SlideShare a Scribd company logo
Nagy Ibraheem Abo El-Khair 
nagy.khair@schneider-electric.com 
nagy.khair@gmail.com 
Mobile : EGY +2 0100 55 35 617 
Summary of Skills: 
- Automation: Control System Engineer at Schneider Electric “Invensys”, EAST & AESC . 
- Electrical : Technical Engineer with EAST Company for Electrical Cabinet Design 
Integration (Low voltage). 
Professional Work Experiences: 
A- Schneider Electric “ Invensys” (March 2012 till present) 
- Senior Project Application Engineer – Triconex 
Triconex Hardware Design (Tricon & Trident) 
TriStation 1131 Application Development 
Database Handling 
SOE Configuration 
Program Emulation 
Reading P&ID diagrams and process study 
Logic Diagram Implementation. 
- IMESA - EEC Office Coordinator and responsible for : 
Developing project strategies. 
Create cost plan for the project. 
Selecting resource for the required tasks. 
Attending corporate HR meetings. 
Coordinating meetings 
Creating a project management calendar 
Administrative duties 
- Projects Experience: 
QATARGAS WASTE WATER TREATMENT PLANT-. QTR 
(INVENSYS / QCON / QatarGas) 
Expand the current system for Fire & Gas by: 
1- Study the current F&G system (system and marshaling cabinets and Logic) 
2- Add more than 50 I/O signals. 
3- New Logic modification according to new C&E. 
4- New hardware modification to meet the requirements. 
5- Supervision at site for all activities 
6- SAT , commissioning and start-up.
ASSIL & KARAM WELL HEADS - EGY 
(INVENSYS / ENNPI / BADR ELDEEN) 
Activities: 
Act as Lead Engineer for Engineering, Pre commission, commissioning and start up for 
Oil Wells based on TRIDENT controller which communicate with HMI to provide the 
following operations: 
1- SSV Shutdown. 
2- Chock valve control. 
3- Corrosion Inhibitor Control. 
4- Monitor and control of instrument. 
5- Oil flow calculation. 
And my role is: 
1- HW Design. 
2- Drawing updates “supervision for 2 engineers and CAD team”. 
3- Supervision for cabinet’s integration. 
4- Lead 2 engineers for Pre-FAT and FAT. 
5- Lead 2 engineers for SW update and download. 
KHUFF GAS WELL HEADS SHUTDOWN - KSA 
(INVENSYS / SAUDI ARAMCO) 
Activities Act as Lead Engineer for Engineering, FAT, Pre commission, commissioning and 
start up for Gas Wells “125 Cabinets” based on TRIDENT controller which communicate 
with SCADA system “YOKOGAWA” to provide the following operations: 
1- SSV Shutdown. 
2- Chock valve control. 
3- Corrosion Inhibitor Control. 
4- Monitor and control of instrument. 
5- Gas flow calculation. 
And my role is: 
1- HW Design. 
2- Drawing updates “supervision for 2 engineers and CAD team”. 
3- Supervision for cabinets integration (125 cabinets) 
4- Material purchasing arrangement. 
5- Responsible for all Materials for the project. 
6- Lead 2 engineers for Pre-FAT and FAT. 
7- Lead 2 engineers for SW update and download. 
8- Preparing and tracking of ARAMCO latest standards through TOC (table of 
compliance) 
9- Handling Customer meetings to discuss ARAMCO standard to be comply with our 
project. 
10-Responsible for cabinet’s shipment to customer and receiving delivery notes.
SHAYBAH IGHC - KSA 
(INVENSYS / SAMSUNG / SAUDI ARAMCO) 
Activities: 
Engineering, FAT, IFAT, SAT and ISAT completion and pre commission for GOSP4 “23 
Cabinets” based on TRICON controller that communicate with DCS system “FOXBORO” 
and CCS system “ TRIDENT” to provide a complete ESD system for Crude, Gas, utility 
areas. 
Upgrade firmware for old module to be compatible with new modules. 
HELIUM 2 PROJECT - QATAR 
(INVENSYS / AIRLIQUIED / RAS GAS) 
Activities: 
SAT completion, Pre commission, commissioning and start up for new unit Helium 2 
based on TRICON controller which communicate with DCS system “FOXBORO” and to 
provide a complete ESD & FGD systems for new unit. 
GASAL AIR SEPARATION UNIT GASEOUS OXYGEN SUPPLY LINE - QATAR 
(INVENSYS / ALBALAGH / ORYX GTL) 
Activities: 
SAT completion, Pre commission, commissioning and start up for separation unit based 
on TRICON controller which communicates with DCS system “FOXBORO” to provide 
complete ESD & FGS systems for new unit. 
Damietta Export Facility Modifications - Egypt 
(INVENSYS / UDGC) 
Activities: 
SAT completion, Pre commission, commissioning and start up for new system based on 
TRIDENT controller which communicates with DCS system “FOXBORO” to provide 
complete ESD & FGS systems for new unit. 
Installation of Fire & Gas System - Egypt 
(INVENSYS / ANRPC) 
Activities: 
SAT completion, Pre commission, commissioning and start up for new system based on 
TRIDENT controller which communicates with InTouch “WONDERWARE” to provide a 
complete ESD & FGS systems fornew unit. Reconfigure for HMI system for 
WONDERWARE to match the client requirements.
Installation of Fire & Gas System - Egypt 
(INVENSYS / ESTYRENICS) 
Activities: 
SAT completion, Pre commission, commissioning and start up for new system based on 
TRIDENT controller which communicates with DCS system “FOXBORO” to provide 
complete FGS systems for new unit. 
Installation of ESD System - Egypt 
(INVENSYS / PETROBEL) 
Activities: 
SAT completion, Pre commission, commissioning and start up for new system based on 
TRIDENT controller which communicates with DCS system “FOXBORO” to provide 
complete ESD systems for new unit. 
B- EAST ( Engineering and Services Technology ) ( May 2008 to March 
2012) 
- Senior Automation Engineer 
Programming SIEMENS PLCs ( S7-200 , S7-300 , LOGO ) 
Design, establish network. 
Programming ABB soft starter and variable speed drive. 
Design control and power circuit. 
Working as maintenance engineer 
Commissioning and start-up for projects. 
Working as instrumentation engineer. 
Installation on site. 
Complete Pre-FAT, FAT and SAT. 
Electrical drawings using AUTOCAD and E-Plan. 
Support proposal team to make quotations. 
Projects Experience: 
NEW CONTROL SYSTEM - EGYPT 
(EAST / EFACO) 
Activities: 
Complete Engineering, supplies of All Control panel (10 Panels) for 2 Production 
Line ,Power monitoring, Analysis system, PLC Software (SIEMENS Step 7 ) and 
SCADA System (InTouch) , Develop new software and erection and 
commissioning of the new system, Analysis devices from Camille Bauer that cover 
to melting furnace. All products supplied from Camille Bauer, Switzerland total 
signal of 120 signals. 
BAG FILTER UPGRADE - EGYPT 
(EAST / SUEZ CEMENT COMPANY) 
Activities: 
Complete Engineering, Supply control panel for bag filter using SIEMENS (S7- 
300).Develop new software and erction and commissioning the new system.
UPGRADE OF CEMENT MILLS SYSTEM - EGYPT 
(EAST / TOURAH CEMENT COMPANY) 
Activities: 
Design, implementation, erection and commissioning of a complete control and power 
system to upgrade the Cement Mills at Line 7 Tourah Cement. 
The project includes: 
- Control system ABB Industrial IT design, supply, install and start-up 
- HMI development 
- Cable Trays supply, routing design and install 
- cables Supply and install 
- Power panels Design, manufacturing and install 
- Control Panels Design, manufacturing and install 
- Transformer supply and Install 
- Medium voltage cables supply and install 
- Project documentation 
- Connections for all projects equipments. 
- FAT & SAT 
POWER MONITORING SYSTEM - EGYPT 
(EAST / SUEZ CEMENT COMPANY) 
Activities: 
Monitoring of the power consumption for 123 motor each with a separate indicator 
(Camille Bauer A210). The project includes the supply of product, engineering, panel 
assembly, erection and commissioning on site. 
NEW RICE MILL PLANT - EGYPT 
(EAST / PHAROUS FOR RICE MILLING) 
Activities: 
The project is concerned of engineering, supplying, commissioning and installation of the 
complete electrical 
Package for the Rice milling plant: 
- Main distribution panel 
- Main MCC panel 
- IN-feeding MCC panel 
- Cable routing and cable laying 
- motors connections 
- Dry test and on load test 
FAULT RECORDING SYSTEM FOR POWER STATION - EGYPT 
(EAST / DAMNHOUR POWER STATION) 
Activities: 
The project includes material supply, engineering, implementation and installation of the 
complete project. 
The supplies include 5 units of Camille Bauer Video Graphics recorders with 36 channels 
each for a total of 180 channels to be monitored
C- AESC ( Advanced Engineering Systems Company ) ( Nov 2007 to May 2008 ) 
- Automation Engineer 
Working as automation engineer. 
Programming OMRON PLCs (CPM1A, CQM1H and CJ1M). 
Programming OMRON soft starter and variable speed drive. 
Education: 
University : Helwan University 
Faculty : Engineering 
Department : Electrical Power & Machines Dept. 
Grade : Good 
Graduation project: Protection, Control and Monitoring of Multimotor using Intelligent 
Relay. 
Project grade : Excellent. 
Graduation year : May 2007 
Technical certificate: 
1- PMP course from PM House ( Preparing for certificate from PMI ) 
2- TRICON/TriStation 1131 Comprehensive Training. 
3- InTouch Software (Wonderware ) 
4- Basic course of ABB DC Drive (DCS800) in ABB University in Germany 
5- Summer internship in of Suez Petroleum Co. (GAPCO) at Red Sea Region. 
6- Summer internship in El-Sewedy Electrometer 
7- SIEMENS PLC (specification, programming and wiring). 
8- OMRON PLC (specification, programming and wiring). 
9- AUTOCAD. 
10-E-Plan. 
Computer Skills: 
- MS Windows XP - 7. 
- MS Office XP. 
Languages: 
- Arabic Language (Mother tongue Language). 
- Very good English (Written& Spoken). 
Personal Information: 
- Full Address : EGYPT – Giza - 6 of October City. 
- Date of Birth : 17 / 6 / 1984 
- Marital Status: Married 
- Military Status : Exempted

More Related Content

What's hot (19)

Raghu Resume
Raghu Resume Raghu Resume
Raghu Resume
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Fpso fso automation
Fpso fso automationFpso fso automation
Fpso fso automation
 
Isa-sachin-upstream-onshore.ppt
Isa-sachin-upstream-onshore.pptIsa-sachin-upstream-onshore.ppt
Isa-sachin-upstream-onshore.ppt
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
HOSAM CV
HOSAM CVHOSAM CV
HOSAM CV
 
Process Unit Module Automation - Leveraging concepts from ISA106
Process Unit Module Automation - Leveraging concepts from ISA106Process Unit Module Automation - Leveraging concepts from ISA106
Process Unit Module Automation - Leveraging concepts from ISA106
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
Ismail Ramadan
Ismail RamadanIsmail Ramadan
Ismail Ramadan
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
LAMINE Anouar en
LAMINE Anouar enLAMINE Anouar en
LAMINE Anouar en
 
IESA: Automation for Oil & Gas Industry
IESA: Automation for Oil & Gas IndustryIESA: Automation for Oil & Gas Industry
IESA: Automation for Oil & Gas Industry
 
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPD
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 

Viewers also liked

C v dr. hany elnakib
C v  dr. hany elnakibC v  dr. hany elnakib
C v dr. hany elnakibMining1
 
Egypt - Outsourcing Destination
Egypt - Outsourcing DestinationEgypt - Outsourcing Destination
Egypt - Outsourcing Destinationdivination55555
 
C:\Users\Patrick\Desktop\Bestof Egypt Vol4
C:\Users\Patrick\Desktop\Bestof Egypt Vol4C:\Users\Patrick\Desktop\Bestof Egypt Vol4
C:\Users\Patrick\Desktop\Bestof Egypt Vol4Sven Boermeester
 
Exportprocessingzonespak (1)
Exportprocessingzonespak (1)Exportprocessingzonespak (1)
Exportprocessingzonespak (1)Aamir Abbasi
 
DESIGNERS Consultants\' CV of Hotels & Resorts
DESIGNERS Consultants\'  CV of Hotels & ResortsDESIGNERS Consultants\'  CV of Hotels & Resorts
DESIGNERS Consultants\' CV of Hotels & Resortssherine_2011
 
Mustafa rizvi 21 03-2012-
Mustafa rizvi  21 03-2012-Mustafa rizvi  21 03-2012-
Mustafa rizvi 21 03-2012-mbrizvi
 
Stacie Mead Resume
Stacie Mead ResumeStacie Mead Resume
Stacie Mead ResumeStacie Mead
 
Audie Cherry MSU Unoff Trans
Audie Cherry MSU Unoff TransAudie Cherry MSU Unoff Trans
Audie Cherry MSU Unoff TransAudie Cherry
 
La evolucion de sistemas operativos
La evolucion de sistemas operativosLa evolucion de sistemas operativos
La evolucion de sistemas operativosRODRO009
 
Presentacion propuestas aede2 nov2014 v20 vp
Presentacion propuestas aede2 nov2014 v20 vpPresentacion propuestas aede2 nov2014 v20 vp
Presentacion propuestas aede2 nov2014 v20 vpAEDE2ECUADOR
 
Lecture 9 mobilising knowledge
Lecture 9 mobilising knowledgeLecture 9 mobilising knowledge
Lecture 9 mobilising knowledgemoduledesign
 

Viewers also liked (17)

C v dr. hany elnakib
C v  dr. hany elnakibC v  dr. hany elnakib
C v dr. hany elnakib
 
Egypt - Outsourcing Destination
Egypt - Outsourcing DestinationEgypt - Outsourcing Destination
Egypt - Outsourcing Destination
 
C:\Users\Patrick\Desktop\Bestof Egypt Vol4
C:\Users\Patrick\Desktop\Bestof Egypt Vol4C:\Users\Patrick\Desktop\Bestof Egypt Vol4
C:\Users\Patrick\Desktop\Bestof Egypt Vol4
 
Exportprocessingzonespak (1)
Exportprocessingzonespak (1)Exportprocessingzonespak (1)
Exportprocessingzonespak (1)
 
Training Plan
Training PlanTraining Plan
Training Plan
 
DESIGNERS Consultants\' CV of Hotels & Resorts
DESIGNERS Consultants\'  CV of Hotels & ResortsDESIGNERS Consultants\'  CV of Hotels & Resorts
DESIGNERS Consultants\' CV of Hotels & Resorts
 
Export Processing Zones Pakistan
Export Processing Zones PakistanExport Processing Zones Pakistan
Export Processing Zones Pakistan
 
Mustafa rizvi 21 03-2012-
Mustafa rizvi  21 03-2012-Mustafa rizvi  21 03-2012-
Mustafa rizvi 21 03-2012-
 
Ma3 1 i
Ma3 1 iMa3 1 i
Ma3 1 i
 
Stacie Mead Resume
Stacie Mead ResumeStacie Mead Resume
Stacie Mead Resume
 
584d09a5
584d09a5584d09a5
584d09a5
 
Audie Cherry MSU Unoff Trans
Audie Cherry MSU Unoff TransAudie Cherry MSU Unoff Trans
Audie Cherry MSU Unoff Trans
 
La evolucion de sistemas operativos
La evolucion de sistemas operativosLa evolucion de sistemas operativos
La evolucion de sistemas operativos
 
Presentacion propuestas aede2 nov2014 v20 vp
Presentacion propuestas aede2 nov2014 v20 vpPresentacion propuestas aede2 nov2014 v20 vp
Presentacion propuestas aede2 nov2014 v20 vp
 
V
VV
V
 
Lecture 9 mobilising knowledge
Lecture 9 mobilising knowledgeLecture 9 mobilising knowledge
Lecture 9 mobilising knowledge
 
Palladium Magazine Special Summer 2014
Palladium Magazine Special Summer 2014Palladium Magazine Special Summer 2014
Palladium Magazine Special Summer 2014
 

Similar to Nagy_CV_Docx (20)

Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
CV-Bokarica
CV-BokaricaCV-Bokarica
CV-Bokarica
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefs
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
khaled cv
khaled cvkhaled cv
khaled cv
 
M.ElGamal CV
M.ElGamal CVM.ElGamal CV
M.ElGamal CV
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
Allam CV
Allam CVAllam CV
Allam CV
 
Mohamed Elwardany's resume
Mohamed Elwardany's resumeMohamed Elwardany's resume
Mohamed Elwardany's resume
 
Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017
 
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
WV CV_Eng_2016
WV CV_Eng_2016WV CV_Eng_2016
WV CV_Eng_2016
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Resume
ResumeResume
Resume
 
PAUL_OWEN_CV
PAUL_OWEN_CVPAUL_OWEN_CV
PAUL_OWEN_CV
 

Nagy_CV_Docx

  • 1. Nagy Ibraheem Abo El-Khair nagy.khair@schneider-electric.com nagy.khair@gmail.com Mobile : EGY +2 0100 55 35 617 Summary of Skills: - Automation: Control System Engineer at Schneider Electric “Invensys”, EAST & AESC . - Electrical : Technical Engineer with EAST Company for Electrical Cabinet Design Integration (Low voltage). Professional Work Experiences: A- Schneider Electric “ Invensys” (March 2012 till present) - Senior Project Application Engineer – Triconex Triconex Hardware Design (Tricon & Trident) TriStation 1131 Application Development Database Handling SOE Configuration Program Emulation Reading P&ID diagrams and process study Logic Diagram Implementation. - IMESA - EEC Office Coordinator and responsible for : Developing project strategies. Create cost plan for the project. Selecting resource for the required tasks. Attending corporate HR meetings. Coordinating meetings Creating a project management calendar Administrative duties - Projects Experience: QATARGAS WASTE WATER TREATMENT PLANT-. QTR (INVENSYS / QCON / QatarGas) Expand the current system for Fire & Gas by: 1- Study the current F&G system (system and marshaling cabinets and Logic) 2- Add more than 50 I/O signals. 3- New Logic modification according to new C&E. 4- New hardware modification to meet the requirements. 5- Supervision at site for all activities 6- SAT , commissioning and start-up.
  • 2. ASSIL & KARAM WELL HEADS - EGY (INVENSYS / ENNPI / BADR ELDEEN) Activities: Act as Lead Engineer for Engineering, Pre commission, commissioning and start up for Oil Wells based on TRIDENT controller which communicate with HMI to provide the following operations: 1- SSV Shutdown. 2- Chock valve control. 3- Corrosion Inhibitor Control. 4- Monitor and control of instrument. 5- Oil flow calculation. And my role is: 1- HW Design. 2- Drawing updates “supervision for 2 engineers and CAD team”. 3- Supervision for cabinet’s integration. 4- Lead 2 engineers for Pre-FAT and FAT. 5- Lead 2 engineers for SW update and download. KHUFF GAS WELL HEADS SHUTDOWN - KSA (INVENSYS / SAUDI ARAMCO) Activities Act as Lead Engineer for Engineering, FAT, Pre commission, commissioning and start up for Gas Wells “125 Cabinets” based on TRIDENT controller which communicate with SCADA system “YOKOGAWA” to provide the following operations: 1- SSV Shutdown. 2- Chock valve control. 3- Corrosion Inhibitor Control. 4- Monitor and control of instrument. 5- Gas flow calculation. And my role is: 1- HW Design. 2- Drawing updates “supervision for 2 engineers and CAD team”. 3- Supervision for cabinets integration (125 cabinets) 4- Material purchasing arrangement. 5- Responsible for all Materials for the project. 6- Lead 2 engineers for Pre-FAT and FAT. 7- Lead 2 engineers for SW update and download. 8- Preparing and tracking of ARAMCO latest standards through TOC (table of compliance) 9- Handling Customer meetings to discuss ARAMCO standard to be comply with our project. 10-Responsible for cabinet’s shipment to customer and receiving delivery notes.
  • 3. SHAYBAH IGHC - KSA (INVENSYS / SAMSUNG / SAUDI ARAMCO) Activities: Engineering, FAT, IFAT, SAT and ISAT completion and pre commission for GOSP4 “23 Cabinets” based on TRICON controller that communicate with DCS system “FOXBORO” and CCS system “ TRIDENT” to provide a complete ESD system for Crude, Gas, utility areas. Upgrade firmware for old module to be compatible with new modules. HELIUM 2 PROJECT - QATAR (INVENSYS / AIRLIQUIED / RAS GAS) Activities: SAT completion, Pre commission, commissioning and start up for new unit Helium 2 based on TRICON controller which communicate with DCS system “FOXBORO” and to provide a complete ESD & FGD systems for new unit. GASAL AIR SEPARATION UNIT GASEOUS OXYGEN SUPPLY LINE - QATAR (INVENSYS / ALBALAGH / ORYX GTL) Activities: SAT completion, Pre commission, commissioning and start up for separation unit based on TRICON controller which communicates with DCS system “FOXBORO” to provide complete ESD & FGS systems for new unit. Damietta Export Facility Modifications - Egypt (INVENSYS / UDGC) Activities: SAT completion, Pre commission, commissioning and start up for new system based on TRIDENT controller which communicates with DCS system “FOXBORO” to provide complete ESD & FGS systems for new unit. Installation of Fire & Gas System - Egypt (INVENSYS / ANRPC) Activities: SAT completion, Pre commission, commissioning and start up for new system based on TRIDENT controller which communicates with InTouch “WONDERWARE” to provide a complete ESD & FGS systems fornew unit. Reconfigure for HMI system for WONDERWARE to match the client requirements.
  • 4. Installation of Fire & Gas System - Egypt (INVENSYS / ESTYRENICS) Activities: SAT completion, Pre commission, commissioning and start up for new system based on TRIDENT controller which communicates with DCS system “FOXBORO” to provide complete FGS systems for new unit. Installation of ESD System - Egypt (INVENSYS / PETROBEL) Activities: SAT completion, Pre commission, commissioning and start up for new system based on TRIDENT controller which communicates with DCS system “FOXBORO” to provide complete ESD systems for new unit. B- EAST ( Engineering and Services Technology ) ( May 2008 to March 2012) - Senior Automation Engineer Programming SIEMENS PLCs ( S7-200 , S7-300 , LOGO ) Design, establish network. Programming ABB soft starter and variable speed drive. Design control and power circuit. Working as maintenance engineer Commissioning and start-up for projects. Working as instrumentation engineer. Installation on site. Complete Pre-FAT, FAT and SAT. Electrical drawings using AUTOCAD and E-Plan. Support proposal team to make quotations. Projects Experience: NEW CONTROL SYSTEM - EGYPT (EAST / EFACO) Activities: Complete Engineering, supplies of All Control panel (10 Panels) for 2 Production Line ,Power monitoring, Analysis system, PLC Software (SIEMENS Step 7 ) and SCADA System (InTouch) , Develop new software and erection and commissioning of the new system, Analysis devices from Camille Bauer that cover to melting furnace. All products supplied from Camille Bauer, Switzerland total signal of 120 signals. BAG FILTER UPGRADE - EGYPT (EAST / SUEZ CEMENT COMPANY) Activities: Complete Engineering, Supply control panel for bag filter using SIEMENS (S7- 300).Develop new software and erction and commissioning the new system.
  • 5. UPGRADE OF CEMENT MILLS SYSTEM - EGYPT (EAST / TOURAH CEMENT COMPANY) Activities: Design, implementation, erection and commissioning of a complete control and power system to upgrade the Cement Mills at Line 7 Tourah Cement. The project includes: - Control system ABB Industrial IT design, supply, install and start-up - HMI development - Cable Trays supply, routing design and install - cables Supply and install - Power panels Design, manufacturing and install - Control Panels Design, manufacturing and install - Transformer supply and Install - Medium voltage cables supply and install - Project documentation - Connections for all projects equipments. - FAT & SAT POWER MONITORING SYSTEM - EGYPT (EAST / SUEZ CEMENT COMPANY) Activities: Monitoring of the power consumption for 123 motor each with a separate indicator (Camille Bauer A210). The project includes the supply of product, engineering, panel assembly, erection and commissioning on site. NEW RICE MILL PLANT - EGYPT (EAST / PHAROUS FOR RICE MILLING) Activities: The project is concerned of engineering, supplying, commissioning and installation of the complete electrical Package for the Rice milling plant: - Main distribution panel - Main MCC panel - IN-feeding MCC panel - Cable routing and cable laying - motors connections - Dry test and on load test FAULT RECORDING SYSTEM FOR POWER STATION - EGYPT (EAST / DAMNHOUR POWER STATION) Activities: The project includes material supply, engineering, implementation and installation of the complete project. The supplies include 5 units of Camille Bauer Video Graphics recorders with 36 channels each for a total of 180 channels to be monitored
  • 6. C- AESC ( Advanced Engineering Systems Company ) ( Nov 2007 to May 2008 ) - Automation Engineer Working as automation engineer. Programming OMRON PLCs (CPM1A, CQM1H and CJ1M). Programming OMRON soft starter and variable speed drive. Education: University : Helwan University Faculty : Engineering Department : Electrical Power & Machines Dept. Grade : Good Graduation project: Protection, Control and Monitoring of Multimotor using Intelligent Relay. Project grade : Excellent. Graduation year : May 2007 Technical certificate: 1- PMP course from PM House ( Preparing for certificate from PMI ) 2- TRICON/TriStation 1131 Comprehensive Training. 3- InTouch Software (Wonderware ) 4- Basic course of ABB DC Drive (DCS800) in ABB University in Germany 5- Summer internship in of Suez Petroleum Co. (GAPCO) at Red Sea Region. 6- Summer internship in El-Sewedy Electrometer 7- SIEMENS PLC (specification, programming and wiring). 8- OMRON PLC (specification, programming and wiring). 9- AUTOCAD. 10-E-Plan. Computer Skills: - MS Windows XP - 7. - MS Office XP. Languages: - Arabic Language (Mother tongue Language). - Very good English (Written& Spoken). Personal Information: - Full Address : EGYPT – Giza - 6 of October City. - Date of Birth : 17 / 6 / 1984 - Marital Status: Married - Military Status : Exempted