SlideShare a Scribd company logo
Smart-UPS® Output Hardwire Kit
SURT 15/20 kVA 230 Vac
Hardwire the UPS
Refer to the Smart-UPS User Manual for additional installation information.
Wiring must be performed by a qualified electrician. Adhere to all local and national electrical codes.
1. For input wiring only, install a utility circuit breaker in accordance with local electrical codes.
2. Switch the utility circuit breaker OFF.
3. Remove the appropriate circular knockouts from the input and output wiring trays.
4. Remove the screws that secure the covers and take the covers off of the trays.
5. Remove the five screws that secure the strain relief bar.
6. Remove the appropriate jumpers for input power source compatibility and output wiring options, refer
to “Wiring Specifications” on page 3 in this manual.
7. Insert the cables through the knockout holes to the terminal blocks. Connect the ground terminal first,
refer to “Wiring Specifications” on page 3 in the this manual.
8. Use an appropriate strain-relief not supplied, on the hardwired input and output power cables.
9. Replace the wiring tray covers. Failure to do so may result in personal injury or equipment damage.
10. Install the wiring trays, refer to graphics below.
11.
5x
suo0672a
SUO0671A
Input Wiring Tray Output Wiring Tray
Strain Relief Bar
Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U2
Install input and output wiring trays in UPS rear panel
suo0673a
suo0649a
Input Wiring Tray
Ground
EPO Port
Cold Start/EPO Reset
Output Wiring Tray
Ground
RJ45
Connector
Input Wiring Tray
Output Wiring Tray
XLBP Connector
Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U 3
Wiring Specifications
Adhere to national and local electrical codes when wiring.
*Terminal screw tightening torque: 4.5 Nm (40 lb-in) minimum
**Use cables and input circuit breakers rated for specifications listed in these tables.
NOTE: Units configured for three phase input and single phase output operation, the entire load connected to the
UPS will transfer to L1 and Neutral of the three phase input when the UPS is operating in Bypass mode.
***The current is specified at nominal input voltage.
The acceptable input frequency range is 40 Hz to 70 Hz.
The output frequency is user selectable. Refer to the PowerView display menu screens for available options.
Input Connections Output Connections
Main Input
Single-Phase: Wire to L1, N, and
Three-Phase: Wire to L1, L2, L3, N, and
Hardwire
Single-Phase: Wire to L1, N, and
Three-Phase: Wire to L1, L2, L3, N, and
Bypass Input (optional)
Single-Phase: Wire to B1, N, and
Three-Phase: Wire to B1, B2, B3, N, and
Single-phase PDU
XL battery pack PDU to UPS: Wire L1, N,
Single Feed
Wiring
Number
of
Phases Voltage
Current
Full Load***
(maximum)
External Input
Circuit Breaker
(typical)
Wire Size
(typical)*
SURT15K XLI/XLICH/XLI-CC
Input
Output
1
1
220/230/240 VAC
220/230/240 VAC
83 A
66 A
100 A each phase
not required
35 mm2
25 mm2
Input
Output
3
1
380/400/415 VAC
220/230/240 VAC
28 A each phase
66 A
100 A each phase**
not required
35 mm2**
25 mm2
Input
Output
3
3
380/400/415 VAC
380/400/415 VAC
28 A each phase
22 A each phase
35 A or 40 A each phase
not required
6 mm2
6 mm2
SURT20K XLI/XLICH/XLI-CC
Input
Output
1
1
220/230/240 VAC
220/230/240 VAC
105 A
87 A
125 A each phase
not required
50 mm2
35 mm2
Input
Output
3
1
380/400/415 VAC
220/230/240 VAC
35 A each phase
87 A
125 A each phase**
not required
50 mm2**
35 mm2
Input
Output
3
3
380/400/415 VAC
380/400/415 VAC
35 A each phase
29 A each phase
50 A each phase
not required
10 mm2
10 mm2
Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U4
*Terminal screw tightening torque: 4.5 Nm (40 lb-in) minimum
**Use cables and input circuit breakers rated for specifications listed in these tables.
NOTE: Units configured for three phase input and single phase output operation, the entire load connected to the
UPS will transfer to L1 and Neutral of the three phase input when the UPS is operating in Bypass mode.
***The current is specified at nominal input voltage.
The acceptable input frequency range is 40 Hz to 70 Hz.
The output frequency is user selectable. Refer to the PowerView display menu screens for available options
Dual Feed
Wiring
Number
of
Phases Voltage
Current
Full Load***
(maximum)
External Input
Circuit Breaker
Mains (typical)
External Input
Circuit Breaker
Bypass (typical)
Wire
Size
Mains*
(typical)
Wire
Size
Bypass*
(typical)
SURT15K XLI/XLICH/XLI-CC
Input
Output
1
1
220/230/240 VAC
220/230/240 VAC
83 A
66 A
100 A each phase
not required
100 A each phase
not required
35 mm2
25 mm2
35 mm2
25 mm2
Input
Output
3
1
380/400/415 VAC
220/230/240 VAC
28 A each phase
66 A
35 A or 40 A each phase
not required
100 A each phase**
not required
6 mm2
25 mm2
35 mm2**
25 mm2
Input
Output
3
3
380/400/415 VAC
380/400/415 VAC
28 A each phase
22 A each phase
35 A or 40 A each phase
not required
35 A or 40 A each phase
not required
6 mm2
6 mm2
6 mm2
6 mm2
SURT20K XLI/XLICH/XLI-CC
Input
Output
1
1
220/230/240 VAC
220/230/240 VAC
105 A
87 A
125 A each phase
not required
125 A each phase
not required
50 mm2
35 mm2
50 mm2
35 mm2
Input
Output
3
1
380/400/415 VAC
220/230/240 VAC
35 A each phase
87 A
50 A each phase
not required
125 A each phase**
not required
10 mm2
35 mm2
50 mm2**
35 mm2
Input
Output
3
3
380/400/415 VAC
380/400/415 VAC
35 A each phase
29 A each phase
50 A each phase
not required
50 A each phase
not required
10 mm2
10 mm2
10 mm2
10 mm2
Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U 5
Output wiring options
Output wiring overview. Refer to the diagrams on the following pages for output wiring options.
Labeled jumpers and connectors must be installed in the appropriate locations.
N
OSJ
L3 L2 L1
suo0682a
Neutral
Ground
Output Phase 2
Output Phase 1
Output Phase 3
PDU Terminals
Factory Default Configuration
Output Shorting Jumper (OSJ)
for single phase output
OSJ
N L3 L2 L1
suo0683a
N L3 L2 L1
suo0684a
Output hardwire option 1
Single phase hardwire output
connection
Output hardwire option 2
Three phase hardwire output connection
XLBP PDU not connected
Output shorting jumper (OSJ) removed
Ensure the OSJ is
secured to the output
wiring tray using the
five screws provided.
Customer support and warranty information is available at the APC Web site, www.apc.com.
© 2011 APC by Schneider Electric. APC, the APC logo and Smart-UPS are owned by Schneider
Electric Industries S.A.S., American Power Conversion Corporation, or their affiliated companies.
All other trademarks are property of their respective owners.
990-4540
6/2011
OSJ
N L3 L2 L1
suo0685a
Output PDU option
Single phase output connection to battery pack PDU
Ensure the OSJ is secured to the output wiring tray using the
five screws provided.
PDU connectors
XLBP

More Related Content

What's hot

Advanced motion controls z12a8ddc
Advanced motion controls z12a8ddcAdvanced motion controls z12a8ddc
Advanced motion controls z12a8ddc
Electromate
 
Advanced motion controls z6a6ddc
Advanced motion controls z6a6ddcAdvanced motion controls z6a6ddc
Advanced motion controls z6a6ddc
Electromate
 
Advanced motion controls s30a40ac
Advanced motion controls s30a40acAdvanced motion controls s30a40ac
Advanced motion controls s30a40ac
Electromate
 
Advanced motion controls zb6a6
Advanced motion controls zb6a6Advanced motion controls zb6a6
Advanced motion controls zb6a6
Electromate
 
Uim48701z r2
Uim48701z r2Uim48701z r2
Uim48701z r2
Raafat younis
 
Advanced motion controls sr30a40ac
Advanced motion controls sr30a40acAdvanced motion controls sr30a40ac
Advanced motion controls sr30a40ac
Electromate
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
Raafat younis
 
Advanced motion controls s100a20
Advanced motion controls s100a20Advanced motion controls s100a20
Advanced motion controls s100a20
Electromate
 
Advanced motion controls bd40a20
Advanced motion controls bd40a20Advanced motion controls bd40a20
Advanced motion controls bd40a20
Electromate
 
Advanced motion controls bd40a8
Advanced motion controls bd40a8Advanced motion controls bd40a8
Advanced motion controls bd40a8
Electromate
 
Ep300 gb-r2
Ep300 gb-r2Ep300 gb-r2
Ep300 gb-r2
Arief Dwiyanto
 
Advanced motion controls 5a5
Advanced motion controls 5a5Advanced motion controls 5a5
Advanced motion controls 5a5
Electromate
 
Haydon kerk dcm8054_dcm8027_specsheet
Haydon kerk dcm8054_dcm8027_specsheetHaydon kerk dcm8054_dcm8027_specsheet
Haydon kerk dcm8054_dcm8027_specsheet
Electromate
 
Advanced motion controls sx30a8
Advanced motion controls sx30a8Advanced motion controls sx30a8
Advanced motion controls sx30a8
Electromate
 
Advanced motion controls mc1x510
Advanced motion controls mc1x510Advanced motion controls mc1x510
Advanced motion controls mc1x510
Electromate
 
Advanced motion controls mc2x510
Advanced motion controls mc2x510Advanced motion controls mc2x510
Advanced motion controls mc2x510
Electromate
 
Advanced motion controls mc3x510
Advanced motion controls mc3x510Advanced motion controls mc3x510
Advanced motion controls mc3x510
Electromate
 
Advanced motion controls z6a6
Advanced motion controls z6a6Advanced motion controls z6a6
Advanced motion controls z6a6
Electromate
 
Advanced motion controls z12a8
Advanced motion controls z12a8Advanced motion controls z12a8
Advanced motion controls z12a8
Electromate
 
Cataloge ats socomec atys 3-dienhathe.vn
Cataloge ats socomec atys 3-dienhathe.vnCataloge ats socomec atys 3-dienhathe.vn
Cataloge ats socomec atys 3-dienhathe.vn
Dien Ha The
 

What's hot (20)

Advanced motion controls z12a8ddc
Advanced motion controls z12a8ddcAdvanced motion controls z12a8ddc
Advanced motion controls z12a8ddc
 
Advanced motion controls z6a6ddc
Advanced motion controls z6a6ddcAdvanced motion controls z6a6ddc
Advanced motion controls z6a6ddc
 
Advanced motion controls s30a40ac
Advanced motion controls s30a40acAdvanced motion controls s30a40ac
Advanced motion controls s30a40ac
 
Advanced motion controls zb6a6
Advanced motion controls zb6a6Advanced motion controls zb6a6
Advanced motion controls zb6a6
 
Uim48701z r2
Uim48701z r2Uim48701z r2
Uim48701z r2
 
Advanced motion controls sr30a40ac
Advanced motion controls sr30a40acAdvanced motion controls sr30a40ac
Advanced motion controls sr30a40ac
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
 
Advanced motion controls s100a20
Advanced motion controls s100a20Advanced motion controls s100a20
Advanced motion controls s100a20
 
Advanced motion controls bd40a20
Advanced motion controls bd40a20Advanced motion controls bd40a20
Advanced motion controls bd40a20
 
Advanced motion controls bd40a8
Advanced motion controls bd40a8Advanced motion controls bd40a8
Advanced motion controls bd40a8
 
Ep300 gb-r2
Ep300 gb-r2Ep300 gb-r2
Ep300 gb-r2
 
Advanced motion controls 5a5
Advanced motion controls 5a5Advanced motion controls 5a5
Advanced motion controls 5a5
 
Haydon kerk dcm8054_dcm8027_specsheet
Haydon kerk dcm8054_dcm8027_specsheetHaydon kerk dcm8054_dcm8027_specsheet
Haydon kerk dcm8054_dcm8027_specsheet
 
Advanced motion controls sx30a8
Advanced motion controls sx30a8Advanced motion controls sx30a8
Advanced motion controls sx30a8
 
Advanced motion controls mc1x510
Advanced motion controls mc1x510Advanced motion controls mc1x510
Advanced motion controls mc1x510
 
Advanced motion controls mc2x510
Advanced motion controls mc2x510Advanced motion controls mc2x510
Advanced motion controls mc2x510
 
Advanced motion controls mc3x510
Advanced motion controls mc3x510Advanced motion controls mc3x510
Advanced motion controls mc3x510
 
Advanced motion controls z6a6
Advanced motion controls z6a6Advanced motion controls z6a6
Advanced motion controls z6a6
 
Advanced motion controls z12a8
Advanced motion controls z12a8Advanced motion controls z12a8
Advanced motion controls z12a8
 
Cataloge ats socomec atys 3-dienhathe.vn
Cataloge ats socomec atys 3-dienhathe.vnCataloge ats socomec atys 3-dienhathe.vn
Cataloge ats socomec atys 3-dienhathe.vn
 

Similar to Manual 1

Advanced motion controls se30a40ac
Advanced motion controls se30a40acAdvanced motion controls se30a40ac
Advanced motion controls se30a40ac
Electromate
 
Ct2000 f manual_english
Ct2000 f manual_englishCt2000 f manual_english
Ct2000 f manual_english
Toàn Huỳnh
 
Rv1 a.2aj specs.bfp a8050k
Rv1 a.2aj specs.bfp a8050kRv1 a.2aj specs.bfp a8050k
Rv1 a.2aj specs.bfp a8050k
Abe Paih
 
Advanced motion controls s100a40ac
Advanced motion controls s100a40acAdvanced motion controls s100a40ac
Advanced motion controls s100a40ac
Electromate
 
Advanced motion controls 50a20
Advanced motion controls 50a20Advanced motion controls 50a20
Advanced motion controls 50a20
Electromate
 
Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]
Toàn Huỳnh
 
ABB Transformers MV Medium Voltage Transformers Guide
ABB Transformers MV Medium Voltage Transformers GuideABB Transformers MV Medium Voltage Transformers Guide
ABB Transformers MV Medium Voltage Transformers Guide
Thorne & Derrick International
 
Advanced motion controls b40a20
Advanced motion controls b40a20Advanced motion controls b40a20
Advanced motion controls b40a20
Electromate
 
Advanced motion controls 25a20
Advanced motion controls 25a20Advanced motion controls 25a20
Advanced motion controls 25a20
Electromate
 
Abb trio-tl-outd
Abb trio-tl-outdAbb trio-tl-outd
Abb trio-tl-outd
Optimus Energy Philippines
 
Advanced motion controls 20a20
Advanced motion controls 20a20Advanced motion controls 20a20
Advanced motion controls 20a20
Electromate
 
Advanced motion controls sr10a40
Advanced motion controls sr10a40Advanced motion controls sr10a40
Advanced motion controls sr10a40
Electromate
 
Advanced motion controls sr30a40
Advanced motion controls sr30a40Advanced motion controls sr30a40
Advanced motion controls sr30a40
Electromate
 
Advanced motions controls 20a14
Advanced motions controls 20a14Advanced motions controls 20a14
Advanced motions controls 20a14
Electromate
 
Advanced motion controls b25a20
Advanced motion controls b25a20Advanced motion controls b25a20
Advanced motion controls b25a20
Electromate
 
Advanced motion controls b40a8
Advanced motion controls b40a8Advanced motion controls b40a8
Advanced motion controls b40a8
Electromate
 
Advanced motion controls be40a20
Advanced motion controls be40a20Advanced motion controls be40a20
Advanced motion controls be40a20
Electromate
 
Advanced motion controls s30a40
Advanced motion controls s30a40Advanced motion controls s30a40
Advanced motion controls s30a40
Electromate
 
The Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
The Ins and Outs of Isolation: A Guide to Selecting The Right IsolatorThe Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
The Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
Instrument Specialties, Inc.
 
Advanced motion controls b40a40ac
Advanced motion controls b40a40acAdvanced motion controls b40a40ac
Advanced motion controls b40a40ac
Electromate
 

Similar to Manual 1 (20)

Advanced motion controls se30a40ac
Advanced motion controls se30a40acAdvanced motion controls se30a40ac
Advanced motion controls se30a40ac
 
Ct2000 f manual_english
Ct2000 f manual_englishCt2000 f manual_english
Ct2000 f manual_english
 
Rv1 a.2aj specs.bfp a8050k
Rv1 a.2aj specs.bfp a8050kRv1 a.2aj specs.bfp a8050k
Rv1 a.2aj specs.bfp a8050k
 
Advanced motion controls s100a40ac
Advanced motion controls s100a40acAdvanced motion controls s100a40ac
Advanced motion controls s100a40ac
 
Advanced motion controls 50a20
Advanced motion controls 50a20Advanced motion controls 50a20
Advanced motion controls 50a20
 
Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]
 
ABB Transformers MV Medium Voltage Transformers Guide
ABB Transformers MV Medium Voltage Transformers GuideABB Transformers MV Medium Voltage Transformers Guide
ABB Transformers MV Medium Voltage Transformers Guide
 
Advanced motion controls b40a20
Advanced motion controls b40a20Advanced motion controls b40a20
Advanced motion controls b40a20
 
Advanced motion controls 25a20
Advanced motion controls 25a20Advanced motion controls 25a20
Advanced motion controls 25a20
 
Abb trio-tl-outd
Abb trio-tl-outdAbb trio-tl-outd
Abb trio-tl-outd
 
Advanced motion controls 20a20
Advanced motion controls 20a20Advanced motion controls 20a20
Advanced motion controls 20a20
 
Advanced motion controls sr10a40
Advanced motion controls sr10a40Advanced motion controls sr10a40
Advanced motion controls sr10a40
 
Advanced motion controls sr30a40
Advanced motion controls sr30a40Advanced motion controls sr30a40
Advanced motion controls sr30a40
 
Advanced motions controls 20a14
Advanced motions controls 20a14Advanced motions controls 20a14
Advanced motions controls 20a14
 
Advanced motion controls b25a20
Advanced motion controls b25a20Advanced motion controls b25a20
Advanced motion controls b25a20
 
Advanced motion controls b40a8
Advanced motion controls b40a8Advanced motion controls b40a8
Advanced motion controls b40a8
 
Advanced motion controls be40a20
Advanced motion controls be40a20Advanced motion controls be40a20
Advanced motion controls be40a20
 
Advanced motion controls s30a40
Advanced motion controls s30a40Advanced motion controls s30a40
Advanced motion controls s30a40
 
The Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
The Ins and Outs of Isolation: A Guide to Selecting The Right IsolatorThe Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
The Ins and Outs of Isolation: A Guide to Selecting The Right Isolator
 
Advanced motion controls b40a40ac
Advanced motion controls b40a40acAdvanced motion controls b40a40ac
Advanced motion controls b40a40ac
 

Recently uploaded

Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 

Recently uploaded (20)

Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 

Manual 1

  • 1. Smart-UPS® Output Hardwire Kit SURT 15/20 kVA 230 Vac Hardwire the UPS Refer to the Smart-UPS User Manual for additional installation information. Wiring must be performed by a qualified electrician. Adhere to all local and national electrical codes. 1. For input wiring only, install a utility circuit breaker in accordance with local electrical codes. 2. Switch the utility circuit breaker OFF. 3. Remove the appropriate circular knockouts from the input and output wiring trays. 4. Remove the screws that secure the covers and take the covers off of the trays. 5. Remove the five screws that secure the strain relief bar. 6. Remove the appropriate jumpers for input power source compatibility and output wiring options, refer to “Wiring Specifications” on page 3 in this manual. 7. Insert the cables through the knockout holes to the terminal blocks. Connect the ground terminal first, refer to “Wiring Specifications” on page 3 in the this manual. 8. Use an appropriate strain-relief not supplied, on the hardwired input and output power cables. 9. Replace the wiring tray covers. Failure to do so may result in personal injury or equipment damage. 10. Install the wiring trays, refer to graphics below. 11. 5x suo0672a SUO0671A Input Wiring Tray Output Wiring Tray Strain Relief Bar
  • 2. Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U2 Install input and output wiring trays in UPS rear panel suo0673a suo0649a Input Wiring Tray Ground EPO Port Cold Start/EPO Reset Output Wiring Tray Ground RJ45 Connector Input Wiring Tray Output Wiring Tray XLBP Connector
  • 3. Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U 3 Wiring Specifications Adhere to national and local electrical codes when wiring. *Terminal screw tightening torque: 4.5 Nm (40 lb-in) minimum **Use cables and input circuit breakers rated for specifications listed in these tables. NOTE: Units configured for three phase input and single phase output operation, the entire load connected to the UPS will transfer to L1 and Neutral of the three phase input when the UPS is operating in Bypass mode. ***The current is specified at nominal input voltage. The acceptable input frequency range is 40 Hz to 70 Hz. The output frequency is user selectable. Refer to the PowerView display menu screens for available options. Input Connections Output Connections Main Input Single-Phase: Wire to L1, N, and Three-Phase: Wire to L1, L2, L3, N, and Hardwire Single-Phase: Wire to L1, N, and Three-Phase: Wire to L1, L2, L3, N, and Bypass Input (optional) Single-Phase: Wire to B1, N, and Three-Phase: Wire to B1, B2, B3, N, and Single-phase PDU XL battery pack PDU to UPS: Wire L1, N, Single Feed Wiring Number of Phases Voltage Current Full Load*** (maximum) External Input Circuit Breaker (typical) Wire Size (typical)* SURT15K XLI/XLICH/XLI-CC Input Output 1 1 220/230/240 VAC 220/230/240 VAC 83 A 66 A 100 A each phase not required 35 mm2 25 mm2 Input Output 3 1 380/400/415 VAC 220/230/240 VAC 28 A each phase 66 A 100 A each phase** not required 35 mm2** 25 mm2 Input Output 3 3 380/400/415 VAC 380/400/415 VAC 28 A each phase 22 A each phase 35 A or 40 A each phase not required 6 mm2 6 mm2 SURT20K XLI/XLICH/XLI-CC Input Output 1 1 220/230/240 VAC 220/230/240 VAC 105 A 87 A 125 A each phase not required 50 mm2 35 mm2 Input Output 3 1 380/400/415 VAC 220/230/240 VAC 35 A each phase 87 A 125 A each phase** not required 50 mm2** 35 mm2 Input Output 3 3 380/400/415 VAC 380/400/415 VAC 35 A each phase 29 A each phase 50 A each phase not required 10 mm2 10 mm2
  • 4. Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U4 *Terminal screw tightening torque: 4.5 Nm (40 lb-in) minimum **Use cables and input circuit breakers rated for specifications listed in these tables. NOTE: Units configured for three phase input and single phase output operation, the entire load connected to the UPS will transfer to L1 and Neutral of the three phase input when the UPS is operating in Bypass mode. ***The current is specified at nominal input voltage. The acceptable input frequency range is 40 Hz to 70 Hz. The output frequency is user selectable. Refer to the PowerView display menu screens for available options Dual Feed Wiring Number of Phases Voltage Current Full Load*** (maximum) External Input Circuit Breaker Mains (typical) External Input Circuit Breaker Bypass (typical) Wire Size Mains* (typical) Wire Size Bypass* (typical) SURT15K XLI/XLICH/XLI-CC Input Output 1 1 220/230/240 VAC 220/230/240 VAC 83 A 66 A 100 A each phase not required 100 A each phase not required 35 mm2 25 mm2 35 mm2 25 mm2 Input Output 3 1 380/400/415 VAC 220/230/240 VAC 28 A each phase 66 A 35 A or 40 A each phase not required 100 A each phase** not required 6 mm2 25 mm2 35 mm2** 25 mm2 Input Output 3 3 380/400/415 VAC 380/400/415 VAC 28 A each phase 22 A each phase 35 A or 40 A each phase not required 35 A or 40 A each phase not required 6 mm2 6 mm2 6 mm2 6 mm2 SURT20K XLI/XLICH/XLI-CC Input Output 1 1 220/230/240 VAC 220/230/240 VAC 105 A 87 A 125 A each phase not required 125 A each phase not required 50 mm2 35 mm2 50 mm2 35 mm2 Input Output 3 1 380/400/415 VAC 220/230/240 VAC 35 A each phase 87 A 50 A each phase not required 125 A each phase** not required 10 mm2 35 mm2 50 mm2** 35 mm2 Input Output 3 3 380/400/415 VAC 380/400/415 VAC 35 A each phase 29 A each phase 50 A each phase not required 50 A each phase not required 10 mm2 10 mm2 10 mm2 10 mm2
  • 5. Output Hardwire Kit SURT 15/20 kVA 230 Vac Stack/Rack-Mount 6U 5 Output wiring options Output wiring overview. Refer to the diagrams on the following pages for output wiring options. Labeled jumpers and connectors must be installed in the appropriate locations. N OSJ L3 L2 L1 suo0682a Neutral Ground Output Phase 2 Output Phase 1 Output Phase 3 PDU Terminals Factory Default Configuration Output Shorting Jumper (OSJ) for single phase output OSJ N L3 L2 L1 suo0683a N L3 L2 L1 suo0684a Output hardwire option 1 Single phase hardwire output connection Output hardwire option 2 Three phase hardwire output connection XLBP PDU not connected Output shorting jumper (OSJ) removed Ensure the OSJ is secured to the output wiring tray using the five screws provided.
  • 6. Customer support and warranty information is available at the APC Web site, www.apc.com. © 2011 APC by Schneider Electric. APC, the APC logo and Smart-UPS are owned by Schneider Electric Industries S.A.S., American Power Conversion Corporation, or their affiliated companies. All other trademarks are property of their respective owners. 990-4540 6/2011 OSJ N L3 L2 L1 suo0685a Output PDU option Single phase output connection to battery pack PDU Ensure the OSJ is secured to the output wiring tray using the five screws provided. PDU connectors XLBP