CURRICULLUMVITAE
Martin Pallister
Functional summary
 ADDRESS : 38 Pienaar Str
 Witbank
 1034
 Telephone no : 0721918825
 Health Good
 Married
 Drivers license code 08 [EB]
 ID no : 6807055056081
2005– Present
Master Artisan Instruments. Highveld Steel
 Calibrations of Tx’s; I/P’s; Kinetrols; Mass Probars; Magflows and
Power cylinders.
 Calibration & maintenance of O2 Analysers
 Temparature control loops using Type S, K and pt 100's
 CCTV installations & maintenance
 Fault finding with use of PLC5 & Logix5000
 Training of Appy’s & Students
 Spares control
 Calibration & maintenance of Portable & fixed gas detectors.
Crowcon tetra3
 Installations and commissioning of all instruments
 Maintenance & repair of flame pack detection
 Wiring of PLC’s & panels
 Maintenance & repair to solenoid actuators
Summary of
work
experience
 Process control of Pusher & Walking beam re heat furnaces
 Control of annealing furnace.(Normalizer furnace)
 Use of SCADA for furnace control
2002 - 2005
Workshop Manager CSM Warmbaths
*0 Overseeing of Technicians
*1 Daily running of workshop
*2 Electronic repairs to component level
*3 Ordering of spares
*4 Communication with major suppliers & manufacturers
*5 Repairs to electronic appliances ie; Tv’s, Hi-Fi’s DVD’s
*6 Customer relations
 2000 - 2002
 Worked for cellphone company Celltalk
In charge of all repairs & refurbishments to cellphones
Came back to South Africa
1994 - 2000
Went abroad for further experience
Seaward Electronics
Electronic Supervisor
*0 Repair & calibration of electrical test equipment
*1 Fault finding to component level
*2 Overseeing of all spares
*3 Control of receiving & dispatching of repaired items
*4 Customer relations
*5 All aspects of administration
*6 Quality control to ISO9001 standard
*7 Use of various PC programs for reports
1993 - 1994
Instrument Mech Highveld Steel [Anglo
American plc group]
*8 Project planning
*9 Upkeep of all plant equipment on shift
*10 Maintainance and fault finding on Modicon 584 with P190
controller
*11 Over head crane maintainance and repair.(limit switches)
*12 Installing & upkeep of angle encoders
1990 - 1993
Apprentice
*0 Instrumentation Highveld Steel
Trade Test Olifantsfontein 1993 red seal
Tertiary Education
*7 N1-N2 Elctrical maintenance [Witbank Technical College]
*8 N3 Electrotechnology & Instrumentation [WTC]
*9 N4 Electronics & Instrumentation [WTC]
Career Courses
*10 Factory Talk ViewSE Programming [Rockwell]
*11 Fundamentals of AC & DC Drives [Rockwell]
*12 Fundamentals of Logix5000 [Rockwell]
*13 PLC5 Programming [Rockwell]
*14 Reliability Centered Maintenance
*15 Q A for Supervisors
*16 Supervisory Skills
*17 Outcomes Based Safety Training Level 1-3
*18 Electrical Flexability Training
All original certificates will be produced on interview.
Afrikaans, English,
REFEREES
Mr P J Swallow 0722500987
Languages
Mr J Lombard 0834542145
Mr J.L.C Friend 0842473871

Martin Cv

  • 1.
    CURRICULLUMVITAE Martin Pallister Functional summary ADDRESS : 38 Pienaar Str  Witbank  1034  Telephone no : 0721918825  Health Good  Married  Drivers license code 08 [EB]  ID no : 6807055056081 2005– Present Master Artisan Instruments. Highveld Steel  Calibrations of Tx’s; I/P’s; Kinetrols; Mass Probars; Magflows and Power cylinders.  Calibration & maintenance of O2 Analysers  Temparature control loops using Type S, K and pt 100's  CCTV installations & maintenance  Fault finding with use of PLC5 & Logix5000  Training of Appy’s & Students  Spares control  Calibration & maintenance of Portable & fixed gas detectors. Crowcon tetra3  Installations and commissioning of all instruments  Maintenance & repair of flame pack detection  Wiring of PLC’s & panels  Maintenance & repair to solenoid actuators Summary of work experience
  • 2.
     Process controlof Pusher & Walking beam re heat furnaces  Control of annealing furnace.(Normalizer furnace)  Use of SCADA for furnace control 2002 - 2005 Workshop Manager CSM Warmbaths *0 Overseeing of Technicians *1 Daily running of workshop *2 Electronic repairs to component level *3 Ordering of spares *4 Communication with major suppliers & manufacturers *5 Repairs to electronic appliances ie; Tv’s, Hi-Fi’s DVD’s *6 Customer relations  2000 - 2002  Worked for cellphone company Celltalk In charge of all repairs & refurbishments to cellphones Came back to South Africa 1994 - 2000 Went abroad for further experience Seaward Electronics Electronic Supervisor *0 Repair & calibration of electrical test equipment *1 Fault finding to component level *2 Overseeing of all spares *3 Control of receiving & dispatching of repaired items *4 Customer relations *5 All aspects of administration *6 Quality control to ISO9001 standard *7 Use of various PC programs for reports 1993 - 1994 Instrument Mech Highveld Steel [Anglo American plc group] *8 Project planning
  • 3.
    *9 Upkeep ofall plant equipment on shift *10 Maintainance and fault finding on Modicon 584 with P190 controller *11 Over head crane maintainance and repair.(limit switches) *12 Installing & upkeep of angle encoders 1990 - 1993 Apprentice *0 Instrumentation Highveld Steel Trade Test Olifantsfontein 1993 red seal Tertiary Education *7 N1-N2 Elctrical maintenance [Witbank Technical College] *8 N3 Electrotechnology & Instrumentation [WTC] *9 N4 Electronics & Instrumentation [WTC] Career Courses *10 Factory Talk ViewSE Programming [Rockwell] *11 Fundamentals of AC & DC Drives [Rockwell] *12 Fundamentals of Logix5000 [Rockwell] *13 PLC5 Programming [Rockwell] *14 Reliability Centered Maintenance *15 Q A for Supervisors *16 Supervisory Skills *17 Outcomes Based Safety Training Level 1-3 *18 Electrical Flexability Training All original certificates will be produced on interview. Afrikaans, English, REFEREES Mr P J Swallow 0722500987 Languages
  • 4.
    Mr J Lombard0834542145 Mr J.L.C Friend 0842473871