SlideShare a Scribd company logo
Mohammad Hassan Mustafa Morsy CV Page 1 of 6
Mohammad Hassan Mustafa Morsy
PRESENT POSITION : Assistant Resident Engineer (Civil).
TOTAL YEARS OF EXPERIENCE: 13 MARITAL STATUS : Married
YEAR OF BIRTH : 1977 NATIONALITY : Egyptian
Address: Lulu Building Al Salam Street, floor No. 5 – Abu Dhabi - UAE
Email Address: eng.mh2003@gmail.com – mohammed.hassan@dorsch.com
Mobile Phone Number: +971502314574
Skype Account :- (eng_mh2003)
_________________________________________________________________________
KEY QUALIFICATIONS
 Total of 13 years experienced in the field of Construction Supervision, including
management related to the construction covering all aspects of Engineering,
Procurement and Construction.
 Successful Civil Engineer with extensive skills and talent.
 Computer Literate with knowledge in MS Office, MS Project (Primavera, AutoCAD).
 Training Courses for Concrete and Concrete Products.
 Training Courses for QA/QC Awareness.
 Training Courses for Health, Safety and Environmental.
 Training Course in Project Management Professional (PMP)
 Training Course in Effective Planning &Scheduling using Primavera. P6.(EPS)
 Training Course in Confined Space Entry.
 Training Course in Six Sigma Yellow Belt.
 Training Course in Scrum fundamentals Certified Credential.
_________________________________________________________________________
EDUCATION
May 2002 Bachelors Degree in Civil Engineer, Helwan University, Cairo Egypt
_____________________________________________________________________________________________________
Mohammad Hassan Mustafa Morsy CV Page 2 of 6
EMPLOYMENT RECORD
2007 – To Date Dorsch Holding GmbH – DC Abu Dhabi
Contract O-2536:-
Construction Supervision of Rehabilitation and Replacement
Sewerage Network in Abu Dhabi City which comprises of new
sewerage network for pipes ranging from 150mm to 600mm
dia., replacement of existing sewer lines and rehabilitation of
existing sewers by means of Cured in Place Method (CIPP) and
patch repairs for the partially defective sewers. The scope of
works also includes:-
 Construction of new manholes and chambers
 Non Destructive Road Crossings (NDRC)
 Protection and Relocation of existing Utilities.
 Reinstatement of Existing Pavement & Asphalt.
 Reinstatement of affected plantation and landscaping.
Contract ADSSC-1383.1:-
Construction Supervision of Rehabilitation and Replacement Sewerage
Network in Mussafah Industrial City - Abu Dhabi which comprises of new
sewerage network for pipes ranging from 150mm to 800 mm dia.,
replacement of existing sewer lines and rehabilitation of existing sewers
by means of Cured in Place Method (CIPP) and patch repairs for the
partially defective sewers. The scope of works also includes:-
 Construction of new manholes and chambers
 Non Destructive Road Crossings (NDRC)
 Protection and Relocation of existing Utilities.
 Reinstatement of Existing Pavement.
 Reinstatement of affected plantation and landscaping.
_____________________________________________________________________________________________________
Mohammad Hassan Mustafa Morsy CV Page 3 of 6
Contract 480:-
Construction of Irrigation mains at Khalifa Town A, Abu Dhabi.
 Construction of 5 Pumping Stations including M&E Works
 Construction of 5 Reservoirs capacity 1.8 Million gal. each
 Laying of Irrigation pipe lines 150km of Various diameters from
160 to 500mm HDPE
 Construction of related Pressure Control Valves (gate valve,
washout, Air release and flow meters.) Total 340 Valve Chambers.
 Construction of 193 NDM by using Directional Drilling Method.
 Responsibilities:
 Work with Construction Managers to develop high quality civil
engineering systems detailing implementation procedures,
methodologies and guidelines for ensuring effective execution
of project.
 Coordinate all Civil and Structural Engineering activities at
project sites.
 Serve as the onsite resource for all matters related Civil
engineering and provide feedback and sketches to be
incorporated in drawings by Designers/Drafters.
 Monitor and supervise onsite civil engineering activities for
conformance with the provisions of the Contract specifications
and project requirement.
 Achieve a detailed understanding of the Contract documents
(drawings and specifications), coordinate work with other
disciplines such as architectural, mechanical, electrical and
advice project managers as necessary.
 Perform site activities such as inspection and record of existing
field conditions, take and verify measurements within project
area review the day to day contractors’ claims at project
sites, facilitate problem solving with subcontractors and
clients during construction.
 Prepare technical documents and assist in the receipt and
review contractor’s as-built drawings and submittals.
 Ensure appropriate usage and application of the Project
Management System (PMS) with respect to entry and
analysis of work related data for day to day functioning to
facilitate seamless communication of all relevant
(technical/non-technical) information.
 Attend and participate in Client and PM site meetings and
reviews to direct the activities of onsite Civil and Structural
engineering activities carried out by project teams,
subcontractors etc based on meeting feedback.
_____________________________________________________________________________________________________
Mohammad Hassan Mustafa Morsy CV Page 4 of 6
 Assist in the testing and commissioning of structures and
oversee the review and approval process for all Civil and
Structural engineering activities submittals.
 Liaison with local authorities and ministerial agencies.
 Comply with OHSE System &Ensure QHSE requirements are
performed in job-related activities.
 Participate in QHSE audits and workplace inspections.
 Report non conformities and propose corrective actions.
 Perform other duties as assigned.
Contract No. : 401 Construction of Water and Irrigation Lines in the Western Region
Project value: 148 million UAE Dhs.
Responsibilities:
 Construction supervision for the entire project infrastructure works
especially sewerage and storm water networks.
 Preparing daily, weekly, and monthly reports of civil work in the
project for head office and municipality.
 Preparing and finishing the daily task, site instruction, inspection
requests, etc.
 Revision of quantities and estimation and doing the calculations
according to the need of work
 Sharing with the safety Engineer to insure Safety in site according
to specifications.
 Checking construction activities during project construction and
doing the snag list according to specifications.
_____________________________________________________________________________________________________
Mohammad Hassan Mustafa Morsy CV Page 5 of 6
01/2006 – 01/2007 Nasr Allah Gen. Con. Est.
Projects Engineer
Company Industry: Construction
Job Role/Department: Contractor Engineer
Project value: 20 million UAE Dhs.
Responsibilities:
 Managing all construction operations for all sites which was
villas , compound & buildings in Al Ain city with all related
sewerage & water networks as well as the road works.
 Preparing all quantity calculations and estimations for projects.
 Review of shop drawings, specifications, and project
documents with the consultant and client.
 Submittal of subcontractors and coordinate between them
during the construction operations.
 Arrange all projects documentary during construction till
finishing.
 Make study and pricing for new tenders.
 Review the site safety and make sure of it.
 Control all project documents during construction like
Checking requests, Variation Orders, and material submittal
.etc.
 The necessary reports for the clients or the consultant.
 Comply with OHSE System.
 Ensure QHSE requirements are performed in job-related
activities.
11/2004 – 12/2005 Al Amal Company for Building Investment, Egypt
Site Engineer
Company Industry: Construction Investment
Job Role/Department: Construction Engineer
Project value: 38 Egyptian. Pounds
Responsibilities:
 Managing all construction operations for the project AlGoman
Resort in H.H.SH. Zayed city, Giza, Egypt.
 Preparing all quantity calculations and estimations for projects.
 Review of shop drawings, specifications and project
documents with the consultant.
 Submittal of subcontractors and coordination between them
during the construction operations.
 Arranging all projects documents during construction till
finishing.
 Review the site safety and make sure of it.
 Control all project documents during project construction.
 Prepares the necessary reports for the clients or the
consultant.
 Cooperating in the sales operations for the project units.
_____________________________________________________________________________________________________
Mohammad Hassan Mustafa Morsy CV Page 6 of 6
06/2002 – 10/2004 RIDG. For Project Manager Office, Egypt
Site Engineer
Company Industry: Construction Project Management
Job Role/Department: Civil Engineering
Project value: 250 million Egyptian. Pounds
Responsibilities:
 Construction supervision for all the project elements especially
infrastructure works in (Hyper one Mall) construction at
Sh. Zayed city Giza Egypt.
 Preparing daily, weekly and monthly reports of infrastructure
works in the project for head office and owner
 Preparing and finishing the daily task, site instruction’s,
inspection requests, etc
 Preparation of quantities and estimation and doing the
calculations according to need of work
 Checking construction elements during project handing over
and doing the snag list according to specifications
 Sharing will the staff in implementing the QC&QA requirements
on site operations.
 Comply with OHSE System, Participate in QHSE audits and
workplace inspections.
COUNTRIES OF ASSIGNMENT
United Arab Emirates, Egypt
_________________________________________________________________________
LANGUAGES
Arabic, English •

More Related Content

What's hot

MANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CVMANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CVManish Gupta
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
Abdullatif Abdulla
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
Mohamed Hablas
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy
 
ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15Atiquzzaman Mohiuddin
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
Ayman Fathy
 
Resume_Nimish_Bhoyar
Resume_Nimish_BhoyarResume_Nimish_Bhoyar
Resume_Nimish_BhoyarNimish Bhoyar
 
Ici proposal combined
Ici proposal combinedIci proposal combined
Ici proposal combined
Janson Chen
 
CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016QASIM IRSHID
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
Wasi Sami
 

What's hot (20)

Final Resume
Final ResumeFinal Resume
Final Resume
 
Ardante CV
Ardante CVArdante CV
Ardante CV
 
MANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CVMANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CV
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
CV
CVCV
CV
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
API 510 RESUME
API 510 RESUMEAPI 510 RESUME
API 510 RESUME
 
ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
 
Resume_Nimish_Bhoyar
Resume_Nimish_BhoyarResume_Nimish_Bhoyar
Resume_Nimish_Bhoyar
 
Ici proposal combined
Ici proposal combinedIci proposal combined
Ici proposal combined
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016
 
March-2015
March-2015March-2015
March-2015
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
last c v 1-1-15
last c v 1-1-15last c v 1-1-15
last c v 1-1-15
 

Viewers also liked

CV-GIS-Job-Muhammad Sohail Akbar
CV-GIS-Job-Muhammad Sohail AkbarCV-GIS-Job-Muhammad Sohail Akbar
CV-GIS-Job-Muhammad Sohail AkbarSohail Akbar Goheer
 
eng mohammed hassan cv atef
eng mohammed hassan cv atefeng mohammed hassan cv atef
eng mohammed hassan cv atefchad3461
 
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connects
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connectsGrade 8 9 2 b convert rates marzano rubric course 3 florida math connects
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connectsTaleese
 
Grade 8 9 2 c marzano rubric florida math connects course 3
Grade 8 9 2 c marzano rubric florida math connects course 3Grade 8 9 2 c marzano rubric florida math connects course 3
Grade 8 9 2 c marzano rubric florida math connects course 3Taleese
 
building bulletin
building bulletinbuilding bulletin
building bulletinNarendra D
 
QUINCY CHUGH-PORTFOLIOPortfolio
QUINCY CHUGH-PORTFOLIOPortfolioQUINCY CHUGH-PORTFOLIOPortfolio
QUINCY CHUGH-PORTFOLIOPortfolio
Quuincy Chugh
 
đau Cột Sống Thắt Lưng
đau Cột Sống Thắt Lưngđau Cột Sống Thắt Lưng
đau Cột Sống Thắt Lưngwendell132
 
FiscalAndSocialEffectsOfStateAlcoholControlSystems
FiscalAndSocialEffectsOfStateAlcoholControlSystemsFiscalAndSocialEffectsOfStateAlcoholControlSystems
FiscalAndSocialEffectsOfStateAlcoholControlSystemsSean Yu
 
FASE DE PLANEACION (INGLES)
FASE DE PLANEACION (INGLES)FASE DE PLANEACION (INGLES)
FASE DE PLANEACION (INGLES)
andreseams
 
Thoai Hoa Khop Xuong
Thoai Hoa Khop XuongThoai Hoa Khop Xuong
Thoai Hoa Khop Xuongjune498
 
HFeragen_Portfolio_2016
HFeragen_Portfolio_2016HFeragen_Portfolio_2016
HFeragen_Portfolio_2016Hannah Feragen
 
Folder Insert & Specification Sheets email version
Folder Insert & Specification Sheets email versionFolder Insert & Specification Sheets email version
Folder Insert & Specification Sheets email versionVic Cooper
 
専門ゼミ進捗
専門ゼミ進捗専門ゼミ進捗
専門ゼミ進捗
Daiki Tsukahara
 
0 wiki технологии
0 wiki технологии0 wiki технологии
0 wiki технологии
KewpaN
 

Viewers also liked (20)

CV-GIS-Job-Muhammad Sohail Akbar
CV-GIS-Job-Muhammad Sohail AkbarCV-GIS-Job-Muhammad Sohail Akbar
CV-GIS-Job-Muhammad Sohail Akbar
 
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
eng mohammed hassan cv atef
eng mohammed hassan cv atefeng mohammed hassan cv atef
eng mohammed hassan cv atef
 
MOHAMED HASSAN CV
MOHAMED HASSAN CVMOHAMED HASSAN CV
MOHAMED HASSAN CV
 
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connects
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connectsGrade 8 9 2 b convert rates marzano rubric course 3 florida math connects
Grade 8 9 2 b convert rates marzano rubric course 3 florida math connects
 
Grade 8 9 2 c marzano rubric florida math connects course 3
Grade 8 9 2 c marzano rubric florida math connects course 3Grade 8 9 2 c marzano rubric florida math connects course 3
Grade 8 9 2 c marzano rubric florida math connects course 3
 
Genesis Resume NF2
Genesis Resume NF2Genesis Resume NF2
Genesis Resume NF2
 
building bulletin
building bulletinbuilding bulletin
building bulletin
 
QUINCY CHUGH-PORTFOLIOPortfolio
QUINCY CHUGH-PORTFOLIOPortfolioQUINCY CHUGH-PORTFOLIOPortfolio
QUINCY CHUGH-PORTFOLIOPortfolio
 
đau Cột Sống Thắt Lưng
đau Cột Sống Thắt Lưngđau Cột Sống Thắt Lưng
đau Cột Sống Thắt Lưng
 
FiscalAndSocialEffectsOfStateAlcoholControlSystems
FiscalAndSocialEffectsOfStateAlcoholControlSystemsFiscalAndSocialEffectsOfStateAlcoholControlSystems
FiscalAndSocialEffectsOfStateAlcoholControlSystems
 
Let s just make it funny
Let s just make it funnyLet s just make it funny
Let s just make it funny
 
SPEC EXAMPLES
SPEC EXAMPLESSPEC EXAMPLES
SPEC EXAMPLES
 
FASE DE PLANEACION (INGLES)
FASE DE PLANEACION (INGLES)FASE DE PLANEACION (INGLES)
FASE DE PLANEACION (INGLES)
 
Thoai Hoa Khop Xuong
Thoai Hoa Khop XuongThoai Hoa Khop Xuong
Thoai Hoa Khop Xuong
 
HFeragen_Portfolio_2016
HFeragen_Portfolio_2016HFeragen_Portfolio_2016
HFeragen_Portfolio_2016
 
CURRICULUM VITAE.M.comprehensive
CURRICULUM VITAE.M.comprehensiveCURRICULUM VITAE.M.comprehensive
CURRICULUM VITAE.M.comprehensive
 
Folder Insert & Specification Sheets email version
Folder Insert & Specification Sheets email versionFolder Insert & Specification Sheets email version
Folder Insert & Specification Sheets email version
 
専門ゼミ進捗
専門ゼミ進捗専門ゼミ進捗
専門ゼミ進捗
 
0 wiki технологии
0 wiki технологии0 wiki технологии
0 wiki технологии
 

Similar to Mohammad Hassan -CV

Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
SALEM MOHAMMED
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
Ayman Mitkees
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CMemad salim
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineeramer kallas
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016Karim Absawi
 

Similar to Mohammad Hassan -CV (20)

John CV
John CVJohn CV
John CV
 
Eng.ahmed
Eng.ahmedEng.ahmed
Eng.ahmed
 
Mostafa Ragaee
Mostafa RagaeeMostafa Ragaee
Mostafa Ragaee
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Moataz Mostafa
Moataz MostafaMoataz Mostafa
Moataz Mostafa
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Sheraz Mahdi New CV
Sheraz Mahdi New CVSheraz Mahdi New CV
Sheraz Mahdi New CV
 
ANASCV
ANASCVANASCV
ANASCV
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
CV Template mohamed1
CV Template mohamed1CV Template mohamed1
CV Template mohamed1
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
Robin CV 2015
Robin CV 2015Robin CV 2015
Robin CV 2015
 
resume
resumeresume
resume
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 

Mohammad Hassan -CV

  • 1. Mohammad Hassan Mustafa Morsy CV Page 1 of 6 Mohammad Hassan Mustafa Morsy PRESENT POSITION : Assistant Resident Engineer (Civil). TOTAL YEARS OF EXPERIENCE: 13 MARITAL STATUS : Married YEAR OF BIRTH : 1977 NATIONALITY : Egyptian Address: Lulu Building Al Salam Street, floor No. 5 – Abu Dhabi - UAE Email Address: eng.mh2003@gmail.com – mohammed.hassan@dorsch.com Mobile Phone Number: +971502314574 Skype Account :- (eng_mh2003) _________________________________________________________________________ KEY QUALIFICATIONS  Total of 13 years experienced in the field of Construction Supervision, including management related to the construction covering all aspects of Engineering, Procurement and Construction.  Successful Civil Engineer with extensive skills and talent.  Computer Literate with knowledge in MS Office, MS Project (Primavera, AutoCAD).  Training Courses for Concrete and Concrete Products.  Training Courses for QA/QC Awareness.  Training Courses for Health, Safety and Environmental.  Training Course in Project Management Professional (PMP)  Training Course in Effective Planning &Scheduling using Primavera. P6.(EPS)  Training Course in Confined Space Entry.  Training Course in Six Sigma Yellow Belt.  Training Course in Scrum fundamentals Certified Credential. _________________________________________________________________________ EDUCATION May 2002 Bachelors Degree in Civil Engineer, Helwan University, Cairo Egypt
  • 2. _____________________________________________________________________________________________________ Mohammad Hassan Mustafa Morsy CV Page 2 of 6 EMPLOYMENT RECORD 2007 – To Date Dorsch Holding GmbH – DC Abu Dhabi Contract O-2536:- Construction Supervision of Rehabilitation and Replacement Sewerage Network in Abu Dhabi City which comprises of new sewerage network for pipes ranging from 150mm to 600mm dia., replacement of existing sewer lines and rehabilitation of existing sewers by means of Cured in Place Method (CIPP) and patch repairs for the partially defective sewers. The scope of works also includes:-  Construction of new manholes and chambers  Non Destructive Road Crossings (NDRC)  Protection and Relocation of existing Utilities.  Reinstatement of Existing Pavement & Asphalt.  Reinstatement of affected plantation and landscaping. Contract ADSSC-1383.1:- Construction Supervision of Rehabilitation and Replacement Sewerage Network in Mussafah Industrial City - Abu Dhabi which comprises of new sewerage network for pipes ranging from 150mm to 800 mm dia., replacement of existing sewer lines and rehabilitation of existing sewers by means of Cured in Place Method (CIPP) and patch repairs for the partially defective sewers. The scope of works also includes:-  Construction of new manholes and chambers  Non Destructive Road Crossings (NDRC)  Protection and Relocation of existing Utilities.  Reinstatement of Existing Pavement.  Reinstatement of affected plantation and landscaping.
  • 3. _____________________________________________________________________________________________________ Mohammad Hassan Mustafa Morsy CV Page 3 of 6 Contract 480:- Construction of Irrigation mains at Khalifa Town A, Abu Dhabi.  Construction of 5 Pumping Stations including M&E Works  Construction of 5 Reservoirs capacity 1.8 Million gal. each  Laying of Irrigation pipe lines 150km of Various diameters from 160 to 500mm HDPE  Construction of related Pressure Control Valves (gate valve, washout, Air release and flow meters.) Total 340 Valve Chambers.  Construction of 193 NDM by using Directional Drilling Method.  Responsibilities:  Work with Construction Managers to develop high quality civil engineering systems detailing implementation procedures, methodologies and guidelines for ensuring effective execution of project.  Coordinate all Civil and Structural Engineering activities at project sites.  Serve as the onsite resource for all matters related Civil engineering and provide feedback and sketches to be incorporated in drawings by Designers/Drafters.  Monitor and supervise onsite civil engineering activities for conformance with the provisions of the Contract specifications and project requirement.  Achieve a detailed understanding of the Contract documents (drawings and specifications), coordinate work with other disciplines such as architectural, mechanical, electrical and advice project managers as necessary.  Perform site activities such as inspection and record of existing field conditions, take and verify measurements within project area review the day to day contractors’ claims at project sites, facilitate problem solving with subcontractors and clients during construction.  Prepare technical documents and assist in the receipt and review contractor’s as-built drawings and submittals.  Ensure appropriate usage and application of the Project Management System (PMS) with respect to entry and analysis of work related data for day to day functioning to facilitate seamless communication of all relevant (technical/non-technical) information.  Attend and participate in Client and PM site meetings and reviews to direct the activities of onsite Civil and Structural engineering activities carried out by project teams, subcontractors etc based on meeting feedback.
  • 4. _____________________________________________________________________________________________________ Mohammad Hassan Mustafa Morsy CV Page 4 of 6  Assist in the testing and commissioning of structures and oversee the review and approval process for all Civil and Structural engineering activities submittals.  Liaison with local authorities and ministerial agencies.  Comply with OHSE System &Ensure QHSE requirements are performed in job-related activities.  Participate in QHSE audits and workplace inspections.  Report non conformities and propose corrective actions.  Perform other duties as assigned. Contract No. : 401 Construction of Water and Irrigation Lines in the Western Region Project value: 148 million UAE Dhs. Responsibilities:  Construction supervision for the entire project infrastructure works especially sewerage and storm water networks.  Preparing daily, weekly, and monthly reports of civil work in the project for head office and municipality.  Preparing and finishing the daily task, site instruction, inspection requests, etc.  Revision of quantities and estimation and doing the calculations according to the need of work  Sharing with the safety Engineer to insure Safety in site according to specifications.  Checking construction activities during project construction and doing the snag list according to specifications.
  • 5. _____________________________________________________________________________________________________ Mohammad Hassan Mustafa Morsy CV Page 5 of 6 01/2006 – 01/2007 Nasr Allah Gen. Con. Est. Projects Engineer Company Industry: Construction Job Role/Department: Contractor Engineer Project value: 20 million UAE Dhs. Responsibilities:  Managing all construction operations for all sites which was villas , compound & buildings in Al Ain city with all related sewerage & water networks as well as the road works.  Preparing all quantity calculations and estimations for projects.  Review of shop drawings, specifications, and project documents with the consultant and client.  Submittal of subcontractors and coordinate between them during the construction operations.  Arrange all projects documentary during construction till finishing.  Make study and pricing for new tenders.  Review the site safety and make sure of it.  Control all project documents during construction like Checking requests, Variation Orders, and material submittal .etc.  The necessary reports for the clients or the consultant.  Comply with OHSE System.  Ensure QHSE requirements are performed in job-related activities. 11/2004 – 12/2005 Al Amal Company for Building Investment, Egypt Site Engineer Company Industry: Construction Investment Job Role/Department: Construction Engineer Project value: 38 Egyptian. Pounds Responsibilities:  Managing all construction operations for the project AlGoman Resort in H.H.SH. Zayed city, Giza, Egypt.  Preparing all quantity calculations and estimations for projects.  Review of shop drawings, specifications and project documents with the consultant.  Submittal of subcontractors and coordination between them during the construction operations.  Arranging all projects documents during construction till finishing.  Review the site safety and make sure of it.  Control all project documents during project construction.  Prepares the necessary reports for the clients or the consultant.  Cooperating in the sales operations for the project units.
  • 6. _____________________________________________________________________________________________________ Mohammad Hassan Mustafa Morsy CV Page 6 of 6 06/2002 – 10/2004 RIDG. For Project Manager Office, Egypt Site Engineer Company Industry: Construction Project Management Job Role/Department: Civil Engineering Project value: 250 million Egyptian. Pounds Responsibilities:  Construction supervision for all the project elements especially infrastructure works in (Hyper one Mall) construction at Sh. Zayed city Giza Egypt.  Preparing daily, weekly and monthly reports of infrastructure works in the project for head office and owner  Preparing and finishing the daily task, site instruction’s, inspection requests, etc  Preparation of quantities and estimation and doing the calculations according to need of work  Checking construction elements during project handing over and doing the snag list according to specifications  Sharing will the staff in implementing the QC&QA requirements on site operations.  Comply with OHSE System, Participate in QHSE audits and workplace inspections. COUNTRIES OF ASSIGNMENT United Arab Emirates, Egypt _________________________________________________________________________ LANGUAGES Arabic, English •