TONY THOMAS
Mechanical Engineer
S/o Mr. K.V Thomas,
Kollamparambil House, Thathampally (post),
Alleppey, Kerala, INDIA – 688013.
Mobile – +97156- 7206887
E-mail : tony_4h@rediffmail.com
-------------------------------------------------------------------------------------------------------------------------
OBJECTIVE:
It is my ambition to join an organization that will make use of my solid services
and at the same time help me grow, complementing my dedication to continuous
learning and constant improvement. I have always striven in whatever I undertook
to do exhibiting my credentials and potentials. I therefore, aspire to be a part of a
work culture that places a premium on quality of work. To best describe myself, I
have the inclination and ability to take up any related assignments allotted to me
with total diligence, dedication and sincerity.
PERSONAL DETAILS
Date of Birth : 12th
May 1985
Nationality : Indian
Religion : Roman Catholic (Christian)
Marital status : Married
Languages Known : English, Hind, Tamil & Malayalam
Passport Details : Passport No. M 2392686
Place of Issue: Cochin, India
Valid upto: 18 - 09- 2024
Driving License : Holding UAE driving license
Present Address : Tony Thomas
French Industrial Technology (L.L.C)
P.O.Box 32925, Mussafah,
Abudhabi,UAE.
Page 1 of 4
QUALIFICATIONS / TRAINING
• B.E. Mechanical Engineering from Visveswaraiah Technological University,
Bangalore, India - 2007
• Good Knowledge in MS Word, Excel & Power Point.
• Proficient in Auto CAD(Completed AutoCAD -2008 detailed course)
• Internet related skills etc
Work Experience : Around 71/2 Year’s experience in the field of
Mechanical Engineering & Construction/Oil& Gas
field maintenance service.
CAREER HISTORY:
August 2010 Onwards;
Worked with M/s. French Industrial Technology, Abu Dhabi, U.A.E. (one of the
leading Valve Service Company in UAE for clients like ADNOC Groups, TOTAL,
GASCO, NPCC, DOLPHIN ENERGY, CCC, FURMANITE, PETROFAC, TECHNIP,
ARAMCO, Mc DERMOTT, QATARGAS, RASGAS, HYUNDAI, SAMSUNG
ENGINEERING etc.) as Service Engineer [General Maintenance Department].
ACTIVITY OF COMPANY
• A company dealing with maintenance of oilfield, offshore, onshore,
powerplant &valve service operation in the gulf and Far East.
• Fitech serves as an Authorized service centre for Grove Dresser, Tyco, FCT,
Petrolvalves, Perar S.P.A., LCM Italia, Virgo Valves, LVF, OMS Saleri S.p.A.
etc.
Job Description:
• Knowledge on Maintenance of all types, sizes & classes of valves in oil & gas
industry.
• Knowledge in servicing of shut off valves (ball, gate. globe, check, butterfly &
needle valves.)
• Complete refurbishment of valves of various sizes.
Page 2 of 4
• Knowledge in servicing of Hydraulic & pneumatic actuators, Gear box etc,
• Calibration of all types of MOV’s.
• Experience in servicing of pressure safety valves.
• Experience in servicing of Control valves and MOkveld Valves.
• Experience in servicing of Axial flow Choke valves.
• Testing of valves including Hydrostatic & air testing.
• Testing & calibration of the pressure safety valves.
• Involvement in workshop activities, through major assemblies and testing.
• Manufacturing of parts including obsolete parts.
• Repairing and maintenance of Rotary machinery such as: pumps, blowers
etc,
• Repairing and maintenance of Heat Exchangers.
• Lapping of Ball and Seats for metal seated valves.
• Machining of required components
• Serviced about 500 valves for Saipem/Poyam at DRYDOCK dubai (Project:
FSRU TOSCANA).
• Commissioning of MOVs for NPCC/ADMA at Zakum field (OffshoreProject:
ZCSC DEMOTHBALLING).
• Site Assistance to Petrofac for commissioning valves at CDS project ASAB.
• Site Assistance to petrofac for commissioning valves at 2003 project Kuwait.
• Commissioning & inspection of valves for BlackCat Engg. at their QP project
Qatar.
• Site Assistance to Alstom for servicing valves at sohar aluminium plant
Oman.
• Site Assistance to L&T OMAN, for testing and commissioning of valves for
their ADMA project.
• Representing PIBIVIESSE for serviving valves at SaudiArabia for their
ARAMCO project.(Supervision for Valve Overhauling Activity of 36” size valve
valves).
• Representing CAMERON, for commissioning of Hydraulic control panels on
L&T OMAN,for their ADMA project.
• Testing and Modification of Hydraulic control panels for
CAMERON/LEDEEN.
• Prepare service activity forms for the jobs which in charge with.
• Prepare inspection & Service reports for jobs in charge with.
• Conservant with the following codes.
API 598/ BS 6755
API 527/ BS 6759
API 6D
January 2010 to April 2010
Worked with M/s. BAHWAN ENGINEERING COMPANY (Sultanate of Oman)
as "MECHANICAL SUPERVISOR"
Page 3 of 4
Project: OMIFCO Maintenance Project Shutdown Works) Sur, Oman
(Client: Oman Indian Fertilizer Company)
Job description
• Supervision and Maintenance of Effluent treatment Plant.
• Servicing and Testing of Diaphragm Valves.
• Servicing of pumps and Agitator.
• Controlling site construction activities.
• Servicing of Pressure safety valves.
• Servicing of blower, evaporator etc,,
• Testing of various sizes of valves.
• Preparation of daily progress Report.
March 2009 to December 2009
Worked with M/s. General Engineering & Const. Works, Alleppey, Kerala, India
as Mechanical Engineer.
Job description
• Execution of works as per the project scope with regards to Quality & HSE.
• Delegation of works to charge-hands.
• Controlling site construction activities.
• Preparation of site daily/weekly/monthly progress report.
• Inspection of Incoming materials & preparing inspection reports.
• Follow-up with client for payment.
• Responsible to keep and maintain all the machinery and test equipments in
good condition and safe operational performance.
August 2008 to February 2009 ( Mission Visa )
Worked with M/s. French Industrial Technology, Abu Dhabi, U.A.E. (one of the
leading Valve Service Company in UAE for clients like TOTAL, GASCO, NPCC,
Page 4 of 4
DOLPHIN, CCC, FURMANITE etc.) as Mechanical Engineer [General Maintenance
Department]
Job Description:
• Supervision of servicing of Gate, Globe, Check Valves & Safety Relief Valves.
• Complete refurbishment of valves up to and including (12 inch).
• Servicing of Double block & Bleed valves.
• Testing and calibration of pressure safety valves.
• Stripping, cleaning and preparation of inspection report for valves.
• Testing of valves as per applicable codes.
• Fabrication of the following outside lever and addition of manual or
powered
Actuator.
• Manufacturing of parts including obsolete parts.
• Lapping of Ball and Seats for metal seated valves
• Machining of required components
• Steam, air and liquid testing.
July 2007 to July 2008;
Worked with M/s. General Engineering & Const. Works, Alleppey, Kerala, India
as Mechanical Engineer.
Job description
• Execution of works as per the project scope with regards to Quality & HSE.
• Delegation of works to charge-hands.
• Controlling site construction activities
• Preparation of site daily/weekly/monthly progress report
• Inspection of Incoming materials & preparing inspection reports
• Follow-up with client for payment,
• Execution of work as per drawing
• Preparation of daily progress report.
• Inspection of Incoming material & preparing inspection reports.
• Co-ordinating with material suppliers / vendors for procurement.
Declaration
Page 5 of 4
I hereby declare that the above written particulars are true.
Tony Thomas
Page 6 of 4
I hereby declare that the above written particulars are true.
Tony Thomas
Page 6 of 4

new cv

  • 1.
    TONY THOMAS Mechanical Engineer S/oMr. K.V Thomas, Kollamparambil House, Thathampally (post), Alleppey, Kerala, INDIA – 688013. Mobile – +97156- 7206887 E-mail : tony_4h@rediffmail.com ------------------------------------------------------------------------------------------------------------------------- OBJECTIVE: It is my ambition to join an organization that will make use of my solid services and at the same time help me grow, complementing my dedication to continuous learning and constant improvement. I have always striven in whatever I undertook to do exhibiting my credentials and potentials. I therefore, aspire to be a part of a work culture that places a premium on quality of work. To best describe myself, I have the inclination and ability to take up any related assignments allotted to me with total diligence, dedication and sincerity. PERSONAL DETAILS Date of Birth : 12th May 1985 Nationality : Indian Religion : Roman Catholic (Christian) Marital status : Married Languages Known : English, Hind, Tamil & Malayalam Passport Details : Passport No. M 2392686 Place of Issue: Cochin, India Valid upto: 18 - 09- 2024 Driving License : Holding UAE driving license Present Address : Tony Thomas French Industrial Technology (L.L.C) P.O.Box 32925, Mussafah, Abudhabi,UAE. Page 1 of 4
  • 2.
    QUALIFICATIONS / TRAINING •B.E. Mechanical Engineering from Visveswaraiah Technological University, Bangalore, India - 2007 • Good Knowledge in MS Word, Excel & Power Point. • Proficient in Auto CAD(Completed AutoCAD -2008 detailed course) • Internet related skills etc Work Experience : Around 71/2 Year’s experience in the field of Mechanical Engineering & Construction/Oil& Gas field maintenance service. CAREER HISTORY: August 2010 Onwards; Worked with M/s. French Industrial Technology, Abu Dhabi, U.A.E. (one of the leading Valve Service Company in UAE for clients like ADNOC Groups, TOTAL, GASCO, NPCC, DOLPHIN ENERGY, CCC, FURMANITE, PETROFAC, TECHNIP, ARAMCO, Mc DERMOTT, QATARGAS, RASGAS, HYUNDAI, SAMSUNG ENGINEERING etc.) as Service Engineer [General Maintenance Department]. ACTIVITY OF COMPANY • A company dealing with maintenance of oilfield, offshore, onshore, powerplant &valve service operation in the gulf and Far East. • Fitech serves as an Authorized service centre for Grove Dresser, Tyco, FCT, Petrolvalves, Perar S.P.A., LCM Italia, Virgo Valves, LVF, OMS Saleri S.p.A. etc. Job Description: • Knowledge on Maintenance of all types, sizes & classes of valves in oil & gas industry. • Knowledge in servicing of shut off valves (ball, gate. globe, check, butterfly & needle valves.) • Complete refurbishment of valves of various sizes. Page 2 of 4
  • 3.
    • Knowledge inservicing of Hydraulic & pneumatic actuators, Gear box etc, • Calibration of all types of MOV’s. • Experience in servicing of pressure safety valves. • Experience in servicing of Control valves and MOkveld Valves. • Experience in servicing of Axial flow Choke valves. • Testing of valves including Hydrostatic & air testing. • Testing & calibration of the pressure safety valves. • Involvement in workshop activities, through major assemblies and testing. • Manufacturing of parts including obsolete parts. • Repairing and maintenance of Rotary machinery such as: pumps, blowers etc, • Repairing and maintenance of Heat Exchangers. • Lapping of Ball and Seats for metal seated valves. • Machining of required components • Serviced about 500 valves for Saipem/Poyam at DRYDOCK dubai (Project: FSRU TOSCANA). • Commissioning of MOVs for NPCC/ADMA at Zakum field (OffshoreProject: ZCSC DEMOTHBALLING). • Site Assistance to Petrofac for commissioning valves at CDS project ASAB. • Site Assistance to petrofac for commissioning valves at 2003 project Kuwait. • Commissioning & inspection of valves for BlackCat Engg. at their QP project Qatar. • Site Assistance to Alstom for servicing valves at sohar aluminium plant Oman. • Site Assistance to L&T OMAN, for testing and commissioning of valves for their ADMA project. • Representing PIBIVIESSE for serviving valves at SaudiArabia for their ARAMCO project.(Supervision for Valve Overhauling Activity of 36” size valve valves). • Representing CAMERON, for commissioning of Hydraulic control panels on L&T OMAN,for their ADMA project. • Testing and Modification of Hydraulic control panels for CAMERON/LEDEEN. • Prepare service activity forms for the jobs which in charge with. • Prepare inspection & Service reports for jobs in charge with. • Conservant with the following codes. API 598/ BS 6755 API 527/ BS 6759 API 6D January 2010 to April 2010 Worked with M/s. BAHWAN ENGINEERING COMPANY (Sultanate of Oman) as "MECHANICAL SUPERVISOR" Page 3 of 4
  • 4.
    Project: OMIFCO MaintenanceProject Shutdown Works) Sur, Oman (Client: Oman Indian Fertilizer Company) Job description • Supervision and Maintenance of Effluent treatment Plant. • Servicing and Testing of Diaphragm Valves. • Servicing of pumps and Agitator. • Controlling site construction activities. • Servicing of Pressure safety valves. • Servicing of blower, evaporator etc,, • Testing of various sizes of valves. • Preparation of daily progress Report. March 2009 to December 2009 Worked with M/s. General Engineering & Const. Works, Alleppey, Kerala, India as Mechanical Engineer. Job description • Execution of works as per the project scope with regards to Quality & HSE. • Delegation of works to charge-hands. • Controlling site construction activities. • Preparation of site daily/weekly/monthly progress report. • Inspection of Incoming materials & preparing inspection reports. • Follow-up with client for payment. • Responsible to keep and maintain all the machinery and test equipments in good condition and safe operational performance. August 2008 to February 2009 ( Mission Visa ) Worked with M/s. French Industrial Technology, Abu Dhabi, U.A.E. (one of the leading Valve Service Company in UAE for clients like TOTAL, GASCO, NPCC, Page 4 of 4
  • 5.
    DOLPHIN, CCC, FURMANITEetc.) as Mechanical Engineer [General Maintenance Department] Job Description: • Supervision of servicing of Gate, Globe, Check Valves & Safety Relief Valves. • Complete refurbishment of valves up to and including (12 inch). • Servicing of Double block & Bleed valves. • Testing and calibration of pressure safety valves. • Stripping, cleaning and preparation of inspection report for valves. • Testing of valves as per applicable codes. • Fabrication of the following outside lever and addition of manual or powered Actuator. • Manufacturing of parts including obsolete parts. • Lapping of Ball and Seats for metal seated valves • Machining of required components • Steam, air and liquid testing. July 2007 to July 2008; Worked with M/s. General Engineering & Const. Works, Alleppey, Kerala, India as Mechanical Engineer. Job description • Execution of works as per the project scope with regards to Quality & HSE. • Delegation of works to charge-hands. • Controlling site construction activities • Preparation of site daily/weekly/monthly progress report • Inspection of Incoming materials & preparing inspection reports • Follow-up with client for payment, • Execution of work as per drawing • Preparation of daily progress report. • Inspection of Incoming material & preparing inspection reports. • Co-ordinating with material suppliers / vendors for procurement. Declaration Page 5 of 4
  • 6.
    I hereby declarethat the above written particulars are true. Tony Thomas Page 6 of 4