• Project Goal
• Why Green Line PTC/Evaluation Criteria?
• Key Findings
• Maintaining Green Line Service Characteristics
• Projected Implementation Costs
• Next Steps
• Project Implementation Schedule
• Q&A
2
Project Goal
• Provide safe, reliable and efficient service to the
traveling public
• Limit the risk of an accident by on the MBTA’s Green
Line by implementing a Positive Train Control (PTC)
system
• Project divided into three phases:
– Phase I – Vehicle Collision Avoidance Assessment
– Phase II – Condition Assessment
– Phase III – Alternatives Analysis
and Recommendations
3
Positive Train Control
• Positive Train Control is a system to prevent:
– Train‐to‐train collisions
– Excessive speed derailments, including derailments
related to curve restrictions, and slow orders
– Train incursions into established work zones
– Movement through main line switch in the incorrect
position.
4
Why Green Line PTC?
The National Transportation Safety Board (NTSB)
investigation of a Green Line May 2008 incident, which
involved one fatality and multiple injuries, concluded:
“This accident could have been prevented had the Massachusetts Bay Transportation
Authority Green Line been equipped with a positive train control system that could have
intervened to stop train 3667 before it could strike the rear of train 3681.”
Synergies of PTC and Green Line “state of good repair”
investments,
• Track switch replacement
• Microprocessor interlockings
• Replacement of obsolete signal components
• Improved communications (Fiber backbone)
5
MBTA Green Line PTC Phase III
Alternatives Analysis Evaluation Criteria
• Operational Improvements/Impact
• Order of Magnitude Cost
• In‐service History
• System Design Principles
• Impact on Collision Avoidance
• Vehicle Considerations
• Infrastructure Improvement
• Modification and Expansion
• Fall‐back Operations
• Additional Operational Advantages
• Feasibility of Implementation
6
Green Line PTC Key Findings
Maintaining Green Line Service Characteristics
• Green Line with each of the 3 PTC Technologies (Moving
Block, Virtual Block, Distance-to-Go) was simulated.
– PTC results in degradations in travel times, passenger wait
times, and throughputs
– PTC will require mitigation in order to maintain current Green
Line customer experience.
• Three mitigation scenarios based upon speed
improvements were simulated.
– Speed Improvements
– Infrastructure Improvements
– Three Car Operations
• Mitigation strategies improved throughput and travel
times.
7
Green Line PTC Key Findings
• Scores of 3 PTC technologies differ by less than 2
percent.
• MBTA should progress PTC preliminary design while
maintaining ability to support any of the 3
technologies.
• As detailed plans and specifications are developed,
MBTA opt for:
– Specification of a particular technology or;
– Selection of a supplier/integrator based on a
performance specification not tied to one
technology.
(Cont.)
8
Maintaining Green Line Service
Characteristics – Trip Time
Baseline
NotFeasible
PTC without
Mitigation PTC with Mitigation
PTC with
Speed Increase &
3-Car Ops
PTC with
Vehicle
Changes
PTC with
Operational
Changes
PTC with
Speed
Increases
Better than or
equal to Baseline
9
AverageTripTime–CentralSubway
Maintaining Green Line Service
Characteristics – Central Subway Throughput
Baseline
NotFeasible
PTC without
Mitigation PTC with Mitigation
PTC with
Speed Increase &
3-Car Ops
PTC with
Vehicle
Changes
PTC with
Operational
Changes
PTC with
Speed
Increases
Better than or
equal to Baseline
10
PassengersperHour
Projected Implementation Costs
• Estimated Green Line PTC capital cost (2012 $):
– CBTC Moving Block - $662 million,
– CBTC Virtual Block - $645 million
– DTG estimated - $721 million
– Estimates include train control and vehicle installation costs for
a “live” system
– Estimates reflect PTC mitigation, including track upgrades,
turnout replacement and additional vehicles/power system
upgrades to support 3‐car operation
11
Green Line PTC Next Steps
• Address Green Line train control “state of good
repair” issues,
– Build out fiber backbone,
– Track circuit replacement,
– Replace interlockings for better reliability, make
them “PTC ready”,
– Track switch replacement (reliability, speed
improvements)
• These projects will make Green Line “PTC Ready” and
provide improved service (better passenger
information, reliability and travel times),
12
Green Line PTC Next Steps (GLX)
• GLX can serve as Green Line PTC initial deployment
phase (vehicles, central control and wayside),
– Improves implementation efficiency by eliminating
revenue operating constraints during construction,
– Provides signal system cost savings versus wayside
signaling now and PTC after GLX opens.
13
(Cont.)
Green Line PTC Implementation Schedule
Standard Procurement (Months)
6
12
18
24
30
36
42
48
54
60
66
72
78
84
90
96
102
108
114
120
Consultant Design
Prebid/Bid & Award
Final Design Submittals
& Review
Manufacturing of Equipment
& Factory Testing
Vehicle Installation
Field & OCC Installation
Testing and Certification
Total Duration
18 Months
18 Months
12 Months
30 Months
48 Months
60 Months
18 Months
9 Years
14
Decision
point – 22
months
Summary
• Begin PTC design and Readiness Projects
• State of good repair projects also achieve PTC
readiness
– Immediate benefit to riding public through decreased travel
times and increased service reliability
• Green Line Extension (GLX) provides unique
opportunity for Testing and Validation
15
Q&A
16

More Related Content

What's hot

1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
Ello Weits
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4
armada7000
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
Rakesh Venkateswaran
 

What's hot (20)

Urban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An OverviewUrban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An Overview
 
Traffic Conditions - From Now Until Forever
Traffic Conditions - From Now Until ForeverTraffic Conditions - From Now Until Forever
Traffic Conditions - From Now Until Forever
 
demandlocker_TRB_v3
demandlocker_TRB_v3demandlocker_TRB_v3
demandlocker_TRB_v3
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council Presentation
 
Session 38 Anahid Nabavi Larijani
Session 38 Anahid Nabavi LarijaniSession 38 Anahid Nabavi Larijani
Session 38 Anahid Nabavi Larijani
 
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and EmissionsTraffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
 
Antony johnstone m_v2
Antony johnstone m_v2Antony johnstone m_v2
Antony johnstone m_v2
 
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
 
Traffic Lights Control System for Indian Cities using WSN and Fuzzy Control
Traffic Lights Control System for Indian Cities using WSN and Fuzzy ControlTraffic Lights Control System for Indian Cities using WSN and Fuzzy Control
Traffic Lights Control System for Indian Cities using WSN and Fuzzy Control
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4
 
Tim gray
Tim grayTim gray
Tim gray
 
Appointment system tru x_usc_hackathon
Appointment system tru x_usc_hackathonAppointment system tru x_usc_hackathon
Appointment system tru x_usc_hackathon
 
Adding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalAdding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette International
 
CV_SIG_DES_MG_Dastagir 07_11_2016
CV_SIG_DES_MG_Dastagir 07_11_2016CV_SIG_DES_MG_Dastagir 07_11_2016
CV_SIG_DES_MG_Dastagir 07_11_2016
 
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.20165th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
 
CV_Shrikant
CV_ShrikantCV_Shrikant
CV_Shrikant
 
Traffic signal
Traffic signalTraffic signal
Traffic signal
 
Session 38 Xiaoliang Ma
Session 38 Xiaoliang MaSession 38 Xiaoliang Ma
Session 38 Xiaoliang Ma
 
(Slides) A Technique for Information Sharing using Inter-Vehicle Communicatio...
(Slides) A Technique for Information Sharing using Inter-Vehicle Communicatio...(Slides) A Technique for Information Sharing using Inter-Vehicle Communicatio...
(Slides) A Technique for Information Sharing using Inter-Vehicle Communicatio...
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
 

Viewers also liked

Fiilde Zaman
Fiilde ZamanFiilde Zaman
Fiilde Zaman
yardimt
 
Solution of the French mystery
Solution of the French mysterySolution of the French mystery
Solution of the French mystery
Eva Rekkedal
 
Dilbilgisi
DilbilgisiDilbilgisi
Dilbilgisi
yardimt
 
The Czech town mystery
The Czech town mysteryThe Czech town mystery
The Czech town mystery
Eva Rekkedal
 
Then our buildings shape us 10 minutes
Then our buildings shape us   10 minutesThen our buildings shape us   10 minutes
Then our buildings shape us 10 minutes
Tim Berglund
 
Writing presentation bob wilson - dec 2010
Writing presentation   bob wilson - dec 2010Writing presentation   bob wilson - dec 2010
Writing presentation bob wilson - dec 2010
Ed Ingman
 

Viewers also liked (20)

Why the 66 is broken
Why the 66 is brokenWhy the 66 is broken
Why the 66 is broken
 
MBTA Passenger Communications Report - February 2014
MBTA Passenger Communications Report - February 2014MBTA Passenger Communications Report - February 2014
MBTA Passenger Communications Report - February 2014
 
Fiilde Zaman
Fiilde ZamanFiilde Zaman
Fiilde Zaman
 
Hot Chocolate
Hot ChocolateHot Chocolate
Hot Chocolate
 
Why it takes 7 13 touches dmanc 011514-presentation_slides
Why it takes 7 13 touches dmanc 011514-presentation_slidesWhy it takes 7 13 touches dmanc 011514-presentation_slides
Why it takes 7 13 touches dmanc 011514-presentation_slides
 
Norway activities, finish
Norway   activities, finishNorway   activities, finish
Norway activities, finish
 
Solution of the French mystery
Solution of the French mysterySolution of the French mystery
Solution of the French mystery
 
Unit 5, GRE401
Unit 5, GRE401Unit 5, GRE401
Unit 5, GRE401
 
Dilbilgisi
DilbilgisiDilbilgisi
Dilbilgisi
 
stuboi
stuboistuboi
stuboi
 
Syndcom
SyndcomSyndcom
Syndcom
 
The Czech town mystery
The Czech town mysteryThe Czech town mystery
The Czech town mystery
 
20100227 U Xcamp Seoul
20100227 U Xcamp Seoul20100227 U Xcamp Seoul
20100227 U Xcamp Seoul
 
Then our buildings shape us 10 minutes
Then our buildings shape us   10 minutesThen our buildings shape us   10 minutes
Then our buildings shape us 10 minutes
 
Writing presentation bob wilson - dec 2010
Writing presentation   bob wilson - dec 2010Writing presentation   bob wilson - dec 2010
Writing presentation bob wilson - dec 2010
 
Ideate Assignment - Kerry Maton
Ideate Assignment - Kerry MatonIdeate Assignment - Kerry Maton
Ideate Assignment - Kerry Maton
 
Rw Newsletter24
Rw Newsletter24Rw Newsletter24
Rw Newsletter24
 
Memorial
MemorialMemorial
Memorial
 
9 immutable laws presentation Direct Marketing Association #dma13 in Chicago.
9 immutable laws presentation Direct Marketing Association #dma13 in Chicago.  9 immutable laws presentation Direct Marketing Association #dma13 in Chicago.
9 immutable laws presentation Direct Marketing Association #dma13 in Chicago.
 
Idei de amenajari interioare
Idei de amenajari interioareIdei de amenajari interioare
Idei de amenajari interioare
 

Similar to MBTA Green Line Positive Train Control Project

Final Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP OrdersFinal Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP Orders
Brian Kaiser, PE
 
MetroRapid board_ops_committee
MetroRapid board_ops_committeeMetroRapid board_ops_committee
MetroRapid board_ops_committee
castillog123
 
Sofia Poster - cc edits (2)
Sofia Poster - cc edits (2)Sofia Poster - cc edits (2)
Sofia Poster - cc edits (2)
Sofia Faraz
 

Similar to MBTA Green Line Positive Train Control Project (20)

Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 
Presentation1 (1).pptx
Presentation1 (1).pptxPresentation1 (1).pptx
Presentation1 (1).pptx
 
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARETRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony Johnstone
 
AITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerAITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan Stirzaker
 
Condition-based Maintenance for High-speed Fleet
Condition-based Maintenance for High-speed FleetCondition-based Maintenance for High-speed Fleet
Condition-based Maintenance for High-speed Fleet
 
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two ImplementationTraffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
 
Rail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on TrainsRail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on Trains
 
Mysore, pilot project
Mysore, pilot projectMysore, pilot project
Mysore, pilot project
 
AITPM Risk and Governance
AITPM Risk and GovernanceAITPM Risk and Governance
AITPM Risk and Governance
 
Final Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP OrdersFinal Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP Orders
 
CNG NETWORK PPT.pdf
CNG NETWORK PPT.pdfCNG NETWORK PPT.pdf
CNG NETWORK PPT.pdf
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
MetroRapid board_ops_committee
MetroRapid board_ops_committeeMetroRapid board_ops_committee
MetroRapid board_ops_committee
 
9 pilot projects rs final
9 pilot projects rs final9 pilot projects rs final
9 pilot projects rs final
 
Sofia Poster - cc edits (2)
Sofia Poster - cc edits (2)Sofia Poster - cc edits (2)
Sofia Poster - cc edits (2)
 
Rethinking the Next Generation of BRT in China
Rethinking the Next Generation of BRT in ChinaRethinking the Next Generation of BRT in China
Rethinking the Next Generation of BRT in China
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance
 

Recently uploaded

Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 

Recently uploaded (20)

Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 

MBTA Green Line Positive Train Control Project

  • 1. PRESENTATION MBTA Green Line Positive Train Control Project Presented to: MBTA Board of Directors | December 2012
  • 2. Agenda • Project Goal • Why Green Line PTC/Evaluation Criteria? • Key Findings • Maintaining Green Line Service Characteristics • Projected Implementation Costs • Next Steps • Project Implementation Schedule • Q&A 2
  • 3. Project Goal • Provide safe, reliable and efficient service to the traveling public • Limit the risk of an accident by on the MBTA’s Green Line by implementing a Positive Train Control (PTC) system • Project divided into three phases: – Phase I – Vehicle Collision Avoidance Assessment – Phase II – Condition Assessment – Phase III – Alternatives Analysis and Recommendations 3
  • 4. Positive Train Control • Positive Train Control is a system to prevent: – Train‐to‐train collisions – Excessive speed derailments, including derailments related to curve restrictions, and slow orders – Train incursions into established work zones – Movement through main line switch in the incorrect position. 4
  • 5. Why Green Line PTC? The National Transportation Safety Board (NTSB) investigation of a Green Line May 2008 incident, which involved one fatality and multiple injuries, concluded: “This accident could have been prevented had the Massachusetts Bay Transportation Authority Green Line been equipped with a positive train control system that could have intervened to stop train 3667 before it could strike the rear of train 3681.” Synergies of PTC and Green Line “state of good repair” investments, • Track switch replacement • Microprocessor interlockings • Replacement of obsolete signal components • Improved communications (Fiber backbone) 5
  • 6. MBTA Green Line PTC Phase III Alternatives Analysis Evaluation Criteria • Operational Improvements/Impact • Order of Magnitude Cost • In‐service History • System Design Principles • Impact on Collision Avoidance • Vehicle Considerations • Infrastructure Improvement • Modification and Expansion • Fall‐back Operations • Additional Operational Advantages • Feasibility of Implementation 6
  • 7. Green Line PTC Key Findings Maintaining Green Line Service Characteristics • Green Line with each of the 3 PTC Technologies (Moving Block, Virtual Block, Distance-to-Go) was simulated. – PTC results in degradations in travel times, passenger wait times, and throughputs – PTC will require mitigation in order to maintain current Green Line customer experience. • Three mitigation scenarios based upon speed improvements were simulated. – Speed Improvements – Infrastructure Improvements – Three Car Operations • Mitigation strategies improved throughput and travel times. 7
  • 8. Green Line PTC Key Findings • Scores of 3 PTC technologies differ by less than 2 percent. • MBTA should progress PTC preliminary design while maintaining ability to support any of the 3 technologies. • As detailed plans and specifications are developed, MBTA opt for: – Specification of a particular technology or; – Selection of a supplier/integrator based on a performance specification not tied to one technology. (Cont.) 8
  • 9. Maintaining Green Line Service Characteristics – Trip Time Baseline NotFeasible PTC without Mitigation PTC with Mitigation PTC with Speed Increase & 3-Car Ops PTC with Vehicle Changes PTC with Operational Changes PTC with Speed Increases Better than or equal to Baseline 9 AverageTripTime–CentralSubway
  • 10. Maintaining Green Line Service Characteristics – Central Subway Throughput Baseline NotFeasible PTC without Mitigation PTC with Mitigation PTC with Speed Increase & 3-Car Ops PTC with Vehicle Changes PTC with Operational Changes PTC with Speed Increases Better than or equal to Baseline 10 PassengersperHour
  • 11. Projected Implementation Costs • Estimated Green Line PTC capital cost (2012 $): – CBTC Moving Block - $662 million, – CBTC Virtual Block - $645 million – DTG estimated - $721 million – Estimates include train control and vehicle installation costs for a “live” system – Estimates reflect PTC mitigation, including track upgrades, turnout replacement and additional vehicles/power system upgrades to support 3‐car operation 11
  • 12. Green Line PTC Next Steps • Address Green Line train control “state of good repair” issues, – Build out fiber backbone, – Track circuit replacement, – Replace interlockings for better reliability, make them “PTC ready”, – Track switch replacement (reliability, speed improvements) • These projects will make Green Line “PTC Ready” and provide improved service (better passenger information, reliability and travel times), 12
  • 13. Green Line PTC Next Steps (GLX) • GLX can serve as Green Line PTC initial deployment phase (vehicles, central control and wayside), – Improves implementation efficiency by eliminating revenue operating constraints during construction, – Provides signal system cost savings versus wayside signaling now and PTC after GLX opens. 13 (Cont.)
  • 14. Green Line PTC Implementation Schedule Standard Procurement (Months) 6 12 18 24 30 36 42 48 54 60 66 72 78 84 90 96 102 108 114 120 Consultant Design Prebid/Bid & Award Final Design Submittals & Review Manufacturing of Equipment & Factory Testing Vehicle Installation Field & OCC Installation Testing and Certification Total Duration 18 Months 18 Months 12 Months 30 Months 48 Months 60 Months 18 Months 9 Years 14 Decision point – 22 months
  • 15. Summary • Begin PTC design and Readiness Projects • State of good repair projects also achieve PTC readiness – Immediate benefit to riding public through decreased travel times and increased service reliability • Green Line Extension (GLX) provides unique opportunity for Testing and Validation 15