Analysis and Design of Structural Components of a Ten Storied RCC Residential...Shariful Haque Robin
This report has been prepared as an integral part of the internship program for the Bachelor of Science in Civil Engineering (BSCE) under the Department of Civil Engineering in IUBAT−International University of Business Agriculture and Technology. The Dynamic Design and Development (DDD) Ltd. nominated as the organization for the practicum while honorable Prof. Dr. Md. Monirul Islam, Chair of the Department of Civil Engineering rendered his kind consent to academically supervise the internship program.
Tower design using Dynamic analysis method is now became easier than ever with this simple and effective PDF manual. Starting from modeling, defining till computing results based on Dynamic Analysis you can build the tower of your dream.
Engineering is fun and so does this PDF !
Analysis and Design of Structural Components of a Ten Storied RCC Residential...Shariful Haque Robin
This report has been prepared as an integral part of the internship program for the Bachelor of Science in Civil Engineering (BSCE) under the Department of Civil Engineering in IUBAT−International University of Business Agriculture and Technology. The Dynamic Design and Development (DDD) Ltd. nominated as the organization for the practicum while honorable Prof. Dr. Md. Monirul Islam, Chair of the Department of Civil Engineering rendered his kind consent to academically supervise the internship program.
Tower design using Dynamic analysis method is now became easier than ever with this simple and effective PDF manual. Starting from modeling, defining till computing results based on Dynamic Analysis you can build the tower of your dream.
Engineering is fun and so does this PDF !
مُلخص لأهم اشتراطات واحتياطات بنود التنفيذ فى الكود المصري للمنشآت الخرسانيه المسلحه
سلسلة الكود بيقولك تتضمن معظم ما يهم مهندس التنفيذ مدعمه بأرقام البنود التى يسهل الرجوع اليها عند الحاجه من الكود المصري
#الكود_بيقولك
#تنفيذ
#مدني
This program addresses in an integrated manner the key activities involved in the safe, effective and timely commissioning and start-up of a new plant or facility. Start Up and Commissioning of new plant and equipment presents both a major technical and management challenge. An organisation’s personnel must familiarise themselves with new equipment, processes and technologies, develop the relevant operating and safety procedures.
At the same time there is the requirement to execute an exceptionally large scope of work – much of it complex when compared to routine operations - over a short period of time, with equipment and plant which is as yet unproven and that may pose significant risks to personnel, environment and profitability.
This 5 day training course addresses the technical issues of commissioning and starting up various equipment and asset types commonly found in processing plant environments, the development of specific commissioning procedures, process and facility wide commissioning strategies. The course will also address the broader managerial issues of commissioning and start up planning, resourcing, budgeting and cost control, risk management – safety, environmental, financial and operational, problem solving and trouble shooting.
Book for Beginners, RCC Design by ETABSYousuf Dinar
Advancement of softwares is main cause behind comparatively quick and simple
design while avoiding complexity and time consuming manual procedure. However
mistake or mislead could be happened during designing the structures because of not
knowing the proper procedure depending on the situation. Design book based on
manual or hand design is sometimes time consuming and could not be good aids with
softwares as several steps are shorten during finite element modeling. This book may
work as a general learning hand book which bridges the software and the manual
design properly. The writers of this book used linear static analysis under BNBC and
ACI code to generate a six story residential building which could withstand wind load
of 210 kmph and seismic event of that region. The building is assumed to be designed
in Dhaka, Bangladesh under RAJUK rules to get legality of that concern organization.
For easy and explained understanding the book chapters are oriented in 2 parts. Part A
is concern about modeling and analysis which completed in only one chapter. Part B
is organized with 8 chapters. From chapter 1 to 7 the writers designed the model
building and explained with references how to consider during design so that
creativity of readers could not be threated. Chapter 8 is dedicated for estimation. As a
whole the book will help the readers to experience a building construction related all
facts and how to progress in design. Although the volume I is limited to linear static
analysis, upcoming volume will eventually consider dynamic facts to perform
dynamic analysis. Implemented equations are organized in the appendix section for
easy memorizing.
BNBC and other codes are improving and expending day by day, by covering new
and improved information as civil engineering is a vast field to continue the research.
Before designing something or taking decision judge the contemporary codes and
choose data, equations, factors and coefficient from the updated one.
Book for Beginners series is basic learning book of YDAS outlines. Here only
rectangular grid system modeling and a particular model is shown. Round shape grid
is avoided to keep the study simple. No advanced analysis is described and it is kept
simple for beginners. Only two way slab is elaborated with direct design method,
avoiding other procedures. In case of beam, only flexural and shear designs are made.
T- Beam, L- Beam or other shapes are not shown as rectangular beam was enough for
this study. Bi-axial column and foundation design is not shown. During column and
foundation design only pure axial load is considered. Use of interaction diagram is not
shown in manual design. Load centered isolated and combined footing designs are
shown, avoiding eccentric loading conditions. Pile and pile cap design, Mat
foundation design, strap footing design and sand pile concept are not included in this
برعاية : مدونة مهندس مدنى تحت الإنشاء
http://engineer-underconstruction.blogspot.com.eg
لتحميل الملف
http://engineer-underconstruction.blogspot.com.eg/2016/02/Metal.Scaffolding.html
نظم الشدات المعدنيه
1 – نظام الدعامات المفرد مع الكمرات التلسكوبيه – Props with Telescopic Decking Beams
2 – نظام الدعامات المزدوجه الثقيله – Shorbrace System
3 - نظام الدعامات المزدوجه الخفيفه – Light Weight System
3 - نظام الكاب لوك – CupLock System
4 – نظام طبالي الـ U- Form
5 - شدات الخزانات والحوائط
Offshore pile design according to international practiceWeb2Present
In this webinar, industry leading organizations present:
- Learnings from project Borkum West 2, one of German´s most advanced offshore wind projects
- The challenges of the piling design and results of the geotechnical investigation
- Recommendations and observations about potential hazards or obstruction during the foundation installation
Register for free here:
http://www.web2present.com/upcoming-webinars-details.php?id=116
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE, UMRAKH
SNPIT & RC, UMRAKH
National Conference : 2014
ISBN: 978-81-929339-0-0
National Conference : “TRENDS & CHALLENGES OF CIVIL ENGINEERING IN TODAY’S TRANSFORMING WORLD”
مُلخص لأهم اشتراطات واحتياطات بنود التنفيذ فى الكود المصري للمنشآت الخرسانيه المسلحه
سلسلة الكود بيقولك تتضمن معظم ما يهم مهندس التنفيذ مدعمه بأرقام البنود التى يسهل الرجوع اليها عند الحاجه من الكود المصري
#الكود_بيقولك
#تنفيذ
#مدني
This program addresses in an integrated manner the key activities involved in the safe, effective and timely commissioning and start-up of a new plant or facility. Start Up and Commissioning of new plant and equipment presents both a major technical and management challenge. An organisation’s personnel must familiarise themselves with new equipment, processes and technologies, develop the relevant operating and safety procedures.
At the same time there is the requirement to execute an exceptionally large scope of work – much of it complex when compared to routine operations - over a short period of time, with equipment and plant which is as yet unproven and that may pose significant risks to personnel, environment and profitability.
This 5 day training course addresses the technical issues of commissioning and starting up various equipment and asset types commonly found in processing plant environments, the development of specific commissioning procedures, process and facility wide commissioning strategies. The course will also address the broader managerial issues of commissioning and start up planning, resourcing, budgeting and cost control, risk management – safety, environmental, financial and operational, problem solving and trouble shooting.
Book for Beginners, RCC Design by ETABSYousuf Dinar
Advancement of softwares is main cause behind comparatively quick and simple
design while avoiding complexity and time consuming manual procedure. However
mistake or mislead could be happened during designing the structures because of not
knowing the proper procedure depending on the situation. Design book based on
manual or hand design is sometimes time consuming and could not be good aids with
softwares as several steps are shorten during finite element modeling. This book may
work as a general learning hand book which bridges the software and the manual
design properly. The writers of this book used linear static analysis under BNBC and
ACI code to generate a six story residential building which could withstand wind load
of 210 kmph and seismic event of that region. The building is assumed to be designed
in Dhaka, Bangladesh under RAJUK rules to get legality of that concern organization.
For easy and explained understanding the book chapters are oriented in 2 parts. Part A
is concern about modeling and analysis which completed in only one chapter. Part B
is organized with 8 chapters. From chapter 1 to 7 the writers designed the model
building and explained with references how to consider during design so that
creativity of readers could not be threated. Chapter 8 is dedicated for estimation. As a
whole the book will help the readers to experience a building construction related all
facts and how to progress in design. Although the volume I is limited to linear static
analysis, upcoming volume will eventually consider dynamic facts to perform
dynamic analysis. Implemented equations are organized in the appendix section for
easy memorizing.
BNBC and other codes are improving and expending day by day, by covering new
and improved information as civil engineering is a vast field to continue the research.
Before designing something or taking decision judge the contemporary codes and
choose data, equations, factors and coefficient from the updated one.
Book for Beginners series is basic learning book of YDAS outlines. Here only
rectangular grid system modeling and a particular model is shown. Round shape grid
is avoided to keep the study simple. No advanced analysis is described and it is kept
simple for beginners. Only two way slab is elaborated with direct design method,
avoiding other procedures. In case of beam, only flexural and shear designs are made.
T- Beam, L- Beam or other shapes are not shown as rectangular beam was enough for
this study. Bi-axial column and foundation design is not shown. During column and
foundation design only pure axial load is considered. Use of interaction diagram is not
shown in manual design. Load centered isolated and combined footing designs are
shown, avoiding eccentric loading conditions. Pile and pile cap design, Mat
foundation design, strap footing design and sand pile concept are not included in this
برعاية : مدونة مهندس مدنى تحت الإنشاء
http://engineer-underconstruction.blogspot.com.eg
لتحميل الملف
http://engineer-underconstruction.blogspot.com.eg/2016/02/Metal.Scaffolding.html
نظم الشدات المعدنيه
1 – نظام الدعامات المفرد مع الكمرات التلسكوبيه – Props with Telescopic Decking Beams
2 – نظام الدعامات المزدوجه الثقيله – Shorbrace System
3 - نظام الدعامات المزدوجه الخفيفه – Light Weight System
3 - نظام الكاب لوك – CupLock System
4 – نظام طبالي الـ U- Form
5 - شدات الخزانات والحوائط
Offshore pile design according to international practiceWeb2Present
In this webinar, industry leading organizations present:
- Learnings from project Borkum West 2, one of German´s most advanced offshore wind projects
- The challenges of the piling design and results of the geotechnical investigation
- Recommendations and observations about potential hazards or obstruction during the foundation installation
Register for free here:
http://www.web2present.com/upcoming-webinars-details.php?id=116
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE, UMRAKH
SNPIT & RC, UMRAKH
National Conference : 2014
ISBN: 978-81-929339-0-0
National Conference : “TRENDS & CHALLENGES OF CIVIL ENGINEERING IN TODAY’S TRANSFORMING WORLD”
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
الجامعة التكنولوجية
قسم هندسة البناء والإنشاءات
فرع هندسة الطرق والجسور
مختبر الأسفلت
دليل تجارب الاسفلت المختبرية
Asphalt Experiments Guide Laboratory
:أعداد
م.د. زينب ابراهيم قاسم
م شرف مختبر الاسفلت
University of Technology
Building and Construction
Engineering Department
Highways and Bridges Engineering Branch
Asphalt Laboratory
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTIONBahzad5
FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS
CONDITIONS OF CONTRACT
FOR WORKS OF CIVIL
ENGINEERING CONSTRUCTION
PART I GENERAL CONDITIONS
WITH FORMS OF TENDER AND AGREEMENT
FOURTH EDITION 1987
Reprinted 1988 with editorial amendments
Reprinted 1992 with further amendments
الشروط العامة لمقاولات اعمال الهندسة المدنيةBahzad5
الشروط العامة لمقاولات اعمال الهندسة المدنية ((بقسميها الاول والثاني)) المعدة من وزارة التخطيط مع اخر التعديلات عليها بغداد 2002
توزيع المكتبة القانونية - بغداد
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
REPUBLIC OF IRAQ
MINISTRY OF PLANNING
LEGAL DEPARTMENT
GENERAL CONDITIONS
FOR
CONTRACTS OF CIVIL ENGINEERING WORKS
PART I & II
PREPARED BY SPECIAL COMMITTEE AND
APPROVED BY THE PLANNING BOARD
JUNE 1973
Dar Al-Hurriyah
Al-Jamhurriyah Press, Baghdad
The Planning Board at its fifth meeting held on 12/6/1972 approved
these conditions vide resolution No. 2 and enforced the distribution
thereof to Ministries and Public establishments to act accordingly when
announcing tenders and adhering to the application thereof in all
contracts of civil engineering works together with the observance of
accuracy in the application of the second part for these conditions as to