-cities-and-communities







EIS LTD (I-World Concept and Smart Sustainable
City Strategy: http ://
www.slideshare.net/ashabook/eis-ltd )
IBM (Smarter Planet Initiative)
Cisco Systems (Smart + Connected
Communities)
European Innovation Partnership (Smart Cities
and Communities: http
://ec.europa.eu/eip/smar tcities )













Siemens (Smart Mobility Initiative)
Huawei (Smart City Initiative)
Orange (France Telecom) (Smart City Initiative)
Alcatel-Lucent (Smart City Initiative)
Microsoft (Intelligent City Platform)
Oracle (Intelligent Government Platform)
Toshiba (Intelligent Energy and Smart)
Schneider Electric (Smart City Initiative)
Hitachi (Smart City Initiative)

Smart City Planning, Inc.

>
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved



















EIS ltd

1. Smar t Economy (Innovation, Productivity, Innovative Spirit, Intellectual Proper ty, Entrepreneurship,
Knowledge Market/Industr y, Openness)
Holyoke, Massachusetts; Kochi, India; Malta; Manado, Indonesia; Nanjing, China
2. Smar t Environment (Natural Capital and Resources, Sustainable Resource Management)
Amsterdam, Netherlands; Burlington, Ontario; Dublin, Ireland; Dubuque, Iowa; Glasgow, Scotland, United Kingdom; Lyon,
France; Malaga, Spain; Peterborough, United Kingdom; San Diego, California; Shenyang, China; Santa Barbara, California;
Stockholm, Sweden; Sydney, Australia; Yokohama, Japan; Pafos, Cyprus
3. Smar t Governance (e-Par ticipation, public/social ser vices, transparency, political strategies and
perspectives)
Chengdu, China; Edinburgh, United Kingdom; Matosinhos, Portugal; Syracuse, New York; Wilmington, North Carolina
4. Smar t Lifestyle (Smar t Living, Quality of Life)
Boise, Idaho; Houston, Texas; Johannesburg, South Africa; Pafos, Cyprus
5. Smar t Transpor tation (Smar t Mobility, innovative, safe and sustainable transpor t systems and facilities)
Alameda County, California; Alcoa, Tennessee; Portland, Oregon; Southampton, United Kingdom
6. Smar t Community (Social Cohesion, Unity in Community, Human Infrastructure, Inter faces, Integration)
Chattanooga, Tennessee; Dublin, Ohio; Eindhoven, the Netherlands; Issy-les-Moulineaux, France; Luxembourg; Queensland,
Australia; Stratford, Ontario, Canada; Windsor-Essex, Ontario, Canada; Pafos, Cyprus; Skolkovo, Russia  
Future Limassol Strategy implies all six dimensions to be merged and interrelated: Smart People, Smart Economy, Smart
Governance, Smart Mobility, Smart Environments, and Smart Living. The EU Smart Communities and Cities Prototype: 3.0 City,
from Dumb to Intelligent Cities. http://www.slideshare.net/ashabook/30-cityeu-prototype
Cities
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved











As the cities, regions and corridors get
aggregated, this will necessitate the
development of Smart Cities to increase the
urban performance, wealth, productivity, and
wellbeing.
Given the tendency of integration of the core city
with its suburbs (suburbanization or urban
sprawl), and daughter cities (city networking),
there are 3 types of intelligent growth for
Limassol:
Metropolis, or Mega City: Integration of
core city with suburbs, downtowns and local
communities.
Mega Region: Integration of two or more cities
or expansion of city to join with neighbouring
cities to form a Mega Region.
Mega Corridor: Urbanization Corridors
connecting two or more Mega Cities or Mega
Regions, converging to form a Mega Corridor,
distinguished by the following features>>>>

















EIS ltd

World class urban infrastructures and facilities
Integrated Infrastructure of Fiber Telecommunications,
Green Roads, Clean Energy , Intelligent Transportation, and
Ubiquitous Mobile Networks
Sustainable Urban and Rural Redevelopment
Smart Cities, Eco Communities, Smart Property
Developments, Cultural Sustainable Settlements
Smart Regions, Region Clusters and Mega Corridors
Industrial Innovation Parks, Business Clusters, Knowledge
Parks, Science & Technology Parks, Health Parks,
Biomedical Parks, Agriculture Technology Parks, Energy
Parks, Server Farms, Eco Farms, ICT Parks
International Airport and/or Seaport Development Parks
(Free Economic Zone, Intercontinental Logistics Centers,
Smart Commerce & Trade Centers)
Environmental Protection Projects and Eco Parks
Green Transportation Multimodal Networks (connected eco
mobility, bike lanes, public transit, pathways, nature trails,
etc.

Sustainable Smart Urban and Rural Environments
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved
















EIS ltd

Smart Limassol is to develop and roll out the converged urban systems and infrastructures of tomorrow. 
Integrated Sustainable Infrastructure of Fiber Telecommunications , Green Roads, Clean
Energy , Intelligent Transpor tation, and Ubiquitous Mobile Networks make a key enabler
for building Smar t or Intelligent or Innovation City, with healthy economy, society and
environment
Optical Transpor t, Mobile, Eco Energy, Green Roads, and Intelligent Transpor tation
Networks
Fiber-Optic, Mobile, Sustainable Energy Infrastructure and Intelligent Transpor tation
Systems Deployment Act of 2014
The key motivation is to build the urban base for Sustainable Intelligent Communities, smart economy and
innovative enterprises, smart mobility of people, goods and information, ecotourism and smart development
property projects and intelligent utilities, solar farms and wind parks, web farms and smart cloud computing
industries, knowledge parks and innovation clusters, intelligent government and smart public services.
To create an integrated sustainable infrastructure of city-wide fiber optic networks, green energy and natural
gas infrastructure, and intelligent transportation systems.
The Government shall install Fiber Optic and Green Energy conduit infrastructures as part of new public
roads construction projects.
Addressing major concerns in the EU as climate change and urbanization, developing eco communities,
smart economy, knowledge industry, sustainable infrastructure, sustainable transport and smart mobility,
and making renewable energy more affordable, the Planning is enforcing the EU 2020 Strategy for smart,
sustainable and inclusive growth.









European Financial Stabilisation Mechanism (EFSM)
EU MultiAnnual Financial Framework (>EUR 1 trillion)
Horizon 2020 Program
Sovereign Funds (China, the Middle East, Russia)
International Monetar y Fund
Smar t Nation/City Investment of Major Corporations:
European Innovation Partnership;
IBM (Smarter Planet Initiative); Cisco Systems (Smart + Connected
Communities); Siemens (Smart Mobility Initiative); Orange (France
Telecom) (Smart City Initiative); Alcatel-Lucent (Smart City Initiative);
Microsoft (Intelligent City Platform); Oracle (Intelligent Government
Platform); Toshiba (Intelligent Energy and Smart); Schneider Electric (Smart
City Initiative); Hitachi (Smart City Initiative); Huawei (Smart City Initiative);
Smart City Planning, Inc., etc.
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved

EIS ltd


























Multi- Annual Financial Framework, MFF, to deliver the Europe 2020 strategy.
Heading 1: Smar t and Inclusive Growth, 490.908 (EUR million in 2011 prices) ;
H2: Sustainable Growth, Natural Resources , 382.927;
H3: Security and Citizenship , 18.535;
H4: Global Europe , 70.000;
H5: Administration, 62.629.
Total Commitment Appropriations, 1.025.000, 1,05% of GNI.
Total Outside MAFF, 58.316
In the design of the next MFF, the Commission has implemented the principles it outlined in the 2010 budget review focusing on:
delivering key policy priorities; EU added value; impacts and results; delivering mutual benefits across the European Union;
Major hallmarks of the next set of financial programmes and instruments will be a focus on results, increased use of conditionality, the
simplification of delivery and leveraging investment by innovative financial instruments;
The Commission proposes to allocate €80 billion for the 2014-2020 period for the Common Strategic Framework for Research and
Innovation, Horizon 2020
In all, the Commission proposes to allocate €376 billion for the 2014-2020 period for spending in cohesion policy instruments for
Convergence regions, Transition regions, Competitiveness regions, Territorial cooperation. Cohesion Policy provides the necessary
investment framework and delivery system to deliver the Europe 2020 objectives.
Outside the MFF: €3 billion for the European Globalisation Adjustment Fund; €7 billion for the European Solidarity Fund
The Commission proposes to allocate €281.8 billion for Pillar I of the Common Agricultural Policy and €89.9 b for
rural development for the 2014-2020 period. This funding will be complemented by a f ur ther €15.2 b.
NOTE. EU funding is helping to support: Development of new technologies; Cutting-edge research; High-speed internet access; Smar t
transpor t and energy infrastructure; Energy ef ficiency and renewable energies; Business development; Skills and training
Legal base: Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the Cohesion Fund and repealing
Council Regulation (EC) No 1084/2006
http://ec.europa.eu/regional_policy/sources/docoffic/official/regulation/pdf/2014/proposals/regulation/cohesion/cohesion_proposal_en.pdf
http://www.slideshare.net/ashabook/i-europe-title-10150491
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved

SMART BUDGET FOR SUSTAINABLE GROWTH AND JOBS AND
POLICY AND INVESTMENT SYNERGIES














The Treaty on the Functioning of the European Union
COMMUNICATION FROM THE COMMISSION TO THE
EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN
ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE
OF THE REGIONS. A Budget for Europe 2020
REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE
COUNCIL laying down common provisions on the CSF
FUNDS and repealing Council Regulation (EC) No
1083/2006
COMMISSION STAFF WORKING DOCUMENT Elements for a
Common Strategic Framework 2014 to 2020
COMMISSION STAFF WORKING DOCUMENT
The par tnership principle in the implementation of the
Common Strategic Framework Funds - elements for a
European Code of Conduct on Par tnership
Position of the Commission Services on the development
of Par tnership Agreement and programmes in Member
States for the period 2014-2020
Big Europe’s pressing challenges are related to the
decreasing labour market oppor tunities, the increasing
risk of social exclusion, and inef ficient social protection
systems , stagnant investment in R&D&I and the low
availability of finance to the private sector, inef ficient use
of resources, weak competitiveness and low innovation
per formance, the underdeveloped low carbon economy and
the inef ficient use of natural resources,, all of which are
interrelated.

EIS ltd

THEMATIC OBJECTIVES: KEY POLICY OBJECTIVES, FUNDING
PRIORITIES AND EX ANTE CONDITIONALITIES






















1. STRENGTHENING RESEARCH, TECHNOLOGICAL
DEVELOPMENT AND INNOVATION (Digital City, RIS3
Strategies)
2. ENHANCING ACCESS TO AND, USE AND QUALIT Y OF
INFORMATION AND COMMUNICATION TECHNOLOGIES
(Digital City, RIS3 Strategies)
3. ENHANCING THE COMPETITIVENESS OF SMES, THE
AGRICULTURAL SECTOR (FOR THE EAFRD) AND THE
FISHERIES AND AQUACULTURE SECTOR (FOR THE EMFF,
Social City)
4. SUPPORTING THE SHIFT TOWARDS A LOW-CARBON
ECONOMY IN ALL SECTORS (Eco City)
5. PROMOTING CLIMATE CHANGE ADAPTATION AND RISK
PREVENTION AND MANAGEMENT (Eco City
6. PROTECTING THE ENVIRONMENT AND PROMOTING
RESOURCE EFFICIENCY (Eco City)
7. PROMOTING SUSTAINABLE TRANSPORT AND REMOVING
BOTTLENECKS IN KEY NET WORK INFRASTRUCTURES (Eco
City)
8. PROMOTING EMPLOYMENT AND SUPPORTING LABOUR
MOBILIT Y (Social City)
9. PROMOTING SOCIAL INCLUSION AND COMBATING
POVERT Y (Social City)
10. INVESTING IN EDUCATION, SKILLS AND LIFELONG
LEARNING (Social City)
11. ENHANCING INSTITUTIONAL CAPACIT Y AND ENSURING
AN EFFICIENT PUBLIC ADMINISTRATION (Social City)
Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved

EIS ltd

INTELLIGENT COMMUNITY AND SMART CITY RESOURCES


http://www.slideshare.net/ashabook/presentations



http://www.slideshare.net/ashabook/smar tworl-dabr
http://www.slideshare.net/ashabook/iworld-25498222
http://www.slideshare.net/ashabook/smar t-cities-28497022
http://www.slideshare.net/ashabook/future-cities-27402134
http://www.slideshare.net/ashabook/30-cityeu-prototype
http://www.slideshare.net/ashabook/future-proper ty
http://www.slideshare.net/ashabook/ibuilding-26545480
http://www.slideshare.net/ashabook/innovationrussia
http://www.slideshare.net/ashabook/ss-21105098
http://www.slideshare.net/ashabook/moscow-smar t-territor y -of-the-future-compatibility mode
http://www.slideshare.net/ashabook/ss-9714384
http://www.slideshare.net/ashabook/skolkovo-26893979
http://www.slideshare.net/ashabook/smar t-europe
http://www.slideshare.net/ashabook/igermany
http://www.slideshare.net/ashabook/smar t-britain
http://www.slideshare.net/ashabook/future-cyprus-2013-2020

















Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved

EIS ltd

Smart Limassol

  • 1.
    Communities: EUROPEAN INNOVATION PARTNERSHIPON SMART COMMUNITIES AND CITIES 2014-2020 By http:// www.slideshare.net/ashabook/eis-ltd Smart, Sustainable, Future Communities are engines of growth, high-quality jobs and living. The “Smart City Limassol” Program aims to transform LIMASSOL as an intelligent sustainable city: environmentally sustainable, innovative, regionally and globally attractive for businesses, citizens, visitors and investors. SMART LIMASSOL is projected to be managed by an open intelligent management platform as a city digital dashboard for its critical areas and systems: Urban Land and Environment, Roads and Transportation, Energy networks and Utilities, ICT networks and fiber telecom infrastructure, Public and residential buildings, Natural Resources, Water and Waste management, Social infrastructure, Health and safety, Education and culture, Public administration and services.
  • 2.
    I. II. III.  1) 2) 3) 4) 5)  1. 2. 3. 4. 5. 6. 7. 8. Smar t growth:developing an economy based on knowledge and innovation (INNOVATION; EDUCATION; DIGITAL SOCIETY). Sustainable growth: promoting a more resource efficient, greener and more competitive economy (CLIMATE, ENERGY AND MOBILITY; COMPETITIVENESS). Inclusive growth: fostering a high-employment economy delivering social and territorial cohesion (EMPLOYMENT AND SKILLS; FIGHTING POVERTY). The headline targets: 75 % of the population aged 20-64 should be employed. 3% of the EU's GDP should be invested in R&D. The "20/20/20" climate/energy targets should be met (including an increase to 30% of emissions reduction if the conditions are right). The share of early school leavers should be under 10% and at least 40% of the younger generation should have a tertiary degree. 20 million less people should be at risk of poverty The flagship initiatives : INNOVATION: "Innovation Union" . EDUCATION: "Youth on the move. DIGITAL SOCIETY: "A digital agenda for Europe" . CLIMATE, ENERGY and MOBILITY: "Resource efficient Europe" COMPETITIVENESS: "An industrial policy for the globalisation era". EMPLOYMENT and SKILLS: "An agenda for new skills and jobs" . FIGHTING POVERTY: "European platform against poverty". EUROPE 2020: A Strategy for Smart, Sustainable and Inclusive Growth. Communication from the Commission, European Commission, 2010, Brussels, EU
  • 3.
    SUSTAINABLE URBAN TRINITY of Wellbeing,Quality of Life and Sustainable Growth Eco- Social City/ Town/ Community City/ Town/ Community Physical Capital Natural Capital Ecosystems Natural Resources Renewables/RES Eco Technologies Green Infrastructure Eco-Urbanization Green Society ECO-SUSTAINABLE GROWTH Social/Human/I-Capital Innovation Ecosystems Smart Living Smart Economy Knowledge Infrastructure i-Industry Smart Governance Equity, Wellbeing, QoL Knowledge Society SOCIAL/INCLUSIVE GROWTH SUSTAINABLE CITY i-City Platform Digital City/ Town/ Community Information/Digital Capital Smart Mobility , Smart Services ICT Infrastructure, OTN, Optical Networks , NG Broadband 3DTV, HDTV, CC, Intelligent Clouds Internet of Things, u-Computation Digital/Cyber Society TECHNOLOGICAL/SMART GROWTH Building Smart Cities and Communities 2013 All Rights Reserved EIS Ltd
  • 4.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved         EIS ltd Redeveloped as a Smart and Sustainable City, Limassol is to emerge as an Intelligent City of the Future of three critical urban levels planned, managed and coordinated as integral multi-projects: Digital/ICT/Hi-Tech/Ubiquitous/Cyber/Mobile/Smar t City (Districts, Municipalities, Communities) (Digital/Information Capital; Intelligent ICT Infrastructure, Multi-Play Telecom Networks, Smart Governance, Intelligent Management Platforms, Ubiquitous Computation, Network-integrated Buildings, Digital Communities, Digital/Virtual Lifestyle) Sustainable/Ecological/Green/Zero-Carbon/Zero-Waste/Zero-Energy/Nature Friendly/Eco City (Districts, Municipalities, Communities) (Natural Capital; Natural Resources, Physical Capital, Green Energy Networks, Green Buildings, Eco-Environment, Eco Communities, Green Lifestyle) Knowledge/Learning/Innovation/ /Intelligent/Science/Intellectual/LivingLab/Creative/Human /Social City (Districts, Municipalities, Communities) (Knowledge or Innovation Capital; Human/Intellectual Capital, Social Capital and Networks, Social Cohesion, Knowledge Triangles/Health Triangles, Knowledge EcoSystems, Knowledge Communities, Intelligent/Smart Lifestyle) The goal of the Smart Limassol Strategy is to enhance urban wealth, performance and competitiveness, and promoting smart innovation and creativity, education, art and medicine, science and technology, industry and commerce, transportation and mobility, social communications and public administration and environment conservation. In all, Sustainable City Limassol is to be renewed as cyber-physical territorial ecosystem with interdependent urban systems: sustainable land and environment, smart people, interconnected info- and infrastructure and intelligent government. SMART TERRITORIES OF THE F UTURE: The EU Smar t Communities and Cities Prototype: 3.0 City, f rom Dumb to Intelligent Cities. http://www.slideshare.net/as habook/30-cityeu-prototype
  • 5.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved  1. 2. 3. 4.  Limassol Smart City activities could be cross-classified by strategies, scales, motivations (social, economic or ecological), financial models, ownership or initiator, greenfield or brownfield, business model or driving industrial sector, or driving technology, as: CLASS I. Smar t City of full sustainability (PPP turnkey urban greenfield project with a global smart city plan, all functional areas and all aspects of urban life are covered by an all-encompassing and all-inclusive Master Development Plan of 3.0 City, Types: All-Inclusive, Innovation, Eco-sustainable, Economic, Energy, Oil/Gas, Financial, Mobile, etc.); CLASS II. IT projects of various scales (u-cities, with all-IP citywide network with comprehensive smart city platforms intelligently connecting networked devices, machines and vehicles to create an urban Internet of Things infrastructure, no global smart city plan, Types: all-encompassing, special and economic recovery); CLASS III. Private or public fragmented urban projects , with no global smart city plan (Types: Innovation-centric, Health, Education, Tourism, Mobility, Energy, etc.); CLASS IV. Closed government-led PPP ecosystem projects , usually no comprehensive urban master plan An IT smart city relies on information and communications technologies, including mobile networks, to improve the quality of life of its citizens in a sustainable way. It combines and shares disparate data sets captured by intelligently-connected infrastructure, people and vehicles, to generate new insights and provide ubiquitous services that enable citizens to access information about city services and move around easily, improve the efficiency of city operations, enhance security, fuel economic activity and increase resilience to natural disasters. http://www.slideshare.net/ashabook/creating-the -future-tomorrows-world       EIS ltd IT smar t city ser vice categories and applications ■ Transpor t, including public transport, intelligent transport systems and parking, GIS; ■ Environment/Energy, Environment Management, Energy networks, such as smart grids, smart meters, smart energy-efficient buildings; Telecom networks , all-IP core networks, ultra-high broadband access convergence networks, advanced services and applications, such as FTTx, GPON, LTE, multi-play services, urban traffic management, building automation, lighting and energy management, access and security networks, location-based services, trust and security platforms, multimodal user Interfaces, Anytime/any place Ubiquitous connectivity, the Internet of Things between machines (multiple devices and sensors and actuators) and humans, M2M and M2M2H (real time data and control) ■ Municipal projects, city administration and public utilities, waste management, modernisation of water systems, smart lighting systems, public safety and city resilience programms; ■ Public Services , Education and Health, Safety and Security, and Social Networking, Economic Stimulus projects
  • 6.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved            EIS ltd Smar t Urban Planning and Development (Intelligent City Conception and Planning, Green City Strategy, Digital/Intelligent City Strategy, Knowledge City Strategy, integrated digital planning, sustainable land use and smart building development) Smar t Governance (e-Participation, e-administration, intelligent urban management system) Sustainable Energy (renewable energy networks, tri-generation and district heating/cooling systems; advanced metering infrastructure, smart grid, energy management systems, smart domestic appliances, intelligent street lighting, solar power plants) Smar t Buildings and Facilities (green construction, smart buildings, eco hotels, energy-efficient refurbishment of public buildings, innovative insulation, green roofs; net zero energy buildings) Smar t Economy (innovative urban economy, smart commercial spaces, innovation, employment opportunities, green tourism and jobs, business clusters) Smar t Environment (coastal regeneration, seaside environment protection, green infrastructure, eco parks and zones, advanced sewerage system, rainwater harvesting, grey water treatment, living roofs, reduction, re-use and recycling waste, integrated green areas, urban forest and farms) Smar t Transpor tation (public transport system, bus routes, cycle lanes, green trails networks) ICT (smart network-connected districts, sectors and communities, optical Ethernet, Fiber-To-the-Home access, WiFi zones, smart appliances, urban operation systems, building integration platform, cloud computing, ubiquitous computing, web farms, ICT clusters, smart digital services, ICT jobs) Intelligent Community (sense of community, social cohesion, innovative ecosystems and creative communities, knowledge triangles, knowledge parks, knowledge jobs) Sustainable Lifestyle (smart community complexes, leisure and health centers, cultural centers, athletic centers, green lifestyle, smart lifestyle, intelligent lifestyle)  
  • 7.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved            Smart ICT, Optical Transportation, and Mobile Networks Smart and Green Energy Smart and Sustainable Water Smart and Sustainable Waste Smart Mobility and Green Transportation Smart and Green Building and Sustainable Construction Smart People and Knowledge Workers Smart Government and Intelligent Administration Smart Business and Commerce Smart Safety and Health Smart Culture, Education, Research and Innovation EIS ltd
  • 8.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved            Digital or Smart Community Technologies Green or Eco Community Technologies Social or Inclusive Community Technologies Sustainable Community Integrating Technologies, as Socio-Technological Open Platform, Internet of Things, Green ICT, Smart Healthcare, Social ICT, Smart Social Technologies, and Internet of Everything Technologies. EIS ltd
  • 9.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved              SMART ECO CIT Y STRATEGY (Vision & Strategy & Priority Public Projects) Scope: Smart City Branding & Full Sustainability Report; Cost range – Negotiable as a certain percentage from the budget SMART URBAN PROJECTS MANAGEMENT PLANNING (Work Breakdown Structure and Project Organization Structure) Scope: Smart Eco District Program; Cost – Negotiable as a certain percentage from the budget SUSTAINABLE DEVELOPMENT CERTIFICATION AND ECO-LABELING (Eco-Label Europe, Silver, Gold or Platinum level buildings et al; Concept Design, online registration, delivery date, cost) Scope: International Green Certification and Accreditation Systems (Certified, Silver, Gold, Platinum); Cost Range – Negotiable as a certain percentage from the budget DIGITAL CIT Y MANAGEMENT PLATFORM (schema, High Level Design (HLD), cost range, implementation, delivery date) Scope: Urban Management System; Cost Range – Negotiable as a certain percentage from the budget SMART CIT Y PROJECTS LISTING (of eco securities on a new public exchange, locally and internationally, global smart companies selection as strategic investors)  Scope: Smart Investor Package  Cost Range – Negotiable as a certain percentage from the budget   EIS ltd  
  • 10.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved       On 10 July 2012, the European Commission launched the Smart Cities and Communities European Innovation Partnership under the responsibility of Directorate-General for Communications Networks, Content and Technology, Sustainable and Secure Society, Smart Cities and Sustainability. The partnership proposes to pool resources to support the demonstration of energy, transport and information and communication technologies (ICT) in urban areas: C(2012)4701 final, 10.7.2012 The energy, transport and ICT industries are invited to work together with cities to combine their technologies to address cities' needs. This will enable innovative, integrated and efficient technologies to roll out and enter the market more easily, while placing cities at the centre of innovation. The funding will be awarded through yearly calls for proposals under "Horizon 2020", the new research and innovation funding framework under the next Multiannual Financing Framework (MFF 2014-2020). Communication from the Commission "Smar t Cities and Communities - European Innovation Par tnership" [COM(2012)4701. GB: EUROPEAN COMMISSION, DIRECTORATE-GENERAL FOR COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY, DIRECTORATE-GENERAL FOR ENERGY, DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT GB: The Smar t Cities Stakeholder Platform , a collaborative, networking and knowledge sharing tool in the domain of Smart Cities and Communities. GB: High Level Group (supported by its Sherpa Group): High level representatives from industry, research and cities, which are appointed by the European Commission in their personal capacity.       EIS ltd Definition and Goals: Smart Cities are defined as systems of people interacting with and using flows of energy, materials, services and financing to catalyse sustainable economic development, resilience, and high quality of life; these flows and interactions become smart through making strategic use of information and communication infrastructure and services in a process of transparent urban planning and management that is responsive to the social and economic needs of society. Goals: 1. negotiate obstacles to smart cities, to co-fund demonstration projects and to help coordinate existing city initiatives and projects, by pooling its resources together; 2. establish strategic partnerships between industry, financial institutions, and European cities to develop the urban systems and infrastructures of tomorrow; 3. combine ICT, energy management and transport management to create innovative solutions to the major urban environmental, societal and health challenges. SOURCES: http://ec.europa.eu/energy/technology/initiatives/smart_cities_en.htm http://www.eu-smartcities.eu/blog/what-exactly-are-smart-cities-and-communities-towards-eip-conference
  • 11.
             The Smart LimassolStrategic Planning is to cover the SIP of the EIP on Smart Cities and Communities:  Sustainable Urban Mobility – Alternative energies, public transport, efficient logistics, planning;  Sustainable Districts and Built Environment – improving the energy efficiency of buildings and districts, increasing the share of renewable energy sources used and the liveability of our communities;  Integrated Infrastructures and processes across Energy, ICT and Transport – connecting infrastructure assets to improve the efficiency and sustainability of cities The Plan puts forward eight key horizontal enablers on the themes of Decisions, Insight, and Financing. Eleven inter-dependent priority areas are considered to be the most important concerning Smart Cities and Communities, and the intersection with the areas of energy, transport and ICT, as in the diagram, Priority Areas. Each priority area is to be specified against: context and challenges; drivers and goals; and actions to perform. Source: European Innovation Par tnership on Smar t Cities and Communities - Strategic Implementation Plan 14.10.2013 http://eu-smartcities.eu/content/presenting-european-innovation-partnership-smart-cities-and-communities
  • 12.
            Smart Limassol willbe presented as an active member of the planned Lighthouse Projects, inviting institutions, public bodies, industries, city networks, and academia to proactively contribute to the cause. To deploy smart city solutions across urban mobility; districts and built environment; and integrated infrastructures, reaching Europe's 20/20/20 energy and climate targets, the concept of Smart City ”Lighthouse Initiatives” is to be implemented, requesting collaboration between the European Commission, Member States and Industry, as well as cities and research institutions. Over the next 7 years, a portfolio of at least 20 - 25 lighthouse projects is to be created: each with 6-10 cities (and partners), with the potential for Europe-wide roll out – dependent on levels of commitment, and access to / creation of funds. Successful lighthouse initiatives will provide a solid foundation and give confidence to other cities, in the knowledge they can apply tested solutions (and that have already attracted investment) – that will be better, faster, and cheaper to implement a Europe-wide deployment of Smart City concepts. . Implementation principles to be guided: close city–industry collaboration; outcome and user-centric approach to service design; open governance and information principles; inclusive and balanced SME participation; integration of physical and digital infrastructures; actively seek to innovate, learn, and share knowledge; collaborative governance. Source: European Innovation Par tner ship on Smar t Cities and Communities - Strategic Implementation Plan 14.10.2013 http://eu-smartcities.eu/content/presenting-european-innovation-partnership-smart-cities-and-communities
  • 13.
        EIS LTD (I-WorldConcept and Smart Sustainable City Strategy: http :// www.slideshare.net/ashabook/eis-ltd ) IBM (Smarter Planet Initiative) Cisco Systems (Smart + Connected Communities) European Innovation Partnership (Smart Cities and Communities: http ://ec.europa.eu/eip/smar tcities )           Siemens (Smart Mobility Initiative) Huawei (Smart City Initiative) Orange (France Telecom) (Smart City Initiative) Alcatel-Lucent (Smart City Initiative) Microsoft (Intelligent City Platform) Oracle (Intelligent Government Platform) Toshiba (Intelligent Energy and Smart) Schneider Electric (Smart City Initiative) Hitachi (Smart City Initiative) Smart City Planning, Inc. >
  • 14.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved              EIS ltd 1. Smar t Economy (Innovation, Productivity, Innovative Spirit, Intellectual Proper ty, Entrepreneurship, Knowledge Market/Industr y, Openness) Holyoke, Massachusetts; Kochi, India; Malta; Manado, Indonesia; Nanjing, China 2. Smar t Environment (Natural Capital and Resources, Sustainable Resource Management) Amsterdam, Netherlands; Burlington, Ontario; Dublin, Ireland; Dubuque, Iowa; Glasgow, Scotland, United Kingdom; Lyon, France; Malaga, Spain; Peterborough, United Kingdom; San Diego, California; Shenyang, China; Santa Barbara, California; Stockholm, Sweden; Sydney, Australia; Yokohama, Japan; Pafos, Cyprus 3. Smar t Governance (e-Par ticipation, public/social ser vices, transparency, political strategies and perspectives) Chengdu, China; Edinburgh, United Kingdom; Matosinhos, Portugal; Syracuse, New York; Wilmington, North Carolina 4. Smar t Lifestyle (Smar t Living, Quality of Life) Boise, Idaho; Houston, Texas; Johannesburg, South Africa; Pafos, Cyprus 5. Smar t Transpor tation (Smar t Mobility, innovative, safe and sustainable transpor t systems and facilities) Alameda County, California; Alcoa, Tennessee; Portland, Oregon; Southampton, United Kingdom 6. Smar t Community (Social Cohesion, Unity in Community, Human Infrastructure, Inter faces, Integration) Chattanooga, Tennessee; Dublin, Ohio; Eindhoven, the Netherlands; Issy-les-Moulineaux, France; Luxembourg; Queensland, Australia; Stratford, Ontario, Canada; Windsor-Essex, Ontario, Canada; Pafos, Cyprus; Skolkovo, Russia   Future Limassol Strategy implies all six dimensions to be merged and interrelated: Smart People, Smart Economy, Smart Governance, Smart Mobility, Smart Environments, and Smart Living. The EU Smart Communities and Cities Prototype: 3.0 City, from Dumb to Intelligent Cities. http://www.slideshare.net/ashabook/30-cityeu-prototype Cities
  • 15.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved      As the cities, regions and corridors get aggregated, this will necessitate the development of Smart Cities to increase the urban performance, wealth, productivity, and wellbeing. Given the tendency of integration of the core city with its suburbs (suburbanization or urban sprawl), and daughter cities (city networking), there are 3 types of intelligent growth for Limassol: Metropolis, or Mega City: Integration of core city with suburbs, downtowns and local communities. Mega Region: Integration of two or more cities or expansion of city to join with neighbouring cities to form a Mega Region. Mega Corridor: Urbanization Corridors connecting two or more Mega Cities or Mega Regions, converging to form a Mega Corridor, distinguished by the following features>>>>           EIS ltd World class urban infrastructures and facilities Integrated Infrastructure of Fiber Telecommunications, Green Roads, Clean Energy , Intelligent Transportation, and Ubiquitous Mobile Networks Sustainable Urban and Rural Redevelopment Smart Cities, Eco Communities, Smart Property Developments, Cultural Sustainable Settlements Smart Regions, Region Clusters and Mega Corridors Industrial Innovation Parks, Business Clusters, Knowledge Parks, Science & Technology Parks, Health Parks, Biomedical Parks, Agriculture Technology Parks, Energy Parks, Server Farms, Eco Farms, ICT Parks International Airport and/or Seaport Development Parks (Free Economic Zone, Intercontinental Logistics Centers, Smart Commerce & Trade Centers) Environmental Protection Projects and Eco Parks Green Transportation Multimodal Networks (connected eco mobility, bike lanes, public transit, pathways, nature trails, etc. Sustainable Smart Urban and Rural Environments
  • 16.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved         EIS ltd Smart Limassol is to develop and roll out the converged urban systems and infrastructures of tomorrow.  Integrated Sustainable Infrastructure of Fiber Telecommunications , Green Roads, Clean Energy , Intelligent Transpor tation, and Ubiquitous Mobile Networks make a key enabler for building Smar t or Intelligent or Innovation City, with healthy economy, society and environment Optical Transpor t, Mobile, Eco Energy, Green Roads, and Intelligent Transpor tation Networks Fiber-Optic, Mobile, Sustainable Energy Infrastructure and Intelligent Transpor tation Systems Deployment Act of 2014 The key motivation is to build the urban base for Sustainable Intelligent Communities, smart economy and innovative enterprises, smart mobility of people, goods and information, ecotourism and smart development property projects and intelligent utilities, solar farms and wind parks, web farms and smart cloud computing industries, knowledge parks and innovation clusters, intelligent government and smart public services. To create an integrated sustainable infrastructure of city-wide fiber optic networks, green energy and natural gas infrastructure, and intelligent transportation systems. The Government shall install Fiber Optic and Green Energy conduit infrastructures as part of new public roads construction projects. Addressing major concerns in the EU as climate change and urbanization, developing eco communities, smart economy, knowledge industry, sustainable infrastructure, sustainable transport and smart mobility, and making renewable energy more affordable, the Planning is enforcing the EU 2020 Strategy for smart, sustainable and inclusive growth.
  • 17.
            European Financial StabilisationMechanism (EFSM) EU MultiAnnual Financial Framework (>EUR 1 trillion) Horizon 2020 Program Sovereign Funds (China, the Middle East, Russia) International Monetar y Fund Smar t Nation/City Investment of Major Corporations: European Innovation Partnership; IBM (Smarter Planet Initiative); Cisco Systems (Smart + Connected Communities); Siemens (Smart Mobility Initiative); Orange (France Telecom) (Smart City Initiative); Alcatel-Lucent (Smart City Initiative); Microsoft (Intelligent City Platform); Oracle (Intelligent Government Platform); Toshiba (Intelligent Energy and Smart); Schneider Electric (Smart City Initiative); Hitachi (Smart City Initiative); Huawei (Smart City Initiative); Smart City Planning, Inc., etc. Building Smart Cities and Communities Azamat Abdoullaev 2013 All Rights Reserved EIS ltd
  • 18.
                      Multi- Annual FinancialFramework, MFF, to deliver the Europe 2020 strategy. Heading 1: Smar t and Inclusive Growth, 490.908 (EUR million in 2011 prices) ; H2: Sustainable Growth, Natural Resources , 382.927; H3: Security and Citizenship , 18.535; H4: Global Europe , 70.000; H5: Administration, 62.629. Total Commitment Appropriations, 1.025.000, 1,05% of GNI. Total Outside MAFF, 58.316 In the design of the next MFF, the Commission has implemented the principles it outlined in the 2010 budget review focusing on: delivering key policy priorities; EU added value; impacts and results; delivering mutual benefits across the European Union; Major hallmarks of the next set of financial programmes and instruments will be a focus on results, increased use of conditionality, the simplification of delivery and leveraging investment by innovative financial instruments; The Commission proposes to allocate €80 billion for the 2014-2020 period for the Common Strategic Framework for Research and Innovation, Horizon 2020 In all, the Commission proposes to allocate €376 billion for the 2014-2020 period for spending in cohesion policy instruments for Convergence regions, Transition regions, Competitiveness regions, Territorial cooperation. Cohesion Policy provides the necessary investment framework and delivery system to deliver the Europe 2020 objectives. Outside the MFF: €3 billion for the European Globalisation Adjustment Fund; €7 billion for the European Solidarity Fund The Commission proposes to allocate €281.8 billion for Pillar I of the Common Agricultural Policy and €89.9 b for rural development for the 2014-2020 period. This funding will be complemented by a f ur ther €15.2 b. NOTE. EU funding is helping to support: Development of new technologies; Cutting-edge research; High-speed internet access; Smar t transpor t and energy infrastructure; Energy ef ficiency and renewable energies; Business development; Skills and training Legal base: Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the Cohesion Fund and repealing Council Regulation (EC) No 1084/2006 http://ec.europa.eu/regional_policy/sources/docoffic/official/regulation/pdf/2014/proposals/regulation/cohesion/cohesion_proposal_en.pdf http://www.slideshare.net/ashabook/i-europe-title-10150491
  • 19.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved SMART BUDGET FOR SUSTAINABLE GROWTH AND JOBS AND POLICY AND INVESTMENT SYNERGIES         The Treaty on the Functioning of the European Union COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS. A Budget for Europe 2020 REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down common provisions on the CSF FUNDS and repealing Council Regulation (EC) No 1083/2006 COMMISSION STAFF WORKING DOCUMENT Elements for a Common Strategic Framework 2014 to 2020 COMMISSION STAFF WORKING DOCUMENT The par tnership principle in the implementation of the Common Strategic Framework Funds - elements for a European Code of Conduct on Par tnership Position of the Commission Services on the development of Par tnership Agreement and programmes in Member States for the period 2014-2020 Big Europe’s pressing challenges are related to the decreasing labour market oppor tunities, the increasing risk of social exclusion, and inef ficient social protection systems , stagnant investment in R&D&I and the low availability of finance to the private sector, inef ficient use of resources, weak competitiveness and low innovation per formance, the underdeveloped low carbon economy and the inef ficient use of natural resources,, all of which are interrelated. EIS ltd THEMATIC OBJECTIVES: KEY POLICY OBJECTIVES, FUNDING PRIORITIES AND EX ANTE CONDITIONALITIES            1. STRENGTHENING RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INNOVATION (Digital City, RIS3 Strategies) 2. ENHANCING ACCESS TO AND, USE AND QUALIT Y OF INFORMATION AND COMMUNICATION TECHNOLOGIES (Digital City, RIS3 Strategies) 3. ENHANCING THE COMPETITIVENESS OF SMES, THE AGRICULTURAL SECTOR (FOR THE EAFRD) AND THE FISHERIES AND AQUACULTURE SECTOR (FOR THE EMFF, Social City) 4. SUPPORTING THE SHIFT TOWARDS A LOW-CARBON ECONOMY IN ALL SECTORS (Eco City) 5. PROMOTING CLIMATE CHANGE ADAPTATION AND RISK PREVENTION AND MANAGEMENT (Eco City 6. PROTECTING THE ENVIRONMENT AND PROMOTING RESOURCE EFFICIENCY (Eco City) 7. PROMOTING SUSTAINABLE TRANSPORT AND REMOVING BOTTLENECKS IN KEY NET WORK INFRASTRUCTURES (Eco City) 8. PROMOTING EMPLOYMENT AND SUPPORTING LABOUR MOBILIT Y (Social City) 9. PROMOTING SOCIAL INCLUSION AND COMBATING POVERT Y (Social City) 10. INVESTING IN EDUCATION, SKILLS AND LIFELONG LEARNING (Social City) 11. ENHANCING INSTITUTIONAL CAPACIT Y AND ENSURING AN EFFICIENT PUBLIC ADMINISTRATION (Social City)
  • 20.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved EIS ltd INTELLIGENT COMMUNITY AND SMART CITY RESOURCES  http://www.slideshare.net/ashabook/presentations  http://www.slideshare.net/ashabook/smar tworl-dabr http://www.slideshare.net/ashabook/iworld-25498222 http://www.slideshare.net/ashabook/smar t-cities-28497022 http://www.slideshare.net/ashabook/future-cities-27402134 http://www.slideshare.net/ashabook/30-cityeu-prototype http://www.slideshare.net/ashabook/future-proper ty http://www.slideshare.net/ashabook/ibuilding-26545480 http://www.slideshare.net/ashabook/innovationrussia http://www.slideshare.net/ashabook/ss-21105098 http://www.slideshare.net/ashabook/moscow-smar t-territor y -of-the-future-compatibility mode http://www.slideshare.net/ashabook/ss-9714384 http://www.slideshare.net/ashabook/skolkovo-26893979 http://www.slideshare.net/ashabook/smar t-europe http://www.slideshare.net/ashabook/igermany http://www.slideshare.net/ashabook/smar t-britain http://www.slideshare.net/ashabook/future-cyprus-2013-2020               
  • 21.
    Building Smart Citiesand Communities Azamat Abdoullaev 2013 All Rights Reserved EIS ltd