MV 600 SS SP Vaporizer
Part (a) Positing for Vaporizer
The crane had assisted with the CO2 vaporizer positioning in CGRS as shown below but it
failed to position it into the CGRS due to roof height issue. To amend the issue, by using the
forklift, CGRS operator are able to move the vaporizer into the CGRS plant without
exceeding the roof height limits. The position of the vaporizer are meant to be nearby to a
drain so that droplets formed from the CO2 liquid can be conveniently drained.
Crane is positioning the vaporizer
Final position of the vaporizer after the adjustment from the forklift
Part (b) Ground Drilling for Vaporizer
To tighten the vaporizer onto the ground, our mainetance team do for drilling for each sides
(total of 4 side) in order for the placement of bolts, nuts and washers. After the tightening, the
water level balancing is off the aligment and after some obresvations, it is seen that the there
is a gap between the vaporizor and the ground at two sides as shown below. To compensate
for the differ in ground heights, our mainetance team put a shim beneath the vaporizer before
putting the bolt. In the end, the water level balancing is shown with a normal reading.
Drilling and bolting the vaporizer onto the ground
The off-set of water level balancing as seen in the middle
The gap bewteen the vaporizer and ground
The water level balancing after putting the shim
The shim beneath the vaporizer
The final position of the vaporizer
Part (c) Railing for Vaporizer
The railing is installed at 3 sides of the vaporizer to prevent any collision onto the vaporizer
from pallet or forklift.
Part (4) Vaporizer Specification
Vaporizer Parameters and Dimensions
Dimensions (m) Surfac
e Area
(𝒎 𝟐
)
Weigh
t (kg)
Rating
(kg/hr
)
Pressure Material Flange
L W H MAW
P
(barg)
Testin
g
(barg)
1.1
4 m
1.7
1 m
4.9
5 m
208 𝑚2
738 kg 400
kg/hr
80 barg 88 barg Aluminiu
m
Flange
with 1
1
2
”
300#
R.F.W.
N ANSI
Flange Dimensions
Flange connection with 𝟏
𝟏
𝟐
" with ANSI 300#
Nominal
Pipe Size
NPS
(inches)
Diameter of
Flange
(inches)
No of Bolts Diameter of
Bolts Holes
(inches)
Diameter of
Bolt Holes
(inches)
Bolt Circle
(inches)
1
1
2
" 6
1
8
"
4 3
4⁄ " 0.88”
4
1
2
"
Part (d) Vaporizer’s Fittings and costing
Justification:
Inlet connection:
SS)Shut-off valve:
Firstly, to turn on the gas flow of CO2 through the vaporizer during refilling operation.
Secondly, to turn off the gas flow when changing pallet connection from depleted pallet to
filled pallet, this is to ensure safety purpose by preventing the backflow of gas from the
vaporizer.
2) Vent/Purge valve
First, to safety vent out all the remaining gas and liquid which remained inside the tubing
during the time period between after switching off the gas flow and before changing the
pallet connection. Second, to purge the residual moisture and contamination.
3) Relief/ Safety valve:
To prevent the vaporizer from being overpressurized.
Outlet connection:
SS)Temperature gauge (exist with vaporizer)
To monitor and ensure that all the CO2 are in gas phase by refering to the phase diagram of
CO2 (Pressure-Temperature graph) as shown below.
2) Check valve
To prevent backflow of gas into the vaporizer at all times.
*The specification for all fittings and tubing is stated as below
The outlet connection doesn’t need a venting valve since the CGRS mixed gas refilling itself
is provided with one as shown below.
Fitting and tubing required
No Equipment Dimension/
Connection
Description Quantity Total Price
1 Blind Flange Class 300#
Threaded
with ½”
FNPT
Material:
Stainless Steel 304
Manufacturer:
JET Engineering
2 RM 442.00
2 Gasket Class 300#
NPS: 1.5”
Material:
PTFE (Teflon)
Manufacturer:
“Any”
2 RM 134.00
3 Bolts, nuts and
washers for
flange
M20 x
90mm”
Material:
Stainless Steel 316
8 sets RM 68.00
4 Meca-Inox
shut-off valve
½” FNPT Purpose:
On/Off application
Manufacturer:
Meca-Inox
Material:
Stainless Steel
Temperature
Range:
-50°C to 54°C
Working Pressure:
100 barg
Type:
Full bore cryogenic
ball valve, 3pc
1 RM 560.00
5 Ball/Vent
valve
½” (Tube) Purpose:
For venting gas
Manufacturer:
Dk-Lok
Ordering Number:
SS-63TS8
1 RM 636.80
6 Check valve ½” FNPT Purpose:
Prevent back flow
Manufacturer:
Dk-Lok
Ordering Number:
V33D-F-8N-1-S
1 RM 291.70
7 Safety/ Relief
valve
½” MNPT Purpose:
To prevent excessive
pressure into the
vaporizer
Manufacturer:
Generant
Material:
Stainless Steel 316
Seal Material:
Teflon
Temperature
Range:
-220°C to 205°C
Set pressure:
1100 psi (76 bar)
Ordering number:
HPRVA-500-SS-T-
1100
1 RM 2,050.00
8 Elbows ½” Manufacturer:
Dk-Lok
Material:
Stainless Steel
Ordering number:
DL-8
4 RM 100.00
9 Male Elbows ½” to MNPT Manufacturer:
Dk-Lok
Material:
Stainless Steel
Ordering number:
DLM8-8N
3 RM 90.90
10 Tee ½”(Tube)
½”(Tube)
½”(Tube)
Purpose:
For vent valve/ relief
Manufacturer:
Dk-Lok
Ordering number:
DT-8
2 RM 136.40
11 Male
connector
½”(Tube)
½”(MNPT)
Purpose:
To connect tube with
superior valve
Manufacturer:
Dk-Lok
Ordering number:
DMC8-8N
2 RM 200.00
12 Male
connector
½”(Tube)
¼”(MNPT)
Purpose:
To connect tube with
smart hose
Manufacturer:
Dk-Lok
Ordering number:
DMC8-4N-S
1 RM 40.00
13 Female
connector
½” to FNPT Purpose:
To connect tube with
relief valve
Manufacturer:
Dk-Lok
Ordering number:
DCF-8-8N
1 RM 70.00
14 Stainless Steel
Tubing
½” Manufacturer:
Swagelok
Length:
20ft (1 meter)
Thickness:
0.049”
Ordering number:
SS-T8-S-049-20
2 RM 480.80
15 Tube clamp ½” 5 RM 32.50
16 Ambient
Vaporizer
1 RM 28,000
Total costing RM 33,333.10
Part (f) Completion of Installation
The fittings had been completely installed on 30/6/2016.
Part (g) Testing
Maximum pressure achieved – up to 75 barg
Leak test – No possible leak is found
Part (h) Operation
Status: Currently, up and running with pallet.

More Related Content

What's hot

Genie jtr joule thomson regulator datasheet
Genie jtr joule thomson regulator datasheetGenie jtr joule thomson regulator datasheet
Genie jtr joule thomson regulator datasheet
a1-cbiss
 
02 wireline
02 wireline02 wireline
02 wireline
Johan RC
 

What's hot (14)

Tubing string
Tubing stringTubing string
Tubing string
 
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
 
Three Piece Ball Valves Available With Metal Seats
Three Piece Ball Valves Available With Metal SeatsThree Piece Ball Valves Available With Metal Seats
Three Piece Ball Valves Available With Metal Seats
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Technical Information for PC4000 Pipeline Connector
Technical Information for PC4000 Pipeline ConnectorTechnical Information for PC4000 Pipeline Connector
Technical Information for PC4000 Pipeline Connector
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
780182
780182780182
780182
 
API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)
 
Genie jtr joule thomson regulator datasheet
Genie jtr joule thomson regulator datasheetGenie jtr joule thomson regulator datasheet
Genie jtr joule thomson regulator datasheet
 
02 wireline
02 wireline02 wireline
02 wireline
 
Titan Flow Controls Series CV-50 Check Valve
Titan Flow Controls Series CV-50 Check ValveTitan Flow Controls Series CV-50 Check Valve
Titan Flow Controls Series CV-50 Check Valve
 
Pressure Regulating Valve - Type G-4 Cash Valve
Pressure Regulating Valve - Type G-4 Cash ValvePressure Regulating Valve - Type G-4 Cash Valve
Pressure Regulating Valve - Type G-4 Cash Valve
 
PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)
 

Viewers also liked

Arkadin Global Corporate Presentation
Arkadin Global  Corporate PresentationArkadin Global  Corporate Presentation
Arkadin Global Corporate Presentation
Colinardyer
 
Corporate Presentation Arkadin
Corporate Presentation ArkadinCorporate Presentation Arkadin
Corporate Presentation Arkadin
Grégoire Kiss
 
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
SlideShare
 

Viewers also liked (19)

Arkadin Global Corporate Presentation
Arkadin Global  Corporate PresentationArkadin Global  Corporate Presentation
Arkadin Global Corporate Presentation
 
Discover Connected Innovation
Discover Connected InnovationDiscover Connected Innovation
Discover Connected Innovation
 
Corporate Presentation Arkadin
Corporate Presentation ArkadinCorporate Presentation Arkadin
Corporate Presentation Arkadin
 
Full report (Petronas Prai)
Full report (Petronas Prai)Full report (Petronas Prai)
Full report (Petronas Prai)
 
UTAR Cert
UTAR CertUTAR Cert
UTAR Cert
 
IEM Cert
IEM CertIEM Cert
IEM Cert
 
Synergy Project
Synergy ProjectSynergy Project
Synergy Project
 
BEM Cert
BEM CertBEM Cert
BEM Cert
 
What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great Infographics
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShare
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
 
You Suck At PowerPoint!
You Suck At PowerPoint!You Suck At PowerPoint!
You Suck At PowerPoint!
 
10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization
 
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingHow To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
 
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShare
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShare
 

Similar to MV 600 SS SP vapaorizer (cyroquip)

010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
Juan Novillo Ramos
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
dai20nao
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
zhenchun51
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
zu0582kui
 

Similar to MV 600 SS SP vapaorizer (cyroquip) (20)

Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
Catalog flow straighner
Catalog flow straighnerCatalog flow straighner
Catalog flow straighner
 
Technical data sheet
Technical data sheetTechnical data sheet
Technical data sheet
 
Piston Isolation Valves For Steam and Condensate
Piston Isolation Valves For Steam and CondensatePiston Isolation Valves For Steam and Condensate
Piston Isolation Valves For Steam and Condensate
 
HDOT one of the topmost Manufacturing Units in India
HDOT one of the topmost Manufacturing Units in IndiaHDOT one of the topmost Manufacturing Units in India
HDOT one of the topmost Manufacturing Units in India
 
Jgb industrial cleaning catalog
Jgb industrial cleaning catalogJgb industrial cleaning catalog
Jgb industrial cleaning catalog
 
Tg section eqpt details
Tg section eqpt detailsTg section eqpt details
Tg section eqpt details
 
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdfVolvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
Volvo EC140B LC EC140BLC Excavator Service Repair Manual Instant Download.pdf
 

MV 600 SS SP vapaorizer (cyroquip)

  • 1. MV 600 SS SP Vaporizer
  • 2. Part (a) Positing for Vaporizer The crane had assisted with the CO2 vaporizer positioning in CGRS as shown below but it failed to position it into the CGRS due to roof height issue. To amend the issue, by using the forklift, CGRS operator are able to move the vaporizer into the CGRS plant without exceeding the roof height limits. The position of the vaporizer are meant to be nearby to a drain so that droplets formed from the CO2 liquid can be conveniently drained. Crane is positioning the vaporizer Final position of the vaporizer after the adjustment from the forklift
  • 3. Part (b) Ground Drilling for Vaporizer To tighten the vaporizer onto the ground, our mainetance team do for drilling for each sides (total of 4 side) in order for the placement of bolts, nuts and washers. After the tightening, the water level balancing is off the aligment and after some obresvations, it is seen that the there is a gap between the vaporizor and the ground at two sides as shown below. To compensate for the differ in ground heights, our mainetance team put a shim beneath the vaporizer before putting the bolt. In the end, the water level balancing is shown with a normal reading. Drilling and bolting the vaporizer onto the ground The off-set of water level balancing as seen in the middle
  • 4. The gap bewteen the vaporizer and ground The water level balancing after putting the shim
  • 5. The shim beneath the vaporizer The final position of the vaporizer
  • 6. Part (c) Railing for Vaporizer The railing is installed at 3 sides of the vaporizer to prevent any collision onto the vaporizer from pallet or forklift.
  • 7. Part (4) Vaporizer Specification Vaporizer Parameters and Dimensions Dimensions (m) Surfac e Area (𝒎 𝟐 ) Weigh t (kg) Rating (kg/hr ) Pressure Material Flange L W H MAW P (barg) Testin g (barg) 1.1 4 m 1.7 1 m 4.9 5 m 208 𝑚2 738 kg 400 kg/hr 80 barg 88 barg Aluminiu m Flange with 1 1 2 ” 300# R.F.W. N ANSI Flange Dimensions Flange connection with 𝟏 𝟏 𝟐 " with ANSI 300# Nominal Pipe Size NPS (inches) Diameter of Flange (inches) No of Bolts Diameter of Bolts Holes (inches) Diameter of Bolt Holes (inches) Bolt Circle (inches) 1 1 2 " 6 1 8 " 4 3 4⁄ " 0.88” 4 1 2 "
  • 8. Part (d) Vaporizer’s Fittings and costing Justification: Inlet connection: SS)Shut-off valve: Firstly, to turn on the gas flow of CO2 through the vaporizer during refilling operation. Secondly, to turn off the gas flow when changing pallet connection from depleted pallet to filled pallet, this is to ensure safety purpose by preventing the backflow of gas from the vaporizer. 2) Vent/Purge valve First, to safety vent out all the remaining gas and liquid which remained inside the tubing during the time period between after switching off the gas flow and before changing the pallet connection. Second, to purge the residual moisture and contamination. 3) Relief/ Safety valve: To prevent the vaporizer from being overpressurized.
  • 9. Outlet connection: SS)Temperature gauge (exist with vaporizer) To monitor and ensure that all the CO2 are in gas phase by refering to the phase diagram of CO2 (Pressure-Temperature graph) as shown below. 2) Check valve To prevent backflow of gas into the vaporizer at all times. *The specification for all fittings and tubing is stated as below The outlet connection doesn’t need a venting valve since the CGRS mixed gas refilling itself is provided with one as shown below.
  • 10. Fitting and tubing required No Equipment Dimension/ Connection Description Quantity Total Price 1 Blind Flange Class 300# Threaded with ½” FNPT Material: Stainless Steel 304 Manufacturer: JET Engineering 2 RM 442.00 2 Gasket Class 300# NPS: 1.5” Material: PTFE (Teflon) Manufacturer: “Any” 2 RM 134.00 3 Bolts, nuts and washers for flange M20 x 90mm” Material: Stainless Steel 316 8 sets RM 68.00 4 Meca-Inox shut-off valve ½” FNPT Purpose: On/Off application Manufacturer: Meca-Inox Material: Stainless Steel Temperature Range: -50°C to 54°C Working Pressure: 100 barg Type: Full bore cryogenic ball valve, 3pc 1 RM 560.00 5 Ball/Vent valve ½” (Tube) Purpose: For venting gas Manufacturer: Dk-Lok Ordering Number: SS-63TS8 1 RM 636.80 6 Check valve ½” FNPT Purpose: Prevent back flow Manufacturer: Dk-Lok Ordering Number: V33D-F-8N-1-S 1 RM 291.70
  • 11. 7 Safety/ Relief valve ½” MNPT Purpose: To prevent excessive pressure into the vaporizer Manufacturer: Generant Material: Stainless Steel 316 Seal Material: Teflon Temperature Range: -220°C to 205°C Set pressure: 1100 psi (76 bar) Ordering number: HPRVA-500-SS-T- 1100 1 RM 2,050.00 8 Elbows ½” Manufacturer: Dk-Lok Material: Stainless Steel Ordering number: DL-8 4 RM 100.00 9 Male Elbows ½” to MNPT Manufacturer: Dk-Lok Material: Stainless Steel Ordering number: DLM8-8N 3 RM 90.90 10 Tee ½”(Tube) ½”(Tube) ½”(Tube) Purpose: For vent valve/ relief Manufacturer: Dk-Lok Ordering number: DT-8 2 RM 136.40 11 Male connector ½”(Tube) ½”(MNPT) Purpose: To connect tube with superior valve Manufacturer: Dk-Lok Ordering number: DMC8-8N 2 RM 200.00
  • 12. 12 Male connector ½”(Tube) ¼”(MNPT) Purpose: To connect tube with smart hose Manufacturer: Dk-Lok Ordering number: DMC8-4N-S 1 RM 40.00 13 Female connector ½” to FNPT Purpose: To connect tube with relief valve Manufacturer: Dk-Lok Ordering number: DCF-8-8N 1 RM 70.00 14 Stainless Steel Tubing ½” Manufacturer: Swagelok Length: 20ft (1 meter) Thickness: 0.049” Ordering number: SS-T8-S-049-20 2 RM 480.80 15 Tube clamp ½” 5 RM 32.50 16 Ambient Vaporizer 1 RM 28,000 Total costing RM 33,333.10
  • 13. Part (f) Completion of Installation The fittings had been completely installed on 30/6/2016.
  • 14. Part (g) Testing Maximum pressure achieved – up to 75 barg Leak test – No possible leak is found Part (h) Operation Status: Currently, up and running with pallet.