2012

                                                  Management
                                                  Information
                                                …and its use within an IFA scenario
                                   Management Information (MI): Application of management
                                   techniques to collect information, communicate it within and outside
                                   the organization, and process it to enable managers to make quicker
                                   and better decisions.
                                   Management Information System (MIS) is a system or process that
                                   provides information needed to manage organizations effectively.
                                   Management information systems are regarded to be a subset of the
                                   overall internal controls procedures in a business, which cover the
                                   application of people, documents, technologies, and procedures.
                                   Management information systems are distinct from regular
                                   information systems in that they are used to analyse other
                                   information systems applied in operational activities in the
                                   organisation.




Page | 0                                                                     Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor                                         Lee Werrell
                                                                           CEI Compliance Limited
Introduction to Management Information
                                                                                                           By CEI Compliance Limited




Contents
Background ...................................................................................................................................................................
Fundamentals ...............................................................................................................................................................
Assessing Your Needs..................................................................................................................................................



Go Mobile- Request Other Whitepapers sent to your email;




                                                   Compliance Risk
        Balanced Scorecard for                                                                                                    Regulatory Visit
                                                     Assessment                         Financial Crime 2012
                SMEs                                                                                                            Preparation Coaching
                                                    Methodology




          S166 Guide for Snr
                                                    Strategy Setting                          TCF Guide                               UCIS Sales
             Management

                                              Simply scan the QR code for the relevant Whitepaper




Page | 1                                                                                                          Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                                By CEI Compliance Limited




                                  Now Available
                                  as Kindle or EBook Download
                                  Is your Compliance Department as compliant as it
                                  should be?
                                  Are your Compliance Risk Assessments accurate?
                                  Is your Annual Monitoring Plan as comprehensive as it
                                  should be?
                                         Click on the picture




Also Available
We cover 11 main areas other than competence and
qualifications to help you decide your strategy and
assist with your planning to get you ready for 1st
January 2013.
Our workbook covers;
Business Vision and Mission Statement
Business Plan
Operational Plan
Financial Crime
Remuneration
Investment Process
Creating a Portfolio
Growing
Compliance (including our compliance risk
assessment methodology)
Governance
Exit Strategy – End Game Planning
Click Here to get full details and your copy NOW!




Page | 2                                                            Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                              By CEI Compliance Limited
Background
           Since March 2008, when TCF measures required Management Information
           to provide a measure of how effective and the level of adherence of the
           application of the initiative, it seems that the FSA have increasingly
           encouraged businesses to use MI to demonstrate how they are operating
           and identify areas that may require some attention.

           A recent survey of companies across the FSA spectrum has provided
           evidence that a number of firms use MI
           but few can explain what they use it for
           or why? Often these elements are
           forgotten over time and seldom
           reviewed to reflect contemporary needs
           or risk factors.

           Designing MI to suit a company’s needs is
           not always easy, as it takes some time in
           planning to identify exactly what is
           needed. While we can, and have
           helped a number of organisations of all
           sizes constructing MI, the bottom line is,
           as always, what is to be done with the
           data.

           So why use MI or develop our own system for MI? Surely we know what is
           going on in our own business, don’t we? Obviously we do, anecdotally
           and superficially that is clear, but how do we compare results to groups of
           people, processes or risks identified and, furthermore, identify trends and
           improving or deteriorating results over time? Even as that great fictional
           investigator of Agatha Christie fame, Hercule Poirot would remark,
           sometimes the little grey cells let us all down.

           So if we are going to use any MI system, we have to understand and be
           absolutely clear on the form it is to take. There is no point in running
           multiple systems that offer a plethora of methods when all we will end up
           doing is getting confused: often challenging understanding about the
           definitions rather than the information.

           Who does this apply to? Well, quite honestly everyone from sole trader to
           large concerns; no one is exempt.

           Whilst a few people are afraid of doing things wrong by not having “the
           right” information it could easily be argued that, any information for
           comparison could be seen as better than none in many instances.
           Management information systems are designed to be organic and
           changeable over time, to develop with your business model, help you
           expand your business and can benefit you in many ways by assisting you
           to make better, informed decisions.
Page | 3                                                          Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                By CEI Compliance Limited




Page | 4                                            Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                                 By CEI Compliance Limited
Fundamentals
           The basic rules needed for designing or improving any management
           information that we need is, to make it;

                 Relevant: Consider what is specifically relevant to your firm and who
                  needs to see it or be aware of it.
                 Accurate: There is no point in making decisions based on rough
                  figures or perceptions of performance.
                 Timely: How often does this need to be measured? Weekly;
                  Monthly: Quarterly? Who needs to see it and when? Does it need to
                  be collated first?
                 Acted upon: What are the key triggers? We know all about KPIs but
                                                    what levels are acceptable? Be
                                                    clear on what you are looking for
                  Did You Know? In 2011,
                                                    and what you will do with it when
                       the FSA fined 9
                       companies over               you know.
                     £2,870,000 in cases                               Recorded: Write
                    involving inaccurate,           down in hard or soft copy what you
                     misleading or non-             do when you gather the
                         existent MI.               information, why it is important and
                    Don’t get caught out.           actions you will take at various
                                                    thresholds or breaches. Circulate
                                                    the results to those who need to
                  know and incorporate any decisions in policy reviews.

           The next item on your agenda has to be to decide how the information is
           going to be collected and used. How is it;

                   Gathered or sighted. New business register, Continuous Professional
                    Development (CPD), Key Performance Indicators (KPIs), Key Risk
                    Indicators (KRIs), training logs, compliance consultants reports,
                    audits, TCF customer surveys, Not taken up(NTU) or Not proceeded
                    with(NPW) applications, trail commissions, fees, training courses
                    applied for or attended etc.
                   Analysis. How is this information collated? All information for
                    everyone (name and shame) or certain data for Senior
                    Management? Are there to be graphs, tables, bar charts or
                    coloured segments to show progress, advancement on certain
                    issues? Decide how you wish to present the information.
                   Circulation. Who needs to know and what level do they need to
                    know? An adviser may need to know % of target for themself and
                    their team, but management may need to know lapse rate and
                    case scores specifically.
                   Action. Hold regular 1:1 meeting with staff. Set trigger points and
                    action plan frameworks to include remedial training or enhanced
                    supervision.
                   Measurement. How are these elements to be measured and
                    moved on? What trends are there; are tolerances being met? Do
Page | 5                                                             Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                                   By CEI Compliance Limited
                    you need to use a scorecard? (See article on implementing the
                    balanced scorecard in small and medium sized firms at
                    http://www.cei-compliance-limited.co.uk/bsc/).

           Do not leave these fundamental steps to fall into place, because without
           them any further planning is unstable.


Assessing Your Needs
           You have now decided what you are going to obtain MI on, and what
           you are going to do with it when you have got it, so now what?

           Now you have to look at the business processes and decide what you
           consider relevant. To give you some ideas you could look at;

                 Financial Position: Can you present to Senior Management that the
                  company is meeting the FSAs own funds test and meet all liabilities
                  as they fall due?
                 Financial Rewards: Can you identify incentives or rewards that may
                  encourage inappropriate behaviour amongst the management,
                  staff or advisers?
                 Span of Control: Do all individuals have      CEI Compliance can assist you in
                                                                 preparing all of your compliance
                  the resources and adequate support to
                                                                   monitoring, risk register and
                  fulfil their role to the standards set by
                                                                      remedial work planning.
                  the company?                                  Call them today on 0800 689 9 689
                 Risk Management: Can you                                or go online at
                  demonstrate that you have assessed
                  and prioritised all risks and can
                                                                www.ceicompliance.co.uk
                  evidence that risks are mitigated or
                  accommodated accordingly as well as
                  the culture displaying that TCF is fully embedded?
                 Recruitment: Can you evidence that all Fit and Proper checks have
                  been completed on all advisers and that previous complaints,
                  concerns or other issues have had a satisfactory explanation or that
                  periodic credit and other checks have provided comfort that there
                  are no issues with advisers acting inappropriately?
                 Competence and Qualification: Can you identify the gaps in
                  adviser’s knowledge and experience and take appropriate action
                  to ensure any skill gaps are remedied or provided for? Can you
                  confirm all advisers are adequately supervised?
                 Turnover and retention: Can you confirm that the reasons for
                  leaving are specifically individual and not endemic?
                 Advice Process: Can you confirm that advisers are giving suitable
                  advice and that their cases are being monitored adequately? How
                  are the advisers risk rated? Do we know what sources of business
                  are used by each adviser?
                 Product/Provider Selection: Can you satisfy senior management
                  that products are adequately recommended according to the

Page | 6                                                               Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                                    By CEI Compliance Limited
                    client risk rating and that an appropriate range of products are
                    considered for recommendation?
                Financial Promotions: Identify financial promotions campaigns and
                    their link to profitability or additional business generation? Identify
                    any root causes from complaints (either end of next working day or
                    regulated, as applicable)?
                Complaints: Identify root causes and/or areas of concern for
                                                         advisers or teams? Confirm all staff
              CEI Compliance conducts Executive          are aware of their responsibilities?
                 Coaching for Regulatory Visits          Identify average time of complaints
             Call today on 0800 689 9 689 or send a      investigations and resolution?
                blank email to regvis2012@cei-
                     compliance-limited.co.uk



           Current Practices
           How do you know if what you are doing is good or bad? Surely if it works
           for you, it is OK? It is your business after all.

           The FSA have conducted studies of good and bad practices and while
           we are not going to provide each area duplicated in this document, we
           have reproduced some for you to get an idea of the things that are not
           bad practices, but could be better.

           Good Practice                                        Poor Practice
           T&C
           The T & C scheme included                           The principal at the firm
           completing an initial risk assessment               considered that because he
           for each adviser by grading each of                 trained and trusted an
           them. This would take into account                  adviser, he didn’t need to
           industry experience, qualifications,                formally review his work.
           complaints, types of business they                  There was some form of
           would be writing, Key Performance                   training programme in place
           Indicators (KPI’s) and the results of               for     a    less  experienced
           file reviews. The three grades                      adviser. However, the lack of
           determined how much supervision                     suitable      monitoring    and
           each adviser needed.                                review procedures meant
                                                               there was a real risk that
           Financial Promotions                                customers       could    receive
           The firm had a procedure in place                   poorer quality of advice and
           that recorded customer queries and                  the firm was exposed to the
           complaints received about their                     risk of future complaints.
           financial promotions. The results
           were measured and analysed                          The firm’s website was not
           enabling the firm to identify areas of              included in its       ‘Financial
           concern and act upon them.                          Promotions’            checklist.
                                                               Therefore, the firm did not
                                                               remove      out-of-date     and
                                                               inappropriate material from its
                                                               website.

Page | 7                                                                Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
So to assess if your Management Information System is relevant, accurate, timely, acted
           upon and recorded, you will need to answer a number of questions. Here are some
           examples;
                Can you adequately assess the financial soundness of the people you recruit?
                Are new recruits adequately supervised?
                Can you identify weak areas of the advice process for individuals or a team?
                When was your Compliance Manual updated?
                Has the sales process changed since it was last documented?
                How well does your review service for clients work?
                Where there have been changes in circumstances for clients, do you
                   review the previous advice?
                When were your processes last tested and checked?
                How do you measure your complaints; purely by numbers?
                Are you comfortable of the impact of your adviser’s remuneration?
               If you do not assess and measure your firm’s recruitment procedures to ensure
               they are sufficiently robust, you could make inappropriate appointments.
               Identifying and addressing the root causes of staff turnover is good business
               practice. It could mean lower recruitment costs.

                By identifying the level of competency of new advisers and understanding
                the type of business they will bring to your firm, you can assess if this is
                appropriate for the advice and services being provided to your customers
                and you can assess your firm’s ability to adequately supervise them. This will
                reduce the risk of your firm giving customers poor advice.

                Not assessing and measuring how your firm identifies gaps in adviser skills and
                knowledge or the quality of the training could lead to poor advice. Not
                measuring key indicators such as persistency rates, replacement business and
                complaints may hide issues which could develop into larger problems later.

                These failures could lead to costly remedial action or regulatory discipline in
                the future.

                So we have seen that assessing information gathered from key areas such as
                financial promotions, complaints, recruitment and training and competence,
                can help you measure the standards within your firm, identify risks, highlight
                where standards can be raised and helps to protect your business. These
                areas are high traffic areas and if you are involved in sales yourself, can be
                very demanding and detracting from your own business.




Page | 8                                                                   Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor
Introduction to Management Information
                                                                       By CEI Compliance Limited

                 CEI Compliance can help provide a full compliance
                   support service, reducing required management
                 time, ensuring all areas are up to date and working
                  for your firm’s long term benefit. Call 0800 689 9
                689 today or go online at www.ceicompliance.co.uk




                This whitepaper was written by Lee Werrell FInstSMM MCSI Cert PFS,
                founder of CEI Compliance Limited. Lee is contactable at any time and
                welcomes enquiries from all businesses. Call 0800 689 9 689.




                                                free guide




Page | 9                                                                   Version 1.6 June 2012
www.ceicompliance.co.uk The Compliance Doctor

Management information v1 6

  • 1.
    2012 Management Information …and its use within an IFA scenario Management Information (MI): Application of management techniques to collect information, communicate it within and outside the organization, and process it to enable managers to make quicker and better decisions. Management Information System (MIS) is a system or process that provides information needed to manage organizations effectively. Management information systems are regarded to be a subset of the overall internal controls procedures in a business, which cover the application of people, documents, technologies, and procedures. Management information systems are distinct from regular information systems in that they are used to analyse other information systems applied in operational activities in the organisation. Page | 0 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor Lee Werrell CEI Compliance Limited
  • 2.
    Introduction to ManagementInformation By CEI Compliance Limited Contents Background ................................................................................................................................................................... Fundamentals ............................................................................................................................................................... Assessing Your Needs.................................................................................................................................................. Go Mobile- Request Other Whitepapers sent to your email; Compliance Risk Balanced Scorecard for Regulatory Visit Assessment Financial Crime 2012 SMEs Preparation Coaching Methodology S166 Guide for Snr Strategy Setting TCF Guide UCIS Sales Management Simply scan the QR code for the relevant Whitepaper Page | 1 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 3.
    Introduction to ManagementInformation By CEI Compliance Limited Now Available as Kindle or EBook Download Is your Compliance Department as compliant as it should be? Are your Compliance Risk Assessments accurate? Is your Annual Monitoring Plan as comprehensive as it should be? Click on the picture Also Available We cover 11 main areas other than competence and qualifications to help you decide your strategy and assist with your planning to get you ready for 1st January 2013. Our workbook covers; Business Vision and Mission Statement Business Plan Operational Plan Financial Crime Remuneration Investment Process Creating a Portfolio Growing Compliance (including our compliance risk assessment methodology) Governance Exit Strategy – End Game Planning Click Here to get full details and your copy NOW! Page | 2 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 4.
    Introduction to ManagementInformation By CEI Compliance Limited Background Since March 2008, when TCF measures required Management Information to provide a measure of how effective and the level of adherence of the application of the initiative, it seems that the FSA have increasingly encouraged businesses to use MI to demonstrate how they are operating and identify areas that may require some attention. A recent survey of companies across the FSA spectrum has provided evidence that a number of firms use MI but few can explain what they use it for or why? Often these elements are forgotten over time and seldom reviewed to reflect contemporary needs or risk factors. Designing MI to suit a company’s needs is not always easy, as it takes some time in planning to identify exactly what is needed. While we can, and have helped a number of organisations of all sizes constructing MI, the bottom line is, as always, what is to be done with the data. So why use MI or develop our own system for MI? Surely we know what is going on in our own business, don’t we? Obviously we do, anecdotally and superficially that is clear, but how do we compare results to groups of people, processes or risks identified and, furthermore, identify trends and improving or deteriorating results over time? Even as that great fictional investigator of Agatha Christie fame, Hercule Poirot would remark, sometimes the little grey cells let us all down. So if we are going to use any MI system, we have to understand and be absolutely clear on the form it is to take. There is no point in running multiple systems that offer a plethora of methods when all we will end up doing is getting confused: often challenging understanding about the definitions rather than the information. Who does this apply to? Well, quite honestly everyone from sole trader to large concerns; no one is exempt. Whilst a few people are afraid of doing things wrong by not having “the right” information it could easily be argued that, any information for comparison could be seen as better than none in many instances. Management information systems are designed to be organic and changeable over time, to develop with your business model, help you expand your business and can benefit you in many ways by assisting you to make better, informed decisions. Page | 3 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 5.
    Introduction to ManagementInformation By CEI Compliance Limited Page | 4 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 6.
    Introduction to ManagementInformation By CEI Compliance Limited Fundamentals The basic rules needed for designing or improving any management information that we need is, to make it;  Relevant: Consider what is specifically relevant to your firm and who needs to see it or be aware of it.  Accurate: There is no point in making decisions based on rough figures or perceptions of performance.  Timely: How often does this need to be measured? Weekly; Monthly: Quarterly? Who needs to see it and when? Does it need to be collated first?  Acted upon: What are the key triggers? We know all about KPIs but what levels are acceptable? Be clear on what you are looking for Did You Know? In 2011, and what you will do with it when the FSA fined 9 companies over you know. £2,870,000 in cases  Recorded: Write involving inaccurate, down in hard or soft copy what you misleading or non- do when you gather the existent MI. information, why it is important and Don’t get caught out. actions you will take at various thresholds or breaches. Circulate the results to those who need to know and incorporate any decisions in policy reviews. The next item on your agenda has to be to decide how the information is going to be collected and used. How is it;  Gathered or sighted. New business register, Continuous Professional Development (CPD), Key Performance Indicators (KPIs), Key Risk Indicators (KRIs), training logs, compliance consultants reports, audits, TCF customer surveys, Not taken up(NTU) or Not proceeded with(NPW) applications, trail commissions, fees, training courses applied for or attended etc.  Analysis. How is this information collated? All information for everyone (name and shame) or certain data for Senior Management? Are there to be graphs, tables, bar charts or coloured segments to show progress, advancement on certain issues? Decide how you wish to present the information.  Circulation. Who needs to know and what level do they need to know? An adviser may need to know % of target for themself and their team, but management may need to know lapse rate and case scores specifically.  Action. Hold regular 1:1 meeting with staff. Set trigger points and action plan frameworks to include remedial training or enhanced supervision.  Measurement. How are these elements to be measured and moved on? What trends are there; are tolerances being met? Do Page | 5 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 7.
    Introduction to ManagementInformation By CEI Compliance Limited you need to use a scorecard? (See article on implementing the balanced scorecard in small and medium sized firms at http://www.cei-compliance-limited.co.uk/bsc/). Do not leave these fundamental steps to fall into place, because without them any further planning is unstable. Assessing Your Needs You have now decided what you are going to obtain MI on, and what you are going to do with it when you have got it, so now what? Now you have to look at the business processes and decide what you consider relevant. To give you some ideas you could look at;  Financial Position: Can you present to Senior Management that the company is meeting the FSAs own funds test and meet all liabilities as they fall due?  Financial Rewards: Can you identify incentives or rewards that may encourage inappropriate behaviour amongst the management, staff or advisers?  Span of Control: Do all individuals have CEI Compliance can assist you in preparing all of your compliance the resources and adequate support to monitoring, risk register and fulfil their role to the standards set by remedial work planning. the company? Call them today on 0800 689 9 689  Risk Management: Can you or go online at demonstrate that you have assessed and prioritised all risks and can www.ceicompliance.co.uk evidence that risks are mitigated or accommodated accordingly as well as the culture displaying that TCF is fully embedded?  Recruitment: Can you evidence that all Fit and Proper checks have been completed on all advisers and that previous complaints, concerns or other issues have had a satisfactory explanation or that periodic credit and other checks have provided comfort that there are no issues with advisers acting inappropriately?  Competence and Qualification: Can you identify the gaps in adviser’s knowledge and experience and take appropriate action to ensure any skill gaps are remedied or provided for? Can you confirm all advisers are adequately supervised?  Turnover and retention: Can you confirm that the reasons for leaving are specifically individual and not endemic?  Advice Process: Can you confirm that advisers are giving suitable advice and that their cases are being monitored adequately? How are the advisers risk rated? Do we know what sources of business are used by each adviser?  Product/Provider Selection: Can you satisfy senior management that products are adequately recommended according to the Page | 6 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 8.
    Introduction to ManagementInformation By CEI Compliance Limited client risk rating and that an appropriate range of products are considered for recommendation?  Financial Promotions: Identify financial promotions campaigns and their link to profitability or additional business generation? Identify any root causes from complaints (either end of next working day or regulated, as applicable)?  Complaints: Identify root causes and/or areas of concern for advisers or teams? Confirm all staff CEI Compliance conducts Executive are aware of their responsibilities? Coaching for Regulatory Visits Identify average time of complaints Call today on 0800 689 9 689 or send a investigations and resolution? blank email to regvis2012@cei- compliance-limited.co.uk Current Practices How do you know if what you are doing is good or bad? Surely if it works for you, it is OK? It is your business after all. The FSA have conducted studies of good and bad practices and while we are not going to provide each area duplicated in this document, we have reproduced some for you to get an idea of the things that are not bad practices, but could be better. Good Practice Poor Practice T&C The T & C scheme included The principal at the firm completing an initial risk assessment considered that because he for each adviser by grading each of trained and trusted an them. This would take into account adviser, he didn’t need to industry experience, qualifications, formally review his work. complaints, types of business they There was some form of would be writing, Key Performance training programme in place Indicators (KPI’s) and the results of for a less experienced file reviews. The three grades adviser. However, the lack of determined how much supervision suitable monitoring and each adviser needed. review procedures meant there was a real risk that Financial Promotions customers could receive The firm had a procedure in place poorer quality of advice and that recorded customer queries and the firm was exposed to the complaints received about their risk of future complaints. financial promotions. The results were measured and analysed The firm’s website was not enabling the firm to identify areas of included in its ‘Financial concern and act upon them. Promotions’ checklist. Therefore, the firm did not remove out-of-date and inappropriate material from its website. Page | 7 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 9.
    So to assessif your Management Information System is relevant, accurate, timely, acted upon and recorded, you will need to answer a number of questions. Here are some examples;  Can you adequately assess the financial soundness of the people you recruit?  Are new recruits adequately supervised?  Can you identify weak areas of the advice process for individuals or a team?  When was your Compliance Manual updated?  Has the sales process changed since it was last documented?  How well does your review service for clients work?  Where there have been changes in circumstances for clients, do you review the previous advice?  When were your processes last tested and checked?  How do you measure your complaints; purely by numbers?  Are you comfortable of the impact of your adviser’s remuneration? If you do not assess and measure your firm’s recruitment procedures to ensure they are sufficiently robust, you could make inappropriate appointments. Identifying and addressing the root causes of staff turnover is good business practice. It could mean lower recruitment costs. By identifying the level of competency of new advisers and understanding the type of business they will bring to your firm, you can assess if this is appropriate for the advice and services being provided to your customers and you can assess your firm’s ability to adequately supervise them. This will reduce the risk of your firm giving customers poor advice. Not assessing and measuring how your firm identifies gaps in adviser skills and knowledge or the quality of the training could lead to poor advice. Not measuring key indicators such as persistency rates, replacement business and complaints may hide issues which could develop into larger problems later. These failures could lead to costly remedial action or regulatory discipline in the future. So we have seen that assessing information gathered from key areas such as financial promotions, complaints, recruitment and training and competence, can help you measure the standards within your firm, identify risks, highlight where standards can be raised and helps to protect your business. These areas are high traffic areas and if you are involved in sales yourself, can be very demanding and detracting from your own business. Page | 8 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor
  • 10.
    Introduction to ManagementInformation By CEI Compliance Limited CEI Compliance can help provide a full compliance support service, reducing required management time, ensuring all areas are up to date and working for your firm’s long term benefit. Call 0800 689 9 689 today or go online at www.ceicompliance.co.uk This whitepaper was written by Lee Werrell FInstSMM MCSI Cert PFS, founder of CEI Compliance Limited. Lee is contactable at any time and welcomes enquiries from all businesses. Call 0800 689 9 689. free guide Page | 9 Version 1.6 June 2012 www.ceicompliance.co.uk The Compliance Doctor