Digital Workflow from Design to Construction
Milling and Paving
Equipment and the use of 3D
Models
Kevin Garcia, Trimble
Laikram Narsingh (Nars), Wirtgen
Jim Preston, TOPCON
What we’ll cover today
There are three main components to be aware for AMG
1.Model Creation
• It’s not just a digital version of the plans!
2.Machine Setup
• Ensuring you understand tractor operations/physics
for consistent performance
3.In Field Technology and Execution
• Steps for success
Modelling and Pre-Construction
• More realistic representation of existing road surface conditions
• Leverage software to determine if specifications are able to be achieved
• Maximize financial bonus opportunity for smoothness / rideability with most efficient design
Design surface
Understanding Machine Setup and Operation
1. Physical Reference
Automatic Paving & Milling – Sensors following 2 Types of Reference
Joint, Base, Curb
or String Line
Averaging Ski
Following Mat
or Base
Z RH
Y
Z LH
X
2. 3 D Coordinates as Reference
3D Model
Traverse
Slope
Sensor
reading
Slope Beam
What is Needed for 3D Paving or Milling
1. 3D Models – Surveying Companies, Topcon Trimble & Leica, Etc.
2. 3D Positioning Instruments – Topcon, Trimble and Leica etc.
3. Machine Controls & Equipment with Proper Setup
Topcon, Trimble or Leica, Etc. Positioning Instruments
GPS / UTS
3D Models
3D Paving & Milling
Machine & controls with Proper Setup
Setup for 3D Milling
Setup / Benchmarking Is Straightforward
 Drum Width is Fixed
 Drum Moves in Direct Relation to the Mill Legs
 Speed limited by Hydraulics & 3D Data Processing
Setup for 3D Paving
Could Control 1, 2 or 3D
 Pavement Depth – LH & RH (Z)
 Pavement Width (X)
 Direction of Pavement (Y)
For Proper Setup:
Must Understand Principles of the
Free Floating Screed & Screed Design
D3 Steering
Control (Y)
D Mat Depth
L (Z)
D Mat
Depth
R (Z)
Principles of the Free Floating Screed
The screed Floats on the Asphalt like a Water Skier
 Pavement Depth Held by 5 Forces ….. Not Mechanical like the Mill
 Pull Force Exerted at Towpoint
 Towpoint also Increase / Decrease Pavement Depth
Depth Crank –
Increase / Decrease
Screed Angle
Tow Point
Pull Force
Depth Controlled By Increasing / Decreasing Screed Angle of Attack
1. Manually with Depth Crank or Tow Point
 Depth Crank Can Set Screed Flat with Towpoint at Different Position
2. Automatic Control of Towpoint
 Dept Crank should be locked
 Depth Crank must be Set to 0 when setting up for 3D Paving
Towpoint
Cylinder
Depth Crank
Principles of the Free Floating Screed
2 Types of Extendable Screeds – Front & Rear Mount
 Each with 3 Sections
1. Main Screed
2. LH Extension with Slope & Height Adjustment
3. RH Extension with Slope & Height Adjustment
Rear Mounted Extensions Screeds
Main Screed
RH Extension
LH Extension
Unequal Width Front Mount Screed
Main Screed
LH Extension RH Extension
Screed Design
Main
Front Mount Extension Height Adjustment (MH)
 Sets Trailing Edges of Extension to Main
 Extension is usually ¼” Below the Main
Mat Depth
Plane B – Trailing Edge
Ext
MH Main
Screed Design
Main
LH & RH
Extension
Trailing Edges
Mat
Depth
MH
Main Screed
RH Extension
LH Extension
Rear Mount Extension Height Adjustment (MH)
 Sets Trailing Edges of Extension to Main
 Extension is usually ¼” Above the Main
 Could also be Sloped
Screed Design
Screed Design
Rear Mount Extension Screed – Match Height & Slope & Crown
Rear Mount Extension Screed – Match Height & Slope
Extension Match
height Moves Up /
Down & Slope
Screed Design
Setup Procedure When using Trimble on Vögele / VR 600
Rear Mount Extension Screed – Match Height & Slope
Depth must be verified in a Few Locations
 Under the Main Screed
 Under Both Extensions Screeds
 Must Consider Rolldown for Final Elevation
Verifying Pavement Depth When using 3D Controls
It takes approx. 5 x Length of tow arm to reach new Depth after Corrections
 Must allow the screed to react before Checking Grade after Corrections
2 nd 1st
3 rd
4 th
5 th
65 %
85 %
100 %
Verifying Pavement Depth When using 3D Controls
Slope Sensors used in 3D Paving
Mast Lean Slope Sensor
Traverse Slope
Sensor – Mount
on the Slope
Beam
Vögele Extension
Slope Sensor
Verifying Malfunctions
Malfunctions could be Driven by the Following:
 Paving / Milling Equipment ……… or 3D Instruments ……….or Model
 Could easily Switch to Physical Reference to Verify Equipment
Setup must be done based on 1, 2 or 3D Controls
Setup Procedure for Leica System
Setup Procedure for Trimble System
Infield Technology and Steps for Success
RDMC
LPS/UTS
MMGPS
3D Applications
Adequate overlap Control
Out of the way of traffic
Establishing Control Points
Steps for Success
•Proper control (i.e. TS or level) and has verified using mmGPS.
•Location of control points…
 Distance to machine to laser (500 feet MAX)
 Pattern of truck traffic & machine travel
 Adequate Reference/Bench hubs 100’ from Control
Horizontal Working Range for Paving
±500ft ±500ft ±500ft
Tx #1 Tx #2 Tx #3 Tx #4
±2000ft
±250ft ±250ft
Job Setup
 Verify you have a tight localization that is not set using GPS.
 Set multiple “control points” to be used for the transmitters.
• These transmitter control points should not be set using GPS.
 Set a second control point or grade verification hub approximately 100’/30m from
each transmitter location to be used to verify transmitter height.
• These control points should not be set using GPS.
 Set multiple control points or grade verification hubs around the site to be used to
verify grade during the project.
• These control points should not be set using GPS.
 Minimize operational distance from the transmitter.
• 750’ for grading applications
• 500’ for asphalt paving applications
• 300’ for concrete paving applications
• In windy conditions, reduce operating distances.
Job Setup
 Consider truck & equipment traffic when placing transmitter locations.
 If using fixed height tripods, put sand bags on them to reduce vibrations.
Set to minimum heights whenever possible.
 Calibrate the transmitter before starting a new project.
 Verify transmitter setup every day.
• “Check-in” on multiple control points or accurate verification hubs.
• If transmitter calibration is suspect, first rotate on all four axis to
verify, then calibrate if needed.
 When on airport projects or locations susceptible to radio interference,
test the radios on the project before starting the project.
Asphalt Paving
 Assign a person to continuously verify grade behind the paver.
 Assign a person to be responsible to continuously monitoring the control box
and truck traffic, and immediately switch to manual control when the
transmitter is blocked.
 Make sure the crew understands how to make proper transmitter switching
transitions.
 For best results when joint matching, use a Sonic Tracker.
 Have extra batteries for sensors, data collectors, transmitters.
Possibly run transmitter off marine battery.
 Have backup equipment.
 Make sure all machine measurements and calibrations are correct.
Questions?

More Related Content

Similar to MTCE-ISIC-04-Milling Paving.pptx

Application of GPS in mining
Application of GPS in miningApplication of GPS in mining
Application of GPS in mining
VansajRaj2
 
BEA's LZR-WIDESCAN Technical Training
BEA's LZR-WIDESCAN Technical TrainingBEA's LZR-WIDESCAN Technical Training
BEA's LZR-WIDESCAN Technical Training
BEA, Inc.
 
Cyrus Vibration Machines India Pvt Ltd
Cyrus Vibration Machines India Pvt LtdCyrus Vibration Machines India Pvt Ltd
Cyrus Vibration Machines India Pvt Ltd
Ganesh Karale
 
veescan-brochure-issue-4
veescan-brochure-issue-4veescan-brochure-issue-4
veescan-brochure-issue-4ETher NDE
 
2022 presentation on efficient paving by Todd Mansell with Caaterpillar
2022 presentation on efficient paving by Todd Mansell with Caaterpillar2022 presentation on efficient paving by Todd Mansell with Caaterpillar
2022 presentation on efficient paving by Todd Mansell with Caaterpillar
California Asphalt Pavement Association
 
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
Carlo882478
 
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4   session 3 - st dev con 2016 - pedestrian dead reckoningTrack 4   session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
ST_World
 
Lec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdfLec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdf
MdNaimulIslamSany
 
MVS Product Catalog
MVS Product CatalogMVS Product Catalog
MVS Product CatalogMike Camp
 
Presentation1Practical purposes of mud logging
Presentation1Practical purposes of mud loggingPresentation1Practical purposes of mud logging
Presentation1Practical purposes of mud loggingelharith mohamed
 
Presentation1 practical purposes of mud logging
Presentation1 practical purposes of mud loggingPresentation1 practical purposes of mud logging
Presentation1 practical purposes of mud logging
elharith mohamed
 
Presentation1 practical purposes of mud logging
Presentation1 practical purposes of mud loggingPresentation1 practical purposes of mud logging
Presentation1 practical purposes of mud logging
elharith mohamed
 
Caged Quadrotor Drone for Inspection of HVAC Ducts
Caged Quadrotor Drone for Inspection of HVAC DuctsCaged Quadrotor Drone for Inspection of HVAC Ducts
Caged Quadrotor Drone for Inspection of HVAC Ducts
Arwa Abougharib
 
GeoTeam_GT-150-13_Data Processing Report_Rev01
GeoTeam_GT-150-13_Data Processing Report_Rev01GeoTeam_GT-150-13_Data Processing Report_Rev01
GeoTeam_GT-150-13_Data Processing Report_Rev01Mohamed Mohamed
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings construction
Kundan Sanap
 
Robot programming
Robot programmingRobot programming
Robot programming
Gopal Saini
 
stratagraph-brochure-2014
stratagraph-brochure-2014stratagraph-brochure-2014
stratagraph-brochure-2014Jeremy Bondick
 
Specifying & Sizing Electromechanical Linear Actuators
Specifying & Sizing Electromechanical Linear ActuatorsSpecifying & Sizing Electromechanical Linear Actuators
Specifying & Sizing Electromechanical Linear Actuators
Rollon Corporation
 

Similar to MTCE-ISIC-04-Milling Paving.pptx (20)

Shreya.pptx
Shreya.pptxShreya.pptx
Shreya.pptx
 
Cruise Control
Cruise ControlCruise Control
Cruise Control
 
Application of GPS in mining
Application of GPS in miningApplication of GPS in mining
Application of GPS in mining
 
BEA's LZR-WIDESCAN Technical Training
BEA's LZR-WIDESCAN Technical TrainingBEA's LZR-WIDESCAN Technical Training
BEA's LZR-WIDESCAN Technical Training
 
Cyrus Vibration Machines India Pvt Ltd
Cyrus Vibration Machines India Pvt LtdCyrus Vibration Machines India Pvt Ltd
Cyrus Vibration Machines India Pvt Ltd
 
veescan-brochure-issue-4
veescan-brochure-issue-4veescan-brochure-issue-4
veescan-brochure-issue-4
 
2022 presentation on efficient paving by Todd Mansell with Caaterpillar
2022 presentation on efficient paving by Todd Mansell with Caaterpillar2022 presentation on efficient paving by Todd Mansell with Caaterpillar
2022 presentation on efficient paving by Todd Mansell with Caaterpillar
 
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
487665348-PPT-on-FALLING-WEIGHT-DEFLECTOMETER.pptx
 
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4   session 3 - st dev con 2016 - pedestrian dead reckoningTrack 4   session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
 
Lec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdfLec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdf
 
MVS Product Catalog
MVS Product CatalogMVS Product Catalog
MVS Product Catalog
 
Presentation1Practical purposes of mud logging
Presentation1Practical purposes of mud loggingPresentation1Practical purposes of mud logging
Presentation1Practical purposes of mud logging
 
Presentation1 practical purposes of mud logging
Presentation1 practical purposes of mud loggingPresentation1 practical purposes of mud logging
Presentation1 practical purposes of mud logging
 
Presentation1 practical purposes of mud logging
Presentation1 practical purposes of mud loggingPresentation1 practical purposes of mud logging
Presentation1 practical purposes of mud logging
 
Caged Quadrotor Drone for Inspection of HVAC Ducts
Caged Quadrotor Drone for Inspection of HVAC DuctsCaged Quadrotor Drone for Inspection of HVAC Ducts
Caged Quadrotor Drone for Inspection of HVAC Ducts
 
GeoTeam_GT-150-13_Data Processing Report_Rev01
GeoTeam_GT-150-13_Data Processing Report_Rev01GeoTeam_GT-150-13_Data Processing Report_Rev01
GeoTeam_GT-150-13_Data Processing Report_Rev01
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings construction
 
Robot programming
Robot programmingRobot programming
Robot programming
 
stratagraph-brochure-2014
stratagraph-brochure-2014stratagraph-brochure-2014
stratagraph-brochure-2014
 
Specifying & Sizing Electromechanical Linear Actuators
Specifying & Sizing Electromechanical Linear ActuatorsSpecifying & Sizing Electromechanical Linear Actuators
Specifying & Sizing Electromechanical Linear Actuators
 

More from gkchang

IICTG-Inaugural-v2
IICTG-Inaugural-v2IICTG-Inaugural-v2
IICTG-Inaugural-v2gkchang
 
2015ERPUG-ProVAL-Chang-v1
2015ERPUG-ProVAL-Chang-v12015ERPUG-ProVAL-Chang-v1
2015ERPUG-ProVAL-Chang-v1gkchang
 
Practical implementation of automated joint fault measuerment
Practical implementation of automated joint fault measuermentPractical implementation of automated joint fault measuerment
Practical implementation of automated joint fault measuerment
gkchang
 
Fundamentals of Intelligent Compaction
Fundamentals of Intelligent CompactionFundamentals of Intelligent Compaction
Fundamentals of Intelligent Compaction
gkchang
 
Intelligent Construction - an overview
Intelligent Construction - an overviewIntelligent Construction - an overview
Intelligent Construction - an overviewgkchang
 
Implementation Grinding Simulation in ProVAL
Implementation Grinding Simulation in ProVALImplementation Grinding Simulation in ProVAL
Implementation Grinding Simulation in ProVAL
gkchang
 
Quantify Impact of JCP Curl/Warp on Smoothness
Quantify Impact of JCP Curl/Warp on SmoothnessQuantify Impact of JCP Curl/Warp on Smoothness
Quantify Impact of JCP Curl/Warp on Smoothness
gkchang
 
FHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent FindingsFHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent Findings
gkchang
 

More from gkchang (8)

IICTG-Inaugural-v2
IICTG-Inaugural-v2IICTG-Inaugural-v2
IICTG-Inaugural-v2
 
2015ERPUG-ProVAL-Chang-v1
2015ERPUG-ProVAL-Chang-v12015ERPUG-ProVAL-Chang-v1
2015ERPUG-ProVAL-Chang-v1
 
Practical implementation of automated joint fault measuerment
Practical implementation of automated joint fault measuermentPractical implementation of automated joint fault measuerment
Practical implementation of automated joint fault measuerment
 
Fundamentals of Intelligent Compaction
Fundamentals of Intelligent CompactionFundamentals of Intelligent Compaction
Fundamentals of Intelligent Compaction
 
Intelligent Construction - an overview
Intelligent Construction - an overviewIntelligent Construction - an overview
Intelligent Construction - an overview
 
Implementation Grinding Simulation in ProVAL
Implementation Grinding Simulation in ProVALImplementation Grinding Simulation in ProVAL
Implementation Grinding Simulation in ProVAL
 
Quantify Impact of JCP Curl/Warp on Smoothness
Quantify Impact of JCP Curl/Warp on SmoothnessQuantify Impact of JCP Curl/Warp on Smoothness
Quantify Impact of JCP Curl/Warp on Smoothness
 
FHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent FindingsFHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent Findings
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

MTCE-ISIC-04-Milling Paving.pptx

  • 1. IS-IC.ORG ISIC TRACK Digital Workflow from Design to Construction Milling and Paving Equipment and the use of 3D Models Kevin Garcia, Trimble Laikram Narsingh (Nars), Wirtgen Jim Preston, TOPCON
  • 2. What we’ll cover today There are three main components to be aware for AMG 1.Model Creation • It’s not just a digital version of the plans! 2.Machine Setup • Ensuring you understand tractor operations/physics for consistent performance 3.In Field Technology and Execution • Steps for success
  • 4.
  • 5.
  • 6. • More realistic representation of existing road surface conditions • Leverage software to determine if specifications are able to be achieved • Maximize financial bonus opportunity for smoothness / rideability with most efficient design
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 16. 1. Physical Reference Automatic Paving & Milling – Sensors following 2 Types of Reference Joint, Base, Curb or String Line Averaging Ski Following Mat or Base Z RH Y Z LH X 2. 3 D Coordinates as Reference 3D Model Traverse Slope Sensor reading Slope Beam
  • 17. What is Needed for 3D Paving or Milling 1. 3D Models – Surveying Companies, Topcon Trimble & Leica, Etc. 2. 3D Positioning Instruments – Topcon, Trimble and Leica etc. 3. Machine Controls & Equipment with Proper Setup Topcon, Trimble or Leica, Etc. Positioning Instruments GPS / UTS 3D Models 3D Paving & Milling Machine & controls with Proper Setup
  • 18. Setup for 3D Milling Setup / Benchmarking Is Straightforward  Drum Width is Fixed  Drum Moves in Direct Relation to the Mill Legs  Speed limited by Hydraulics & 3D Data Processing
  • 19. Setup for 3D Paving Could Control 1, 2 or 3D  Pavement Depth – LH & RH (Z)  Pavement Width (X)  Direction of Pavement (Y) For Proper Setup: Must Understand Principles of the Free Floating Screed & Screed Design D3 Steering Control (Y) D Mat Depth L (Z) D Mat Depth R (Z)
  • 20. Principles of the Free Floating Screed The screed Floats on the Asphalt like a Water Skier  Pavement Depth Held by 5 Forces ….. Not Mechanical like the Mill  Pull Force Exerted at Towpoint  Towpoint also Increase / Decrease Pavement Depth Depth Crank – Increase / Decrease Screed Angle Tow Point Pull Force
  • 21. Depth Controlled By Increasing / Decreasing Screed Angle of Attack 1. Manually with Depth Crank or Tow Point  Depth Crank Can Set Screed Flat with Towpoint at Different Position 2. Automatic Control of Towpoint  Dept Crank should be locked  Depth Crank must be Set to 0 when setting up for 3D Paving Towpoint Cylinder Depth Crank Principles of the Free Floating Screed
  • 22. 2 Types of Extendable Screeds – Front & Rear Mount  Each with 3 Sections 1. Main Screed 2. LH Extension with Slope & Height Adjustment 3. RH Extension with Slope & Height Adjustment Rear Mounted Extensions Screeds Main Screed RH Extension LH Extension Unequal Width Front Mount Screed Main Screed LH Extension RH Extension Screed Design
  • 23. Main Front Mount Extension Height Adjustment (MH)  Sets Trailing Edges of Extension to Main  Extension is usually ¼” Below the Main Mat Depth Plane B – Trailing Edge Ext MH Main Screed Design
  • 24. Main LH & RH Extension Trailing Edges Mat Depth MH Main Screed RH Extension LH Extension Rear Mount Extension Height Adjustment (MH)  Sets Trailing Edges of Extension to Main  Extension is usually ¼” Above the Main  Could also be Sloped Screed Design
  • 25. Screed Design Rear Mount Extension Screed – Match Height & Slope & Crown
  • 26. Rear Mount Extension Screed – Match Height & Slope Extension Match height Moves Up / Down & Slope Screed Design
  • 27. Setup Procedure When using Trimble on Vögele / VR 600 Rear Mount Extension Screed – Match Height & Slope
  • 28. Depth must be verified in a Few Locations  Under the Main Screed  Under Both Extensions Screeds  Must Consider Rolldown for Final Elevation Verifying Pavement Depth When using 3D Controls
  • 29. It takes approx. 5 x Length of tow arm to reach new Depth after Corrections  Must allow the screed to react before Checking Grade after Corrections 2 nd 1st 3 rd 4 th 5 th 65 % 85 % 100 % Verifying Pavement Depth When using 3D Controls
  • 30. Slope Sensors used in 3D Paving Mast Lean Slope Sensor Traverse Slope Sensor – Mount on the Slope Beam Vögele Extension Slope Sensor
  • 31. Verifying Malfunctions Malfunctions could be Driven by the Following:  Paving / Milling Equipment ……… or 3D Instruments ……….or Model  Could easily Switch to Physical Reference to Verify Equipment
  • 32. Setup must be done based on 1, 2 or 3D Controls Setup Procedure for Leica System
  • 33. Setup Procedure for Trimble System
  • 34.
  • 35. Infield Technology and Steps for Success
  • 36.
  • 37.
  • 38.
  • 40. Adequate overlap Control Out of the way of traffic Establishing Control Points
  • 42. •Proper control (i.e. TS or level) and has verified using mmGPS. •Location of control points…  Distance to machine to laser (500 feet MAX)  Pattern of truck traffic & machine travel  Adequate Reference/Bench hubs 100’ from Control Horizontal Working Range for Paving ±500ft ±500ft ±500ft Tx #1 Tx #2 Tx #3 Tx #4 ±2000ft ±250ft ±250ft
  • 43. Job Setup  Verify you have a tight localization that is not set using GPS.  Set multiple “control points” to be used for the transmitters. • These transmitter control points should not be set using GPS.  Set a second control point or grade verification hub approximately 100’/30m from each transmitter location to be used to verify transmitter height. • These control points should not be set using GPS.  Set multiple control points or grade verification hubs around the site to be used to verify grade during the project. • These control points should not be set using GPS.  Minimize operational distance from the transmitter. • 750’ for grading applications • 500’ for asphalt paving applications • 300’ for concrete paving applications • In windy conditions, reduce operating distances.
  • 44. Job Setup  Consider truck & equipment traffic when placing transmitter locations.  If using fixed height tripods, put sand bags on them to reduce vibrations. Set to minimum heights whenever possible.  Calibrate the transmitter before starting a new project.  Verify transmitter setup every day. • “Check-in” on multiple control points or accurate verification hubs. • If transmitter calibration is suspect, first rotate on all four axis to verify, then calibrate if needed.  When on airport projects or locations susceptible to radio interference, test the radios on the project before starting the project.
  • 45. Asphalt Paving  Assign a person to continuously verify grade behind the paver.  Assign a person to be responsible to continuously monitoring the control box and truck traffic, and immediately switch to manual control when the transmitter is blocked.  Make sure the crew understands how to make proper transmitter switching transitions.  For best results when joint matching, use a Sonic Tracker.  Have extra batteries for sensors, data collectors, transmitters. Possibly run transmitter off marine battery.  Have backup equipment.  Make sure all machine measurements and calibrations are correct.