SlideShare a Scribd company logo
1 of 3
M.K.RIFAY AHAMED Contact no: +91 9715107213
Mail me: rifayeie@gmail.com
CAREER OBJECTIVE
Seeking a challenging environment that encourages continuous learning and creativity
that provides exposure to new ideas and stimulates personal and professional growth.
EDUCATIONAL QUALIFICATION
Name of
the
Degree
Name of the College / University Year of
Passing
Area of
Specialization % of Marks
B.E.
Kongu Engineering
College(Autonomous),
Perundurai,
Erode
2013
Electronics and
Instrumentation
77.9
Higher
Secondary
(HSC)
A.T.M. Higher Secondary School,
Erode
2009
Mathematics,
Physics,
Chemistry,
Computer
Science
89
SSLC
Government High School,
B.P.Agraharam, Erode
2007
Tamil, English,
Mathematics,
Science, Social
Sciences
86.6
ACHIEVEMENTS
 School First in SSLC
 Got a Prize from Erode District Collector in SSLC
 School Third in Higher Secondary
 Got ‘S’ grade in Engineering Mathematics-III
SKILL SET
 Basics of Auto Cad, Microsoft Office
 HTML 4
• Currently working as a Electrical Engineer in Blue Star LTD Since June 2016
PROJECT
Project Name Prozone Mall-Coimbatore-TN-India
Consultant Glancy Global solutions
Contractor: Blue Star Limited
Client: Alliancce Mall Developers
Designation Project Engineer – Electrical
Prozone Mall One of the biggest mall in Coimbatore with shops and theater
facilities in one door steps.
ROLE AND RESPONSIBILITIES
• Installation Of 11 Kv Indoor Ring main unit
• Installtion of 11 Kv HT VCB Panel
• Installation of 2 Nos of 1600 Kva Transformer
• Installation 1500 Kva DG
• Installation of MV Panels and HT panels
• Performimg the Documentation works involved in the projects
• Executing the electrical works like cabling, wiring, Installation of Light fittings and panel
installation works in the projects
• Bill Preparation for the project
• Worked as a Electrical Engineer in C.S.Projects(I) Pvt Ltd From Jan 2014 to June 2016
PROJECT
Project Name Texvalley-Erode-TN-India
Consultant C.S Project (I) Pvt Ltd
Contractor: URC Construction
Client: Lotus Group Erode.
Designer: Tritech Engineering & Zaxis Engineering Solutions
Designation Project Engineer – Electrical
Texvalley is the India’s first biggest textile mall which is made world class
trading buying and selling centre by Lotus group and central government collaboration. Texvalley
Around 16.7 lakhs square feet building area
ROLE AND RESPONSIBILITIES
ELECTRICAL ROLES
• Completed the Installation of 3 nos of 2000Kva Outdoor type Volt Amp Transformers
In Site
• Installed 22KV, 3PANEL VCB – Indoor Panel With IP 54 Protection
• Megawin Switchgear for Entire HT Switchgear Range upto 33 KV comprising of VCB
Panels (3.6 KV to 36 KV)
• Completed the Installation 1010 Kva DG In site
• Installed 1250A Sadwitch BBT of about 600 Rmts In our Site
• Installed 250 A Air Insulated BBT of about 5000 Rmts In our site
• General supervision and inspect the installation, modification and commissioning of
Electrical Low Voltage systems at construction sites
• Monitor, verify, and document the work being performed through site.
• To ensure proper implementation of design at site.
• Provide technical assistance to the construction team as needed.
• Ensure that all ELV Systems are conducted under controlled conditions as per shop
drawings, method statements, specification and work plan
• To coordinate with other engineering discipline.
• To handle the complete Low Voltage installation, testing, commissioning (CCTV, Fire
Alarm Systems and Public Addressing System)
• Plan, review, and coordinate design and construction operations to ensure compliance
with design drawings and specifications
• Investigate equipment and system failures or unexpected maintenance problems
• To ensure safety standards and procedures are implemented and followed in accordance
with contract requirements and Company guidelines
PERSONAL DETAILS
Fathers Name : R.M.M. Mohammed Kaja Asraf Ali
Date of Birth : 23.11.1991
Languages Known : Tamil- Read,Write and Speak
English-Read,Write and Speak
Arabic-Read and Write.
Address : 23/28,E.K.H.M.Line,B.P.Agraharam,Erode-638005
PLACE:
DATE : [M.K.RIFAY AHAMED]

More Related Content

What's hot (10)

abmcv Dec 2016
abmcv Dec 2016abmcv Dec 2016
abmcv Dec 2016
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Govindaraj. K (1)
Govindaraj. K (1)Govindaraj. K (1)
Govindaraj. K (1)
 
Nithn CV
Nithn CVNithn CV
Nithn CV
 
Udai
UdaiUdai
Udai
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
ROBERT BROWN CV 2015
ROBERT BROWN CV 2015ROBERT BROWN CV 2015
ROBERT BROWN CV 2015
 
Rahul1
Rahul1Rahul1
Rahul1
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
girish_cv
girish_cvgirish_cv
girish_cv
 

Viewers also liked (16)

Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12
 
Resume, Ian Purdie, 08-02-2016
Resume, Ian Purdie, 08-02-2016Resume, Ian Purdie, 08-02-2016
Resume, Ian Purdie, 08-02-2016
 
Patrick Greer Senior Resume
Patrick Greer Senior ResumePatrick Greer Senior Resume
Patrick Greer Senior Resume
 
PAJ M 5 resume
PAJ M 5 resumePAJ M 5 resume
PAJ M 5 resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Seo cv
Seo cvSeo cv
Seo cv
 
Josh Higgins Resume
Josh Higgins ResumeJosh Higgins Resume
Josh Higgins Resume
 
RESUME - SIRJAN NAGPAL
RESUME - SIRJAN NAGPALRESUME - SIRJAN NAGPAL
RESUME - SIRJAN NAGPAL
 
RESUME
RESUMERESUME
RESUME
 
suchitra (suchi)resume NEW 2
suchitra (suchi)resume  NEW 2suchitra (suchi)resume  NEW 2
suchitra (suchi)resume NEW 2
 
annukurni_resume
annukurni_resumeannukurni_resume
annukurni_resume
 
Resume_Main
Resume_MainResume_Main
Resume_Main
 
Resume-rajatjain
Resume-rajatjainResume-rajatjain
Resume-rajatjain
 
John Marks - Resume October 2015
John Marks - Resume October 2015John Marks - Resume October 2015
John Marks - Resume October 2015
 
Goutam_Sahoo_Resume
Goutam_Sahoo_ResumeGoutam_Sahoo_Resume
Goutam_Sahoo_Resume
 
Resume -Senthil Kumar
Resume -Senthil Kumar Resume -Senthil Kumar
Resume -Senthil Kumar
 

Similar to Resume (20)

CV ( Muzamil)
CV ( Muzamil)  CV ( Muzamil)
CV ( Muzamil)
 
Samar khan resume (1)
Samar khan resume (1)Samar khan resume (1)
Samar khan resume (1)
 
junaid cv
junaid cvjunaid cv
junaid cv
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Tamer Mohamed
Tamer Mohamed Tamer Mohamed
Tamer Mohamed
 
Er_Manish_Patel (CV)
Er_Manish_Patel (CV)Er_Manish_Patel (CV)
Er_Manish_Patel (CV)
 
2015.Nov.Resume Eric Kaplun
2015.Nov.Resume Eric Kaplun2015.Nov.Resume Eric Kaplun
2015.Nov.Resume Eric Kaplun
 
Updated resume.pdf
Updated resume.pdfUpdated resume.pdf
Updated resume.pdf
 
Ansari_EEE
Ansari_EEEAnsari_EEE
Ansari_EEE
 
Isyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad ResumeIsyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad Resume
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
Rod Lavan CV - Oct 2015
Rod Lavan CV - Oct 2015Rod Lavan CV - Oct 2015
Rod Lavan CV - Oct 2015
 
Resume_(2)
Resume_(2)Resume_(2)
Resume_(2)
 
Resume
ResumeResume
Resume
 
VIJAY Resume
VIJAY ResumeVIJAY Resume
VIJAY Resume
 
electrical engineer
electrical engineerelectrical engineer
electrical engineer
 
dhanaraj
dhanarajdhanaraj
dhanaraj
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
 
LIJAS CV
LIJAS CVLIJAS CV
LIJAS CV
 

Resume

  • 1. M.K.RIFAY AHAMED Contact no: +91 9715107213 Mail me: rifayeie@gmail.com CAREER OBJECTIVE Seeking a challenging environment that encourages continuous learning and creativity that provides exposure to new ideas and stimulates personal and professional growth. EDUCATIONAL QUALIFICATION Name of the Degree Name of the College / University Year of Passing Area of Specialization % of Marks B.E. Kongu Engineering College(Autonomous), Perundurai, Erode 2013 Electronics and Instrumentation 77.9 Higher Secondary (HSC) A.T.M. Higher Secondary School, Erode 2009 Mathematics, Physics, Chemistry, Computer Science 89 SSLC Government High School, B.P.Agraharam, Erode 2007 Tamil, English, Mathematics, Science, Social Sciences 86.6 ACHIEVEMENTS  School First in SSLC  Got a Prize from Erode District Collector in SSLC  School Third in Higher Secondary  Got ‘S’ grade in Engineering Mathematics-III SKILL SET  Basics of Auto Cad, Microsoft Office  HTML 4
  • 2. • Currently working as a Electrical Engineer in Blue Star LTD Since June 2016 PROJECT Project Name Prozone Mall-Coimbatore-TN-India Consultant Glancy Global solutions Contractor: Blue Star Limited Client: Alliancce Mall Developers Designation Project Engineer – Electrical Prozone Mall One of the biggest mall in Coimbatore with shops and theater facilities in one door steps. ROLE AND RESPONSIBILITIES • Installation Of 11 Kv Indoor Ring main unit • Installtion of 11 Kv HT VCB Panel • Installation of 2 Nos of 1600 Kva Transformer • Installation 1500 Kva DG • Installation of MV Panels and HT panels • Performimg the Documentation works involved in the projects • Executing the electrical works like cabling, wiring, Installation of Light fittings and panel installation works in the projects • Bill Preparation for the project • Worked as a Electrical Engineer in C.S.Projects(I) Pvt Ltd From Jan 2014 to June 2016 PROJECT Project Name Texvalley-Erode-TN-India Consultant C.S Project (I) Pvt Ltd Contractor: URC Construction Client: Lotus Group Erode. Designer: Tritech Engineering & Zaxis Engineering Solutions Designation Project Engineer – Electrical Texvalley is the India’s first biggest textile mall which is made world class trading buying and selling centre by Lotus group and central government collaboration. Texvalley Around 16.7 lakhs square feet building area ROLE AND RESPONSIBILITIES ELECTRICAL ROLES • Completed the Installation of 3 nos of 2000Kva Outdoor type Volt Amp Transformers In Site
  • 3. • Installed 22KV, 3PANEL VCB – Indoor Panel With IP 54 Protection • Megawin Switchgear for Entire HT Switchgear Range upto 33 KV comprising of VCB Panels (3.6 KV to 36 KV) • Completed the Installation 1010 Kva DG In site • Installed 1250A Sadwitch BBT of about 600 Rmts In our Site • Installed 250 A Air Insulated BBT of about 5000 Rmts In our site • General supervision and inspect the installation, modification and commissioning of Electrical Low Voltage systems at construction sites • Monitor, verify, and document the work being performed through site. • To ensure proper implementation of design at site. • Provide technical assistance to the construction team as needed. • Ensure that all ELV Systems are conducted under controlled conditions as per shop drawings, method statements, specification and work plan • To coordinate with other engineering discipline. • To handle the complete Low Voltage installation, testing, commissioning (CCTV, Fire Alarm Systems and Public Addressing System) • Plan, review, and coordinate design and construction operations to ensure compliance with design drawings and specifications • Investigate equipment and system failures or unexpected maintenance problems • To ensure safety standards and procedures are implemented and followed in accordance with contract requirements and Company guidelines PERSONAL DETAILS Fathers Name : R.M.M. Mohammed Kaja Asraf Ali Date of Birth : 23.11.1991 Languages Known : Tamil- Read,Write and Speak English-Read,Write and Speak Arabic-Read and Write. Address : 23/28,E.K.H.M.Line,B.P.Agraharam,Erode-638005 PLACE: DATE : [M.K.RIFAY AHAMED]