‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت ﺑﺈﺳﺘﺨﺪام‬
‫‪Microsoft Project‬‬

‫م. ﻧﺒﻴﻞ اﺏﺮاهﻴﻢ اﻟﺼﻮاﻟﺤﻲ‬
‫ﻣﺎﺟﺴﺘﻴﺮ ﻓﻲ ادارة اﻟﻤﺸﺮوﻋﺎت اﻟﻬﻨﺪﺳﻴﺔ‬

‫1‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫ﺟﺪول اﻟﻤﺤﺘﻮیﺎت‬
‫إدارة اﻟﻤﺸﺮوﻋﺎت ﺑﺈﺳﺘﺨﺪام ........................................................................................................ 1‬
‫‪1 ............................................................................................................. Microsoft Project‬‬
‫1. ﻡﻔﻬﻮم ادارة اﻟﻤﺸﺮوﻋﺎت ....................................................................................................... 5‬
‫1-1 اﻟﻤﻘــﺪﻣﺔ ..................................................................................................................... 5‬
‫1-2 اﻷهﺪاف....................................................................................................................... 5‬
‫1-3 ﻣﺎذا ﺳﻮف ﺕﺘﻌﻠﻢ ............................................................................................................ 5‬
‫1-4 ﻡﺒﺎدئ إدارة اﻟﻤﺸﺮوﻋﺎت ................................................................................................. 6‬
‫1-4-1 ﻡﺎ هﻮاﻟﻤﺸﺮوع ..................................................................................................... 6‬
‫1-4-2 ﺻﻔﺎت اﻟﻤﺸﺮوع .................................................................................................... 6‬
‫1-5 إدارة اﻟﻤﺸﺮوﻋﺎت ......................................................................................................... 6‬
‫1-6 اﻟﻤﺮاﺣﻞ اﻷﺳﺎﺳﻴﺔ ﻟﻠﻤﺸﺮوع ............................................................................................. 7‬
‫1-6-1 اﻟﻤﺮﺣﻠﺔ اﻷوﻟﻰ : اﻟﺘﺨﻄﻴﻂ ......................................................................................... 7‬
‫1-6-2 اﻟﻘﻴﻮد :ﻣﺜﻠﺚ اﻟﻤﺸﺮوع ............................................................................................. 7‬
‫1-7 دورة ﺣﻴﺎﻩ اﻟﻤﺸﺮوع ‪7 .............................................................. The Project Life Cycle‬‬
‫1-8 ﻋﻨﺎﺻﺮ ادارة اﻟﻤﺸﺮوﻋﺎت ................................................................................................ 8‬
‫1-8-1 ﻃﺮق ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ‪9 ......................................................................Scheduling‬‬
‫1-8-2 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ...................................................................................................... 9‬
‫1-8-3 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ ........................................................................................ 01‬
‫1-8-4 ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج )‪10 .............................................................................. (CPM‬‬
‫2. اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺑﻴﻦ اﻟﻤﻬﺎم ‪11 ................................................................ Task Relationship‬‬
‫2-1 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ )‪12 .............................................................................. (Total Float‬‬
‫2-2 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﺤﺮة )‪12 ................................................................................ (Free Float‬‬
‫2-3 ﺣﻞ ﻡﺨﻄﻂ اﻟﺸﺒﻜﺎت ...................................................................................................... 21‬
‫2-4 هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ "‪13 ............................................. “Work Breakdown Structure‬‬
‫3. إدارة وﺕﺨﻄﻴﻂ اﻟﻤﺸﺮوع ﺑﺈﺳﺘﺨﺪام ‪14 .................................................................... MS Project‬‬
‫3-1 اﻟﺒﺪایﺔ ﻡﻊ ‪14 ............................................................................................. MS Project‬‬
‫3-2 اﺳﺘﻜﺸﺎف واﺟﻬﺔ ‪14 .................................................................................... MS Project‬‬
‫3-3 ﻗﻀﻴﺐ اﻷدوات ............................................................................................................ 41‬
‫3-4 ﻋﺮض وﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ .................................................................................................. 51‬
‫3-5 ﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ.............................................................................................................. 51‬
‫3-6 اﻟﺠﺪاول ‪15 ........................................................................................................ Tables‬‬
‫3-7 ﻡﻨﻈﺮ ‪16 ............................................................................................. GANTT Chart‬‬
‫3-8 ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ....................................................................................................... 61‬
‫3-8-1 ﻓﺘﺢ ﻡﺘﻒ ﺟﺪیﺪ ..................................................................................................... 61‬
‫3-8-2 إدﺧﺎل ﺏﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻷوﻟﻴﺔ ................................................................................. 61‬
‫3-8-3 أوﻟﻮیﺔ اﻟﻌﻤﻞ ﺽﻤﻦ اﻟﻤﺸﺮوع ‪17 ...................................................................Priority‬‬
‫3-8-4 ﻥﺘﺎﺋﺞ إﺣﺼﺎﺋﻴﺔ ..................................................................................................... 71‬
‫3-9 ﺕﺴﺠﻴﻞ ﺻﻔﺎت اﻟﻤﺸﺮوع ................................................................................................ 71‬
‫4. إدﺥﺎل اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ.................................................................................................. 81‬
‫4-1 ادﺥﺎل اﻟﻤﻬﺎم............................................................................................................... 81‬
‫4-2 اﻟﻤﺪد اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم ..................................................................................................... 91‬
‫4-3 إدراج ﻥﺸﺎط ﺑﻴﻦ أﻥﺸﻄﺔ اﺥﺮى ....................................................................................... 91‬
‫5. ﺿﺒﻂ ﺕﻘﻮیﻢ اﻟﻤﺸﺮوع .......................................................................................................... 02‬
‫5-1 ﺕﺤﺪیﺪ أیﺎم اﻟﻌﻤﻞ واﻹﺟﺎزات ............................................................................................ 02‬
‫5-2 ﻥﺴﺦ اﻟﻤﻬﺎم وﻟﺼﻘﻬﺎ ‪21 ........................................................................ Copy and Paste‬‬
‫5-3 ﻡﺴﺢ اﻟﻤﻬﺎم ‪21 ....................................................................................................Delete‬‬
‫5-4 اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‪21 ............................................................................ Summary Tasks‬‬
‫5-5 إﻟﻐﺎء اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ .................................................................................................. 22‬
‫5-6 أﺣﺠﺎر اﻟﺰاویﺔ ............................................................................................................. 22‬
‫2‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫5-7 اﺽﺎﻓﺔ ﻡﻼﺣﻈﺎت ﻋﻠﻰ اﻟﻤﻬﻤﺔ .......................................................................................... 22‬
‫5-8 رﺑﻂ اﻟﻤﻬﺎم ‪23 ....................................................................................... Linking Tasks‬‬
‫5-9 ﺕﻐﻴﻴﺮ اﻟﻌﻼﻗﺎت ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺘﺮاﺑﻄﺔ ‪24 ........................................... Change Relationships‬‬
‫5-01 اﻟﻤﻬﺎم اﻟﻤﺘﻜﺮرة ‪25 ............................................................................. Recurring task‬‬
‫5-11 اﻟﻘﻴﺪ ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﻬﺎم ‪25 .............................................................. Task Constraints‬‬
‫5-11-1 أﻥﻮاع اﻟﻘﻴﻮد ...................................................................................................... 52‬
‫5-11-2 اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ‪25 ............................................................... . Flexible Constraints‬‬
‫5-11-3 اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ ‪26 ...................................................... . Inflexible Constraints‬‬
‫5-11-4 اواﻡﺮ اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ............................................................................................. 62‬
‫5-11-5 اواﻡﺮ اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ....................................................................................... 72‬
‫5-11-6 إﺽﺎﻓﻪ ﻗﻴﻮد ﻋﻠﻰ أى ﻡﻬﻤﺔ .................................................................................... 72‬
‫5-11-7 ازاﻟﺔ اﻟﻘﻴﻮد....................................................................................................... 72‬
‫5-21 ﺕﻐﻴﻴﺮ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ‪27 ................................................................................. Time scale‬‬
‫5-31 ﺕﻐﻴﻴﺮ ﻃﺮیﻘﻪ ﻋﺮض ‪27 ........................................................................ GANTT Chart‬‬
‫5-31 اﻇﻬﺎر ﺥﻂ اﻟﻤﺴﺎر اﻟﺤﺮج ............................................................................................. 82‬
‫6. أدارة اﻟﻤﻮارد‪30 .......................................................................... Resources Management‬‬
‫6-1 اﻥﻮاع اﻟﻤﻮارد ............................................................................................................. 03‬
‫6-2 إدﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد ................................................................................................. 03‬
‫6-3 ﺕﻌﻴﻴﻦ ﻡﻮارد ﻟﻤﻬﺎم ....................................................................................................... 03‬
‫6-4 ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ‪30 .................................................................................. Resource sheet‬‬
‫6-5 ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد ......................................................................................................... 13‬
‫6-6 ﺕﻌﺮیﻒ ﻣﺠﻤﻮﻋﺎت اﻟﻌﻤﻞ ‪32 ........................................................................... Workgroup‬‬
‫6-7 ﺕﺨﺼﻴﺺ اﻟﻤﻮارد‪32 ......................................................................... Assign Resources‬‬
‫6-8 ﻓﻬﻢ ﻋﻤﻞ اﻟﻤﻮارد ........................................................................................................ 33‬
‫6- 9 ﻥﻮع ﻡﻬﻤﺔ اﻟﻌﻤﻞ ‪33 ..................................................................................... Task Type‬‬
‫6-9-1 ﻣﻬﻤﺔ ذات وﺡﺪات ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪33 .................. Fixed Units with Effort Driven‬‬
‫6-9-2 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ‪34 ................................................................... Fixed Duration‬‬
‫6-9-3 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪34 ..................Fixed Duration with Effort Driven‬‬
‫6-9-4 ﺕﺤﺪیﺪ اﻟﻨﻮع اﻻﻓﺘﺮاﺿﻲ ﻟﻠﻤﻬﻤﺔ................................................................................. 43‬
‫6-01 ادارة اﻟﻤﻮارد ............................................................................................................ 43‬
‫6-11 ﺕﺤﺪیﺪ ﺕﺎریﺦ ﻋﻤﻞ اﻟﻤﻮرد ............................................................................................. 43‬
‫6-21 دراﺳﺔ ﺕﺪرج ﺳﻌﺮ اﻟﻤﻮرد............................................................................................. 53‬
‫6-21 إدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ‪36 .............................................................................. Fixed Cost‬‬
‫6-31 اﻟﻌﻤﻞ ﻡﻊ اﻟﻜﻨﺘﻮر ‪37 ............................................................. Contouring Assignment‬‬
‫6-41 أﻧﻮاع دوال اﻟﻜﻨﺘﻮر ..................................................................................................... 73‬
‫7. ﻇﺒﻂ و ﺕﻌﺪیﻞ اﻟﺠﺪوﻟﺔ .......................................................................................................... 93‬
‫7-1 اﻟﻌﻤﻞ ﻡﻊ اﻟﻮﻗﺖ اﻹﺽﺎﻓﻲ ‪39 ................................................................... Overtime Work‬‬
‫7-2 ﻓﻬﻢ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻮﻗﺖ اﻻﺿﺎﻓﻲ: ....................................................................................... 93‬
‫7-3 ﺕﺴﻮیﺔ ﺕﻌﺎرﺽﺎت اﻟﻤﻮارد ‪40 ................................... Resource over allocation Leveling‬‬
‫7-4 ﺕﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻤﺤﻤﻠﺔ ﺕﺤﻤﻴﻼ زاﺋﺪ ‪40 ................... Locating the over allocations Task‬‬
‫7-5 ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﺘﺠﺰﺋﺔ او ﺕﺄﺥﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ ................................................................... 04‬
‫7-6 ﺕﻄﺒﻴﻖ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ................................................................................................. 14‬
‫7-7 اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ‪42 .......................................................................... Automatic Leveling‬‬
‫7-8 ﺵﻜﻞ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت ‪42 ........................................................................ Bars Format‬‬
‫7-9 ﺕﺨﻄﻴﻂ اﻻﺳﻄﺮ و اﻻﻋﻤﺪﻩ ‪43 ........................................................................... Gridlines‬‬
‫7-01 ﺵﻜﻞ اﻟﻌﻼﻗﺎت ‪43 ..................................................................................... Layout Bars‬‬
‫7-11 اﺽﺎﻓﺔ ﺟﺪاول ﺟﺪیﺪة ‪43 ..................................................................... Add more tables‬‬
‫8. إدارة ﺕﺘﺒﻊ اﻟﻤﺸﺮوع ‪44 ............................................................................. Project Tracking‬‬
‫8-1 ﺣﻔﻆ اﻟﻤﺨﻄﻂ اﻻﺳﺎﺳﻲ ‪44 ................................................................. Saving A Baseline‬‬
‫8-2 ﻋﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ/اﻟﻘﺎﻋﺪیﺔ...................................................................................... 44‬
‫8-3 ﺕﺤﺮیﺮ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ ................................................................................................. 54‬
‫3‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫8-4 ﻡﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ ................................................................................................... 54‬
‫8-5 ﺕﺘﺒﻊ ﺥﻄﻂ ﻡﺆﻗﺘﺔ ‪45 ................................................................................. Interim Plans‬‬
‫8-6 ﻋﺮض ﺥﻄﺔ ﻡﺆﻗﺘﺔ ....................................................................................................... 54‬
‫8-7 ﻡﺘﺎﺑﻌﺔاﻟﺘﻘﺪم ‪45 ..............................................................................................Tracking‬‬
‫8-8 ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ ‪46 ......................................................................Up date Project‬‬
‫8-9 ﺥﻂ اﻟﺘﻘﺪم ‪47 ......................................................................................... Progress line‬‬
‫8-01 ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع ‪47 ................................................................................ Options‬‬
‫8-6 اﻟﻤﺮﺵﺤﺎت ‪48 ................................................................................................... Filters‬‬
‫9. اﻟﻄﺒﺎﻋﺔ ‪49 ......................................................................................................... Printing‬‬
‫9-1 ادﺥﺎل اﻟﺼﻮر ‪50 ...................................................................... Insert Object/Picture‬‬
‫9-2 اﻟﺘﻘﺎریﺮ ‪50 ..................................................................................................... Reports‬‬
‫9-3 ﺣﻔﻆ اﻟﻤﻠﻒ ﻋﻠﻰ ﺻﻮرة أآﺴﻞ ‪51 ..................................................... Save As Excel Form‬‬
‫9-4 اﺳﺘﻴﺮاد ﻡﻠﻒ اآﺴﻞ اﻟﻰ ﻡﺎیﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ ‪52 .................................... Import Excel File‬‬

‫4‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫1. ﻡﻔﻬﻮم ادارة اﻟﻤﺸﺮوﻋﺎت‬
‫1-1 اﻟﻤﻘــﺪﻣﺔ‬
‫إن هﺬﻩ اﻟﺪورة ﺗﻌﻄﻰ ﻡﻘﺪﻡﺔ ﻋﻦ ﻡﺒ ﺎدئ إدارة اﻟﻤﺸ ﺮوﻋﺎت واﻟﻄ ﺮق اﻟﻤﺴ ﺘﺨﺪﻡﺔ ﻟ ﺬﻟﻚ ﺑﺎﺳ ﺘﺨﺪام‬
‫ﺗﻄﺒﻴﻘﺎت ﺑﺮﻧﺎﻡﺞ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ. ﺳﻮف یﺘﻌﻠﻢ اﻟﻄﺎﻟ ﺐ أن یﻔ ﺮق ﺑ ﻴﻦ اﻟﻤﺸ ﺮوع وﺑ ﻴﻦ اي‬
‫ﺥﺪﻡ ﺔ أﺥ ﺮى وﺳ ﻮف یﻜ ﻮن ﺑﻤﻘ ﺪورﻩ ﻋﻨ ﺪ ﻧﻬﺎی ﺔ اﻟ ﺪورة ﻡﻌﺮﻓ ﺔ اﻟﻤﺮاﺣ ﻞ اﻟﺮﺋﻴﺴ ﻴﺔ ﻟﻠﻤﺸ ﺮوع‬
‫وﺳ ﻮف یﻜ ﻮن ﻗ ﺎدرا ﻋﻠ ﻰ إدارة اﻟﻤﻬ ﺎم ﺑﺎﺳ ﺘﺨﺪام ‪ .MS Project‬إن اﻟﻤﺠ ﺎﻻت اﻟﺘ ﻲ ﺗﻌﻄﻴﻬ ﺎ‬
‫اﻟﺪورة ﺗﺸﻤﻞ ادﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ، إدارة اﻟﻤﻬ ﺎم وﺗﺤﺪی ﺪ ﻡ ﺪﺗﻬﺎ ، ﻋﻤ ﻞ اﻟﻤﻬ ﺎم اﻟﺘﻠﺨﻴﺼ ﻴﺔ‬
‫وﻧﺸ ﺎء اﻟﻤﻬ ﺎم اﻟﻔﺮﻋﻴ ﺔ ﻡ ﻊ رﺑ ﻂ اﻟﻤﻬ ﺎم ﺑﻌﻀ ﻬﺎ ﺑ ﺒﻌﺾ‬

‫.آﻤ ﺎ ﺳ ﻮف ی ﺘﻌﻠﻢ اﻟﻤﺸ ﺎرك آﻴﻔﻴ ﺔ‬

‫ﺗﺨﺼﻴﺺ اﻟﻤ ﻮارد وﺣﻔ ﻆ اﻟﻤﺸ ﺮوع اﻷﺳﺎﺳ ﻲ و ﺗﺘﺒ ﻊ اﻟﻤﺸ ﺮوع اﺛﻨ ﺎء اﻟﺘﻨﻔﻴ ﺬ وﻃﺒﺎﻋ ﺔ واﻋ ﺪاد‬
‫اﻟﺘﻘﺎریﺮ اﻟﻼزﻡﺔ اﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ .‬
‫1-2 اﻷهﺪاف‬
‫ﻓﻲ ﻧﻬﺎیﺔ هﺬﻩ اﻟﺪورة ﺳﻮف یﻜﻮن ﻟﺪیﻚ اﻟﻘﺪرة ﻋﻠﻰ :‬
‫ﻓﻬﻢ اﻟﻤﺒﺎدئ اﻷﺳﺎﺳﻴﺔ ﻹدارة اﻟﻤﺸﺮوﻋﺎت.‬
‫اﻟﺘﻌﺮف ﻋﻠﻰ ﺑﻌﺾ ﻡﺼﻄﻠﺤﺎت إدارة اﻟﻤﺸﺮوﻋﺎت.‬
‫ﻡﻌﺮﻓﺔ آﻴﻒ یﻤﻜﻦ اﻻﺳﺘﻔﺎدة ﻡﻦ ‪MS Project‬‬
‫ﻡﻌﺮﻓﺔ ﻋﻨﺎﺹﺮ ﺗﺮآﻴﺐ ‪MS Project‬‬
‫ﺗﻤﻴﻴﺰ اﻟﺴﻤﺎت اﻷﺳﺎﺳﻴﺔ ﻟﺒﺮﻧﺎﻡﺞ ‪MS Project‬‬
‫اﻟﻘﺪرة ﻋﻠﻲ ﻋﻤﻞ ﺗﺨﻄﻴﻂ ﻡﺘﻜﺎﻡﻞ ااﻡﺸﺮوع.‬
‫1-3 ﻣﺎذا ﺳﻮف ﺕﺘﻌﻠﻢ‬
‫اﻟﻤﻘﺪﻡﺔ ﻹدارة اﻟﻤﺸﺮوﻋﺎت‬
‫اﻟﻤﻘﺪﻡﺔ ﻻﺳﺘﺨﺪام ‪MS Project‬‬
‫اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوﻋﺎت‬
‫ﺗﻜﻮیﻦ اﻟﻤﺸﺮوع‬
‫ﺗﺤﺪیﺪ ﻋﻼﻗﺎت اﻟﻤﻬﺎم‬
‫إدارة و ﺗﺨﺼﻴﺺ اﻟﻤﻮارد اﻟﻤﺸﺮوع‬
‫ﺗﺨﺼﻴﺺ ﺗﻜﺎﻟﻴﻒ اﻟﻤﺸﺮوع‬
‫ﻡﺮاﻗﺒﺔ و اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﺘﻜﻠﻔﺔ‬
‫ﺗﺘﺒﻊ اﻟﻤﺸﺮوع أﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ‬
‫ﻃﺒﺎﻋﺔ وﻗﺮاءة ﺗﻘﺎریﺮ اﻟﻤﺸﺮوع.‬
‫5‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫1-4 ﻡﺒﺎدئ إدارة اﻟﻤﺸﺮوﻋﺎت‬
‫1-4-1 ﻡﺎ هﻮاﻟﻤﺸﺮوع‬
‫اﻟﻤﺸ ﺮوع ه ﻮ اﻟﺴ ﻌﻲ اﻟﻤﺆﻗ ﺖ ﻹیﺠ ﺎد ﻡﻨ ﺘﺞ أو ﺥﺪﻡ ﺔ وﺣﻴ ﺪﻩ. و ﺗﻌﻨ ﻲ آﻠﻤ ﺔ ﻡﺆﻗ ﺖ هﻨ ﺎ أن آ ﻞ‬
‫ّ‬
‫ّ‬
‫ﻡﺸﺮوع ﻟﻪ ﺑ َا َﺔ ﻡﺤﺪدﻩ و ﻧﻬﺎیﺔ ﻡﺤﺪدﻩ و ﺗﻌﻨﻲ آﻠﻤﺔ وﺣﻴﺪة أن اﻟﻤﻨﺘﺞ أو اﻟﺨﺪﻡﺔ ُﺨﺘﻠﻔ ﺔ ﺑﻄﺮیﻘ ﺔ‬
‫ﻡ‬
‫ّ‬
‫ِﺪ ی‬
‫ﻡﺘﻤﻴﺰة ﻋﻦ آﻞ اﻟﻤﻨﺘﺠﺎت واﻟﺨﺪﻡﺎت اﻷﺥﺮى.‬
‫ّ‬
‫و ﻟﻘ ﺪ ﻋ ﺮف هﻴﺮﺳ ﻮن )2991 ( اﻟﻤﺸ ﺮوع ﺑﺄﻧ ﻪ "أي ﺳﻠﺴ ﻠﺔ ﻡ ﻦ اﻷﻧﺸ ﻄﺔ أو اﻟﻤﻬ ﺎم اﻟﺘ ﻲ ﻟﻬ ﺎ‬
‫أهﺪاف ﻡﺤﺪدﻩ یﺠﺐ أن ﺗﻨﺠﺰ ﺽﻤﻦ ﻡﻮاﺹﻔﺎت ﻡﺤ ﺪدﻩ و ﻟ ﻪ ﺑﺪای ﺔ و ﻧﻬﺎی ﺔ ﻡﺤ ﺪدﺗﺎن و ﻟ ﻪ ﺗﻤﻮی ﻞ‬
‫ﻡﺤﺪد و یﺴﺘﻌﻤﻞ اﻟﻤﺼﺎدر اﻟﻤﺨﺘﻠﻔﺔ ﻡﻦ اﻡﻮال و وﻗﺖ و ﻡﻌﺪات و ﻋﻤﺎﻟ ﻪ. و ﻟﻘ ﺪ ﻧﺴ ﺐ ﺑﺮیﻤ ﺎن و‬
‫ﺁﺥﺮیﻦ )5991 ( اﻟﻲ ﻟﻴﺶ و ﺗﻴﺮﻧﺮ )0991 ( ﺗﻌﺮیﻒ اﻟﻤﺸ ﺮوع ﺑﺄﻧ ﻪ " وﺣ ﺪة اﺳ ﺘﺜﻤﺎر ﺹ ﻨﺎﻋﻲ‬
‫ﺟﺪیﺪة و اﻟﺘﻲ ﻟﻬﺎ ﺑﻌﺾ اﻟﻤﻌﺎﻟﻢ اﻟﻤﻤﻴﺰة أو اﻟﻤﺘﻔﺮدة و ذﻟﻚ ﻡﻦ ﺥﻼل ﺗﻨﺎﻏﻢ اﻟﻮﻗﺖ ﻡﻊ اﻟﺘﻜﻠﻔﺔ".‬
‫1-4-2 ﺻﻔﺎت اﻟﻤﺸﺮوع‬
‫یﻤﻜﻦ ﺗﻠﺨﻴﺺ ﺹﻔﺎت اﻟﻤﺸﺮوع ﺑﺄﻧﻪ:‬
‫ﻟﻪ هﺪف یﻤﻜﻦ ﻗﻴﺎﺳﻪ‬
‫وﻗﺖ ﻡﺤﺪد‬
‫ﻡﻮارد ﻡﺤﺪدة‬
‫ﻡﻬﺎم ﻡﻌﺘﻤﺪة ﻋﻠﻰ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ‬
‫اﻟﻤﺸﺮوع داﺋﻤﺎ ﻓﻲ ﺣﺎﻟﺔ ﺗﻐﻴﻴﺮ )دیﻨﺎﻡﻴﻜﻲ(‬
‫1-5 إدارة اﻟﻤﺸﺮوﻋﺎت‬
‫إﻧﻬﺎ ﻋﻤﻠﻴﺔ ﺗﺘﻜﻮن ﻡﻦ وﻇﺎﺋﻒ ﻡﺘﻨﻮﻋﺔ هﻲ:‬
‫اﻟﺘﺨﻄﻴﻂ‬
‫اﻟﺘﻨﻈﻴﻢ‬
‫اﻟﻤﺮاﻗﺒﺔ‬
‫اﻟﺘﺤﻜﻢ‬
‫وذﻟﻚ ﻟﻜﻞ ﻡﻦ اﻟﻌﻨﺎﺹﺮ اﻟﺘﺎﻟﻴﺔ‬
‫اﻟﻮﻗﺖ‬
‫اﻟﺘﻜﻠﻔﺔ‬
‫اﻟﺠﻮدة‬
‫اﻻداء‬

‫6‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫1-6 اﻟﻤﺮاﺣﻞ اﻷﺳﺎﺳﻴﺔ ﻟﻠﻤﺸﺮوع‬
‫ﺟﻤﻴﻊ اﻟﻤﺸﺎریﻊ ﺗﺸﻤﻞ ﻋﻠﻰ ﺗﻘﺴﻴﻢ اﻟﻤﺸﺮوع إﻟﻰ ﻡﻬﺎم یﻤﻜﻦ ﻗﻴﺎﺳﻬﺎ ویﻤﻜﻦ ﺟﺪوﻟﺘﻬﺎ وﺗﺸﻤﻞ‬
‫اﻻﺗﺼﺎل ﺑﻴﻦ أﻋﻀﺎء اﻟﻔﺮیﻖ وأیﻀﺎ ﻡﺘﺎﺑﻌﺔ ﺗﻘﺪم اﻟﻌﻤﻞ‬
‫ﺟﻤﻴﻊ اﻟﻤﺸﺮوﻋﺎت ﺗﺘﻜﻮن ﻡﻦ ﺛﻼث ﻡﺮاﺣﻞ رﺋﻴﺴﻴﺔ هﻲ:‬
‫اﻟﺘﺨﻄﻴﻂ‬
‫ﺗﺘﺒﻊ وادارة اﻟﺘﻘﺪم‬
‫اﻧﻬﺎء اﻟﻤﺸﺮوع.‬
‫1-6-1 اﻟﻤﺮﺣﻠﺔ اﻷوﻟﻰ : اﻟﺘﺨﻄﻴﻂ‬
‫إن اﻓﻀﻞ ﻃﺮیﻘﺔ ﻟﻠﺘﺨﻄﻴﻂ هﻲ ﺑﺈﻏﻼق اﻟﻜﻤﺒﻴﻮﺗﺮ واﻻﻡﺴﺎك ﺑﺎﻟﻘﻠﻢ واﻟﻮرﻗﺔ وذﻟﻚ ﻟﺘﺤﺪیﺪ اﻻﺗﻰ:‬
‫1.‬

‫أهﺪاف اﻟﻤﺸﺮوع.‬

‫2.‬

‫اﻟﻤﺴﺘﻔﻴﺪیﻦ ﻡﻦ اﻟﻤﺸﺮوع ، ﺗﻮﻗﻌﺎﺗﻬﻢ ، وﻡﺴﺘﻮى اﻟﺘﺄﺛﻴﺮ.‬

‫3.‬

‫اﻟﻤﻬﺎم اﻟﻤﻄﻠﻮب ﺗﻨﻔﻴﺬهﺎ ، ویﺸﻤﻞ ذﻟﻚ اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻌﻠﻮﻡﺎت إﺽﺎﻓﻴﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻄﻠﺐ.‬

‫4.‬

‫اﻟﻤﻮارد اﻟﻤﺘﻮﻓﺮة.‬

‫5.‬

‫اﻟﻘﻴﻮد )اﻟﻤﻮاﻋﻴﺪ اﻟﻤﺤﺪدة – اﻟﻤﻴﺰاﻧﻴﺔ - اﻟﻤﻮارد(‬

‫1-6-2 اﻟﻘﻴﻮد :ﻣﺜﻠﺚ اﻟﻤﺸﺮوع‬
‫إن اﻟﻤﺸﺮوع یﺘﻢ ﺗﺸﻜﻴﻠﻪ ﺑﺎﺳﺘﺨﺪام ﻋﺎﻡﻞ اﻟﻘﻴﻮد واﻟﻘﻴﻮد اﻟﻤﺒﺪﺋﻴﺔ هﻲ : ) اﻟﻮﻗﺖ واﻟﺘﻜﺎﻟﻴﻒ وﻣﺠﺎل‬
‫اﻟﻤﺸﺮوع(‬
‫اﻟﻮﻗﺖ: آﻢ ﻡﻦ اﻟﻮﻗﺖ ﺳﻮف یﺴﺘﻐﺮق اﻟﻤﺸﺮوع واﻟﺬي ﺳﻮف یﻨﻌﻜﺲ ﻋﻠﻰ ﺟﺪوﻟﺔ اﻟﻤﺸﺮوع‬
‫اﻟﺘﻜﺎﻟﻴﻒ :آﻢ ﻡﻦ اﻟﻤﺎل ﺳﻮف یﻜﻠﻒ اﻟﻤﺸﺮوع وذﻟﻚ اﻋﺘﻤﺎدا ﻋﻠﻰ ﺗﻜﺎﻟﻴﻒ اﻟﻤﻮارد ﻡﻦ ﻡﻮارد‬
‫ً‬
‫ﺑﺸﺮیﺔ وﻡﻌﺪات وﻡﻮاد.‬
‫اﻟﻤﺠﺎل :آﻢ هﻮ ﺣﺠﻢ اﻟﻌﻤﻞ اﻟﻤﻄﻠﻮب ﻟﺘﻠﺒﻴﺔ أهﺪاف وﻡﻬﺎم اﻟﻤﺸﺮوع.‬
‫هﺬﻩ اﻟﻌﻮاﻡﻞ اﻟﺜﻼﺛﺔ ﻡﻌﺎ ﺗﺴﻤﻰ ﻡﺜﻠﺚ اﻟﻤﺸﺮوع .أن ﺗﻌﺪیﻞ أي ﻋﻨﺼﺮ ﻡﻦ ﻋﻨﺎﺹﺮ ﻡﺜﻠﺚ‬
‫ً‬
‫اﻟﻤﺸﺮوع ﺳﻮف یﺆﺛﺮ ﻋﻠﻰ اﻟﻌﻨﺼﺮیﻦ اﻵﺥﺮیﻦ وﻋﺎدة ﻡﺎ یﻜﻮن أﺣﺪهﻢ ﻟﻪ ﺗﺄﺛﻴﺮ اآﺒﺮ ﻋﻠﻰ‬
‫ﻡﺸﺮوﻋﻚ.‬
‫1-7 دورة ﺣﻴﺎﻩ اﻟﻤﺸﺮوع ‪The Project Life Cycle‬‬
‫ﻟﻘﺪ ﺗﺒﻨﻰ ﻡﻌﻬﺪ إدارة اﻟﻤﺸﺮوﻋﺎت اﻷﻡﺮیﻜﻴﺔ ﺗﻘﺴﻴﻢ دورة ﺣﻴﺎة اﻟﻤﺸﺮوع و اﻟﺬي اﻗﺘﺮﺣﻪ "ﻡﻮرس"‬
‫"‪ "Morris‬واﻟﺬي ﺣﻴﺚ ﻗﺴﻢ اﻟﻤﺸﺮوع اﻟﻰ أرﺑﻌﺔ ﻡﺮاﺣﻞ هﻲ:-‬
‫1- ﻣﺮﺡﻠﺔ اﻟﺠﺪوى: " ‪“Feasibility‬‬

‫7‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫وهﻲ ﺗﺸﻤﻞ ﻋﻠﻰ وﺽﻊ اﻟﻤﺸﺮوع ﻓﻲ ﺹﻴﺎﻏﺔ رﺳﻤﻴﺔ ودراﺳﺎت اﻟﺠﺪوى واﻟﺘﺼﻤﻴﻤﺎت اﻻﺳﺘﺮاﺗﻴﺠﻴﺔ‬
‫وﻡﺮﺣﻠﺔ اﻟﻤﻮاﻓﻘﺎت ﻋﻠﻰ آﻞ ﻡﺎ ﺳﺒﻖ.‬
‫2- ﻣﺮﺡﻠﺔ اﻟﺘﺨﻄﻴﻂ واﻟﺘﺼﻤﻴﻢ : "‪“Planning & Design‬‬
‫وﺗﺸﻤﻞ ﻋﻠﻰ اﻟﺘﺼﻤﻴﻢ اﻷﺳﺎﺳﻲ وﺣﺴﺎب آﻞ ﻡﻦ اﻟﺘﻜﻠﻔﺔ وﺟﺪوﻟﺔ اﻟﻤﺸﺮوع وﺹﻴﺎﻏﺔ ﺑﻨﻮد اﻟﻌﻘﺪ‬
‫وﺵﺮوﻃﻪ واﻟﺨﻄﻂ اﻟﺘﻔﺼﻴﻠﻴﺔ.‬
‫3- ﻣﺮﺡﻠﺔ اﻹﻧﺘﺎج :"‪“Production Stage‬‬
‫ﺗﺘﻜﻮن ﻡﻦ اﻟﺘﺼﻨﻴﻊ واﻟﺘﻮریﺪ واﻷﻋﻤﺎل اﻟﻤﺪیﻨﺔ واﻟﺘﺮآﻴﺒﺎت واﻟﻔﺤﻮﺹﺎت.‬
‫4- اﻹﻧﻬﺎء : "‪"Turning Over‬‬
‫وهﻲ ﺗﺸﻤﻞ إﻧﻬﺎء اﻷﻋﻤﺎل واﻟﺘﺸﻐﻴﻞ واﻟﻔﺤﺺ اﻟﻨﻬﺎﺋﻲ واﻟﺼﻴﺎﻧﺔ. آﻞ هﺬﻩ اﻟﻤﺮاﺣﻞ ﻡﻮﺽﺤﺔ ﻓﻲ‬
‫اﻟﺸﻜﻞ أدﻧﺎﻩ.‬
‫1-8 ﻋﻨﺎﺻﺮ ادارة اﻟﻤﺸﺮوﻋﺎت‬
‫ﺗﺘﻜﻮن ادارة اﻟﻤﺸﺮوﻋﺎت ﻡﻦ اﻟﻌﻨﺎﺹﺮ اﻟﺘﺎﻟﻴﺔ:‬
‫اﻟﺠﺪوﻟﺔ‬
‫اﻟﻤﻴﺰایﻨﺔ‬
‫اﻟﻤﻮارد‬
‫ﻡﺘﺎﺑﻌﺔ اﻟﺘﻘﺪم‬
‫اﻟﺘﻘﺎریﺮ‬

‫اﻟﺸﻜﻞ 1-1 : دورة ﺡﻴﺎة اﻟﻤﺸﺮوع‬
‫8‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫1-8-1 ﻃﺮق ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ‪Scheduling‬‬
‫هﻨﺎك أﻧﻮاع ﻋﺪیﺪة ﻡﻦ اﻟﺠﺪوﻟﺔ اﻟﺰﻡﻨﻴﺔ ﻡﻨﻬﺎ :‬
‫ﻗﺎﺋﻤﻪ اﻟﻤﺸﺘﺮیﺎت.‬
‫ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن.‬
‫ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ.‬
‫اﻟﻤﺴﺎر اﻟﺤﺮج.‬
‫ﻃﺮیﻘﺔ ‪. PERT‬‬
‫اﻟﻤﺤﺎآﺎة.‬
‫1-8-2 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن‬
‫ﻟﻘﺪ ﻗﺎم هﻨﺮي ﺟﺎﻧﺖ ‪ (1861-1919) Henry Gantt‬ﺑﺘﻄ ﻮیﺮ ﻃﺮیﻘ ﺔ ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن. ﺣﻴ ﺚ‬
‫ﻻ زال ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﻌﺮف آﺄﻓﻀﻞ ﻃﺮیﻘﺔ ﻟﺘﻤﺜﻴﻞ اﻟﺨﻄﻂ. یﻌﺮض ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن أﻧﺸ ﻄﺔ‬
‫َِْ ُ‬
‫اﻟﻤﺸﺮوع و آﻴﻔﻴﺔ ﺟﺪوﻟﺔ أزﻡﻨﺔ هﺬﻩ اﻷﻧﺸﻄﺔ و ذﻟﻚ ﺑﺎﺳﺘﺨﺪام اﻟﻘﻀ ﺒﺎن واﻟﺘ ﻲ یﻨﺎﺳ ﺐ ﻃﻮﻟﻬ ﺎ ﻡ ﻊ‬
‫اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻟﻸﻧﺸﻄﺔ. و یﻌﺪ ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن أﺣ ﺪ أدوات اﻟﺘﺨﻄ ﻴﻂ اﻷﻗ ﺪم و اﻟﺘ ﻲ ﺑﺮ َﻨ ﺖ ﻋﻠ ﻰ‬
‫َ ْه‬
‫َِْ‬
‫آﻮﻧﻬﺎ أداة ﻡﻔﻴﺪة. إ ّﻪ ﺑﺴﻴﻂ و واﺽﺢ، و ﺳﻬﻞ اﻻﺳﺘﻌﻤﺎل و اﻟﻔﻬﻢ. و ه ﻮ وﺳ ﻴﻠﺔ ﺗﺨﻄ ﻴﻂ و ﺟﺪوﻟ ﺔ‬
‫َْ َ ُ‬
‫ﻧ‬
‫ﻡﻨﺘﺸ ﺮة ﺑﺸ ﻜﻞ واﺳ ﻊ و ه ﻮ ُ یﺤﺘ ﺎج إﻟ ﻲ ﻡﺮاﺟﻌ ﺔ و ﺗﺤ ﺪیﺚ ﺑﺪرﺟ ﺔ اﻗ ﻞ ﻡ ﻦ أي ﻡ ﻦ اﻷﻧﻈﻤ ﺔ‬
‫اﻟﻤﻌﻘﺪة.‬
‫اﻟﻨ َﺎط هﻮ ﻡﻬ ّﺔ أو ﻋﻤﻞ أو ﻡﺠﻤﻮﻋﺔ ُﺮﺗﺒﻄﺔ ﻡﻦ اﻟﻤﻬﺎم و اﻟﺬي أ َاؤﻩ یﺴ ﺎهﻢ ﺑﺈآﻤ ﺎل اﻟﻤﺸ ﺮوع.‬
‫َد ُ َ ِ ُ‬
‫ّ‬
‫ﻡ‬
‫ﻤ‬
‫ﺸ‬
‫ﻋﻼوة ﻋﻠﻰ ﺗﺨ ﱢﺺ ﺗﻮاریﺦ ﻷﻧﺸﻄﺔ اﻟﻤﺸﺮوع،ﻓﺎن ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ﺗﺸﻤﻞ ﺗﺠﻬﻴ ﺰ اﻟﻤ ﻮاد و‬
‫ُ َﺼ ُ‬
‫اﻟﻌﻤﺎﻟﺔ و اﻟﻤﻌﺪات اﻟﻼزﻡﺔ ﻟﻠﻤﻬﺎم ﺥﻼل وﻗﺖ اﻟﻤﺸﺮوع .‬
‫ّ‬
‫.یﻄﻠﺐ اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻼك ﺗﻘﺪیﻢ ﺟﺪول زﻡﻨﻲ ﺗﻔﺼﻴﻠﻲ ﻟﻠﻤﺸﺮوع یﻘﺪﻡﻪ اﻟﻤﻘﺎول آﻮﺳﻴﻠﺔ ﻟﻤﺮاﻗﺒﺔ‬
‫ﺑﺮﻧﺎﻡﺞ اﻟﻌﻤﻞ.‬
‫وﻻ یﻤﻜ ﻦ اﻻﺳ ﺘﺨﻔﺎف ﺑﻘﻴﻤ ﺔ ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن . ان أﺣ ﺪ أه ﻢ ﻋﻨﺎﺹ ﺮ اﻟﻘ ﻮﻩ ﺗﻜﻤ ﻦ ﻓ ﻲ ﻗﺪرﺗ ﻪ‬
‫ُِْ ُ‬
‫اﻟﺴﺮیﻌﺔ و اﻟﻮاﺽﺤﺔ ﻋﻠﻰ ﻋﺮض وﺣﺎﻟﺔ اﻟﻤﺸﺮوع. و یﻤﻜ ﻦ ﻟﻤﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن أن یﺴ ﺘﻌﻤﻞ ﻟﺘﻨﻘ ﻞ‬
‫ُ ْ َ ْ َ َ َ ُْ َ‬
‫ُِْ ُ‬
‫ﺹﻮرﻩ ﻋﻦ وﺽﻊ اﻟﻤﺸﺮوع ﺑﺸﻜﻞ ﻋ ﺎم ﺑﻤ ﺎ یﻠﺒ ﻲ ﺣﺎﺟ ﺎت اﻹدارة اﻟ ُﻠﻴ ﺎ . وﻋﻨ ﺪﻡﺎ ﺗﻜ ﻮن اﻟﻤ ﻮارد‬
‫ﻌ‬
‫اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع ﻡﺤﺪدة. ﻓﺈن ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﺴﺘﺨﺪم ﻟﺘﻘﻴ ﻴﻢ اﻻﺳ ﺘﻌﻤﺎل اﻟﻤﺒ ﺪﺋﻲ ﻟﻬ ﺬﻩ اﻟﻤ ﻮارد‬
‫و ﻋﻠﻰ اﻟﺮﻏﻢ ﻡﻦ ذﻟﻚ ﻓﺎن اﻟﻌﻼﻗ ﺎت و اﻟ ﺮواﺑﻂ ﺑ ﻴﻦ اﻷﻧﺸ ﻄﺔ ﻻ یﻤﻜ ﻦ ﺗﻤﺜﻴﻠﻬ ﺎ ﺑﺴ ﻬﻮﻟﺔ، ﻻ ﺳ ّﻤﺎ‬
‫ﻴ‬
‫ﻓ ﻲ اﻟﻤﺸ ﺎریﻊ اﻟﻜﺒﻴ ﺮة ﺣﻴ ﺚ یﻔﻀ ﻞ اﺳ ﺘﻌﻤﺎل ﺟﺪوﻟ ﺔ اﻟﺸ ﺒﻜﺎت ﻟﻬ ﺬا اﻟﻐ ﺮض. إﻧ ﻪ ﻡ ﻦ اﻟﺼ ﻌْﺐ‬
‫َ‬
‫ّ‬
‫اﻟﺘﻌﺮف ﻋﻠﻰ ﺗﺘﺒﻊ اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴ ﺔ و اﻟﻘﻴ ﻮد ﺑ ﻴﻦ اﻟﻔﻌﺎﻟﻴ ﺎت و أیﻀ ﺎ إﻧ ﻪ ﻡ ﻦ اﻟﺼ ﻌْﺐ اﺳ ﺘﻌْﻤﺎَﻪ‬
‫َ ُ ْ َ َﻟ‬
‫ً ّ‬

‫9‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫ﻟﻠﺘﻨ ّﺆ ﺑﺎﻟﻤﺆ ﱢﺮات اﻟﺘﻲ ﺗﺘﻐﻴﺮ ﻓﻲ اﻷﻧﺸﻄﺔ ﻋﻠﻰ ُ اﻟﺠﺪول ﺑﺸﻜﻞ ﻋﺎم. ﻟﺬﻟﻚ ﻓﺎن ﻡﺨﻄﻂ اﻟﻘﻀ ﺒﺎن ﻟ ﻪ‬
‫َ َ َﱠ ُ‬
‫ُ َﺛ‬
‫ﺒ‬
‫ﻗﺪرﻩ ﻡﺤﺪودة آﺎداﻩ ﻟﻠﺘﺤﻜﻢ.‬
‫1-8-3 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ‬
‫ان ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن اﻟﻤﺘ ﺮاﺑﻂ ه ﻮ ﻡﺨﻄ ﻂ ﻗﻀ ﺒﺎن ﺗ ﻢ رﺑ ﻂ ﻓﻌﺎﻟﻴﺎﺗ ﻪ ﺑﻮاﺳ ﻄﺔ اﻟﻌﻼﻗ ﺎت اﻟﻤﻨﻄﻘﻴ ﺔ‬
‫اّﺘﻲ ﺗﻈﻬﺮ اﻋﺘﻤﺎد اﻟﻔﻌﺎﻟﻴﺎت ﻋﻠﻰ ﺑﻌﻀﻬﺎ ﺑﺸﻜﻞ ﻡﻨﻄﻘﻲ. و ﻗﺪ أﺹﺒﺢ ﻡﻌﺮوﻓﺎ آﻮﺳﻴﻠﺔ ﻟﻌﻤﻞ ﺗﻤﺜﻴ ﻞ‬
‫َ َْ َ‬
‫ﻟ َ َْ ُ‬
‫ﺑﻴﺎﻧﻲ ﻡﻨﻄﻘ ﻲ ﻋﻠ ﻰ اﻟﺤﺎﺳ ﻮب، ﺣﻴ ﺚ اﻧ ﻪ یﺴ ﻬﻞ ﺗﻤﺜﻴ ﻞ اﻷﻧﺸ ﻄﺔ و رواﺑﻄﻬ ﺎ ﻡﺒﺎﺵ ﺮة ﻋﻠ ﻰ ﺟﻬ ﺎز‬
‫اﻟﻜﻤﺒﻴﻮﺗﺮ.‬
‫ﻟﻴﺲ ﻓﻘﻂ اﻷﺳﻬﻢ اﻟﺘﻲ ﺗﺮﺑﻂ ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ﺗﻤ ﱢﻞ اﻟﺮﺑﻂ اﻟﻤﻨﻄﻘﻲ ﺑﻴﻦ اﻟﻔﻌﺎﻟﻴﺎت و ﻟﻜﻨﻬﺎ أیﻀ ﺎ‬
‫ُ َﺜ ُ‬
‫َ ِْ ُ‬
‫ﺗﺴﺘﺨﺪم ﻟﺮﺑﻂ اﻟﻤﻮرد. ان اﻟﺘﺮاﺑﻂ ﺑﻴﻦ اﻷﻧﺸﻄﺔ ﻟﻪ ﻓﺎﺋﺪﻩ یﻤﻜﻦ ﻡﻦ ﺥﻼﻟﻪ ﻡﺘﺎﺑﻌﺔ اى ﺗ ﺄﺥﻴﺮ ﻓ ﻲ‬
‫اﻟﻔﻌﺎﻟﻴﺎت ﺑﺴﻬﻮﻟﺔ و ﻋﻤﻞ اﻟﻤﺘﺎﺑﻌﺔ و اﻟﺘﺤﻜﻢ اﻟﻤﻄﻠﻮﺑﻴﻦ ﻋﻨﺪ ﺗﻘﺪم اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع.‬
‫1-8-4 ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج )‪(CPM‬‬
‫ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج ﺗﺤﺪد ﺳﻠﺴﻠﺔ اﻟﻔﻌﺎﻟﻴﺎت ﻓﻲ اﻟﻤﺸﺮوع و اﻟﺘﻲ ﺗﺘﺤﻜﻢ ﻓﻲ اﻟﺰﻡﻦ اﻟ ﺬي ﺳ ﻴﺄ ُﺬﻩ‬
‫َ ْﺥ ُ‬
‫ََ َ ﱠ ُ‬
‫اﻟﻤﺸﺮوع )8991 ,‪ .(Hinze‬ﺗﻘﻮم هﺬﻩ اﻟﻄﺮیﻘﺔ ﺑﺤﺴﺎب اﻟﺤﺪ اﻻدﻧﻰ ﻡﻦ اﻟﻮﻗﺖ اﻟﻼزم ﻟﻠﻤﺸ ﺮوع‬
‫ﻡﻦ اﻟﺒ َا َﺔ اﻟﻤﻤﻜﻨﺔ و ﺗﻨ ِﻲ وﻓﻘﺎ ﻷﻧﺸﻄﺔ اﻟﻤﺸﺮوع.‬
‫ُ ْﻬ‬
‫ِﺪ ی‬
‫ﺗﻄ ﻮرت ﻃﺮیﻘ ﺔ اﻟﻤﺴ ﺎر اﻟﺤ ﺮج ﺑﺎﻟﻤﺸ ﺎرآﺔ ﺑ ﻴﻦ اﻟﻌ ﺎﻟﻤﻴﻦ) ‪ Remington rand‬و ‪DuPont‬‬
‫َ َﱠَ ْ‬
‫‪ .(Bedworth‬إن ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج و ﺗﻘﻨﻴﺎت اﻟﺠﺪوﻟﺔ اﻟ ُﺮﺗﺒﻄﺔ ﺑﻬﺎ، ﻡﺜ ﻞ اﻟﻤ ﻮرد و ﺗﺤﻠﻴ ﻞ‬
‫ﻤ‬
‫اﻷﺳ ﻌﺎر ﻻ زاﻟ ﺖ ﺗﻤﺜ ﻞ أﻗ ﻮى اﻷدوات اﻟﺘﺤﻠﻴﻠﻴ ﺔ اﻟﻤﺴ ﺘﺨﺪﻡﺔ ﻟﻠﺘﺨﻄ ﻴﻂ و اﻟ ﺘﺤﻜﻢ ﻓ ﻲ اﻟﻤﺸ ﺮوع و‬
‫َِْ‬
‫ّ‬
‫اﻷآﺜﺮ ﻋﻠﻰ ﻧﺤﻮ واﺳﻊ ﻓﻲ اﺳﺘﺨﺪام ﺗﻘﻨﻴﺎت اﻟﻜﻤﺒﻴﻮﺗﺮ.‬
‫إن أﻗﻮى ﻣﻤﻴﺰات اﺳﺘﺨﺪام ‪ CPM‬هﻲ:‬
‫• أﻧﻬﺎ یﻤﻜﻦ أن ﺗﻤﺜﻞ ﻋﺪدا آﺒﻴﺮا ﻡﻦ اﻷﻧﺸﻄﺔ، هﻲ ﺗﻮ ﱢﺢ اﻟﻌﻼﻗﺔ اﻟﻤﺸﺘﺮآﺔ ﺑﻴﻦ اﻷﻧﺸﻄﺔ.‬
‫ُ َﺽ ُ‬
‫• اﻧﻬﺎ ﻡﻔﻴﺪة ﺟﺪا ﻟﺘﻮﻗﻊ ﻡﺎ ﺳﻴﺤﺪث وﺗﺴﺘﻌﻤﻞ اﻟﺘﺤﻜﻢ ﻓﻲ اﻻﻧﺸﻄﺔ.‬
‫• اﻧﻬﺎ ﺗﺤﺪد اآﺜﺮ اﻟﻌﻨﺎﺹﺮ اﻟﺤﺮﺟﺔ ﻓﻲ اﻟﻤﺸﺮوع و ﺗﺤﺪد اوﻟﻮیﺎت اﻟﺘﻨﻔﻴﺬ اﻟﻤﻨﺎﺳﺒﺔ.‬
‫• ان اﻟﺠﻤﻊ ﺑﻴﻦ اﺳﺘﺨﺪام ‪ CPM‬و ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﺴﺎﻋﺪ ﻓﻲ ﺗﺤﺪیﺪ اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ‬
‫ﻟﻠﻤﺸﺮوع.‬
‫َ‬

‫01‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫2. اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺑﻴﻦ اﻟﻤﻬﺎم ‪Task Relationship‬‬
‫هﻨﺎك ارﺑﻊ اﻧﻮاع ﻡﻦ اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ و اﻟﺘﻲ ﺗﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ و اﻟﺸﻜﻞ 2-1یﻮﺽﺢ‬
‫هﺬة اﻟﻌﻼﻗﺎت و هﻲ:‬
‫1. )‪ : Finish to Start(FS‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﺑﻌﺪ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬
‫2. )‪ : Start to Start(SS‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﻊ ﺑﺪاﺑﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬
‫3. )‪ : Finish to Finish(FF‬ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﻊ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬
‫4. )‪ : Start to Finish (SF‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﻊ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﺒﺎﺵﺮة‬

‫‪Lead/Lag Relationships‬‬
‫‪FF ij‬‬

‫‪Dj‬‬
‫‪EF‬‬

‫‪Forward Pass‬‬

‫‪j‬‬

‫‪i‬‬

‫‪Di‬‬
‫‪FS ij‬‬

‫.‪ES DESC‬‬

‫‪ES DESC. EF‬‬
‫‪SS ij‬‬

‫‪SF ij‬‬

‫‪FF jk‬‬

‫‪Dk‬‬
‫‪LF‬‬

‫‪Backward Pass‬‬

‫‪k‬‬

‫‪j‬‬

‫‪Dj‬‬
‫‪FS jk‬‬

‫.‪LS DESC‬‬

‫‪LS DESC. LF‬‬
‫‪SS jk‬‬

‫‪SF jk‬‬

‫اﻟﺸﻜﻞ 2-1 : اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺏﻴﻦ اﻟﻤﻬﺎم‬
‫و ﻟﺘﻤﺜﻴﻞ اي ﻓﻌﺎﻟﻴﺔ یﺴﺘﺨﺪم اﻟﺸﻜﻞ 2-2 ﻟﺘﻮﺽﻴﺢ ﻧﻬﺎیﺎت و ﺑﺪایﺎت اﻟﻤﻬﺎم‬
‫اﻟﻨﻬﺎیﺔ اﻟﻤﺒﻜﺮة‬

‫‪E.S‬‬

‫‪E.F‬‬

‫اﻟﺒﺪایﺔ اﻟﻤﺒﻜﺮة‬

‫اﻟﻨﺸﺎط‬
‫اﻟﻨﻬﺎیﺔ اﻟﻤﺒﺄﺥﺮة‬

‫‪L.F‬‬

‫.‪D‬‬

‫.‪L.S‬‬

‫اﻟﺒﺪایﺔ اﻟﻤﺘﺄﺥﺮة‬

‫اﻟﺸﻜﻞ 2-2 : ﺕﻤﺜﻴﻞ اﻟﺒﺪایﺔ اﻟﻤﺒﻜﺮة و اﻟﻤﺄﺧﺮة ﻟﻠﻤﻬﺎم‬
‫11‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫.‪E.F. = E.S. + D‬‬
‫.‪L.F. = L.S + D‬‬
‫2-1 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ )‪(Total Float‬‬
‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ اﻟﺘﻰ یﺴﻤﺢ ﺑﻬﺎ ﻟﻠﻨﺸﺎط ان یﺘﺄﺥﺮ دون ان یﺆﺛﺮ ﻋﻠﻰ اﻟﻔﺘﺮة اﻟﻜﻠﻴﺔ ﻟﻠﻤﺸﺮوع‬
‫) ﻟﻠﻤﻬﻤﺔ(.‪ ) – E.F‬ﻟﻠﻤﻬﻤﺔ(.‪Total Float ( T.F.) = L.F‬‬
‫.‪= L.S- E.S‬‬

‫‪OR‬‬

‫اذا آﺎﻧﺖ ﻗﻴﻤﺔ ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ اﻟﻠﻤﻬﻤﺔ اﻟﻮاﺣﺪة ﺗﺴﺎوي ﺹﻔﺮ ﻓﺎن اﻟﻤﻬﻤﺔ ﺗﺴﻤﻰ ﻡﻬﻤﺔ ﺣﺮﺟﺔ‬
‫و هﻲ ﺗﻘﻊ ﻋﻠﻰ اﻟﻤﺴﺎر اﻟﺤﺮج و اي ﺗﺎﺥﻴﺮ او ﺗﻐﻴﻴﺮ ﻓﻲ ﻡﺪة ﺗﻨﻔﻴﺬهﺎ یﺆﺛﺮ ﻋﻠﻰ ﻡﺪة اﻟﻤﺸﺮوع‬
‫آﻜﻞ.‬
‫2-2 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﺤﺮة )‪(Free Float‬‬
‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ اﻟﺘﺮاآﻤﻴﺔ ﻟﻼﻧﺸﻄﺔ اﻟﻐﻴﺮ ﺣﺮﺟﺔ ﻟﻠﻤﺸﺮوع آﻠﻪ‬
‫.)ﻟﻠﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ (‪) – E.F‬ﻟﻠﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ (‪Free Float (F.F) = E.S‬‬
‫2-3 ﺣﻞ ﻡﺨﻄﻂ اﻟﺸﺒﻜﺎت‬
‫ﺕﻤﺮیﻦ‬
‫اﻟﻤﻄﻠﻮب ﺣﻞ اﻟﺸﺒﻜﺔ اﻟﺘﺎﻟﻴﺔ آﻤﺎ هﻲ ﻡﻮﺽﺤﺔ ﻓﻲ اﻟﺸﻜﻞ 3-2 ﻡﻊ ایﺠﺎد اﻟﻤﺴﺎر اﻟﺤﺮج‬

‫اﻟﺸﻜﻞ 2-3 : ﺵﺒﻜﺔ ﺕﺘﺎﺏﻊ اﻟﻤﻬﺎم ﻓﻲ اﻟﻤﺸﺮوع‬

‫21‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫2-4 هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ "‪“Work Breakdown Structure‬‬
‫ان هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ "‪ "WBS‬یﻌﻄ ﻲ ﺗﺼ ﻮرا ﻋ ﻦ ﺗﺮﺗﻴ ﺐ اﻟﻤﺸ ﺮوع اﻟﻬﻴﻜﻠ ﻲ وذﻟ ﻚ ﺽ ﻤﻦ‬
‫ً‬
‫ﻡﺴﺘﻮیﺎت یﻜﻮن ﻓﻲ اﻟﻤﺴﺘﻮى اﻷﻋﻠﻰ اﻟﺨﺪﻡﺔ اﻟﺘﻲ ﻧﺮیﺪ اﻟﻮﺹ ﻞ اﻟﻴﻬ ﺎ آﻨﺘﻴﺠ ﺔ ﻹﻧﺸ ﺎء اﻟﻤﺸ ﺮوع وﻓ ﻲ‬
‫أدﻧﻰ ﻡﺴﺘﻮى ﻟﻬ ﺎ یﻮﺟ ﺪ ﻡﻬﻤ ﺔ اﻟﻌﻤ ﻞ ”‪ “Task‬او اﻟﻔﻌﺎﻟﻴ ﺔ " ‪ “Activity‬واﻟﺘ ﻲ یﻤﻜ ﻦ ﺗﻘﺴ ﻴﻤﻬﺎ اﻟ ﻰ‬
‫أﻋﻤﺎل ﻡﺤﺪدة ﻋﻠﻰ ﻡﺠﻤﻮﻋ ﺎت ﻡﺴ ﺘﻘﻠﺔ و یﻤﻜ ﻦ رﺹ ﺪ وﻗ ﺖ ﻡﺤ ﺪد و ﻗ ﻴﻢ ﻡﺎﻟﻴ ﺔ ﻡﺤ ﺪدة ﻟﻬ ﺬﻩ اﻟﻔﻌﺎﻟﻴ ﺔ.‬
‫ویﻤﻜ ﻦ ﺑﻤﺴ ﺎﻋﺪة هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ان یﻘ ﻮم اﻟﻤﺨﻄ ﻂ ﻟﻠﻤﺸ ﺮوع ﺑﺘﻮﺽ ﻴﺢ اﻟﻔﻌﺎﻟﻴ ﺎت اﻟﻤﻄﻠ ﻮب‬
‫أداؤهﺎ ﺽﻤﻦ وﻗﺖ واﺣﺪ وﻡﺎ یﺘﺒﻌﻬﺎ ﻓﻲ اﻟﻮﻗﺖ ﻡﻦ ﻧﺎﺣﻴﺔ اﻷداء وﻋﻠﻰ اﻟﺘﻮاﻟﻲ ﺑﺸ ﻜﻞ ﻡﻨ ﺘﻈﻢ وﺵ ﺎﻡﻞ .‬
‫ویﺴﺘﺨﺪم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ﻟﻜ ﻞ ﻡ ﻦ ﺟﺪوﻟ ﺔ اﻟﻤﺸ ﺮوع ﻟﻠﻤ ﻮارد واﻟﺘﻜ ﺎﻟﻴﻒ. ویﻘ ﻮم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ‬
‫اﻟﻤﻔﺼﻞ ﺑﺘﺒﺴﻴﻂ واﺥﺘﺼﺎر ﻋﻤﻠﻴﺔ اﻟﺘﻘﺎریﺮ ﺣﻮل اﻟﺘﻜﻠﻔﺔ وﺗﻘﺪم اﻟﻌﻤﻞ.‬
‫ویﺘﻢ إﻧﺸﺎء هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﺗﺤﺖ ﻧﻈﺎم ﻋﺪدي واﻟﺬي یﻤﻜﻦ ﺗﻄﺒﻴﻘ ﻪ ﻋﻨ ﺪ ﻡﺴ ﺘﻮیﺎت ﻡﺘﻌ ﺪدة وذﻟ ﻚ‬
‫ﻟﻌﻤﻞ هﻴﻜﻠﻴﺔ ﻟﻜﻞ ﻡﻦ اﻟﺘﻜﻠﻔﺔ وﺗﺨﻄﻴﻂ اﻟﺠﺪوﻟﺔ وﻋﻤﻞ اﻟﺘﻘﺎریﺮ.‬
‫وﺑﻤﻜ ﻦ ان یﺴ ﺘﺨﺪم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ﻻﻧﺘ ﺎج ﻡﺼ ﻔﻮﻓﺔ اﻟﻤﺴ ﺆوﻟﻴﺎت وﺟﺪوﻟ ﺔ اﻟﺸ ﺒﻜﺎت وﺣﺼ ﺮ‬
‫اﻟﺘﻜﺎﻟﻴﻒ وﺗﺤﻠﻴﻞ اﻟﻤﺨﺎﻃﺮ وهﻴﻜﻞ اﻟﻤﻨﻈﻤﺔ وﺣﺼﺮ أﻋﻤﺎل اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﻤﺸﺮوع.‬
‫إن هﻴﻜﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ه ﻮ ﺗﻨﻤ ﻴﻂ اﻟﻤﻬ ﺎم ﻓ ﻰ ﻗ ﻮاﺋﻢ ﺗﻮﺽ ﺢ ﻓﻴﻬ ﺎ ﺣﺴ ﺎب اﻟﻤ ﻮارد اﻟﻼزﻡ ﺔ‬
‫ﻹﻧﻬﺎء اﻟﻤﻬﺎم واﻟﺸﻜﻞ اﻟﺘﺎﻟﻲ یﻮﺽﺢ ﻡﺜﺎل ﻟﺬﻟﻚ.‬
‫هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﻟﻠﻤﺸﺮوع‬
‫اﻻﻧﺸﻄﺔ اﻟﻤﺪرﺳﺔ اﻟﻼﻡﻨﻬﺠﻴﺔ‬

‫ﻡﻨﻄﻘﺔ رﻓﺢ‬

‫اﻟﻤﺴﺘﻮى 1‬

‫ﻡﻨﻄﻘﺔ ﺥﺎن یﻮﻧﺲ‬
‫اﻟﻤﺴﺘﻮى 2‬

‫ﻡﺠﻤﻮﻋﺔ ﺣﻴﻔﺎ‬

‫ﻡﺠﻤﻮﻋﺔ اﻟﻘﺪس‬

‫ﻡﺠﻤﻮﻋﺔ یﺎﻓﺎ‬

‫اﻟﻤﺴﺘﻮى 3‬
‫ریﺎﺽﺔ‬

‫آﻤﺒﻴﻮﺗﺮ‬

‫رﺳﻢ‬

‫آﻤﺒﻴﻮﺗﺮ‬

‫ریﺎﺽﺔ‬

‫رﺳﻢ‬

‫ریﺎﺽﺔ‬

‫آﻤﺒﻴﻮﺗﺮ‬

‫رﺳﻢ‬

‫اﻟﻤﺴﺘﻮى 4‬

‫اﻟﺸﻜﻞ 2-4 : هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﻟﻠﻤﺸﺮوع‬

‫31‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫3. إدارة وﺕﺨﻄﻴﻂ اﻟﻤﺸﺮوع ﺑﺈﺳﺘﺨﺪام ‪MS Project‬‬
‫3-1 اﻟﺒﺪایﺔ ﻡﻊ ‪MS Project‬‬
‫یﻤﻜﻦ اﻟﺒﺪء ﺑﻤﺸﺮوع ‪ MS Project‬ﺑﻮاﺳﻄﺔ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻡﺰ اﻟﻤﺤﺪد ﻓﻲ‬
‫‪MS Project‬أو ﺑﻮاﺳﻄﺔ ﻓﺘﺢ أي ﻡﺸﺮوع ﻡﻦ ‪MS Project‬‬
‫3-2 اﺳﺘﻜﺸﺎف واﺟﻬﺔ ‪MS Project‬‬
‫إﺽﺎﻓﺔ إﻟﻰ ﻋﻨﺎﺹﺮ‪ Windows‬اﻟﻌﺎدي ﻓﺈن ‪ MS Project‬ﻟﻪ ﻡﻤﻴﺰات یﻤﻜﻦ ﻡﻌﺮﻓﺘﻬﺎ ﻡﻦ‬
‫ﺑﺮاﻡﺞ اﻟﺠﺪاول اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻡﺜﻞ اﻷﻋﻤﺪة واﻟﺼﻔﻮف واﻟﻤﻌﺎدﻟﺔ اﻟﺘﻲ یﺴﺘﺨﺪﻡﻬﺎ اﻟﺼﻒ ﻟﻠﻜﺘﺎﺑﺔ. ان‬
‫اﻟﻤﻌﻠﻮﻡﺎت یﺘﻢ إدﺥﺎﻟﻬﺎ إﻟﻰ اﻟﺤﻘﻞ اﻟﻤﻨﺎﺳﺐ آﻘﺎﻋﺪة ﺑﻴﺎﻧﺎت وهﻨﺎك أواﻡﺮ ﻡﺘﻔﺮدة ووﺳﺎﺋﻞ ﻡﺤﺪدة‬
‫ﻟﻠﻌﻤﻞ ﻡﻊ اﻟﻤﺸﺮوﻋﺎت و اﻟﺸﻜﻞ 3-1 یﻮﺽﺢ اﻟﻮاﺟﻬﺔ اﻟﺮﺋﻴﺴﻴﺔ.‬

‫اﻟﺸﻜﻞ 3-1 : واﺟﻬﺔ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ اﻟﺮﺋﻴﺴﻴﺔ‬
‫3-3 ﻗﻀﻴﺐ اﻷدوات‬
‫‪ o‬ﻗﻀﻴﺐ اﻷدوات اﻟﻘﻴﺎﺳﻲ و هﻮ ﻡﻮﺽﺢ ﻓﻲ اﻟﺸﻜﻞ 3-2.‬
‫‪ o‬ﻗﻀﻴﺐ اﻷدوات اﻟﻤﻌﺪل‬

‫اﻟﺸﻜﻞ 3-2 : ﺵﺮیﻂ اﻻدوات ﻓﻲ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ‬
‫یﺴﺘﺨﺪم ﻗﻀﻴﺐ اﻻدوات ﻓﻲ ﺗﻨﻔﻴﺬ اﻻواﻡﺮ اﻟﻤﺨﺘﻠﻔﺔ و ﺑﺸﻜﻞ ﺳﺮیﻊ ﻡﻦ ﻋﻠﻰ ﺳﻄﺢ اﻟﺸﺎﺵﺔ‬
‫ﺑﺈﺳﺘﺨﺪام اﻟﻔﺄرة.‬
‫41‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫3-4 ﻋﺮض وﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ‬
‫یﻤﻜﻦ ﻋﺮض اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻨﺎﻇﺮ اﻟﺮﺋﻴﺴﻴﺔ اﻟﻤﺘﻮﻓﺮ ﻓﻰ ‪ MS Project‬واﻟﺘﻰ ﺗﺘﻜﻮن ﻡﻦ‬
‫‪ Bar (GANTT) chart‬یﺴﺘﺨﺪم ﻟﻌﻤﻞ ﻡﺪﺥﻼت اﻟﻤﺸﺮوع اﻟﺮﺋﻴﺴﻴﺔ ) اﻟﻤﻬﺎم و ﻡﺪدهﺎ‬
‫اﻟﺰﻡﻨﻴﺔ(‬
‫)‪ Network (CPM‬یﺴﺘﺨﺪم ﻓﻲ ﻋﺮض ﻋﻼﻗﺎت اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ ﻋﻠﻰ ﺵﻜﻞ‬
‫ﺵﺒﻜﺔ ﻡﻦ اﻟﻤﺴﺘﻄﻴﻼت.‬
‫‪ Task usage‬یﻮﺽﺢ ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﺘﻲ ﻧﻔﺬﺗﻬﺎ اﻟﻤﻮارد ﻡﻦ اﻟﻤﻬﻤﺔ‬
‫‪ Gantt tracking‬یﻈﻬﺮ اﻟﻌﻤﻞ اﻟﻤﻨﺠﺰ ﻓﻲ اﻟﻤﺴﺮوع و ﻧﺴﺒﺔ اﻻﻧﺠﺎز.‬
‫‪ Resource Graph‬یﻮﺽﺢ ﺗﻌﺎرﺽﺎت اﻟﻤﻮارد.‬
‫‪ Resource Usage‬یﻮﺽﺢ اﺳﺘﺨﺪام اﻟﻤﻮارد اﻟﻤﺨﺼﺼﺔ ﻟﻠﻤﻬﺎم اﻟﻤﺨﺘﻠﻔﺔ.‬
‫‪ Resource Sheet‬یﻮﺽﺢ اﻟﻤﻮارد اﻟﻤﺘﺎﺣﺔ ﻟﻠﻤﺸﺮوع.‬
‫و هﻨﺎك اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻨﺎﻇﺮ اﻻﺽﺎﻓﻴﺔ اﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﺸﻜﻞ 3-3.‬

‫اﻟﺸﻜﻞ 3-3 : ﻣﻨﺎﻇﺮ اﺿﺎﻓﻴﺔ ﻓﻲ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ‬
‫3-5 ﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻰ اﻟﻴﺴﺎر ﻋﻠﻰ اﻟﺸﺎﺵﺔ اﻟﺮﺋﻴﺴﻴﺔ یﻤﻜﻦ اﺥﺘﻴﺎر اﻟﻤﻨﻈﺮ اﻟﻤﻨﺎﺳﺐ.‬
‫• یﻤﻜﻦ ﻡﻦ اﻷﻡﺮ‬

‫‪ View > More views‬اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻨﺎﻇﺮ اﺽﺎﻓﻴﺔ.‬

‫3-6 اﻟﺠﺪاول ‪Tables‬‬
‫ﻟﻜﻞ ﻡﻨﻈﺮ ﻓﻰ ﻡﻴﻜﺮوﺳﻮف ﺑﺮوﺟﻜﺖ هﻨﺎك ﻗﻮاﺋﻢ ﻡﺨﺘﻠﻔﺔ واﻟﺘﻰ ﺗﻘﻮم ﺑﺘﻌﺮیﻒ اﻟﻤﻌﻠﻮﻡﺎت‬
‫ﺣﺴﺐ اﻟﺘﻮﺹﻴﻒ اﻟﺨﺎص ﺑﻬﺎ .ﻓﻤﺜﻼ ﺑﺎﻟﻨﻈﺮ اﻟﻰ ﻗﺎﺋﻤﺔ اﻟﺠﺪوﻟﺔ ﻓﺎﻧﻚ ﺳﻮف ﺗﻼﺣﻆ ﺗﺎریﺦ‬
‫ﺑﺪایﺔ وﻧﻬﺎیﺔ اى ﻡﻬﻤﺔ .واﻟﻘﺎﺋﻤﺔ اﻟﻤﺘﺎﺣﺔ ﻋﻠﻰ ﻡﻴﻜﺮوﺳﻮف ﺑﺮوﺟﻜﺖ هﻲ ﻗﺎﺋﻤﺔ اﻹدﺥﺎل‬

‫51‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫‪Entry Table‬ﺣﻴﺚ ﺳﻴﻜﻮن ﺑﺈﻡﻜﺎﻧﻚ إدﺥﺎل اﻟﻤﻌﻠﻮﻡﺎت ﻋﻦ اﻟﻤﻬﺎم وﺣﺘﻰ یﻤﻜﻦ ﺗﻐﻴﻴﺮ‬
‫اﻟﻘﺎﺋﻤﺔ ﻓﺈن یﺠﺐ ﻋﻤﻞ اﻟﺘﺎﻟﻲ-:‬
‫1. أﻧﻘﺮ ﻋﻠﻰ ﻗﺎﺋﻤﺔ ‪ View‬ﻡﻦ ﺵﺮیﻂ اﻻدوات.‬
‫2. أﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪. Tables‬‬
‫3. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Tables‬ﻧﻮع اﻻدﺥﺎل اﻟﻤﻄﻠﻮب )‪ ( Cost‬ﻡﺜﻼ.‬
‫3-7 ﻡﻨﻈﺮ ‪GANTT Chart‬‬
‫إن ﻡﻨﻈﺮ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت )‪ (GANTT Chart‬هﻮ اﻟﻤﻨﻈﺮ اﻟﺮﺋﻴﺴﻲ اﻟﻤﻌﺮوض واﻟﻤﺘﺎح داﺋﻤﺎ‬
‫ً‬
‫ﻋﻠﻰ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ وهﻮ اﻟﻤﻨﻈﺮ اﻟﺬي یﻤﻜﻨﻚ ﻡﻨﻪ إدﺥﺎل وﺗﻌﺪیﻞ اﻟﻤﻌﻠﻮﻡﺎت ﻓﻲ اﻟﻤﺸﺮوع.‬
‫وﻋﻨﺪ ﻋﺮﺽﻚ ﻟﻤﻨﻈﺮ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت اﺗﺒﻊ اﻵﺗﻲ.‬
‫1. أﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ﻡﻨﻈﺮ ‪.GANTT‬‬
‫2. ﺳﻮف یﻈﻬﺮ ﻟﺪیﻚ ﻋﻨﺎﺹﺮ ﻡﻨﻈﺮ ‪ GANTT‬اﻟﺮﺋﻴﺴﻴﺔ.‬
‫3-8 ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع‬
‫3-8-1 ﻓﺘﺢ ﻡﺘﻒ ﺟﺪیﺪ‬
‫1. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ File‬اﺥﺘﺮ ﻓﺘﺢ ﻡﺎف ﺟﺪیﺪ ‪New‬‬
‫2. ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺬي یﻈﻬﺮ اﺥﺘﺮ ‪Blank project‬‬
‫3-8-2 إدﺧﺎل ﺏﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻷوﻟﻴﺔ‬
‫إن أول ﺥﻄﻮة ﻓﻲ إدارة اﻟﻤﺸﺮوع هﻲ ﺗﺤﺪیﺪ ﺗﺎریﺦ ﺑﺪایﺔ اﻟﻤﺸﺮوع ‪ start date‬ﻟﻠﻮﺹﻮل إﻟﻰ‬
‫ﻗﺎﺋﻤﺔ إدﺥﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﻤﻬﻴﺪیﺔ اﺗﺒﻊ اﻵﺗﻲ:‬
‫1. ﻡﻦ اﻟﻔﺎﺋﻤﺔ ‪ Project‬اﺥﺘﺮ ‪Project Information‬‬
‫2. ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻗﻢ ﺑﺈدﺥﺎل ﺗﺎریﺦ ﺑﺪایﺔ اﻟﻤﺸﺮوع ‪. Start date‬‬

‫اﻟﺸﻜﻞ 3-4 : ﻣﻌﻠﻮﻣﺎت ﺏﺪایﺔ أوﻧﻬﺎیﺔ اﻟﻤﺸﺮوع‬
‫61‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻓﻲ اﻟﺸﻜﻞ 3-4 یﻤﻜﻦ إدﺥﺎل ﺑﺪایﺔ أوﻧﻬﺎیﺔ اﻟﻤﺸﺮوع وﺣﺎﻟﺔ اﻟﻤﺸﺮوع‬
‫واﻷوﻟﻮیﺔ ﻟﻠﻤﺸﺮوع ﺽﻤﻦ ﻡﺸﺎریﻊ اﻟﺸﺮآﺔ اﻻﺥﺮى.‬
‫ﺕﺤﺬیﺮ‬
‫. ﻓﻘﻂ یﻤﻜﻨﻚ إدﺥﺎل إﻡﺎ ﺑﺪایﺔ اﻟﻤﺸﺮوع وهﻮ‬

‫ﻻ یﻤﻜﻦ إدﺥﺎل ﺑﺪایﺔ وﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﻡﻌﺎ‬
‫ً‬

‫اﻟﺸﺎﺋﻊ)‪ ،(Forward pass‬أﻡﺎ إذا آﺎﻧﺖ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع هﻲ اﻷهﻢ وهﻨﺎك ﻗﻴﺪ ﻹﻧﻬﺎء اﻟﻤﺸﺮوع ﻗﺒﻞ‬
‫ﻡﻮﻋﺪ ﻡﺤﺪد ﻓﻴﻤﻜﻦ إدﺥﺎل ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع. و یﻜﻮن اﻟﺘﺨﻄﻴﻂ ﻓﻲ هﺬة اﻟﺤﺎﻟﺔ ﻡﻦ اﻟﺨﻠﻒ اﻟﻰ اﻻﻡﺎم و‬
‫یﺴﻤﻰ )‪(Backward pass‬‬
‫3-8-3 أوﻟﻮیﺔ اﻟﻌﻤﻞ ﺽﻤﻦ اﻟﻤﺸﺮوع ‪Priority‬‬
‫یﻘﻮم ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ ﺑﺈدﺥﺎل أوﻟﻮیﺔ اﻟﻤﺸﺮوع ﺑﻴﻦ ﻋﺪة ﻡﺸﺎریﻊ ﻹیﺠﺎد اﻟﺘﻮازن ﻓﻲ اﺳﺘﺨﺪام‬
‫اﻟﻤﻮارد اﻟﻤﺸﺘﺮآﺔ . ﺗﻘﺎس اﻷوﻟﻮیﺔ ﺑﻘﻴﻤﺔ ﺗﻘﺪر ﻡﻦ 0.0 إﻟﻰ 0001 ﻓﻘﻴﻤﺔ 0001 ﺗﻌﻄﻲ ﻷﻋﻠﻰ‬
‫أوﻟﻮیﺔ.‬
‫3-8-4 ﻥﺘﺎﺋﺞ إﺣﺼﺎﺋﻴﺔ‬
‫یﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻌﻠﻮﻡﺎت إﺣﺼﺎﺋﻴﺔ ﻋﻦ اﻟﻤﺸﺮوع إذا ﺗﻢ اﺥﺘﻴﺎر ﻡﺮﺑﻊ ‪ Statistic‬ﻓﻲ ﻡﺮﺑﻊ‬
‫ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ‪Project Information‬‬
‫3-9 ﺕﺴﺠﻴﻞ ﺻﻔﺎت اﻟﻤﺸﺮوع‬
‫یﻤﻜﻦ ﺗﺴﺠﻴﻞ اﻟﻌﺪیﺪ ﻡﻦ ﺹﻔﺎت اﻟﻤﺸﺮوع اﻟﺜﺎﺑﺘﺔ و اﻟﺘﻲ ﺗﻤﺜﻞ اداﻩ ﺗﻌﺮیﻒ اﻟﻤﺸﺮوع ﺣﻴﺚ یﺘﻢ‬
‫اﺳﺘﺨﺪام هﺬﻩ اﻟﺼﻔﺎت ﺽﻤﻦ ﻡﺨﺮﺟﺎت اﻟﻤﺸﺮوع ﻡﺜﻞ اﺳﻢ اﻟﻤﺸﺮوع و اﺳﻢ ﻡﺪیﺮ اﻟﻤﺸﺮوع و اﺳﻢ‬
‫اﻟﺸﺮآﺔ و ﺥﻼﻓﺔ و ﻟﻌﻤﻞ ذﻟﻚ اﺗﺒﻊ اﻻﺗﻲ:‬
‫1. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ File‬أﺥﺘﺮ ‪Properties‬‬
‫2. إﺥﺘﺮ ﺵﺎﺵﺔ ‪ Summary‬و اﺽﻒ اﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻨﺎﺳﺒﺔ‬
‫3. اﻧﻘﺮ ﻡﻮاﻓﻖ ‪OK‬‬

‫71‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫4. إدﺥﺎل اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ‬
‫4-1 ادﺥﺎل اﻟﻤﻬﺎم‬
‫ﻋﻨﺪ ﺑﺪایﺔ أي ﻡﺸﺮوع ﺟﺪیﺪ ﻓﺈﻧﻚ ﺗﻜﻮن ﺟﺎهﺰا ﻹدﺥﺎل اﻟﻤﻬﺎم، ﻓﻘﻂ ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ﺳﻄﺮ ﻡﻬﻤﺔ‬
‫ً‬
‫ﺟﺪیﺪة واﺑﺪأ ﺑﻌﻤﻠﻴﺔ اﻟﻄﺒﺎﻋﺔ.‬
‫اﺳﺘﺨﺪام اﻟﻤﻔﺘﺎح ‪ Tab‬ﻟﻠﺘﺤﺮك إﻟﻰ ﻋﻤﻮد اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ‪Duration‬‬
‫اﺳﺘﺨﺪم اﻟﻤﻔﺘﺎح ‪ Enter‬ﻟﻠﺘﺤﺮك ﺑﻴﻦ اﻻﺳﻄﺮ ﻻدﺥﺎل ﻡﻬﺎم ﺟﺪیﺪة.‬
‫ﺑﺈﻡﻜﺎﻧﻚ إدﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﺑﺎﻟﺴﺎﻋﺔ أو ﺑﺎﻟﻴﻮم أو ﺑﺎﻟﺸﻬﺮ أو اﻷﺳﺒﻮع .إذا ﻟﻢ ﺗﺪﺥﻞ أي ﻡﺪة ﻓﺈن‬
‫ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ یﺤﺘﺴﺐ اﻟﻤﺪﻩ اﻟﺰﻡﻨﻴﺔ یﻮﻡﺎ واﺣﺪا.‬
‫ً‬
‫ً‬
‫ﺑﻌﺪ إدﺥﺎﻟﻚ اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﺳﻮف یﻌﺮض ﻟﻚ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ هﺬﻩ اﻟﻤﻌﻠﻮﻡﺎت ﻡﻤﺜﻠﺔ‬
‫ﺑﻴﺎﻧﻴﺎ ﻓﻲ ﻡﺨﻄﻂ ﺟﺎﻧﺖ إﻟﻰ اﻟﻴﻤﻴﻦ.‬
‫ً‬
‫ﺕﻤﺮیﻦ‬
‫اﻟﻤﻄﻠﻮب ادﺥﺎل اﻟﻔﻌﺎﻟﻴﺎت اﻟﺘﺎﻟﻴﺔ ﻓﻲ ﻡﻠﻒ ﺟﺪیﺪ ﺑﻌﻨﻮان ‪ Water pipe line‬و اﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﺸﻜﻞ‬
‫4-1.‬

‫اﻟﺸﻜﻞ 4-1 : ﻓﻌﺎﻟﻴﺎت ﻣﺸﺮوع ﺕﻮﺹﻴﻞ ﺧﻂ ﻣﻴﺎة‬

‫81‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫4-2 اﻟﻤﺪد اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم‬
‫یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم ﺑﻮاﺣﺪ ﻡﻦ ﺛﻼث ﻃﺮق‬
‫1. ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺰر اﻻیﺴﺮ ﻟﻠﻔﺄرة ﻋﻠﻰ اﺳﻢ اﻟﻔﻌﺎﻟﺔ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪Task‬‬
‫‪ Information‬ﺣﻴﺚ یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ‪ Duration‬و اﻟﺸﻜﻞ 4-2 یﻮﺽﺢ ﻡﺮﺑﻊ ﻡﻌﻠﻮﻡﺎت‬
‫اﻟﻤﻬﻤﺔ.‬
‫2. یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻡﺒﺎﺵﺮة ﻡﻦ ﻡﺮﺑﻊ ‪ GANTT‬اﻟﺤﻮاري.‬
‫3. یﻤﻜﻦ زیﺎدة ﻡﺪة اﻟﻔﻌﺎﻟﻴﺔ ﻡﺒﺎﺵﺮة ﻡﻦ اﻟﻘﻀﻴﺐ ﺟﻬﺔ اﻟﻴﻤﻴﻦ.‬

‫اﻟﺸﻜﻞ 4-2 : ﻣﺮﺏﻊ ﺡﻮار ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﻤﺔ‬
‫4-3 إدراج ﻥﺸﺎط ﺑﻴﻦ أﻥﺸﻄﺔ اﺥﺮى‬
‫ﻧﺤﺪد اﻟﻨﺸﺎط اﻟﻤﻄﻠﻮب إدراج اﻷﻧﺸﻄﺔ اﻟﺠﺪیﺪﻩ ﻗﺒﻠﻪ.‬
‫ﻧﻀﻐﻂ زر ‪ Insert‬ﻡﻦ ﻟﻮﺣﺔ اﻟﻤﻔﺎﺗﻴﺢ.‬
‫ﻧﻜﺘﺐ أﺳﻤﺎء اﻟﻤﻬﺎم اﻟﺠﺪیﺪة ﺣﻴﺚ یﺘﻢ رﺑﻂ اﻟﻨﺸﺎط اﻟﻤﺪرج اﻟﺠﺪیﺪ ﺑﻌﻼﻗﺔ )‪ (FS‬ﺗﻠﻘﺎﺋﻴﺎ‬
‫ﻡﻊ اﻷﻧﺸﻄﺔ اﻷﺥﺮى.‬

‫91‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫5. ﺿﺒﻂ ﺕﻘﻮیﻢ اﻟﻤﺸﺮوع‬
‫5-1 ﺕﺤﺪیﺪ أیﺎم اﻟﻌﻤﻞ واﻹﺟﺎزات‬
‫ﻋﻨﺪ ﺑﺪایﺔ أي ﻡﺸﺮوع یﺠﺐ ﺗﺤﺪیﺪ ﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﻴﻮﻡﻴﺔ وﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻷﺳﺒﻮﻋﻴﺔ وأیﺎم‬
‫اﻟﻌﻄﻞ وﻡﻮﻋﺪ ﺑﺪایﺔ اﻷﺳﺒﻮع وأیﺎم اﻹﺟﺎزات اﻟﻤﺘﻜﺮرة واﻟﻐﻴﺮ ﻡﺘﻜﺮرة أﺛﻨﺎء ﻓﺘﺮة اﻟﻤﺸﺮوع.‬
‫وﻟﻌﻤﻞ ذﻟﻚ یﺘﻢ ﻓﺘﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺘﺎﻟﻲ‬
‫1. ﺕﻌﺪیﻞ ﺧﻴﺎرات اﻟﺘﻘﻮیﻢ‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Change Working Time‬‬
‫اﻧﻘﺮ ﻋﻠﻰ زر ‪ Options‬ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﻤﻔﺘﻮح ﺣﻴﺚ یﺘﻢ ﻓﺘﺢ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪Calendar‬‬
‫یﺘﻢ اﺥﺘﻴﺎر یﻮم اﻟﺴﺒﺖ آﺒﺪایﺔ ﻟﻼﺳﺒﻮع‬
‫یﺘﻢ ﺗﻌﺪیﻞ ﺑﺪأ ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻟﻠﻤﺸﺮوع ﺣﺴﺐ ﻧﻈﺎم اﻟﻤﺆﺳﺴﺔ‬
‫2. اﺧﺘﻴﺎر یﻮم ﻣﺨﺼﺺ ﺏﻌﻄﻠﺔ‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Change Working Time‬‬
‫ﺣﺪد اﻟﻴﻮم او اﻻیﺎم اﻟﺘﻰ ﺳﺘﻜﻮن ایﺎم اﻋﻄﺎل ﺽﻤﻦ ﻓﺘﺮة اﻟﻤﺸﺮوع‬
‫ﻋﻠﻢ هﺬﻩ اﻻیﺎم ﺑﺎﻟﻔﺄرة‬
‫ﻗﻢ یﺘﻐﻴﻴﺮ ﺹﻔﺔ هﺬة اﻻیﺎم ﺑﺄﺥﺘﻴﺎر ‪Non working time‬‬
‫و یﻤﻜﻦ ﻣﺒﺎﺵﺮة ﻣﻦ اﻟﻤﺮﺏﻊ اﻟﺤﻮاري ‪ Change Working Time‬ﻋﻤﻞ اﻻﺕﻲ:‬
‫ﻡﻦ هﺬا اﻟﻤﺮﺑﻊ یﺘﻢ ﺗﺤﻮیﻞ ﺑﺪایﺔ اﻟﻌﻤﻞ إﻟﻰ یﻮم اﻟﺴﺒﺖ ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر یﻮﻡﻲ اﻟﺴﺒﺖ واﻷﺣﺪ ﺛﻢ‬
‫وﺑﺬﻟﻚ یﺘﺤﻮل یﻮﻡﻲ اﻟﺴﺒﺖ واﻷﺣﺪ ﻡﻦ أیﺎم‬

‫ﻧﺨﺘﺎر )‪(Non default working time‬‬
‫ﻋﻄﻞ إﻟﻰ ﻋﻤﻞ.‬

‫ﺛﻢ یﺘﻢ اﺥﺘﻴﺎر یﻮم اﻟﺠﻤﻌﺔ ﻡﻊ اﻷﻡﺮ )‪ (Non working time‬وﺑﺬﻟﻚ یﺘﺤﻮل یﻮم اﻟﺠﻤﻌﺔ إﻟﻰ‬
‫ﻋﻄﻠﺔ.‬
‫و اﻟﺸﻜﻞ 5-1 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﻐﻴﻴﺮ ﺗﻘﻮیﻢ اﻟﻤﺸﺮوع.‬

‫02‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﺸﻜﻞ 5-1: ﻣﺮﺏﻊ ﺡﻮاري ﺧﺎص ﺏﺘﻘﻮیﻢ اﻟﻤﺸﺮوع‬
‫5-2 ﻥﺴﺦ اﻟﻤﻬﺎم وﻟﺼﻘﻬﺎ ‪Copy and Paste‬‬
‫ﻟﺴﻬﻮﻟﻪ ﺗﻨﻔﻴﺬ وإدﺥﺎل اﻟﻤﻬﺎم إذا ﺗﻜﺮر ﺑﻌﺾ اﻟﻤﻬﺎم یﻤﻜﻦ اﻟﻘﻴﺎم ﺑﻌﻤﻞ ﻧﺴﺨﻪ ﻡﻨﻬﺎ أو ﻗﺺ‬
‫وﻟﺼﻖ اﻟﻤﻬﺎم ﻓﻰ ﻡﻜﺎن ﺟﺪیﺪ وذﻟﻚ ﺑﺎﺗﺒﺎع اﻵﺗﻲ -:‬
‫یﺘﻢ اﺥﺘﻴﺎر اﻟﺨﻼیﺎ ﺑﻮﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ رﻗﻢ ﺗﻌﺮیﻒ ‪ ID‬اﻟﺨﻠﻴﺔ‬
‫ﻧﺨﺘﺎر أﻡﺮ ‪ Copy‬ﻡﻦ ﻗﺎﺋﻤﺔ ‪Edit‬‬
‫ﻧﺤﺪد ﺥﻼیﺎ ﻓﺎرﻏﻪ یﺘﻢ اﻟﻠﺼﻖ إﻟﻴﻬﺎ .‬
‫ﺛﻢ ﻧﺴﺘﺨﺪم اﻷﻡﺮ ‪ Paste‬ﻡﻦ ﻗﺎﺋﻤﻪ ‪Edit‬‬
‫إذا آﺎن اﻟﻤﻄﻠﻮب ﻗﺺ یﺘﻢ اﺥﺘﻴﺎر أﻡﺮ ‪ Cut‬ﻡﻦ ﻗﺎﺋﻤﺔ ‪Edit‬‬
‫ﻧﻜﺮر أﻡﺮ ‪Paste‬‬
‫5-3 ﻡﺴﺢ اﻟﻤﻬﺎم ‪Delete‬‬
‫ﻟﻤﺴﺢ ﻡﻬﻤﺔ أو ﻡﺠﻤﻮﻋﻪ ﻡﻦ اﻟﻤﻬﺎم یﺘﻢ ﺗﺤﺪیﺪهﺎ ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ ﺑﺎﻧﻘﺮ ﻋﻠﻰ رﻗﻢ ﺗﻌﺮیﻒ اﻟﺨﻠﻴﺔ ‪ID‬‬
‫ﺛﻢ ﻡﻦ ﻗﺎﺋﻤﻪ ‪ Edit‬یﺘﻢ اﺥﺘﻴﺎر اﻷﻡﺮ ‪Delete‬‬
‫5-4 اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ‪Summary Tasks‬‬
‫یﺘﻢ ﺟﻤﻊ ﻡﺠﻤﻮﻋﺔ ﻡﻦ اﻟﻤﻬﺎم ﺗﺤﺖ ﻡﻬﺎم ﺗﻠﺨﻴﺼﻴﺔ و اﻟﺸﻜﻞ 5-2 یﻮﺽﺢ ﺵﻜﻞ اﻟﻤﻬﺎم‬
‫اﻟﺘﻠﺨﻴﺼﻴﺔ وﺗﻜﻮن ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم ﺗﺸﺘﺮك ﻡﻊ ﺑﻌﻀﻬﺎ ﻓﻰ ﺹﻔﺎت ﻡﻌﻴﻨﻪ وﺗﻜﻮن ﻡﺪﻩ اﻟﻤﻬﺎم‬
‫اﻟﺘﻠﺨﻴﺼﻴﺔ هﻮ اﻟﻔﺮق ﺑﻴﻦ ﺗﺎریﺦ ﺑﺪایﺔ وﻧﻬﺎیﺔ ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم اﻟﻤﻨﻀﻮیﺔ ﺗﺤﺖ اﻟﻤﺠﻤﻮﻋﺔ‬
‫اﻟﺘﻠﺨﻴﺼﻴﺔ .‬
‫یﺘﻢ إﻧﺸﺎء ذﻟﻚ ﺣﺴﺐ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ-:‬
‫12‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫إدراج اﻟﻨﺸﺎط اﻟﺘﺠﻤﻴﻌﻲ آﻌﻨﻮان ﻟﻤﺠﻤﻮﻋﻪ ﻡﻬﺎم.‬
‫یﺘﻢ ﺗﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻔﺮﻋﻴﺔ اﻟﺘﺎﺑﻌﺔ ﻟﻬﺎ ﺑﺘﻌﻠﻴﻤﻬﺎ ﺑﺎﻟﻤﺆﺵﺮ.‬
‫ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Project‬یﺘﻢ اﺥﺘﻴﺎر ‪ Outline‬ﺛﻢ ﻧﺨﺘﺎر أﻡﺮ ‪Indent‬‬
‫وﺑﺬﻟﻚ ﻧﺤﺼﻞ ﻋﻠﻰ اﻟﻨﺸﺎط اﻟﺘﻠﺨﻴﺼﻲ.‬

‫اﻟﺸﻜﻞ 5-2: ﺵﻜﻞ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‬
‫ﻣﻼﺡﻈﺔ‬
‫یﻤﻜﻦ رﺑﻂ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ او ﻡﻊ اي ﺥﻼیﺎ ﻡﻨﻀﻮیﺔ ﺗﺤﺘﻬﺎ.‬
‫ﻻزاﻟﺔ اﻟﺮﺑﻄﺔ ﺑﻴﻦ ﺥﻠﻴﺘﻴﻦ ﻧﺨﺘﺎر هﺬﻩ اﻟﺨﻼیﺎ و ﻧﺨﺘﺎر اﻻﻡﺮ ‪ Unlink‬ﻡﻦ ﺵﺮیﻂ اﻻدوات‬
‫اﻟﺮﺋﺒﺴﻲ‬
‫ﻻ ﺗﺤﺎول ازاﻟﺔ اﻟﺮواﺑﻂ ﺑﻮاﺳﻄﺔ اﺳﺘﺨﺪام اﻻﻡﺮ ‪ Delete‬ﻟﻤﺴﺢ اﻟﺨﻼیﺎ اﻟﻤﺮﺗﺒﻄﻪ ﺑﻬﺎ‬
‫‪ Predecessors‬و هﺬا ﺳﻮف یﺆدي اﻟﻰ ﻡﺴﺢ اﻟﻤﻬﻤﺔ ﺑﺎﻟﻜﺎﻡﻞ و ﻟﻴﺲ اﻟﺮاﺑﻄﺔ وﺣﺪهﺎ.‬
‫5-5 إﻟﻐﺎء اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‬
‫ﺣﺪد اﻟﻤﻬﺎم اﻟﻤﺘﻔﺮﻋﺔ ﻋﻦ اﻟﻤﻬﻤﻪ اﻟﺘﻠﺨﻴﺼﻴﺔ .‬
‫ﻡﻦ ﻗﺎﺋﻤﻪ‬

‫‪ Project‬ﻧﺨﺘﺎر ‪ outline‬ﺛﻢ ﻧﺨﺘﺎر ‪Out dent‬‬

‫ﺗﻘﻮم ﺑﻤﺴﺢ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ﻡﻦ ﻗﺎﺋﻤﺔ اﻟﻤﺸﺮوع .‬
‫5-6 أﺣﺠﺎر اﻟﺰاویﺔ‬
‫هﻲ ﻋﺒﺎرة ﻋﻦ ﻡﻬﺎم ﻋﻤﻞ ﻟﻬﺎ اهﻤﻴﺔ ﺥﺎﺹﺔ ﻓﻲ اﻟﻤﺸﺮوع ﻡﺜﻞ ﻧﻬﺎیﺔ اﻟﻤﺮﺣﻠﺔ اﻻوﻟﻰ ﻟﻠﻤﺸﺮوع او‬
‫ﻡﻮﻋﺪ ﺗﻮریﺪ ﻡﻮاد ﻡﻬﻤﺔ او ﻡﻮﻋﺪ اﺥﺬ ﻡﻮاﻓﻘﺎت ﻡﻦ اﻻﺳﺘﺸﺎري و یﺘﻢ ادراج اﺣﺠﺎر اﻟﺰاویﺔ ﺑﻤﺪة‬
‫زﻡﻨﻴﺔ ﺗﺴﺎوى ﺹﻔﺮ.‬
‫5-7 اﺽﺎﻓﺔ ﻡﻼﺣﻈﺎت ﻋﻠﻰ اﻟﻤﻬﻤﺔ‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Project‬اﺥﺘﺮ اﻻﻡﺮ ‪. Task Information‬‬
‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري أﺥﺘﺮ اﻟﻮاﺟﻬﺔ ‪. Task notes‬‬
‫22‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﺽﻒ اي ﻡﻼﺣﻈﺎت ﺥﺎﺹﺔ ﺑﺎﻟﻤﻬﻤﺔ اﻟﻤﺨﺘﺎرة.‬
‫5-8 رﺑﻂ اﻟﻤﻬﺎم ‪Linking Tasks‬‬
‫إن رﺑﻂ اﻟﻤﻬﺎم ﺑﻌﻀﻬﺎ ﺑﺒﻌﺾ یﺘﻄﻠﺐ ﺗﻔﻬﻢ اﻟﻌﻼﻗﺎت اﻟﻤﺒﺎﺵﺮة ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺨﺘﻠﻔﺔ وﻗﺪ ﺳﺒﻖ اﻟﺤﺪیﺚ‬
‫ﻋﻦ أرﺑﻊ ﻋﻼﻗﺎت ﻡﻨﻄﻘﻴﺔ ﻟﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وهﻰ‬

‫)‪ (FS, FF, SS, SF‬ﺣﻴﺚ‬

‫ﺗﺴﺘﺨﺪم هﺬﻩ اﻟﻌﻼﻗﺎت ﻟﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ.‬
‫إن هﺬﻩ اﻟﻤﺮﺣﻠﺔ ﻡﻦ أدق وأهﻢ ﻡﺮاﺣﻞ اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوع ورﺑﻂ اﻟﻔﻌﺎﻟﻴﺎت ﻡﻊ ﺑﻌﻀﻬﺎ یﻌﻨﻰ ﺗﺸﻜﻴﻞ‬
‫اﻟﻤﺴﺎر اﻟﺤﺮج ﻟﻠﻤﺸﺮوع وذﻟﻚ ﺑﺘﺤﺪیﺪ أﻗﺼﺮ ﻡﺪة یﻤﻜﻦ إﻧﺠﺎز اﻟﻤﺸﺮوع ﻓﻴﻬﺎ .‬
‫یﻌﺘﻤﺪ آﺜﻴﺮ ﻡﻦ اﻟﻔﻌﺎﻟﻴﺎت ﻓﻰ ﺑﺪایﺘﻬﺎ ﻋﻠﻰ ﻧﻬﺎیﺔ ﻓﻌﺎﻟﻴﻪ أﺥﺮى .ﻟﺬﻟﻚ ﺗﺴﻤﻰ اﻟﻔﻌﺎﻟﻴﺔ اﻟﺘﻰ یﺘﻢ إﻧﺠﺎزهﺎ‬
‫أوﻻ ﺑﺄﻧﻬﺎ اﻟﺴﺎﺑﻘﺔ )‪ ،(Predecessor‬واﻟﺘﻰ ﺗﻠﻰ ﻓﻰ اﻹﻧﺠﺎز ﺗﺴﻤﻰ اﻟﻼﺣﻘﺔ .)‪(Successor‬‬
‫یﻤﻜﻦ رﺑﻂ اﻟﻤﻬﺎم ﺑﺎﺳﺘﺨﺪام وﺳﺎﺋﻞ ﻡﺘﻌﺪدة وأﺳﻬﻞ ﻃﺮیﻘﺔ هﻰ ﺑﺘﻌﻠﻴﻢ اﻟﻔﻌﺎﻟﻴﺘﻴﻦ اﻟﻤﻄﻠﻮب رﺑﻄﻬﻤﺎ‬
‫ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ ﺛﻢ اﻟﻀﻐﻂ ﻋﻠﻰ أداﻩ رﺑﻂ اﻟﻤﻬﺎم ﻓﻰ ﺵﺮیﻂ اﻷدوات.‬
‫یﻤﻜﻦ أیﻀﺎ ﺏﺎﺳﺘﺨﺪام ‪Task Information Box‬‬
‫وذﻟﻚ ﺑﺎﺗﺒﺎع اﻟﺨﻄﻮات اﻷﺗﻴﺔ :‬
‫ﻓﻌﻞ اﻟﻤﻬﻤﺔ اﻟﺘﺎﻟﻴﺔ‪ Successor‬اﻟﺘﻲ یﺮاد رﺑﻄﻬﺎ ﻡﻊ ﻡﻬﻤﺔ ﺳﺎﺑﻘﺔ ‪ Predecessor‬و‬
‫اﺧﺘﺮ ﻣﻦ ﺵﺮیﻂ اﻻدوات ‪. Task Information Tool‬‬
‫اﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪. Predecessor‬‬
‫ﻋﻠﻢ اﻟﺴﻬﻢ ﺛﻢ اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﺔ ﻧﻮع اﻟﺮﺑﻂ اﻟﻤﻄﻠﻮب.‬
‫و اﻟﺸﻜﻞ 5-3 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﺒﻮیﺐ‪ Predecessor‬و اﻟﺨﺎص ﺑﺮﺑﻂ‬
‫اﻟﻤﻬﺎم‬
‫رﺏﻂ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻤﻬﺎم ﻣﺮة واﺡﺪ‬
‫ﻋﻠﻢ ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم ﺑﺎﻟﺆﺵﺮ او ﺑﺎﺳﺘﺨﺪام ‪ Shift‬او ‪ Control‬ﻡﻊ اﻻﺳﻬﻢ‬
‫اﺥﺘﺮ ‪ Link task‬ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﺮﺋﻴﺴﻴﺔ.‬
‫یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺑﺮﺑﻂ اﻟﻤﻬﺎم ﺑﺎﻟﻌﻼﻗﺔ ‪ . FS‬ﻓﻲ ﺣﺎل اﻟﺮﻏﺒﺔ ﺑﺘﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ ﺑﻴﻦ‬
‫ﻡﻬﻤﺘﻴﻦ اﺳﺘﺨﺪم اﻟﻄﺮیﻘﺔ اﻟﺘﺎﻟﻴﺔ.‬

‫32‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﺸﻜﻞ 5-3: ﻣﺮﺏﻊ ﺡﻮاري ﺕﺒﻮیﺐ ‪ Predecessor‬و اﻟﺨﺎص ﺏﺮﺏﻂ اﻟﻤﻬﺎم‬
‫5-9 ﺕﻐﻴﻴﺮ اﻟﻌﻼﻗﺎت ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺘﺮاﺑﻄﺔ ‪Change Relationships‬‬
‫إن رﺑﻂ اﻷﻧﺸﻄﺔ ﻡﻦ ﺥﻼل أﻡﺮ ‪ Link Task‬یﺘﻢ ﻋﻠﻰ اﻟﻌﻼﻗﺔ اﻻﻓﺘﺮﺽﻴﺔ ﻟﻠﺒﺮﻧﺎﻡﺞ وهﻰ )‪(FS‬‬
‫وﻟﺬﻟﻚ یﻤﻜﻦ ﺗﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ ﺑﻌﺪ ذﻟﻚ ﺑﺎﺗﺒﺎع إﺣﺪى ﻃﺮیﻘﺘﻴﻦ .‬
‫اﺥﺘﺮ ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ اﻟﻌﻤﻠﻴﺔ اﻟﻼﺣﻘﺔ اﻟﺘﻰ یﺮاد ﺗﻐﻴﻴﺮ ﻋﻼﻗﺘﻬﺎ ﻡﻊ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ .‬
‫ﻡﻦ أﻡﺮ ‪ Project‬اﺥﺘﺮ ‪ Task Information‬او ﺑﻮاﺳﻄﺔ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ‬
‫اﻟﺨﻠﻴﺔ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺘﺎﻟﻰ ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر ﻗﺎﺋﻤﺔ‬

‫‪ Predecessor‬ﻡﻦ‬

‫ﻋﺎﻡﻮد ‪ .Type‬و اﻟﺸﻜﻞ 5-4 یﻮﺽﺢ رﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ.‬
‫یﻤﻜﻦ ﺗﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ اﻟﻤﻄﻠﻮﺑﺔ ویﻤﻜﻦ ﺗﺤﺪیﺪ ﻗﻴﻤﻪ واﺵﺎرﻩ ‪Lag‬‬
‫اﻟﻄﺮیﻘﺔ اﻟﺜﺎﻧﻴﺔ‬
‫اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺨﻂ اﻟﺮاﺑﻂ ﺑﻴﻦ اﻟﻔﻌﺎﻟﺘﻴﻦ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﺣﻴﺚ یﻤﻜﻦ ﺗﻐﻴﻴﺮ‬
‫ﻧﻮع اﻟﻌﻼﻗﺔ وﻗﻴﻤﻪ ‪Lag‬‬

‫اﻟﺸﻜﻞ 5-4: رﺏﻂ اﻟﻤﻬﺎم ﻣﻊ ﺏﻌﻀﻬﺎ اﻟﺒﻌﺾ‬
‫42‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫5-01 اﻟﻤﻬﺎم اﻟﻤﺘﻜﺮرة ‪Recurring task‬‬
‫ﻋﻨﺪ ﺗﻜﺮار ﻡﻬﻤﻪ ﻡﺎ ﻓﻰ اﻟﻤﺸﺮوع ﺑﺸﻜﻞ ﻡﻨﺘﻈﻢ آﺄن ﺗﺤﺪث آﻞ یﻮﻡﻴﻦ أو آﻞ أﺳﺒﻮع وهﻜﺬا، ﻓﺎن‬
‫اﻟﺒﺮﻧﺎﻡﺞ یﻌﻄﻰ اﻟﻤﺠﺎل ﻟﺘﻜﺮار ﻡﺜﻞ هﺬﻩ اﻟﻤﻬﺎم . و اﻟﺸﻜﻞ 5-5 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص‬
‫ﺑﺘﻜﺮار اﻟﻤﻬﺎم ﻋﻠﻰ ﻓﺘﺮات ﻡﻨﺘﻈﻤﺔ.‬
‫ﻡﻦ ﻗﺎﺋﻤﻪ‬

‫‪ Insert‬ﻧﺨﺘﺎر ‪Recurring task‬‬

‫یﺘﻢ ﺗﺤﺪیﺪ إﺳﻢ ‪ Task name‬واﻟﻤﺪﻩ اﻟﺰﻡﻨﻴﺔ ﺑﺎﻻﺽﺎﻓﻪ اﻟﻰ ﻃﺮیﻘﺔ ﺗﻜﺮار اﻟﻤﻬﻤﺔ.‬

‫اﻟﺸﻜﻞ 5-5 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺏﺘﻜﺮار اﻟﻤﻬﺎم ﻋﻠﻰ ﻓﺘﺮات ﻣﻨﺘﻈﻤﺔ‬
‫5-11 اﻟﻘﻴﺪ ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﻬﺎم ‪Task Constraints‬‬
‫ﻋﻨﺪ اﺳﺘﻌﻤﺎل أى ﻡﻬﻤﻪ یﻜﻮن اﻷﻡﺮ اﻻﻓﺘﺮاﺽﻲ داﺥﻞ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ أن هﺬﻩ اﻟﻤﻬﻤﻪ یﺘﻢ‬
‫ﺗﻨﻔﻴﺬهﺎ ‪ , As soon As possible‬وذﻟﻚ إذا ﺗﻢ ﺟﺪوﻟﺔ اﻟﻤﻬﺎم ﻟﺘﺒﺪأ ﻓﻲ اﻗﺮب وﻗﺖ ﻡﻤﻜﻦ . أﻡﺎ‬
‫ﻋﻨﺪﻡﺎ یﺘﻢ ﺗﺤﺪیﺪ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﻋﻨﺪ ﺑﺪأ اﻟﺠﺪوﻟﺔ ﻓﻲ ﻡﺮﺑﻊ ‪ Project Information‬ﻓﺈن اﻟﺠﺪوﻟﺔ‬
‫ﺗﺘﻢ ﺑﺤﻴﺚ ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻋﻨﺪ أآﺒﺮ ﺗﺄﺥﻴﺮ ﻡﻤﻜﻦ ‪ As Late As Possible‬و آﻞ ذﻟﻚ ﻡﺮﺗﺒﻂ ﺑﺘﺎریﺦ ﺑﺪأ‬
‫أو ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ. وﻟﻜﻦ ﻟﻴﺲ هﺬا هﻮ اﻟﻘﻴﺪ اﻟﻮﺣﻴﺪ اﻟﺬى یﻤﻜﻦ ﻓﺮﺽﻪ ﻋﻠﻰ ﺗﻨﻔﻴﺬ أى ﻡﻬﻤﺔ ﺑﻞ‬
‫هﻨﺎك اﻟﻌﺪیﺪ ﻡﻦ اﻟﺼﻴﻎ اﻟﺘﻰ ﺗﺤﻤﻞ ﻡﻌﺎﻧﻰ ﻡﺨﺘﻠﻔﻪ وﺗﺤﻤﻞ ﻗﻴﻮد ﻡﺤﺪدﻩ ﻋﻠﻰ ﺗﻨﻔﻴﺬ اﻟﻤﻬﺎم .وﺗﺒﻘﻰ ﻡﻬﻤﻪ‬
‫اﻟﻤﺨﻄﻂ ﻓﻰ أن یﺤﺪد ﻧﻮع اﻟﻘﻴﻮد اﻟﺘﻰ ﺳﻴﻔﺮﺽﻬﺎ ﻋﻠﻰ ﺗﻨﻔﻴﺬ ﻡﻬﻤﻪ ﻡﺎ.‬
‫5-11-1 أﻥﻮاع اﻟﻘﻴﻮد‬
‫هﻨﻚ ﻧﻮﻋﻴﻦ ﻡﻦ اﻟﻘﻴﻮد و هﻲ:‬
‫5-11-2 اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ‪. Flexible Constraints‬‬
‫52‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫وهﻲ ﺗﺴﻤﺢ ﻟﻠﺒﺮﻧﺎﻡﺞ ان یﺤﺴﺐ اﻟﺠﺪوﻟﺔ و ان یﻘﻮم ﺑﻀﺒﻄﻬﺎ و ﺗﻌﺪیﻠﻬﺎ ﺑﺸﻜﻞ ﻡﻨﺎﺳﺐ ﺑﻨﺎء ﻋﻠﻰ اﻟﻘﻴﻮد‬
‫اﻟﻤﻔﺮوﺽﺔ.‬
‫5-11-3 اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ ‪. Inflexible Constraints‬‬
‫و هﻲ اﻟﺘﻲ ﺗﺤﺪد اﻟﺠﺪوﻟﺔ ﻻﻧﻬﺎ ﺗﺘﻄﻠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ او ﺗﻨﺘﻬﻲ ﺽﻤﻦ ﺵﺮوط ﻡﺤﺪدة. و اﻟﻘﻴﻮد ﻏﻴﺮ‬
‫اﻟﻤﺮﻧﺔ ﺗﻄﺒﻖ ﻋﻨﺪﻡﺎ یﻜﻮن هﻨﺎك ﺽﺮورة ﻡﻄﻠﻘﺔ و ﻗﺪ یﺆدي ﺗﻄﺒﻴﻘﻬﺎ اﻟﻰ ﻓﺮض اﻟﻌﺪیﺪ ﻡﻦ اﻟﺘﻀﺎرﺑﺎت‬
‫ﻋﻨﺪ ﺗﻨﻔﻴﺬ اﻟﻤﻬﺎم. واﻟﺸﻜﻞ 5-6 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻠﺘﺒﻮیﺐ ‪ Advanced‬و اﻟﺬي یﻈﻬﺮ ﻓﺌﺎت‬
‫اﻟﻘﻴﻮد اﻟﻤﺨﺘﻠﻔﺔ داﺥﻞ اﻟﺒﺮﻧﺎﻡﺞ.‬
‫5-11-4 اواﻡﺮ اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ‬
‫‪As soon as possible‬‬

‫و هﻮ اﻟﺨﻴﺎر اﻻﻓﺘﺮاﺽﻲ ﻋﻨﺪﻡﺎ ﺗﺤﺪد ﺗﺎریﺦ ﺑﺪأ اﻟﻤﺸﺮوع ﺑﺤﻴﺚ‬
‫ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﺑﺄﻗﺮب وﻗﺖ ﻡﻤﻜﻦ و ذﻟﻚ ﺑﻤﺮاﻋﺎة اﻟﺮواﺑﻂ اﻻﺥﺮى‬
‫ﻟﻠﻤﻬﻤﺔ.‬

‫‪As late as possible‬‬

‫و هﻮاﻟﺨﻴﺎر اﻻﻓﺘﺮاﺽﻲ ﻋﻨﺪﻡﺎ ﺗﺤﺪد ﺗﺎریﺦ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﺑﺤﻴﺚ‬
‫ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻡﻊ اآﺒﺮ ﺗﺄﺥﻴﺮ ﻡﻤﻜﻦ و ذﻟﻚ ﺑﻤﺮاﻋﺎة اﻟﺮواﺑﻂ اﻻﺥﺮى‬
‫ﻟﻠﻤﻬﻤﺔ.‬

‫‪ Finish No Earlier Than‬یﺠﺐ ان ﻻ ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬
‫‪ Start No Earlier Than‬یﺠﺐ ان ﻻ ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬

‫اﻟﺸﻜﻞ 5-6 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري ﻟﻠﺘﺒﻮیﺐ ‪ Advanced‬و اﻟﺬي یﻈﻬﺮ ﻓﺌﺎت اﻟﻘﻴﻮد اﻟﻤﺨﺘﻠﻔﺔ‬

‫62‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫5-11-5 اواﻡﺮ اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ‬
‫یﺠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻓﻲ اﻟﺘﺎریﺦ اﻟﻤﺤﺪد.‬

‫‪Must Start on‬‬
‫‪Must Finish on‬‬

‫یﺠﺐ ان ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻓﻲ اﻟﺘﺎریﺦ اﻟﻤﺤﺪد‬

‫‪Finish No Later Than‬‬

‫یﺠﺐ ان ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬

‫‪Start No Later Than‬‬

‫یﺠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻓﻲ او ﻗﺒﻞ اﻟﺘﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬

‫5-11-6 إﺽﺎﻓﻪ ﻗﻴﻮد ﻋﻠﻰ أى ﻡﻬﻤﺔ‬
‫اﻧﻘﺮ ﻧﻘﺮة ﻡﺰدوﺟﺔ ﻋﻠﻰ ﺥﻠﻴﺔ اﻟﻤﻬﻤﺔ ﻟﻔﺘﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪Task information‬‬
‫اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪Advanced‬‬
‫أﻧﻘﺮ ﻋﻠﻰ ﺳﻬﻢ اﻟﻘﺎﺋﻤﺔ ‪. Constraint Types‬‬
‫أﺥﺘﺮ اﻟﻘﻴﺪ اﻟﻤﻨﺎﺳﺐ و اﺥﺘﺮ ﺗﺎریﺦ ﺑﺪأ اﻟﻘﻴﺪ ﻡﻦ ‪ Constraint Date‬ﺗﻢ اآﺪ اﻻﺥﺘﻴﺎر‪OK‬‬
‫5-11-7 ازاﻟﺔ اﻟﻘﻴﻮد‬
‫ﺣﺪد اﻟﻤﻬﻤﺔ اﻟﻤﺮاد ازاﻟﺔ اﻟﻘﻴﺪ ﻋﻨﻬﺎ‬
‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Project‬اﻻﻡﺮ ‪ Task Information‬ﺛﻢ اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ‬
‫‪. Advanced‬‬
‫إﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Constraint Type‬اﻻﻡﺮ ‪ As soon As possible‬ﺛﻢ اﻧﻘﺮ ‪. OK‬‬
‫ﺑﺈﺥﺘﻴﺎر اﻻﻡﺮ‪ As soon As possible‬ﺗﻜﻮن ﻗﺪ ازﻟﺖ اﻟﻘﻴﺪ ﻏﻴﺮ اﻟﻤﺮن ﻋﻦ اﻟﻤﻬﻤﺔ.‬
‫ﺽﺒﻂ ﺗﺎریﺦ اﻻﻧﺠﺎز اﻻﺥﻴﺮ ﻟﻠﻌﻤﻞ ‪Setting Deadline‬‬
‫ﺑﺪﻻ ﻡﻦ ﻓﺮض ﻗﻴﺪ ﻏﻴﺮ ﻡﺮن یﻤﻜﻦ ﺗﺴﺠﻴﻞ ﻡﻮﻋﺪ اﻻﻧﺠﺎز اﻻﺥﻴﺮ ﻟﻤﻬﻤﺔ ﻡﺎ و اﻟﺬي یﺠﺐ ان‬
‫ﻻ ﺗﺘﺄﺥﺮ ﺑﻌﺪﻩ و ﻟﻜﻦ یﻤﻜﻦ ان ﺗﻨﺠﺰ ﻗﺒﻠﺔ. و وﺽﻊ ‪ Deadline‬ﻟﻦ یﻐﻴﺮ ﻡﻦ ﺗﺎریﺦ اﻟﺠﺪوﻟﺔ‬
‫اﻟﻤﻔﺘﺮض. و اذا ﺗﻢ ﺗﺠﺎوز ﺗﺎریﺦ ‪ Deadline‬و ﻟﻢ ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﺑﻌﺪ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﻌﺮض‬
‫ﻡﺆﺵﺮ ﻓﻲ اﻟﻌﻤﻮد ‪ Indicator‬ﺑﻮاﺳﻄﺔ ﺳﻬﻢ ﻧﺤﻮ اﻻﺳﻔﻞ ﻟﻠﺪﻻﻟﺔ ﻋﻠﻰ ذﻟﻚ.‬
‫5-21 ﺕﻐﻴﻴﺮ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ‪Time scale‬‬
‫یﻤﻜﻦ اﻟﺘﺤﻜﻢ ﻓﻰ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ﻓﻰ ﻟﻮﺣﻪ ‪ GANTT Chart‬وذﻟﻚ ﺑﺎﺳﺘﺨﺪام‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Format‬اﺥﺘﺮ اﻷﻡﺮ ‪Time scale‬‬
‫5-31 ﺕﻐﻴﻴﺮ ﻃﺮیﻘﻪ ﻋﺮض ‪GANTT Chart‬‬
‫یﺘﻢ ﺗﻐﻴﻴﺮ ﻃﺮیﻖ إﺥﺮاج وﻋﺮض ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ﺑﺎﺳﺘﺨﺪام اﻷﻡﺮ اﻟﺘﺎﻟﻰ:‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ‬

‫‪ Format‬اﺥﺘﺮ اﻷﻡﺮ‬

‫‪ Gantt chart wizard‬ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر‬

‫اﻟﻤﺤﺪدات اﻟﺘﻰ ﺗﺮﻏﺒﻬﺎ.‬
‫72‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫5-31 اﻇﻬﺎر ﺥﻂ اﻟﻤﺴﺎر اﻟﺤﺮج‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ‬

‫‪ Format‬اﺥﺘﺮ اﻷﻡﺮ‬

‫‪Gantt chart wizard‬‬

‫اﺧﺘﺮ اﻻﻣﺮ ‪ critical bath‬ﻣﻦ 3 ‪. Step‬‬
‫اآﻤﻞ ﺑﺎﻗﻲ اﻟﺨﻴﺎرات و ﺗﺄآﺪ ﻡﻦ ﺗﻨﻔﻴﺬ اﻻﻡﺮ اﻻﺥﻴﺮ ‪ Format‬ﻟﻠﺘﺄآﺪ ﻡﻦ ﺗﻨﻔﻴﺬ اﻻﻡﺮ‬

‫اﻟﺸﻜﻞ 5-7 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري و اﻟﺬي یﺤﺪد اﺧﺘﻴﺎرات ﻋﺮض ﻣﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت‬

‫82‬
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Project 1
Project description:
The table 1 indicating the tasks of the project, duration and its relations and
constraint
Conditions
Starting date of the project is 10/10/03
The time period is 5 days.
Required:
Establish a Bar chart diagram.
Establish logical relation ships
Table 1
No. Activity

Depends on

Type of relation

Duration

1

Introduction

----

----

1 day

2

MS project

Introduction

FS

1 day

3

Data entry

MS project

FS

1day

4

Logical

MS project

FS

2day

relations

Data entry

SS

Constraints

Logical

FF

1 day

FS

1 day

5

relations
6

Improvement Constraints

29
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫6. أدارة اﻟﻤﻮارد‪Resources Management‬‬
‫6-1 اﻥﻮاع اﻟﻤﻮارد‬
‫ان ﻡﻮارد اﻟﻤﺸﺮوع ﺗﺘﻜﻮن ﻡﻦ اﻷﺵﺨﺎص واﻟﻤﻮاد واﻟﻤﻌﺪات .ویﻮﺟﺪ هﻨﺎك ﻧﻮﻋﺎن ﻡﻦ اﻟﻤﻮارد -:‬
‫• ﻣﻮارد ﻋﻤﻞ ‪Work Resources‬‬
‫وﻡﻮارد اﻟﻌﻤﻞ ﺗﺸﻴﺮ اﻟﻰ اﻷﺵﺨﺎص و اﻟﻤﻌﺪات اﻟﻤﺤﺪدیﻦ ﻟﺘﻨﻔﻴﺬ ﻡﻬﻤﺔ ﻡﺎ . و یﻤﻜﻦ ﺗﺤﺪیﺪ اﻷﺵﺨﺎص‬
‫ﺑﻮاﺳﻄﺔ أﺳﻤﺎﺋﻬﻢ أو ﺑﻮاﺳﻄﺔ اﻟﻮﻇﻴﻔﺔ اﻟﺘﻰ یﺸﻐﻠﻮهﺎ .‬
‫• ﻣﻮارد ﻣﺎدیﺔ ‪Material Resources‬‬
‫اﻟﻤﻮارد اﻟﻤﺎدیﺔ ﺗﺸﻴﺮ اﻟﻰ اﻟﻤﻮاد اﻟﺘﻰ ﺳﻮف یﺴﺘﻬﻠﻜﻬﺎ اﻟﻤﺸﺮوع أﺛﻨﺎء ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ اﺽﺎﻓﻪ اﻟﻰ اﺳﻢ‬
‫اﻟﻤﻮرد ﻓﺎﻧﻪ یﻠﺰﻡﻚ ﻡﻌﺮﻓﺔ اﻟﻜﻤﻴﻪ اﻟﺘﻰ یﺘﻮﻓﺮ ﺑﻬﺎ وﺗﻜﺎﻟﻴﻒ هﺬﻩ اﻟﻤﻮارد.‬
‫ﻓﻤﺜﻼ ﻗﺪ یﻠﺰم أﺣﺪ اﻟﻤﻮارد ﻟﻴﻌﻤﻞ ﻓﻘﻂ %01 ﻡﻦ 04 ﺳﺎﻋﺔ اﻷﺳﺒﻮﻋﻴﺔ ﻋﻠﻰ ﻡﻬﻤﺔ ﻡﺤﺪودة .‬
‫وﺳﻮف ﺗﺆﺛﺮ هﺬﻩ اﻟﻨﺴﺒﺔ ﺑﺎﻟﻄﺒﻊ ﻋﻠﻰ ﻡﺪﻩ اﻟﻤﺸﺮوع آﻜﻞ .‬
‫ویﻤﻜﻦ ﺥﻼل اﻟﺒﺮﻧﺎﻡﺞ ﺗﺠﻬﻴﺰ ﻗﺎﺋﻤﻪ ﻡﻮارد واﻻﺥﺘﻴﺎر ﻡﻦ ﺽﻤﻦ هﺬﻩ اﻟﻘﺎﺋﻤﺔ وﺗﻌﻴﻴﻦ اﻟﻤﻮارد اﻟﺨﺎﺹﺔ‬
‫ﻟﺒﻐﺾ اﻟﻤﻬﺎم أو ﻟﻜﻞ اﻟﻤﻬﺎم.‬
‫6-2 إدﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد‬
‫یﻤﻜﻦ ادﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد ﺑﻌﺪة ﻃﺮق:‬
‫• إﺽﺎﻓﺔ ﻋﻨﺎویﻦ ﻡﻦ دﻓﺘﺮ اﻟﺒﺮیﺪ اﻻﻟﻜﺘﺮوﻧﻲ ‪ E-mail‬ﻓﻲ ﻡﺮﺑﻊ ﺣﻮار ﺗﻜﻠﻴﻒ اﻟﻤﻮارد‬
‫‪. Assign Resource‬‬
‫• اﺽﺎﻓﺔ اﻟﻤﻮارد ﻡﺒﺎﺵﺮة ﻓﻲ ﺟﺪول ﻡﻦ ﺹﻔﺤﺔ اﻟﻤﻮارد ‪. Resource Sheet‬‬
‫• إﺽﺎﻓﺔ ﻡﻌﻠﻮﻡﺎت ﻡﻔﺼﻠﺔ ﺑﺎﺳﺘﺨﺪام ﻡﺮﺑﻊ ﺣﻮار ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد‬
‫‪. Information‬‬
‫• إدﺥﺎل اﻟﻤﻮرد ﻓﻲ ﻧﻤﻮذج ‪. Resource Form‬‬
‫6-3 ﺕﻌﻴﻴﻦ ﻡﻮارد ﻟﻤﻬﺎم‬
‫إﺥﺘﺮ اﻟﻤﻬﻤﺔ ﺑﺎﻟﻤﺆﺵﺮ‬
‫إﺥﺘﺮ ﻡﻦ ‪ Project‬اﻻﻡﺮ ‪Task Information‬‬
‫إﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪Advanced‬‬
‫أآﺘﺐ اﺳﻢ اﻟﻤﻮرد وﻋﺪد اﻟﻮﺣﺪات اﻟﻤﺘﻮﻓﺮة‬
‫إﺽﻐﻂ ﻋﻠﻰ اﻟﻤﻔﺘﺎح )‪ (Tab‬ﻓﻲ ﻟﻮﺣﺔ اﻟﻤﻔﺎﺗﻴﺢ ﻟﻼﻧﺘﻘﺎل اﻟﻲ اﻟﺤﻘﻞ اﻟﺘﺎﻟﻲ.‬
‫6-4 ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ‪Resource sheet‬‬
‫03‬

‫‪Resource‬‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫یﻤﻜﻦ ﻋﻤﻞ ﻗﺎﺋﻤﺔ ﻡﻮار ﻓﻰ ﻡﻠﻒ ﺥﺎص یﺴﻤﻰ‬

‫‪ Resource sheet‬وذﻟﻚ ﻡﻦ أﻡﺮ‬

‫‪. View‬‬
‫اﺥﺘﺮ اﻻﻡﺮ ‪ Resource sheet‬ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪.View‬‬
‫اﺽﻒ ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ.‬
‫و اﻟﺠﺪول اﻟﺘﺎﻟﻲ یﻮﺽﺢ اﻟﻤﻌﺎﻥﻲ اﻟﻤﺨﺘﻠﻔﺔ ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻮرد‬
‫‪Resource Name‬‬

‫أﺳﻢ اﻟﻤﻮرد.‬

‫‪Type‬‬

‫ﻧﻮع اﻟﻤﻮرد)ﻋﻤﻞ او ﻡﺎدي (.‬

‫‪Material label‬‬

‫وﺣﺪة ﻗﻴﺎس اﻟﻤﻮرد اﻟﻤﺎدي)ﻋﺪد، آﺠﻢ،ﻃﻦ..(.‬

‫‪Initial‬‬

‫ﺑﺎدﺋﺔ اﺳﻢ اﻟﻤﻮرد.‬

‫‪Group‬‬

‫اذا‬

‫ﺗﺸﺎﺑﻬﺖ‬

‫اﻟﻤﻮارد‬

‫ﻓﻲ‬

‫اﻟﺼﻔﺎت‬

‫ﺗﻮﺿﻊ‬

‫ﺿﻤﻦ‬

‫ﻡﺠﻤﻮﻋﺔ)ﻡﺒﺮﻡﺠﻴﻦ، ﻡﺪرﺳﻴﻦ،..(.‬
‫‪Max Units‬‬

‫اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ اﻟﻘﺼﻮي اﻟﻤﺘﻮﻓﺮة ﻡﻦ اﻟﻤﻮرد و ﻗﺪ ﺗﻜﺘﺐ ﻋﻠﻰ‬
‫ﺵﻜﻞ ﻋﺪد‬

‫‪Std. Rate‬‬

‫اﻟﻜﻠﻔﺔ ﻓﻲ وﺣﺪة اﻟﺰﻡﻦ )‪ $100/d‬ﻏﻲ 001 دوﻻر ﻓﻲ اﻟﻴﻮم و‬
‫هﻜﺬا(‬

‫‪Ovt. Rate‬‬

‫اﻟﻜﻠﻔﺔ ﻓﻲ وﺣﺪة اﻟﺰﻡﻦ اﻟﻤﺪﻓﻮﻋﺔ ﻟﻠﻌﻤﻞ اﻻﺿﺎﻓﻲ‬

‫‪Cost/Use‬‬

‫اﻟﻜﻠﻔﺔ ﻟﻠﻤﻮاد ﺗﻀﺎف و ذﻟﻚ ﺣﺎل اﺳﺘﺨﺎﻡﻬﺎ ﻟﻤﺮة. اي ﻡﻌﺪل اﻟﺰﻡﻦ‬
‫یﻘﺎس ﺑﺎﻟﻤﺮة.‬

‫‪Accrue At‬‬

‫ﺗﻮﺿﺢ ﻡﺘﻰ یﺴﺘﺤﻖ دﻓﻊ اﻟﻤﻮرد و هﻨﺎك ﺛﻼث ﺥﻴﺎرات ﻋﻨﺪ ﺑﺪایﺔ‬
‫ﻋﻤﻞ اﻟﻤﻮرد ‪ Srart‬او ﻋﻨﺪ ﻧﻬﺎیﺔ ﻋﻤﻞ اﻟﻤﻮرد ‪ End‬او یﺘﻢ‬
‫اﻟﺪﻓﻊ ﺑﺎﻟﺘﻨﺎﺳﺐ ﻡﻊ اﺳﺘﺨﺪام اﻟﻤﻮرد ‪Prorated‬‬

‫‪Base Calendar‬‬

‫وهﻮ ﻧﻮع اﻟﺘﻘﻮیﻢ و یﻮﺝﺪ ﺛﻼث اﻧﻮاع ﻡﻦ اﻟﺘﻘﻮیﻢ .‬

‫‪Code‬‬

‫و یﻤﻜﻦ ادﺥﺎل اي رﻡﺰ ﻡﺎﻟﻲ یﺘﻢ اﺣﺘﺴﺎب اﻟﻤﻮرد ﻋﻠﻴﻪ.‬

‫6-5 ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد‬
‫یﻤﻜﻦ اﺽﺎﻓﺔ ﻡﻌﻠﻮﻡﺎت اﺥﺮى ﻋﻦ اﻟﻤﻮرد‬
‫اﻧﻘﺮ ﻧﻘﺮة ﻡﺰدوﺟﺔ ﻋﻠﻰ اﺳﻢ اﻟﻤﻮرد ‪ Resource Name‬ﻓﻲ ﻡﺮﺑﻊ ﺣﻮاري‬
‫‪ Resource Sheet‬یﻈﻬﺮ ﻡﺮﺑﻊ ‪. Resource Information‬‬
‫ﻗﻢ ﺑﺈدﺥﺎل اي ﻡﻌﻠﻮﻡﺎت ﻡﺘﻮﻓﺮة ﻋﻦ اﻟﻤﻮرد..‬
‫13‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫یﻤﻜﻦ ادﺥﺎل ‪ Working Time‬و ادﺥﺎل ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ ﺣﺎل و ﺟﻮد ﺗﻐﻴﻴﺮ ﻓﻲ ﺗﻜﺎﻟﻴﻒ‬
‫اﻟﻤﻮرد ﻡﻊ اﻟﺰﻡﻦ ‪. Cost‬‬
‫6-6 ﺕﻌﺮیﻒ ﻣﺠﻤﻮﻋﺎت اﻟﻌﻤﻞ ‪Workgroup‬‬
‫اﺥﺘﺮ ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪ Resource Information‬اﻟﻌﻨﻮان ‪workgroup‬‬
‫یﻮﺟﺪ ﺛﻼث ﺥﻴﺎرات ﺗﻤﻨﺤﻚ اﻡﻜﺎﻧﻴﺔ اﻟﺘﻮاﺹﻞ ﻡﻊ اﻟﻤﻮرد و هﻲ‬
‫‪Default‬‬
‫‪None‬‬
‫‪E-mail‬‬
‫‪Web‬‬
‫یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺗﻠﻘﺎﺋﻴﺎ ﺑﺎﺳﻨﺎد ﻧﻮع ﻡﺠﻤﻮﻋﺔ اﻟﻌﻤﻞ اﻟﻰ آﻞ ﻡﻮرد و ﻧﻮع ﻡﺠﻤﻮﻋﺔ اﻟﻌﻤﻞ اﻻﻓﺘﺮاﺽﻲ‬
‫هﻮ ‪Email‬‬
‫6-7 ﺕﺨﺼﻴﺺ اﻟﻤﻮارد ‪Assign Resources‬‬
‫یﺘﻢ ﺗﺨﺼﻴﺺ ﻡﻮرد ﻡﺎ ﻟﻤﻬﻤﻪ ﻋﻤﻞ آﻤﺎ یﻠﻰ:‬
‫ﺣﺪد اﻟﻤﻬﻤﺔ اﻟﺘﻲ ﺗﺮیﺪ اﺽﺎﻓﺔ ﻡﻮرد ﻟﻬﺎ.‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﻪ ‪ Tools‬اﺥﺘﺮ ‪ Resources‬ﺛﻢ اﺥﺘﺮ ‪.Assign Resources‬‬
‫یﻤﻜﻦ ﺗﺨﺼﻴﺺ أى ﻋﺪد ﻡﻦ اﻟﻤﻮارد ﻟﻠﻤﻬﻤﺔ ﺣﺴﺐ ﻡﺎ ﺗﺤﺘﺎج.‬
‫یﺘﻢ وﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ Resource Name‬ﻓﻴﻈﻬﺮ ﺳﻬﻢ اﻟﻘﺎﺋﻤﺔ.‬
‫اﺽﻐﻂ ﻋﻠﻰ اﻟﺴﻬﻢ ﺗﻈﻬﺮ ﻗﺎﺋﻤﺔ اﻟﻤﻮارد اﻟﻤﺘﻮﻓﺮة.‬
‫اﺥﺘﺮ اﺳﻢ اﻟﻤﻮرد ﻡﻦ اﻟﻘﺎﺋﻤﺔ.‬
‫اﺽﻒ ﺑﻌﺪ ذﻟﻚ ﻋﺪد اﻟﻮﺣﺪات ﻡﻦ هﺬا اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ ﻻداء هﺬة اﻟﻤﻬﻤﺔ.‬
‫ﻻﺽﺎﻓﺔ ﻡﻮرد اﺥﺮ ﻟﻠﻤﻬﻤﺔ آﺮر ﻡﺎ ﺳﺒﻖ.‬
‫ﻻ یﻤﻜﻦ اﺽﺎﻓﺔ ﻡﻮردیﻦ ﻓﻲ ﻋﻤﻠﻴﺔ واﺣﺪﻩ.‬
‫و اﻟﺸﻜﻞ 6-1 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻬﺎم و ﺹﻔﺤﺔ ﺗﺒﻮیﺐ ‪Resources‬‬
‫ﺣﻴﺚ یﺘﻢ ادﺥﺎل و ﺗﺨﺼﻴﺺ اﻟﻤﻮارد.‬

‫23‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫.‬
‫اﻟﺸﻜﻞ 6-1: ﻣﺮﺏﻊ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﺎم و ﺹﻔﺤﺔ ﺕﺒﻮیﺐ ‪ Resources‬ﻟﺘﺨﺼﻴﺺ اﻟﻤﻮارد.‬
‫6-8 ﻓﻬﻢ ﻋﻤﻞ اﻟﻤﻮارد‬
‫ﻋﻨﺪ ادﺥﺎل اي ﻡﻮرد ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﺘﻌﺎﻡﻞ ﻡﻊ ﺛﻼث ﻋﻮاﻡﻞ هﻲ:‬
‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ )‪Duration (D‬‬
‫اﻟﻮﺣﺪات )‪Units (U‬‬
‫اﻟﺠﻬﺪ ) اﻟﻌﻤﻞ( )‪Work (W‬‬
‫و یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺑﺤﺴﺎب ﻗﻴﻤﺔ اﻟﺠﻬﺪ آﻤﺎ یﻠﻲ:‬
‫‪Work = Duration * Units‬‬
‫ﻣﺜﺎل:‬
‫ﻧﻔﺮض وﺟﻮد ﻡﻬﻤﺔ ﻋﻤﻞ یﺴﺘﻐﺮق اداؤهﺎ ﺥﻤﺴﺔ ایﺎم ﻋﻤﻞ و ﻗﺪ ﺗﻢ ﺗﺨﺼﻴﺺ ﺛﻼث ﻡﻮارد ﻟﻬﺎ ، آﻞ‬
‫ﻡﻮرد ﻡﺨﺼﺺ ﺑﻘﻴﻤﺔ 001% ﻡﻦ اﻟﻮﺣﺪات. ﺑﻔﺮض اﺳﺘﺨﺪام ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﻘﻴﺎﺳﻴﺔ وهﻲ 8 ﺳﺎﻋﺎت‬
‫ﻓﻲ اﻟﻴﻮم ، ﻓﺈن ﻗﻴﻤﺔ اﻟﺠﻬﺪ ‪ W‬ﺗﺤﺴﺐ آﻤﺎ یﻠﻲ:‬
‫.‪Work = 5*8*3 = 120 hrs‬‬
‫ﻓﻲ ﺣﺎﻟﺔ اﺽﺎﻓﺔ اي ﻡﻮارد اﺥﺮ ﻟﻬﺬة اﻟﻔﻌﺎﻟﻴﺔ ﻓﺎن اﻟﺒﺮﻧﻤﺞ ﺳﻮف یﻘﻮم ﺑﺎﻋﺎدة اﻟﺠﺪوﻟﺔ. و ﺑﺎﻻﺥﺘﻴﺎر ﺑﻴﻦ‬
‫ﺗﻌﺪیﻞ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ و اﻟﻮﺣﺪة و اﻟﺠﻬﺪ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ ﻡﺒﻨﻲ ﻋﻠﻲ اﺥﺘﻴﺎر ﺗﻐﻴﻴﺮ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ آﺎول‬
‫اﺥﺘﻴﺎر. و ﻟﻜﻦ ﻋﻨﺪ ﻋﻤﻞ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﻟﺘﻜﻮن ﺛﺎﺑﺘﺔ ‪ Fixed‬ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ ﺳﻮف یﺨﺘﺎر ﺗﻐﻴﻴﺮ اﻟﺠﻬﺪ‬
‫و ﺗﺒﻘﻰ اﻟﻮﺣﺪة ﺛﺎﺑﺘﺔ.و هﻜﺬا یﻤﻜﻦ اﻟﺘﺤﻜﻢ ﻓﻲ اﺥﺘﻴﺎرات اﻟﺒﺮﻧﺎﻡﺞ و ذﻟﻚ ﻡﻊ ﺗﻌﺮیﻒ ‪Task Type‬‬
‫6- 9 ﻥﻮع ﻡﻬﻤﺔ اﻟﻌﻤﻞ ‪Task Type‬‬
‫6-9-1 ﻣﻬﻤﺔ ذات وﺡﺪات ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪Fixed Units with Effort Driven‬‬
‫33‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫إذا اﺽﻔﺖ وﺣﺪات ﻡﻮارد ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬
‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﺘﻜﻠﻴﻒ اﻟﻤﻮرد ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬
‫إذا ﻏﻴﺮت اﻟﻤﺪة، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬
‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬
‫یﻤﻜﻦ ﺗﻘﺼﻴﺮ ﻡﺪة ﻡﻬﻤﺔ اﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ ﺑﺎﺽﺎﻓﺔ وﺣﺪات ﻟﻠﻤﻬﻤﺔ.‬
‫6-9-2 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ‪Fixed Duration‬‬
‫اذا اﺽﻔﺖ او ﺣﺬﻓﺖ وﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻌﻤﻞ.‬
‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﻠﻮﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬
‫إذا ﻗﻤﺖ ﺑﺰیﺎدة اﻟﻤﺪة ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬
‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬
‫6-9-3 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪Fixed Duration with Effort Driven‬‬
‫اذا اﺽﻔﺖ او ﺣﺬﻓﺖ وﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬
‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﻠﻮﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬
‫إذا ﻗﻤﺖ ﺑﺰیﺎدة اﻟﻤﺪة ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻮﺣﺪات.‬
‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬
‫6-9-4 ﺕﺤﺪیﺪ اﻟﻨﻮع اﻻﻓﺘﺮاﺿﻲ ﻟﻠﻤﻬﻤﺔ‬
‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﻻﻡﺮ ‪ Option‬ﺛﻢ اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪. Schedule‬‬
‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪. Default Task Type‬‬
‫اﻧﻘﺮ ﻋﻠﻰ زر ‪ OK‬ﻟﺘﻄﺒﻴﻖ اﻟﺘﻐﻴﻴﺮ.‬
‫ﺳﻮف یﺼﺒﺢ اﻟﻨﻮع اﻟﺬي اﺥﺘﺮﺗﺔ هﻮ ﻧﻮع اﻟﻤﻬﺎم اﻟﺠﺪیﺪة ﺑﻌﺪ اﻻﺥﺘﻴﺎر و ﻟﻜﻨﻪ ﻻ یﻐﻴﻴﺮ‬
‫ﺥﺼﺎﺋﺺ او ﻧﻮع اﻟﻤﻬﺎم اﻟﺘﻲ ﺳﺒﻖ ﺗﺨﺼﻴﺼﻬﺎ.‬
‫6-01 ادارة اﻟﻤﻮارد‬
‫ان ادارﻩ اﻟﻤﻮارد ﺗﻌﻨﻰ ﺗﺤﺪیﺪ ﻡﺪﻩ ﻋﻤﻞ اﻟﻤﻮرد وﻡﻮاﻋﻴﺪ اﺳﺘﺨﺪاﻡﻬﺎ اﺽﺎﻓﻪ اﻟﻰ إﻡﻜﺎﻧﻴﺔ ﺗﻐﻴﻴﺮ ﺳﻌﺮ‬
‫اﻟﻤﻮرد أﺛﻨﺎء ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ واﻟﺨﻄﻮة اﻷوﻟﻰ هﻰ:‬
‫ﻡﻦ ﻗﺎﺋﻤﺔ ‪ view‬ﻧﺨﺘﺎر ‪Resource usage‬‬
‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى هﺬا یﻤﻜﻦ ﻋﻤﻞ اﻷﺗﻰ -:‬
‫6-11 ﺕﺤﺪیﺪ ﺕﺎریﺦ ﻋﻤﻞ اﻟﻤﻮرد‬

‫43‬
‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ب‬

‫‪MS PROJECT‬‬

‫‪ Resource usage‬ﻧﻘﻮم ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﺮد‬

‫اﻟﻤﺮاد ﺗﺤﺪیﺪ ﻡﻮﻋﺪ أو ﺗﺎریﺦ اﻟﻌﻤﻞ ﺑﻪ ﻓﻴﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى اﻟﻤﺴﻤﻰ‬

‫‪Assignment‬‬

‫‪Information‬ﺣﻴﺚ یﺘﻢ ﺗﺤﺪیﺪ ﻡﻮﻋﺪ ﺑﺪأ اﺳﺘﺨﺪام اﻟﻤﻮرد أو ﻡﻮﻋﺪ ﻧﻬﺎیﺔ اﺳﺘﺨﺪاﻡﻪ .‬
‫6-21 دراﺳﺔ ﺕﺪرج ﺳﻌﺮ اﻟﻤﻮرد‬
‫ﻓﻰ ﺣﺎﻟﻪ اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوع وآﺎن هﻨﺎك ﺗﻮﻗﻌﺎت أن أﺳﻌﺎر اﺳﺘﺨﺪام ﺑﻌﺾ اﻟﻤﻮارد ﺳﻮف یﺘﻐﻴﺮ‬
‫ﺥﻼل ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﺘﻴﺢ ﻟﻚ أن ﺗﺴﺠﻞ أآﺜﺮ ﻡﻦ ﻡﻌﺪل ﻟﺴﻌﺮ اﻟﻤﻮرد ﺥﻼل ﺗﻠﻚ اﻟﻔﺘﺮة.‬
‫ﻓﻰ ﻧﻔﺲ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ‪. Resource Usage‬‬
‫یﺘﻢ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﻮرد ﻓﻴﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى ‪Resource‬‬
‫‪. Information‬‬
‫یﺘﻢ اﺥﺘﻴﺎر ﻗﺎﺋﻤﻪ ‪ Cost‬ﺣﻴﺚ یﻮﺟﺪ ﺑﻬﺎ ﺥﻤﺲ ﻗﻮاﺋﻢ أﺳﻌﺎر ﻡﺮﺗﺒﻪ ﺣﺴﺐ اﻷﺣﺮف ,‪A, B‬‬
‫‪C, D, E‬ﺗﻀﻢ اﻟﻘﺎﺋﻤﻪ ‪ A‬اﻟﺴﻌﺮ اﻟﻘﻴﺎﺳﻰ اﻟﺬى ﺗﻢ إدﺥﺎﻟﻪ ﻓﻰ ‪ .Resource Sheet‬و‬
‫اﻟﺸﻜﻞ 6-2 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻮرد و ﺹﻔﺤﺔ ﺗﺒﻮیﺐ ‪ costs‬ﺣﻴﺚ یﺘﻢ‬
‫ادﺥﺎل و ﺗﺨﺼﻴﺺ اﻟﺘﻜﺎﻟﻴﻒ.‬
‫یﺘﻢ إدﺥﺎل أﺳﻌﺎر ﺟﺪیﺪﻩ ﻓﻰ اﻟﻘﺎﺋﻤﺔ ‪ B‬وﺗﻮاریﺦ اﺳﺘﺨﺪام هﺬﻩ اﻷﺳﻌﺎر .‬
‫یﺘﻢ ﺗﺨﺼﻴﺺ اﻟﺴﻌﺮ اﻟﺠﺪیﺪ ﻟﻠﻤﻬﻤﺔ اﻟﻤﻄﻠﻮﺑﺔ وذﻟﻚ ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﻬﻤﺔ‬
‫ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ ‪Assignment Information‬‬

‫اﻟﺸﻜﻞ 6-2: ﻣﺮﺏﻊ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻮرد و ﺹﻔﺤﺔ ﺕﺒﻮیﺐ ‪ costs‬ﺡﻴﺚ ﻟﺘﺨﺼﻴﺺ اﻟﺘﻜﺎﻟﻴﻒ.‬

‫53‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫6-21 إدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ‪Fixed Cost‬‬
‫ﻏﺎﻟﺒﺎ ﻡﺎ ﺗﻜﻮن هﻨﺎك ﺑﻌﺾ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ﻓﻰ اﻟﻤﺸﺮوﻋﺎت اﻟﺘﻰ ﻻ ﺗﺘﺄﺛﺮ ﺑﻮﻗﺖ ﺗﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬
‫أو ﻡﺪﻩ اﻟﺘﻨﻔﻴﺬ وهﺬﻩ اﻟﺘﻜﺎﻟﻴﻒ ﻡﺜﻞ ﺛﻤﻦ ﺑﻌﺾ اﻟﻤﻮاد و ﺛﻤﻦ اﻟﻤﻮاﺹﻼت و ﻡﺼﺎریﻒ‬
‫اﻟﻔﺤﻮﺹﺎت ﺣﻴﺚ یﺘﻢ إدﺥﺎﻟﻬﺎ ﻡﺒﺎﺵﺮة آﺘﻜﺎﻟﻴﻒ ﺛﺎﺑﺘﺔ .اﻟﺸﻜﻞ 6-3 یﻮﺽﺢ واﺟﺔ ‪GANTT‬‬
‫ﻡﻊ ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ. و اﻟﺸﻜﻞ 6-4 یﻮﺽﺢ واﺟﺔ ‪ Resource Sheet‬ﻡﻊ ﻗﺎﺋﻤﺔ ﺗﻜﺎﻟﻴﻒ‬
‫اﻟﻤﻮارد.‬
‫.وﻹدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ﻧﺘﺒﻊ اﻻﺗﻲ:‬
‫ﻡﻦ ﻗﺎﺋﻤﻪ ‪ view‬ﻧﺨﺘﺎر اﻷﻡﺮ ‪ Table‬وﻡﻨﻪ ﻧﺨﺘﺎر ‪Cost‬‬
‫یﻈﻬﺮ ﻋﺪد ﻡﻦ أﻋﻤﺪﻩ ﺗﻜﺎﻟﻴﻒ اﻟﻤﺸﺮوع ﺣﻴﺚ یﺘﻢ إدﺥﺎل ﺗﻜﺎﻟﻴﻒ اﻟﻤﻮارد أﻡﺎم اﻟﻤﻬﺎم‬
‫آﺘﻜﺎﻟﻴﻒ ﺛﺎﺑﺘﺔ.‬

‫اﻟﺸﻜﻞ 6-3: واﺟﺔ ‪ GANTT‬ﻣﻊ ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺏﺘﺔ.‬

‫اﻟﺸﻜﻞ 6-4: واﺟﺔ ‪ Resource Sheet‬ﻣﻊ ﻗﺎﺋﻤﺔ ﺕﻜﺎﻟﻴﻒ اﻟﻤﻮارد.‬

‫63‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫6-31 اﻟﻌﻤﻞ ﻡﻊ اﻟﻜﻨﺘﻮر ‪Contouring Assignment‬‬
‫ان ﻃﺮیﻘﺔ ﺗﻮزیﻊ اﻟﻤﻮرد ﺥﻼل ﻓﺘﺮة اﻟﻌﻤﻞ یﻌﺘﻤﺪ ﻋﻠﻰ اﻟﺘﻮزیﻊ اﻟﻜﻮﻧﺘﻮري ﺣﻴﺚ یﻮﺟﺪ ﻋﺪة ﻃﺮق‬
‫ﻟﻠﺘﻮزیﻊ و ﻋﺎدة ﻡﺎ یﻜﻮن اﻟﺘﻮزیﻊ اﻻﻓﺘﺮاﺽﻲ‪ Default‬هﻮ اﻟﻜﻮﻧﺘﻮر اﻟﻤﺴﻄﺢ ‪ Flat‬ﺣﻴﺚ یﺘﻢ‬
‫ﺗﻮزیﻊ اﻟﻤﻮرد ﺑﺎﻟﺘﺴﺎوي ﻋﻠﻰ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﺑﻤﻌﺪل 8 ﺳﺎﻋﺎت یﻮﻡﻴﺎ.‬
‫ان اﻟﺨﻴﺎرات اﻻﺥﺮى اﻟﻤﻮﺟﻮدة ﺗﻘﻮم ﺑﺘﻌﺪیﻞ اﻟﺘﻮزیﻊ ﺣﺴﺐ اﻟﺮﻏﺒﺔ.‬
‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ‪ Project‬اﻻﻡﺮ ‪.Assignment Information‬‬
‫اﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪ general‬ﺛﻢ ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ work contour‬و اﺥﺘﺮ ﻧﻮع اﻟﻜﻮﻧﺘﻮر.‬

‫اﻟﺸﻜﻞ 6-5 : ﺕﺨﺼﻴﺺ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﻤﺔ ﻣﻊ ﻗﺎﺋﻤﺔ ﺧﻴﺎرات اﻟﻜﻮﻧﺘﻮر‬
‫6-41 أﻧﻮاع دوال اﻟﻜﻨﺘﻮر‬
‫یﻮﺟﺪ ﺛﻤﺎﻧﻴﺔ ﺗﻮزیﻌﺎت اﺣﺼﺎﺋﻴﺔ ﻡﺒﻨﻴﺔ داﺥﻞ اﻟﺒﺮﻧﺎﻡﺞ ﻟﺘﻮزیﻊ ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻋﻠﻲ اﻟﻤﻬﻤﺔ ﺥﻼل اﻟﻤﺪة.‬
‫و اﻟﺸﻜﻞ 6-5 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﺨﺼﻴﺺ ﻡﻌﻠﻮﻡﺎت اﻟﻤﻬﻤﺔ ﻡﻊ ﻗﺎﺋﻤﺔ ﺥﻴﺎرات‬
‫اﻟﻜﻮﻧﺘﻮر. و اﻻﻡﺮ اﻻﻓﺘﺮاﺽﻲ ﻓﻲ اﻟﺒﺮﻧﺎﻡﺞ هﻮ اﻟﺘﻮزیﻊ اﻟﻤﺴﺘﻮي ‪ Flat‬وذﻟﻚ یﻌﻨﻲ ان ﺳﺎﻋﺎت‬
‫اﻟﻌﻤﻞ ﻡﻮزﻋﺔ ﺑﺎﺗﺴﺎوي ﻋﻠﻰ اﻻیﺎم و ذﻟﻚ ﺑﻤﻌﺪل 8 ﺳﺎﻋﺎت ﻓﻲ اﻟﻴﻮم.‬
‫ﻓﻲ ﺣﻞ وﺟﻮد اﺥﺘﻼف او ﻋﺪم ﺗﺴﺎوي ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻋﻠﻰ ﻡﺪى ﻡﺪة اﻟﻤﻬﻤﺔ، یﺘﻢ اﺥﺘﻴﺎر ﻧﻮع اﻟﺘﻮزیﻊ‬
‫اﻟﻤﻨﺎﺳﺐ ﻡﻦ ﺑﻴﻦ اﻻﻧﻮاع اﻻﺗﻴﺔ:‬

‫73‬
‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﻤﺴﻄﺢ ) ‪(Flat‬‬

‫‪MS PROJECT‬‬

‫و هﻮ اﻟﻜﻨﺘﻮر اﻻﻓﺘﺮاﺿﻲ و یﻜﻮن ﻋﻠﻰ ﺵﻜﻞ ﻣﺴﺘﺎو ﻋﻠﻰ آﺎﻣﻞ اﻟﻤﺪة‬

‫اﻟﻤﺤﻤﻞ ﺧﻠﻔﺎ )‪ (Back-loaded‬هﻨﺎك ذروﻩ ﻓﻲ آﻤﻴﺔ اﻟﻌﻤﻞ ﻓﻲ ﻧﻬﺎیﺔ اﻟﺘﻜﻠﻴﻒ‬
‫ﻟﻤﺤﻤﻞ اﻣﺎﻣﺎ ) ‪(Front-loaded‬هﻨﺎك ذروﻩ ﻓﻲ آﻤﻴﺔ اﻟﻌﻤﻞ ﻓﻲ ﺏﺪایﺔ اﻟﺘﻜﻠﻴﻒ‬
‫ﺙﻨﺎﺋﻲ اﻟﺬروة )‪ (Double Peak‬هﻨﺎك ذروﺕﻴﻦ ﻣﺘﻤﻴﺰﺕﻴﻦ یﺘﺮآﺰ ﻓﻴﻬﻤﺎ اﻟﻌﻤﻞ‬
‫اﻟﺬروة اﻟﻤﺒﻜﺮة )‪ (Early Peak‬ﻣﺸﺎﺏﻪ ﻟﻠﻤﺤﻤﻞ اﻣﺎﻣﺎ ﻣﻊ ﺕﺪرج ﺏﺎﺕﺠﺎﻩ ذروة اﻟﻨﺸﺎط‬
‫ا ﻟﺬروة اﻟﻤﺘﺄﺧﺮة )‪ ( Late peak‬ﻣﺸﺎﺏﻪ ﻟﻠﻤﺤﻤﻞ ﺧﻠﻔﺎ ﻣﻊ ﺕﺪرج ﺏﺎﺕﺠﺎﻩ ذروة اﻟﻨﺸﺎط‬
‫اﻟﺠﺮس )‪ (Bell‬هﻨﺎل ذروة وﺡﻴﺪة ﻓﻲ ﻣﻨﺘﺼﻒ اﻟﻨﺸﺎط‬
‫اﻟﺴﻠﺤﻔﺎة )‪ (Turtle‬ﺵﺒﻴﻪ ﺏﺎﻟﺠﺮس ﻣﻊ ﺕﺪرج ﻧﺤﻮ اﻟﺤﻮاف‬

‫83‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫7. ﻇﺒﻂ و ﺕﻌﺪیﻞ اﻟﺠﺪوﻟﺔ‬
‫7-1 اﻟﻌﻤﻞ ﻡﻊ اﻟﻮﻗﺖ اﻹﺽﺎﻓﻲ ‪Overtime Work‬‬
‫ﻗﺪ ﺗﺤﺘﺎج ﺑﻌﺾ اﻟﻤﻬﺎم ﻻﺳﺘﺨﺪام ﺑﻌﺾ اﻟﻤﻮارد وﻗﺘﺎ إﺽﺎﻓﻴﺎ وﻟﺬﻟﻚ ﻻﺑﺪ ﻡﻦ إدﺥﺎل ﺗﻜﺎﻟﻴﻒ اﻟﻮﻗﺖ‬
‫اﻹﺽﺎﻓﻲ ﺽﻤﻦ ﺗﻜﺎﻟﻴﻒ اﻟﻌﻤﻞ .وﻹدﺥﺎل ﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻹﺽﺎﻓﻲ ﻧﺘﺒﻊ اﻷﺗﻰ -:‬
‫یﺠﺐ اﻟﻮﻗﻮف ﺑﺎﻟﻤﺆﺵﺮ أوﻻ ﻋﻠﻰ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻰ اﻟﺨﺎص ﺑﺎﻟﻤﻮارد ﺛﻢ ﻧﺨﺘﺎر اﻷﻡﺮ.‬
‫ﻡﻦ ﻗﺎﺋﻤﻪ‬

‫‪ Format‬ﻧﺨﺘﺎر‬

‫‪ Details‬ﻡﻦ ﺛﻢ ﻧﺨﺘﺎر ‪. Resource Work‬‬

‫ﺣﻴﺚ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى اﻟﺘﺎﻟﻰ ﻓﻰ أﺳﻔﻞ ﻗﺎﺋﻤﻪ اﻹدﺥﺎل ویﺘﻢ إدﺥﺎل ﻋﺪد ﺳﺎﻋﺎت‬
‫اﻟﻌﻤﻞ اﻹﺽﺎﻓﻲ. و اﻟﺸﻜﻞ 6-5 یﻮﺽﺢ ﻃﺮیﻘﺔ ﺗﺨﺼﻴﺺ اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻟﻠﻤﻬﻤﺔ.‬

‫اﻟﺸﻜﻞ 7-1 : ﺕﺨﺼﻴﺺ اﻟﻌﻤﻞ اﻻﺿﺎﻓﻲ ﻟﻠﻤﻬﻤﺔ‬
‫7-2 ﻓﻬﻢ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻮﻗﺖ اﻻﺿﺎﻓﻲ:‬
‫ان آﻤﻴﺔ اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻟﻦ یﺘﻢ اﺽﺎﻓﺘﻬﺎ ﻟﻠﺠﻬﺪ اﻟﺨﺎص ﺑﺎﻟﻤﻬﻤﺔ ﻻن اﻟﺠﻬﺪ )‪ (work‬یﻤﺜﻞ آﻤﻴﺔ‬
‫اﻟﻌﻤﻞ اﻻﺟﻤﺎﻟﻴﺔ. ان اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻓﻘﻂ یﻤﺜﻞ ﺟﺰء ﻡﻦ اﻟﻌﻤﻞ ﻗﻴﻤﺔ اﻟﻌﻤﻞ اﻟﻜﻠﻲ و اﻟﺘﻲ ﺳﻮف یﺘﻢ‬
‫ﺣﺴﺎﺑﻬﺎ ﺑﻌﺪل ﺗﻜﻠﻔﺔ اﺽﺎﻓﻴﺔ. ﻋﻨﺪ ادﺥﺎل ﻗﻴﻤﺔ ﻋﻤﻞ اﺽﺎﻓﻲ ﻓﺎن اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﻤﺔ ﺳﻮف ﺗﻘﻞ.‬
‫ﻡﺜﺎل: ﻋﻨﺪﻡﺎ یﻌﻤﻞ ﺵﺨﺺ ﻡﺎ ﻡﺪة 04 ﺳﺎﻋﺔ و ذﻟﻚ ﺑﻌﺪل 8 ﺳﺎﻋﺎت یﻮﻡﻴﺎ و ﺳﺎﻋﺘﻴﻦ ﻋﻤﻞ اﺽﺎﻓﻲ‬
‫ﻓﺎن یﺠﺐ ﺗﻌﻴﻴﻦ 01 ﺳﺎﻋﺎت ﻋﻤﻞ یﻮﻡﻴﺔ و یﺘﻢ ﺗﺤﺪیﺪ ﺳﺎﻋﺘﻴﻦ ﻡﻦ اﻟﻌﺸﺮة آﻌﻤﻞ اﺽﺎﻓﻲ . آﻤﺎ ان‬
‫اﻟﻌﻤﻞ ﺳﻮف یﺘﻢ ﺗﻨﻔﻴﺬﻩ ﻓﻲ ارﺑﻌﺔ ایﺎم و ﻟﻴﺲ ﻓﻲ ﺥﻤﺴﺔ ایﺎم.‬

‫93‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫7-3 ﺕﺴﻮیﺔ ﺕﻌﺎرﺽﺎت اﻟﻤﻮارد ‪Resource over allocation Leveling‬‬
‫ﺗﺤﺪث اﻟﺘﻌﺎرﺽﺎت ﻓﻲ اﻟﻤﻮارد ﻋﻨﺪﻡﺎ ﺗﺰیﺪ اﻟﺤﺎﺟﺔ ﻟﻤﻮرد ﻡﻌﻴﻦ ﺥﻼل ﻓﺘﺮة ﻡﻌﻴﻨﺔ ﻋﻦ اﻗﺼﻲ ﻋﺪد‬
‫ﻡﺘﺮﻓﺮ ﻡﻦ هﺬا اﻟﻤﻮرد. اذا ﺗﻢ ﺟﺪوﻟﺔ ﻡﻮرد ﻟﻴﻌﻤﻞ ﻋﻠﻰ ﻡﻬﺎم ﻡﺘﻌﺪدة ﻓﺎﻧﻪ ﻡﻦ اﻟﻤﺤﺘﻤﻞ ﻟﻬﺬا اﻟﻤﻮرد ان‬
‫یﺤﺪث ﻟﻪ ﺗﻌﺎرض ﻋﻨﺪ اﺳﺘﺨﺪاﻡﻪ ﻓﻲ هﺬﻩ اﻟﻤﻬﺎم. ﻓﻲ آﻞ ﻡﻨﻈﺮ ﻓﺎن اﻟﺘﻌﺎرﺽﺎت ﺗﻈﻬﺮ ﺑﺎﻟﻠﻮن اﻟﺤﻤﺮ.‬
‫ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ﻓﺎﻧﻪ یﻈﻬﺮ ﺗﺤﺬیﺮ ﺑﺬﻟﻚ ﻓﻲ اﻟﻬﻮاﻡﺶ.‬
‫7-4 ﺕﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻤﺤﻤﻠﺔ ﺕﺤﻤﻴﻼ زاﺋﺪ‬

‫‪Locating the over allocations Task‬‬

‫اﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ View‬اﻟﻤﻨﻈﺮ ‪Resource Graph‬‬
‫اﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Window‬اﻻﻡﺮ ‪split‬‬
‫ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ Resource Graph‬و اﺽﻐﻂ ﻋﻠﻰ اﻟﺰر اﻻیﻤﻦ ﻟﻠﻔﺄرﻩ ﺳﻮف‬
‫یﻈﻬﺮ ﻟﻚ ﻋﺪة ﺥﻴﺎرات‬
‫اﺣﺘﺮ ‪Over allocation‬‬
‫ﺟﺮب ﺑﺎﺥﺘﺒﺎر‪ ways to resolve over allocations‬و ذﻟﻚ ﺑﺎﺳﺘﺨﺪام‬
‫‪To delay a task‬‬
‫‪Split a task‬‬
‫‪Assign additional or different resources‬‬
‫7-5 ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﺘﺠﺰﺋﺔ او ﺕﺄﺥﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬
‫اﻟﺨﻴﺎرات اﻟﻤﺘﺎﺡﺔ ﻻزاﻟﺔ اﻟﺘﻌﺎرﺿﺎت‬
‫ﺕﺠﺰﺋﺔ اﻟﻤﻬﻤﺔ‬
‫ﺕﺄﺧﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬
‫اﺿﺎﻓﺔ ﻣﻮارد‬
‫اﻟﻌﻤﻞ وﻗﺖ اﺿﺎﻓﻲ‬
‫و اﻟﻘﻮاﻋﺪ اﻟﻌﺎﻣﺔ اﻟﻤﺘﺒﻌﺔ ﻟﺘﺤﺪیﺪ ذﻟﻚ هﻲ ﻋﻠﻰ اﻟﺘﺮﺕﻴﺐ:‬
‫اﻟﻮﻗﺖ اﻟﻤﺘﺎح‬
‫اوﻟﻮیﺔ ﺕﻨﻔﻴﺬ اﻟﻤﻬﺎم‬
‫اﻟﺮواﺏﻂ و اﻟﻘﻴﻮد‬
‫رﻗﻢ اﻟﻤﻬﻤﺔ ‪. ID‬‬
‫ﺕﺎریﺦ اﻟﺘﻨﻔﻴﺬ.‬

‫04‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫7-6 ﺕﻄﺒﻴﻖ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت‬
‫اﺥﺘﺮ اي ﻡﻬﻤﺔ‬
‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﻻﻡﺮ‪Resource Leveling‬‬
‫اﺥﺘﺮ اﻻﻡﺮ ‪ Level From/To‬ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري‬
‫اﺥﺘﺮ ﻡﻦ اﻟﺘﻘﻮیﻢ اﻟﺘﻮاریﺦ اﻟﺘﻲ ﺗﺮﻏﺐ ﺑﻴﻨﻬﺎ ﻓﻲ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت‬
‫یﺘﻢ ﺗﺴﻮیﺔ اﻟﺘﻌﺎرﺽﺎت ﺣﺴﺐ اﻟﺨﻴﺎرات اﻟﺘﺎﻟﻴﺔ‬
‫ﻃﺮیﻘﺔ رﻗﻢ 1 : اﻟﻤﻬﻤﺔ ذات اﻟﺘﺮﻗﻴﻢ اﻻآﺒﺮ ﺕﺄﺧﺮ اوﻻ‬
‫ﻃﺮیﻘﺔ رﻗﻢ 2 : اﺳﺘﺨﺪام اﻟﻄﺮیﻘﺔ اﻟﻘﻴﺎﺳﻴﺔ اﻟﻤﻔﺘﺮﺿﺔ ﻓﻲ اﻟﺒﺮﻧﺎﻣﺞ و اﻟﺘﻲ ﺕﺴﻴﺮ وﻓﻖ اﻟﻘﻮاﻋﺪ‬
‫اﻟﺘﺎﻟﻴﺔ:‬
‫1. اﻟﻤﻬﺎم اﻟﺘﻰ ﻻ ﺗﺮﺗﺒﻂ ﺑﻤﻬﺎم ﻻﺣﻘﺔ ﺗﺆﺥﺮ اوﻻ‬
‫2. ﺛﻢ ﺗﺆﺥﺮ اﻟﻤﻬﺎم اﻟﺘﻲ ﻻ ﺗﻘﻊ ﻋﻠﻰ اﻟﻤﺴﺎر اﻟﺤﺮج‬
‫3. ﺛﻢ اﻟﻤﻬﺎم ذات اﻻوﻟﻮیﺔ اﻟﺪﻧﻴﺎ و ﺑﺪون ﻗﻴﻮد‬
‫4. اﻟﻤﻬﺎم ذات اﻟﺒﺪایﺎت اﻟﻤﺘﺄﺥﺮة یﺘﺎح ﻟﻬﺎ اﻟﺒﺪأ ﻡﺘﺄﺥﺮا‬
‫ﻃﺮیﻘﺔ رﻗﻢ 3 : اﺳﺘﺨﺪام اﻟﻄﺮیﻘﺔ اﻟﻘﻴﺎﺳﻴﺔ ﻣﻊ اﺧﺬ اﻻوﻟﻮیﺔ ﻓﻲ اﻻﻋﺘﺒﺎر و اﻟﺘﻲ ﺕﺴﻴﺮ وﻓﻖ اﻟﻘﻮاﻋﺪ‬
‫اﻟﺘﺎﻟﻴﺔ:‬
‫و هﻨﺎ ﺗﻜﻮن اﻻوﻟﻮیﺔ هﻲ اﻟﻌﺎﻡﻞ اﻟﺬي یﺘﺤﻜﻢ ﻓﻲ ﺗﺎﺥﻴﺮ اﻟﻤﻬﺎم ذات اﻻوﻟﻮیﺔ اﻻدﻧﻰ.‬
‫ﻃﺮیﻘﺔ رﻗﻢ 4 : اﺳﺘﺨﺪم ﻃﺮیﻘﺘﻚ اﻟﺨﺎﺹﺔ ﻟﺘﺴﻮیﺔ اﻟﻤﻮارد وذﻟﻚ آﻤﺎ یﻠﻲ‬
‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﻻﻡﺮ‪ More Views‬ﺛﻢ اﺥﺘﺮ‪Resource Allocation‬‬
‫اﺥﺘﺮ ‪ Gantt Chart‬ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻰ‬
‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪View‬اﻻﻣﺮ ‪Table > More Tables‬‬
‫اﺥﺘﺮ اﻻﻡﺮ ‪ Delay‬ﺛﻢ اﺥﺘﺮ ‪Apply‬‬
‫ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﻌﻠﻮى ‪ Resource Usage Table‬اﺽﻐﻂ ﺑﺎﻟﺰر اﻻیﻤﻦ ﻟﻠﻔﺄرة ﻋﻠﻲ‬
‫.‪Work Column‬‬
‫اﺥﺘﺮ ‪Insert Column‬‬
‫اﺥﺘﺮ ‪Assignment Delay Column‬‬
‫اﺥﺘﺮ ‪Ok‬‬
‫اذا اردت ادﺧﺎل ﺕﺄﺧﻴﺮ ﻋﻠﻰ ﺕﻨﻘﻴﺬ اﻟﻤﻬﻤﺔ‬
‫اﺥﺘﺮ اى ﻡﻮرد ﻡﺨﺼﺺ ﻟﻠﻤﻬﻤﺔ ﺗﺮیﺪ ﺗﺄﺥﻴﺮﻩ‬
‫اﺥﺘﺮ ‪ Leveling Delay Field‬ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻲ ﻻﺽﺎﻓﺔ اﻟﻤﺪة اﻟﺘﻰ ﺗﺮیﺪ ﺗﺄﺥﻴﺮهﺎ.‬
‫14‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫7-7 اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ‪Automatic Leveling‬‬
‫اذا اﺥﺘﺮت اﻟﺘﺴﻮیﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ﻓﺈن اﻟﺒﺮﻧﺎﻡﺞ ﺳﻮف یﻘﻮم ﺑﺘﻌﺪیﻞ اﻟﻤﻬﺎم و ﺑﺘﺴﻮیﺔ اﻟﻤﻮارد ﺗﺒﺎﻋﺎ ﺣﺎل‬
‫ادﺥﺎﻟﻬﺎ و هﻮ ﺳﻮف یﻘﻮم ﺑﺎﺣﺪ ﺥﻴﺎریﻦ اﻡﺎ ﺗﻤﺪیﺪ اﻟﻤﻬﻤﺔ او ﺗﻘﻄﻴﻌﻬﺎ ﻡﻤﺎ یﺴﺒﺐ زیﺎدة اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ. و‬
‫اﺳﺘﺤﺪام اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ﻓﻲ اﻟﻤﺸﺎریﻊ اﻟﻜﺒﻴﺮة یﺒﻄﺊ اﻟﺘﺨﻄﻴﻂ.‬
‫‪Automatic‬‬

‫‪Resource Leveling‬‬

‫‪Tools‬‬

‫7-8 ﺵﻜﻞ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت ‪Bars Format‬‬
‫‪Time scale‬‬

‫‪Format‬‬

‫‪Categories‬‬

‫‪Bar‬‬

‫‪Styles‬‬
‫‪Bar Style‬‬

‫‪Setting‬‬

‫‪Format‬‬
‫‪Format‬‬

‫‪Right Click on mouse‬‬

‫اﻟﺸﻜﻞ 7-2 : اﻟﻤﻘﻴﺎس اﻟﺰﻣﻨﻲ ﻟﻮﺡﺪة اﻟﺰﻣﻦ‬

‫24‬
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﺸﻜﻞ 7-3 : ﺕﻐﻴﻴﺮ ﺵﻜﻞ اﻟﻤﺴﺘﻘﻴﻤﺎت‬
Gridlines ‫7-9 ﺕﺨﻄﻴﻂ اﻻﺳﻄﺮ و اﻻﻋﻤﺪﻩ‬
Format

Gridlines

Right click on the lines
Layout Bars ‫7-01 ﺵﻜﻞ اﻟﻌﻼﻗﺎت‬
Format

Layout

‫اﻟﺸﻜﻞ 7-4 : ﺕﻐﻴﻴﺮ ﺵﻜﻞ اﻟﺮواﺏﻂ‬
Add more tables ‫7-11 اﺽﺎﻓﺔ ﺟﺪاول ﺟﺪیﺪة‬
View
43

table

more tables
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫8. إدارة ﺕﺘﺒﻊ اﻟﻤﺸﺮوع ‪Project Tracking‬‬
‫8-1 ﺣﻔﻆ اﻟﻤﺨﻄﻂ اﻻﺳﺎﺳﻲ ‪Saving A Baseline‬‬
‫ان ﻡﻦ اﻋﻈﻢ ﻡﻴﺰات اﺳﺘﺨﺪام اﻟﺘﻘﻨﻴﺎت اﻟﺤﺪیﺜﺔ ﻓﻲ ادارة اﻟﻤﺸﺮوﻋﺎت هﻲ اﻡﻜﺎﻧﻴﺔ ﻋﻤﻞ ﻡﺘﺎﺑﻌﺔ و‬
‫ﺗﺤﻜﻢ ﻓﻲ ﺳﻴﺮ ﻋﻤﻞ اﻟﻤﺸﺮوﻋﺎت ﺑﻄﺮیﻘﺔ ﺳﻬﻠﺔ و ﺳﺮیﻌﺔ. ان اول ﺥﻄﻮات اﻟﺘﺘﺒﻊ ان یﺘﻢ ﺣﻔﻆ‬
‫اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ و اﻟﺬي ﺳﻮف یﺴﺘﺨﺪم آﺄﺳﺎس ﻟﻠﻤﻘﺎرﻧﺔ ﺣﺎل ﺑﺪأ اﻟﻌﻤﻞ ﻓﻲ اﻟﻤﺸﺮوع و ﺑﺪأ ﻋﻤﻠﻴﺔ‬
‫اﻟﺘﺘﺒﻊ. اﻟﺸﻜﻞ 8-1 یﻮﺽﺢ ﻡﺮﺑﻊ ﺣﻮار ﺣﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ. ﻻﺣﻆ اﻧﻪ یﺠﺐ ان ﻻ یﺘﻢ ﺣﻔﻆ‬
‫اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ اﻻ ﺑﻌﺪ اﻟﺘﻴﻘﻦ ﻡﻦ اﺳﺘﻜﻤﺎل ادﺥﺎل آﺎﻡﻞ ﻋﻨﺎﺹﺮ اﻟﻤﺸﺮوع ﻡﻦ ﻡﻬﺎم و ﻡﺪد زﻡﻨﻴﺔ‬
‫و ﻡﻮارد و ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﻴﻦ اﻟﻤﻮارد. و ﻟﺤﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ ﻧﺘﺒﻊ اﻻﺗﻲ:‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Tracking‬‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ اﺥﺘﺮ اﻻﻡﺮ ‪Save baseline‬‬
‫اﺥﺘﺮ ایﻀﺎ اﻻﻡﺮ ‪ Entire Project‬و ذﻟﻚ ﻟﺤﻔﻆ آﺎﻡﻞ اﻟﻤﺸﺮوع آﻤﺸﺮوع اﺳﺎﺳﻲ‬
‫ﻣﻼﺡﻈﺔ‬
‫ﻗﺒﻞ ﺡﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ ، اﺡﺘﻔﻆ ﺏﻨﺴﺨﺔ اﺧﺮى ﻣﻦ اﻟﺨﻄﺔ ﻗﺒﻞ ﺡﻔﻈﻬﺎ و ذﻟﻚ ﻻﻣﻜﺎن‬
‫اﺳﺘﺨﺪاﻣﻬﺎ ﺡﺎل ﺡﺪوث ﺕﻐﻴﻴﺮ آﺒﻴﺮ ﻋﻠﻰ اﻟﺨﻄﺔ ﻗﺒﻞ ﺏﺪأ اﻟﺘﻨﻔﻴﺬ.‬

‫اﻟﺸﻜﻞ 8-1 : ﺡﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ‬
‫8-2 ﻋﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ/اﻟﻘﺎﻋﺪیﺔ‬
‫ﻟﻌﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ اﺕﺒﻊ اﻻﺕﻲ:‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﺥﺘﺮ اﻟﻤﻨﻈﺮ ‪GANTT Tracking‬‬
‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﺥﺘﺮ ‪ Table>More Tables‬ﺛﻢ اﺥﺘﺮ ‪. Baseline‬‬

‫44‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫یﺸﻜﻞ اﻟﻌﺮض ﺥﻄﻴﻦ )ﻗﻈﻴﺒﻴﻦ( یﻤﺜﻞ اﻟﺴﻔﻠﻲ ﺥﻂ اﻻﺳﺎﺳﻲ/اﻟﻘﺎﻋﺪة و اﻟﻌﻠﻮي یﻤﺜﻞ اﻟﻤﻬﻤﺔ اﻟﺠﺎري‬
‫ﺗﺘﺒﻌﻬﺎ و هﻲ ﻗﺎﺑﻠﺔ ﻟﻠﺘﻌﺪیﻞ ﺑﻴﻨﻤﺎ اﻟﺨﻂ اﻻﺳﺎﺳﻲ ﻻ یﺘﻐﻴﺮ و ﻻ یﻤﻜﻦ ﺗﻌﺪیﻠﻪ.‬
‫8-3 ﺕﺤﺮیﺮ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ‬
‫ﻋﻨﺪ اﺟﺮاء ﺕﺤﺪیﺚ ﻋﻠﻲ ﺏﻴﺎﻧﺎت اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ او اﺿﺎﻓﺔ ﺏﻌﺾ اﻟﺒﻨﻮد اﻟﻴﻬﺎ ﻗﻢ ﺏﺎﺕﺒﺎع اﻟﺨﻄﻮات‬
‫اﻟﺘﺎﻟﻴﺔ:‬
‫اﺥﺘﺮ اﻟﻤﻬﺎم اﻟﻤﻀﺎﻓﺔ/اﻟﻤﻌﺪﻟﺔ ﻓﻲ ﺟﺪول ادﺥﺎل ‪. GANTT‬‬
‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools>Tracking‬اﻻﻡﺮ ‪. Save baseline‬‬
‫اﻧﻘﺮ ﻋﻠﻰ زر اﻟﻤﻬﺎم اﻟﻤﺤﺪد ‪ Selected Tasks‬ﺛﻢ اﺥﺘﺮ ‪. OK‬‬
‫8-4 ﻡﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ‬
‫ﻻﻟﻐﺎء و ﻣﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ:‬
‫اﺥﺘﺮ اﻻﻡﺮ ‪Tools >Tracking > Clear Baseline‬‬
‫اﺥﺘﺮ ‪. OK‬‬
‫8-5 ﺕﺘﺒﻊ ﺥﻄﻂ ﻡﺆﻗﺘﺔ ‪Interim Plans‬‬
‫ﺥﻼل ﺳﻴﺮ اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع ﻗﺪ ﺗﺮﻏﺐ ﺑﺤﻔﻆ ﺥﻄﺔ ﻡﺆﻗﺘﺔ و ﺗﺘﻀﻤﻦ ﺗﻐﻴﻴﺮات ﻋﻠﻰ ﺗﻮاریﺦ ﺑﺪأ‬
‫و اﻧﺘﻬﺎء اﻟﻤﻬﺎم اﻟﺤﺎﻟﻴﺔ و یﻤﻜﻦ ﺣﻔﻆ ﺣﺘﻰ ﻋﺸﺮة ﺥﻄﻂ ﻡﺆﻗﺘﺔ آﻤﺎ یﻠﻲ:‬
‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools>Tracking‬اﻻﻡﺮ ‪. Save baseline‬‬
‫اﺥﺘﺮ ‪save interim plan‬‬
‫ﻡﻦ اﻟﻼﺋﺤﺔ اﻟﻤﻨﺴﺪﻟﺔ ‪ ، copy‬ﺣﺪد اﻟﺤﻘﻮل ‪. Start/Finish‬‬
‫ﻓﻲ ﻡﻜﺎن ‪ Into‬ﺣﺪد 1‪. Start1/Finish‬‬
‫ﺣﺪد ﻡﺎ اذا آﻨﺖ ﺗﺮیﺪ ﺣﻔﻆ ﺥﻄﺔ ﻡﺆﻗﺘﺔ ﻟﻜﻞ ﻟﻠﻤﺸﺮوع او ﻟﺠﺰء ﻡﻨﻪ.‬
‫اﻧﻘﺮ ‪. OK‬‬
‫8-6 ﻋﺮض ﺥﻄﺔ ﻡﺆﻗﺘﺔ‬
‫اﻓﺘﺢ اﻟﻌﺮض ‪. GANTT Tracking‬‬
‫اﺽﻒ اﻋﻤﺪة 1 ‪. Start1 / Finish‬‬
‫اﻧﻔﺮ ‪. OK‬‬
‫8-7 ﻡﺘﺎﺑﻌﺔاﻟﺘﻘﺪم ‪Tracking‬‬
‫ان اﻟﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ هﻲ اﻟﺴﻴﺮ ﻗﺪﻡﺎ ﻡﻊ ﺗﻘﺪم اﻟﻌﻤﻞ ﻓﻲ اﻟﻤﺸﺮوع یﻮﻡﺎ ﺑﻴﻮم و ﺗﺰویﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺑﺨﻂ‬
‫اﻟﺴﻴﺮاﻟﻌﻤﻠﻲ ﻟﻠﻤﺸﺮوع و ﻡﺘﺎﺑﻌﺔ ﻡﺪى ﺗﻮاﻓﻖ او اﻧﺤﺮاف ﺥﻄﺔ اﻟﻤﺸﺮوع ﻋﻦ واﻗﻊ اﻟﺘﻨﻔﻴﺬ.‬
‫‪Update task‬‬

‫‪Tracking‬‬

‫‪Tools‬‬
‫54‬
‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫‪Task form details‬‬

‫‪MS PROJECT‬‬

‫‪More tables‬‬

‫اﻟﺸﻜﻞ 8-2 : ﺕﺘﺒﻊ و ﺕﺤﺪیﺚ ﻣﻬﺎم اﻟﻤﺸﺮوع‬

‫اﻟﺸﻜﻞ 8-3 : ﺕﺘﺒﻊ اﻟﻤﻬﺎم ﻣﻊ ﺡﻔﻆ ﺡﺨﻂ اﻟﻘﺎﻋﺪة ﻟﻠﻤﺸﺮوع‬
‫8-8 ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ ‪Up date Project‬‬
‫آﺜﻴﺮا ﻡﺎ یﻜﻮن اﻟﻤﺸﺮوع ﺑﻜﺎﻡﻞ ﻓﻌﺎﻟﻴﺎﺗﺔ اﻟﺘﻲ ﻟﻢ یﺘﻢ اﻧﺠﺎزهﺎ ﺑﻌﺪ ﺑﺤﺎﺟﺔ اﻟﻲ ﺗﺤﺪیﺚ و ذﻟﻚ ﻓﻲ اﺣﻮال‬
‫ﺗﻮﻗﻒ اﻟﻤﺸﺮوع ﻟﻌﺬر ﻗﺎهﺮ ﻡﺪة ﻡﻦ اﻟﺰﻡﻦ.‬
‫ﻟﺘﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ :‬
‫‪Update project‬‬

‫‪Tracking‬‬

‫‪Tools‬‬

‫64‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﺸﻜﻞ 8-4 : ﻣﺮﺏﻊ ﺡﻮاري ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع‬
‫8-9 ﺥﻂ اﻟﺘﻘﺪم ‪Progress line‬‬
‫ان ﺥﻄﻮط اﻟﺘﻘﺪم هﻲ اﺣﺪي وﺳﺎﺋﻞ ﻋﺮض و ﺗﺘﻴﻊ اﻟﻤﺸﺮوع اﺛﻨﺎء ﺗﻘﺪم اﻟﻌﻤﻞ و یﺴﺎﻋﺪ ذﻟﻚ ﺑﺘﺤﺪیﺪ و‬
‫ﺑﺸﻜﻞ ﻓﻮري و ﺳﺮیﻊ وﺽﻊ اﻟﻔﻌﺎﻟﻴﺎت ﻋﻨﺪ ﺗﺎریﺦ ﻡﺤﺪد ﺣﻴﺚ یﺘﻢ ﻡﺘﺎﺑﻌﺔ اﻟﻔﻌﺎﻟﻴﺎت اﻟﻤﺘﺄﺥﺮة ﻋﻦ‬
‫اﻟﺨﻄﺔ ﻋﻨﺪ زﻡﻦ ﻡﻌﻴﻦ و ﻡﺤﺎوﻟﺔ ﺗﺪارك ذﻟﻚ‬
‫‪Tools‬‬
‫‪Tracking‬‬
‫‪Progress line‬‬

‫اﻟﺸﻜﻞ 8-5 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻄﻮط اﻟﺘﻘﺪم ﻟﻠﻤﺸﺮوع‬
‫8-01 ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع ‪Options‬‬
‫ان ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع هﻲ ﻡﻦ اهﻢ اﻟﺨﻴﺎرات اﻟﺘﻲ ﻋﻠﻲ اﻟﻤﺨﻄﻂ ﺗﺤﺪیﺪهﺎ ﻡﻦ اﺟﻞ اﻇﻬﺎر‬
‫اﻟﻤﻌﻠﻮﻡﺎت ﺑﺎﻟﺸﻜﻞ اﻟﻤﻨﺎﺳﺐ و ﻋﻤﻞ اﻟﺘﻐﻴﻴﺮات ﻓﻲ اﻟﻮﺣﺪات و اﻻیﺎم واﻟﺘﻘﻮیﻢ وﺳﺎﻋﺎت اﻟﻌﻤﻞ و ﻧﻮع‬
‫اﻟﻌﻤﻠﺔ اﻟﻤﺘﺪاوﻟﺔ و و یﻔﻀﻞ اﻟﻤﺨﻄﻂ ان یﻘﻮم ﺑﻬﺬة اﻟﺘﻐﻴﻴﺮات ﻋﻨﺪ ﺑﺪایﺔ ﻋﻤﻠﺔ ﻓﻲ اي ﻡﺸﺮوع ﺟﺪیﺪ‬
‫وان ﺗﺘﻨﺎﺳﺐ اﻟﺨﻴﺎرات اﻡﻌﺪﻟﺔ ﻡﻦ ﻧﻮع و ﺣﺠﻢ و ﻡﺪة اﻟﻤﺸﺮوع. و ﻻﺟﺮاء هﺬة اﻟﺘﻐﻴﻴﺮات یﺘﻢ‬
‫ااﺳﺘﺨﺪام اﻻﻡﺮ:‬
‫‪Options‬‬

‫‪Tools‬‬

‫و اﻟﺸﻜﻞ 8-6 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺺ ﺑﺨﻴﺎرات اﻟﻤﺸﺮوع‬
‫74‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫اﻟﺸﻜﻞ 8-6 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات اﻟﻤﺸﺮوع‬
‫8-6 اﻟﻤﺮﺵﺤﺎت ‪Filters‬‬
‫یﻤﻜﻦ اﺳﺘﺨﺎم اﻟﻤﺮﺵﺤﺎت ﻟﻌﻤﻞ ﺕﺼﻔﻴﺔ ﻟﻠﻤﻌﻠﻮﻣﺎت اواﻻﺳﺘﻌﻼم ﺡﻮل اﻟﻤﻬﺎم او اﻟﻤﻮارد .‬
‫‪Option‬‬

‫‪More filter‬‬

‫‪Project‬‬

‫‪Filtered for‬‬

‫و یﻤﻜﻦ اﺳﺘﺨﺪام اﻟﺘﺼﻔﻴﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ‪ Auto filter‬ﺏﺎﻟﻀﻐﻂ ﻋﻠﻰ زر اﻟﺘﺼﻔﻴﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ﻓﻲ ﺵﺮیﻂ‬
‫اﻻدوات .‬

‫84‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫9. اﻟﻄﺒﺎﻋﺔ ‪Printing‬‬
‫ﻗﺒﻞ اﺟﺮاء ﻋﻤﻠﻴﺔ اﻟﻄﺒﺎﻋﺔ یﺠﺐ ﻋﻤﻞ ﺗﺠﻬﻴﺰ ﻟﺼﻔﺤﺔ اﻟﻄﺒﺎﻋﺔ و ﺥﺎﺹﺔ ﻓﻲ ﺗﺤﺪیﺪ ﻋﻨﻮان اﻟﻤﺸﺮوع و‬
‫ﺗﺤﺪیﺪ اى ﻡﻌﻠﻮﻡﺎت یﺠﺐ ان ﺗﻈﻬﺮ ﻓﻲ ﻋﻨﻮان اﻟﺠﺪول ﻡﺜﻞ اﺳﻢ اﻟﻤﺎﻟﻚ و اﻟﻤﺘﺒﺮع و اﻻﺳﺘﺸﺎري و‬
‫رﻗﻢ اﻟﻤﺸﺮوع و آﻞ ذﻟﻚ آﻤﺎ یﻈﻬﺮ ﺑﺎﻟﺸﻜﻞ 9-1ﺣﻴﺚ یﻤﻜﻦ ﺽﺒﻂ اﻟﻄﺒﺎﻋﺔ ﻟﻠﻤﺸﺮوع ﺑﺎﺳﺘﺨﺪام‬
‫اﻻﻡﺮ:‬
‫‪File Page setup‬‬

‫اﻟﺸﻜﻞ 9-1 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺿﺒﻂ اﻟﻄﺒﺎﻋﺔ ﻟﻠﻤﺸﺮوع‬
‫‪Print Preview‬‬
‫‪Print‬‬

‫‪File‬‬

‫‪File‬‬

‫اﻟﺸﻜﻞ 9-2 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات اﻟﻄﺒﺎﻋﺔ اﻟﻤﺸﺮوع‬
‫94‬
‫‪MS PROJECT‬‬

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

‫9-1 ادﺥﺎل اﻟﺼﻮر ‪Insert Object/Picture‬‬
‫اﺣﻴﺎﻧﺎ یﺘﻄﻠﺐ اﻻﻡﺮ ادﺥﺎل ﺹﻮر او ﺵﻌﺎرات ﻟﻤﺆﺳﺴﺔ او هﻴﺌﺔ ﻋﻠﻰ ﻋﻨﻮان اﻟﺠﺪول و یﻤﻜﻦ ﻋﻤﻞ‬
‫ذﻟﻚ آﻤﺎ یﻈﻬﺮ ﺑﺎﻟﺸﻜﻞ 9-3‬
‫‪Insert‬‬
‫‪Object‬‬
‫‪File get picture from art clip‬‬
‫‪Objects to header or footer‬‬
‫‪insert picture‬‬

‫‪Page setup‬‬

‫‪Insert object Microsoft clip Gallery‬‬

‫اﻟﺸﻜﻞ 9-3 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ادراج اﻟﺼﻮرة اﻟﻰ ﻋﻨﻮان اﻟﻤﺸﺮوع‬
‫‪Add picture to bars‬‬
‫9-2 اﻟﺘﻘﺎریﺮ ‪Reports‬‬
‫ان ﻡﻦ اآﺒﺮ ﻓﻮاﺋﺪ اﺳﺘﺨﺪام اﻟﺒﺮﻧﺎﻡﺞ هﻮ ﻗﺪرﺗﺔ ﻋﻠﻰ اﻧﺘﺎج ﺗﻘﺎریﺮ ﻋﺪیﺪة و ﻡﺘﻨﻮﻋﺔ و هﻰ ﺗﻠﺰم اﺛﻨﺎء‬
‫ﺗﻘﺪم اﻟﻌﻤﻞ و ﻓﻲ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﺣﻴﺚ یﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻰ اﻟﺘﻘﺎریﺮ اﻟﺘﺎﻟﻴﺔ:‬
‫‪ : Overview‬ﻡﻌﻠﻮﻡﺎت ﻋﺎﻡﺔ ﻋﻦ اﻟﻤﺸﺮوع‬
‫‪ :Current activities‬ﻡﻌﻠﻮﻡﺎت ﺗﻔﺼﻴﻠﻴﺔ ﻋﻦ اﻻﻧﺸﻄﺔ اﻟﻤﺸﻜﻠﺔ ﻟﻠﻤﺸﺮوع‬
‫‪ : Costs‬ﻡﻌﻠﻮﻡﺎت ﺗﻔﺼﻴﻠﻴﺔ ﻋﻦ ﺗﻜﻠﻔﺔ ﻟﻠﻤﺸﺮوع‬
‫‪ :Assighments‬ﻡﻌﻠﻮﻡﺎت ﻋﻦ اﻟﻤﻮارد اﻟﻤﺨﺼﺔ ﻟﻼﻧﺸﻄﺔ‬
‫‪ : Workload‬ﻡﻌﻠﻮﻡﺎت ﻋﻦ ﺳﺎﻋﺎت اﻟﻌﻤﻞ و اﺳﺘﻐﻼل اﻟﻤﻮارد ﻗﻲ اﻟﻤﺸﺮوع‬
‫05‬
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

View

reports

‫اﻟﺸﻜﻞ 9-4 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺕﻘﺎریﺮ اﻟﻤﺸﺮوع‬
Save As Excel Form ‫9-3 ﺣﻔﻆ اﻟﻤﻠﻒ ﻋﻠﻰ ﺻﻮرة أآﺴﻞ‬
Save as

Microsoft Excel

Workbook

Excel ‫اﻟﺸﻜﻞ 9-5 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺡﻔﻆ اﻟﻤﺸﺮوع اﻟﻲ‬
Save

Export format

earned value

Analysis by excel
View

Tool bars

analysis

Analysis timescale Date in Excel
Pivot tables
51
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Save as
Save

Export format

Microsoft excel

pivot table

Task and resource pivot table

Import Excel File ‫9-4 اﺳﺘﻴﺮاد ﻡﻠﻒ اآﺴﻞ اﻟﻰ ﻡﺎیﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ‬
Open excel file

file type

Microsoft excel work book look in

select

the work book you need to import

52
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Project 2
Project description:
The table 1 indicating the tasks of the project, duration and its relations and
constraint
The table 2 indicating the tasks of the project, resources and material costs
The table 3 indicating the persons and equipment costs
Conditions
Starting date of the project is 10/10/03
The time period is 5 days.
The trainer is working one overtime hour every day
Required:
Establish a Bar chart diagram.
Establish logical relation ships
Assign the needed resources for each activity
Calculate the cost estimate for the project
Table 1: Activities and relationships
No.

Activity

Depends on

Type of relation

Duration

1

Introduction

----

----

1 day

2

MS project

Introduction

FS

1 day

3

Data entry

MS project

FS

1day

4

Logical

MS project

FS

2day

relations

Data entry

SS

Constraints

Logical

FF

1 day

FS

1 day

5

relations
6

Improvement

Constraints

53
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Table 2 : Resources, Equipments and Material cost
No.

Activity

Resources

Equipments

Material cost
$

1

Introduction

Trainer, Project

(10) Computers, (1) LCD

200

Manager
Cad operator ,
Facilitator
2

MS project

Trainer ,Cad operator

(10) Computers, (1) LCD

20

3

Data entry

Trainer , Cad operator

(10) Computers, (1) LCD

20

4

Logical

Trainer, Cad operator

(10) Computers, (1) LCD

20

relations
5

Constraints

Trainer , Cad operator

(10) Computers ,(1) LCD

20

6

Improvement

Trainer, Project

(10) Computers, (1) LCD

300

Manager
Cad operator,
Facilitator

Table 3: Standard and Overtime rates
No.

Description

Standard rate $

Overtime rate
$

1

Trainer

20$/hr.

30$/hr.

2

Cad Operator

7$/hr.

10$/hr.

3

Project manager

30$/hr.

45$/hr.

4

Facilitator

4$/hr.

6$/hr.

5

Computer

2$/hr

--

6

LCD

4$/hr

---

54
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Project 3
Project description:
Attached is CPM diagram indicating the logical relation ships between the
activities? The table 1 indicating the constraint table for resources
distribution.
Table 2 explains the regular and over time rates.
Conditions
The engineer is working every day two overtime working hours.
Starting date of the project is 10/10/03
The available resources are limited.
Material price for activity should be dealt with as fixed price.
Required
Establish a Bar chart diagram for the problem below.
Assign the needed resources for each activity
Calculate the cost estimate for the project
Table 1: Equipments and Material costs
No.

Activity

Description

Equipments

Material cost $

1

A

Engineer (1No.), Mechanic

Drill, Saw

200

Voltmeter

3000

Hammer

500

(2No.)
2

B

Engineer (1No.),
Electric (2No.)

3

C

Engineer (1No.), Foreman
(1No.)

4

D

Engineer (1No.), Mechanic

Drill

(1No.)
5

E

Engineer (1No.), Mechanic
(1No.), Electric

6

F

Drill, Voltmeter

(1No.)

Engineer (1No.), Foreman
(1No.)
55

Hammer
MS PROJECT

‫إدارة اﻟﻤﺸﺮوﻋﺎت‬

Table 2: Standard and Overtime rates
No.

Description

Standard rate $

Overtime rate
$

1

Engineer

10$/hr.

15$/hr.

2

Mechanic

7$/hr.

10$/hr.

3

Electric

5$/hr.

7$/hr.

4

Foreman

4$/hr.

6$/hr.

56

Ms project trainee

  • 1.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫إدارةاﻟﻤﺸﺮوﻋﺎت ﺑﺈﺳﺘﺨﺪام‬ ‫‪Microsoft Project‬‬ ‫م. ﻧﺒﻴﻞ اﺏﺮاهﻴﻢ اﻟﺼﻮاﻟﺤﻲ‬ ‫ﻣﺎﺟﺴﺘﻴﺮ ﻓﻲ ادارة اﻟﻤﺸﺮوﻋﺎت اﻟﻬﻨﺪﺳﻴﺔ‬ ‫1‬
  • 2.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫ﺟﺪولاﻟﻤﺤﺘﻮیﺎت‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت ﺑﺈﺳﺘﺨﺪام ........................................................................................................ 1‬ ‫‪1 ............................................................................................................. Microsoft Project‬‬ ‫1. ﻡﻔﻬﻮم ادارة اﻟﻤﺸﺮوﻋﺎت ....................................................................................................... 5‬ ‫1-1 اﻟﻤﻘــﺪﻣﺔ ..................................................................................................................... 5‬ ‫1-2 اﻷهﺪاف....................................................................................................................... 5‬ ‫1-3 ﻣﺎذا ﺳﻮف ﺕﺘﻌﻠﻢ ............................................................................................................ 5‬ ‫1-4 ﻡﺒﺎدئ إدارة اﻟﻤﺸﺮوﻋﺎت ................................................................................................. 6‬ ‫1-4-1 ﻡﺎ هﻮاﻟﻤﺸﺮوع ..................................................................................................... 6‬ ‫1-4-2 ﺻﻔﺎت اﻟﻤﺸﺮوع .................................................................................................... 6‬ ‫1-5 إدارة اﻟﻤﺸﺮوﻋﺎت ......................................................................................................... 6‬ ‫1-6 اﻟﻤﺮاﺣﻞ اﻷﺳﺎﺳﻴﺔ ﻟﻠﻤﺸﺮوع ............................................................................................. 7‬ ‫1-6-1 اﻟﻤﺮﺣﻠﺔ اﻷوﻟﻰ : اﻟﺘﺨﻄﻴﻂ ......................................................................................... 7‬ ‫1-6-2 اﻟﻘﻴﻮد :ﻣﺜﻠﺚ اﻟﻤﺸﺮوع ............................................................................................. 7‬ ‫1-7 دورة ﺣﻴﺎﻩ اﻟﻤﺸﺮوع ‪7 .............................................................. The Project Life Cycle‬‬ ‫1-8 ﻋﻨﺎﺻﺮ ادارة اﻟﻤﺸﺮوﻋﺎت ................................................................................................ 8‬ ‫1-8-1 ﻃﺮق ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ‪9 ......................................................................Scheduling‬‬ ‫1-8-2 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ...................................................................................................... 9‬ ‫1-8-3 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ ........................................................................................ 01‬ ‫1-8-4 ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج )‪10 .............................................................................. (CPM‬‬ ‫2. اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺑﻴﻦ اﻟﻤﻬﺎم ‪11 ................................................................ Task Relationship‬‬ ‫2-1 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ )‪12 .............................................................................. (Total Float‬‬ ‫2-2 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﺤﺮة )‪12 ................................................................................ (Free Float‬‬ ‫2-3 ﺣﻞ ﻡﺨﻄﻂ اﻟﺸﺒﻜﺎت ...................................................................................................... 21‬ ‫2-4 هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ "‪13 ............................................. “Work Breakdown Structure‬‬ ‫3. إدارة وﺕﺨﻄﻴﻂ اﻟﻤﺸﺮوع ﺑﺈﺳﺘﺨﺪام ‪14 .................................................................... MS Project‬‬ ‫3-1 اﻟﺒﺪایﺔ ﻡﻊ ‪14 ............................................................................................. MS Project‬‬ ‫3-2 اﺳﺘﻜﺸﺎف واﺟﻬﺔ ‪14 .................................................................................... MS Project‬‬ ‫3-3 ﻗﻀﻴﺐ اﻷدوات ............................................................................................................ 41‬ ‫3-4 ﻋﺮض وﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ .................................................................................................. 51‬ ‫3-5 ﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ.............................................................................................................. 51‬ ‫3-6 اﻟﺠﺪاول ‪15 ........................................................................................................ Tables‬‬ ‫3-7 ﻡﻨﻈﺮ ‪16 ............................................................................................. GANTT Chart‬‬ ‫3-8 ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ....................................................................................................... 61‬ ‫3-8-1 ﻓﺘﺢ ﻡﺘﻒ ﺟﺪیﺪ ..................................................................................................... 61‬ ‫3-8-2 إدﺧﺎل ﺏﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻷوﻟﻴﺔ ................................................................................. 61‬ ‫3-8-3 أوﻟﻮیﺔ اﻟﻌﻤﻞ ﺽﻤﻦ اﻟﻤﺸﺮوع ‪17 ...................................................................Priority‬‬ ‫3-8-4 ﻥﺘﺎﺋﺞ إﺣﺼﺎﺋﻴﺔ ..................................................................................................... 71‬ ‫3-9 ﺕﺴﺠﻴﻞ ﺻﻔﺎت اﻟﻤﺸﺮوع ................................................................................................ 71‬ ‫4. إدﺥﺎل اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ.................................................................................................. 81‬ ‫4-1 ادﺥﺎل اﻟﻤﻬﺎم............................................................................................................... 81‬ ‫4-2 اﻟﻤﺪد اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم ..................................................................................................... 91‬ ‫4-3 إدراج ﻥﺸﺎط ﺑﻴﻦ أﻥﺸﻄﺔ اﺥﺮى ....................................................................................... 91‬ ‫5. ﺿﺒﻂ ﺕﻘﻮیﻢ اﻟﻤﺸﺮوع .......................................................................................................... 02‬ ‫5-1 ﺕﺤﺪیﺪ أیﺎم اﻟﻌﻤﻞ واﻹﺟﺎزات ............................................................................................ 02‬ ‫5-2 ﻥﺴﺦ اﻟﻤﻬﺎم وﻟﺼﻘﻬﺎ ‪21 ........................................................................ Copy and Paste‬‬ ‫5-3 ﻡﺴﺢ اﻟﻤﻬﺎم ‪21 ....................................................................................................Delete‬‬ ‫5-4 اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‪21 ............................................................................ Summary Tasks‬‬ ‫5-5 إﻟﻐﺎء اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ .................................................................................................. 22‬ ‫5-6 أﺣﺠﺎر اﻟﺰاویﺔ ............................................................................................................. 22‬ ‫2‬
  • 3.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫5-7اﺽﺎﻓﺔ ﻡﻼﺣﻈﺎت ﻋﻠﻰ اﻟﻤﻬﻤﺔ .......................................................................................... 22‬ ‫5-8 رﺑﻂ اﻟﻤﻬﺎم ‪23 ....................................................................................... Linking Tasks‬‬ ‫5-9 ﺕﻐﻴﻴﺮ اﻟﻌﻼﻗﺎت ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺘﺮاﺑﻄﺔ ‪24 ........................................... Change Relationships‬‬ ‫5-01 اﻟﻤﻬﺎم اﻟﻤﺘﻜﺮرة ‪25 ............................................................................. Recurring task‬‬ ‫5-11 اﻟﻘﻴﺪ ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﻬﺎم ‪25 .............................................................. Task Constraints‬‬ ‫5-11-1 أﻥﻮاع اﻟﻘﻴﻮد ...................................................................................................... 52‬ ‫5-11-2 اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ‪25 ............................................................... . Flexible Constraints‬‬ ‫5-11-3 اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ ‪26 ...................................................... . Inflexible Constraints‬‬ ‫5-11-4 اواﻡﺮ اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ............................................................................................. 62‬ ‫5-11-5 اواﻡﺮ اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ....................................................................................... 72‬ ‫5-11-6 إﺽﺎﻓﻪ ﻗﻴﻮد ﻋﻠﻰ أى ﻡﻬﻤﺔ .................................................................................... 72‬ ‫5-11-7 ازاﻟﺔ اﻟﻘﻴﻮد....................................................................................................... 72‬ ‫5-21 ﺕﻐﻴﻴﺮ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ‪27 ................................................................................. Time scale‬‬ ‫5-31 ﺕﻐﻴﻴﺮ ﻃﺮیﻘﻪ ﻋﺮض ‪27 ........................................................................ GANTT Chart‬‬ ‫5-31 اﻇﻬﺎر ﺥﻂ اﻟﻤﺴﺎر اﻟﺤﺮج ............................................................................................. 82‬ ‫6. أدارة اﻟﻤﻮارد‪30 .......................................................................... Resources Management‬‬ ‫6-1 اﻥﻮاع اﻟﻤﻮارد ............................................................................................................. 03‬ ‫6-2 إدﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد ................................................................................................. 03‬ ‫6-3 ﺕﻌﻴﻴﻦ ﻡﻮارد ﻟﻤﻬﺎم ....................................................................................................... 03‬ ‫6-4 ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ‪30 .................................................................................. Resource sheet‬‬ ‫6-5 ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد ......................................................................................................... 13‬ ‫6-6 ﺕﻌﺮیﻒ ﻣﺠﻤﻮﻋﺎت اﻟﻌﻤﻞ ‪32 ........................................................................... Workgroup‬‬ ‫6-7 ﺕﺨﺼﻴﺺ اﻟﻤﻮارد‪32 ......................................................................... Assign Resources‬‬ ‫6-8 ﻓﻬﻢ ﻋﻤﻞ اﻟﻤﻮارد ........................................................................................................ 33‬ ‫6- 9 ﻥﻮع ﻡﻬﻤﺔ اﻟﻌﻤﻞ ‪33 ..................................................................................... Task Type‬‬ ‫6-9-1 ﻣﻬﻤﺔ ذات وﺡﺪات ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪33 .................. Fixed Units with Effort Driven‬‬ ‫6-9-2 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ‪34 ................................................................... Fixed Duration‬‬ ‫6-9-3 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪34 ..................Fixed Duration with Effort Driven‬‬ ‫6-9-4 ﺕﺤﺪیﺪ اﻟﻨﻮع اﻻﻓﺘﺮاﺿﻲ ﻟﻠﻤﻬﻤﺔ................................................................................. 43‬ ‫6-01 ادارة اﻟﻤﻮارد ............................................................................................................ 43‬ ‫6-11 ﺕﺤﺪیﺪ ﺕﺎریﺦ ﻋﻤﻞ اﻟﻤﻮرد ............................................................................................. 43‬ ‫6-21 دراﺳﺔ ﺕﺪرج ﺳﻌﺮ اﻟﻤﻮرد............................................................................................. 53‬ ‫6-21 إدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ‪36 .............................................................................. Fixed Cost‬‬ ‫6-31 اﻟﻌﻤﻞ ﻡﻊ اﻟﻜﻨﺘﻮر ‪37 ............................................................. Contouring Assignment‬‬ ‫6-41 أﻧﻮاع دوال اﻟﻜﻨﺘﻮر ..................................................................................................... 73‬ ‫7. ﻇﺒﻂ و ﺕﻌﺪیﻞ اﻟﺠﺪوﻟﺔ .......................................................................................................... 93‬ ‫7-1 اﻟﻌﻤﻞ ﻡﻊ اﻟﻮﻗﺖ اﻹﺽﺎﻓﻲ ‪39 ................................................................... Overtime Work‬‬ ‫7-2 ﻓﻬﻢ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻮﻗﺖ اﻻﺿﺎﻓﻲ: ....................................................................................... 93‬ ‫7-3 ﺕﺴﻮیﺔ ﺕﻌﺎرﺽﺎت اﻟﻤﻮارد ‪40 ................................... Resource over allocation Leveling‬‬ ‫7-4 ﺕﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻤﺤﻤﻠﺔ ﺕﺤﻤﻴﻼ زاﺋﺪ ‪40 ................... Locating the over allocations Task‬‬ ‫7-5 ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﺘﺠﺰﺋﺔ او ﺕﺄﺥﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ ................................................................... 04‬ ‫7-6 ﺕﻄﺒﻴﻖ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ................................................................................................. 14‬ ‫7-7 اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ‪42 .......................................................................... Automatic Leveling‬‬ ‫7-8 ﺵﻜﻞ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت ‪42 ........................................................................ Bars Format‬‬ ‫7-9 ﺕﺨﻄﻴﻂ اﻻﺳﻄﺮ و اﻻﻋﻤﺪﻩ ‪43 ........................................................................... Gridlines‬‬ ‫7-01 ﺵﻜﻞ اﻟﻌﻼﻗﺎت ‪43 ..................................................................................... Layout Bars‬‬ ‫7-11 اﺽﺎﻓﺔ ﺟﺪاول ﺟﺪیﺪة ‪43 ..................................................................... Add more tables‬‬ ‫8. إدارة ﺕﺘﺒﻊ اﻟﻤﺸﺮوع ‪44 ............................................................................. Project Tracking‬‬ ‫8-1 ﺣﻔﻆ اﻟﻤﺨﻄﻂ اﻻﺳﺎﺳﻲ ‪44 ................................................................. Saving A Baseline‬‬ ‫8-2 ﻋﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ/اﻟﻘﺎﻋﺪیﺔ...................................................................................... 44‬ ‫8-3 ﺕﺤﺮیﺮ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ ................................................................................................. 54‬ ‫3‬
  • 4.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫8-4ﻡﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ ................................................................................................... 54‬ ‫8-5 ﺕﺘﺒﻊ ﺥﻄﻂ ﻡﺆﻗﺘﺔ ‪45 ................................................................................. Interim Plans‬‬ ‫8-6 ﻋﺮض ﺥﻄﺔ ﻡﺆﻗﺘﺔ ....................................................................................................... 54‬ ‫8-7 ﻡﺘﺎﺑﻌﺔاﻟﺘﻘﺪم ‪45 ..............................................................................................Tracking‬‬ ‫8-8 ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ ‪46 ......................................................................Up date Project‬‬ ‫8-9 ﺥﻂ اﻟﺘﻘﺪم ‪47 ......................................................................................... Progress line‬‬ ‫8-01 ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع ‪47 ................................................................................ Options‬‬ ‫8-6 اﻟﻤﺮﺵﺤﺎت ‪48 ................................................................................................... Filters‬‬ ‫9. اﻟﻄﺒﺎﻋﺔ ‪49 ......................................................................................................... Printing‬‬ ‫9-1 ادﺥﺎل اﻟﺼﻮر ‪50 ...................................................................... Insert Object/Picture‬‬ ‫9-2 اﻟﺘﻘﺎریﺮ ‪50 ..................................................................................................... Reports‬‬ ‫9-3 ﺣﻔﻆ اﻟﻤﻠﻒ ﻋﻠﻰ ﺻﻮرة أآﺴﻞ ‪51 ..................................................... Save As Excel Form‬‬ ‫9-4 اﺳﺘﻴﺮاد ﻡﻠﻒ اآﺴﻞ اﻟﻰ ﻡﺎیﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ ‪52 .................................... Import Excel File‬‬ ‫4‬
  • 5.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1.ﻡﻔﻬﻮم ادارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1-1 اﻟﻤﻘــﺪﻣﺔ‬ ‫إن هﺬﻩ اﻟﺪورة ﺗﻌﻄﻰ ﻡﻘﺪﻡﺔ ﻋﻦ ﻡﺒ ﺎدئ إدارة اﻟﻤﺸ ﺮوﻋﺎت واﻟﻄ ﺮق اﻟﻤﺴ ﺘﺨﺪﻡﺔ ﻟ ﺬﻟﻚ ﺑﺎﺳ ﺘﺨﺪام‬ ‫ﺗﻄﺒﻴﻘﺎت ﺑﺮﻧﺎﻡﺞ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ. ﺳﻮف یﺘﻌﻠﻢ اﻟﻄﺎﻟ ﺐ أن یﻔ ﺮق ﺑ ﻴﻦ اﻟﻤﺸ ﺮوع وﺑ ﻴﻦ اي‬ ‫ﺥﺪﻡ ﺔ أﺥ ﺮى وﺳ ﻮف یﻜ ﻮن ﺑﻤﻘ ﺪورﻩ ﻋﻨ ﺪ ﻧﻬﺎی ﺔ اﻟ ﺪورة ﻡﻌﺮﻓ ﺔ اﻟﻤﺮاﺣ ﻞ اﻟﺮﺋﻴﺴ ﻴﺔ ﻟﻠﻤﺸ ﺮوع‬ ‫وﺳ ﻮف یﻜ ﻮن ﻗ ﺎدرا ﻋﻠ ﻰ إدارة اﻟﻤﻬ ﺎم ﺑﺎﺳ ﺘﺨﺪام ‪ .MS Project‬إن اﻟﻤﺠ ﺎﻻت اﻟﺘ ﻲ ﺗﻌﻄﻴﻬ ﺎ‬ ‫اﻟﺪورة ﺗﺸﻤﻞ ادﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ، إدارة اﻟﻤﻬ ﺎم وﺗﺤﺪی ﺪ ﻡ ﺪﺗﻬﺎ ، ﻋﻤ ﻞ اﻟﻤﻬ ﺎم اﻟﺘﻠﺨﻴﺼ ﻴﺔ‬ ‫وﻧﺸ ﺎء اﻟﻤﻬ ﺎم اﻟﻔﺮﻋﻴ ﺔ ﻡ ﻊ رﺑ ﻂ اﻟﻤﻬ ﺎم ﺑﻌﻀ ﻬﺎ ﺑ ﺒﻌﺾ‬ ‫.آﻤ ﺎ ﺳ ﻮف ی ﺘﻌﻠﻢ اﻟﻤﺸ ﺎرك آﻴﻔﻴ ﺔ‬ ‫ﺗﺨﺼﻴﺺ اﻟﻤ ﻮارد وﺣﻔ ﻆ اﻟﻤﺸ ﺮوع اﻷﺳﺎﺳ ﻲ و ﺗﺘﺒ ﻊ اﻟﻤﺸ ﺮوع اﺛﻨ ﺎء اﻟﺘﻨﻔﻴ ﺬ وﻃﺒﺎﻋ ﺔ واﻋ ﺪاد‬ ‫اﻟﺘﻘﺎریﺮ اﻟﻼزﻡﺔ اﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ .‬ ‫1-2 اﻷهﺪاف‬ ‫ﻓﻲ ﻧﻬﺎیﺔ هﺬﻩ اﻟﺪورة ﺳﻮف یﻜﻮن ﻟﺪیﻚ اﻟﻘﺪرة ﻋﻠﻰ :‬ ‫ﻓﻬﻢ اﻟﻤﺒﺎدئ اﻷﺳﺎﺳﻴﺔ ﻹدارة اﻟﻤﺸﺮوﻋﺎت.‬ ‫اﻟﺘﻌﺮف ﻋﻠﻰ ﺑﻌﺾ ﻡﺼﻄﻠﺤﺎت إدارة اﻟﻤﺸﺮوﻋﺎت.‬ ‫ﻡﻌﺮﻓﺔ آﻴﻒ یﻤﻜﻦ اﻻﺳﺘﻔﺎدة ﻡﻦ ‪MS Project‬‬ ‫ﻡﻌﺮﻓﺔ ﻋﻨﺎﺹﺮ ﺗﺮآﻴﺐ ‪MS Project‬‬ ‫ﺗﻤﻴﻴﺰ اﻟﺴﻤﺎت اﻷﺳﺎﺳﻴﺔ ﻟﺒﺮﻧﺎﻡﺞ ‪MS Project‬‬ ‫اﻟﻘﺪرة ﻋﻠﻲ ﻋﻤﻞ ﺗﺨﻄﻴﻂ ﻡﺘﻜﺎﻡﻞ ااﻡﺸﺮوع.‬ ‫1-3 ﻣﺎذا ﺳﻮف ﺕﺘﻌﻠﻢ‬ ‫اﻟﻤﻘﺪﻡﺔ ﻹدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﻤﻘﺪﻡﺔ ﻻﺳﺘﺨﺪام ‪MS Project‬‬ ‫اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوﻋﺎت‬ ‫ﺗﻜﻮیﻦ اﻟﻤﺸﺮوع‬ ‫ﺗﺤﺪیﺪ ﻋﻼﻗﺎت اﻟﻤﻬﺎم‬ ‫إدارة و ﺗﺨﺼﻴﺺ اﻟﻤﻮارد اﻟﻤﺸﺮوع‬ ‫ﺗﺨﺼﻴﺺ ﺗﻜﺎﻟﻴﻒ اﻟﻤﺸﺮوع‬ ‫ﻡﺮاﻗﺒﺔ و اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﺘﻜﻠﻔﺔ‬ ‫ﺗﺘﺒﻊ اﻟﻤﺸﺮوع أﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ‬ ‫ﻃﺒﺎﻋﺔ وﻗﺮاءة ﺗﻘﺎریﺮ اﻟﻤﺸﺮوع.‬ ‫5‬
  • 6.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1-4ﻡﺒﺎدئ إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1-4-1 ﻡﺎ هﻮاﻟﻤﺸﺮوع‬ ‫اﻟﻤﺸ ﺮوع ه ﻮ اﻟﺴ ﻌﻲ اﻟﻤﺆﻗ ﺖ ﻹیﺠ ﺎد ﻡﻨ ﺘﺞ أو ﺥﺪﻡ ﺔ وﺣﻴ ﺪﻩ. و ﺗﻌﻨ ﻲ آﻠﻤ ﺔ ﻡﺆﻗ ﺖ هﻨ ﺎ أن آ ﻞ‬ ‫ّ‬ ‫ّ‬ ‫ﻡﺸﺮوع ﻟﻪ ﺑ َا َﺔ ﻡﺤﺪدﻩ و ﻧﻬﺎیﺔ ﻡﺤﺪدﻩ و ﺗﻌﻨﻲ آﻠﻤﺔ وﺣﻴﺪة أن اﻟﻤﻨﺘﺞ أو اﻟﺨﺪﻡﺔ ُﺨﺘﻠﻔ ﺔ ﺑﻄﺮیﻘ ﺔ‬ ‫ﻡ‬ ‫ّ‬ ‫ِﺪ ی‬ ‫ﻡﺘﻤﻴﺰة ﻋﻦ آﻞ اﻟﻤﻨﺘﺠﺎت واﻟﺨﺪﻡﺎت اﻷﺥﺮى.‬ ‫ّ‬ ‫و ﻟﻘ ﺪ ﻋ ﺮف هﻴﺮﺳ ﻮن )2991 ( اﻟﻤﺸ ﺮوع ﺑﺄﻧ ﻪ "أي ﺳﻠﺴ ﻠﺔ ﻡ ﻦ اﻷﻧﺸ ﻄﺔ أو اﻟﻤﻬ ﺎم اﻟﺘ ﻲ ﻟﻬ ﺎ‬ ‫أهﺪاف ﻡﺤﺪدﻩ یﺠﺐ أن ﺗﻨﺠﺰ ﺽﻤﻦ ﻡﻮاﺹﻔﺎت ﻡﺤ ﺪدﻩ و ﻟ ﻪ ﺑﺪای ﺔ و ﻧﻬﺎی ﺔ ﻡﺤ ﺪدﺗﺎن و ﻟ ﻪ ﺗﻤﻮی ﻞ‬ ‫ﻡﺤﺪد و یﺴﺘﻌﻤﻞ اﻟﻤﺼﺎدر اﻟﻤﺨﺘﻠﻔﺔ ﻡﻦ اﻡﻮال و وﻗﺖ و ﻡﻌﺪات و ﻋﻤﺎﻟ ﻪ. و ﻟﻘ ﺪ ﻧﺴ ﺐ ﺑﺮیﻤ ﺎن و‬ ‫ﺁﺥﺮیﻦ )5991 ( اﻟﻲ ﻟﻴﺶ و ﺗﻴﺮﻧﺮ )0991 ( ﺗﻌﺮیﻒ اﻟﻤﺸ ﺮوع ﺑﺄﻧ ﻪ " وﺣ ﺪة اﺳ ﺘﺜﻤﺎر ﺹ ﻨﺎﻋﻲ‬ ‫ﺟﺪیﺪة و اﻟﺘﻲ ﻟﻬﺎ ﺑﻌﺾ اﻟﻤﻌﺎﻟﻢ اﻟﻤﻤﻴﺰة أو اﻟﻤﺘﻔﺮدة و ذﻟﻚ ﻡﻦ ﺥﻼل ﺗﻨﺎﻏﻢ اﻟﻮﻗﺖ ﻡﻊ اﻟﺘﻜﻠﻔﺔ".‬ ‫1-4-2 ﺻﻔﺎت اﻟﻤﺸﺮوع‬ ‫یﻤﻜﻦ ﺗﻠﺨﻴﺺ ﺹﻔﺎت اﻟﻤﺸﺮوع ﺑﺄﻧﻪ:‬ ‫ﻟﻪ هﺪف یﻤﻜﻦ ﻗﻴﺎﺳﻪ‬ ‫وﻗﺖ ﻡﺤﺪد‬ ‫ﻡﻮارد ﻡﺤﺪدة‬ ‫ﻡﻬﺎم ﻡﻌﺘﻤﺪة ﻋﻠﻰ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ‬ ‫اﻟﻤﺸﺮوع داﺋﻤﺎ ﻓﻲ ﺣﺎﻟﺔ ﺗﻐﻴﻴﺮ )دیﻨﺎﻡﻴﻜﻲ(‬ ‫1-5 إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫إﻧﻬﺎ ﻋﻤﻠﻴﺔ ﺗﺘﻜﻮن ﻡﻦ وﻇﺎﺋﻒ ﻡﺘﻨﻮﻋﺔ هﻲ:‬ ‫اﻟﺘﺨﻄﻴﻂ‬ ‫اﻟﺘﻨﻈﻴﻢ‬ ‫اﻟﻤﺮاﻗﺒﺔ‬ ‫اﻟﺘﺤﻜﻢ‬ ‫وذﻟﻚ ﻟﻜﻞ ﻡﻦ اﻟﻌﻨﺎﺹﺮ اﻟﺘﺎﻟﻴﺔ‬ ‫اﻟﻮﻗﺖ‬ ‫اﻟﺘﻜﻠﻔﺔ‬ ‫اﻟﺠﻮدة‬ ‫اﻻداء‬ ‫6‬
  • 7.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1-6اﻟﻤﺮاﺣﻞ اﻷﺳﺎﺳﻴﺔ ﻟﻠﻤﺸﺮوع‬ ‫ﺟﻤﻴﻊ اﻟﻤﺸﺎریﻊ ﺗﺸﻤﻞ ﻋﻠﻰ ﺗﻘﺴﻴﻢ اﻟﻤﺸﺮوع إﻟﻰ ﻡﻬﺎم یﻤﻜﻦ ﻗﻴﺎﺳﻬﺎ ویﻤﻜﻦ ﺟﺪوﻟﺘﻬﺎ وﺗﺸﻤﻞ‬ ‫اﻻﺗﺼﺎل ﺑﻴﻦ أﻋﻀﺎء اﻟﻔﺮیﻖ وأیﻀﺎ ﻡﺘﺎﺑﻌﺔ ﺗﻘﺪم اﻟﻌﻤﻞ‬ ‫ﺟﻤﻴﻊ اﻟﻤﺸﺮوﻋﺎت ﺗﺘﻜﻮن ﻡﻦ ﺛﻼث ﻡﺮاﺣﻞ رﺋﻴﺴﻴﺔ هﻲ:‬ ‫اﻟﺘﺨﻄﻴﻂ‬ ‫ﺗﺘﺒﻊ وادارة اﻟﺘﻘﺪم‬ ‫اﻧﻬﺎء اﻟﻤﺸﺮوع.‬ ‫1-6-1 اﻟﻤﺮﺣﻠﺔ اﻷوﻟﻰ : اﻟﺘﺨﻄﻴﻂ‬ ‫إن اﻓﻀﻞ ﻃﺮیﻘﺔ ﻟﻠﺘﺨﻄﻴﻂ هﻲ ﺑﺈﻏﻼق اﻟﻜﻤﺒﻴﻮﺗﺮ واﻻﻡﺴﺎك ﺑﺎﻟﻘﻠﻢ واﻟﻮرﻗﺔ وذﻟﻚ ﻟﺘﺤﺪیﺪ اﻻﺗﻰ:‬ ‫1.‬ ‫أهﺪاف اﻟﻤﺸﺮوع.‬ ‫2.‬ ‫اﻟﻤﺴﺘﻔﻴﺪیﻦ ﻡﻦ اﻟﻤﺸﺮوع ، ﺗﻮﻗﻌﺎﺗﻬﻢ ، وﻡﺴﺘﻮى اﻟﺘﺄﺛﻴﺮ.‬ ‫3.‬ ‫اﻟﻤﻬﺎم اﻟﻤﻄﻠﻮب ﺗﻨﻔﻴﺬهﺎ ، ویﺸﻤﻞ ذﻟﻚ اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻌﻠﻮﻡﺎت إﺽﺎﻓﻴﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻄﻠﺐ.‬ ‫4.‬ ‫اﻟﻤﻮارد اﻟﻤﺘﻮﻓﺮة.‬ ‫5.‬ ‫اﻟﻘﻴﻮد )اﻟﻤﻮاﻋﻴﺪ اﻟﻤﺤﺪدة – اﻟﻤﻴﺰاﻧﻴﺔ - اﻟﻤﻮارد(‬ ‫1-6-2 اﻟﻘﻴﻮد :ﻣﺜﻠﺚ اﻟﻤﺸﺮوع‬ ‫إن اﻟﻤﺸﺮوع یﺘﻢ ﺗﺸﻜﻴﻠﻪ ﺑﺎﺳﺘﺨﺪام ﻋﺎﻡﻞ اﻟﻘﻴﻮد واﻟﻘﻴﻮد اﻟﻤﺒﺪﺋﻴﺔ هﻲ : ) اﻟﻮﻗﺖ واﻟﺘﻜﺎﻟﻴﻒ وﻣﺠﺎل‬ ‫اﻟﻤﺸﺮوع(‬ ‫اﻟﻮﻗﺖ: آﻢ ﻡﻦ اﻟﻮﻗﺖ ﺳﻮف یﺴﺘﻐﺮق اﻟﻤﺸﺮوع واﻟﺬي ﺳﻮف یﻨﻌﻜﺲ ﻋﻠﻰ ﺟﺪوﻟﺔ اﻟﻤﺸﺮوع‬ ‫اﻟﺘﻜﺎﻟﻴﻒ :آﻢ ﻡﻦ اﻟﻤﺎل ﺳﻮف یﻜﻠﻒ اﻟﻤﺸﺮوع وذﻟﻚ اﻋﺘﻤﺎدا ﻋﻠﻰ ﺗﻜﺎﻟﻴﻒ اﻟﻤﻮارد ﻡﻦ ﻡﻮارد‬ ‫ً‬ ‫ﺑﺸﺮیﺔ وﻡﻌﺪات وﻡﻮاد.‬ ‫اﻟﻤﺠﺎل :آﻢ هﻮ ﺣﺠﻢ اﻟﻌﻤﻞ اﻟﻤﻄﻠﻮب ﻟﺘﻠﺒﻴﺔ أهﺪاف وﻡﻬﺎم اﻟﻤﺸﺮوع.‬ ‫هﺬﻩ اﻟﻌﻮاﻡﻞ اﻟﺜﻼﺛﺔ ﻡﻌﺎ ﺗﺴﻤﻰ ﻡﺜﻠﺚ اﻟﻤﺸﺮوع .أن ﺗﻌﺪیﻞ أي ﻋﻨﺼﺮ ﻡﻦ ﻋﻨﺎﺹﺮ ﻡﺜﻠﺚ‬ ‫ً‬ ‫اﻟﻤﺸﺮوع ﺳﻮف یﺆﺛﺮ ﻋﻠﻰ اﻟﻌﻨﺼﺮیﻦ اﻵﺥﺮیﻦ وﻋﺎدة ﻡﺎ یﻜﻮن أﺣﺪهﻢ ﻟﻪ ﺗﺄﺛﻴﺮ اآﺒﺮ ﻋﻠﻰ‬ ‫ﻡﺸﺮوﻋﻚ.‬ ‫1-7 دورة ﺣﻴﺎﻩ اﻟﻤﺸﺮوع ‪The Project Life Cycle‬‬ ‫ﻟﻘﺪ ﺗﺒﻨﻰ ﻡﻌﻬﺪ إدارة اﻟﻤﺸﺮوﻋﺎت اﻷﻡﺮیﻜﻴﺔ ﺗﻘﺴﻴﻢ دورة ﺣﻴﺎة اﻟﻤﺸﺮوع و اﻟﺬي اﻗﺘﺮﺣﻪ "ﻡﻮرس"‬ ‫"‪ "Morris‬واﻟﺬي ﺣﻴﺚ ﻗﺴﻢ اﻟﻤﺸﺮوع اﻟﻰ أرﺑﻌﺔ ﻡﺮاﺣﻞ هﻲ:-‬ ‫1- ﻣﺮﺡﻠﺔ اﻟﺠﺪوى: " ‪“Feasibility‬‬ ‫7‬
  • 8.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫وهﻲﺗﺸﻤﻞ ﻋﻠﻰ وﺽﻊ اﻟﻤﺸﺮوع ﻓﻲ ﺹﻴﺎﻏﺔ رﺳﻤﻴﺔ ودراﺳﺎت اﻟﺠﺪوى واﻟﺘﺼﻤﻴﻤﺎت اﻻﺳﺘﺮاﺗﻴﺠﻴﺔ‬ ‫وﻡﺮﺣﻠﺔ اﻟﻤﻮاﻓﻘﺎت ﻋﻠﻰ آﻞ ﻡﺎ ﺳﺒﻖ.‬ ‫2- ﻣﺮﺡﻠﺔ اﻟﺘﺨﻄﻴﻂ واﻟﺘﺼﻤﻴﻢ : "‪“Planning & Design‬‬ ‫وﺗﺸﻤﻞ ﻋﻠﻰ اﻟﺘﺼﻤﻴﻢ اﻷﺳﺎﺳﻲ وﺣﺴﺎب آﻞ ﻡﻦ اﻟﺘﻜﻠﻔﺔ وﺟﺪوﻟﺔ اﻟﻤﺸﺮوع وﺹﻴﺎﻏﺔ ﺑﻨﻮد اﻟﻌﻘﺪ‬ ‫وﺵﺮوﻃﻪ واﻟﺨﻄﻂ اﻟﺘﻔﺼﻴﻠﻴﺔ.‬ ‫3- ﻣﺮﺡﻠﺔ اﻹﻧﺘﺎج :"‪“Production Stage‬‬ ‫ﺗﺘﻜﻮن ﻡﻦ اﻟﺘﺼﻨﻴﻊ واﻟﺘﻮریﺪ واﻷﻋﻤﺎل اﻟﻤﺪیﻨﺔ واﻟﺘﺮآﻴﺒﺎت واﻟﻔﺤﻮﺹﺎت.‬ ‫4- اﻹﻧﻬﺎء : "‪"Turning Over‬‬ ‫وهﻲ ﺗﺸﻤﻞ إﻧﻬﺎء اﻷﻋﻤﺎل واﻟﺘﺸﻐﻴﻞ واﻟﻔﺤﺺ اﻟﻨﻬﺎﺋﻲ واﻟﺼﻴﺎﻧﺔ. آﻞ هﺬﻩ اﻟﻤﺮاﺣﻞ ﻡﻮﺽﺤﺔ ﻓﻲ‬ ‫اﻟﺸﻜﻞ أدﻧﺎﻩ.‬ ‫1-8 ﻋﻨﺎﺻﺮ ادارة اﻟﻤﺸﺮوﻋﺎت‬ ‫ﺗﺘﻜﻮن ادارة اﻟﻤﺸﺮوﻋﺎت ﻡﻦ اﻟﻌﻨﺎﺹﺮ اﻟﺘﺎﻟﻴﺔ:‬ ‫اﻟﺠﺪوﻟﺔ‬ ‫اﻟﻤﻴﺰایﻨﺔ‬ ‫اﻟﻤﻮارد‬ ‫ﻡﺘﺎﺑﻌﺔ اﻟﺘﻘﺪم‬ ‫اﻟﺘﻘﺎریﺮ‬ ‫اﻟﺸﻜﻞ 1-1 : دورة ﺡﻴﺎة اﻟﻤﺸﺮوع‬ ‫8‬
  • 9.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫1-8-1ﻃﺮق ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ‪Scheduling‬‬ ‫هﻨﺎك أﻧﻮاع ﻋﺪیﺪة ﻡﻦ اﻟﺠﺪوﻟﺔ اﻟﺰﻡﻨﻴﺔ ﻡﻨﻬﺎ :‬ ‫ﻗﺎﺋﻤﻪ اﻟﻤﺸﺘﺮیﺎت.‬ ‫ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن.‬ ‫ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ.‬ ‫اﻟﻤﺴﺎر اﻟﺤﺮج.‬ ‫ﻃﺮیﻘﺔ ‪. PERT‬‬ ‫اﻟﻤﺤﺎآﺎة.‬ ‫1-8-2 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن‬ ‫ﻟﻘﺪ ﻗﺎم هﻨﺮي ﺟﺎﻧﺖ ‪ (1861-1919) Henry Gantt‬ﺑﺘﻄ ﻮیﺮ ﻃﺮیﻘ ﺔ ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن. ﺣﻴ ﺚ‬ ‫ﻻ زال ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﻌﺮف آﺄﻓﻀﻞ ﻃﺮیﻘﺔ ﻟﺘﻤﺜﻴﻞ اﻟﺨﻄﻂ. یﻌﺮض ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن أﻧﺸ ﻄﺔ‬ ‫َِْ ُ‬ ‫اﻟﻤﺸﺮوع و آﻴﻔﻴﺔ ﺟﺪوﻟﺔ أزﻡﻨﺔ هﺬﻩ اﻷﻧﺸﻄﺔ و ذﻟﻚ ﺑﺎﺳﺘﺨﺪام اﻟﻘﻀ ﺒﺎن واﻟﺘ ﻲ یﻨﺎﺳ ﺐ ﻃﻮﻟﻬ ﺎ ﻡ ﻊ‬ ‫اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻟﻸﻧﺸﻄﺔ. و یﻌﺪ ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن أﺣ ﺪ أدوات اﻟﺘﺨﻄ ﻴﻂ اﻷﻗ ﺪم و اﻟﺘ ﻲ ﺑﺮ َﻨ ﺖ ﻋﻠ ﻰ‬ ‫َ ْه‬ ‫َِْ‬ ‫آﻮﻧﻬﺎ أداة ﻡﻔﻴﺪة. إ ّﻪ ﺑﺴﻴﻂ و واﺽﺢ، و ﺳﻬﻞ اﻻﺳﺘﻌﻤﺎل و اﻟﻔﻬﻢ. و ه ﻮ وﺳ ﻴﻠﺔ ﺗﺨﻄ ﻴﻂ و ﺟﺪوﻟ ﺔ‬ ‫َْ َ ُ‬ ‫ﻧ‬ ‫ﻡﻨﺘﺸ ﺮة ﺑﺸ ﻜﻞ واﺳ ﻊ و ه ﻮ ُ یﺤﺘ ﺎج إﻟ ﻲ ﻡﺮاﺟﻌ ﺔ و ﺗﺤ ﺪیﺚ ﺑﺪرﺟ ﺔ اﻗ ﻞ ﻡ ﻦ أي ﻡ ﻦ اﻷﻧﻈﻤ ﺔ‬ ‫اﻟﻤﻌﻘﺪة.‬ ‫اﻟﻨ َﺎط هﻮ ﻡﻬ ّﺔ أو ﻋﻤﻞ أو ﻡﺠﻤﻮﻋﺔ ُﺮﺗﺒﻄﺔ ﻡﻦ اﻟﻤﻬﺎم و اﻟﺬي أ َاؤﻩ یﺴ ﺎهﻢ ﺑﺈآﻤ ﺎل اﻟﻤﺸ ﺮوع.‬ ‫َد ُ َ ِ ُ‬ ‫ّ‬ ‫ﻡ‬ ‫ﻤ‬ ‫ﺸ‬ ‫ﻋﻼوة ﻋﻠﻰ ﺗﺨ ﱢﺺ ﺗﻮاریﺦ ﻷﻧﺸﻄﺔ اﻟﻤﺸﺮوع،ﻓﺎن ﺟﺪوﻟﺔ اﻟﻤﺸﺮوﻋﺎت ﺗﺸﻤﻞ ﺗﺠﻬﻴ ﺰ اﻟﻤ ﻮاد و‬ ‫ُ َﺼ ُ‬ ‫اﻟﻌﻤﺎﻟﺔ و اﻟﻤﻌﺪات اﻟﻼزﻡﺔ ﻟﻠﻤﻬﺎم ﺥﻼل وﻗﺖ اﻟﻤﺸﺮوع .‬ ‫ّ‬ ‫.یﻄﻠﺐ اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻼك ﺗﻘﺪیﻢ ﺟﺪول زﻡﻨﻲ ﺗﻔﺼﻴﻠﻲ ﻟﻠﻤﺸﺮوع یﻘﺪﻡﻪ اﻟﻤﻘﺎول آﻮﺳﻴﻠﺔ ﻟﻤﺮاﻗﺒﺔ‬ ‫ﺑﺮﻧﺎﻡﺞ اﻟﻌﻤﻞ.‬ ‫وﻻ یﻤﻜ ﻦ اﻻﺳ ﺘﺨﻔﺎف ﺑﻘﻴﻤ ﺔ ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن . ان أﺣ ﺪ أه ﻢ ﻋﻨﺎﺹ ﺮ اﻟﻘ ﻮﻩ ﺗﻜﻤ ﻦ ﻓ ﻲ ﻗﺪرﺗ ﻪ‬ ‫ُِْ ُ‬ ‫اﻟﺴﺮیﻌﺔ و اﻟﻮاﺽﺤﺔ ﻋﻠﻰ ﻋﺮض وﺣﺎﻟﺔ اﻟﻤﺸﺮوع. و یﻤﻜ ﻦ ﻟﻤﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن أن یﺴ ﺘﻌﻤﻞ ﻟﺘﻨﻘ ﻞ‬ ‫ُ ْ َ ْ َ َ َ ُْ َ‬ ‫ُِْ ُ‬ ‫ﺹﻮرﻩ ﻋﻦ وﺽﻊ اﻟﻤﺸﺮوع ﺑﺸﻜﻞ ﻋ ﺎم ﺑﻤ ﺎ یﻠﺒ ﻲ ﺣﺎﺟ ﺎت اﻹدارة اﻟ ُﻠﻴ ﺎ . وﻋﻨ ﺪﻡﺎ ﺗﻜ ﻮن اﻟﻤ ﻮارد‬ ‫ﻌ‬ ‫اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع ﻡﺤﺪدة. ﻓﺈن ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﺴﺘﺨﺪم ﻟﺘﻘﻴ ﻴﻢ اﻻﺳ ﺘﻌﻤﺎل اﻟﻤﺒ ﺪﺋﻲ ﻟﻬ ﺬﻩ اﻟﻤ ﻮارد‬ ‫و ﻋﻠﻰ اﻟﺮﻏﻢ ﻡﻦ ذﻟﻚ ﻓﺎن اﻟﻌﻼﻗ ﺎت و اﻟ ﺮواﺑﻂ ﺑ ﻴﻦ اﻷﻧﺸ ﻄﺔ ﻻ یﻤﻜ ﻦ ﺗﻤﺜﻴﻠﻬ ﺎ ﺑﺴ ﻬﻮﻟﺔ، ﻻ ﺳ ّﻤﺎ‬ ‫ﻴ‬ ‫ﻓ ﻲ اﻟﻤﺸ ﺎریﻊ اﻟﻜﺒﻴ ﺮة ﺣﻴ ﺚ یﻔﻀ ﻞ اﺳ ﺘﻌﻤﺎل ﺟﺪوﻟ ﺔ اﻟﺸ ﺒﻜﺎت ﻟﻬ ﺬا اﻟﻐ ﺮض. إﻧ ﻪ ﻡ ﻦ اﻟﺼ ﻌْﺐ‬ ‫َ‬ ‫ّ‬ ‫اﻟﺘﻌﺮف ﻋﻠﻰ ﺗﺘﺒﻊ اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴ ﺔ و اﻟﻘﻴ ﻮد ﺑ ﻴﻦ اﻟﻔﻌﺎﻟﻴ ﺎت و أیﻀ ﺎ إﻧ ﻪ ﻡ ﻦ اﻟﺼ ﻌْﺐ اﺳ ﺘﻌْﻤﺎَﻪ‬ ‫َ ُ ْ َ َﻟ‬ ‫ً ّ‬ ‫9‬
  • 10.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫ﻟﻠﺘﻨّﺆ ﺑﺎﻟﻤﺆ ﱢﺮات اﻟﺘﻲ ﺗﺘﻐﻴﺮ ﻓﻲ اﻷﻧﺸﻄﺔ ﻋﻠﻰ ُ اﻟﺠﺪول ﺑﺸﻜﻞ ﻋﺎم. ﻟﺬﻟﻚ ﻓﺎن ﻡﺨﻄﻂ اﻟﻘﻀ ﺒﺎن ﻟ ﻪ‬ ‫َ َ َﱠ ُ‬ ‫ُ َﺛ‬ ‫ﺒ‬ ‫ﻗﺪرﻩ ﻡﺤﺪودة آﺎداﻩ ﻟﻠﺘﺤﻜﻢ.‬ ‫1-8-3 ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن اﻟﻤﺘﺮاﺑﻂ‬ ‫ان ﻡﺨﻄ ﻂ اﻟﻘﻀ ﺒﺎن اﻟﻤﺘ ﺮاﺑﻂ ه ﻮ ﻡﺨﻄ ﻂ ﻗﻀ ﺒﺎن ﺗ ﻢ رﺑ ﻂ ﻓﻌﺎﻟﻴﺎﺗ ﻪ ﺑﻮاﺳ ﻄﺔ اﻟﻌﻼﻗ ﺎت اﻟﻤﻨﻄﻘﻴ ﺔ‬ ‫اّﺘﻲ ﺗﻈﻬﺮ اﻋﺘﻤﺎد اﻟﻔﻌﺎﻟﻴﺎت ﻋﻠﻰ ﺑﻌﻀﻬﺎ ﺑﺸﻜﻞ ﻡﻨﻄﻘﻲ. و ﻗﺪ أﺹﺒﺢ ﻡﻌﺮوﻓﺎ آﻮﺳﻴﻠﺔ ﻟﻌﻤﻞ ﺗﻤﺜﻴ ﻞ‬ ‫َ َْ َ‬ ‫ﻟ َ َْ ُ‬ ‫ﺑﻴﺎﻧﻲ ﻡﻨﻄﻘ ﻲ ﻋﻠ ﻰ اﻟﺤﺎﺳ ﻮب، ﺣﻴ ﺚ اﻧ ﻪ یﺴ ﻬﻞ ﺗﻤﺜﻴ ﻞ اﻷﻧﺸ ﻄﺔ و رواﺑﻄﻬ ﺎ ﻡﺒﺎﺵ ﺮة ﻋﻠ ﻰ ﺟﻬ ﺎز‬ ‫اﻟﻜﻤﺒﻴﻮﺗﺮ.‬ ‫ﻟﻴﺲ ﻓﻘﻂ اﻷﺳﻬﻢ اﻟﺘﻲ ﺗﺮﺑﻂ ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ﺗﻤ ﱢﻞ اﻟﺮﺑﻂ اﻟﻤﻨﻄﻘﻲ ﺑﻴﻦ اﻟﻔﻌﺎﻟﻴﺎت و ﻟﻜﻨﻬﺎ أیﻀ ﺎ‬ ‫ُ َﺜ ُ‬ ‫َ ِْ ُ‬ ‫ﺗﺴﺘﺨﺪم ﻟﺮﺑﻂ اﻟﻤﻮرد. ان اﻟﺘﺮاﺑﻂ ﺑﻴﻦ اﻷﻧﺸﻄﺔ ﻟﻪ ﻓﺎﺋﺪﻩ یﻤﻜﻦ ﻡﻦ ﺥﻼﻟﻪ ﻡﺘﺎﺑﻌﺔ اى ﺗ ﺄﺥﻴﺮ ﻓ ﻲ‬ ‫اﻟﻔﻌﺎﻟﻴﺎت ﺑﺴﻬﻮﻟﺔ و ﻋﻤﻞ اﻟﻤﺘﺎﺑﻌﺔ و اﻟﺘﺤﻜﻢ اﻟﻤﻄﻠﻮﺑﻴﻦ ﻋﻨﺪ ﺗﻘﺪم اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع.‬ ‫1-8-4 ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج )‪(CPM‬‬ ‫ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج ﺗﺤﺪد ﺳﻠﺴﻠﺔ اﻟﻔﻌﺎﻟﻴﺎت ﻓﻲ اﻟﻤﺸﺮوع و اﻟﺘﻲ ﺗﺘﺤﻜﻢ ﻓﻲ اﻟﺰﻡﻦ اﻟ ﺬي ﺳ ﻴﺄ ُﺬﻩ‬ ‫َ ْﺥ ُ‬ ‫ََ َ ﱠ ُ‬ ‫اﻟﻤﺸﺮوع )8991 ,‪ .(Hinze‬ﺗﻘﻮم هﺬﻩ اﻟﻄﺮیﻘﺔ ﺑﺤﺴﺎب اﻟﺤﺪ اﻻدﻧﻰ ﻡﻦ اﻟﻮﻗﺖ اﻟﻼزم ﻟﻠﻤﺸ ﺮوع‬ ‫ﻡﻦ اﻟﺒ َا َﺔ اﻟﻤﻤﻜﻨﺔ و ﺗﻨ ِﻲ وﻓﻘﺎ ﻷﻧﺸﻄﺔ اﻟﻤﺸﺮوع.‬ ‫ُ ْﻬ‬ ‫ِﺪ ی‬ ‫ﺗﻄ ﻮرت ﻃﺮیﻘ ﺔ اﻟﻤﺴ ﺎر اﻟﺤ ﺮج ﺑﺎﻟﻤﺸ ﺎرآﺔ ﺑ ﻴﻦ اﻟﻌ ﺎﻟﻤﻴﻦ) ‪ Remington rand‬و ‪DuPont‬‬ ‫َ َﱠَ ْ‬ ‫‪ .(Bedworth‬إن ﻃﺮیﻘﺔ اﻟﻤﺴﺎر اﻟﺤﺮج و ﺗﻘﻨﻴﺎت اﻟﺠﺪوﻟﺔ اﻟ ُﺮﺗﺒﻄﺔ ﺑﻬﺎ، ﻡﺜ ﻞ اﻟﻤ ﻮرد و ﺗﺤﻠﻴ ﻞ‬ ‫ﻤ‬ ‫اﻷﺳ ﻌﺎر ﻻ زاﻟ ﺖ ﺗﻤﺜ ﻞ أﻗ ﻮى اﻷدوات اﻟﺘﺤﻠﻴﻠﻴ ﺔ اﻟﻤﺴ ﺘﺨﺪﻡﺔ ﻟﻠﺘﺨﻄ ﻴﻂ و اﻟ ﺘﺤﻜﻢ ﻓ ﻲ اﻟﻤﺸ ﺮوع و‬ ‫َِْ‬ ‫ّ‬ ‫اﻷآﺜﺮ ﻋﻠﻰ ﻧﺤﻮ واﺳﻊ ﻓﻲ اﺳﺘﺨﺪام ﺗﻘﻨﻴﺎت اﻟﻜﻤﺒﻴﻮﺗﺮ.‬ ‫إن أﻗﻮى ﻣﻤﻴﺰات اﺳﺘﺨﺪام ‪ CPM‬هﻲ:‬ ‫• أﻧﻬﺎ یﻤﻜﻦ أن ﺗﻤﺜﻞ ﻋﺪدا آﺒﻴﺮا ﻡﻦ اﻷﻧﺸﻄﺔ، هﻲ ﺗﻮ ﱢﺢ اﻟﻌﻼﻗﺔ اﻟﻤﺸﺘﺮآﺔ ﺑﻴﻦ اﻷﻧﺸﻄﺔ.‬ ‫ُ َﺽ ُ‬ ‫• اﻧﻬﺎ ﻡﻔﻴﺪة ﺟﺪا ﻟﺘﻮﻗﻊ ﻡﺎ ﺳﻴﺤﺪث وﺗﺴﺘﻌﻤﻞ اﻟﺘﺤﻜﻢ ﻓﻲ اﻻﻧﺸﻄﺔ.‬ ‫• اﻧﻬﺎ ﺗﺤﺪد اآﺜﺮ اﻟﻌﻨﺎﺹﺮ اﻟﺤﺮﺟﺔ ﻓﻲ اﻟﻤﺸﺮوع و ﺗﺤﺪد اوﻟﻮیﺎت اﻟﺘﻨﻔﻴﺬ اﻟﻤﻨﺎﺳﺒﺔ.‬ ‫• ان اﻟﺠﻤﻊ ﺑﻴﻦ اﺳﺘﺨﺪام ‪ CPM‬و ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن یﺴﺎﻋﺪ ﻓﻲ ﺗﺤﺪیﺪ اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ‬ ‫ﻟﻠﻤﺸﺮوع.‬ ‫َ‬ ‫01‬
  • 11.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫2.اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺑﻴﻦ اﻟﻤﻬﺎم ‪Task Relationship‬‬ ‫هﻨﺎك ارﺑﻊ اﻧﻮاع ﻡﻦ اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ و اﻟﺘﻲ ﺗﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ و اﻟﺸﻜﻞ 2-1یﻮﺽﺢ‬ ‫هﺬة اﻟﻌﻼﻗﺎت و هﻲ:‬ ‫1. )‪ : Finish to Start(FS‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﺑﻌﺪ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬ ‫2. )‪ : Start to Start(SS‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﻊ ﺑﺪاﺑﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬ ‫3. )‪ : Finish to Finish(FF‬ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﻊ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﺒﺎﺵﺮة‬ ‫4. )‪ : Start to Finish (SF‬ﺗﺒﺪأ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ ﻡﻊ ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ ﻡﺒﺎﺵﺮة‬ ‫‪Lead/Lag Relationships‬‬ ‫‪FF ij‬‬ ‫‪Dj‬‬ ‫‪EF‬‬ ‫‪Forward Pass‬‬ ‫‪j‬‬ ‫‪i‬‬ ‫‪Di‬‬ ‫‪FS ij‬‬ ‫.‪ES DESC‬‬ ‫‪ES DESC. EF‬‬ ‫‪SS ij‬‬ ‫‪SF ij‬‬ ‫‪FF jk‬‬ ‫‪Dk‬‬ ‫‪LF‬‬ ‫‪Backward Pass‬‬ ‫‪k‬‬ ‫‪j‬‬ ‫‪Dj‬‬ ‫‪FS jk‬‬ ‫.‪LS DESC‬‬ ‫‪LS DESC. LF‬‬ ‫‪SS jk‬‬ ‫‪SF jk‬‬ ‫اﻟﺸﻜﻞ 2-1 : اﻟﻌﻼﻗﺎت اﻟﻤﻨﻄﻘﻴﺔ ﺏﻴﻦ اﻟﻤﻬﺎم‬ ‫و ﻟﺘﻤﺜﻴﻞ اي ﻓﻌﺎﻟﻴﺔ یﺴﺘﺨﺪم اﻟﺸﻜﻞ 2-2 ﻟﺘﻮﺽﻴﺢ ﻧﻬﺎیﺎت و ﺑﺪایﺎت اﻟﻤﻬﺎم‬ ‫اﻟﻨﻬﺎیﺔ اﻟﻤﺒﻜﺮة‬ ‫‪E.S‬‬ ‫‪E.F‬‬ ‫اﻟﺒﺪایﺔ اﻟﻤﺒﻜﺮة‬ ‫اﻟﻨﺸﺎط‬ ‫اﻟﻨﻬﺎیﺔ اﻟﻤﺒﺄﺥﺮة‬ ‫‪L.F‬‬ ‫.‪D‬‬ ‫.‪L.S‬‬ ‫اﻟﺒﺪایﺔ اﻟﻤﺘﺄﺥﺮة‬ ‫اﻟﺸﻜﻞ 2-2 : ﺕﻤﺜﻴﻞ اﻟﺒﺪایﺔ اﻟﻤﺒﻜﺮة و اﻟﻤﺄﺧﺮة ﻟﻠﻤﻬﺎم‬ ‫11‬
  • 12.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫.‪E.F.= E.S. + D‬‬ ‫.‪L.F. = L.S + D‬‬ ‫2-1 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ )‪(Total Float‬‬ ‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ اﻟﺘﻰ یﺴﻤﺢ ﺑﻬﺎ ﻟﻠﻨﺸﺎط ان یﺘﺄﺥﺮ دون ان یﺆﺛﺮ ﻋﻠﻰ اﻟﻔﺘﺮة اﻟﻜﻠﻴﺔ ﻟﻠﻤﺸﺮوع‬ ‫) ﻟﻠﻤﻬﻤﺔ(.‪ ) – E.F‬ﻟﻠﻤﻬﻤﺔ(.‪Total Float ( T.F.) = L.F‬‬ ‫.‪= L.S- E.S‬‬ ‫‪OR‬‬ ‫اذا آﺎﻧﺖ ﻗﻴﻤﺔ ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﻜﻠﻴﺔ اﻟﻠﻤﻬﻤﺔ اﻟﻮاﺣﺪة ﺗﺴﺎوي ﺹﻔﺮ ﻓﺎن اﻟﻤﻬﻤﺔ ﺗﺴﻤﻰ ﻡﻬﻤﺔ ﺣﺮﺟﺔ‬ ‫و هﻲ ﺗﻘﻊ ﻋﻠﻰ اﻟﻤﺴﺎر اﻟﺤﺮج و اي ﺗﺎﺥﻴﺮ او ﺗﻐﻴﻴﺮ ﻓﻲ ﻡﺪة ﺗﻨﻔﻴﺬهﺎ یﺆﺛﺮ ﻋﻠﻰ ﻡﺪة اﻟﻤﺸﺮوع‬ ‫آﻜﻞ.‬ ‫2-2 ﻓﺘﺮة اﻟﺴﻤﺎح اﻟﺤﺮة )‪(Free Float‬‬ ‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ اﻟﺘﺮاآﻤﻴﺔ ﻟﻼﻧﺸﻄﺔ اﻟﻐﻴﺮ ﺣﺮﺟﺔ ﻟﻠﻤﺸﺮوع آﻠﻪ‬ ‫.)ﻟﻠﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ (‪) – E.F‬ﻟﻠﻤﻬﻤﺔ اﻟﻼﺣﻘﺔ (‪Free Float (F.F) = E.S‬‬ ‫2-3 ﺣﻞ ﻡﺨﻄﻂ اﻟﺸﺒﻜﺎت‬ ‫ﺕﻤﺮیﻦ‬ ‫اﻟﻤﻄﻠﻮب ﺣﻞ اﻟﺸﺒﻜﺔ اﻟﺘﺎﻟﻴﺔ آﻤﺎ هﻲ ﻡﻮﺽﺤﺔ ﻓﻲ اﻟﺸﻜﻞ 3-2 ﻡﻊ ایﺠﺎد اﻟﻤﺴﺎر اﻟﺤﺮج‬ ‫اﻟﺸﻜﻞ 2-3 : ﺵﺒﻜﺔ ﺕﺘﺎﺏﻊ اﻟﻤﻬﺎم ﻓﻲ اﻟﻤﺸﺮوع‬ ‫21‬
  • 13.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫2-4هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ "‪“Work Breakdown Structure‬‬ ‫ان هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ "‪ "WBS‬یﻌﻄ ﻲ ﺗﺼ ﻮرا ﻋ ﻦ ﺗﺮﺗﻴ ﺐ اﻟﻤﺸ ﺮوع اﻟﻬﻴﻜﻠ ﻲ وذﻟ ﻚ ﺽ ﻤﻦ‬ ‫ً‬ ‫ﻡﺴﺘﻮیﺎت یﻜﻮن ﻓﻲ اﻟﻤﺴﺘﻮى اﻷﻋﻠﻰ اﻟﺨﺪﻡﺔ اﻟﺘﻲ ﻧﺮیﺪ اﻟﻮﺹ ﻞ اﻟﻴﻬ ﺎ آﻨﺘﻴﺠ ﺔ ﻹﻧﺸ ﺎء اﻟﻤﺸ ﺮوع وﻓ ﻲ‬ ‫أدﻧﻰ ﻡﺴﺘﻮى ﻟﻬ ﺎ یﻮﺟ ﺪ ﻡﻬﻤ ﺔ اﻟﻌﻤ ﻞ ”‪ “Task‬او اﻟﻔﻌﺎﻟﻴ ﺔ " ‪ “Activity‬واﻟﺘ ﻲ یﻤﻜ ﻦ ﺗﻘﺴ ﻴﻤﻬﺎ اﻟ ﻰ‬ ‫أﻋﻤﺎل ﻡﺤﺪدة ﻋﻠﻰ ﻡﺠﻤﻮﻋ ﺎت ﻡﺴ ﺘﻘﻠﺔ و یﻤﻜ ﻦ رﺹ ﺪ وﻗ ﺖ ﻡﺤ ﺪد و ﻗ ﻴﻢ ﻡﺎﻟﻴ ﺔ ﻡﺤ ﺪدة ﻟﻬ ﺬﻩ اﻟﻔﻌﺎﻟﻴ ﺔ.‬ ‫ویﻤﻜ ﻦ ﺑﻤﺴ ﺎﻋﺪة هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ان یﻘ ﻮم اﻟﻤﺨﻄ ﻂ ﻟﻠﻤﺸ ﺮوع ﺑﺘﻮﺽ ﻴﺢ اﻟﻔﻌﺎﻟﻴ ﺎت اﻟﻤﻄﻠ ﻮب‬ ‫أداؤهﺎ ﺽﻤﻦ وﻗﺖ واﺣﺪ وﻡﺎ یﺘﺒﻌﻬﺎ ﻓﻲ اﻟﻮﻗﺖ ﻡﻦ ﻧﺎﺣﻴﺔ اﻷداء وﻋﻠﻰ اﻟﺘﻮاﻟﻲ ﺑﺸ ﻜﻞ ﻡﻨ ﺘﻈﻢ وﺵ ﺎﻡﻞ .‬ ‫ویﺴﺘﺨﺪم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ﻟﻜ ﻞ ﻡ ﻦ ﺟﺪوﻟ ﺔ اﻟﻤﺸ ﺮوع ﻟﻠﻤ ﻮارد واﻟﺘﻜ ﺎﻟﻴﻒ. ویﻘ ﻮم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ‬ ‫اﻟﻤﻔﺼﻞ ﺑﺘﺒﺴﻴﻂ واﺥﺘﺼﺎر ﻋﻤﻠﻴﺔ اﻟﺘﻘﺎریﺮ ﺣﻮل اﻟﺘﻜﻠﻔﺔ وﺗﻘﺪم اﻟﻌﻤﻞ.‬ ‫ویﺘﻢ إﻧﺸﺎء هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﺗﺤﺖ ﻧﻈﺎم ﻋﺪدي واﻟﺬي یﻤﻜﻦ ﺗﻄﺒﻴﻘ ﻪ ﻋﻨ ﺪ ﻡﺴ ﺘﻮیﺎت ﻡﺘﻌ ﺪدة وذﻟ ﻚ‬ ‫ﻟﻌﻤﻞ هﻴﻜﻠﻴﺔ ﻟﻜﻞ ﻡﻦ اﻟﺘﻜﻠﻔﺔ وﺗﺨﻄﻴﻂ اﻟﺠﺪوﻟﺔ وﻋﻤﻞ اﻟﺘﻘﺎریﺮ.‬ ‫وﺑﻤﻜ ﻦ ان یﺴ ﺘﺨﺪم هﻴﻜ ﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ﻻﻧﺘ ﺎج ﻡﺼ ﻔﻮﻓﺔ اﻟﻤﺴ ﺆوﻟﻴﺎت وﺟﺪوﻟ ﺔ اﻟﺸ ﺒﻜﺎت وﺣﺼ ﺮ‬ ‫اﻟﺘﻜﺎﻟﻴﻒ وﺗﺤﻠﻴﻞ اﻟﻤﺨﺎﻃﺮ وهﻴﻜﻞ اﻟﻤﻨﻈﻤﺔ وﺣﺼﺮ أﻋﻤﺎل اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﻤﺸﺮوع.‬ ‫إن هﻴﻜﻞ اﻟﻌﻤ ﻞ اﻟﻤﻔﺼ ﻞ ه ﻮ ﺗﻨﻤ ﻴﻂ اﻟﻤﻬ ﺎم ﻓ ﻰ ﻗ ﻮاﺋﻢ ﺗﻮﺽ ﺢ ﻓﻴﻬ ﺎ ﺣﺴ ﺎب اﻟﻤ ﻮارد اﻟﻼزﻡ ﺔ‬ ‫ﻹﻧﻬﺎء اﻟﻤﻬﺎم واﻟﺸﻜﻞ اﻟﺘﺎﻟﻲ یﻮﺽﺢ ﻡﺜﺎل ﻟﺬﻟﻚ.‬ ‫هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﻟﻠﻤﺸﺮوع‬ ‫اﻻﻧﺸﻄﺔ اﻟﻤﺪرﺳﺔ اﻟﻼﻡﻨﻬﺠﻴﺔ‬ ‫ﻡﻨﻄﻘﺔ رﻓﺢ‬ ‫اﻟﻤﺴﺘﻮى 1‬ ‫ﻡﻨﻄﻘﺔ ﺥﺎن یﻮﻧﺲ‬ ‫اﻟﻤﺴﺘﻮى 2‬ ‫ﻡﺠﻤﻮﻋﺔ ﺣﻴﻔﺎ‬ ‫ﻡﺠﻤﻮﻋﺔ اﻟﻘﺪس‬ ‫ﻡﺠﻤﻮﻋﺔ یﺎﻓﺎ‬ ‫اﻟﻤﺴﺘﻮى 3‬ ‫ریﺎﺽﺔ‬ ‫آﻤﺒﻴﻮﺗﺮ‬ ‫رﺳﻢ‬ ‫آﻤﺒﻴﻮﺗﺮ‬ ‫ریﺎﺽﺔ‬ ‫رﺳﻢ‬ ‫ریﺎﺽﺔ‬ ‫آﻤﺒﻴﻮﺗﺮ‬ ‫رﺳﻢ‬ ‫اﻟﻤﺴﺘﻮى 4‬ ‫اﻟﺸﻜﻞ 2-4 : هﻴﻜﻞ اﻟﻌﻤﻞ اﻟﻤﻔﺼﻞ ﻟﻠﻤﺸﺮوع‬ ‫31‬
  • 14.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫3.إدارة وﺕﺨﻄﻴﻂ اﻟﻤﺸﺮوع ﺑﺈﺳﺘﺨﺪام ‪MS Project‬‬ ‫3-1 اﻟﺒﺪایﺔ ﻡﻊ ‪MS Project‬‬ ‫یﻤﻜﻦ اﻟﺒﺪء ﺑﻤﺸﺮوع ‪ MS Project‬ﺑﻮاﺳﻄﺔ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻡﺰ اﻟﻤﺤﺪد ﻓﻲ‬ ‫‪MS Project‬أو ﺑﻮاﺳﻄﺔ ﻓﺘﺢ أي ﻡﺸﺮوع ﻡﻦ ‪MS Project‬‬ ‫3-2 اﺳﺘﻜﺸﺎف واﺟﻬﺔ ‪MS Project‬‬ ‫إﺽﺎﻓﺔ إﻟﻰ ﻋﻨﺎﺹﺮ‪ Windows‬اﻟﻌﺎدي ﻓﺈن ‪ MS Project‬ﻟﻪ ﻡﻤﻴﺰات یﻤﻜﻦ ﻡﻌﺮﻓﺘﻬﺎ ﻡﻦ‬ ‫ﺑﺮاﻡﺞ اﻟﺠﺪاول اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻡﺜﻞ اﻷﻋﻤﺪة واﻟﺼﻔﻮف واﻟﻤﻌﺎدﻟﺔ اﻟﺘﻲ یﺴﺘﺨﺪﻡﻬﺎ اﻟﺼﻒ ﻟﻠﻜﺘﺎﺑﺔ. ان‬ ‫اﻟﻤﻌﻠﻮﻡﺎت یﺘﻢ إدﺥﺎﻟﻬﺎ إﻟﻰ اﻟﺤﻘﻞ اﻟﻤﻨﺎﺳﺐ آﻘﺎﻋﺪة ﺑﻴﺎﻧﺎت وهﻨﺎك أواﻡﺮ ﻡﺘﻔﺮدة ووﺳﺎﺋﻞ ﻡﺤﺪدة‬ ‫ﻟﻠﻌﻤﻞ ﻡﻊ اﻟﻤﺸﺮوﻋﺎت و اﻟﺸﻜﻞ 3-1 یﻮﺽﺢ اﻟﻮاﺟﻬﺔ اﻟﺮﺋﻴﺴﻴﺔ.‬ ‫اﻟﺸﻜﻞ 3-1 : واﺟﻬﺔ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ اﻟﺮﺋﻴﺴﻴﺔ‬ ‫3-3 ﻗﻀﻴﺐ اﻷدوات‬ ‫‪ o‬ﻗﻀﻴﺐ اﻷدوات اﻟﻘﻴﺎﺳﻲ و هﻮ ﻡﻮﺽﺢ ﻓﻲ اﻟﺸﻜﻞ 3-2.‬ ‫‪ o‬ﻗﻀﻴﺐ اﻷدوات اﻟﻤﻌﺪل‬ ‫اﻟﺸﻜﻞ 3-2 : ﺵﺮیﻂ اﻻدوات ﻓﻲ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ‬ ‫یﺴﺘﺨﺪم ﻗﻀﻴﺐ اﻻدوات ﻓﻲ ﺗﻨﻔﻴﺬ اﻻواﻡﺮ اﻟﻤﺨﺘﻠﻔﺔ و ﺑﺸﻜﻞ ﺳﺮیﻊ ﻡﻦ ﻋﻠﻰ ﺳﻄﺢ اﻟﺸﺎﺵﺔ‬ ‫ﺑﺈﺳﺘﺨﺪام اﻟﻔﺄرة.‬ ‫41‬
  • 15.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫3-4ﻋﺮض وﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ‬ ‫یﻤﻜﻦ ﻋﺮض اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻨﺎﻇﺮ اﻟﺮﺋﻴﺴﻴﺔ اﻟﻤﺘﻮﻓﺮ ﻓﻰ ‪ MS Project‬واﻟﺘﻰ ﺗﺘﻜﻮن ﻡﻦ‬ ‫‪ Bar (GANTT) chart‬یﺴﺘﺨﺪم ﻟﻌﻤﻞ ﻡﺪﺥﻼت اﻟﻤﺸﺮوع اﻟﺮﺋﻴﺴﻴﺔ ) اﻟﻤﻬﺎم و ﻡﺪدهﺎ‬ ‫اﻟﺰﻡﻨﻴﺔ(‬ ‫)‪ Network (CPM‬یﺴﺘﺨﺪم ﻓﻲ ﻋﺮض ﻋﻼﻗﺎت اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ ﻋﻠﻰ ﺵﻜﻞ‬ ‫ﺵﺒﻜﺔ ﻡﻦ اﻟﻤﺴﺘﻄﻴﻼت.‬ ‫‪ Task usage‬یﻮﺽﺢ ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﺘﻲ ﻧﻔﺬﺗﻬﺎ اﻟﻤﻮارد ﻡﻦ اﻟﻤﻬﻤﺔ‬ ‫‪ Gantt tracking‬یﻈﻬﺮ اﻟﻌﻤﻞ اﻟﻤﻨﺠﺰ ﻓﻲ اﻟﻤﺴﺮوع و ﻧﺴﺒﺔ اﻻﻧﺠﺎز.‬ ‫‪ Resource Graph‬یﻮﺽﺢ ﺗﻌﺎرﺽﺎت اﻟﻤﻮارد.‬ ‫‪ Resource Usage‬یﻮﺽﺢ اﺳﺘﺨﺪام اﻟﻤﻮارد اﻟﻤﺨﺼﺼﺔ ﻟﻠﻤﻬﺎم اﻟﻤﺨﺘﻠﻔﺔ.‬ ‫‪ Resource Sheet‬یﻮﺽﺢ اﻟﻤﻮارد اﻟﻤﺘﺎﺣﺔ ﻟﻠﻤﺸﺮوع.‬ ‫و هﻨﺎك اﻟﻌﺪیﺪ ﻡﻦ اﻟﻤﻨﺎﻇﺮ اﻻﺽﺎﻓﻴﺔ اﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﺸﻜﻞ 3-3.‬ ‫اﻟﺸﻜﻞ 3-3 : ﻣﻨﺎﻇﺮ اﺿﺎﻓﻴﺔ ﻓﻲ ﻣﻴﻜﻮﺳﻮﻓﺖ ﺏﺮوﺟﻜﺖ‬ ‫3-5 ﺕﻐﻴﻴﺮ اﻟﻤﻨﺎﻇﺮ‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻰ اﻟﻴﺴﺎر ﻋﻠﻰ اﻟﺸﺎﺵﺔ اﻟﺮﺋﻴﺴﻴﺔ یﻤﻜﻦ اﺥﺘﻴﺎر اﻟﻤﻨﻈﺮ اﻟﻤﻨﺎﺳﺐ.‬ ‫• یﻤﻜﻦ ﻡﻦ اﻷﻡﺮ‬ ‫‪ View > More views‬اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻨﺎﻇﺮ اﺽﺎﻓﻴﺔ.‬ ‫3-6 اﻟﺠﺪاول ‪Tables‬‬ ‫ﻟﻜﻞ ﻡﻨﻈﺮ ﻓﻰ ﻡﻴﻜﺮوﺳﻮف ﺑﺮوﺟﻜﺖ هﻨﺎك ﻗﻮاﺋﻢ ﻡﺨﺘﻠﻔﺔ واﻟﺘﻰ ﺗﻘﻮم ﺑﺘﻌﺮیﻒ اﻟﻤﻌﻠﻮﻡﺎت‬ ‫ﺣﺴﺐ اﻟﺘﻮﺹﻴﻒ اﻟﺨﺎص ﺑﻬﺎ .ﻓﻤﺜﻼ ﺑﺎﻟﻨﻈﺮ اﻟﻰ ﻗﺎﺋﻤﺔ اﻟﺠﺪوﻟﺔ ﻓﺎﻧﻚ ﺳﻮف ﺗﻼﺣﻆ ﺗﺎریﺦ‬ ‫ﺑﺪایﺔ وﻧﻬﺎیﺔ اى ﻡﻬﻤﺔ .واﻟﻘﺎﺋﻤﺔ اﻟﻤﺘﺎﺣﺔ ﻋﻠﻰ ﻡﻴﻜﺮوﺳﻮف ﺑﺮوﺟﻜﺖ هﻲ ﻗﺎﺋﻤﺔ اﻹدﺥﺎل‬ ‫51‬
  • 16.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫‪EntryTable‬ﺣﻴﺚ ﺳﻴﻜﻮن ﺑﺈﻡﻜﺎﻧﻚ إدﺥﺎل اﻟﻤﻌﻠﻮﻡﺎت ﻋﻦ اﻟﻤﻬﺎم وﺣﺘﻰ یﻤﻜﻦ ﺗﻐﻴﻴﺮ‬ ‫اﻟﻘﺎﺋﻤﺔ ﻓﺈن یﺠﺐ ﻋﻤﻞ اﻟﺘﺎﻟﻲ-:‬ ‫1. أﻧﻘﺮ ﻋﻠﻰ ﻗﺎﺋﻤﺔ ‪ View‬ﻡﻦ ﺵﺮیﻂ اﻻدوات.‬ ‫2. أﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪. Tables‬‬ ‫3. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Tables‬ﻧﻮع اﻻدﺥﺎل اﻟﻤﻄﻠﻮب )‪ ( Cost‬ﻡﺜﻼ.‬ ‫3-7 ﻡﻨﻈﺮ ‪GANTT Chart‬‬ ‫إن ﻡﻨﻈﺮ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت )‪ (GANTT Chart‬هﻮ اﻟﻤﻨﻈﺮ اﻟﺮﺋﻴﺴﻲ اﻟﻤﻌﺮوض واﻟﻤﺘﺎح داﺋﻤﺎ‬ ‫ً‬ ‫ﻋﻠﻰ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ وهﻮ اﻟﻤﻨﻈﺮ اﻟﺬي یﻤﻜﻨﻚ ﻡﻨﻪ إدﺥﺎل وﺗﻌﺪیﻞ اﻟﻤﻌﻠﻮﻡﺎت ﻓﻲ اﻟﻤﺸﺮوع.‬ ‫وﻋﻨﺪ ﻋﺮﺽﻚ ﻟﻤﻨﻈﺮ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت اﺗﺒﻊ اﻵﺗﻲ.‬ ‫1. أﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ﻡﻨﻈﺮ ‪.GANTT‬‬ ‫2. ﺳﻮف یﻈﻬﺮ ﻟﺪیﻚ ﻋﻨﺎﺹﺮ ﻡﻨﻈﺮ ‪ GANTT‬اﻟﺮﺋﻴﺴﻴﺔ.‬ ‫3-8 ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع‬ ‫3-8-1 ﻓﺘﺢ ﻡﺘﻒ ﺟﺪیﺪ‬ ‫1. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ File‬اﺥﺘﺮ ﻓﺘﺢ ﻡﺎف ﺟﺪیﺪ ‪New‬‬ ‫2. ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺬي یﻈﻬﺮ اﺥﺘﺮ ‪Blank project‬‬ ‫3-8-2 إدﺧﺎل ﺏﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻷوﻟﻴﺔ‬ ‫إن أول ﺥﻄﻮة ﻓﻲ إدارة اﻟﻤﺸﺮوع هﻲ ﺗﺤﺪیﺪ ﺗﺎریﺦ ﺑﺪایﺔ اﻟﻤﺸﺮوع ‪ start date‬ﻟﻠﻮﺹﻮل إﻟﻰ‬ ‫ﻗﺎﺋﻤﺔ إدﺥﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﻤﻬﻴﺪیﺔ اﺗﺒﻊ اﻵﺗﻲ:‬ ‫1. ﻡﻦ اﻟﻔﺎﺋﻤﺔ ‪ Project‬اﺥﺘﺮ ‪Project Information‬‬ ‫2. ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻗﻢ ﺑﺈدﺥﺎل ﺗﺎریﺦ ﺑﺪایﺔ اﻟﻤﺸﺮوع ‪. Start date‬‬ ‫اﻟﺸﻜﻞ 3-4 : ﻣﻌﻠﻮﻣﺎت ﺏﺪایﺔ أوﻧﻬﺎیﺔ اﻟﻤﺸﺮوع‬ ‫61‬
  • 17.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫ﻡﻦاﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻓﻲ اﻟﺸﻜﻞ 3-4 یﻤﻜﻦ إدﺥﺎل ﺑﺪایﺔ أوﻧﻬﺎیﺔ اﻟﻤﺸﺮوع وﺣﺎﻟﺔ اﻟﻤﺸﺮوع‬ ‫واﻷوﻟﻮیﺔ ﻟﻠﻤﺸﺮوع ﺽﻤﻦ ﻡﺸﺎریﻊ اﻟﺸﺮآﺔ اﻻﺥﺮى.‬ ‫ﺕﺤﺬیﺮ‬ ‫. ﻓﻘﻂ یﻤﻜﻨﻚ إدﺥﺎل إﻡﺎ ﺑﺪایﺔ اﻟﻤﺸﺮوع وهﻮ‬ ‫ﻻ یﻤﻜﻦ إدﺥﺎل ﺑﺪایﺔ وﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﻡﻌﺎ‬ ‫ً‬ ‫اﻟﺸﺎﺋﻊ)‪ ،(Forward pass‬أﻡﺎ إذا آﺎﻧﺖ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع هﻲ اﻷهﻢ وهﻨﺎك ﻗﻴﺪ ﻹﻧﻬﺎء اﻟﻤﺸﺮوع ﻗﺒﻞ‬ ‫ﻡﻮﻋﺪ ﻡﺤﺪد ﻓﻴﻤﻜﻦ إدﺥﺎل ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع. و یﻜﻮن اﻟﺘﺨﻄﻴﻂ ﻓﻲ هﺬة اﻟﺤﺎﻟﺔ ﻡﻦ اﻟﺨﻠﻒ اﻟﻰ اﻻﻡﺎم و‬ ‫یﺴﻤﻰ )‪(Backward pass‬‬ ‫3-8-3 أوﻟﻮیﺔ اﻟﻌﻤﻞ ﺽﻤﻦ اﻟﻤﺸﺮوع ‪Priority‬‬ ‫یﻘﻮم ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ ﺑﺈدﺥﺎل أوﻟﻮیﺔ اﻟﻤﺸﺮوع ﺑﻴﻦ ﻋﺪة ﻡﺸﺎریﻊ ﻹیﺠﺎد اﻟﺘﻮازن ﻓﻲ اﺳﺘﺨﺪام‬ ‫اﻟﻤﻮارد اﻟﻤﺸﺘﺮآﺔ . ﺗﻘﺎس اﻷوﻟﻮیﺔ ﺑﻘﻴﻤﺔ ﺗﻘﺪر ﻡﻦ 0.0 إﻟﻰ 0001 ﻓﻘﻴﻤﺔ 0001 ﺗﻌﻄﻲ ﻷﻋﻠﻰ‬ ‫أوﻟﻮیﺔ.‬ ‫3-8-4 ﻥﺘﺎﺋﺞ إﺣﺼﺎﺋﻴﺔ‬ ‫یﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻰ ﻡﻌﻠﻮﻡﺎت إﺣﺼﺎﺋﻴﺔ ﻋﻦ اﻟﻤﺸﺮوع إذا ﺗﻢ اﺥﺘﻴﺎر ﻡﺮﺑﻊ ‪ Statistic‬ﻓﻲ ﻡﺮﺑﻊ‬ ‫ﻡﻌﻠﻮﻡﺎت اﻟﻤﺸﺮوع ‪Project Information‬‬ ‫3-9 ﺕﺴﺠﻴﻞ ﺻﻔﺎت اﻟﻤﺸﺮوع‬ ‫یﻤﻜﻦ ﺗﺴﺠﻴﻞ اﻟﻌﺪیﺪ ﻡﻦ ﺹﻔﺎت اﻟﻤﺸﺮوع اﻟﺜﺎﺑﺘﺔ و اﻟﺘﻲ ﺗﻤﺜﻞ اداﻩ ﺗﻌﺮیﻒ اﻟﻤﺸﺮوع ﺣﻴﺚ یﺘﻢ‬ ‫اﺳﺘﺨﺪام هﺬﻩ اﻟﺼﻔﺎت ﺽﻤﻦ ﻡﺨﺮﺟﺎت اﻟﻤﺸﺮوع ﻡﺜﻞ اﺳﻢ اﻟﻤﺸﺮوع و اﺳﻢ ﻡﺪیﺮ اﻟﻤﺸﺮوع و اﺳﻢ‬ ‫اﻟﺸﺮآﺔ و ﺥﻼﻓﺔ و ﻟﻌﻤﻞ ذﻟﻚ اﺗﺒﻊ اﻻﺗﻲ:‬ ‫1. ﻡﻦ ﻗﺎﺋﻤﺔ ‪ File‬أﺥﺘﺮ ‪Properties‬‬ ‫2. إﺥﺘﺮ ﺵﺎﺵﺔ ‪ Summary‬و اﺽﻒ اﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻨﺎﺳﺒﺔ‬ ‫3. اﻧﻘﺮ ﻡﻮاﻓﻖ ‪OK‬‬ ‫71‬
  • 18.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫4.إدﺥﺎل اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ‬ ‫4-1 ادﺥﺎل اﻟﻤﻬﺎم‬ ‫ﻋﻨﺪ ﺑﺪایﺔ أي ﻡﺸﺮوع ﺟﺪیﺪ ﻓﺈﻧﻚ ﺗﻜﻮن ﺟﺎهﺰا ﻹدﺥﺎل اﻟﻤﻬﺎم، ﻓﻘﻂ ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ﺳﻄﺮ ﻡﻬﻤﺔ‬ ‫ً‬ ‫ﺟﺪیﺪة واﺑﺪأ ﺑﻌﻤﻠﻴﺔ اﻟﻄﺒﺎﻋﺔ.‬ ‫اﺳﺘﺨﺪام اﻟﻤﻔﺘﺎح ‪ Tab‬ﻟﻠﺘﺤﺮك إﻟﻰ ﻋﻤﻮد اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ‪Duration‬‬ ‫اﺳﺘﺨﺪم اﻟﻤﻔﺘﺎح ‪ Enter‬ﻟﻠﺘﺤﺮك ﺑﻴﻦ اﻻﺳﻄﺮ ﻻدﺥﺎل ﻡﻬﺎم ﺟﺪیﺪة.‬ ‫ﺑﺈﻡﻜﺎﻧﻚ إدﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﺑﺎﻟﺴﺎﻋﺔ أو ﺑﺎﻟﻴﻮم أو ﺑﺎﻟﺸﻬﺮ أو اﻷﺳﺒﻮع .إذا ﻟﻢ ﺗﺪﺥﻞ أي ﻡﺪة ﻓﺈن‬ ‫ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ یﺤﺘﺴﺐ اﻟﻤﺪﻩ اﻟﺰﻡﻨﻴﺔ یﻮﻡﺎ واﺣﺪا.‬ ‫ً‬ ‫ً‬ ‫ﺑﻌﺪ إدﺥﺎﻟﻚ اﻟﻤﻬﺎم واﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﺳﻮف یﻌﺮض ﻟﻚ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ هﺬﻩ اﻟﻤﻌﻠﻮﻡﺎت ﻡﻤﺜﻠﺔ‬ ‫ﺑﻴﺎﻧﻴﺎ ﻓﻲ ﻡﺨﻄﻂ ﺟﺎﻧﺖ إﻟﻰ اﻟﻴﻤﻴﻦ.‬ ‫ً‬ ‫ﺕﻤﺮیﻦ‬ ‫اﻟﻤﻄﻠﻮب ادﺥﺎل اﻟﻔﻌﺎﻟﻴﺎت اﻟﺘﺎﻟﻴﺔ ﻓﻲ ﻡﻠﻒ ﺟﺪیﺪ ﺑﻌﻨﻮان ‪ Water pipe line‬و اﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﺸﻜﻞ‬ ‫4-1.‬ ‫اﻟﺸﻜﻞ 4-1 : ﻓﻌﺎﻟﻴﺎت ﻣﺸﺮوع ﺕﻮﺹﻴﻞ ﺧﻂ ﻣﻴﺎة‬ ‫81‬
  • 19.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫4-2اﻟﻤﺪد اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم‬ ‫یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﺎم ﺑﻮاﺣﺪ ﻡﻦ ﺛﻼث ﻃﺮق‬ ‫1. ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺰر اﻻیﺴﺮ ﻟﻠﻔﺄرة ﻋﻠﻰ اﺳﻢ اﻟﻔﻌﺎﻟﺔ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪Task‬‬ ‫‪ Information‬ﺣﻴﺚ یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ‪ Duration‬و اﻟﺸﻜﻞ 4-2 یﻮﺽﺢ ﻡﺮﺑﻊ ﻡﻌﻠﻮﻡﺎت‬ ‫اﻟﻤﻬﻤﺔ.‬ ‫2. یﻤﻜﻦ ادﺥﺎل اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ ﻡﺒﺎﺵﺮة ﻡﻦ ﻡﺮﺑﻊ ‪ GANTT‬اﻟﺤﻮاري.‬ ‫3. یﻤﻜﻦ زیﺎدة ﻡﺪة اﻟﻔﻌﺎﻟﻴﺔ ﻡﺒﺎﺵﺮة ﻡﻦ اﻟﻘﻀﻴﺐ ﺟﻬﺔ اﻟﻴﻤﻴﻦ.‬ ‫اﻟﺸﻜﻞ 4-2 : ﻣﺮﺏﻊ ﺡﻮار ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﻤﺔ‬ ‫4-3 إدراج ﻥﺸﺎط ﺑﻴﻦ أﻥﺸﻄﺔ اﺥﺮى‬ ‫ﻧﺤﺪد اﻟﻨﺸﺎط اﻟﻤﻄﻠﻮب إدراج اﻷﻧﺸﻄﺔ اﻟﺠﺪیﺪﻩ ﻗﺒﻠﻪ.‬ ‫ﻧﻀﻐﻂ زر ‪ Insert‬ﻡﻦ ﻟﻮﺣﺔ اﻟﻤﻔﺎﺗﻴﺢ.‬ ‫ﻧﻜﺘﺐ أﺳﻤﺎء اﻟﻤﻬﺎم اﻟﺠﺪیﺪة ﺣﻴﺚ یﺘﻢ رﺑﻂ اﻟﻨﺸﺎط اﻟﻤﺪرج اﻟﺠﺪیﺪ ﺑﻌﻼﻗﺔ )‪ (FS‬ﺗﻠﻘﺎﺋﻴﺎ‬ ‫ﻡﻊ اﻷﻧﺸﻄﺔ اﻷﺥﺮى.‬ ‫91‬
  • 20.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫5.ﺿﺒﻂ ﺕﻘﻮیﻢ اﻟﻤﺸﺮوع‬ ‫5-1 ﺕﺤﺪیﺪ أیﺎم اﻟﻌﻤﻞ واﻹﺟﺎزات‬ ‫ﻋﻨﺪ ﺑﺪایﺔ أي ﻡﺸﺮوع یﺠﺐ ﺗﺤﺪیﺪ ﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﻴﻮﻡﻴﺔ وﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻷﺳﺒﻮﻋﻴﺔ وأیﺎم‬ ‫اﻟﻌﻄﻞ وﻡﻮﻋﺪ ﺑﺪایﺔ اﻷﺳﺒﻮع وأیﺎم اﻹﺟﺎزات اﻟﻤﺘﻜﺮرة واﻟﻐﻴﺮ ﻡﺘﻜﺮرة أﺛﻨﺎء ﻓﺘﺮة اﻟﻤﺸﺮوع.‬ ‫وﻟﻌﻤﻞ ذﻟﻚ یﺘﻢ ﻓﺘﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺘﺎﻟﻲ‬ ‫1. ﺕﻌﺪیﻞ ﺧﻴﺎرات اﻟﺘﻘﻮیﻢ‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Change Working Time‬‬ ‫اﻧﻘﺮ ﻋﻠﻰ زر ‪ Options‬ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﻤﻔﺘﻮح ﺣﻴﺚ یﺘﻢ ﻓﺘﺢ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪Calendar‬‬ ‫یﺘﻢ اﺥﺘﻴﺎر یﻮم اﻟﺴﺒﺖ آﺒﺪایﺔ ﻟﻼﺳﺒﻮع‬ ‫یﺘﻢ ﺗﻌﺪیﻞ ﺑﺪأ ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻟﻠﻤﺸﺮوع ﺣﺴﺐ ﻧﻈﺎم اﻟﻤﺆﺳﺴﺔ‬ ‫2. اﺧﺘﻴﺎر یﻮم ﻣﺨﺼﺺ ﺏﻌﻄﻠﺔ‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Change Working Time‬‬ ‫ﺣﺪد اﻟﻴﻮم او اﻻیﺎم اﻟﺘﻰ ﺳﺘﻜﻮن ایﺎم اﻋﻄﺎل ﺽﻤﻦ ﻓﺘﺮة اﻟﻤﺸﺮوع‬ ‫ﻋﻠﻢ هﺬﻩ اﻻیﺎم ﺑﺎﻟﻔﺄرة‬ ‫ﻗﻢ یﺘﻐﻴﻴﺮ ﺹﻔﺔ هﺬة اﻻیﺎم ﺑﺄﺥﺘﻴﺎر ‪Non working time‬‬ ‫و یﻤﻜﻦ ﻣﺒﺎﺵﺮة ﻣﻦ اﻟﻤﺮﺏﻊ اﻟﺤﻮاري ‪ Change Working Time‬ﻋﻤﻞ اﻻﺕﻲ:‬ ‫ﻡﻦ هﺬا اﻟﻤﺮﺑﻊ یﺘﻢ ﺗﺤﻮیﻞ ﺑﺪایﺔ اﻟﻌﻤﻞ إﻟﻰ یﻮم اﻟﺴﺒﺖ ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر یﻮﻡﻲ اﻟﺴﺒﺖ واﻷﺣﺪ ﺛﻢ‬ ‫وﺑﺬﻟﻚ یﺘﺤﻮل یﻮﻡﻲ اﻟﺴﺒﺖ واﻷﺣﺪ ﻡﻦ أیﺎم‬ ‫ﻧﺨﺘﺎر )‪(Non default working time‬‬ ‫ﻋﻄﻞ إﻟﻰ ﻋﻤﻞ.‬ ‫ﺛﻢ یﺘﻢ اﺥﺘﻴﺎر یﻮم اﻟﺠﻤﻌﺔ ﻡﻊ اﻷﻡﺮ )‪ (Non working time‬وﺑﺬﻟﻚ یﺘﺤﻮل یﻮم اﻟﺠﻤﻌﺔ إﻟﻰ‬ ‫ﻋﻄﻠﺔ.‬ ‫و اﻟﺸﻜﻞ 5-1 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﻐﻴﻴﺮ ﺗﻘﻮیﻢ اﻟﻤﺸﺮوع.‬ ‫02‬
  • 21.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﺸﻜﻞ5-1: ﻣﺮﺏﻊ ﺡﻮاري ﺧﺎص ﺏﺘﻘﻮیﻢ اﻟﻤﺸﺮوع‬ ‫5-2 ﻥﺴﺦ اﻟﻤﻬﺎم وﻟﺼﻘﻬﺎ ‪Copy and Paste‬‬ ‫ﻟﺴﻬﻮﻟﻪ ﺗﻨﻔﻴﺬ وإدﺥﺎل اﻟﻤﻬﺎم إذا ﺗﻜﺮر ﺑﻌﺾ اﻟﻤﻬﺎم یﻤﻜﻦ اﻟﻘﻴﺎم ﺑﻌﻤﻞ ﻧﺴﺨﻪ ﻡﻨﻬﺎ أو ﻗﺺ‬ ‫وﻟﺼﻖ اﻟﻤﻬﺎم ﻓﻰ ﻡﻜﺎن ﺟﺪیﺪ وذﻟﻚ ﺑﺎﺗﺒﺎع اﻵﺗﻲ -:‬ ‫یﺘﻢ اﺥﺘﻴﺎر اﻟﺨﻼیﺎ ﺑﻮﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ رﻗﻢ ﺗﻌﺮیﻒ ‪ ID‬اﻟﺨﻠﻴﺔ‬ ‫ﻧﺨﺘﺎر أﻡﺮ ‪ Copy‬ﻡﻦ ﻗﺎﺋﻤﺔ ‪Edit‬‬ ‫ﻧﺤﺪد ﺥﻼیﺎ ﻓﺎرﻏﻪ یﺘﻢ اﻟﻠﺼﻖ إﻟﻴﻬﺎ .‬ ‫ﺛﻢ ﻧﺴﺘﺨﺪم اﻷﻡﺮ ‪ Paste‬ﻡﻦ ﻗﺎﺋﻤﻪ ‪Edit‬‬ ‫إذا آﺎن اﻟﻤﻄﻠﻮب ﻗﺺ یﺘﻢ اﺥﺘﻴﺎر أﻡﺮ ‪ Cut‬ﻡﻦ ﻗﺎﺋﻤﺔ ‪Edit‬‬ ‫ﻧﻜﺮر أﻡﺮ ‪Paste‬‬ ‫5-3 ﻡﺴﺢ اﻟﻤﻬﺎم ‪Delete‬‬ ‫ﻟﻤﺴﺢ ﻡﻬﻤﺔ أو ﻡﺠﻤﻮﻋﻪ ﻡﻦ اﻟﻤﻬﺎم یﺘﻢ ﺗﺤﺪیﺪهﺎ ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ ﺑﺎﻧﻘﺮ ﻋﻠﻰ رﻗﻢ ﺗﻌﺮیﻒ اﻟﺨﻠﻴﺔ ‪ID‬‬ ‫ﺛﻢ ﻡﻦ ﻗﺎﺋﻤﻪ ‪ Edit‬یﺘﻢ اﺥﺘﻴﺎر اﻷﻡﺮ ‪Delete‬‬ ‫5-4 اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ‪Summary Tasks‬‬ ‫یﺘﻢ ﺟﻤﻊ ﻡﺠﻤﻮﻋﺔ ﻡﻦ اﻟﻤﻬﺎم ﺗﺤﺖ ﻡﻬﺎم ﺗﻠﺨﻴﺼﻴﺔ و اﻟﺸﻜﻞ 5-2 یﻮﺽﺢ ﺵﻜﻞ اﻟﻤﻬﺎم‬ ‫اﻟﺘﻠﺨﻴﺼﻴﺔ وﺗﻜﻮن ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم ﺗﺸﺘﺮك ﻡﻊ ﺑﻌﻀﻬﺎ ﻓﻰ ﺹﻔﺎت ﻡﻌﻴﻨﻪ وﺗﻜﻮن ﻡﺪﻩ اﻟﻤﻬﺎم‬ ‫اﻟﺘﻠﺨﻴﺼﻴﺔ هﻮ اﻟﻔﺮق ﺑﻴﻦ ﺗﺎریﺦ ﺑﺪایﺔ وﻧﻬﺎیﺔ ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم اﻟﻤﻨﻀﻮیﺔ ﺗﺤﺖ اﻟﻤﺠﻤﻮﻋﺔ‬ ‫اﻟﺘﻠﺨﻴﺼﻴﺔ .‬ ‫یﺘﻢ إﻧﺸﺎء ذﻟﻚ ﺣﺴﺐ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ-:‬ ‫12‬
  • 22.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫إدراجاﻟﻨﺸﺎط اﻟﺘﺠﻤﻴﻌﻲ آﻌﻨﻮان ﻟﻤﺠﻤﻮﻋﻪ ﻡﻬﺎم.‬ ‫یﺘﻢ ﺗﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻔﺮﻋﻴﺔ اﻟﺘﺎﺑﻌﺔ ﻟﻬﺎ ﺑﺘﻌﻠﻴﻤﻬﺎ ﺑﺎﻟﻤﺆﺵﺮ.‬ ‫ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Project‬یﺘﻢ اﺥﺘﻴﺎر ‪ Outline‬ﺛﻢ ﻧﺨﺘﺎر أﻡﺮ ‪Indent‬‬ ‫وﺑﺬﻟﻚ ﻧﺤﺼﻞ ﻋﻠﻰ اﻟﻨﺸﺎط اﻟﺘﻠﺨﻴﺼﻲ.‬ ‫اﻟﺸﻜﻞ 5-2: ﺵﻜﻞ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‬ ‫ﻣﻼﺡﻈﺔ‬ ‫یﻤﻜﻦ رﺑﻂ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ او ﻡﻊ اي ﺥﻼیﺎ ﻡﻨﻀﻮیﺔ ﺗﺤﺘﻬﺎ.‬ ‫ﻻزاﻟﺔ اﻟﺮﺑﻄﺔ ﺑﻴﻦ ﺥﻠﻴﺘﻴﻦ ﻧﺨﺘﺎر هﺬﻩ اﻟﺨﻼیﺎ و ﻧﺨﺘﺎر اﻻﻡﺮ ‪ Unlink‬ﻡﻦ ﺵﺮیﻂ اﻻدوات‬ ‫اﻟﺮﺋﺒﺴﻲ‬ ‫ﻻ ﺗﺤﺎول ازاﻟﺔ اﻟﺮواﺑﻂ ﺑﻮاﺳﻄﺔ اﺳﺘﺨﺪام اﻻﻡﺮ ‪ Delete‬ﻟﻤﺴﺢ اﻟﺨﻼیﺎ اﻟﻤﺮﺗﺒﻄﻪ ﺑﻬﺎ‬ ‫‪ Predecessors‬و هﺬا ﺳﻮف یﺆدي اﻟﻰ ﻡﺴﺢ اﻟﻤﻬﻤﺔ ﺑﺎﻟﻜﺎﻡﻞ و ﻟﻴﺲ اﻟﺮاﺑﻄﺔ وﺣﺪهﺎ.‬ ‫5-5 إﻟﻐﺎء اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ‬ ‫ﺣﺪد اﻟﻤﻬﺎم اﻟﻤﺘﻔﺮﻋﺔ ﻋﻦ اﻟﻤﻬﻤﻪ اﻟﺘﻠﺨﻴﺼﻴﺔ .‬ ‫ﻡﻦ ﻗﺎﺋﻤﻪ‬ ‫‪ Project‬ﻧﺨﺘﺎر ‪ outline‬ﺛﻢ ﻧﺨﺘﺎر ‪Out dent‬‬ ‫ﺗﻘﻮم ﺑﻤﺴﺢ اﻟﻤﻬﺎم اﻟﺘﻠﺨﻴﺼﻴﺔ ﻡﻦ ﻗﺎﺋﻤﺔ اﻟﻤﺸﺮوع .‬ ‫5-6 أﺣﺠﺎر اﻟﺰاویﺔ‬ ‫هﻲ ﻋﺒﺎرة ﻋﻦ ﻡﻬﺎم ﻋﻤﻞ ﻟﻬﺎ اهﻤﻴﺔ ﺥﺎﺹﺔ ﻓﻲ اﻟﻤﺸﺮوع ﻡﺜﻞ ﻧﻬﺎیﺔ اﻟﻤﺮﺣﻠﺔ اﻻوﻟﻰ ﻟﻠﻤﺸﺮوع او‬ ‫ﻡﻮﻋﺪ ﺗﻮریﺪ ﻡﻮاد ﻡﻬﻤﺔ او ﻡﻮﻋﺪ اﺥﺬ ﻡﻮاﻓﻘﺎت ﻡﻦ اﻻﺳﺘﺸﺎري و یﺘﻢ ادراج اﺣﺠﺎر اﻟﺰاویﺔ ﺑﻤﺪة‬ ‫زﻡﻨﻴﺔ ﺗﺴﺎوى ﺹﻔﺮ.‬ ‫5-7 اﺽﺎﻓﺔ ﻡﻼﺣﻈﺎت ﻋﻠﻰ اﻟﻤﻬﻤﺔ‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Project‬اﺥﺘﺮ اﻻﻡﺮ ‪. Task Information‬‬ ‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري أﺥﺘﺮ اﻟﻮاﺟﻬﺔ ‪. Task notes‬‬ ‫22‬
  • 23.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﺽﻒاي ﻡﻼﺣﻈﺎت ﺥﺎﺹﺔ ﺑﺎﻟﻤﻬﻤﺔ اﻟﻤﺨﺘﺎرة.‬ ‫5-8 رﺑﻂ اﻟﻤﻬﺎم ‪Linking Tasks‬‬ ‫إن رﺑﻂ اﻟﻤﻬﺎم ﺑﻌﻀﻬﺎ ﺑﺒﻌﺾ یﺘﻄﻠﺐ ﺗﻔﻬﻢ اﻟﻌﻼﻗﺎت اﻟﻤﺒﺎﺵﺮة ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺨﺘﻠﻔﺔ وﻗﺪ ﺳﺒﻖ اﻟﺤﺪیﺚ‬ ‫ﻋﻦ أرﺑﻊ ﻋﻼﻗﺎت ﻡﻨﻄﻘﻴﺔ ﻟﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وهﻰ‬ ‫)‪ (FS, FF, SS, SF‬ﺣﻴﺚ‬ ‫ﺗﺴﺘﺨﺪم هﺬﻩ اﻟﻌﻼﻗﺎت ﻟﺮﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ.‬ ‫إن هﺬﻩ اﻟﻤﺮﺣﻠﺔ ﻡﻦ أدق وأهﻢ ﻡﺮاﺣﻞ اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوع ورﺑﻂ اﻟﻔﻌﺎﻟﻴﺎت ﻡﻊ ﺑﻌﻀﻬﺎ یﻌﻨﻰ ﺗﺸﻜﻴﻞ‬ ‫اﻟﻤﺴﺎر اﻟﺤﺮج ﻟﻠﻤﺸﺮوع وذﻟﻚ ﺑﺘﺤﺪیﺪ أﻗﺼﺮ ﻡﺪة یﻤﻜﻦ إﻧﺠﺎز اﻟﻤﺸﺮوع ﻓﻴﻬﺎ .‬ ‫یﻌﺘﻤﺪ آﺜﻴﺮ ﻡﻦ اﻟﻔﻌﺎﻟﻴﺎت ﻓﻰ ﺑﺪایﺘﻬﺎ ﻋﻠﻰ ﻧﻬﺎیﺔ ﻓﻌﺎﻟﻴﻪ أﺥﺮى .ﻟﺬﻟﻚ ﺗﺴﻤﻰ اﻟﻔﻌﺎﻟﻴﺔ اﻟﺘﻰ یﺘﻢ إﻧﺠﺎزهﺎ‬ ‫أوﻻ ﺑﺄﻧﻬﺎ اﻟﺴﺎﺑﻘﺔ )‪ ،(Predecessor‬واﻟﺘﻰ ﺗﻠﻰ ﻓﻰ اﻹﻧﺠﺎز ﺗﺴﻤﻰ اﻟﻼﺣﻘﺔ .)‪(Successor‬‬ ‫یﻤﻜﻦ رﺑﻂ اﻟﻤﻬﺎم ﺑﺎﺳﺘﺨﺪام وﺳﺎﺋﻞ ﻡﺘﻌﺪدة وأﺳﻬﻞ ﻃﺮیﻘﺔ هﻰ ﺑﺘﻌﻠﻴﻢ اﻟﻔﻌﺎﻟﻴﺘﻴﻦ اﻟﻤﻄﻠﻮب رﺑﻄﻬﻤﺎ‬ ‫ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ ﺛﻢ اﻟﻀﻐﻂ ﻋﻠﻰ أداﻩ رﺑﻂ اﻟﻤﻬﺎم ﻓﻰ ﺵﺮیﻂ اﻷدوات.‬ ‫یﻤﻜﻦ أیﻀﺎ ﺏﺎﺳﺘﺨﺪام ‪Task Information Box‬‬ ‫وذﻟﻚ ﺑﺎﺗﺒﺎع اﻟﺨﻄﻮات اﻷﺗﻴﺔ :‬ ‫ﻓﻌﻞ اﻟﻤﻬﻤﺔ اﻟﺘﺎﻟﻴﺔ‪ Successor‬اﻟﺘﻲ یﺮاد رﺑﻄﻬﺎ ﻡﻊ ﻡﻬﻤﺔ ﺳﺎﺑﻘﺔ ‪ Predecessor‬و‬ ‫اﺧﺘﺮ ﻣﻦ ﺵﺮیﻂ اﻻدوات ‪. Task Information Tool‬‬ ‫اﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪. Predecessor‬‬ ‫ﻋﻠﻢ اﻟﺴﻬﻢ ﺛﻢ اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﺔ ﻧﻮع اﻟﺮﺑﻂ اﻟﻤﻄﻠﻮب.‬ ‫و اﻟﺸﻜﻞ 5-3 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﺒﻮیﺐ‪ Predecessor‬و اﻟﺨﺎص ﺑﺮﺑﻂ‬ ‫اﻟﻤﻬﺎم‬ ‫رﺏﻂ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻤﻬﺎم ﻣﺮة واﺡﺪ‬ ‫ﻋﻠﻢ ﻡﺠﻤﻮﻋﺔ اﻟﻤﻬﺎم ﺑﺎﻟﺆﺵﺮ او ﺑﺎﺳﺘﺨﺪام ‪ Shift‬او ‪ Control‬ﻡﻊ اﻻﺳﻬﻢ‬ ‫اﺥﺘﺮ ‪ Link task‬ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﺮﺋﻴﺴﻴﺔ.‬ ‫یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺑﺮﺑﻂ اﻟﻤﻬﺎم ﺑﺎﻟﻌﻼﻗﺔ ‪ . FS‬ﻓﻲ ﺣﺎل اﻟﺮﻏﺒﺔ ﺑﺘﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ ﺑﻴﻦ‬ ‫ﻡﻬﻤﺘﻴﻦ اﺳﺘﺨﺪم اﻟﻄﺮیﻘﺔ اﻟﺘﺎﻟﻴﺔ.‬ ‫32‬
  • 24.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﺸﻜﻞ5-3: ﻣﺮﺏﻊ ﺡﻮاري ﺕﺒﻮیﺐ ‪ Predecessor‬و اﻟﺨﺎص ﺏﺮﺏﻂ اﻟﻤﻬﺎم‬ ‫5-9 ﺕﻐﻴﻴﺮ اﻟﻌﻼﻗﺎت ﺑﻴﻦ اﻟﻤﻬﺎم اﻟﻤﺘﺮاﺑﻄﺔ ‪Change Relationships‬‬ ‫إن رﺑﻂ اﻷﻧﺸﻄﺔ ﻡﻦ ﺥﻼل أﻡﺮ ‪ Link Task‬یﺘﻢ ﻋﻠﻰ اﻟﻌﻼﻗﺔ اﻻﻓﺘﺮﺽﻴﺔ ﻟﻠﺒﺮﻧﺎﻡﺞ وهﻰ )‪(FS‬‬ ‫وﻟﺬﻟﻚ یﻤﻜﻦ ﺗﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ ﺑﻌﺪ ذﻟﻚ ﺑﺎﺗﺒﺎع إﺣﺪى ﻃﺮیﻘﺘﻴﻦ .‬ ‫اﺥﺘﺮ ﺑﻮاﺳﻄﺔ اﻟﻤﺆﺵﺮ اﻟﻌﻤﻠﻴﺔ اﻟﻼﺣﻘﺔ اﻟﺘﻰ یﺮاد ﺗﻐﻴﻴﺮ ﻋﻼﻗﺘﻬﺎ ﻡﻊ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ .‬ ‫ﻡﻦ أﻡﺮ ‪ Project‬اﺥﺘﺮ ‪ Task Information‬او ﺑﻮاﺳﻄﺔ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ‬ ‫اﻟﺨﻠﻴﺔ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺘﺎﻟﻰ ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر ﻗﺎﺋﻤﺔ‬ ‫‪ Predecessor‬ﻡﻦ‬ ‫ﻋﺎﻡﻮد ‪ .Type‬و اﻟﺸﻜﻞ 5-4 یﻮﺽﺢ رﺑﻂ اﻟﻤﻬﺎم ﻡﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ.‬ ‫یﻤﻜﻦ ﺗﻐﻴﻴﺮ ﻧﻮع اﻟﻌﻼﻗﺔ اﻟﻤﻄﻠﻮﺑﺔ ویﻤﻜﻦ ﺗﺤﺪیﺪ ﻗﻴﻤﻪ واﺵﺎرﻩ ‪Lag‬‬ ‫اﻟﻄﺮیﻘﺔ اﻟﺜﺎﻧﻴﺔ‬ ‫اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺨﻂ اﻟﺮاﺑﻂ ﺑﻴﻦ اﻟﻔﻌﺎﻟﺘﻴﻦ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﺣﻴﺚ یﻤﻜﻦ ﺗﻐﻴﻴﺮ‬ ‫ﻧﻮع اﻟﻌﻼﻗﺔ وﻗﻴﻤﻪ ‪Lag‬‬ ‫اﻟﺸﻜﻞ 5-4: رﺏﻂ اﻟﻤﻬﺎم ﻣﻊ ﺏﻌﻀﻬﺎ اﻟﺒﻌﺾ‬ ‫42‬
  • 25.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫5-01اﻟﻤﻬﺎم اﻟﻤﺘﻜﺮرة ‪Recurring task‬‬ ‫ﻋﻨﺪ ﺗﻜﺮار ﻡﻬﻤﻪ ﻡﺎ ﻓﻰ اﻟﻤﺸﺮوع ﺑﺸﻜﻞ ﻡﻨﺘﻈﻢ آﺄن ﺗﺤﺪث آﻞ یﻮﻡﻴﻦ أو آﻞ أﺳﺒﻮع وهﻜﺬا، ﻓﺎن‬ ‫اﻟﺒﺮﻧﺎﻡﺞ یﻌﻄﻰ اﻟﻤﺠﺎل ﻟﺘﻜﺮار ﻡﺜﻞ هﺬﻩ اﻟﻤﻬﺎم . و اﻟﺸﻜﻞ 5-5 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص‬ ‫ﺑﺘﻜﺮار اﻟﻤﻬﺎم ﻋﻠﻰ ﻓﺘﺮات ﻡﻨﺘﻈﻤﺔ.‬ ‫ﻡﻦ ﻗﺎﺋﻤﻪ‬ ‫‪ Insert‬ﻧﺨﺘﺎر ‪Recurring task‬‬ ‫یﺘﻢ ﺗﺤﺪیﺪ إﺳﻢ ‪ Task name‬واﻟﻤﺪﻩ اﻟﺰﻡﻨﻴﺔ ﺑﺎﻻﺽﺎﻓﻪ اﻟﻰ ﻃﺮیﻘﺔ ﺗﻜﺮار اﻟﻤﻬﻤﺔ.‬ ‫اﻟﺸﻜﻞ 5-5 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺏﺘﻜﺮار اﻟﻤﻬﺎم ﻋﻠﻰ ﻓﺘﺮات ﻣﻨﺘﻈﻤﺔ‬ ‫5-11 اﻟﻘﻴﺪ ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﻬﺎم ‪Task Constraints‬‬ ‫ﻋﻨﺪ اﺳﺘﻌﻤﺎل أى ﻡﻬﻤﻪ یﻜﻮن اﻷﻡﺮ اﻻﻓﺘﺮاﺽﻲ داﺥﻞ ﻡﻴﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ أن هﺬﻩ اﻟﻤﻬﻤﻪ یﺘﻢ‬ ‫ﺗﻨﻔﻴﺬهﺎ ‪ , As soon As possible‬وذﻟﻚ إذا ﺗﻢ ﺟﺪوﻟﺔ اﻟﻤﻬﺎم ﻟﺘﺒﺪأ ﻓﻲ اﻗﺮب وﻗﺖ ﻡﻤﻜﻦ . أﻡﺎ‬ ‫ﻋﻨﺪﻡﺎ یﺘﻢ ﺗﺤﺪیﺪ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﻋﻨﺪ ﺑﺪأ اﻟﺠﺪوﻟﺔ ﻓﻲ ﻡﺮﺑﻊ ‪ Project Information‬ﻓﺈن اﻟﺠﺪوﻟﺔ‬ ‫ﺗﺘﻢ ﺑﺤﻴﺚ ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻋﻨﺪ أآﺒﺮ ﺗﺄﺥﻴﺮ ﻡﻤﻜﻦ ‪ As Late As Possible‬و آﻞ ذﻟﻚ ﻡﺮﺗﺒﻂ ﺑﺘﺎریﺦ ﺑﺪأ‬ ‫أو ﻧﻬﺎیﺔ اﻟﻤﻬﻤﺔ اﻟﺴﺎﺑﻘﺔ. وﻟﻜﻦ ﻟﻴﺲ هﺬا هﻮ اﻟﻘﻴﺪ اﻟﻮﺣﻴﺪ اﻟﺬى یﻤﻜﻦ ﻓﺮﺽﻪ ﻋﻠﻰ ﺗﻨﻔﻴﺬ أى ﻡﻬﻤﺔ ﺑﻞ‬ ‫هﻨﺎك اﻟﻌﺪیﺪ ﻡﻦ اﻟﺼﻴﻎ اﻟﺘﻰ ﺗﺤﻤﻞ ﻡﻌﺎﻧﻰ ﻡﺨﺘﻠﻔﻪ وﺗﺤﻤﻞ ﻗﻴﻮد ﻡﺤﺪدﻩ ﻋﻠﻰ ﺗﻨﻔﻴﺬ اﻟﻤﻬﺎم .وﺗﺒﻘﻰ ﻡﻬﻤﻪ‬ ‫اﻟﻤﺨﻄﻂ ﻓﻰ أن یﺤﺪد ﻧﻮع اﻟﻘﻴﻮد اﻟﺘﻰ ﺳﻴﻔﺮﺽﻬﺎ ﻋﻠﻰ ﺗﻨﻔﻴﺬ ﻡﻬﻤﻪ ﻡﺎ.‬ ‫5-11-1 أﻥﻮاع اﻟﻘﻴﻮد‬ ‫هﻨﻚ ﻧﻮﻋﻴﻦ ﻡﻦ اﻟﻘﻴﻮد و هﻲ:‬ ‫5-11-2 اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ ‪. Flexible Constraints‬‬ ‫52‬
  • 26.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫وهﻲﺗﺴﻤﺢ ﻟﻠﺒﺮﻧﺎﻡﺞ ان یﺤﺴﺐ اﻟﺠﺪوﻟﺔ و ان یﻘﻮم ﺑﻀﺒﻄﻬﺎ و ﺗﻌﺪیﻠﻬﺎ ﺑﺸﻜﻞ ﻡﻨﺎﺳﺐ ﺑﻨﺎء ﻋﻠﻰ اﻟﻘﻴﻮد‬ ‫اﻟﻤﻔﺮوﺽﺔ.‬ ‫5-11-3 اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ ‪. Inflexible Constraints‬‬ ‫و هﻲ اﻟﺘﻲ ﺗﺤﺪد اﻟﺠﺪوﻟﺔ ﻻﻧﻬﺎ ﺗﺘﻄﻠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ او ﺗﻨﺘﻬﻲ ﺽﻤﻦ ﺵﺮوط ﻡﺤﺪدة. و اﻟﻘﻴﻮد ﻏﻴﺮ‬ ‫اﻟﻤﺮﻧﺔ ﺗﻄﺒﻖ ﻋﻨﺪﻡﺎ یﻜﻮن هﻨﺎك ﺽﺮورة ﻡﻄﻠﻘﺔ و ﻗﺪ یﺆدي ﺗﻄﺒﻴﻘﻬﺎ اﻟﻰ ﻓﺮض اﻟﻌﺪیﺪ ﻡﻦ اﻟﺘﻀﺎرﺑﺎت‬ ‫ﻋﻨﺪ ﺗﻨﻔﻴﺬ اﻟﻤﻬﺎم. واﻟﺸﻜﻞ 5-6 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻠﺘﺒﻮیﺐ ‪ Advanced‬و اﻟﺬي یﻈﻬﺮ ﻓﺌﺎت‬ ‫اﻟﻘﻴﻮد اﻟﻤﺨﺘﻠﻔﺔ داﺥﻞ اﻟﺒﺮﻧﺎﻡﺞ.‬ ‫5-11-4 اواﻡﺮ اﻟﻘﻴﻮد اﻟﻤﺮﻥﺔ‬ ‫‪As soon as possible‬‬ ‫و هﻮ اﻟﺨﻴﺎر اﻻﻓﺘﺮاﺽﻲ ﻋﻨﺪﻡﺎ ﺗﺤﺪد ﺗﺎریﺦ ﺑﺪأ اﻟﻤﺸﺮوع ﺑﺤﻴﺚ‬ ‫ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﺑﺄﻗﺮب وﻗﺖ ﻡﻤﻜﻦ و ذﻟﻚ ﺑﻤﺮاﻋﺎة اﻟﺮواﺑﻂ اﻻﺥﺮى‬ ‫ﻟﻠﻤﻬﻤﺔ.‬ ‫‪As late as possible‬‬ ‫و هﻮاﻟﺨﻴﺎر اﻻﻓﺘﺮاﺽﻲ ﻋﻨﺪﻡﺎ ﺗﺤﺪد ﺗﺎریﺦ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﺑﺤﻴﺚ‬ ‫ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻡﻊ اآﺒﺮ ﺗﺄﺥﻴﺮ ﻡﻤﻜﻦ و ذﻟﻚ ﺑﻤﺮاﻋﺎة اﻟﺮواﺑﻂ اﻻﺥﺮى‬ ‫ﻟﻠﻤﻬﻤﺔ.‬ ‫‪ Finish No Earlier Than‬یﺠﺐ ان ﻻ ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬ ‫‪ Start No Earlier Than‬یﺠﺐ ان ﻻ ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬ ‫اﻟﺸﻜﻞ 5-6 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري ﻟﻠﺘﺒﻮیﺐ ‪ Advanced‬و اﻟﺬي یﻈﻬﺮ ﻓﺌﺎت اﻟﻘﻴﻮد اﻟﻤﺨﺘﻠﻔﺔ‬ ‫62‬
  • 27.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫5-11-5اواﻡﺮ اﻟﻘﻴﻮد ﻏﻴﺮ اﻟﻤﺮﻥﺔ‬ ‫یﺠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻓﻲ اﻟﺘﺎریﺦ اﻟﻤﺤﺪد.‬ ‫‪Must Start on‬‬ ‫‪Must Finish on‬‬ ‫یﺠﺐ ان ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻓﻲ اﻟﺘﺎریﺦ اﻟﻤﺤﺪد‬ ‫‪Finish No Later Than‬‬ ‫یﺠﺐ ان ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﻗﺒﻞ ﺗﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬ ‫‪Start No Later Than‬‬ ‫یﺠﺐ ان ﺗﺒﺪأ اﻟﻤﻬﻤﺔ ﻓﻲ او ﻗﺒﻞ اﻟﺘﺎریﺦ اﻟﻘﻴﺪ اﻟﻤﺤﺪد‬ ‫5-11-6 إﺽﺎﻓﻪ ﻗﻴﻮد ﻋﻠﻰ أى ﻡﻬﻤﺔ‬ ‫اﻧﻘﺮ ﻧﻘﺮة ﻡﺰدوﺟﺔ ﻋﻠﻰ ﺥﻠﻴﺔ اﻟﻤﻬﻤﺔ ﻟﻔﺘﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪Task information‬‬ ‫اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪Advanced‬‬ ‫أﻧﻘﺮ ﻋﻠﻰ ﺳﻬﻢ اﻟﻘﺎﺋﻤﺔ ‪. Constraint Types‬‬ ‫أﺥﺘﺮ اﻟﻘﻴﺪ اﻟﻤﻨﺎﺳﺐ و اﺥﺘﺮ ﺗﺎریﺦ ﺑﺪأ اﻟﻘﻴﺪ ﻡﻦ ‪ Constraint Date‬ﺗﻢ اآﺪ اﻻﺥﺘﻴﺎر‪OK‬‬ ‫5-11-7 ازاﻟﺔ اﻟﻘﻴﻮد‬ ‫ﺣﺪد اﻟﻤﻬﻤﺔ اﻟﻤﺮاد ازاﻟﺔ اﻟﻘﻴﺪ ﻋﻨﻬﺎ‬ ‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Project‬اﻻﻡﺮ ‪ Task Information‬ﺛﻢ اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ‬ ‫‪. Advanced‬‬ ‫إﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Constraint Type‬اﻻﻡﺮ ‪ As soon As possible‬ﺛﻢ اﻧﻘﺮ ‪. OK‬‬ ‫ﺑﺈﺥﺘﻴﺎر اﻻﻡﺮ‪ As soon As possible‬ﺗﻜﻮن ﻗﺪ ازﻟﺖ اﻟﻘﻴﺪ ﻏﻴﺮ اﻟﻤﺮن ﻋﻦ اﻟﻤﻬﻤﺔ.‬ ‫ﺽﺒﻂ ﺗﺎریﺦ اﻻﻧﺠﺎز اﻻﺥﻴﺮ ﻟﻠﻌﻤﻞ ‪Setting Deadline‬‬ ‫ﺑﺪﻻ ﻡﻦ ﻓﺮض ﻗﻴﺪ ﻏﻴﺮ ﻡﺮن یﻤﻜﻦ ﺗﺴﺠﻴﻞ ﻡﻮﻋﺪ اﻻﻧﺠﺎز اﻻﺥﻴﺮ ﻟﻤﻬﻤﺔ ﻡﺎ و اﻟﺬي یﺠﺐ ان‬ ‫ﻻ ﺗﺘﺄﺥﺮ ﺑﻌﺪﻩ و ﻟﻜﻦ یﻤﻜﻦ ان ﺗﻨﺠﺰ ﻗﺒﻠﺔ. و وﺽﻊ ‪ Deadline‬ﻟﻦ یﻐﻴﺮ ﻡﻦ ﺗﺎریﺦ اﻟﺠﺪوﻟﺔ‬ ‫اﻟﻤﻔﺘﺮض. و اذا ﺗﻢ ﺗﺠﺎوز ﺗﺎریﺦ ‪ Deadline‬و ﻟﻢ ﺗﻨﺘﻬﻲ اﻟﻤﻬﻤﺔ ﺑﻌﺪ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﻌﺮض‬ ‫ﻡﺆﺵﺮ ﻓﻲ اﻟﻌﻤﻮد ‪ Indicator‬ﺑﻮاﺳﻄﺔ ﺳﻬﻢ ﻧﺤﻮ اﻻﺳﻔﻞ ﻟﻠﺪﻻﻟﺔ ﻋﻠﻰ ذﻟﻚ.‬ ‫5-21 ﺕﻐﻴﻴﺮ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ‪Time scale‬‬ ‫یﻤﻜﻦ اﻟﺘﺤﻜﻢ ﻓﻰ ﻡﻘﻴﺎس اﻟﺰﻡﻦ ﻓﻰ ﻟﻮﺣﻪ ‪ GANTT Chart‬وذﻟﻚ ﺑﺎﺳﺘﺨﺪام‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Format‬اﺥﺘﺮ اﻷﻡﺮ ‪Time scale‬‬ ‫5-31 ﺕﻐﻴﻴﺮ ﻃﺮیﻘﻪ ﻋﺮض ‪GANTT Chart‬‬ ‫یﺘﻢ ﺗﻐﻴﻴﺮ ﻃﺮیﻖ إﺥﺮاج وﻋﺮض ﻡﺨﻄﻂ اﻟﻘﻀﺒﺎن ﺑﺎﺳﺘﺨﺪام اﻷﻡﺮ اﻟﺘﺎﻟﻰ:‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ‬ ‫‪ Format‬اﺥﺘﺮ اﻷﻡﺮ‬ ‫‪ Gantt chart wizard‬ﺣﻴﺚ یﺘﻢ اﺥﺘﻴﺎر‬ ‫اﻟﻤﺤﺪدات اﻟﺘﻰ ﺗﺮﻏﺒﻬﺎ.‬ ‫72‬
  • 28.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫5-31اﻇﻬﺎر ﺥﻂ اﻟﻤﺴﺎر اﻟﺤﺮج‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ‬ ‫‪ Format‬اﺥﺘﺮ اﻷﻡﺮ‬ ‫‪Gantt chart wizard‬‬ ‫اﺧﺘﺮ اﻻﻣﺮ ‪ critical bath‬ﻣﻦ 3 ‪. Step‬‬ ‫اآﻤﻞ ﺑﺎﻗﻲ اﻟﺨﻴﺎرات و ﺗﺄآﺪ ﻡﻦ ﺗﻨﻔﻴﺬ اﻻﻡﺮ اﻻﺥﻴﺮ ‪ Format‬ﻟﻠﺘﺄآﺪ ﻡﻦ ﺗﻨﻔﻴﺬ اﻻﻡﺮ‬ ‫اﻟﺸﻜﻞ 5-7 : اﻟﻤﺮﺏﻊ اﻟﺤﻮاري و اﻟﺬي یﺤﺪد اﺧﺘﻴﺎرات ﻋﺮض ﻣﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت‬ ‫82‬
  • 29.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Project1 Project description: The table 1 indicating the tasks of the project, duration and its relations and constraint Conditions Starting date of the project is 10/10/03 The time period is 5 days. Required: Establish a Bar chart diagram. Establish logical relation ships Table 1 No. Activity Depends on Type of relation Duration 1 Introduction ---- ---- 1 day 2 MS project Introduction FS 1 day 3 Data entry MS project FS 1day 4 Logical MS project FS 2day relations Data entry SS Constraints Logical FF 1 day FS 1 day 5 relations 6 Improvement Constraints 29
  • 30.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫6.أدارة اﻟﻤﻮارد‪Resources Management‬‬ ‫6-1 اﻥﻮاع اﻟﻤﻮارد‬ ‫ان ﻡﻮارد اﻟﻤﺸﺮوع ﺗﺘﻜﻮن ﻡﻦ اﻷﺵﺨﺎص واﻟﻤﻮاد واﻟﻤﻌﺪات .ویﻮﺟﺪ هﻨﺎك ﻧﻮﻋﺎن ﻡﻦ اﻟﻤﻮارد -:‬ ‫• ﻣﻮارد ﻋﻤﻞ ‪Work Resources‬‬ ‫وﻡﻮارد اﻟﻌﻤﻞ ﺗﺸﻴﺮ اﻟﻰ اﻷﺵﺨﺎص و اﻟﻤﻌﺪات اﻟﻤﺤﺪدیﻦ ﻟﺘﻨﻔﻴﺬ ﻡﻬﻤﺔ ﻡﺎ . و یﻤﻜﻦ ﺗﺤﺪیﺪ اﻷﺵﺨﺎص‬ ‫ﺑﻮاﺳﻄﺔ أﺳﻤﺎﺋﻬﻢ أو ﺑﻮاﺳﻄﺔ اﻟﻮﻇﻴﻔﺔ اﻟﺘﻰ یﺸﻐﻠﻮهﺎ .‬ ‫• ﻣﻮارد ﻣﺎدیﺔ ‪Material Resources‬‬ ‫اﻟﻤﻮارد اﻟﻤﺎدیﺔ ﺗﺸﻴﺮ اﻟﻰ اﻟﻤﻮاد اﻟﺘﻰ ﺳﻮف یﺴﺘﻬﻠﻜﻬﺎ اﻟﻤﺸﺮوع أﺛﻨﺎء ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ اﺽﺎﻓﻪ اﻟﻰ اﺳﻢ‬ ‫اﻟﻤﻮرد ﻓﺎﻧﻪ یﻠﺰﻡﻚ ﻡﻌﺮﻓﺔ اﻟﻜﻤﻴﻪ اﻟﺘﻰ یﺘﻮﻓﺮ ﺑﻬﺎ وﺗﻜﺎﻟﻴﻒ هﺬﻩ اﻟﻤﻮارد.‬ ‫ﻓﻤﺜﻼ ﻗﺪ یﻠﺰم أﺣﺪ اﻟﻤﻮارد ﻟﻴﻌﻤﻞ ﻓﻘﻂ %01 ﻡﻦ 04 ﺳﺎﻋﺔ اﻷﺳﺒﻮﻋﻴﺔ ﻋﻠﻰ ﻡﻬﻤﺔ ﻡﺤﺪودة .‬ ‫وﺳﻮف ﺗﺆﺛﺮ هﺬﻩ اﻟﻨﺴﺒﺔ ﺑﺎﻟﻄﺒﻊ ﻋﻠﻰ ﻡﺪﻩ اﻟﻤﺸﺮوع آﻜﻞ .‬ ‫ویﻤﻜﻦ ﺥﻼل اﻟﺒﺮﻧﺎﻡﺞ ﺗﺠﻬﻴﺰ ﻗﺎﺋﻤﻪ ﻡﻮارد واﻻﺥﺘﻴﺎر ﻡﻦ ﺽﻤﻦ هﺬﻩ اﻟﻘﺎﺋﻤﺔ وﺗﻌﻴﻴﻦ اﻟﻤﻮارد اﻟﺨﺎﺹﺔ‬ ‫ﻟﺒﻐﺾ اﻟﻤﻬﺎم أو ﻟﻜﻞ اﻟﻤﻬﺎم.‬ ‫6-2 إدﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد‬ ‫یﻤﻜﻦ ادﺥﺎل ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد ﺑﻌﺪة ﻃﺮق:‬ ‫• إﺽﺎﻓﺔ ﻋﻨﺎویﻦ ﻡﻦ دﻓﺘﺮ اﻟﺒﺮیﺪ اﻻﻟﻜﺘﺮوﻧﻲ ‪ E-mail‬ﻓﻲ ﻡﺮﺑﻊ ﺣﻮار ﺗﻜﻠﻴﻒ اﻟﻤﻮارد‬ ‫‪. Assign Resource‬‬ ‫• اﺽﺎﻓﺔ اﻟﻤﻮارد ﻡﺒﺎﺵﺮة ﻓﻲ ﺟﺪول ﻡﻦ ﺹﻔﺤﺔ اﻟﻤﻮارد ‪. Resource Sheet‬‬ ‫• إﺽﺎﻓﺔ ﻡﻌﻠﻮﻡﺎت ﻡﻔﺼﻠﺔ ﺑﺎﺳﺘﺨﺪام ﻡﺮﺑﻊ ﺣﻮار ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮارد‬ ‫‪. Information‬‬ ‫• إدﺥﺎل اﻟﻤﻮرد ﻓﻲ ﻧﻤﻮذج ‪. Resource Form‬‬ ‫6-3 ﺕﻌﻴﻴﻦ ﻡﻮارد ﻟﻤﻬﺎم‬ ‫إﺥﺘﺮ اﻟﻤﻬﻤﺔ ﺑﺎﻟﻤﺆﺵﺮ‬ ‫إﺥﺘﺮ ﻡﻦ ‪ Project‬اﻻﻡﺮ ‪Task Information‬‬ ‫إﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪Advanced‬‬ ‫أآﺘﺐ اﺳﻢ اﻟﻤﻮرد وﻋﺪد اﻟﻮﺣﺪات اﻟﻤﺘﻮﻓﺮة‬ ‫إﺽﻐﻂ ﻋﻠﻰ اﻟﻤﻔﺘﺎح )‪ (Tab‬ﻓﻲ ﻟﻮﺣﺔ اﻟﻤﻔﺎﺗﻴﺢ ﻟﻼﻧﺘﻘﺎل اﻟﻲ اﻟﺤﻘﻞ اﻟﺘﺎﻟﻲ.‬ ‫6-4 ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ‪Resource sheet‬‬ ‫03‬ ‫‪Resource‬‬
  • 31.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫یﻤﻜﻦﻋﻤﻞ ﻗﺎﺋﻤﺔ ﻡﻮار ﻓﻰ ﻡﻠﻒ ﺥﺎص یﺴﻤﻰ‬ ‫‪ Resource sheet‬وذﻟﻚ ﻡﻦ أﻡﺮ‬ ‫‪. View‬‬ ‫اﺥﺘﺮ اﻻﻡﺮ ‪ Resource sheet‬ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪.View‬‬ ‫اﺽﻒ ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ.‬ ‫و اﻟﺠﺪول اﻟﺘﺎﻟﻲ یﻮﺽﺢ اﻟﻤﻌﺎﻥﻲ اﻟﻤﺨﺘﻠﻔﺔ ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻮرد‬ ‫‪Resource Name‬‬ ‫أﺳﻢ اﻟﻤﻮرد.‬ ‫‪Type‬‬ ‫ﻧﻮع اﻟﻤﻮرد)ﻋﻤﻞ او ﻡﺎدي (.‬ ‫‪Material label‬‬ ‫وﺣﺪة ﻗﻴﺎس اﻟﻤﻮرد اﻟﻤﺎدي)ﻋﺪد، آﺠﻢ،ﻃﻦ..(.‬ ‫‪Initial‬‬ ‫ﺑﺎدﺋﺔ اﺳﻢ اﻟﻤﻮرد.‬ ‫‪Group‬‬ ‫اذا‬ ‫ﺗﺸﺎﺑﻬﺖ‬ ‫اﻟﻤﻮارد‬ ‫ﻓﻲ‬ ‫اﻟﺼﻔﺎت‬ ‫ﺗﻮﺿﻊ‬ ‫ﺿﻤﻦ‬ ‫ﻡﺠﻤﻮﻋﺔ)ﻡﺒﺮﻡﺠﻴﻦ، ﻡﺪرﺳﻴﻦ،..(.‬ ‫‪Max Units‬‬ ‫اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ اﻟﻘﺼﻮي اﻟﻤﺘﻮﻓﺮة ﻡﻦ اﻟﻤﻮرد و ﻗﺪ ﺗﻜﺘﺐ ﻋﻠﻰ‬ ‫ﺵﻜﻞ ﻋﺪد‬ ‫‪Std. Rate‬‬ ‫اﻟﻜﻠﻔﺔ ﻓﻲ وﺣﺪة اﻟﺰﻡﻦ )‪ $100/d‬ﻏﻲ 001 دوﻻر ﻓﻲ اﻟﻴﻮم و‬ ‫هﻜﺬا(‬ ‫‪Ovt. Rate‬‬ ‫اﻟﻜﻠﻔﺔ ﻓﻲ وﺣﺪة اﻟﺰﻡﻦ اﻟﻤﺪﻓﻮﻋﺔ ﻟﻠﻌﻤﻞ اﻻﺿﺎﻓﻲ‬ ‫‪Cost/Use‬‬ ‫اﻟﻜﻠﻔﺔ ﻟﻠﻤﻮاد ﺗﻀﺎف و ذﻟﻚ ﺣﺎل اﺳﺘﺨﺎﻡﻬﺎ ﻟﻤﺮة. اي ﻡﻌﺪل اﻟﺰﻡﻦ‬ ‫یﻘﺎس ﺑﺎﻟﻤﺮة.‬ ‫‪Accrue At‬‬ ‫ﺗﻮﺿﺢ ﻡﺘﻰ یﺴﺘﺤﻖ دﻓﻊ اﻟﻤﻮرد و هﻨﺎك ﺛﻼث ﺥﻴﺎرات ﻋﻨﺪ ﺑﺪایﺔ‬ ‫ﻋﻤﻞ اﻟﻤﻮرد ‪ Srart‬او ﻋﻨﺪ ﻧﻬﺎیﺔ ﻋﻤﻞ اﻟﻤﻮرد ‪ End‬او یﺘﻢ‬ ‫اﻟﺪﻓﻊ ﺑﺎﻟﺘﻨﺎﺳﺐ ﻡﻊ اﺳﺘﺨﺪام اﻟﻤﻮرد ‪Prorated‬‬ ‫‪Base Calendar‬‬ ‫وهﻮ ﻧﻮع اﻟﺘﻘﻮیﻢ و یﻮﺝﺪ ﺛﻼث اﻧﻮاع ﻡﻦ اﻟﺘﻘﻮیﻢ .‬ ‫‪Code‬‬ ‫و یﻤﻜﻦ ادﺥﺎل اي رﻡﺰ ﻡﺎﻟﻲ یﺘﻢ اﺣﺘﺴﺎب اﻟﻤﻮرد ﻋﻠﻴﻪ.‬ ‫6-5 ﻡﻌﻠﻮﻡﺎت اﻟﻤﻮرد‬ ‫یﻤﻜﻦ اﺽﺎﻓﺔ ﻡﻌﻠﻮﻡﺎت اﺥﺮى ﻋﻦ اﻟﻤﻮرد‬ ‫اﻧﻘﺮ ﻧﻘﺮة ﻡﺰدوﺟﺔ ﻋﻠﻰ اﺳﻢ اﻟﻤﻮرد ‪ Resource Name‬ﻓﻲ ﻡﺮﺑﻊ ﺣﻮاري‬ ‫‪ Resource Sheet‬یﻈﻬﺮ ﻡﺮﺑﻊ ‪. Resource Information‬‬ ‫ﻗﻢ ﺑﺈدﺥﺎل اي ﻡﻌﻠﻮﻡﺎت ﻡﺘﻮﻓﺮة ﻋﻦ اﻟﻤﻮرد..‬ ‫13‬
  • 32.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫یﻤﻜﻦادﺥﺎل ‪ Working Time‬و ادﺥﺎل ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ ﺣﺎل و ﺟﻮد ﺗﻐﻴﻴﺮ ﻓﻲ ﺗﻜﺎﻟﻴﻒ‬ ‫اﻟﻤﻮرد ﻡﻊ اﻟﺰﻡﻦ ‪. Cost‬‬ ‫6-6 ﺕﻌﺮیﻒ ﻣﺠﻤﻮﻋﺎت اﻟﻌﻤﻞ ‪Workgroup‬‬ ‫اﺥﺘﺮ ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ‪ Resource Information‬اﻟﻌﻨﻮان ‪workgroup‬‬ ‫یﻮﺟﺪ ﺛﻼث ﺥﻴﺎرات ﺗﻤﻨﺤﻚ اﻡﻜﺎﻧﻴﺔ اﻟﺘﻮاﺹﻞ ﻡﻊ اﻟﻤﻮرد و هﻲ‬ ‫‪Default‬‬ ‫‪None‬‬ ‫‪E-mail‬‬ ‫‪Web‬‬ ‫یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺗﻠﻘﺎﺋﻴﺎ ﺑﺎﺳﻨﺎد ﻧﻮع ﻡﺠﻤﻮﻋﺔ اﻟﻌﻤﻞ اﻟﻰ آﻞ ﻡﻮرد و ﻧﻮع ﻡﺠﻤﻮﻋﺔ اﻟﻌﻤﻞ اﻻﻓﺘﺮاﺽﻲ‬ ‫هﻮ ‪Email‬‬ ‫6-7 ﺕﺨﺼﻴﺺ اﻟﻤﻮارد ‪Assign Resources‬‬ ‫یﺘﻢ ﺗﺨﺼﻴﺺ ﻡﻮرد ﻡﺎ ﻟﻤﻬﻤﻪ ﻋﻤﻞ آﻤﺎ یﻠﻰ:‬ ‫ﺣﺪد اﻟﻤﻬﻤﺔ اﻟﺘﻲ ﺗﺮیﺪ اﺽﺎﻓﺔ ﻡﻮرد ﻟﻬﺎ.‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﻪ ‪ Tools‬اﺥﺘﺮ ‪ Resources‬ﺛﻢ اﺥﺘﺮ ‪.Assign Resources‬‬ ‫یﻤﻜﻦ ﺗﺨﺼﻴﺺ أى ﻋﺪد ﻡﻦ اﻟﻤﻮارد ﻟﻠﻤﻬﻤﺔ ﺣﺴﺐ ﻡﺎ ﺗﺤﺘﺎج.‬ ‫یﺘﻢ وﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ Resource Name‬ﻓﻴﻈﻬﺮ ﺳﻬﻢ اﻟﻘﺎﺋﻤﺔ.‬ ‫اﺽﻐﻂ ﻋﻠﻰ اﻟﺴﻬﻢ ﺗﻈﻬﺮ ﻗﺎﺋﻤﺔ اﻟﻤﻮارد اﻟﻤﺘﻮﻓﺮة.‬ ‫اﺥﺘﺮ اﺳﻢ اﻟﻤﻮرد ﻡﻦ اﻟﻘﺎﺋﻤﺔ.‬ ‫اﺽﻒ ﺑﻌﺪ ذﻟﻚ ﻋﺪد اﻟﻮﺣﺪات ﻡﻦ هﺬا اﻟﻤﻮرد اﻟﻤﻄﻠﻮﺑﺔ ﻻداء هﺬة اﻟﻤﻬﻤﺔ.‬ ‫ﻻﺽﺎﻓﺔ ﻡﻮرد اﺥﺮ ﻟﻠﻤﻬﻤﺔ آﺮر ﻡﺎ ﺳﺒﻖ.‬ ‫ﻻ یﻤﻜﻦ اﺽﺎﻓﺔ ﻡﻮردیﻦ ﻓﻲ ﻋﻤﻠﻴﺔ واﺣﺪﻩ.‬ ‫و اﻟﺸﻜﻞ 6-1 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻬﺎم و ﺹﻔﺤﺔ ﺗﺒﻮیﺐ ‪Resources‬‬ ‫ﺣﻴﺚ یﺘﻢ ادﺥﺎل و ﺗﺨﺼﻴﺺ اﻟﻤﻮارد.‬ ‫23‬
  • 33.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫.‬ ‫اﻟﺸﻜﻞ6-1: ﻣﺮﺏﻊ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﺎم و ﺹﻔﺤﺔ ﺕﺒﻮیﺐ ‪ Resources‬ﻟﺘﺨﺼﻴﺺ اﻟﻤﻮارد.‬ ‫6-8 ﻓﻬﻢ ﻋﻤﻞ اﻟﻤﻮارد‬ ‫ﻋﻨﺪ ادﺥﺎل اي ﻡﻮرد ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﺘﻌﺎﻡﻞ ﻡﻊ ﺛﻼث ﻋﻮاﻡﻞ هﻲ:‬ ‫اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ )‪Duration (D‬‬ ‫اﻟﻮﺣﺪات )‪Units (U‬‬ ‫اﻟﺠﻬﺪ ) اﻟﻌﻤﻞ( )‪Work (W‬‬ ‫و یﻘﻮم اﻟﺒﺮﻧﺎﻡﺞ ﺑﺤﺴﺎب ﻗﻴﻤﺔ اﻟﺠﻬﺪ آﻤﺎ یﻠﻲ:‬ ‫‪Work = Duration * Units‬‬ ‫ﻣﺜﺎل:‬ ‫ﻧﻔﺮض وﺟﻮد ﻡﻬﻤﺔ ﻋﻤﻞ یﺴﺘﻐﺮق اداؤهﺎ ﺥﻤﺴﺔ ایﺎم ﻋﻤﻞ و ﻗﺪ ﺗﻢ ﺗﺨﺼﻴﺺ ﺛﻼث ﻡﻮارد ﻟﻬﺎ ، آﻞ‬ ‫ﻡﻮرد ﻡﺨﺼﺺ ﺑﻘﻴﻤﺔ 001% ﻡﻦ اﻟﻮﺣﺪات. ﺑﻔﺮض اﺳﺘﺨﺪام ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻟﻘﻴﺎﺳﻴﺔ وهﻲ 8 ﺳﺎﻋﺎت‬ ‫ﻓﻲ اﻟﻴﻮم ، ﻓﺈن ﻗﻴﻤﺔ اﻟﺠﻬﺪ ‪ W‬ﺗﺤﺴﺐ آﻤﺎ یﻠﻲ:‬ ‫.‪Work = 5*8*3 = 120 hrs‬‬ ‫ﻓﻲ ﺣﺎﻟﺔ اﺽﺎﻓﺔ اي ﻡﻮارد اﺥﺮ ﻟﻬﺬة اﻟﻔﻌﺎﻟﻴﺔ ﻓﺎن اﻟﺒﺮﻧﻤﺞ ﺳﻮف یﻘﻮم ﺑﺎﻋﺎدة اﻟﺠﺪوﻟﺔ. و ﺑﺎﻻﺥﺘﻴﺎر ﺑﻴﻦ‬ ‫ﺗﻌﺪیﻞ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ و اﻟﻮﺣﺪة و اﻟﺠﻬﺪ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ ﻡﺒﻨﻲ ﻋﻠﻲ اﺥﺘﻴﺎر ﺗﻐﻴﻴﺮ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ آﺎول‬ ‫اﺥﺘﻴﺎر. و ﻟﻜﻦ ﻋﻨﺪ ﻋﻤﻞ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﻟﺘﻜﻮن ﺛﺎﺑﺘﺔ ‪ Fixed‬ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ ﺳﻮف یﺨﺘﺎر ﺗﻐﻴﻴﺮ اﻟﺠﻬﺪ‬ ‫و ﺗﺒﻘﻰ اﻟﻮﺣﺪة ﺛﺎﺑﺘﺔ.و هﻜﺬا یﻤﻜﻦ اﻟﺘﺤﻜﻢ ﻓﻲ اﺥﺘﻴﺎرات اﻟﺒﺮﻧﺎﻡﺞ و ذﻟﻚ ﻡﻊ ﺗﻌﺮیﻒ ‪Task Type‬‬ ‫6- 9 ﻥﻮع ﻡﻬﻤﺔ اﻟﻌﻤﻞ ‪Task Type‬‬ ‫6-9-1 ﻣﻬﻤﺔ ذات وﺡﺪات ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪Fixed Units with Effort Driven‬‬ ‫33‬
  • 34.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫إذااﺽﻔﺖ وﺣﺪات ﻡﻮارد ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬ ‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﺘﻜﻠﻴﻒ اﻟﻤﻮرد ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬ ‫إذا ﻏﻴﺮت اﻟﻤﺪة، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬ ‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻤﺪة.‬ ‫یﻤﻜﻦ ﺗﻘﺼﻴﺮ ﻡﺪة ﻡﻬﻤﺔ اﺛﻨﺎء اﻟﺘﻨﻔﻴﺬ ﺑﺎﺽﺎﻓﺔ وﺣﺪات ﻟﻠﻤﻬﻤﺔ.‬ ‫6-9-2 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ‪Fixed Duration‬‬ ‫اذا اﺽﻔﺖ او ﺣﺬﻓﺖ وﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻌﻤﻞ.‬ ‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﻠﻮﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬ ‫إذا ﻗﻤﺖ ﺑﺰیﺎدة اﻟﻤﺪة ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬ ‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬ ‫6-9-3 ﻣﻬﻤﺔ ذات ﻣﺪة ﺙﺎﺏﺘﺔ ﻣﻘﺎدة ﺏﺎﻟﺠﻬﺪ ‪Fixed Duration with Effort Driven‬‬ ‫اذا اﺽﻔﺖ او ﺣﺬﻓﺖ وﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬ ‫إذا ﻏﻴﺮت اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮیﺔ ﻟﻠﻮﺣﺪات ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻌﻤﻞ.‬ ‫إذا ﻗﻤﺖ ﺑﺰیﺎدة اﻟﻤﺪة ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب آﻤﻴﺔ اﻟﻮﺣﺪات.‬ ‫إذا ﻏﻴﺮت آﻤﻴﺔ اﻟﻌﻤﻞ ، یﻌﻴﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺣﺴﺎب اﻟﻮﺣﺪات.‬ ‫6-9-4 ﺕﺤﺪیﺪ اﻟﻨﻮع اﻻﻓﺘﺮاﺿﻲ ﻟﻠﻤﻬﻤﺔ‬ ‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﻻﻡﺮ ‪ Option‬ﺛﻢ اﻧﻘﺮ ﻋﻠﻰ ﺹﻔﺤﺔ اﻟﺘﺒﻮیﺐ ‪. Schedule‬‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪. Default Task Type‬‬ ‫اﻧﻘﺮ ﻋﻠﻰ زر ‪ OK‬ﻟﺘﻄﺒﻴﻖ اﻟﺘﻐﻴﻴﺮ.‬ ‫ﺳﻮف یﺼﺒﺢ اﻟﻨﻮع اﻟﺬي اﺥﺘﺮﺗﺔ هﻮ ﻧﻮع اﻟﻤﻬﺎم اﻟﺠﺪیﺪة ﺑﻌﺪ اﻻﺥﺘﻴﺎر و ﻟﻜﻨﻪ ﻻ یﻐﻴﻴﺮ‬ ‫ﺥﺼﺎﺋﺺ او ﻧﻮع اﻟﻤﻬﺎم اﻟﺘﻲ ﺳﺒﻖ ﺗﺨﺼﻴﺼﻬﺎ.‬ ‫6-01 ادارة اﻟﻤﻮارد‬ ‫ان ادارﻩ اﻟﻤﻮارد ﺗﻌﻨﻰ ﺗﺤﺪیﺪ ﻡﺪﻩ ﻋﻤﻞ اﻟﻤﻮرد وﻡﻮاﻋﻴﺪ اﺳﺘﺨﺪاﻡﻬﺎ اﺽﺎﻓﻪ اﻟﻰ إﻡﻜﺎﻧﻴﺔ ﺗﻐﻴﻴﺮ ﺳﻌﺮ‬ ‫اﻟﻤﻮرد أﺛﻨﺎء ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ واﻟﺨﻄﻮة اﻷوﻟﻰ هﻰ:‬ ‫ﻡﻦ ﻗﺎﺋﻤﺔ ‪ view‬ﻧﺨﺘﺎر ‪Resource usage‬‬ ‫ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى هﺬا یﻤﻜﻦ ﻋﻤﻞ اﻷﺗﻰ -:‬ ‫6-11 ﺕﺤﺪیﺪ ﺕﺎریﺦ ﻋﻤﻞ اﻟﻤﻮرد‬ ‫43‬
  • 35.
    ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫ﻡﻦ اﻟﻤﺮﺑﻊاﻟﺤﻮاري اﻟﺨﺎص ب‬ ‫‪MS PROJECT‬‬ ‫‪ Resource usage‬ﻧﻘﻮم ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﺮد‬ ‫اﻟﻤﺮاد ﺗﺤﺪیﺪ ﻡﻮﻋﺪ أو ﺗﺎریﺦ اﻟﻌﻤﻞ ﺑﻪ ﻓﻴﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى اﻟﻤﺴﻤﻰ‬ ‫‪Assignment‬‬ ‫‪Information‬ﺣﻴﺚ یﺘﻢ ﺗﺤﺪیﺪ ﻡﻮﻋﺪ ﺑﺪأ اﺳﺘﺨﺪام اﻟﻤﻮرد أو ﻡﻮﻋﺪ ﻧﻬﺎیﺔ اﺳﺘﺨﺪاﻡﻪ .‬ ‫6-21 دراﺳﺔ ﺕﺪرج ﺳﻌﺮ اﻟﻤﻮرد‬ ‫ﻓﻰ ﺣﺎﻟﻪ اﻟﺘﺨﻄﻴﻂ ﻟﻠﻤﺸﺮوع وآﺎن هﻨﺎك ﺗﻮﻗﻌﺎت أن أﺳﻌﺎر اﺳﺘﺨﺪام ﺑﻌﺾ اﻟﻤﻮارد ﺳﻮف یﺘﻐﻴﺮ‬ ‫ﺥﻼل ﻓﺘﺮﻩ اﻟﺘﻨﻔﻴﺬ ﻓﺎن اﻟﺒﺮﻧﺎﻡﺞ یﺘﻴﺢ ﻟﻚ أن ﺗﺴﺠﻞ أآﺜﺮ ﻡﻦ ﻡﻌﺪل ﻟﺴﻌﺮ اﻟﻤﻮرد ﺥﻼل ﺗﻠﻚ اﻟﻔﺘﺮة.‬ ‫ﻓﻰ ﻧﻔﺲ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ‪. Resource Usage‬‬ ‫یﺘﻢ اﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﻮرد ﻓﻴﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى ‪Resource‬‬ ‫‪. Information‬‬ ‫یﺘﻢ اﺥﺘﻴﺎر ﻗﺎﺋﻤﻪ ‪ Cost‬ﺣﻴﺚ یﻮﺟﺪ ﺑﻬﺎ ﺥﻤﺲ ﻗﻮاﺋﻢ أﺳﻌﺎر ﻡﺮﺗﺒﻪ ﺣﺴﺐ اﻷﺣﺮف ,‪A, B‬‬ ‫‪C, D, E‬ﺗﻀﻢ اﻟﻘﺎﺋﻤﻪ ‪ A‬اﻟﺴﻌﺮ اﻟﻘﻴﺎﺳﻰ اﻟﺬى ﺗﻢ إدﺥﺎﻟﻪ ﻓﻰ ‪ .Resource Sheet‬و‬ ‫اﻟﺸﻜﻞ 6-2 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري ﻟﻤﻌﻠﻮﻡﺎت اﻟﻤﻮرد و ﺹﻔﺤﺔ ﺗﺒﻮیﺐ ‪ costs‬ﺣﻴﺚ یﺘﻢ‬ ‫ادﺥﺎل و ﺗﺨﺼﻴﺺ اﻟﺘﻜﺎﻟﻴﻒ.‬ ‫یﺘﻢ إدﺥﺎل أﺳﻌﺎر ﺟﺪیﺪﻩ ﻓﻰ اﻟﻘﺎﺋﻤﺔ ‪ B‬وﺗﻮاریﺦ اﺳﺘﺨﺪام هﺬﻩ اﻷﺳﻌﺎر .‬ ‫یﺘﻢ ﺗﺨﺼﻴﺺ اﻟﺴﻌﺮ اﻟﺠﺪیﺪ ﻟﻠﻤﻬﻤﺔ اﻟﻤﻄﻠﻮﺑﺔ وذﻟﻚ ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﺳﻢ اﻟﻤﻬﻤﺔ‬ ‫ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ ‪Assignment Information‬‬ ‫اﻟﺸﻜﻞ 6-2: ﻣﺮﺏﻊ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻮرد و ﺹﻔﺤﺔ ﺕﺒﻮیﺐ ‪ costs‬ﺡﻴﺚ ﻟﺘﺨﺼﻴﺺ اﻟﺘﻜﺎﻟﻴﻒ.‬ ‫53‬
  • 36.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫6-21إدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ‪Fixed Cost‬‬ ‫ﻏﺎﻟﺒﺎ ﻡﺎ ﺗﻜﻮن هﻨﺎك ﺑﻌﺾ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ﻓﻰ اﻟﻤﺸﺮوﻋﺎت اﻟﺘﻰ ﻻ ﺗﺘﺄﺛﺮ ﺑﻮﻗﺖ ﺗﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬ ‫أو ﻡﺪﻩ اﻟﺘﻨﻔﻴﺬ وهﺬﻩ اﻟﺘﻜﺎﻟﻴﻒ ﻡﺜﻞ ﺛﻤﻦ ﺑﻌﺾ اﻟﻤﻮاد و ﺛﻤﻦ اﻟﻤﻮاﺹﻼت و ﻡﺼﺎریﻒ‬ ‫اﻟﻔﺤﻮﺹﺎت ﺣﻴﺚ یﺘﻢ إدﺥﺎﻟﻬﺎ ﻡﺒﺎﺵﺮة آﺘﻜﺎﻟﻴﻒ ﺛﺎﺑﺘﺔ .اﻟﺸﻜﻞ 6-3 یﻮﺽﺢ واﺟﺔ ‪GANTT‬‬ ‫ﻡﻊ ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ. و اﻟﺸﻜﻞ 6-4 یﻮﺽﺢ واﺟﺔ ‪ Resource Sheet‬ﻡﻊ ﻗﺎﺋﻤﺔ ﺗﻜﺎﻟﻴﻒ‬ ‫اﻟﻤﻮارد.‬ ‫.وﻹدﺥﺎل اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺑﺘﺔ ﻧﺘﺒﻊ اﻻﺗﻲ:‬ ‫ﻡﻦ ﻗﺎﺋﻤﻪ ‪ view‬ﻧﺨﺘﺎر اﻷﻡﺮ ‪ Table‬وﻡﻨﻪ ﻧﺨﺘﺎر ‪Cost‬‬ ‫یﻈﻬﺮ ﻋﺪد ﻡﻦ أﻋﻤﺪﻩ ﺗﻜﺎﻟﻴﻒ اﻟﻤﺸﺮوع ﺣﻴﺚ یﺘﻢ إدﺥﺎل ﺗﻜﺎﻟﻴﻒ اﻟﻤﻮارد أﻡﺎم اﻟﻤﻬﺎم‬ ‫آﺘﻜﺎﻟﻴﻒ ﺛﺎﺑﺘﺔ.‬ ‫اﻟﺸﻜﻞ 6-3: واﺟﺔ ‪ GANTT‬ﻣﻊ ﻗﺎﺋﻤﺔ اﻟﺘﻜﺎﻟﻴﻒ اﻟﺜﺎﺏﺘﺔ.‬ ‫اﻟﺸﻜﻞ 6-4: واﺟﺔ ‪ Resource Sheet‬ﻣﻊ ﻗﺎﺋﻤﺔ ﺕﻜﺎﻟﻴﻒ اﻟﻤﻮارد.‬ ‫63‬
  • 37.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫6-31اﻟﻌﻤﻞ ﻡﻊ اﻟﻜﻨﺘﻮر ‪Contouring Assignment‬‬ ‫ان ﻃﺮیﻘﺔ ﺗﻮزیﻊ اﻟﻤﻮرد ﺥﻼل ﻓﺘﺮة اﻟﻌﻤﻞ یﻌﺘﻤﺪ ﻋﻠﻰ اﻟﺘﻮزیﻊ اﻟﻜﻮﻧﺘﻮري ﺣﻴﺚ یﻮﺟﺪ ﻋﺪة ﻃﺮق‬ ‫ﻟﻠﺘﻮزیﻊ و ﻋﺎدة ﻡﺎ یﻜﻮن اﻟﺘﻮزیﻊ اﻻﻓﺘﺮاﺽﻲ‪ Default‬هﻮ اﻟﻜﻮﻧﺘﻮر اﻟﻤﺴﻄﺢ ‪ Flat‬ﺣﻴﺚ یﺘﻢ‬ ‫ﺗﻮزیﻊ اﻟﻤﻮرد ﺑﺎﻟﺘﺴﺎوي ﻋﻠﻰ اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﺑﻤﻌﺪل 8 ﺳﺎﻋﺎت یﻮﻡﻴﺎ.‬ ‫ان اﻟﺨﻴﺎرات اﻻﺥﺮى اﻟﻤﻮﺟﻮدة ﺗﻘﻮم ﺑﺘﻌﺪیﻞ اﻟﺘﻮزیﻊ ﺣﺴﺐ اﻟﺮﻏﺒﺔ.‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ‪ Project‬اﻻﻡﺮ ‪.Assignment Information‬‬ ‫اﺥﺘﺮ اﻟﺘﺒﻮیﺐ ‪ general‬ﺛﻢ ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ work contour‬و اﺥﺘﺮ ﻧﻮع اﻟﻜﻮﻧﺘﻮر.‬ ‫اﻟﺸﻜﻞ 6-5 : ﺕﺨﺼﻴﺺ ﻣﻌﻠﻮﻣﺎت اﻟﻤﻬﻤﺔ ﻣﻊ ﻗﺎﺋﻤﺔ ﺧﻴﺎرات اﻟﻜﻮﻧﺘﻮر‬ ‫6-41 أﻧﻮاع دوال اﻟﻜﻨﺘﻮر‬ ‫یﻮﺟﺪ ﺛﻤﺎﻧﻴﺔ ﺗﻮزیﻌﺎت اﺣﺼﺎﺋﻴﺔ ﻡﺒﻨﻴﺔ داﺥﻞ اﻟﺒﺮﻧﺎﻡﺞ ﻟﺘﻮزیﻊ ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻋﻠﻲ اﻟﻤﻬﻤﺔ ﺥﻼل اﻟﻤﺪة.‬ ‫و اﻟﺸﻜﻞ 6-5 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺎص ﺑﺘﺨﺼﻴﺺ ﻡﻌﻠﻮﻡﺎت اﻟﻤﻬﻤﺔ ﻡﻊ ﻗﺎﺋﻤﺔ ﺥﻴﺎرات‬ ‫اﻟﻜﻮﻧﺘﻮر. و اﻻﻡﺮ اﻻﻓﺘﺮاﺽﻲ ﻓﻲ اﻟﺒﺮﻧﺎﻡﺞ هﻮ اﻟﺘﻮزیﻊ اﻟﻤﺴﺘﻮي ‪ Flat‬وذﻟﻚ یﻌﻨﻲ ان ﺳﺎﻋﺎت‬ ‫اﻟﻌﻤﻞ ﻡﻮزﻋﺔ ﺑﺎﺗﺴﺎوي ﻋﻠﻰ اﻻیﺎم و ذﻟﻚ ﺑﻤﻌﺪل 8 ﺳﺎﻋﺎت ﻓﻲ اﻟﻴﻮم.‬ ‫ﻓﻲ ﺣﻞ وﺟﻮد اﺥﺘﻼف او ﻋﺪم ﺗﺴﺎوي ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﻋﻠﻰ ﻡﺪى ﻡﺪة اﻟﻤﻬﻤﺔ، یﺘﻢ اﺥﺘﻴﺎر ﻧﻮع اﻟﺘﻮزیﻊ‬ ‫اﻟﻤﻨﺎﺳﺐ ﻡﻦ ﺑﻴﻦ اﻻﻧﻮاع اﻻﺗﻴﺔ:‬ ‫73‬
  • 38.
    ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﻤﺴﻄﺢ )‪(Flat‬‬ ‫‪MS PROJECT‬‬ ‫و هﻮ اﻟﻜﻨﺘﻮر اﻻﻓﺘﺮاﺿﻲ و یﻜﻮن ﻋﻠﻰ ﺵﻜﻞ ﻣﺴﺘﺎو ﻋﻠﻰ آﺎﻣﻞ اﻟﻤﺪة‬ ‫اﻟﻤﺤﻤﻞ ﺧﻠﻔﺎ )‪ (Back-loaded‬هﻨﺎك ذروﻩ ﻓﻲ آﻤﻴﺔ اﻟﻌﻤﻞ ﻓﻲ ﻧﻬﺎیﺔ اﻟﺘﻜﻠﻴﻒ‬ ‫ﻟﻤﺤﻤﻞ اﻣﺎﻣﺎ ) ‪(Front-loaded‬هﻨﺎك ذروﻩ ﻓﻲ آﻤﻴﺔ اﻟﻌﻤﻞ ﻓﻲ ﺏﺪایﺔ اﻟﺘﻜﻠﻴﻒ‬ ‫ﺙﻨﺎﺋﻲ اﻟﺬروة )‪ (Double Peak‬هﻨﺎك ذروﺕﻴﻦ ﻣﺘﻤﻴﺰﺕﻴﻦ یﺘﺮآﺰ ﻓﻴﻬﻤﺎ اﻟﻌﻤﻞ‬ ‫اﻟﺬروة اﻟﻤﺒﻜﺮة )‪ (Early Peak‬ﻣﺸﺎﺏﻪ ﻟﻠﻤﺤﻤﻞ اﻣﺎﻣﺎ ﻣﻊ ﺕﺪرج ﺏﺎﺕﺠﺎﻩ ذروة اﻟﻨﺸﺎط‬ ‫ا ﻟﺬروة اﻟﻤﺘﺄﺧﺮة )‪ ( Late peak‬ﻣﺸﺎﺏﻪ ﻟﻠﻤﺤﻤﻞ ﺧﻠﻔﺎ ﻣﻊ ﺕﺪرج ﺏﺎﺕﺠﺎﻩ ذروة اﻟﻨﺸﺎط‬ ‫اﻟﺠﺮس )‪ (Bell‬هﻨﺎل ذروة وﺡﻴﺪة ﻓﻲ ﻣﻨﺘﺼﻒ اﻟﻨﺸﺎط‬ ‫اﻟﺴﻠﺤﻔﺎة )‪ (Turtle‬ﺵﺒﻴﻪ ﺏﺎﻟﺠﺮس ﻣﻊ ﺕﺪرج ﻧﺤﻮ اﻟﺤﻮاف‬ ‫83‬
  • 39.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫7.ﻇﺒﻂ و ﺕﻌﺪیﻞ اﻟﺠﺪوﻟﺔ‬ ‫7-1 اﻟﻌﻤﻞ ﻡﻊ اﻟﻮﻗﺖ اﻹﺽﺎﻓﻲ ‪Overtime Work‬‬ ‫ﻗﺪ ﺗﺤﺘﺎج ﺑﻌﺾ اﻟﻤﻬﺎم ﻻﺳﺘﺨﺪام ﺑﻌﺾ اﻟﻤﻮارد وﻗﺘﺎ إﺽﺎﻓﻴﺎ وﻟﺬﻟﻚ ﻻﺑﺪ ﻡﻦ إدﺥﺎل ﺗﻜﺎﻟﻴﻒ اﻟﻮﻗﺖ‬ ‫اﻹﺽﺎﻓﻲ ﺽﻤﻦ ﺗﻜﺎﻟﻴﻒ اﻟﻌﻤﻞ .وﻹدﺥﺎل ﻋﺪد ﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻹﺽﺎﻓﻲ ﻧﺘﺒﻊ اﻷﺗﻰ -:‬ ‫یﺠﺐ اﻟﻮﻗﻮف ﺑﺎﻟﻤﺆﺵﺮ أوﻻ ﻋﻠﻰ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻰ اﻟﺨﺎص ﺑﺎﻟﻤﻮارد ﺛﻢ ﻧﺨﺘﺎر اﻷﻡﺮ.‬ ‫ﻡﻦ ﻗﺎﺋﻤﻪ‬ ‫‪ Format‬ﻧﺨﺘﺎر‬ ‫‪ Details‬ﻡﻦ ﺛﻢ ﻧﺨﺘﺎر ‪. Resource Work‬‬ ‫ﺣﻴﺚ یﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮارى اﻟﺘﺎﻟﻰ ﻓﻰ أﺳﻔﻞ ﻗﺎﺋﻤﻪ اﻹدﺥﺎل ویﺘﻢ إدﺥﺎل ﻋﺪد ﺳﺎﻋﺎت‬ ‫اﻟﻌﻤﻞ اﻹﺽﺎﻓﻲ. و اﻟﺸﻜﻞ 6-5 یﻮﺽﺢ ﻃﺮیﻘﺔ ﺗﺨﺼﻴﺺ اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻟﻠﻤﻬﻤﺔ.‬ ‫اﻟﺸﻜﻞ 7-1 : ﺕﺨﺼﻴﺺ اﻟﻌﻤﻞ اﻻﺿﺎﻓﻲ ﻟﻠﻤﻬﻤﺔ‬ ‫7-2 ﻓﻬﻢ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻮﻗﺖ اﻻﺿﺎﻓﻲ:‬ ‫ان آﻤﻴﺔ اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻟﻦ یﺘﻢ اﺽﺎﻓﺘﻬﺎ ﻟﻠﺠﻬﺪ اﻟﺨﺎص ﺑﺎﻟﻤﻬﻤﺔ ﻻن اﻟﺠﻬﺪ )‪ (work‬یﻤﺜﻞ آﻤﻴﺔ‬ ‫اﻟﻌﻤﻞ اﻻﺟﻤﺎﻟﻴﺔ. ان اﻟﻌﻤﻞ اﻻﺽﺎﻓﻲ ﻓﻘﻂ یﻤﺜﻞ ﺟﺰء ﻡﻦ اﻟﻌﻤﻞ ﻗﻴﻤﺔ اﻟﻌﻤﻞ اﻟﻜﻠﻲ و اﻟﺘﻲ ﺳﻮف یﺘﻢ‬ ‫ﺣﺴﺎﺑﻬﺎ ﺑﻌﺪل ﺗﻜﻠﻔﺔ اﺽﺎﻓﻴﺔ. ﻋﻨﺪ ادﺥﺎل ﻗﻴﻤﺔ ﻋﻤﻞ اﺽﺎﻓﻲ ﻓﺎن اﻟﻔﺘﺮة اﻟﺰﻡﻨﻴﺔ ﻟﻠﻤﻬﻤﺔ ﺳﻮف ﺗﻘﻞ.‬ ‫ﻡﺜﺎل: ﻋﻨﺪﻡﺎ یﻌﻤﻞ ﺵﺨﺺ ﻡﺎ ﻡﺪة 04 ﺳﺎﻋﺔ و ذﻟﻚ ﺑﻌﺪل 8 ﺳﺎﻋﺎت یﻮﻡﻴﺎ و ﺳﺎﻋﺘﻴﻦ ﻋﻤﻞ اﺽﺎﻓﻲ‬ ‫ﻓﺎن یﺠﺐ ﺗﻌﻴﻴﻦ 01 ﺳﺎﻋﺎت ﻋﻤﻞ یﻮﻡﻴﺔ و یﺘﻢ ﺗﺤﺪیﺪ ﺳﺎﻋﺘﻴﻦ ﻡﻦ اﻟﻌﺸﺮة آﻌﻤﻞ اﺽﺎﻓﻲ . آﻤﺎ ان‬ ‫اﻟﻌﻤﻞ ﺳﻮف یﺘﻢ ﺗﻨﻔﻴﺬﻩ ﻓﻲ ارﺑﻌﺔ ایﺎم و ﻟﻴﺲ ﻓﻲ ﺥﻤﺴﺔ ایﺎم.‬ ‫93‬
  • 40.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫7-3ﺕﺴﻮیﺔ ﺕﻌﺎرﺽﺎت اﻟﻤﻮارد ‪Resource over allocation Leveling‬‬ ‫ﺗﺤﺪث اﻟﺘﻌﺎرﺽﺎت ﻓﻲ اﻟﻤﻮارد ﻋﻨﺪﻡﺎ ﺗﺰیﺪ اﻟﺤﺎﺟﺔ ﻟﻤﻮرد ﻡﻌﻴﻦ ﺥﻼل ﻓﺘﺮة ﻡﻌﻴﻨﺔ ﻋﻦ اﻗﺼﻲ ﻋﺪد‬ ‫ﻡﺘﺮﻓﺮ ﻡﻦ هﺬا اﻟﻤﻮرد. اذا ﺗﻢ ﺟﺪوﻟﺔ ﻡﻮرد ﻟﻴﻌﻤﻞ ﻋﻠﻰ ﻡﻬﺎم ﻡﺘﻌﺪدة ﻓﺎﻧﻪ ﻡﻦ اﻟﻤﺤﺘﻤﻞ ﻟﻬﺬا اﻟﻤﻮرد ان‬ ‫یﺤﺪث ﻟﻪ ﺗﻌﺎرض ﻋﻨﺪ اﺳﺘﺨﺪاﻡﻪ ﻓﻲ هﺬﻩ اﻟﻤﻬﺎم. ﻓﻲ آﻞ ﻡﻨﻈﺮ ﻓﺎن اﻟﺘﻌﺎرﺽﺎت ﺗﻈﻬﺮ ﺑﺎﻟﻠﻮن اﻟﺤﻤﺮ.‬ ‫ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﻤﻮارد ﻓﺎﻧﻪ یﻈﻬﺮ ﺗﺤﺬیﺮ ﺑﺬﻟﻚ ﻓﻲ اﻟﻬﻮاﻡﺶ.‬ ‫7-4 ﺕﺤﺪیﺪ اﻟﻤﻬﺎم اﻟﻤﺤﻤﻠﺔ ﺕﺤﻤﻴﻼ زاﺋﺪ‬ ‫‪Locating the over allocations Task‬‬ ‫اﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ View‬اﻟﻤﻨﻈﺮ ‪Resource Graph‬‬ ‫اﺥﺘﺮ ﻡﻦ ﻗﺎﺋﻤﺔ ‪ Window‬اﻻﻡﺮ ‪split‬‬ ‫ﺽﻊ اﻟﻤﺆﺵﺮ ﻋﻠﻰ ‪ Resource Graph‬و اﺽﻐﻂ ﻋﻠﻰ اﻟﺰر اﻻیﻤﻦ ﻟﻠﻔﺄرﻩ ﺳﻮف‬ ‫یﻈﻬﺮ ﻟﻚ ﻋﺪة ﺥﻴﺎرات‬ ‫اﺣﺘﺮ ‪Over allocation‬‬ ‫ﺟﺮب ﺑﺎﺥﺘﺒﺎر‪ ways to resolve over allocations‬و ذﻟﻚ ﺑﺎﺳﺘﺨﺪام‬ ‫‪To delay a task‬‬ ‫‪Split a task‬‬ ‫‪Assign additional or different resources‬‬ ‫7-5 ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﺘﺠﺰﺋﺔ او ﺕﺄﺥﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬ ‫اﻟﺨﻴﺎرات اﻟﻤﺘﺎﺡﺔ ﻻزاﻟﺔ اﻟﺘﻌﺎرﺿﺎت‬ ‫ﺕﺠﺰﺋﺔ اﻟﻤﻬﻤﺔ‬ ‫ﺕﺄﺧﻴﺮ ﺕﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ‬ ‫اﺿﺎﻓﺔ ﻣﻮارد‬ ‫اﻟﻌﻤﻞ وﻗﺖ اﺿﺎﻓﻲ‬ ‫و اﻟﻘﻮاﻋﺪ اﻟﻌﺎﻣﺔ اﻟﻤﺘﺒﻌﺔ ﻟﺘﺤﺪیﺪ ذﻟﻚ هﻲ ﻋﻠﻰ اﻟﺘﺮﺕﻴﺐ:‬ ‫اﻟﻮﻗﺖ اﻟﻤﺘﺎح‬ ‫اوﻟﻮیﺔ ﺕﻨﻔﻴﺬ اﻟﻤﻬﺎم‬ ‫اﻟﺮواﺏﻂ و اﻟﻘﻴﻮد‬ ‫رﻗﻢ اﻟﻤﻬﻤﺔ ‪. ID‬‬ ‫ﺕﺎریﺦ اﻟﺘﻨﻔﻴﺬ.‬ ‫04‬
  • 41.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫7-6ﺕﻄﺒﻴﻖ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت‬ ‫اﺥﺘﺮ اي ﻡﻬﻤﺔ‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﻻﻡﺮ‪Resource Leveling‬‬ ‫اﺥﺘﺮ اﻻﻡﺮ ‪ Level From/To‬ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﺘﻘﻮیﻢ اﻟﺘﻮاریﺦ اﻟﺘﻲ ﺗﺮﻏﺐ ﺑﻴﻨﻬﺎ ﻓﻲ ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت‬ ‫یﺘﻢ ﺗﺴﻮیﺔ اﻟﺘﻌﺎرﺽﺎت ﺣﺴﺐ اﻟﺨﻴﺎرات اﻟﺘﺎﻟﻴﺔ‬ ‫ﻃﺮیﻘﺔ رﻗﻢ 1 : اﻟﻤﻬﻤﺔ ذات اﻟﺘﺮﻗﻴﻢ اﻻآﺒﺮ ﺕﺄﺧﺮ اوﻻ‬ ‫ﻃﺮیﻘﺔ رﻗﻢ 2 : اﺳﺘﺨﺪام اﻟﻄﺮیﻘﺔ اﻟﻘﻴﺎﺳﻴﺔ اﻟﻤﻔﺘﺮﺿﺔ ﻓﻲ اﻟﺒﺮﻧﺎﻣﺞ و اﻟﺘﻲ ﺕﺴﻴﺮ وﻓﻖ اﻟﻘﻮاﻋﺪ‬ ‫اﻟﺘﺎﻟﻴﺔ:‬ ‫1. اﻟﻤﻬﺎم اﻟﺘﻰ ﻻ ﺗﺮﺗﺒﻂ ﺑﻤﻬﺎم ﻻﺣﻘﺔ ﺗﺆﺥﺮ اوﻻ‬ ‫2. ﺛﻢ ﺗﺆﺥﺮ اﻟﻤﻬﺎم اﻟﺘﻲ ﻻ ﺗﻘﻊ ﻋﻠﻰ اﻟﻤﺴﺎر اﻟﺤﺮج‬ ‫3. ﺛﻢ اﻟﻤﻬﺎم ذات اﻻوﻟﻮیﺔ اﻟﺪﻧﻴﺎ و ﺑﺪون ﻗﻴﻮد‬ ‫4. اﻟﻤﻬﺎم ذات اﻟﺒﺪایﺎت اﻟﻤﺘﺄﺥﺮة یﺘﺎح ﻟﻬﺎ اﻟﺒﺪأ ﻡﺘﺄﺥﺮا‬ ‫ﻃﺮیﻘﺔ رﻗﻢ 3 : اﺳﺘﺨﺪام اﻟﻄﺮیﻘﺔ اﻟﻘﻴﺎﺳﻴﺔ ﻣﻊ اﺧﺬ اﻻوﻟﻮیﺔ ﻓﻲ اﻻﻋﺘﺒﺎر و اﻟﺘﻲ ﺕﺴﻴﺮ وﻓﻖ اﻟﻘﻮاﻋﺪ‬ ‫اﻟﺘﺎﻟﻴﺔ:‬ ‫و هﻨﺎ ﺗﻜﻮن اﻻوﻟﻮیﺔ هﻲ اﻟﻌﺎﻡﻞ اﻟﺬي یﺘﺤﻜﻢ ﻓﻲ ﺗﺎﺥﻴﺮ اﻟﻤﻬﺎم ذات اﻻوﻟﻮیﺔ اﻻدﻧﻰ.‬ ‫ﻃﺮیﻘﺔ رﻗﻢ 4 : اﺳﺘﺨﺪم ﻃﺮیﻘﺘﻚ اﻟﺨﺎﺹﺔ ﻟﺘﺴﻮیﺔ اﻟﻤﻮارد وذﻟﻚ آﻤﺎ یﻠﻲ‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﻻﻡﺮ‪ More Views‬ﺛﻢ اﺥﺘﺮ‪Resource Allocation‬‬ ‫اﺥﺘﺮ ‪ Gantt Chart‬ﻡﻦ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻰ‬ ‫اﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪View‬اﻻﻣﺮ ‪Table > More Tables‬‬ ‫اﺥﺘﺮ اﻻﻡﺮ ‪ Delay‬ﺛﻢ اﺥﺘﺮ ‪Apply‬‬ ‫ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﻌﻠﻮى ‪ Resource Usage Table‬اﺽﻐﻂ ﺑﺎﻟﺰر اﻻیﻤﻦ ﻟﻠﻔﺄرة ﻋﻠﻲ‬ ‫.‪Work Column‬‬ ‫اﺥﺘﺮ ‪Insert Column‬‬ ‫اﺥﺘﺮ ‪Assignment Delay Column‬‬ ‫اﺥﺘﺮ ‪Ok‬‬ ‫اذا اردت ادﺧﺎل ﺕﺄﺧﻴﺮ ﻋﻠﻰ ﺕﻨﻘﻴﺬ اﻟﻤﻬﻤﺔ‬ ‫اﺥﺘﺮ اى ﻡﻮرد ﻡﺨﺼﺺ ﻟﻠﻤﻬﻤﺔ ﺗﺮیﺪ ﺗﺄﺥﻴﺮﻩ‬ ‫اﺥﺘﺮ ‪ Leveling Delay Field‬ﻓﻲ اﻟﻤﺮﺑﻊ اﻟﺴﻔﻠﻲ ﻻﺽﺎﻓﺔ اﻟﻤﺪة اﻟﺘﻰ ﺗﺮیﺪ ﺗﺄﺥﻴﺮهﺎ.‬ ‫14‬
  • 42.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫7-7اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ‪Automatic Leveling‬‬ ‫اذا اﺥﺘﺮت اﻟﺘﺴﻮیﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ﻓﺈن اﻟﺒﺮﻧﺎﻡﺞ ﺳﻮف یﻘﻮم ﺑﺘﻌﺪیﻞ اﻟﻤﻬﺎم و ﺑﺘﺴﻮیﺔ اﻟﻤﻮارد ﺗﺒﺎﻋﺎ ﺣﺎل‬ ‫ادﺥﺎﻟﻬﺎ و هﻮ ﺳﻮف یﻘﻮم ﺑﺎﺣﺪ ﺥﻴﺎریﻦ اﻡﺎ ﺗﻤﺪیﺪ اﻟﻤﻬﻤﺔ او ﺗﻘﻄﻴﻌﻬﺎ ﻡﻤﺎ یﺴﺒﺐ زیﺎدة اﻟﻤﺪة اﻟﺰﻡﻨﻴﺔ. و‬ ‫اﺳﺘﺤﺪام اﻟﺘﺴﻮیﺔ اﻻﻟﻴﺔ ﻓﻲ اﻟﻤﺸﺎریﻊ اﻟﻜﺒﻴﺮة یﺒﻄﺊ اﻟﺘﺨﻄﻴﻂ.‬ ‫‪Automatic‬‬ ‫‪Resource Leveling‬‬ ‫‪Tools‬‬ ‫7-8 ﺵﻜﻞ ﻡﺨﻄﻂ اﻟﻤﺴﺘﻘﻴﻤﺎت ‪Bars Format‬‬ ‫‪Time scale‬‬ ‫‪Format‬‬ ‫‪Categories‬‬ ‫‪Bar‬‬ ‫‪Styles‬‬ ‫‪Bar Style‬‬ ‫‪Setting‬‬ ‫‪Format‬‬ ‫‪Format‬‬ ‫‪Right Click on mouse‬‬ ‫اﻟﺸﻜﻞ 7-2 : اﻟﻤﻘﻴﺎس اﻟﺰﻣﻨﻲ ﻟﻮﺡﺪة اﻟﺰﻣﻦ‬ ‫24‬
  • 43.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﺸﻜﻞ7-3 : ﺕﻐﻴﻴﺮ ﺵﻜﻞ اﻟﻤﺴﺘﻘﻴﻤﺎت‬ Gridlines ‫7-9 ﺕﺨﻄﻴﻂ اﻻﺳﻄﺮ و اﻻﻋﻤﺪﻩ‬ Format Gridlines Right click on the lines Layout Bars ‫7-01 ﺵﻜﻞ اﻟﻌﻼﻗﺎت‬ Format Layout ‫اﻟﺸﻜﻞ 7-4 : ﺕﻐﻴﻴﺮ ﺵﻜﻞ اﻟﺮواﺏﻂ‬ Add more tables ‫7-11 اﺽﺎﻓﺔ ﺟﺪاول ﺟﺪیﺪة‬ View 43 table more tables
  • 44.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫8.إدارة ﺕﺘﺒﻊ اﻟﻤﺸﺮوع ‪Project Tracking‬‬ ‫8-1 ﺣﻔﻆ اﻟﻤﺨﻄﻂ اﻻﺳﺎﺳﻲ ‪Saving A Baseline‬‬ ‫ان ﻡﻦ اﻋﻈﻢ ﻡﻴﺰات اﺳﺘﺨﺪام اﻟﺘﻘﻨﻴﺎت اﻟﺤﺪیﺜﺔ ﻓﻲ ادارة اﻟﻤﺸﺮوﻋﺎت هﻲ اﻡﻜﺎﻧﻴﺔ ﻋﻤﻞ ﻡﺘﺎﺑﻌﺔ و‬ ‫ﺗﺤﻜﻢ ﻓﻲ ﺳﻴﺮ ﻋﻤﻞ اﻟﻤﺸﺮوﻋﺎت ﺑﻄﺮیﻘﺔ ﺳﻬﻠﺔ و ﺳﺮیﻌﺔ. ان اول ﺥﻄﻮات اﻟﺘﺘﺒﻊ ان یﺘﻢ ﺣﻔﻆ‬ ‫اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ و اﻟﺬي ﺳﻮف یﺴﺘﺨﺪم آﺄﺳﺎس ﻟﻠﻤﻘﺎرﻧﺔ ﺣﺎل ﺑﺪأ اﻟﻌﻤﻞ ﻓﻲ اﻟﻤﺸﺮوع و ﺑﺪأ ﻋﻤﻠﻴﺔ‬ ‫اﻟﺘﺘﺒﻊ. اﻟﺸﻜﻞ 8-1 یﻮﺽﺢ ﻡﺮﺑﻊ ﺣﻮار ﺣﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ. ﻻﺣﻆ اﻧﻪ یﺠﺐ ان ﻻ یﺘﻢ ﺣﻔﻆ‬ ‫اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ اﻻ ﺑﻌﺪ اﻟﺘﻴﻘﻦ ﻡﻦ اﺳﺘﻜﻤﺎل ادﺥﺎل آﺎﻡﻞ ﻋﻨﺎﺹﺮ اﻟﻤﺸﺮوع ﻡﻦ ﻡﻬﺎم و ﻡﺪد زﻡﻨﻴﺔ‬ ‫و ﻡﻮارد و ازاﻟﺔ اﻟﺘﻌﺎرﺽﺎت ﺑﻴﻦ اﻟﻤﻮارد. و ﻟﺤﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ ﻧﺘﺒﻊ اﻻﺗﻲ:‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools‬اﺥﺘﺮ اﻻﻡﺮ ‪Tracking‬‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ اﺥﺘﺮ اﻻﻡﺮ ‪Save baseline‬‬ ‫اﺥﺘﺮ ایﻀﺎ اﻻﻡﺮ ‪ Entire Project‬و ذﻟﻚ ﻟﺤﻔﻆ آﺎﻡﻞ اﻟﻤﺸﺮوع آﻤﺸﺮوع اﺳﺎﺳﻲ‬ ‫ﻣﻼﺡﻈﺔ‬ ‫ﻗﺒﻞ ﺡﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ ، اﺡﺘﻔﻆ ﺏﻨﺴﺨﺔ اﺧﺮى ﻣﻦ اﻟﺨﻄﺔ ﻗﺒﻞ ﺡﻔﻈﻬﺎ و ذﻟﻚ ﻻﻣﻜﺎن‬ ‫اﺳﺘﺨﺪاﻣﻬﺎ ﺡﺎل ﺡﺪوث ﺕﻐﻴﻴﺮ آﺒﻴﺮ ﻋﻠﻰ اﻟﺨﻄﺔ ﻗﺒﻞ ﺏﺪأ اﻟﺘﻨﻔﻴﺬ.‬ ‫اﻟﺸﻜﻞ 8-1 : ﺡﻔﻆ اﻟﻤﺸﺮوع اﻻﺳﺎﺳﻲ‬ ‫8-2 ﻋﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ/اﻟﻘﺎﻋﺪیﺔ‬ ‫ﻟﻌﺮض اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ اﺕﺒﻊ اﻻﺕﻲ:‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﺥﺘﺮ اﻟﻤﻨﻈﺮ ‪GANTT Tracking‬‬ ‫ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ View‬اﺥﺘﺮ ‪ Table>More Tables‬ﺛﻢ اﺥﺘﺮ ‪. Baseline‬‬ ‫44‬
  • 45.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫یﺸﻜﻞاﻟﻌﺮض ﺥﻄﻴﻦ )ﻗﻈﻴﺒﻴﻦ( یﻤﺜﻞ اﻟﺴﻔﻠﻲ ﺥﻂ اﻻﺳﺎﺳﻲ/اﻟﻘﺎﻋﺪة و اﻟﻌﻠﻮي یﻤﺜﻞ اﻟﻤﻬﻤﺔ اﻟﺠﺎري‬ ‫ﺗﺘﺒﻌﻬﺎ و هﻲ ﻗﺎﺑﻠﺔ ﻟﻠﺘﻌﺪیﻞ ﺑﻴﻨﻤﺎ اﻟﺨﻂ اﻻﺳﺎﺳﻲ ﻻ یﺘﻐﻴﺮ و ﻻ یﻤﻜﻦ ﺗﻌﺪیﻠﻪ.‬ ‫8-3 ﺕﺤﺮیﺮ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ‬ ‫ﻋﻨﺪ اﺟﺮاء ﺕﺤﺪیﺚ ﻋﻠﻲ ﺏﻴﺎﻧﺎت اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ او اﺿﺎﻓﺔ ﺏﻌﺾ اﻟﺒﻨﻮد اﻟﻴﻬﺎ ﻗﻢ ﺏﺎﺕﺒﺎع اﻟﺨﻄﻮات‬ ‫اﻟﺘﺎﻟﻴﺔ:‬ ‫اﺥﺘﺮ اﻟﻤﻬﺎم اﻟﻤﻀﺎﻓﺔ/اﻟﻤﻌﺪﻟﺔ ﻓﻲ ﺟﺪول ادﺥﺎل ‪. GANTT‬‬ ‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools>Tracking‬اﻻﻡﺮ ‪. Save baseline‬‬ ‫اﻧﻘﺮ ﻋﻠﻰ زر اﻟﻤﻬﺎم اﻟﻤﺤﺪد ‪ Selected Tasks‬ﺛﻢ اﺥﺘﺮ ‪. OK‬‬ ‫8-4 ﻡﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ‬ ‫ﻻﻟﻐﺎء و ﻣﺴﺢ اﻟﺨﻄﺔ اﻻﺳﺎﺳﻴﺔ:‬ ‫اﺥﺘﺮ اﻻﻡﺮ ‪Tools >Tracking > Clear Baseline‬‬ ‫اﺥﺘﺮ ‪. OK‬‬ ‫8-5 ﺕﺘﺒﻊ ﺥﻄﻂ ﻡﺆﻗﺘﺔ ‪Interim Plans‬‬ ‫ﺥﻼل ﺳﻴﺮ اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع ﻗﺪ ﺗﺮﻏﺐ ﺑﺤﻔﻆ ﺥﻄﺔ ﻡﺆﻗﺘﺔ و ﺗﺘﻀﻤﻦ ﺗﻐﻴﻴﺮات ﻋﻠﻰ ﺗﻮاریﺦ ﺑﺪأ‬ ‫و اﻧﺘﻬﺎء اﻟﻤﻬﺎم اﻟﺤﺎﻟﻴﺔ و یﻤﻜﻦ ﺣﻔﻆ ﺣﺘﻰ ﻋﺸﺮة ﺥﻄﻂ ﻡﺆﻗﺘﺔ آﻤﺎ یﻠﻲ:‬ ‫إﺥﺘﺮ ﻡﻦ اﻟﻘﺎﺋﻤﺔ ‪ Tools>Tracking‬اﻻﻡﺮ ‪. Save baseline‬‬ ‫اﺥﺘﺮ ‪save interim plan‬‬ ‫ﻡﻦ اﻟﻼﺋﺤﺔ اﻟﻤﻨﺴﺪﻟﺔ ‪ ، copy‬ﺣﺪد اﻟﺤﻘﻮل ‪. Start/Finish‬‬ ‫ﻓﻲ ﻡﻜﺎن ‪ Into‬ﺣﺪد 1‪. Start1/Finish‬‬ ‫ﺣﺪد ﻡﺎ اذا آﻨﺖ ﺗﺮیﺪ ﺣﻔﻆ ﺥﻄﺔ ﻡﺆﻗﺘﺔ ﻟﻜﻞ ﻟﻠﻤﺸﺮوع او ﻟﺠﺰء ﻡﻨﻪ.‬ ‫اﻧﻘﺮ ‪. OK‬‬ ‫8-6 ﻋﺮض ﺥﻄﺔ ﻡﺆﻗﺘﺔ‬ ‫اﻓﺘﺢ اﻟﻌﺮض ‪. GANTT Tracking‬‬ ‫اﺽﻒ اﻋﻤﺪة 1 ‪. Start1 / Finish‬‬ ‫اﻧﻔﺮ ‪. OK‬‬ ‫8-7 ﻡﺘﺎﺑﻌﺔاﻟﺘﻘﺪم ‪Tracking‬‬ ‫ان اﻟﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ هﻲ اﻟﺴﻴﺮ ﻗﺪﻡﺎ ﻡﻊ ﺗﻘﺪم اﻟﻌﻤﻞ ﻓﻲ اﻟﻤﺸﺮوع یﻮﻡﺎ ﺑﻴﻮم و ﺗﺰویﺪ اﻟﺒﺮﻧﺎﻡﺞ ﺑﺨﻂ‬ ‫اﻟﺴﻴﺮاﻟﻌﻤﻠﻲ ﻟﻠﻤﺸﺮوع و ﻡﺘﺎﺑﻌﺔ ﻡﺪى ﺗﻮاﻓﻖ او اﻧﺤﺮاف ﺥﻄﺔ اﻟﻤﺸﺮوع ﻋﻦ واﻗﻊ اﻟﺘﻨﻔﻴﺬ.‬ ‫‪Update task‬‬ ‫‪Tracking‬‬ ‫‪Tools‬‬ ‫54‬
  • 46.
    ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫‪Task formdetails‬‬ ‫‪MS PROJECT‬‬ ‫‪More tables‬‬ ‫اﻟﺸﻜﻞ 8-2 : ﺕﺘﺒﻊ و ﺕﺤﺪیﺚ ﻣﻬﺎم اﻟﻤﺸﺮوع‬ ‫اﻟﺸﻜﻞ 8-3 : ﺕﺘﺒﻊ اﻟﻤﻬﺎم ﻣﻊ ﺡﻔﻆ ﺡﺨﻂ اﻟﻘﺎﻋﺪة ﻟﻠﻤﺸﺮوع‬ ‫8-8 ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ ‪Up date Project‬‬ ‫آﺜﻴﺮا ﻡﺎ یﻜﻮن اﻟﻤﺸﺮوع ﺑﻜﺎﻡﻞ ﻓﻌﺎﻟﻴﺎﺗﺔ اﻟﺘﻲ ﻟﻢ یﺘﻢ اﻧﺠﺎزهﺎ ﺑﻌﺪ ﺑﺤﺎﺟﺔ اﻟﻲ ﺗﺤﺪیﺚ و ذﻟﻚ ﻓﻲ اﺣﻮال‬ ‫ﺗﻮﻗﻒ اﻟﻤﺸﺮوع ﻟﻌﺬر ﻗﺎهﺮ ﻡﺪة ﻡﻦ اﻟﺰﻡﻦ.‬ ‫ﻟﺘﺤﺪیﺚ اﻟﻤﺸﺮوع آﻜﻞ :‬ ‫‪Update project‬‬ ‫‪Tracking‬‬ ‫‪Tools‬‬ ‫64‬
  • 47.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﺸﻜﻞ8-4 : ﻣﺮﺏﻊ ﺡﻮاري ﺕﺤﺪیﺚ اﻟﻤﺸﺮوع‬ ‫8-9 ﺥﻂ اﻟﺘﻘﺪم ‪Progress line‬‬ ‫ان ﺥﻄﻮط اﻟﺘﻘﺪم هﻲ اﺣﺪي وﺳﺎﺋﻞ ﻋﺮض و ﺗﺘﻴﻊ اﻟﻤﺸﺮوع اﺛﻨﺎء ﺗﻘﺪم اﻟﻌﻤﻞ و یﺴﺎﻋﺪ ذﻟﻚ ﺑﺘﺤﺪیﺪ و‬ ‫ﺑﺸﻜﻞ ﻓﻮري و ﺳﺮیﻊ وﺽﻊ اﻟﻔﻌﺎﻟﻴﺎت ﻋﻨﺪ ﺗﺎریﺦ ﻡﺤﺪد ﺣﻴﺚ یﺘﻢ ﻡﺘﺎﺑﻌﺔ اﻟﻔﻌﺎﻟﻴﺎت اﻟﻤﺘﺄﺥﺮة ﻋﻦ‬ ‫اﻟﺨﻄﺔ ﻋﻨﺪ زﻡﻦ ﻡﻌﻴﻦ و ﻡﺤﺎوﻟﺔ ﺗﺪارك ذﻟﻚ‬ ‫‪Tools‬‬ ‫‪Tracking‬‬ ‫‪Progress line‬‬ ‫اﻟﺸﻜﻞ 8-5 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻄﻮط اﻟﺘﻘﺪم ﻟﻠﻤﺸﺮوع‬ ‫8-01 ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع ‪Options‬‬ ‫ان ﺽﺒﻂ ﺥﻴﺎرات اﻟﻤﺸﺮوع هﻲ ﻡﻦ اهﻢ اﻟﺨﻴﺎرات اﻟﺘﻲ ﻋﻠﻲ اﻟﻤﺨﻄﻂ ﺗﺤﺪیﺪهﺎ ﻡﻦ اﺟﻞ اﻇﻬﺎر‬ ‫اﻟﻤﻌﻠﻮﻡﺎت ﺑﺎﻟﺸﻜﻞ اﻟﻤﻨﺎﺳﺐ و ﻋﻤﻞ اﻟﺘﻐﻴﻴﺮات ﻓﻲ اﻟﻮﺣﺪات و اﻻیﺎم واﻟﺘﻘﻮیﻢ وﺳﺎﻋﺎت اﻟﻌﻤﻞ و ﻧﻮع‬ ‫اﻟﻌﻤﻠﺔ اﻟﻤﺘﺪاوﻟﺔ و و یﻔﻀﻞ اﻟﻤﺨﻄﻂ ان یﻘﻮم ﺑﻬﺬة اﻟﺘﻐﻴﻴﺮات ﻋﻨﺪ ﺑﺪایﺔ ﻋﻤﻠﺔ ﻓﻲ اي ﻡﺸﺮوع ﺟﺪیﺪ‬ ‫وان ﺗﺘﻨﺎﺳﺐ اﻟﺨﻴﺎرات اﻡﻌﺪﻟﺔ ﻡﻦ ﻧﻮع و ﺣﺠﻢ و ﻡﺪة اﻟﻤﺸﺮوع. و ﻻﺟﺮاء هﺬة اﻟﺘﻐﻴﻴﺮات یﺘﻢ‬ ‫ااﺳﺘﺨﺪام اﻻﻡﺮ:‬ ‫‪Options‬‬ ‫‪Tools‬‬ ‫و اﻟﺸﻜﻞ 8-6 یﻮﺽﺢ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري اﻟﺨﺺ ﺑﺨﻴﺎرات اﻟﻤﺸﺮوع‬ ‫74‬
  • 48.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫اﻟﺸﻜﻞ8-6 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات اﻟﻤﺸﺮوع‬ ‫8-6 اﻟﻤﺮﺵﺤﺎت ‪Filters‬‬ ‫یﻤﻜﻦ اﺳﺘﺨﺎم اﻟﻤﺮﺵﺤﺎت ﻟﻌﻤﻞ ﺕﺼﻔﻴﺔ ﻟﻠﻤﻌﻠﻮﻣﺎت اواﻻﺳﺘﻌﻼم ﺡﻮل اﻟﻤﻬﺎم او اﻟﻤﻮارد .‬ ‫‪Option‬‬ ‫‪More filter‬‬ ‫‪Project‬‬ ‫‪Filtered for‬‬ ‫و یﻤﻜﻦ اﺳﺘﺨﺪام اﻟﺘﺼﻔﻴﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ‪ Auto filter‬ﺏﺎﻟﻀﻐﻂ ﻋﻠﻰ زر اﻟﺘﺼﻔﻴﺔ اﻟﺘﻠﻘﺎﺋﻴﺔ ﻓﻲ ﺵﺮیﻂ‬ ‫اﻻدوات .‬ ‫84‬
  • 49.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫9.اﻟﻄﺒﺎﻋﺔ ‪Printing‬‬ ‫ﻗﺒﻞ اﺟﺮاء ﻋﻤﻠﻴﺔ اﻟﻄﺒﺎﻋﺔ یﺠﺐ ﻋﻤﻞ ﺗﺠﻬﻴﺰ ﻟﺼﻔﺤﺔ اﻟﻄﺒﺎﻋﺔ و ﺥﺎﺹﺔ ﻓﻲ ﺗﺤﺪیﺪ ﻋﻨﻮان اﻟﻤﺸﺮوع و‬ ‫ﺗﺤﺪیﺪ اى ﻡﻌﻠﻮﻡﺎت یﺠﺐ ان ﺗﻈﻬﺮ ﻓﻲ ﻋﻨﻮان اﻟﺠﺪول ﻡﺜﻞ اﺳﻢ اﻟﻤﺎﻟﻚ و اﻟﻤﺘﺒﺮع و اﻻﺳﺘﺸﺎري و‬ ‫رﻗﻢ اﻟﻤﺸﺮوع و آﻞ ذﻟﻚ آﻤﺎ یﻈﻬﺮ ﺑﺎﻟﺸﻜﻞ 9-1ﺣﻴﺚ یﻤﻜﻦ ﺽﺒﻂ اﻟﻄﺒﺎﻋﺔ ﻟﻠﻤﺸﺮوع ﺑﺎﺳﺘﺨﺪام‬ ‫اﻻﻡﺮ:‬ ‫‪File Page setup‬‬ ‫اﻟﺸﻜﻞ 9-1 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺿﺒﻂ اﻟﻄﺒﺎﻋﺔ ﻟﻠﻤﺸﺮوع‬ ‫‪Print Preview‬‬ ‫‪Print‬‬ ‫‪File‬‬ ‫‪File‬‬ ‫اﻟﺸﻜﻞ 9-2 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات اﻟﻄﺒﺎﻋﺔ اﻟﻤﺸﺮوع‬ ‫94‬
  • 50.
    ‫‪MS PROJECT‬‬ ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ ‫9-1ادﺥﺎل اﻟﺼﻮر ‪Insert Object/Picture‬‬ ‫اﺣﻴﺎﻧﺎ یﺘﻄﻠﺐ اﻻﻡﺮ ادﺥﺎل ﺹﻮر او ﺵﻌﺎرات ﻟﻤﺆﺳﺴﺔ او هﻴﺌﺔ ﻋﻠﻰ ﻋﻨﻮان اﻟﺠﺪول و یﻤﻜﻦ ﻋﻤﻞ‬ ‫ذﻟﻚ آﻤﺎ یﻈﻬﺮ ﺑﺎﻟﺸﻜﻞ 9-3‬ ‫‪Insert‬‬ ‫‪Object‬‬ ‫‪File get picture from art clip‬‬ ‫‪Objects to header or footer‬‬ ‫‪insert picture‬‬ ‫‪Page setup‬‬ ‫‪Insert object Microsoft clip Gallery‬‬ ‫اﻟﺸﻜﻞ 9-3 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ادراج اﻟﺼﻮرة اﻟﻰ ﻋﻨﻮان اﻟﻤﺸﺮوع‬ ‫‪Add picture to bars‬‬ ‫9-2 اﻟﺘﻘﺎریﺮ ‪Reports‬‬ ‫ان ﻡﻦ اآﺒﺮ ﻓﻮاﺋﺪ اﺳﺘﺨﺪام اﻟﺒﺮﻧﺎﻡﺞ هﻮ ﻗﺪرﺗﺔ ﻋﻠﻰ اﻧﺘﺎج ﺗﻘﺎریﺮ ﻋﺪیﺪة و ﻡﺘﻨﻮﻋﺔ و هﻰ ﺗﻠﺰم اﺛﻨﺎء‬ ‫ﺗﻘﺪم اﻟﻌﻤﻞ و ﻓﻲ ﻧﻬﺎیﺔ اﻟﻤﺸﺮوع ﺣﻴﺚ یﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻰ اﻟﺘﻘﺎریﺮ اﻟﺘﺎﻟﻴﺔ:‬ ‫‪ : Overview‬ﻡﻌﻠﻮﻡﺎت ﻋﺎﻡﺔ ﻋﻦ اﻟﻤﺸﺮوع‬ ‫‪ :Current activities‬ﻡﻌﻠﻮﻡﺎت ﺗﻔﺼﻴﻠﻴﺔ ﻋﻦ اﻻﻧﺸﻄﺔ اﻟﻤﺸﻜﻠﺔ ﻟﻠﻤﺸﺮوع‬ ‫‪ : Costs‬ﻡﻌﻠﻮﻡﺎت ﺗﻔﺼﻴﻠﻴﺔ ﻋﻦ ﺗﻜﻠﻔﺔ ﻟﻠﻤﺸﺮوع‬ ‫‪ :Assighments‬ﻡﻌﻠﻮﻡﺎت ﻋﻦ اﻟﻤﻮارد اﻟﻤﺨﺼﺔ ﻟﻼﻧﺸﻄﺔ‬ ‫‪ : Workload‬ﻡﻌﻠﻮﻡﺎت ﻋﻦ ﺳﺎﻋﺎت اﻟﻌﻤﻞ و اﺳﺘﻐﻼل اﻟﻤﻮارد ﻗﻲ اﻟﻤﺸﺮوع‬ ‫05‬
  • 51.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ View reports ‫اﻟﺸﻜﻞ9-4 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺕﻘﺎریﺮ اﻟﻤﺸﺮوع‬ Save As Excel Form ‫9-3 ﺣﻔﻆ اﻟﻤﻠﻒ ﻋﻠﻰ ﺻﻮرة أآﺴﻞ‬ Save as Microsoft Excel Workbook Excel ‫اﻟﺸﻜﻞ 9-5 : ﻣﺮﺏﻊ ﺡﻮاري ﺧﻴﺎرات ﺡﻔﻆ اﻟﻤﺸﺮوع اﻟﻲ‬ Save Export format earned value Analysis by excel View Tool bars analysis Analysis timescale Date in Excel Pivot tables 51
  • 52.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Saveas Save Export format Microsoft excel pivot table Task and resource pivot table Import Excel File ‫9-4 اﺳﺘﻴﺮاد ﻡﻠﻒ اآﺴﻞ اﻟﻰ ﻡﺎیﻜﺮوﺳﻮﻓﺖ ﺑﺮوﺟﻜﺖ‬ Open excel file file type Microsoft excel work book look in select the work book you need to import 52
  • 53.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Project2 Project description: The table 1 indicating the tasks of the project, duration and its relations and constraint The table 2 indicating the tasks of the project, resources and material costs The table 3 indicating the persons and equipment costs Conditions Starting date of the project is 10/10/03 The time period is 5 days. The trainer is working one overtime hour every day Required: Establish a Bar chart diagram. Establish logical relation ships Assign the needed resources for each activity Calculate the cost estimate for the project Table 1: Activities and relationships No. Activity Depends on Type of relation Duration 1 Introduction ---- ---- 1 day 2 MS project Introduction FS 1 day 3 Data entry MS project FS 1day 4 Logical MS project FS 2day relations Data entry SS Constraints Logical FF 1 day FS 1 day 5 relations 6 Improvement Constraints 53
  • 54.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Table2 : Resources, Equipments and Material cost No. Activity Resources Equipments Material cost $ 1 Introduction Trainer, Project (10) Computers, (1) LCD 200 Manager Cad operator , Facilitator 2 MS project Trainer ,Cad operator (10) Computers, (1) LCD 20 3 Data entry Trainer , Cad operator (10) Computers, (1) LCD 20 4 Logical Trainer, Cad operator (10) Computers, (1) LCD 20 relations 5 Constraints Trainer , Cad operator (10) Computers ,(1) LCD 20 6 Improvement Trainer, Project (10) Computers, (1) LCD 300 Manager Cad operator, Facilitator Table 3: Standard and Overtime rates No. Description Standard rate $ Overtime rate $ 1 Trainer 20$/hr. 30$/hr. 2 Cad Operator 7$/hr. 10$/hr. 3 Project manager 30$/hr. 45$/hr. 4 Facilitator 4$/hr. 6$/hr. 5 Computer 2$/hr -- 6 LCD 4$/hr --- 54
  • 55.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Project3 Project description: Attached is CPM diagram indicating the logical relation ships between the activities? The table 1 indicating the constraint table for resources distribution. Table 2 explains the regular and over time rates. Conditions The engineer is working every day two overtime working hours. Starting date of the project is 10/10/03 The available resources are limited. Material price for activity should be dealt with as fixed price. Required Establish a Bar chart diagram for the problem below. Assign the needed resources for each activity Calculate the cost estimate for the project Table 1: Equipments and Material costs No. Activity Description Equipments Material cost $ 1 A Engineer (1No.), Mechanic Drill, Saw 200 Voltmeter 3000 Hammer 500 (2No.) 2 B Engineer (1No.), Electric (2No.) 3 C Engineer (1No.), Foreman (1No.) 4 D Engineer (1No.), Mechanic Drill (1No.) 5 E Engineer (1No.), Mechanic (1No.), Electric 6 F Drill, Voltmeter (1No.) Engineer (1No.), Foreman (1No.) 55 Hammer
  • 56.
    MS PROJECT ‫إدارة اﻟﻤﺸﺮوﻋﺎت‬ Table2: Standard and Overtime rates No. Description Standard rate $ Overtime rate $ 1 Engineer 10$/hr. 15$/hr. 2 Mechanic 7$/hr. 10$/hr. 3 Electric 5$/hr. 7$/hr. 4 Foreman 4$/hr. 6$/hr. 56