A presentation that overlooks Ghana's existing Disaster Management Plans and makes a recommendation to fuse it with mobile Disaster Recovery Regulations to strengthen the effectiveness of the existing plans
Social Work practice conducting PDNA in post disaster situation: Special re...Bibhuti Bhusan Gadanayak
Social Work practice conducting PDNA in post disaster situation: Special reference to the volcanic eruption in bordering area of DR Congo-Rwanda, East Africa on Saturday 22nd May 2021. Presented before the students of Department of Social Work, Visva-Bharati (A Central University of National Importance ) on 11th July 2021 from RWANDA
The Post-Disaster Needs Assessment (PDNA) is an internationally accepted methodology for determining the physical damages, economic losses, and costs of meeting recovery needs after a natural disaster through a government-led process.
A presentation that overlooks Ghana's existing Disaster Management Plans and makes a recommendation to fuse it with mobile Disaster Recovery Regulations to strengthen the effectiveness of the existing plans
Social Work practice conducting PDNA in post disaster situation: Special re...Bibhuti Bhusan Gadanayak
Social Work practice conducting PDNA in post disaster situation: Special reference to the volcanic eruption in bordering area of DR Congo-Rwanda, East Africa on Saturday 22nd May 2021. Presented before the students of Department of Social Work, Visva-Bharati (A Central University of National Importance ) on 11th July 2021 from RWANDA
The Post-Disaster Needs Assessment (PDNA) is an internationally accepted methodology for determining the physical damages, economic losses, and costs of meeting recovery needs after a natural disaster through a government-led process.
This is a presentation on ICT for development, presented to DFID, India for fund raising. This is a part of the United Nations Information Technology Services (UNITeS) programme. This programme was a finalist in the Stockholm Challenge Award 2001
Oscar Zepeda Ramos : Atlas national des risques au mexiqueOECD Governance
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - 3-4 Avril 2017. Info : www.oecd.org/fr/gov/risques/projet-appui-ocde-gestion-risques-maroc-atelier-avril-2017.htm
Presentation on the legal framework around disaster risk reduction in Vietnam by IFRC Southeast Asia Disaster Law delegate at the DIPECHO 17-year review workshop.
This is a presentation on ICT for development, presented to DFID, India for fund raising. This is a part of the United Nations Information Technology Services (UNITeS) programme. This programme was a finalist in the Stockholm Challenge Award 2001
Oscar Zepeda Ramos : Atlas national des risques au mexiqueOECD Governance
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - 3-4 Avril 2017. Info : www.oecd.org/fr/gov/risques/projet-appui-ocde-gestion-risques-maroc-atelier-avril-2017.htm
Presentation on the legal framework around disaster risk reduction in Vietnam by IFRC Southeast Asia Disaster Law delegate at the DIPECHO 17-year review workshop.
Diversity Talks: Diversity & Inclusion Agency Resource GuidePR Council
Presented by HP, the PR Council’s Diversity & Inclusion Resource Guide for Agency Leaders is being published to educate members and the industry in creating an effective diversity and inclusion strategy for their organizations.
Communications leaders understand the existence of differences among their clients’ customer bases, however the talent creating messages is often not reflective of the customer base or potential customers. Although the concept of diversity among our talent is not new to the industry, a transformation of behavior and attitude resulting in the practice of inclusion is being actively pursued.
The Role of Satellite Communications in Disaster ManagementFairTechInstitute
This seminal paper highlights the crucial role that satellite services and next-generation satellite-enabled connectivity will have in saving millions of lives and reducing government expenditure during and post-disaster. Providing unique data, the document forecasts the economic impact and future burden countries will face if disaster communications planning is not taken seriously.
This study provides key insights into the impact of climate change across the world, and how satellite communications will play a pivotal role in saving millions of lives while reducing costs. It highlights how the impact of climate change will be confined to mainly low and middle-income countries that aren't prepared to adapt.
The role of satellite communications in disaster managmentLuca754198
This seminal paper highlights the crucial role that satellite services and next-generation satellite-enabled connectivity will have in saving millions of lives and reducing government expenditure during and post-disaster. Providing unique data, the document forecasts the economic impact and future burden countries will face if disaster communications planning is not taken seriously.
This study provides key insights into the impact of climate change across the world, and how satellite communications will play a pivotal role in saving millions of lives while reducing costs. It highlights how the impact of climate change will be confined to mainly low and middle-income countries that aren't prepared to adapt.
Final Course Project - Crisis Communication PlanAssignment Instr.docxssuser454af01
Final Course Project - Crisis Communication Plan
Assignment Instructions
4. Final Course Project (due at end of week 8)
A. Scope - The final project will be your creation of a Crisis Communication Plan for your organization or an organization of your choice. Using the materials from your weekly assignments, develop a detailed CCP. Use Appendix A Go through the steps of the Crisis Communication Plan, and develop a good - detailed CCP.
B. Objective - The objective is to apply all of what you have learned in this course to your organization.
C. Format
- Use the APA style for all citations.
- Project has neither minimum nor maximum length. Cover the material to the best of your ability.
- Project will be typed in MS Word
- Project will have 1" margins
- Project will be in 12-point Times New Roman font
D. General Guidance
- As you work on your project, you are encouraged to use information in the discussion questions throughout this course. Take what you have been working on from the beginning and continue to develop it.
- This project should end up looking similar to one of the Appendices in your text, but tailored to your organization of choice.
- Feel free to change any names you wish, but do not change position titles nor duty descriptions.
Think through your project. Ask yourself the questions we have discussed in this course.
- Key to your success is how well you have thought through your organization's crisis communication - and how well you have communicated it!
Crisis Communications Plan 1
Crisis Communications Plan 26
The Osceola County Joint Information Crisis Communications Plan Richard A. Halquist - 4115293American Military UniversityEDMG 420 D 003 Sum 11 – Risk CommunicationsMarch 19, 2018Professor Wilhelmsen
The Osceola County Joint Information Crisis Communications Plan
Introduction
The Crisis Communication Plan is the foundation by which the Osceola County Joint Information Network operates. The plan provides strategic details in a tactical format ensuring operability across jurisdictional lines thereby promoting unified messaging with a common voice. The plan basis is the National Incident Management System (NIMS) Joint Information System protocols through which each participating entity shares responsibility equally, yet provides flexibility for each agency to operate independently. (FEMA 2009).
Each section of the plan contains dynamic information requiring regular maintenance ensuring current details related to changes common in any plan. These details are generally in the form of tables and lists including organizational charts to assist team members in organizing quickly when crisis occurs.
While the plan details operational elements requiring appropriate space and face-to-face communications, there is an understanding that many operations use a virtual platform promoting effective and efficient information delivery to the served publics. This concept is termed the Joint Information Center (JIC) ch ...
National Response Framework
i
t
N
ational Response
Fra
mework
Fourth Edition
October 28, 2019
National Response Framework
ii
Execut ive Summary
The National Response Framework (NRF) provides foundational emergency management doctrine for
how the Nation responds to all types of incidents. The NRF is built on scalable, flexible, and adaptable
concepts identified in the National Incident Management System (NIMS) to align key roles and
responsibilities across the Nation. The structures, roles, and responsibilities described in this
Framework can be partially or fully implemented in the context of a threat or hazard, in anticipation of
a significant event, or in response to an incident. Implementation of the structures and procedures
described herein allows for a scaled response, delivery of specific resources and capabilities, and a
level of coordination appropriate to each incident.
Responding to disasters and emergencies requires the cooperation of a variety of organizations; the
larger or more complex the incident, the greater the number and variety of organizations that must
respond. Think of a residential fire: Firefighters are leading the charge; public works may be on scene
providing traffic control; police are providing security; emergency medical services personnel are
triaging, transporting, and redistributing injured to local hospitals; and a local nonprofit or voluntary
organization (e.g., American Red Cross and Salvation Army) may be on hand to assist displaced
residents. For large disasters, such as major hurricanes or earthquakes, the incident complexity is
increased as others—such as states or tribes and, ultimately, the Federal Government—become
involved. Businesses, voluntary organizations, and other elements of the private sector are also key
stakeholders, providing the essential services that must be restored following an incident. The NRF
provides the foundation for how these organizations coordinate, integrate, and unify their response.
The unprecedented scale of recent disasters has spurred continued innovation in response operations
and highlighted the need for further progress to build resilient capabilities to respond to disasters of
increasing frequency and magnitude. This fourth edition of the NRF embraces lessons-learned from
those disasters and shares emerging best practices.
Since publication of the third edition of the NRF in 2016, disaster response operations have
underscored the paramount importance of sustaining essential community lifelines. The Framework
defines community lifelines as those services that enable the continuous operation of critical
government and business functions and are essential to human health and safety or economic security.
If disrupted, rapid stabilization of community lifelines is essential to restoring a sense of normalcy.
Recent disasters have illuminated two underlying features o ...
In a world filled with uncertainties, empowering resilience through effective Emergency Response & Crisis Management is crucial. Explore the vital role these strategies play in preparing for and mitigating crises. Learn about key approaches, teamwork, and preparedness that enable communities and organizations to navigate challenging situations with confidence. Discover the tools and knowledge that foster a culture of resilience, ensuring you're ready to respond effectively when it matters most. Strengthen your ability to face adversity and emerge stronger. Join us in the journey towards a more resilient future.
An explanation of the role technology, science, and engineering in d.docxmelvinjrobinson2199
An explanation of the role technology, science, and engineering in disaster communications. Provide at least two specific examples of communications in your region and how technology, science, or engineering played a role.
Communication during and immediately after a disaster situation is an essential component of response and recovery, in that it associates affected individuals, families, and communities with first responders, emotionally supportive networks, and other family members. Reliable and accessible communication and information systems also are key to a community’s resilience (NIDM, 2014).
The role of communication technology has been acknowledged and been perceived as fundamental to disaster management for a long time. Despite the fact that utilization of communication technology has a role in all the four distinct phases of disaster management namely, mitigation, preparedness, response and recovery, most of the application has traditionally been in response and recovery phases. The newly advance communication and data that have risen in the course of the most recent two decades loan themselves to more prominent potential outcomes of incorporation of various communication frameworks. The interoperability of different correspondence frameworks including web, cell phones, fax, email, radio and TV is progressively getting to be plainly utilitarian. Therefore, the potential outcomes for utilization of communication advancements in alleviation and aversion of catastrophes are likewise expanding.
All disaster crises and emergency actions are by nature disorderly and profoundly dynamic, creating physical, emotional, and social disorder. At the Hartsfield-Jackson Atlanta International Airport varies forms of communication is utilized for disaster management. One of those forms of communication is the usage of the Everbridge Notification System. This system is a global system that allows the airport to send out mass notifications to individuals on incidents that have occurred, or pending that could or have affected the daily operations of the airport. Those notifications are sent in various forms such as text message, email or phone. This one method allows the airport to be able to communicate and be efficient in its translation during a vulnerable and strenuous timeframe. Another method used at the Hartsfield-Jackson Atlanta International Airport is the usage of a Motorola radio system. The Motorola Radio System is a two way communication system that allows the FAA, fire, Ems, law enforcement, and other specific division of the airport to communicate when an incident occurs on the property of the airport. The advancement of technology has been very effective in how the FAA is able to communicate when an aircraft has mechanical issues, or there is an emergency onboard and the needs to land.
Resources:
National Institute Disaster Management. (2014). Disaster Communication. Retrieved from
http://nidm.gov.in/easindia2014/err/pdf/themes_.
Presentación de Juan Honorato, Ex Jefe de la Subdivisión de Auditoría e Inspección de la División de Municipalidades en el bloque "Gestión del conocimiento y su impacto en las metas de calidad de los municipios".
Preentación de Jorge Romero en el bloque: "Gestión del conocimiento y su impacto en las metas de calidad de los municipios".
Encargado de proyecto Ventanilla Tramite Municipal, Subdere.
Comunas Digitales 2009
Presentación de Edgard Boccardo, Gerente de Consultoría de Negocio de Indra, “Cómo las TI pueden ayudar a mejorar la calidad de vida de los vecinos, caso práctico Peñalolén”.
Comunas Digitales 2009
Presentación de Andrea Méndez en el bloque "El desafío tecnológico de la Educación".
Encargada del Proyecto Comunidad Virtual de la Municipalidad de Lo Barnechea.
Comunas Digitales 2009:
Presentación Arturo Catalán, subeditor de Ediciones Especiales de El Mercurio y director del Magíster Internacional en Comunicación y Periodismo Digital.
TEMA: Creatividad, el aprendizaje y la pasión para desarrollar proyectos en internet.
Presentación introductoria acerca de la Web 2.0 para motivar a profesores de colegios y liceos a utilizar este tipo de herramientas en el aula. Además, busca que los pedagogos entiendan los procesos relacionales y comunicacionales que están insertos en los j´venes de hoy.
Presentación del proyecto educacional 2.0 Wikieduca, un portal creado por profesores, para profesores y la comunidad en general. Desarrollado por el Observatorio de Comunicaciones Digitales y Wikia (Empresa fundada por Jimmy Wales, el creador de Wikipedia).
More from Observatorio de Comunicaciones Digitales (20)
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
Monitoring Java Application Security with JDK Tools and JFR Events
Mike Alagna
1. National Emergency Communications Planning Challenges, Progress & Future What is the role of communications during catastrophic situations? Presented by: Michael Alagna Director Homeland Security Strategic Initiatives & Policy Motorola Washington, DC USA May 2010
2. Air Florida 1982 Three Mile Island 1979 Oklahoma City Bombing 1995 Space Shuttle Accident 2003 World Trade Center 2001 Hurricane Katrina 2005 Disasters of all types, man made or natural, can strike ANYWHERE and at ANYTIME! Kentucky Ice Storm 2009 California Wildfires 2008 Tornado Outbreak 1999 California Earthquake 1989 Communications among those responding to a natural disaster, terrorist attack, or other large-scale emergency is the essential component to a successful response and recovery effort, and ultimately in the ability of a Nation’s emergency responders to save lives and property.
3. Significant events and disasters can cause primary communications systems to be lost, diminishing emergency response effectiveness… Planning and implementing comprehensive primary and back-up communications solutions is essential to maintaining critical operations Events Impacting Communications Systems Software failure Spoofing Lightning Loss of back room or electronics bank Interception of signals/ wiretapping Wildfire Loss of infrastructure site facility Radio frequency interference Flooding Loss of infrastructure connectivity Unauthorized use of system resources Extreme temperatures Failure of backup electrical systems Theft of assets Electrical storm Interruption of commercial power Tampering Severe storm (e.g., hurricane, winter storm) Hardware failure Terrorist attack Earthquake TECHNOLOGICAL HUMAN NATURAL
4.
5.
6.
7.
8. Criticality of Communications Across Responder Organizations Critical Information Sharing and Coordinated Interoperable Communications Increases in Complexity to Meet the Requirements of a Responder Community that could Include Tens or Hundreds of Organizations
9.
10.
11. Multi-Dimensional Challenge Tools for improving emergency communications must take into account all of the factors critical for a successful solution. Department of Homeland Security Interoperability Continuum
12.
13.
14.
15.
16.
17. Interoperability Progress Timeline – Progress Is Accelerating P25 Ph 2 2:1 TDMA trunking standard completion targeted 2009 2010 Grant funding tied to P25 2008 1999 P25 conventional standard completed Multiple vendors shipping P25 2004 FCC adopts P25 interoperability standard US Government agencies Treasury, Interior, Departments of Defense and Justice specify P25 ISSI standard defined 700MHz NB spectrum opens Multiple CAP testing labs certified Multi-band radios begin shipping - 4 vendors announce products 14+ subscriber vendors ship P25 10+ P25 system vendors Software definable radios begin shipping 1995 2001 700MHz NB spectrum allocated Multiple vendors shipping 700MHz capable radios Government Industry Collaborative Partnership Motorola supports structured interoperability testing, the publishing of formal test reports and led a TIA process improvement eliminating root causes of previous interoperability issues Motorola and other vendors are validating multi-vendor interoperability following DHS and NIST procedures and has proposed procedural enhancements to improve testing efficiency and to accelerate progress