METHODOLOGY FOR SLUG CATCHER SIZING
Oil & Gas Pipelines are often subjected to an operation called ‘Pigging’ for maintenance purposes
(For e.g., cleaning the pipeline of accumulated liquids or waxes). A pig is launched from a pig
launcher that scrapes out the remnant contents of the pipeline into a vessel known as a ‘Slug
catcher’. The term slug catcher is used since pigging operations produces a Slug flow regime
characterized by the alternating columns of liquids & gases. Slug catcher’s are popularly of two
types – Horizontal Vessel Type & Finger Type Slug catcher. However irrespective of the type
used, the determination of the slug catcher volume becomes the primary step before choosing the
slug catcher type.
In order to estimate the pigging volume, engineers use various Flow Assurance (FA) tools to
estimate & plot a graph between ‘Pipeline Volumetric Flow vs Time’. Here Pipeline volumetric
Flow Rate refers to the point at which liquid exits prior to entering into the slug catcher.
METHODLOGY
The methodology that could be adopted to estimate the excess space required in the slug catcher
volume is based on measuring the volumetric flow rate of the fluid that exits the pipeline from the
time a ‘pig’ is launched into the pipeline and measuring the same parameter until the pig exits the
pipeline. The point at which the pipeline is routed to the slug catcher is where using an FA tool; a
transient study is made to plot a graph between Volumetric flow rate vs. Time. Since the slug
catcher would have a provision to drain the accumulated liquids, it is taken as Drain Rate (QD)
which also decides the effective volume of the slug catcher.
Figure 1. Pig Traversing in a Pipeline
Using the Volumetric Flow Rate vs Time graph, the vessel space required to accommodate the
excess liquid from the pigging operation for a drain rate (QD) can be computed as,
Where,
Page 2 / 3
The purpose of introducing a factor of ‘margin’ in estimating the Slug catcher volume is due to
uncertainties that Flow Assurance Tools can produce as well as the users’ convergence criteria in
arriving at a well converged volumetric flow rate vs time graph. This can be anywhere from 2%
to 30% and is incumbent upon the Flow Assurance Engineer to thoroughly understanding the
principles of FA & the respective FA solver prior to carrying out slug catcher volume calculations.
Following on the equations provided, a tabulation of the volumetric flow rate vs time can be
made in MS-Excel as,
Time [sec]
Volumetric Flow
Rate [m3/s]
Pigging Volume [m3]
ti Qi
ti+1 Qi+1
ti+2 Qi+2
ti+3 Qi+3
.. .. ….
Cumulative Slug/Pigging Volume
Below is an example graph of pigging volume estimated using the above method for a given drain
rate (QD). The cumulative slug/pig volume computed is the area represented under the total
liquid volume flow into the slug catcher curve (‘blue’ line). The ‘red’ line represents the total
liquid volumetric flow that enters the slug catcher while the vessel is constantly drained.
Figure 2. Example of Slug Catcher Volume Required (Illustration Purposes Only)
Page 3 / 3
CHOOSING A SLUG CATCHER SIZE
The drain rate of the slug catcher is determined by the downstream liquid processing capacity in
an Oil & gas facility. Therefore in Brownfield projects, the drain rate cannot be inadvertently
increased beyond its design limit in the event when the pigged volume exceeds the existing slug
catcher’s capacity (For e.g., due to change of production). In such instances, it is prudent to install
an additional slug catcher to cater to the additional pigging volume. In Greenfield projects, the
Basis of Design (BOD) becomes the primary document that determines the drain rate of the slug
catcher. Therefore the excess volume required in the slug catcher above the normal operating
liquid level (NLL) can be determined by plotting a Slug Catcher Volume Vs. Drain Rate Graph.
Below is a representative plot for illustration purposes.
Figure 3. Example of Slug Catcher Volume Selected Based on Drain Rate (Illustration Purposes Only)
SUMMARY
The intent of the slug catcher operation is to accommodate the excess liquids generated by the
pigging operation but not to alter the drain rate that can affect the downstream liquid handling
equipment. This is accomplished by providing space for the excess pigging volume capacity over
and above the Normal Liquid Level (NLL) but below High Liquid Level (HLL) at which liquid
levels are maintained in the slug catcher.

More Related Content

What's hot

Overpressure protection
Overpressure protectionOverpressure protection
Overpressure protectionWei Chiao Kuo
 
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...Waqas Manzoor
 
AFS slug catcher sizing in a gas gathering system
AFS slug catcher sizing in a gas gathering systemAFS slug catcher sizing in a gas gathering system
AFS slug catcher sizing in a gas gathering systemAdam Murray
 
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)Vijay Sarathy
 
Accumulation and Over-pressure: difference between accumulation and overpressure
Accumulation and Over-pressure: difference between accumulation and overpressureAccumulation and Over-pressure: difference between accumulation and overpressure
Accumulation and Over-pressure: difference between accumulation and overpressureVarun Patel
 
Pressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowPressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowVikram Sharma
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Vijay Sarathy
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
Module 6 - Subflowsheet
Module 6 - SubflowsheetModule 6 - Subflowsheet
Module 6 - Subflowsheetriezqaandika
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingVijay Sarathy
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API BasedVijay Sarathy
 
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...Waqas Manzoor
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Chemical Engineering Guy
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Trainingernestvictor
 
Emissions during drilling, production storage and LPG Plant Operation
Emissions during drilling, production storage and LPG Plant OperationEmissions during drilling, production storage and LPG Plant Operation
Emissions during drilling, production storage and LPG Plant OperationMazhar Ali Soomro
 
Fundamentals of Centrifugal Compressor - Head (revised)
Fundamentals of Centrifugal Compressor - Head (revised)Fundamentals of Centrifugal Compressor - Head (revised)
Fundamentals of Centrifugal Compressor - Head (revised)Sudhindra Tiwari
 

What's hot (20)

Overpressure protection
Overpressure protectionOverpressure protection
Overpressure protection
 
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
 
AFS slug catcher sizing in a gas gathering system
AFS slug catcher sizing in a gas gathering systemAFS slug catcher sizing in a gas gathering system
AFS slug catcher sizing in a gas gathering system
 
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
 
Accumulation and Over-pressure: difference between accumulation and overpressure
Accumulation and Over-pressure: difference between accumulation and overpressureAccumulation and Over-pressure: difference between accumulation and overpressure
Accumulation and Over-pressure: difference between accumulation and overpressure
 
Pressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowPressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase Flow
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Module 6 - Subflowsheet
Module 6 - SubflowsheetModule 6 - Subflowsheet
Module 6 - Subflowsheet
 
Three Phase Separators
Three Phase SeparatorsThree Phase Separators
Three Phase Separators
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
 
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
 
Pipe line sizing
Pipe line sizingPipe line sizing
Pipe line sizing
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 
PSV DETAILS.pdf
PSV DETAILS.pdfPSV DETAILS.pdf
PSV DETAILS.pdf
 
Emissions during drilling, production storage and LPG Plant Operation
Emissions during drilling, production storage and LPG Plant OperationEmissions during drilling, production storage and LPG Plant Operation
Emissions during drilling, production storage and LPG Plant Operation
 
Fundamentals of Centrifugal Compressor - Head (revised)
Fundamentals of Centrifugal Compressor - Head (revised)Fundamentals of Centrifugal Compressor - Head (revised)
Fundamentals of Centrifugal Compressor - Head (revised)
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 

Similar to METHODOLOGY FOR SLUG CATCHER SIZING

Spinner velosity tool
Spinner velosity toolSpinner velosity tool
Spinner velosity toolArash Nasiri
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portTunAnh309
 
Drum scrubber ausimm (1)
Drum scrubber ausimm (1)Drum scrubber ausimm (1)
Drum scrubber ausimm (1)trevor ashala
 
Best Practices for Cementing Job Software
Best Practices for Cementing Job SoftwareBest Practices for Cementing Job Software
Best Practices for Cementing Job Softwarepvisoftware
 
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...IRJET Journal
 
SPE 160891 Tar Characterization for Optimum Reservoir .docx
SPE 160891 Tar Characterization for Optimum Reservoir .docxSPE 160891 Tar Characterization for Optimum Reservoir .docx
SPE 160891 Tar Characterization for Optimum Reservoir .docxrafbolet0
 
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...IRJET Journal
 
Surge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running LinersSurge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running Linerspvisoftware
 
Sysdrill.pdf
Sysdrill.pdfSysdrill.pdf
Sysdrill.pdfamrhaggag
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017Low Shear School
 
MECT 4276 - Senior Design Project II, Team HydraLoop Final Report
MECT 4276 - Senior Design Project II, Team HydraLoop Final ReportMECT 4276 - Senior Design Project II, Team HydraLoop Final Report
MECT 4276 - Senior Design Project II, Team HydraLoop Final ReportEdwin Jackson
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenanceManish Goyal
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
Flow measurement basics
Flow measurement basicsFlow measurement basics
Flow measurement basicsSalman1011
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinLaurent Alessio
 
Simplifying stormwater design is costing us money - a short case study
Simplifying stormwater design is costing us money - a short case studySimplifying stormwater design is costing us money - a short case study
Simplifying stormwater design is costing us money - a short case studyAdam Berry
 

Similar to METHODOLOGY FOR SLUG CATCHER SIZING (20)

247 w013
247 w013247 w013
247 w013
 
Spinner velosity tool
Spinner velosity toolSpinner velosity tool
Spinner velosity tool
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake port
 
Poster
PosterPoster
Poster
 
Drum scrubber ausimm (1)
Drum scrubber ausimm (1)Drum scrubber ausimm (1)
Drum scrubber ausimm (1)
 
San1
San1San1
San1
 
Best Practices for Cementing Job Software
Best Practices for Cementing Job SoftwareBest Practices for Cementing Job Software
Best Practices for Cementing Job Software
 
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...
Experimental and Computational Fluid Dynamics (CFD) Analysis of Additively Ma...
 
SPE 160891 Tar Characterization for Optimum Reservoir .docx
SPE 160891 Tar Characterization for Optimum Reservoir .docxSPE 160891 Tar Characterization for Optimum Reservoir .docx
SPE 160891 Tar Characterization for Optimum Reservoir .docx
 
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...
IRJET-Effect of Horizontal Perforated Baffle on Sloshing in Partly Filled Tan...
 
Surge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running LinersSurge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running Liners
 
Sysdrill.pdf
Sysdrill.pdfSysdrill.pdf
Sysdrill.pdf
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017
 
MECT 4276 - Senior Design Project II, Team HydraLoop Final Report
MECT 4276 - Senior Design Project II, Team HydraLoop Final ReportMECT 4276 - Senior Design Project II, Team HydraLoop Final Report
MECT 4276 - Senior Design Project II, Team HydraLoop Final Report
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Flow measurement basics
Flow measurement basicsFlow measurement basics
Flow measurement basics
 
exp.9 flow meter demonstration
exp.9 flow meter demonstrationexp.9 flow meter demonstration
exp.9 flow meter demonstration
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedin
 
Simplifying stormwater design is costing us money - a short case study
Simplifying stormwater design is costing us money - a short case studySimplifying stormwater design is costing us money - a short case study
Simplifying stormwater design is costing us money - a short case study
 

More from Vijay Sarathy

Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyExploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyVijay Sarathy
 
Heating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsHeating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsVijay Sarathy
 
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesEmpirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesVijay Sarathy
 
Evaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryEvaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryVijay Sarathy
 
Key Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsKey Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsVijay Sarathy
 
Cooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationCooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationVijay Sarathy
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationVijay Sarathy
 
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGVijay Sarathy
 
Flash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesFlash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesVijay Sarathy
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionVijay Sarathy
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsVijay Sarathy
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataVijay Sarathy
 
Load Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsLoad Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsVijay Sarathy
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Vijay Sarathy
 
Single Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS DynamicsSingle Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS DynamicsVijay Sarathy
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisVijay Sarathy
 
Chemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialChemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialVijay Sarathy
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionVijay Sarathy
 
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSOPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSVijay Sarathy
 
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALSBOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALSVijay Sarathy
 

More from Vijay Sarathy (20)

Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyExploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
 
Heating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsHeating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas Applications
 
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesEmpirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
 
Evaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryEvaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas Industry
 
Key Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsKey Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude Oils
 
Cooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationCooling Tower Makeup Water Estimation
Cooling Tower Makeup Water Estimation
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & Optimization
 
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
 
Flash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesFlash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return Lines
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand Production
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & Economics
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
 
Load Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsLoad Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas Compressors
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations
 
Single Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS DynamicsSingle Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS Dynamics
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design Basis
 
Chemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialChemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short Tutorial
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas Transmission
 
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSOPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
 
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALSBOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

METHODOLOGY FOR SLUG CATCHER SIZING

  • 1. Page 1 / 2 METHODOLOGY FOR SLUG CATCHER SIZING Oil & Gas Pipelines are often subjected to an operation called ‘Pigging’ for maintenance purposes (For e.g., cleaning the pipeline of accumulated liquids or waxes). A pig is launched from a pig launcher that scrapes out the remnant contents of the pipeline into a vessel known as a ‘Slug catcher’. The term slug catcher is used since pigging operations produces a Slug flow regime characterized by the alternating columns of liquids & gases. Slug catcher’s are popularly of two types – Horizontal Vessel Type & Finger Type Slug catcher. However irrespective of the type used, the determination of the slug catcher volume becomes the primary step before choosing the slug catcher type. In order to estimate the pigging volume, engineers use various Flow Assurance (FA) tools to estimate & plot a graph between ‘Pipeline Volumetric Flow vs Time’. Here Pipeline volumetric Flow Rate refers to the point at which liquid exits prior to entering into the slug catcher. METHODLOGY The methodology that could be adopted to estimate the excess space required in the slug catcher volume is based on measuring the volumetric flow rate of the fluid that exits the pipeline from the time a ‘pig’ is launched into the pipeline and measuring the same parameter until the pig exits the pipeline. The point at which the pipeline is routed to the slug catcher is where using an FA tool; a transient study is made to plot a graph between Volumetric flow rate vs. Time. Since the slug catcher would have a provision to drain the accumulated liquids, it is taken as Drain Rate (QD) which also decides the effective volume of the slug catcher. Figure 1. Pig Traversing in a Pipeline Using the Volumetric Flow Rate vs Time graph, the vessel space required to accommodate the excess liquid from the pigging operation for a drain rate (QD) can be computed as, Where,
  • 2. Page 2 / 3 The purpose of introducing a factor of ‘margin’ in estimating the Slug catcher volume is due to uncertainties that Flow Assurance Tools can produce as well as the users’ convergence criteria in arriving at a well converged volumetric flow rate vs time graph. This can be anywhere from 2% to 30% and is incumbent upon the Flow Assurance Engineer to thoroughly understanding the principles of FA & the respective FA solver prior to carrying out slug catcher volume calculations. Following on the equations provided, a tabulation of the volumetric flow rate vs time can be made in MS-Excel as, Time [sec] Volumetric Flow Rate [m3/s] Pigging Volume [m3] ti Qi ti+1 Qi+1 ti+2 Qi+2 ti+3 Qi+3 .. .. …. Cumulative Slug/Pigging Volume Below is an example graph of pigging volume estimated using the above method for a given drain rate (QD). The cumulative slug/pig volume computed is the area represented under the total liquid volume flow into the slug catcher curve (‘blue’ line). The ‘red’ line represents the total liquid volumetric flow that enters the slug catcher while the vessel is constantly drained. Figure 2. Example of Slug Catcher Volume Required (Illustration Purposes Only)
  • 3. Page 3 / 3 CHOOSING A SLUG CATCHER SIZE The drain rate of the slug catcher is determined by the downstream liquid processing capacity in an Oil & gas facility. Therefore in Brownfield projects, the drain rate cannot be inadvertently increased beyond its design limit in the event when the pigged volume exceeds the existing slug catcher’s capacity (For e.g., due to change of production). In such instances, it is prudent to install an additional slug catcher to cater to the additional pigging volume. In Greenfield projects, the Basis of Design (BOD) becomes the primary document that determines the drain rate of the slug catcher. Therefore the excess volume required in the slug catcher above the normal operating liquid level (NLL) can be determined by plotting a Slug Catcher Volume Vs. Drain Rate Graph. Below is a representative plot for illustration purposes. Figure 3. Example of Slug Catcher Volume Selected Based on Drain Rate (Illustration Purposes Only) SUMMARY The intent of the slug catcher operation is to accommodate the excess liquids generated by the pigging operation but not to alter the drain rate that can affect the downstream liquid handling equipment. This is accomplished by providing space for the excess pigging volume capacity over and above the Normal Liquid Level (NLL) but below High Liquid Level (HLL) at which liquid levels are maintained in the slug catcher.