MOHAMED ALY
136 Port Said, Syeda Zeinab, Cairo, Egypt
(+2)01002581133; (+20)24470185| (+966) 0554141742 ;( +966) 0554600242
alyeldinmohamed@Gmail.com
Career Profile
A skilled, highly trained, confident and effective Railway expert with significant experience in a broad range
of railway different activities Train operation, operation training, operation documentation and regulation,
centralized control operation and training, Test & commissioning, maintenance activities, project
management, accident investigation, system management, integration, rolling stock management,
infrastructure, construction, supervision, depot, quality health and safety. Proven skills in exploring,
designing, and implementing solutions and the management of change.
Key strength
Drive and Initiative: my current role as chief supervision engineer require highly developed
problem – solving skills and ability to respond to crisis swiftly and effectively. Drive the team
towards continual improvements.
Excellent communication skills: it is essential to liaise effectively with management, technical
staff, and contractors and to consult with all those actively involved in the project to understand
comprehensive client needs and to give information in a way it can be understood and assimilated.
A broad range of personal skills: 30 years’ experience in overall railway businesses including,
design, installation, test and commissioning, validation & verification, RAMS, Quality, HSE, and
construction.
Excellent organization and multitasking skills: at present working in a high volume, and pressure
environment in a high-speed project requiring a degree of organization. Working as part of a team
requiring flexibility, adaptability and the ability to multitask in order to keep the project running
smoothly and efficiently under all circumstances.
Team builder: my present and previous roles requiring teams to work together and communicate in
effective way.
Commitment to quality and HSE: driving the quality and HSE functions in the project to
maintain the business excellence and safety according to requirements, regulations, and standards.
People skills & multicultural: have worked profitably with a wide range of people, liaising
successfully with suppliers, contractors, clients. Able to question, consult, negotiate and influence
to gain understanding of the client’s needs using a wide spectrum of approaches to ensure customer
satisfaction.
Leadership: a record of accomplishment of over 30 years of motivating teams to set and achieve
challenging targets and expect the very best from themselves. Feedback from teams demonstrates a
confident, vigorous style of leadership based on sincere consultation allied with clear direction.
Key Skills
 30 years’ experience in overall railway
businesses
 Over 10 years experiences in operation
 Experience in System interface,
integration, validation & verification
 Experiences in different Training program
(operation and maintenance).
 A clear commitment to high standards
 Requirements Engineering
 Configuration Management
 Over 23 years experiences in signalling,
OCC, rolling stock , in the different
activities installation, T&C ,
maintenance and Management
 Experience in Supervision Management
 A clear commitment to Quality and HSE
 Knowledge of Depot equipment’s
 Design Review
 Systems Assurance, RAMS and Safety
Mohamed Aly El Din: Page 1 of 7

Accomplishments
Statistical Analysis (Cairo line 2 rolling stock project)
- Performing data collection and statistical analysis that results in sound recommendations that were
adopted for project improvement.
Project Management (Cairo line 2 rolling stock project)
- Supervising project production efforts to ensure that projects were completed to company standards on
time and within budget constraints.
Research and development (Cairo line 2 rolling stock project)
- Managing research and development requirements to find solution for the obsolete components and old
software to maintain high standard reliability.
Strategic Management (Cairo line 2 rolling stock project)
- Supervise and direct 250 employees on rolling stock maintenance project that result in maintenance
yield improvement, which later translated into 35% GM in company revenue.
Customer satisfaction (Cairo Metro projects)
- Building strong relationship and good communication with customers for maintaining customer
satisfaction.
Career history
DB-International 2015 to present
Chief Supervision Engineer
Managing, organizing the supervision team during the project construction period (Signalling, power AFC,
telecom, GSM-R, track, station, OCC, depot, Catenary and civil work.
- Regular construction site inspections and evaluations of on-site construction supervisors
- Monitoring adherence to the customers construction supervision regulations based on local legal
provisos and training staff
- Constant reviews of construction schedule planning and documentation of construction progress
- Arrange and carrying out regular technical interface meeting with all related parties.
- Close cooperation with and monitoring of contractors and suppliers
- Systems problem solving.
- Prepare for the integration phase for the project
- Follow the design problems and solutions, project documents (O&M documents)
- Follow project RFIs, NCRs, PCCFs and reports
- Deploy the quality function across the project through enhancing the project quality level
- Drive the RAMS function in the project
- Drive the professional training process inside the different team, (on job training, internal & external
professional training)
- Review the project design documents in GCC project.
ALSTOM Egypt July 2015 to Sept 2015
Rolling Stock Management
Preparing rolling stock maintenance tender for Cairo Metro line 2 global Maintenance Contract.
ALSTOM Egypt 2012 to 2015
QEHS country Manager
Establish, manage, and monitor standards, processes, communications, training, and systems for
quality and HSE functions.
- Act as the professional head Quality and HSE for Egypt Transport activities. Pro-actively co-ordinate
the company’s quality, safety, and environmental assurance activities to ensure that the business
exceeds its regulatory, contractual and company obligations.
- Develop and implement strategies taking into account ALSTOM Transport and Corporate
requirements for managing and continually improving the company’s processes delivering the required
quality, safety, and environmental standards.
- Ensure that there are adequate documented quality, safety and environmental processes and
procedures in place to address the activities of the business.
Mohamed Aly El Din: Page 2 of 7
- Ensure that such processes and procedures are common across locations and take into account best
practice.
- Implement an appropriate audit / monitor regime (capturing all levels of organisation) to ensure that
the business is operating in line with its documented quality, safety and environment management
arrangements.
- Communicate widely and effectively within the company to ensure quality, safety and environment
issues and responsibilities are recognised and addressed by project managers.
- Report to the Transport directors the levels of quality, safety, and environmental performance.
- Prepare management reports and recommendations concerning the company’s quality, safety, and
environment performance.
- Lead the Egyptian Head office based quality, safety, and environment team to ensure that their activities
contribute fully to business, ALSTOM and corporate initiatives and objectives.
- Liaise as appropriate with Customers, Regulatory Authorities, and other 3rd Parties in matters relating
to quality, safety, and environment performance.
- Consolidate the Quality Management System and ongoing improvement to meet the relevant ISO
standard
- Develop, organise and carry out Quality awareness training for all personnel
- Organise and manage external & internal audits – including the training of auditors – ensuring audits
are completed to schedule, all documentation is reviewed and is compliant, and all audits meet ISO
standards
- Review/analyse the QMS, Customer Complaints, tenders for new contracts, and assist and advise
Managers on Quality issues ensuring Quality procedures are being adhered to
- Organise internal quality audits and suppliers audits
- Monitor indicators to identify corrective and preventive actions (including CONQ)
- Provide QA metrics on time with full accuracy, in accordance with Corporate guidelines
- Propose management System improvement
ALSTOM Egypt 2010 to 2012
Rolling stock project manager
Responsible for all project execution and deliverables.
- Managing all financial and sales activities.
- Managing and following all the project activities plans.
- Managing the execution of the preventive, corrective, overhauling, and online maintenance activities.
- Managing the planning of the project staffing, training, organization, and working schedules.
- Managing the required spare parts, obsoleteness, R&D.
- Managing the train’s software solutions.
- Managing Customer relation and satisfaction.
- Sustain the target margin for the maintenance project
- Improve GM by Variation order
- Ensure monthly payments on time without penalties
- Gather the maximum available data to facilitate decisions for the preparation of the performance
contract
- Demonstrate appropriate management capacity with the working team, including detached personnel
- Responsible for all aspects of Project Management for the overall project.
- Deploy the EHS and quality according to Alstom standards.
- Responsible for all aspects of work package execution for the overall project.
- Manage the entire project scope of work
- Managing the delivery on time for the overall project and maintain the required availability and project
performance.
- Managing risk and opportunity and their action plans
- Maintain and ensure a high level of Customer satisfaction with performance through effected
communication and liaison.
ALSTOM Egypt 2008 to 2012
Transport QEHS Manager
Mohamed Aly El Din: Page 3 of 7
Establish, manage, and monitor standards, processes,
communications, training, and systems for quality and HSE
functions.
- Consolidate the Quality Management System and ongoing improvement to meet the relevant ISO
standard
- Develop, organise and carry out Quality awareness training for all personnel
- Organise and manage external & internal audits – including the training of auditors – ensuring audits
are completed to schedule, all documentation is reviewed and is compliant, and all audits meet ISO
standards
- Facilitate audits of transport projects activities by the customer and third party inspectors
- Manage the documentation control system, including the management of the document controller, for
Quality and Safety, ensuring that the person is suitably trained and developed
- Report to the Managing Director, monthly meetings, and the Quality Review meeting on quality issues
including the performance of the Quality Management System as a basis for improvement of the Egypt
transport projects.
- Record and monitor all Non-conformances raised on the Database and liaise with Auditors and Actions
when required
- Review/analyse the QMS, Customer Complaints, tenders for new contracts, and assist and advise
Managers on Quality issues ensuring Quality procedures are being adhered to
- Member of ALSTOM Management Team by providing an input and guidance to the successful running
of the business through use of appropriate tools, e.g. business plans
- Define and control the Quality system of the projects
- Organise internal quality audits , contractors, sub-contractors and suppliers audits
- Monitor indicators to identify corrective and preventive actions (including CONQ)
- Provide QA metrics on time with full accuracy, in accordance with Corporate guidelines
- Propose management System improvement
ALSTOM Egypt 2000 to 2008
OCC Maintenance Team leader
Effectively ensure correct execution of corrective and preventative maintenance activities of Cairo L1 & L2
metro in the scope of centralized control system. Ensuring that all aspects of the contract are efficiently and
effectively managed and that business objectives, Customer service, Health & Safety, and finances are
consistently achieved and delivered on time.
- Execute and deliver the project maintenance activities
- Manage and deliver the Site maintenance Plan.
- organize and plan in order to meet individual and business unit objectives within the agreed timescales
- Effectively manage an Operational team to ensure Maintenance targets are consistently met.
- Elaboration Maintenance activity reports
- Maintain the availability of the systems.
- Comply with RAMS standards
- Manage the spare parts.
- Manage the obsolescence
- Implement REX
- R&D
- Elaboration preventive and corrective maintenance plan.
- coach and develop individuals to improve performance and potential, e.g. by use of appraisal
- Communicate with all members of staff by means of one-to-one meetings, formal and informal
discussions, team briefings, KPIs,
- actively participate in and be proactive in the Continuous Improvement culture within Metro projects,
- manage staff availability to ensure staff training requirements are met
- manage employees attendance in accordance with Metro policies and procedures
- Manage, organize, and plan the team’s daily work regime in order to meet contractual targets.
- Staff training and building teams.
- Customer communication and satisfactions
- Lifting of remarks and close FTO files.
ALSTOM Egypt 1996 to 2000
Mohamed Aly El Din: Page 4 of 7
OCC T&C, Maintenance Engineer
- Interface & integration management
- Execute and deliver the project T&C different activities.
- Prepare the test planning and the competition time frame
- Administering anomalies
- Preparing and reporting to ALSTOM Paris anomalies and solution related to the project
- Ensure the completion of testing as per plan
- Ensure Commissioning of the system to the satisfaction of the customer.
- Analyse and understand the tests to be performed.
- Comment on installation test reports.
- Carryout the testing as per procedures, preparation of the outcome in test reports.
- Ensure the technical safety of systems within the scope of work from turnover from erection until hand
over to the customer.
- Factory test S/W, function test and integration.
- Function and integration tests.
- PTO (primary test and operation).
- EWP (experimental working period).
- FTO (final test and operation).
- Internal & acceptance different system tests
- Assisting the CCP functional & dynamic operational tests as representative for the contractor.
- Elaboration the ATS (Automatic Train System) preventive and corrective maintenance documents.
- Elaboration the ATS user manual.
- Elaboration the maintenance schedules and reports.
- Supervising the maintenance team.
- Prepare the test planning and the completion time frame
- Coordinating T&C works and timeslots
- Organizing customer contacts
ALSTOM Egypt 1995 to 1996
SCADA Engineer
- Performing the factory and validation tests for the (ATS system) centralized control equipment’s.
- Elaboration of the site acceptance tests procedure.
ALSTOM Egypt 1992 to 1995
System Engineer
- Validation, Installation, commissioning and maintenance of the (ATS system) centralized control
equipment’s.
- Performing the site acceptance tests for Traffic, Traction and Train follow up system (PCI)
- Assisting the Installation and validation of PCI line 1 (train follow up system).
- Assisting the CCP functional & dynamic operational tests.
- Performing the corrective maintenance and supervising the maintenance team.
Cairo Metro Organization 1990 to 1992
Operation Training Manager
Responsible for the training department in the activities of organization and performing of all training
session: Rolling stock, traction control, Signalling, Automatic train control, Regulation, OCC, Drivers.
This assistance related to all operation fields:
a) Design and compilation of training programs.
b) Production of training schedules.
c) Organization of training centre final structure.
d) Performing of training and assessment of results.
e) Functional definition of simulator for LSB and TCP operation training.
f) Conception of drivers and TCP operator’s instruction manuals.
National Egyptian railways (ENR) 1986 to 1990
Operation Engineer
Mohamed Aly El Din: Page 5 of 7
Supervise metro project line 1
- Performing the functional operational static and dynamic test for contract 9 rolling stock.
- Supervise the functional operational test for local signal box (LSB) and traction control point (TCP)
with the consultant.
- Supervise the experimental working period for the metro project phase 2 EL MARG LINE with the
consultant.
- Supervise the renewal of track
- Supervise the erection of over-head catenary
- Supervise the modification of the stations along the line and its equipment’s.
- Supervise, organize, and execute the weekly work conference for the daily day/night work responsible
for all the safety precaution and safety measurements.
Cairo wastewater project
Automatic Control Engineer
Responsible for the automatic control equipment’s.
Military Service 1984 to 1985
Education
DBA (Doctorate in Business Administration) Ain Shams University, Cairo Egypt (ongoing)
Master in Quality, Arab academy for science, Technology & Maritime Transport
Master degree in law Ain Shams University, Cairo Egypt
B.Sc. Law Ain Shams University, Cairo Egypt
Diploma in Public law Ain Shams University, Cairo Egypt
Diploma in private law Ain Shams University, Cairo Egypt
B.Sc. of engineering, communication department, Ain Shams University, Cairo Egypt
Diploma in Total Quality Management (TQM) AUC American University in Cairo
Training
Lead Auditor, ISO 9001: 2001, IRCA
Lead Auditor, OHSAS 18001, IRCA
Lead Auditor ISO 14001 EMS
Managing the Quality Function, AUC Cairo
Planning for Top Quality, AUC Cairo
Problem Solving & Analysis AUC Cairo
Six Sigma, AUC Cairo
Statistical Process Control (SPC), AUC Cairo
NEBOSH UK International General Certificate in Occupational Safety & Health
OSHA Construction Health & Safety,
NIOSH
Fire Marshal
CNNA (network), Cairo, Egypt
Middle Managerial Skills, Alstom, Cairo, Egypt
Interpersonal communication skills Alstom, Cairo, Egypt
Presentation Skills Alstom, Cairo, Egypt
Arbitration, Cairo, Egypt
Work related Training
TRAINING COURSES IN PARIS SOFRETU & RATP (SYSTRA) 1988
As ENR (Egyptian National Railways) responsible for the activities of organization and follow-up of the
training department, and to have training on:
- Operation safety precaution and safety measurements.
Mohamed Aly El Din: Page 6 of 7
- Rolling stock, traction control , Signalling, Automatic train control, Regulation, OCC, Drivers
TRAINING COURSES IN PARIS SOFRETU & RATP (SYSTRA) 1992
As ENR (Egyptian National Railways) responsible for the training department to have training on the
Centralized Control Point of Cairo metro line 1 (RAMSES COMPLEX) for:-
- Operation safety precaution and safety measurements.
- Different methods of operation for (Urban – Regional) in Paris network.
- Practical training on different centralized control post C.C.P
- Traffic regulation.
- Theoretical and practical training on line operation of different headway.
- Timetable division and methods to create new timetables.
- Different organization on (Urban – Regional) line.
SCADA training in Alstom Paris – France.
Line 2 training in Alstom Paris – France.
EHS reporting Training in Alstom University in Paris.
QSRW training in ALSTOM Paris- France.
AZDP training in Alstom Italy.
EHS training in Dublin - Ireland.
Personal details
Date of Birth: 12 September 1960
Languages: Arabic & English & French
Driving License: Egyptian, Saudi
References: Available on request
Mohamed Aly El Din: Page 7 of 7

More Related Content

What's hot (20)

Brian Prewitt, Production Supervisor
Brian Prewitt, Production SupervisorBrian Prewitt, Production Supervisor
Brian Prewitt, Production Supervisor
 
Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201
 
KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Brian's Resume
Brian's ResumeBrian's Resume
Brian's Resume
 
YEIN RESUME
YEIN RESUMEYEIN RESUME
YEIN RESUME
 
Mohamed Tharwat CV
Mohamed Tharwat CVMohamed Tharwat CV
Mohamed Tharwat CV
 
Rsume
RsumeRsume
Rsume
 
Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015
 
Lee's Resume
Lee's ResumeLee's Resume
Lee's Resume
 
TOM ALLAN CV
TOM ALLAN CVTOM ALLAN CV
TOM ALLAN CV
 
MG CV-Aug 2015
MG CV-Aug  2015MG CV-Aug  2015
MG CV-Aug 2015
 
Chris Murray CV
Chris Murray CVChris Murray CV
Chris Murray CV
 
Brian Prewitt, Production Supervisor
Brian Prewitt, Production SupervisorBrian Prewitt, Production Supervisor
Brian Prewitt, Production Supervisor
 
Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
Tony Avakian's Resume 2016
Tony Avakian's Resume 2016Tony Avakian's Resume 2016
Tony Avakian's Resume 2016
 
John Gwozdz - resume 8-10-16
John Gwozdz - resume  8-10-16John Gwozdz - resume  8-10-16
John Gwozdz - resume 8-10-16
 
2016 Resume
2016 Resume2016 Resume
2016 Resume
 
Nicola Winpenny - CV
Nicola Winpenny - CVNicola Winpenny - CV
Nicola Winpenny - CV
 

Viewers also liked

Driving Schools Leeds
Driving Schools LeedsDriving Schools Leeds
Driving Schools LeedsMarie Rose
 
MEDIX COLLEGE DIPLOMA 2014
MEDIX COLLEGE DIPLOMA 2014MEDIX COLLEGE DIPLOMA 2014
MEDIX COLLEGE DIPLOMA 2014Jackie Redbourne
 
1. Etappe SkodaTour de Luxembourg 2016
1. Etappe SkodaTour de Luxembourg 20161. Etappe SkodaTour de Luxembourg 2016
1. Etappe SkodaTour de Luxembourg 2016Lenoil Issem
 
Bahasa Inggris
Bahasa InggrisBahasa Inggris
Bahasa Inggrismayang96
 
Running a successful RTO Training Organisation
Running a successful RTO Training Organisation Running a successful RTO Training Organisation
Running a successful RTO Training Organisation MerindaRichmondSmith
 
A Real World Guide to Building Highly Available Fault Tolerant SharePoint Farms
A Real World Guide to Building Highly Available Fault Tolerant SharePoint FarmsA Real World Guide to Building Highly Available Fault Tolerant SharePoint Farms
A Real World Guide to Building Highly Available Fault Tolerant SharePoint FarmsEric Shupps
 
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...Tũi Wichets
 
SQL Server High Availability Solutions (Pros & Cons)
SQL Server High Availability Solutions (Pros & Cons)SQL Server High Availability Solutions (Pros & Cons)
SQL Server High Availability Solutions (Pros & Cons)Hamid J. Fard
 
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best Practices
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best PracticesVMworld 2014: Advanced SQL Server on vSphere Techniques and Best Practices
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best PracticesVMworld
 
Symantec ApplicationHA June 2011
Symantec ApplicationHA June 2011Symantec ApplicationHA June 2011
Symantec ApplicationHA June 2011Symantec
 
SQL Server Cluster Presentation
SQL Server Cluster PresentationSQL Server Cluster Presentation
SQL Server Cluster Presentationwebhostingguy
 

Viewers also liked (12)

Driving Schools Leeds
Driving Schools LeedsDriving Schools Leeds
Driving Schools Leeds
 
MEDIX COLLEGE DIPLOMA 2014
MEDIX COLLEGE DIPLOMA 2014MEDIX COLLEGE DIPLOMA 2014
MEDIX COLLEGE DIPLOMA 2014
 
1. Etappe SkodaTour de Luxembourg 2016
1. Etappe SkodaTour de Luxembourg 20161. Etappe SkodaTour de Luxembourg 2016
1. Etappe SkodaTour de Luxembourg 2016
 
Bahasa Inggris
Bahasa InggrisBahasa Inggris
Bahasa Inggris
 
Running a successful RTO Training Organisation
Running a successful RTO Training Organisation Running a successful RTO Training Organisation
Running a successful RTO Training Organisation
 
A Real World Guide to Building Highly Available Fault Tolerant SharePoint Farms
A Real World Guide to Building Highly Available Fault Tolerant SharePoint FarmsA Real World Guide to Building Highly Available Fault Tolerant SharePoint Farms
A Real World Guide to Building Highly Available Fault Tolerant SharePoint Farms
 
Img 20150917 0003
Img 20150917 0003Img 20150917 0003
Img 20150917 0003
 
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...
Building a hyper v cluster for under $2,000 - ข้อมูลสำหรับ สร้าง Hyper-V 2012...
 
SQL Server High Availability Solutions (Pros & Cons)
SQL Server High Availability Solutions (Pros & Cons)SQL Server High Availability Solutions (Pros & Cons)
SQL Server High Availability Solutions (Pros & Cons)
 
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best Practices
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best PracticesVMworld 2014: Advanced SQL Server on vSphere Techniques and Best Practices
VMworld 2014: Advanced SQL Server on vSphere Techniques and Best Practices
 
Symantec ApplicationHA June 2011
Symantec ApplicationHA June 2011Symantec ApplicationHA June 2011
Symantec ApplicationHA June 2011
 
SQL Server Cluster Presentation
SQL Server Cluster PresentationSQL Server Cluster Presentation
SQL Server Cluster Presentation
 

Similar to Railway Expert Mohamed Aly

Similar to Railway Expert Mohamed Aly (20)

Ahmed Abdelaziz CV
Ahmed Abdelaziz CVAhmed Abdelaziz CV
Ahmed Abdelaziz CV
 
Momen's Resume
Momen's ResumeMomen's Resume
Momen's Resume
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
Ahmed Azmy Mohamed
Ahmed Azmy  MohamedAhmed Azmy  Mohamed
Ahmed Azmy Mohamed
 
Bay's CV - November 2016
Bay's CV - November 2016Bay's CV - November 2016
Bay's CV - November 2016
 
Resume_Rajkumar Sharma
Resume_Rajkumar SharmaResume_Rajkumar Sharma
Resume_Rajkumar Sharma
 
CV of Ramy Ahmed- Updated
CV of Ramy Ahmed- UpdatedCV of Ramy Ahmed- Updated
CV of Ramy Ahmed- Updated
 
Yahia Mostafa National
Yahia Mostafa NationalYahia Mostafa National
Yahia Mostafa National
 
Abhishek resume
Abhishek resumeAbhishek resume
Abhishek resume
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
PBS Resume
PBS ResumePBS Resume
PBS Resume
 
Niranjan A Mandyam profile 2016
Niranjan A Mandyam profile 2016Niranjan A Mandyam profile 2016
Niranjan A Mandyam profile 2016
 
Resume plant head 13 jun 15
Resume plant head  13 jun 15Resume plant head  13 jun 15
Resume plant head 13 jun 15
 
Hani Tomoum detailed CV 0116
Hani Tomoum detailed CV 0116Hani Tomoum detailed CV 0116
Hani Tomoum detailed CV 0116
 
CV 2016 LB (B)
CV 2016 LB (B)CV 2016 LB (B)
CV 2016 LB (B)
 
MK CV
MK CVMK CV
MK CV
 
SE CV
SE CVSE CV
SE CV
 
William Thomas Beckley resume
William Thomas Beckley resumeWilliam Thomas Beckley resume
William Thomas Beckley resume
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 

Railway Expert Mohamed Aly

  • 1. MOHAMED ALY 136 Port Said, Syeda Zeinab, Cairo, Egypt (+2)01002581133; (+20)24470185| (+966) 0554141742 ;( +966) 0554600242 alyeldinmohamed@Gmail.com Career Profile A skilled, highly trained, confident and effective Railway expert with significant experience in a broad range of railway different activities Train operation, operation training, operation documentation and regulation, centralized control operation and training, Test & commissioning, maintenance activities, project management, accident investigation, system management, integration, rolling stock management, infrastructure, construction, supervision, depot, quality health and safety. Proven skills in exploring, designing, and implementing solutions and the management of change. Key strength Drive and Initiative: my current role as chief supervision engineer require highly developed problem – solving skills and ability to respond to crisis swiftly and effectively. Drive the team towards continual improvements. Excellent communication skills: it is essential to liaise effectively with management, technical staff, and contractors and to consult with all those actively involved in the project to understand comprehensive client needs and to give information in a way it can be understood and assimilated. A broad range of personal skills: 30 years’ experience in overall railway businesses including, design, installation, test and commissioning, validation & verification, RAMS, Quality, HSE, and construction. Excellent organization and multitasking skills: at present working in a high volume, and pressure environment in a high-speed project requiring a degree of organization. Working as part of a team requiring flexibility, adaptability and the ability to multitask in order to keep the project running smoothly and efficiently under all circumstances. Team builder: my present and previous roles requiring teams to work together and communicate in effective way. Commitment to quality and HSE: driving the quality and HSE functions in the project to maintain the business excellence and safety according to requirements, regulations, and standards. People skills & multicultural: have worked profitably with a wide range of people, liaising successfully with suppliers, contractors, clients. Able to question, consult, negotiate and influence to gain understanding of the client’s needs using a wide spectrum of approaches to ensure customer satisfaction. Leadership: a record of accomplishment of over 30 years of motivating teams to set and achieve challenging targets and expect the very best from themselves. Feedback from teams demonstrates a confident, vigorous style of leadership based on sincere consultation allied with clear direction. Key Skills  30 years’ experience in overall railway businesses  Over 10 years experiences in operation  Experience in System interface, integration, validation & verification  Experiences in different Training program (operation and maintenance).  A clear commitment to high standards  Requirements Engineering  Configuration Management  Over 23 years experiences in signalling, OCC, rolling stock , in the different activities installation, T&C , maintenance and Management  Experience in Supervision Management  A clear commitment to Quality and HSE  Knowledge of Depot equipment’s  Design Review  Systems Assurance, RAMS and Safety Mohamed Aly El Din: Page 1 of 7
  • 2.  Accomplishments Statistical Analysis (Cairo line 2 rolling stock project) - Performing data collection and statistical analysis that results in sound recommendations that were adopted for project improvement. Project Management (Cairo line 2 rolling stock project) - Supervising project production efforts to ensure that projects were completed to company standards on time and within budget constraints. Research and development (Cairo line 2 rolling stock project) - Managing research and development requirements to find solution for the obsolete components and old software to maintain high standard reliability. Strategic Management (Cairo line 2 rolling stock project) - Supervise and direct 250 employees on rolling stock maintenance project that result in maintenance yield improvement, which later translated into 35% GM in company revenue. Customer satisfaction (Cairo Metro projects) - Building strong relationship and good communication with customers for maintaining customer satisfaction. Career history DB-International 2015 to present Chief Supervision Engineer Managing, organizing the supervision team during the project construction period (Signalling, power AFC, telecom, GSM-R, track, station, OCC, depot, Catenary and civil work. - Regular construction site inspections and evaluations of on-site construction supervisors - Monitoring adherence to the customers construction supervision regulations based on local legal provisos and training staff - Constant reviews of construction schedule planning and documentation of construction progress - Arrange and carrying out regular technical interface meeting with all related parties. - Close cooperation with and monitoring of contractors and suppliers - Systems problem solving. - Prepare for the integration phase for the project - Follow the design problems and solutions, project documents (O&M documents) - Follow project RFIs, NCRs, PCCFs and reports - Deploy the quality function across the project through enhancing the project quality level - Drive the RAMS function in the project - Drive the professional training process inside the different team, (on job training, internal & external professional training) - Review the project design documents in GCC project. ALSTOM Egypt July 2015 to Sept 2015 Rolling Stock Management Preparing rolling stock maintenance tender for Cairo Metro line 2 global Maintenance Contract. ALSTOM Egypt 2012 to 2015 QEHS country Manager Establish, manage, and monitor standards, processes, communications, training, and systems for quality and HSE functions. - Act as the professional head Quality and HSE for Egypt Transport activities. Pro-actively co-ordinate the company’s quality, safety, and environmental assurance activities to ensure that the business exceeds its regulatory, contractual and company obligations. - Develop and implement strategies taking into account ALSTOM Transport and Corporate requirements for managing and continually improving the company’s processes delivering the required quality, safety, and environmental standards. - Ensure that there are adequate documented quality, safety and environmental processes and procedures in place to address the activities of the business. Mohamed Aly El Din: Page 2 of 7
  • 3. - Ensure that such processes and procedures are common across locations and take into account best practice. - Implement an appropriate audit / monitor regime (capturing all levels of organisation) to ensure that the business is operating in line with its documented quality, safety and environment management arrangements. - Communicate widely and effectively within the company to ensure quality, safety and environment issues and responsibilities are recognised and addressed by project managers. - Report to the Transport directors the levels of quality, safety, and environmental performance. - Prepare management reports and recommendations concerning the company’s quality, safety, and environment performance. - Lead the Egyptian Head office based quality, safety, and environment team to ensure that their activities contribute fully to business, ALSTOM and corporate initiatives and objectives. - Liaise as appropriate with Customers, Regulatory Authorities, and other 3rd Parties in matters relating to quality, safety, and environment performance. - Consolidate the Quality Management System and ongoing improvement to meet the relevant ISO standard - Develop, organise and carry out Quality awareness training for all personnel - Organise and manage external & internal audits – including the training of auditors – ensuring audits are completed to schedule, all documentation is reviewed and is compliant, and all audits meet ISO standards - Review/analyse the QMS, Customer Complaints, tenders for new contracts, and assist and advise Managers on Quality issues ensuring Quality procedures are being adhered to - Organise internal quality audits and suppliers audits - Monitor indicators to identify corrective and preventive actions (including CONQ) - Provide QA metrics on time with full accuracy, in accordance with Corporate guidelines - Propose management System improvement ALSTOM Egypt 2010 to 2012 Rolling stock project manager Responsible for all project execution and deliverables. - Managing all financial and sales activities. - Managing and following all the project activities plans. - Managing the execution of the preventive, corrective, overhauling, and online maintenance activities. - Managing the planning of the project staffing, training, organization, and working schedules. - Managing the required spare parts, obsoleteness, R&D. - Managing the train’s software solutions. - Managing Customer relation and satisfaction. - Sustain the target margin for the maintenance project - Improve GM by Variation order - Ensure monthly payments on time without penalties - Gather the maximum available data to facilitate decisions for the preparation of the performance contract - Demonstrate appropriate management capacity with the working team, including detached personnel - Responsible for all aspects of Project Management for the overall project. - Deploy the EHS and quality according to Alstom standards. - Responsible for all aspects of work package execution for the overall project. - Manage the entire project scope of work - Managing the delivery on time for the overall project and maintain the required availability and project performance. - Managing risk and opportunity and their action plans - Maintain and ensure a high level of Customer satisfaction with performance through effected communication and liaison. ALSTOM Egypt 2008 to 2012 Transport QEHS Manager Mohamed Aly El Din: Page 3 of 7
  • 4. Establish, manage, and monitor standards, processes, communications, training, and systems for quality and HSE functions. - Consolidate the Quality Management System and ongoing improvement to meet the relevant ISO standard - Develop, organise and carry out Quality awareness training for all personnel - Organise and manage external & internal audits – including the training of auditors – ensuring audits are completed to schedule, all documentation is reviewed and is compliant, and all audits meet ISO standards - Facilitate audits of transport projects activities by the customer and third party inspectors - Manage the documentation control system, including the management of the document controller, for Quality and Safety, ensuring that the person is suitably trained and developed - Report to the Managing Director, monthly meetings, and the Quality Review meeting on quality issues including the performance of the Quality Management System as a basis for improvement of the Egypt transport projects. - Record and monitor all Non-conformances raised on the Database and liaise with Auditors and Actions when required - Review/analyse the QMS, Customer Complaints, tenders for new contracts, and assist and advise Managers on Quality issues ensuring Quality procedures are being adhered to - Member of ALSTOM Management Team by providing an input and guidance to the successful running of the business through use of appropriate tools, e.g. business plans - Define and control the Quality system of the projects - Organise internal quality audits , contractors, sub-contractors and suppliers audits - Monitor indicators to identify corrective and preventive actions (including CONQ) - Provide QA metrics on time with full accuracy, in accordance with Corporate guidelines - Propose management System improvement ALSTOM Egypt 2000 to 2008 OCC Maintenance Team leader Effectively ensure correct execution of corrective and preventative maintenance activities of Cairo L1 & L2 metro in the scope of centralized control system. Ensuring that all aspects of the contract are efficiently and effectively managed and that business objectives, Customer service, Health & Safety, and finances are consistently achieved and delivered on time. - Execute and deliver the project maintenance activities - Manage and deliver the Site maintenance Plan. - organize and plan in order to meet individual and business unit objectives within the agreed timescales - Effectively manage an Operational team to ensure Maintenance targets are consistently met. - Elaboration Maintenance activity reports - Maintain the availability of the systems. - Comply with RAMS standards - Manage the spare parts. - Manage the obsolescence - Implement REX - R&D - Elaboration preventive and corrective maintenance plan. - coach and develop individuals to improve performance and potential, e.g. by use of appraisal - Communicate with all members of staff by means of one-to-one meetings, formal and informal discussions, team briefings, KPIs, - actively participate in and be proactive in the Continuous Improvement culture within Metro projects, - manage staff availability to ensure staff training requirements are met - manage employees attendance in accordance with Metro policies and procedures - Manage, organize, and plan the team’s daily work regime in order to meet contractual targets. - Staff training and building teams. - Customer communication and satisfactions - Lifting of remarks and close FTO files. ALSTOM Egypt 1996 to 2000 Mohamed Aly El Din: Page 4 of 7
  • 5. OCC T&C, Maintenance Engineer - Interface & integration management - Execute and deliver the project T&C different activities. - Prepare the test planning and the competition time frame - Administering anomalies - Preparing and reporting to ALSTOM Paris anomalies and solution related to the project - Ensure the completion of testing as per plan - Ensure Commissioning of the system to the satisfaction of the customer. - Analyse and understand the tests to be performed. - Comment on installation test reports. - Carryout the testing as per procedures, preparation of the outcome in test reports. - Ensure the technical safety of systems within the scope of work from turnover from erection until hand over to the customer. - Factory test S/W, function test and integration. - Function and integration tests. - PTO (primary test and operation). - EWP (experimental working period). - FTO (final test and operation). - Internal & acceptance different system tests - Assisting the CCP functional & dynamic operational tests as representative for the contractor. - Elaboration the ATS (Automatic Train System) preventive and corrective maintenance documents. - Elaboration the ATS user manual. - Elaboration the maintenance schedules and reports. - Supervising the maintenance team. - Prepare the test planning and the completion time frame - Coordinating T&C works and timeslots - Organizing customer contacts ALSTOM Egypt 1995 to 1996 SCADA Engineer - Performing the factory and validation tests for the (ATS system) centralized control equipment’s. - Elaboration of the site acceptance tests procedure. ALSTOM Egypt 1992 to 1995 System Engineer - Validation, Installation, commissioning and maintenance of the (ATS system) centralized control equipment’s. - Performing the site acceptance tests for Traffic, Traction and Train follow up system (PCI) - Assisting the Installation and validation of PCI line 1 (train follow up system). - Assisting the CCP functional & dynamic operational tests. - Performing the corrective maintenance and supervising the maintenance team. Cairo Metro Organization 1990 to 1992 Operation Training Manager Responsible for the training department in the activities of organization and performing of all training session: Rolling stock, traction control, Signalling, Automatic train control, Regulation, OCC, Drivers. This assistance related to all operation fields: a) Design and compilation of training programs. b) Production of training schedules. c) Organization of training centre final structure. d) Performing of training and assessment of results. e) Functional definition of simulator for LSB and TCP operation training. f) Conception of drivers and TCP operator’s instruction manuals. National Egyptian railways (ENR) 1986 to 1990 Operation Engineer Mohamed Aly El Din: Page 5 of 7
  • 6. Supervise metro project line 1 - Performing the functional operational static and dynamic test for contract 9 rolling stock. - Supervise the functional operational test for local signal box (LSB) and traction control point (TCP) with the consultant. - Supervise the experimental working period for the metro project phase 2 EL MARG LINE with the consultant. - Supervise the renewal of track - Supervise the erection of over-head catenary - Supervise the modification of the stations along the line and its equipment’s. - Supervise, organize, and execute the weekly work conference for the daily day/night work responsible for all the safety precaution and safety measurements. Cairo wastewater project Automatic Control Engineer Responsible for the automatic control equipment’s. Military Service 1984 to 1985 Education DBA (Doctorate in Business Administration) Ain Shams University, Cairo Egypt (ongoing) Master in Quality, Arab academy for science, Technology & Maritime Transport Master degree in law Ain Shams University, Cairo Egypt B.Sc. Law Ain Shams University, Cairo Egypt Diploma in Public law Ain Shams University, Cairo Egypt Diploma in private law Ain Shams University, Cairo Egypt B.Sc. of engineering, communication department, Ain Shams University, Cairo Egypt Diploma in Total Quality Management (TQM) AUC American University in Cairo Training Lead Auditor, ISO 9001: 2001, IRCA Lead Auditor, OHSAS 18001, IRCA Lead Auditor ISO 14001 EMS Managing the Quality Function, AUC Cairo Planning for Top Quality, AUC Cairo Problem Solving & Analysis AUC Cairo Six Sigma, AUC Cairo Statistical Process Control (SPC), AUC Cairo NEBOSH UK International General Certificate in Occupational Safety & Health OSHA Construction Health & Safety, NIOSH Fire Marshal CNNA (network), Cairo, Egypt Middle Managerial Skills, Alstom, Cairo, Egypt Interpersonal communication skills Alstom, Cairo, Egypt Presentation Skills Alstom, Cairo, Egypt Arbitration, Cairo, Egypt Work related Training TRAINING COURSES IN PARIS SOFRETU & RATP (SYSTRA) 1988 As ENR (Egyptian National Railways) responsible for the activities of organization and follow-up of the training department, and to have training on: - Operation safety precaution and safety measurements. Mohamed Aly El Din: Page 6 of 7
  • 7. - Rolling stock, traction control , Signalling, Automatic train control, Regulation, OCC, Drivers TRAINING COURSES IN PARIS SOFRETU & RATP (SYSTRA) 1992 As ENR (Egyptian National Railways) responsible for the training department to have training on the Centralized Control Point of Cairo metro line 1 (RAMSES COMPLEX) for:- - Operation safety precaution and safety measurements. - Different methods of operation for (Urban – Regional) in Paris network. - Practical training on different centralized control post C.C.P - Traffic regulation. - Theoretical and practical training on line operation of different headway. - Timetable division and methods to create new timetables. - Different organization on (Urban – Regional) line. SCADA training in Alstom Paris – France. Line 2 training in Alstom Paris – France. EHS reporting Training in Alstom University in Paris. QSRW training in ALSTOM Paris- France. AZDP training in Alstom Italy. EHS training in Dublin - Ireland. Personal details Date of Birth: 12 September 1960 Languages: Arabic & English & French Driving License: Egyptian, Saudi References: Available on request Mohamed Aly El Din: Page 7 of 7