Course objectives
•Define management control … and give a broad definition of it to …
•understand the different implications of management control for
different organisations and different object of performance…
•know how analyzing your organization to built that suits you…
•practice through different cases to give you enough culture of
management control to make you able to implement it in your
organization
How to begin
•Imagine you are head of a company, what ever its size, its shape or its
activities …you have to build a system in order to orientate the conduct of
operations and to asses the results
this system is « management
control »
•From this presentation we could draw some conclusions on management
control :
•First
this system exist in every kind of organisation but not in the
same configuration
•Second
this system won’t be the same in each organisation, it’s
totaly dependent on the organisation composition : its goal, its size, its
culture…
•Third
the configuration of management control system it’s not
stable and could change in terms of the change of the organisation or its
environment
An historical perspective

• MCS are frequently mingled with
Management Accountability (Financial
statements and cost calculation).
• This confusion find is explanation in history
Historical perspective (1/2)
Tools

Exemple of
Cie

Strategic
goals

Control
levers

1900

Cost accouting

Strandardisation
of production

Cost control
Production
planification
Top down
orientated

1920

Budget
ROI

Adaptation to
various market
and local situation

Respect of profit
objectives
Bottom up
mobilization

1950

Planning programming
Budgeting System
explanation of strategic
objectives and budget
adaptated
Flexible planification

Adaptation means
to strategic
Regular review of
strategy

Controling the
objective (not only
financial focus)
Discussion
between top down
and bottom up

US Government
(Mc Namara)
Historical perspective (2/2)
Tools

Exemple of
Cie

Strategic
goals

Control
levers

1980 / 90

ABC / ABM
Target costing
Dashboard

Activation of the
value chain
Service value
added

Adaptation
between process
and value
Activation of
indirect costs

2000

Balanced Score
Card

Enlargement of
the performance
conception
integration of HR
value

Strategic
alignement within
the company

Ccl : An evolution from financial to strategic focus
according to the conditions of performance
Definitions
Different definitions
but an ongoing accordance on the
strategic dimension underlying Management Control System
(MCS)
• “Management Control is the process by which managers
influence other members of the organization to implement
the organization’s strategies.” Anthony (1998)
• Management control system are the “processes and systems
that allow for assurance that the strategic choices and actions
are common and have been consistent" (H. Bouquin, 1991)
– « processus et systèmes qui permettent d’avoir l’assurance que les
choix stratégiques et les actions courantes sont et ont été
cohérentes »
Management system and strategy : examples of
relationship
Strategic expression
Increase market share

Increase quality of service to
maintain long time relation with
customers

Invest in new assets

Main process
under control
Commercial

Knowledge of
customers

Invest process
Commissioning of
investments

Management control
indicators
Increase rate of turnover and
market share
Profitability of new turnover

Customers satisfaction
Customers loyalty
Stabilisation of turnover
Costs of service activities

Long terme profitability of new
invests
Cash flow
Verbatim
From « La place du contrôle de gestion dans la conduite du changement » - Jean Luc Bazet

• "Lorsque le président change, l'organisation change et il y a
obligatoirement une remise en cause du contrôle de gestion puisqu'il est
au centre de l'évolution"
When the president changes, organization changes and there is
necessarily a challenge because of management control is central to the
evolution

•

•
•

"Le contrôle de gestion existe depuis plus de vingt ans dans le Groupe et
son contenu a évolué avec l'organisation »
Management control has existed for over twenty years in the Group
and its content has evolved with the organization
•

•

"Le contrôle de gestion est à la base du management et la direction
manage le Groupe avec cette fonction. Sans une pression forte et une
adhésion globale des dirigeants pour implanter le contrôle de gestion, ça
ne marche pas".
Management control is the basis for the management and direction of
the Group manage with this function. Without strong pressure and a
global membership of leaders to implement management control, it
does not work
Case studies
• For this different companies,
– What are the main strategically goals for this companies?
– Which Key Success Factors are necessary to achieve this objectives ?
– Describe the Management Control System implement in this
companies
– How the MCS allows the development of KSF ?
What is Management Control System

• A frequent vision figured MCS as a
metric system financial botowm line
oriented
• This is a narrow vision
Various dimension of control system

B
r
o
a
d

N
a
r
r
o
w

One’s company system is a mix of this dimensions
Example of management control system… outside
cybernetic system
Values

Rewards /
sanction
system

Policies and
procedures
Visible and invisible control system

Visible
Measurement
systems : financial
and non financial
Ressources allocation systems :
planning, budget, standards …

Socio-cultural systems : communication,
meeting, value sharing, control by the peer
Invisible

Psychologic systems : incentives and rewards, risks
sensitivity, …

Our subject
From financial system to Performance
Measurement System
Financial
performance
Cost control
Profitability mesurement

Budget organization
Cash flow
management
EconomicValue
Added

Strategical
performance

Balanced
scorecard
Process reengineering
(lean management,
6sygma…)
Management by
objectives and reporting

Organizational
performance
ORGANIZATIONAL ISSUES
Management control and organizational topics

First issue :
• Coordinate the organisation between
–
–
–
–
–

Different sub-units
Different levels of decision
Different process
Different goals
Different economic situation
Management control and organizational topics
Coordinate the organization : different levels of organizational control
according to Anthony
Strategic level control

Main
goals

Maintain long lasting
performance
Allow the company to
determine the
orientations according
to the market and
operationnal conditions

Users

Senior management

Exemple
of tools

Pluriannual budget
Strategic map

Management level
control
Maintain the
performance within
each business units
and the coordination
between them

Middle management

Annual budget
KPI (key performance
indicators)

Operational level control
Maintain the
performance of day to
day actions

Local management

Standards costs
Technical indicators
Exemple of coordination by budget
Business plan : pluriannual financial projection of company’s objectives and actions
(1)

Sales budget (3)

Balance sheet and PnL forecast
(2)

Investment budget (5)
Production program for the year
(4)
Purchasing budget (5)

Overheads budget (5)

Commercial objectives

Production Standards

Investments
Organizational position of management control:
an example

• EDF (french electricity purchaser)
Double system / double position
Audit : compliance with
standards (law,
accountability,
administrative
standards…)
Controling control of
financial strategy and
profitability
Tranformation
implementation of new
financial management
system
Management control and organizational topics

• Various position of Management Control
Organization
1) A part of the CFO
2) An independant direction
3) Embedded in B.U.

Advantage and desavantage of each position ?
Table of advantages and disadvantages of each
position
Position

Main tools

Avantages

Disadvantages

CFO

•Cost accounting
•PnL analyzis
•Cash flow control

•Control of financial
balance within the
organization
•Good quality in
accoutability and
financial information

•Only focused in
financial topics
•Distance with
strategic
management

Management
Control Office

•Dashboard –
Balanced Scorecard

•Connection with
strategy
strategic alignment
within organisation

•Some oppositions
with CFO (clash of
viewes and
legitimity)
•Distance with
operationals

Embedded in B.U.

•Operational
dashbords (flow
maangement)
•Specific B.U’s. PnL

•Good knowledge in
oprerational
questions
•Close to
operational decision
(decision support)

•Narrow vision of
the all companie
strategy
Five pictures of Management Controller

•
•
•
•
•
•

Financial information producer
System engineer
Rule keeper
Financial analyst
Internal advisor
Business analyst – business partner
Organizational questions : case

• Management Control System as a mean to
coordination in a decentralized organisation
• MCS and organizational control in Leroy Merlin
Leroy Merlin – group Adeo
• Leroy Merlin is a French home-improvement and gardening retailer
serving thirteen countries, genuine brand of Group Adeo
• Generally established on the outskirts of major town and cities, Leroy
Merlin stores are large centers (9000 m2 on average) providing self-service
and sales assisted services. Its business is centered around six main
sectors: Do It Yourself, building, gardening, sanitary equipment,
renewable energy, and interior decoration.
• Except Leroy Merlin’s stores the group runs several other brands :
Leroy Merlin – groupe Adeo
•

The group knows an important development during the last years. Even in the
period of crizis, the growth didn’t weaken thanks to a good quality of service and
an important international development.

Leroy Merlin is the fourth-largest actor in the world in the do-it-yourself industry, the second-largest in Europe
and the largest in France. For Leroy Merlin, effectively integrating into the local fabric means…
•On-site recruitment,
•Collaboration with local partners, creating central buying offices specific to each country,
•Product selection and accompanying advice tailored to the local inhabitants, homes, and buying practices of
each country, each region, and even each town having a Leroy Merlin store.
http://www.leroymerlin.com
Leroy Merlin – groupe Adeo – MCS
organization
• The organization of MCS function in
Leroy Merlin
– General staff position

part of the CFO

• MCS policy and main orientations
• Implementation of the systems

– Regionaly

part of the regional team

• Tools adaptation at the regional
background
• Coordination between regional and
national level
• Regional animation

– Localy

present in each store

• Part of the direction comity
• Securisation of the information
• Day to day animation with the teams

Job opportunity
Missions :
Membre du comité de direction, vous participez
à l'ensemble des décisions stratégiques du
magasin. En proximité avec le directeur du
magasin et les chefs de secteur, vous pilotez
l'élaboration et le suivi des objectifs, budgets et
plans d'investissement du magasin.
- Vous pilotez les différents indicateurs de
gestion (démarque, marge, flux financiers,
gestion des stocks) et de résultat du magasin.
- Vous animez de façon transversale les chefs
de secteur sur ces indicateurs et développez
au sein de Comité de Direction et des équipes
un esprit d'efficacité et de performance.
- Vous managez l'équipe administrative
(comptabilité, balisage,..).
- Vous êtes garant(e) de la sécurité des biens
et des personnes.
MSC in Leroy Merlin
Commercial department level
Les composantes du compte d'un rayon
Charges

Produits

Soldes intermédiaires

Chiffre d'affaires TTC
Chiffre d'affaires HT

Main goals :
Steering the
turnover and the
commercial
activity

Marge avant remises
Remises aux clients

Marge sur ventes
Var. prov. carte maison, B.A.

Var. prov. carte maison, B.A.

Remises fournisseurs (DPA)

Remises fournisseurs
RFA

Frais sur achats
Var. prov. report de marge

Var. prov. report de marge

Var. prov. AVS et décotes inv.

Var. prov. AVS et décotes inv.

Var. prov. quantités toxiques
Démarques

Var. prov. quantités toxiques

Résultat financier du stock

Résultat financier du stock

Marge nette
Frais de personnel
Prélèvements sur stock

Vente de présentations

Marge métier

Loses and costs of stocks

Direct expenses
labour
(professional margin)
MSC in Leroy Merlin
Store level
postes spécifiques au CE
magasin

Postes communs aux CE
magasin et rayon

Postes spécifiques au CE
magasin

Chiffre d'affaires TTC
Chiffre d'affaires HT

Marge avant remises
Remises aux clients

Marge sur ventes
Var. prov. carte maison, B.A.
Remises fournisseurs

Consolidation of the commercial
performance

RFA
Frais sur achats
Var. prov. report de marge
Var. prov. AVS et décotes inv.
Var. prov. quantités toxiques
Démarques
Résultat financier du stock

Marge nette
Recettes et dépenses des services
Frais de personnel services (hors appuis)
Frais de déplacement
Frais de formation
Publicité
Entretien du bâtiment
Frais de fonctionnement
Frais de matériel (dt prélèvt)
Frais de gestion
Informatique et caisse

Frais de personnel rayons + appuis

Management costs
Prélèvements déstinés aux rayons

Amortissements

Steering the PnL

Marge - frais influençables
Frais non influençables

Résultat opérationnel

Marge métier
The organization and the role of Management
Controler in Leroy Merlin
• Global coordination : from the cybernetic control to the organizational and
strategic control
National level

•Definition and implementation
of MC System
•Animation between regions

Exchange on yearly
objectives
Exchange on
performance
statement

•Weekly on monthly, ranking of
the performance (commercial
and financial) of all the stores

Regional level
•Exchange with the stores and department to analyze their
performance
•Steering the financial performance of new invests (opening and
extention of stores)

Store level
Maintaining
the focus on
commercial
performance

Department level
(embeded)
•Commercial action
orientated

•Coordinate the
commercial action of
department
gap with
the commercial budget
•Controling the costs

Maintaining the focus on
commercial and financial
performance
Maintening the challenge
between stores
The organization of Management Controler in
Leroy Merlin
System ingineer
Business analyst

Strategic control
National level
Regional level MC
Information producteur
Financial analyst
Internal advisor

Management control
Store level MC

Operational control
Department level

Information producter
Business partner
LINKING FINANCIAL
MESUAREMENT TO STRATEGICAL
ISSUES
Management control as an economic system
From BU
Commercial
development

Costs center

Invests center

Profit center

Income statement

Financial position

Cash flow statement

Value creation

Balance sheet

Financial structure

To company
And financial investors
Management control as an economic system
Tools

Organizational
control

Cash flow
management

Financial ratios

EVA

PnL (income
statement)

Relationship
between operational
and cash acquisition

Cash flow statement

Relationship
between global
equilibrium and
strategy

Coordination between
BU and global
organization

Statement under
control

Relationship
between operational
actions and costs

Management
acounting

Strategical
Focus

PnL
Balance sheet

Global organization
Relationship
between company
and financial
investors
Management accounting

• Management accounting differs from financial
accounting in the way it focused in decision
making :
– It’s a formal mechanism for gathering, organising
and communicating informations about an activity
or a production in order to calculate the cost of
this object
Disctinction between management and financial
accounting
Management accounting

Financial accounting

Delimitation of
representation

Object of cost allocation :
productions, activities, business
unit, areas…

Corportation (completeness)

Time span of reports

Determinated by management
needs : monthly, quaterly…
(flexible)

Determinated by standards :
generaly one year

Time focus of reports

Historical (calculation of the cost
allocated in the past) or future
(calculation of the cost targeted
for the future)

Historical
Disctinction between management and financial
accounting
Management
accounting

Financial accounting

Main users

Organisation managers at
various levels

Outsides parties such as
investors, government…but
also managers

Freedom of choices of
accounting measures

No constraints other than
requiring the benefits of
improved management
decisions to exceed
informations costs

Constrained by financial
reporting standards

Behavioural implications in
selecting accounting
measures

Choice should consider how
measurements and reports
will influence managers daily
behaviour

Choice based on how to
measure and communicate
economic phenomena,
behavioral considerations
are secondary, although
executive compensations
based on reported results
may have behavioral impacts

Introduction to management accounting, Bhimani et al, Pearson, p 3
Management accounting

• Discussion around different
methodology of costs calculation and
their managerial implications
Different systems
• Determinated the system of cost accounting it’s a
managerial act and not only a mater of technic.
• Each method aims to strengthen some specific value
levers
Absorption costing
•

Primary goals : a classical method wich leads to
– Separation between direct costs (in direct relation with production
volumes) and indirect ones (not involved in the act of production)
– Allocate direct costs relevant to each sub-units involved in the
production process
– Maintain the relationship between activity level and profit
– Identify and control volumetric indicators relevant to each sub
part of the organisation

Levers of value

Critics and limitations :

Maintaining the relation between costs
and production

Secondary centers (the ones wich are not
directly involved in the production) are not
under control

Focusing on the indicators wich leads to
the growth of costs

Leads to a stiff organisation
A device not in accordance with the rise
of indirect costs (marketing, IT, …)
Absorption costing (full costs)

• Diagram of absorption costings
Direct cost drivers
Material
Factory labour

Administrative
labour
Variable and fixed
overhead

Sub units
involved in
production
(principal
centers)

Finished
goods

W. I.P.

Indirect Cost drivers
Sub units not
involved in
production
(secondary
centers)

Incomes

Costs of goods
sold

P.N.L.
Example of value-chain function, ressource costs
and cost drivers
Value chain function and
ressource costs

Example of indirect cost drivers Example of direct cost drivers

Research and development
Costs of market survey
Salaries of product and process
engineers

Number of new product proposal
Complexity of proposed products

Design of products, services and processes
Salaries of product and process
engineers
Costs of computer-aided design
equipment used to develop prototype of
product for testing

Number of of engineering hours
Number of distinct part per product

Administrative costs
Financial administration
HR

Budget per service
Number of people

Production
Labour wages
Supervisory salaries
Maintenance wages
Depreciation of plant and machinery,
supplies
Energie costs

Labour hours
Labour hours
Number of mechanic hours
Number of machine hours
Kilowatt hours

Marketing
Advertisements
Salary of marketing personnel, travel
costs…

Number of advertissements
Sales euros

Distribution
Wages of shipping personnel
Transportation costs (eg depreciation
of vehicles and fuel)

Labour hours
Weight of items delivered

Customer services
Salaries of service personnel

Labour hours

Costs of supplies, travel

Number of service calls

Introduction to Management
accounting - Pearson
Influences of strategy on accounting systems
Analyse impact of
invest in profitabily
Reckon the exact
costs

•Allocation of costs
from non mature
units
•Analyse the way to
reduce costs

•If choice of invests
during the Market
share increase
periood give the
means for the
developpment
transfert costs to
cows units

•Organise the output
of the units
be
carefull of the
transfert the fixe
costs to other units
Example of strategical costs allocation
How allocate Holding fees ?

High

Low cost stategy
of holding fees

low rate

Market dynamic

High quality strategy /
development of the mark
increase the quality, low rate of
holding fees

Maintain the profitability
average rate of holding fees

(mix of market growth
and competitive
pressure)
Cash cows
holding fees

high level of

Low
Low

Profitability

High
Target costing and how to improve economic
value

• Target costing
– Identification of market price (level of price accepted by market)
– Analyse of the value chain
activities necessary for value and
costs needed for this activities
– Determine production standards for each activity (level of costs
required) according to market price

Levers of value :
Enhance value chain within companie
Externalisation of activities outside the
value chain

Critics and limitations :
A system leading to downsizing and
(sometime) ununployment
Difficulties to valorize qualititative
activities
A device adapted to industries but hard to
implement in service business
Target costing and value chain in luxury business
Intern opérations
Extern opérations

A total transformation of an industry

Third party
Physical flows
Information flows

Textil components

Création
Marketing

Garment assembly

Logistic

wholesale

retail

Consumers

Wholesalers

Quality control
Consumers

Former process directly owned by
industrials
D’après Dominique JACOMET - AUDENCIA - 18 septembre 2012

Current process
internalised
ABC / ABM

• Activity based costing / AB
Management
– The modelisation of the process by the identification of each activity
involved
– Produced items are determined by the volumes of activities engaged for
their realisation
– The relationship between the volumes of activity commited and the
production determines the costs drivers.

Levers of value :

Critics and limitations :

Costs calculation by the real volume of
activities involved

A method quite difficult to implement due
to the reorganisation needed

A method that allows deep change in
organisation : transversality, better
flexibility and orientation to qualitative
objectives

Frequent change in costs inductors and
instability in costs calculation
Classical absorption costing approach
Administration
VP Finance
and
Management

Budget per
division

Marketing

Global management
Production

Indirect
costs

Sales

Direct
costs

Number of
product
developped

Number of
sales
Number of
production

http://fr.edrawsoft.com/
ABC / ABM management
Objectives

Product focused process
Sales
Mkt
Mkt
Market surveys

Customers
observatory

Mkt
Production
Finance
Design and
production
Pricing
planification

Product design

Growth of relative
market share

Customers
satisfaction

Customers focused process
Mkt
Brand
management

Ventes
Sales action

Production
Ventes
Advisory and
implementation

Finance and mngt
Custormers
loyalty
Billing and
accountability

Example of cost drivers for former support function :

Invoices recovery times
Direct costing and the relation between costs and
volumes
• This method aims to analyze costs behaviour and cost-volume relationships :
– Two kinds of costs : variable and fixed
If cost driver level increases
Type of cost

Total cost

Cost per unit

Fixed costs

No change for the same
production structure
Change step by step

Decrease

Variable costs

Increase in proportion to
level of production

No change except for price
impact or productivity gains

"Variable costs," which increase directly in proportion to
the level of sales in dollars or units sold. Depending on your
type of business, some examples would be cost of goods sold,
sales commissions, shipping charges, delivery charges, costs of
direct materials or supplies, wages of part-time or temporary
employees and sales or production bonuses.
"Fixed costs," which remain the same regardless of your
level of sales. Depending on your type of business, some
typical examples would be rent, interest on debt, insurance,
plant and equipment expenses, business licenses and salary of
permanent full-time workers.
http://www.bizfilings.com
Examples of variable and fixed costs
Beta Sales Company
Contribution Format Income Statement

Labour
costs

For Year Ended December 31, 201X
Sales
$ 462,452
Less Variable Costs:
Cost of Goods Sold
$ 230,934
Sales Commissions
$ 58,852
Delivery Charges
$ 13,984
Total Variable Costs
$ 303,770
Contribution Margin
$ 158,682
Less: Fixed Costs:
Advertising
$ 1,850
Depreciation
$ 13,250
Insurance
$ 5,400
Payroll Taxes
$ 8,200
Rent
$ 9,600
Utilities
$ 17,801
Wages
$ 40,000
Total Fixed Costs
$ 96,101
Net Operating Income
$ 62,581

34%
Direct costing

implication

• Contribution margin and break-even point
– By analyzing the variable and fixed costs,
managers can derteminated the level of activity
required to be profitable
– The sum of contribution of each production
(calculated by the variance between the incomes
and the variable cost allocated) must cover up the
global fixed costs
Break even point
• The lever of activity for which the variable margin
matches the fixed costs is the break even point
the
volume of activity seted for a profit egal to 0.
Calculation
Two expression of break even point :
Sales – variable expenses – fixed expenses = 0
Per unit
(Unit sales price x number of units) – (unit variable costs x numbers of units) – fixed
expenses = 0
Unit contribution margin x number of units – fixed expenses = 0
Break even point = fixed expenses / unit contribution margin
Global
Rate of contibution margin x Turnover – fixed expenses = 0
Break even point = fixed expenses / rate of contribution margin
Break even point – graphic presentation
Case Break even point
Assume that the financial statements for Lillian's Bakery
indicate that the bakery's fixed costs are $49,000, and its
variable costs per unit of production (loaf of raisin coffee
cake) are $.30.
Further assume that its sales revenue is $1.00 per loaf.
Q:
1) Calculate the break even point
2) What commercial strategy Lillian’s Bakery can manage when
the B.E point is reach
Break even point and strategical decision
Philips focused on design and marketing
From LUC MATHIEU - Publié le 26 janvier 2006 | L'Usine Nouvelle n° 2994 Design

• By focusing on the outsourcing of assembly and supply components, Philips
has restated results of its consumer electronics. And takes advantage of its
renewed growth to adjust its perimeter.
The origin of this reassessment, the division "Consumer Electronics". Dying
only three years ago, she recorded a growth of 6% ​​(for an operating
margin of 6.7%) over the quarter, while the branches "Lighting" and
"Household" peaked at 1 and 3%. Evidence that the current restructuring is
beginning to bear fruit. Since 2001, the Dutch group has completely
revamped the organization of its subsidiary. With a clear strategy: to
abandon the vertical model for a horizontal structure. In other words, be
confined to the design and marketing of products and hand assembly and
component manufacturing to subcontractors.
Original choices ... to minimize fixed costs
Fixed and variable costs evolution
Fixed costs are not so fixe

Variable cost varie much more than expected
Variable costs per unit

Where management controler must control
Various strategies to steer the costs : standardisation, spare decision of investment
from operational action, budget and variance analyse…
Examples of control strategy to steer costs – the
case of industrial sector
Control system

Impact

Limits

Standardisation of
production

Control variable costs in
each production
Control fixed cost by
planification of invests

Rigidification of production
and processes
Difficulties if need for
adaptation of the production

Production budget (fixe and
variable costs) and
variance analyse

Freedom inside the budget
(confidence in the
responsability a priori) –
control a posteriori
Ongoing amelioration

Bias because of costs
calculation based on past
situation – could generate
difficulties if needs for
change

Sparing the decision
between operational
actions and invest

The operational actors are
focused on maintaining
variable costs at the
estimated level
Fixed costs are steering at
a different level

Could generate difficulties
in the adaptation of invests
to the level of production
From the micro level to the macro level

• Cost accounting leads to a micro vision of
each business unit within the entire
organization
– To steer a company it’s necessary to match micro
to macro level
it means to understand the way
the economic balance are respected
The evolution in performance analyse

• Various Business Units
BU 1

By the allowance of cost and
incomes, cost accounting
leads to a control within B.U.

BU 2
BU 3
BU …

The necessity of a global control to mastered the
economic balance of the global company
Steering cash flow

• Controling costs and profitability is necessary
for a company. But companies are carried out
to banckruptcy because of lack in cash rather
than in profitability.
• Therefore, steering cash flow is a question of
life
• Much more, establishing relationship between
profitability and cash is a crucial issue.
Explain the difficulties of this companies

Turnover
Contribution margin
Fixed costs
Accounts receivable
Inventories
Accounts payable

N
1 230 450,00 €
430 657,50 €
233 453,00 €
307 612,50 €
123 045,00 €
307 612,50 €

N+1
1 345 056,00 €
470 769,60 €
234 500,00 €
497 670,72 €
201 758,40 €
295 912,32 €

N+2
1 434 345,00 €
502 020,75 €
243 221,00 €
530 707,65 €
358 586,25 €
258 182,10 €

Treasurery
1/1
12/31

- €
74 159,50 €

74 159,50 €
29 957,30 €

29 957,30 €
61 162,05 €

N+3
1 450 455,00 €
507 659,25 €
248 085,42 €
725 227,50 €
435 136,50 €
217 568,25 €

61 162,05 €
9 051,93 € -

N+4
1 463 621,00 €
512 267,35 €
253 047,13 €
804 991,55 €
585 448,40 €
146 362,10 €

9 051,93 €
33 009,95 €
Profit – Cash flow’s relationship

From Business ressource Zions Bank
Global cash flow statement and the financial
strategy
From operating to discretionary cash flow

From standard’s and poor
The growing place of cash flow management
Cash flow and change in behaviour
• With the developpment of financial economy and
the place of lenders in the financement of
corporates, the attention on financial structure and
cash flow issues increased. This lead to deep change
in corporate strategy and control system.
Focus
1980

Turnover

Sales and commercial processes

1990

Ebit -ebitda

Global profit

2000

Roce - Roe + Ebitda

Economic value and financial structure

2009

Free cash flow + Roce +
Ebitda
Cash flow management
Economic performance
EBIT or EBITDA: a global vision of economic performance
Statement of Income — Example
(figures in thousands)
Revenue
Sales Revenue

$20,438

Operating Expenses
Cost of goods sold

$7,943

Selling, general and
administrative expenses

$8,172

Depreciation and
amortization
Other expenses
Total operating expenses
Operating income
Non-operating income
Earnings before Interest and
Taxes (EBIT)
Net interest expense/income
Earnings before income taxes
Income taxes
Net Income

$960
$138
$17,213
$3,225
$130
$3,355
$145
$3,210
$1,027
$2,183

EBITDA = EBIT + Depreciation
and Amortization
Economic performance

EBIT: a vision of economic global performance
regardless of financial company’s policy and
income tax impact.
EBITDA : by supressing impact of non
calculated expenses EBITDA leads to a
vision of ability to get cash by is own
activity. It’s also an indicator of
economic performance ignoring changes
in working capital.
EBIT comparator between industries
From profit to cash flow

•Macro Hard case
ROCE (Return On Capital Employed)
Capital employed

Fixed assets

Activity /
turnover
Currents assets –
currents liabilities
(operating
working capital)

Net operating
profit after
tax (NOPAT)

ROCE = NOPAT (or EBIT) /
Capital employed
Structure of ROCE

NOPAT
Capital employed

Could be shared

NOPAT
TURNOVER

Sales profitability

X

TURNOVER
CAPITAL EMPLOYED

Assets efficiency
Analyzing the ROCE and financial strategy
Sales profitability

Profitability strategy

10%

5%

ROCE = 10 %

Volume strategy

2%

1%
1

2

5

10
Assests efficiency
Understand performance strategy via ROCE

High
sales
profit.

Low
sales
profit.
Low assets
efficiency

High assets
efficiency
Financial performance in a market perspective

• EVA = Net Operating Profit After Tax - (Capital
Invested x WACC)
WACC = ((E/V) * Re) + [((D/V) *
Rd)*(1-T)]
E = Market value of the company's
equity
D = Market value of the company's
debt
V = Total Market Value of the
company (E + D)
Re = Cost of Equity
Rd = Cost of Debt
T= Tax Rate
EVA is a trademark of Stern Stewart & Co

weighted average cost of capital
EVA : an example
•

XYZ Consolidated XYZ Consolidated is an example of a manufacturing company operating in
a capital intensive industry. Over five years, revenue grew at a compound annual growth
rate (CAGR) of 9.6%. At the same time, operating earnings expanded at a CAGR of 9.0%. The
company also invested approximately 86¢ in new fixed assets for each $1.00 of incremental
sales.
Year

1

2

3

4

5

EBIT

10 228

5 687

9 359

13 677

14 598

EBITDA

19 979

14 847

18 336

22 887

24 315

Sales Growth

14,4%

-4,9%

8,2%

13,0%

18,9%

Operating Earnings Growth

50,3%

-45,8%

65,8%

49,1%

15,1%

Net Profit Growth

-21,4%

-54,1%

95,6%

56,3%

6,1%

Operating Margin

7,9%

4,5%

6,9%

9,1%

8,8%

Net Profit Margin

4,2%

2,0%

3,7%

5,1%

4,6%
XYZ Consolidated : PnL statement
Summary Profit and Loss Statement
Year
Sales
Sales Growth

1

2

3

4

5

130 984

124 530

134 801

152 327

181 173

14,4%

-4,9%

8,2%

13,0%

10,0%

Cost of Sales

95 749

93 425

100 293

111 953

137 567

Gross Profit

35 235

31 105

34 509

40 374

43 606

26,9%

25,0%

25,6%

26,5%

24,1%

15 256
9 602

16 258
9 225

16 173
9 016

17 487
8 995

19 291
8 322

10 377

5 622

9 320

13 892

15 993

7,9%

4,5%

6,9%

9,1%

8,8%

1 813
150

1 823
(65)

1 802
(39)

1 869
215

2 064
1 395

8 414

3 863

7 557

11 808

12 534

Tax Expense

2 861

1 314

2 569

4 015

4 262

Net Profit

5 554

2 550

4 988

7 794

8 272

4,2%

2,0%

3,7%

5,1%

4,6%

19 830

14 912

18 375

22 672

22 920

15,1%

12,0%

13,6%

14,9%

12,7%

Gross Margin

S, G & A
Depreciation & Amortization
Operating Profit
Operating Margin

Interest Expense
Other (Income) Expense
Pre-tax Profit

Net Profit Margin

EBITDA
EBITDA Margin
XYZ Consolidated : Balance sheet
Summary Balance Sheet
Year

1

2

3

4

5

Cash
Trading Assets

7 084
14 072

9 208
12 472

10 071
13 262

14 428
18 028

5 190
19 358

21 156

21 681

23 333

32 457

24 548

95 430
(45 169)

103 596
(54 180)

113 045
(60 283)

122 537
(68 120)

136 762
(72 286)

50 261

49 416

52 763

54 417

64 476

1 074
-

1 964
-

1 472
-

1 398
-

3 623
-

72 491

73 061

77 568

88 272

92 647

3 892
11 195
1 177

3 574
12 093
1 198

3 846
12 805
62

5 950
19 056
3 679

4 759
14 706
3 638

16 263

16 865

16 713

28 685

23 103

34 072
724

33 215
929

33 077
1 065

29 395
1 522

25 408
1 865

21 432

22 052

26 712

28 670

42 270

72 491

73 061

77 568

88 272

92 647

Total Current Assets
Property & Equipment
Less: Accumulated Depreciation
Net Property & Equipment
Deposits an Other Assets
Goodwill
Total Assets
Bank Credit Line
Accounts Payable
Other Accrued Liabilities
Current Portion of Long-term Debt
Total Current Liabilities
Long Term Debt, less current portion
Other LT Liabilities
Net Worth
Total Liabilities & Net Worth
NOPAT
Net Operating Profit After Taxes
Year

1

2

Operating Profit

10 377

3

4

5

13 892

15 993

5 622

9 320

-

-

-

-

(150)

65

39

(215)

-

-

-

Research & Development

335

(150)

(89)

Operating Lease Expense

3 257

Adjustments:
Depreciation
Other Expense
LIFO Adjustment

Miscellaneous
Taxes

NOPAT

-

3 224
-

3 412
-

(1 395)

1 041

(376)

18

(80)

3 471
-

3 218
-

(4 699)

(2 979)

(4 312)

(6 190)

(5 902)

9 121

5 782

8 370

12 017

11 458
WAAC
Total Invested Capital and Cost of Capital
Year
Capital Employed:
Debt
Equity
Book Value of Capital

1

2

3

4

5

35 249
21 432

34 413
22 052

33 139
26 712

33 074
28 670

29 046
36 942

56 681

56 465

59 851

61 744

65 989

6 901

6 751

6 662

6 680

6 600

Adjustments:
Capitalized R&D
Depreciation

-

-

-

-

-

Goodwill

-

-

-

-

-

Present Value of Operating Leases

10 558

12 645

11 678

9 700

7 400

Total Adjusted Capital

74 140

75 860

78 191

78 123

79 988

Cost of Capital:
Debt (Kd)
Equity
Weighted Average (Kw)
Tax Rate

Pre-Tax
6,5%
20,0%
12,6%
34,0%

After-Tax
4,3%
20,0%
11,4%

Weighting
55%
45%
EVA

Economic Value Added
Year

1

2

3

4

5

NOPAT

9 121

5 782

8 370

12 017

11 458

Capital Cost

8 441

8 636

8 902

8 894

9 106

681

(2 854)

(532)

3 123

2 351

Annual EVA
STRATEGIC CONTROL
From economic steering to strategic management

• Management control doesn’t only focused on
financial topics, but it’s main goal it’s to build
a strategical steering system
• Management control results on strategy, like
strategy resutls on management control
system
PSA case

• Giving the performance indicators followed by
PSA steering committee, established the
strategical objectives of this company
Global sales 2007

bench mark

(in thousand unity)

+3,0%
+4,1%

-0,7%

+7,9%

+5,5%

+6,5%

+8,0%

-0,2%

+1,9%
+2,1%

+12,9%
+9,2%

+7,1%

+2,0%
Turnover 2007 – Automotive activity (in billions of €)

+11,4%
+3,9%
+7,8%
+3,4%

+20,2%
+9,8%
+1,9%
+6,7%

+11,8%

+1,6%

+3,7%
+17,6%
+23,2%
Operational margin

ACTIVITES INDUS. & COMMERCIALES

Chiffre d’Affaires
Coûts d’acquisition

52 683
- 40 558

Frais généraux et commerciaux
Frais d’études, de R&D

- 2 098

Marge Opérationnelle
ACTIVITES DE FINANCEMENT

- 8 250

1 777

Chiffre d’Affaires

1 724

Charges opérationnelles

-1 306

Marge Opérationnelle

418

Marge Opérationnelle Groupe
Frais fi, autres produits&charges, éléments except

2 195
120

Résultat avant impôts

2 315

Impôts

- 685

Minoritaires, MEE, Goodwill

- 133

Résultat net du Groupe

1 497
Operational margin 2007 / 2006 – automotive

2006
2007
La moyenne des taux de ROC des
constructeurs ressort à 3,5% en
2006 et à 4,9% en 2007
Free Cash flow

1 999

2 000

2 001

2 002

2 003

Res. Net des sociétés intégrées
Dotations nettes aux amortissements
Variation du BFR
Autres
Flux financier d'exploitation

670
1 771
1 322
254
4 017

1 354
1 877
-238
-10
2 983

1 653
1 974
-422
-187
3 018

1 643
2 165
330
251
4 389

1 339
2 214
-223
-6
3 324

Acquisition d'immobilisations corporelles
Cessions d'immobilisations corporelles
Acquisitions nettes sociétés et titres
Changement de périmètre et autres
Flux financiers lié aux opérations d'investissements

-1 971
180
-177
-91
-2 059

-2 897
99
-128
-133
-3 059

-2 938
443
-1 584
55
-4 024

-2 790
172
-76
-268
-2 962

-3 007
142
-238
-20
-3 123

FREE CASH FLOW APRES INVESTISSEMENTS

1 958

-76

-1 006

1 427

200

Dividendes versés aux actionnaires de PSA
Dividendes intra-groupe
Dividendes versés aux minoritaires des sociétés intégrées
Variation d'actions propres
Variation de conversion
Autres
Flux des opérations financières

-73
4
-11
-953
21
-200
-1 212

-118
77
-12
-257
-13
149
-174

-217
0
-13
-458
-18
-206
-912

-294
41
-12
-517
-15
475
-322

-325
127
-14
-147
9
119
-231

VARIATION DE LA POSITION FINANCIERE NETTE

746

-250

-1 918

1 105

-31

POSITION FINANCIERE NETTE (début de période)

911

1 657

1 407

-511

594

1 657

1 407

-511

594

563

en ME

POSITION FINANCIERE NETTE (fin de période)
ROCE
From the dashboard to strategic objectives
Sales dynamic

Strategic parameters
•Production cost
•Commercial productivity
•Asset efficiency

Operating margin
Operating margin / Turnover
ROCE

Profitability according to competitors
performance

Relative market
share
Turnover

Strategic parameters :
•Market ‘s growth dynamic
•Competitor’s commercial
performance

Strategic parameters
•Financial market atractivity
•Funders return on
investment
•Investement capacity

Cash flow
Free cash flow

Solvency
The double alignement of management control

• Building strategic control system
Strategical level alignement

Operational level alignement

Operational
objectives

Strategic
system

Strategic
outcomes

Sub-unit economic
performance

Economic
system

Global
economic
goals

Process ongoing
continuous
improvment

Technical
system

Strategic
competencies
acquisition
From strategy to management control : achieve an
ongoing strategic alignement
Intention

Operationnalisation

Company strategic
goals

Alignement
1

Alignement
5

Measurement

Improvement

KPIs
Alignement
3

Alignement
2

Operational
objectives

Processes
improvement

Alignement
4
Alignement 1 : Strategical map
Alignement 1 : from strategical intention to
operationnal objectives

• Building operational objectives
Alignement 2 : Key Performance Indicators
What are KPIs
D1 : Key Performance Indicators (KPI) are measurable factors that relate to an
organisation's objectives. For example, if a company wanted to improve customer
retention, and had noticed a high level of complaints about delivery, then
deliveries made on time over a set period of time would be a KPI.
D2 : Key Performance Indicators (KPIs) are quantitative and qualitative measures used
to review an organisation's progress against its goals. These are broken down and
set as targets for achievement by departments and individuals. The achievement
of these targets is reviewed at regular intervals.

• What are not KPIs
All kind of measurable information disconnected from organizationnal’s goals
Information not linked with an assesment device
Indicators non relevant with action or not specific for the users
Alignement 2 : Key Performance Indicators

Bauer, K 2004, KPIs - The Metrics that Drive Performance
Management, Information Management and
SourceMedia Inc., Brookfield USA, viewed 8 October 2009,

Objectives

KPIs

Scale value

Presentation
Alignement 2 : Key Performance Indicators as a
measurement system

UK gas provider

Scale value through
comparisions

Targets give the
goals to achieve
Alignement 2 : Key Performance Indicators as a
measurement system

Performance and
improvement within the
company
Alignement 3 : From objectives to process
improvment

101
Alignement 3 : Process management
continuous loop

• A continuous improvement

a
Alignement 3 : The methodology
Alignement 3 : Example of ISO 9001 chart
Alignement 4 and 5 : monitoring the strategic
system
the strategic planification solution
Alignement 4 and 5 : Organizing the coordination
through KPIs
Coordinate collective
action

Efficiency
measurement
Managers

Results

Efficacity
measurement

Triangle of the goals
Activities

Means
Economy
measurement

Operationals

Financials

The need for alignement within the different organizational levels
MCS et IT strategy
Management control system depends strongly on information and IT
process.
Organizing MCS means structuring information system.
The quality of a good information system to implement MCS :
•The capability to merge different nature of datas coming from
different sources of information
•The capability to represent different levels of information
from
detail to synthesis
•The capability to conduct in deep analysis by crossing several datas
MCS et IT strategy
Enterprise Resource Planning system

IS as a global database
MCS et IT strategy
Business Intelligence

IS as cognitive system
Alignement 4 and 5 : The difficulty of alignement
within organization
•Could your organization improve its performance
if you could somehow better communicate to your
employees what your strategy is?
•Do you have employees whose hard work is
actually running counter to the organization’s
goals because they have a different
understanding of what you are trying to
accomplish?
•Do various departments in your organization
focus on activities within their own silo more than
on how they support the organization’s mission
and vision?
A global system : Introduction to balanced
scorecard
The balanced scorecard is a strategic planning and management
system that is used extensively in business and industry, government,
and nonprofit organizations worldwide to align business activities to the
vision and strategy of the organization, improve internal and external
communications, and monitor organization performance against
strategic goals. It was originated by Drs. Robert Kaplan (Harvard
Business School) and David Norton as a performance measurement
framework that added strategic non-financial performance measures to
traditional financial metrics to give managers and executives a more
'balanced' view of organizational performance. ]
BSC and strategic system

Integrate the
mesearument
system in
strategical
perspectives
Four perspectives – four categories of KPIs
Four perspectives – four categories of KPIs
example

an
From Bsc to strategy map
Strategy map : a question of adaptation
Strategy map : a question of adaptation
Balanced Score Card : cas

•Wich are the main interest for FMC corp
to implement a BSC system ?
•Wich are the limits of such a system ?
•What methodology followed to
implement BSC ?
TO CONCLUDE
Management control

• Management control is not only a mater of
tools and measure, but has to be seen like a
global system establish link between strategy,
operational processes and economy.
• It fits into a cultural and managerial context
and can’t be separate from.
• It’s a dynamic system in continuous change
wich search a balance between several
tensions wich structure the management and
for that it could activate four levers
Four levers of control : according to Simons
Levers of control
Relevant bibliographie
For those who are interest on going a step further
• Kaplan and Norton
– The Balanced Scorecard: Measures That Drive Performance, with David P. Norton.
Harvard Business Review, January–February 1992.
– The Balanced Scorecard: Translating Strategy Into Action, with David Norton. Harvard
Business School Press, 1996.
– The Strategy-Focused Organization: How Balanced Scorecard Companies Thrive in the
New Business Environment, with David P. Norton. Harvard Business School Press, 2000.
– Alignment: Using the Balanced Scorecard to Create Corporate Synergies, with David P.
Norton. Harvard Business School Press, 2006.

• Simons, R.
– Levers of Control: How Managers Use Innovative Control Systems to Drive Strategic
Renewal. Boston: Harvard Business School Press, 1995.

• The art of Management Control : Issues and Practices : under the
coordination of F. Giraud and Oliver Saulpic. Pearson 2011
• Introductin to management accounting : Bhimani and al. Pearson 2011
SCHOOL OF MANAGEMENT

MANAGEMENT CONTROL

  • 1.
    Management control : definitions– examples – analysis 11/2012
  • 2.
    Course objectives •Define managementcontrol … and give a broad definition of it to … •understand the different implications of management control for different organisations and different object of performance… •know how analyzing your organization to built that suits you… •practice through different cases to give you enough culture of management control to make you able to implement it in your organization
  • 3.
    How to begin •Imagineyou are head of a company, what ever its size, its shape or its activities …you have to build a system in order to orientate the conduct of operations and to asses the results this system is « management control » •From this presentation we could draw some conclusions on management control : •First this system exist in every kind of organisation but not in the same configuration •Second this system won’t be the same in each organisation, it’s totaly dependent on the organisation composition : its goal, its size, its culture… •Third the configuration of management control system it’s not stable and could change in terms of the change of the organisation or its environment
  • 4.
    An historical perspective •MCS are frequently mingled with Management Accountability (Financial statements and cost calculation). • This confusion find is explanation in history
  • 5.
    Historical perspective (1/2) Tools Exempleof Cie Strategic goals Control levers 1900 Cost accouting Strandardisation of production Cost control Production planification Top down orientated 1920 Budget ROI Adaptation to various market and local situation Respect of profit objectives Bottom up mobilization 1950 Planning programming Budgeting System explanation of strategic objectives and budget adaptated Flexible planification Adaptation means to strategic Regular review of strategy Controling the objective (not only financial focus) Discussion between top down and bottom up US Government (Mc Namara)
  • 6.
    Historical perspective (2/2) Tools Exempleof Cie Strategic goals Control levers 1980 / 90 ABC / ABM Target costing Dashboard Activation of the value chain Service value added Adaptation between process and value Activation of indirect costs 2000 Balanced Score Card Enlargement of the performance conception integration of HR value Strategic alignement within the company Ccl : An evolution from financial to strategic focus according to the conditions of performance
  • 7.
    Definitions Different definitions but anongoing accordance on the strategic dimension underlying Management Control System (MCS) • “Management Control is the process by which managers influence other members of the organization to implement the organization’s strategies.” Anthony (1998) • Management control system are the “processes and systems that allow for assurance that the strategic choices and actions are common and have been consistent" (H. Bouquin, 1991) – « processus et systèmes qui permettent d’avoir l’assurance que les choix stratégiques et les actions courantes sont et ont été cohérentes »
  • 8.
    Management system andstrategy : examples of relationship Strategic expression Increase market share Increase quality of service to maintain long time relation with customers Invest in new assets Main process under control Commercial Knowledge of customers Invest process Commissioning of investments Management control indicators Increase rate of turnover and market share Profitability of new turnover Customers satisfaction Customers loyalty Stabilisation of turnover Costs of service activities Long terme profitability of new invests Cash flow
  • 9.
    Verbatim From « Laplace du contrôle de gestion dans la conduite du changement » - Jean Luc Bazet • "Lorsque le président change, l'organisation change et il y a obligatoirement une remise en cause du contrôle de gestion puisqu'il est au centre de l'évolution" When the president changes, organization changes and there is necessarily a challenge because of management control is central to the evolution • • • "Le contrôle de gestion existe depuis plus de vingt ans dans le Groupe et son contenu a évolué avec l'organisation » Management control has existed for over twenty years in the Group and its content has evolved with the organization • • "Le contrôle de gestion est à la base du management et la direction manage le Groupe avec cette fonction. Sans une pression forte et une adhésion globale des dirigeants pour implanter le contrôle de gestion, ça ne marche pas". Management control is the basis for the management and direction of the Group manage with this function. Without strong pressure and a global membership of leaders to implement management control, it does not work
  • 10.
    Case studies • Forthis different companies, – What are the main strategically goals for this companies? – Which Key Success Factors are necessary to achieve this objectives ? – Describe the Management Control System implement in this companies – How the MCS allows the development of KSF ?
  • 11.
    What is ManagementControl System • A frequent vision figured MCS as a metric system financial botowm line oriented • This is a narrow vision
  • 12.
    Various dimension ofcontrol system B r o a d N a r r o w One’s company system is a mix of this dimensions
  • 13.
    Example of managementcontrol system… outside cybernetic system Values Rewards / sanction system Policies and procedures
  • 14.
    Visible and invisiblecontrol system Visible Measurement systems : financial and non financial Ressources allocation systems : planning, budget, standards … Socio-cultural systems : communication, meeting, value sharing, control by the peer Invisible Psychologic systems : incentives and rewards, risks sensitivity, … Our subject
  • 15.
    From financial systemto Performance Measurement System Financial performance Cost control Profitability mesurement Budget organization Cash flow management EconomicValue Added Strategical performance Balanced scorecard Process reengineering (lean management, 6sygma…) Management by objectives and reporting Organizational performance
  • 16.
  • 17.
    Management control andorganizational topics First issue : • Coordinate the organisation between – – – – – Different sub-units Different levels of decision Different process Different goals Different economic situation
  • 18.
    Management control andorganizational topics Coordinate the organization : different levels of organizational control according to Anthony Strategic level control Main goals Maintain long lasting performance Allow the company to determine the orientations according to the market and operationnal conditions Users Senior management Exemple of tools Pluriannual budget Strategic map Management level control Maintain the performance within each business units and the coordination between them Middle management Annual budget KPI (key performance indicators) Operational level control Maintain the performance of day to day actions Local management Standards costs Technical indicators
  • 19.
    Exemple of coordinationby budget Business plan : pluriannual financial projection of company’s objectives and actions (1) Sales budget (3) Balance sheet and PnL forecast (2) Investment budget (5) Production program for the year (4) Purchasing budget (5) Overheads budget (5) Commercial objectives Production Standards Investments
  • 20.
    Organizational position ofmanagement control: an example • EDF (french electricity purchaser) Double system / double position Audit : compliance with standards (law, accountability, administrative standards…) Controling control of financial strategy and profitability Tranformation implementation of new financial management system
  • 21.
    Management control andorganizational topics • Various position of Management Control Organization 1) A part of the CFO 2) An independant direction 3) Embedded in B.U. Advantage and desavantage of each position ?
  • 22.
    Table of advantagesand disadvantages of each position Position Main tools Avantages Disadvantages CFO •Cost accounting •PnL analyzis •Cash flow control •Control of financial balance within the organization •Good quality in accoutability and financial information •Only focused in financial topics •Distance with strategic management Management Control Office •Dashboard – Balanced Scorecard •Connection with strategy strategic alignment within organisation •Some oppositions with CFO (clash of viewes and legitimity) •Distance with operationals Embedded in B.U. •Operational dashbords (flow maangement) •Specific B.U’s. PnL •Good knowledge in oprerational questions •Close to operational decision (decision support) •Narrow vision of the all companie strategy
  • 23.
    Five pictures ofManagement Controller • • • • • • Financial information producer System engineer Rule keeper Financial analyst Internal advisor Business analyst – business partner
  • 24.
    Organizational questions :case • Management Control System as a mean to coordination in a decentralized organisation • MCS and organizational control in Leroy Merlin
  • 25.
    Leroy Merlin –group Adeo • Leroy Merlin is a French home-improvement and gardening retailer serving thirteen countries, genuine brand of Group Adeo • Generally established on the outskirts of major town and cities, Leroy Merlin stores are large centers (9000 m2 on average) providing self-service and sales assisted services. Its business is centered around six main sectors: Do It Yourself, building, gardening, sanitary equipment, renewable energy, and interior decoration. • Except Leroy Merlin’s stores the group runs several other brands :
  • 26.
    Leroy Merlin –groupe Adeo • The group knows an important development during the last years. Even in the period of crizis, the growth didn’t weaken thanks to a good quality of service and an important international development. Leroy Merlin is the fourth-largest actor in the world in the do-it-yourself industry, the second-largest in Europe and the largest in France. For Leroy Merlin, effectively integrating into the local fabric means… •On-site recruitment, •Collaboration with local partners, creating central buying offices specific to each country, •Product selection and accompanying advice tailored to the local inhabitants, homes, and buying practices of each country, each region, and even each town having a Leroy Merlin store. http://www.leroymerlin.com
  • 27.
    Leroy Merlin –groupe Adeo – MCS organization • The organization of MCS function in Leroy Merlin – General staff position part of the CFO • MCS policy and main orientations • Implementation of the systems – Regionaly part of the regional team • Tools adaptation at the regional background • Coordination between regional and national level • Regional animation – Localy present in each store • Part of the direction comity • Securisation of the information • Day to day animation with the teams Job opportunity Missions : Membre du comité de direction, vous participez à l'ensemble des décisions stratégiques du magasin. En proximité avec le directeur du magasin et les chefs de secteur, vous pilotez l'élaboration et le suivi des objectifs, budgets et plans d'investissement du magasin. - Vous pilotez les différents indicateurs de gestion (démarque, marge, flux financiers, gestion des stocks) et de résultat du magasin. - Vous animez de façon transversale les chefs de secteur sur ces indicateurs et développez au sein de Comité de Direction et des équipes un esprit d'efficacité et de performance. - Vous managez l'équipe administrative (comptabilité, balisage,..). - Vous êtes garant(e) de la sécurité des biens et des personnes.
  • 28.
    MSC in LeroyMerlin Commercial department level Les composantes du compte d'un rayon Charges Produits Soldes intermédiaires Chiffre d'affaires TTC Chiffre d'affaires HT Main goals : Steering the turnover and the commercial activity Marge avant remises Remises aux clients Marge sur ventes Var. prov. carte maison, B.A. Var. prov. carte maison, B.A. Remises fournisseurs (DPA) Remises fournisseurs RFA Frais sur achats Var. prov. report de marge Var. prov. report de marge Var. prov. AVS et décotes inv. Var. prov. AVS et décotes inv. Var. prov. quantités toxiques Démarques Var. prov. quantités toxiques Résultat financier du stock Résultat financier du stock Marge nette Frais de personnel Prélèvements sur stock Vente de présentations Marge métier Loses and costs of stocks Direct expenses labour (professional margin)
  • 29.
    MSC in LeroyMerlin Store level postes spécifiques au CE magasin Postes communs aux CE magasin et rayon Postes spécifiques au CE magasin Chiffre d'affaires TTC Chiffre d'affaires HT Marge avant remises Remises aux clients Marge sur ventes Var. prov. carte maison, B.A. Remises fournisseurs Consolidation of the commercial performance RFA Frais sur achats Var. prov. report de marge Var. prov. AVS et décotes inv. Var. prov. quantités toxiques Démarques Résultat financier du stock Marge nette Recettes et dépenses des services Frais de personnel services (hors appuis) Frais de déplacement Frais de formation Publicité Entretien du bâtiment Frais de fonctionnement Frais de matériel (dt prélèvt) Frais de gestion Informatique et caisse Frais de personnel rayons + appuis Management costs Prélèvements déstinés aux rayons Amortissements Steering the PnL Marge - frais influençables Frais non influençables Résultat opérationnel Marge métier
  • 30.
    The organization andthe role of Management Controler in Leroy Merlin • Global coordination : from the cybernetic control to the organizational and strategic control National level •Definition and implementation of MC System •Animation between regions Exchange on yearly objectives Exchange on performance statement •Weekly on monthly, ranking of the performance (commercial and financial) of all the stores Regional level •Exchange with the stores and department to analyze their performance •Steering the financial performance of new invests (opening and extention of stores) Store level Maintaining the focus on commercial performance Department level (embeded) •Commercial action orientated •Coordinate the commercial action of department gap with the commercial budget •Controling the costs Maintaining the focus on commercial and financial performance Maintening the challenge between stores
  • 31.
    The organization ofManagement Controler in Leroy Merlin System ingineer Business analyst Strategic control National level Regional level MC Information producteur Financial analyst Internal advisor Management control Store level MC Operational control Department level Information producter Business partner
  • 32.
  • 33.
    Management control asan economic system From BU Commercial development Costs center Invests center Profit center Income statement Financial position Cash flow statement Value creation Balance sheet Financial structure To company And financial investors
  • 34.
    Management control asan economic system Tools Organizational control Cash flow management Financial ratios EVA PnL (income statement) Relationship between operational and cash acquisition Cash flow statement Relationship between global equilibrium and strategy Coordination between BU and global organization Statement under control Relationship between operational actions and costs Management acounting Strategical Focus PnL Balance sheet Global organization Relationship between company and financial investors
  • 35.
    Management accounting • Managementaccounting differs from financial accounting in the way it focused in decision making : – It’s a formal mechanism for gathering, organising and communicating informations about an activity or a production in order to calculate the cost of this object
  • 36.
    Disctinction between managementand financial accounting Management accounting Financial accounting Delimitation of representation Object of cost allocation : productions, activities, business unit, areas… Corportation (completeness) Time span of reports Determinated by management needs : monthly, quaterly… (flexible) Determinated by standards : generaly one year Time focus of reports Historical (calculation of the cost allocated in the past) or future (calculation of the cost targeted for the future) Historical
  • 37.
    Disctinction between managementand financial accounting Management accounting Financial accounting Main users Organisation managers at various levels Outsides parties such as investors, government…but also managers Freedom of choices of accounting measures No constraints other than requiring the benefits of improved management decisions to exceed informations costs Constrained by financial reporting standards Behavioural implications in selecting accounting measures Choice should consider how measurements and reports will influence managers daily behaviour Choice based on how to measure and communicate economic phenomena, behavioral considerations are secondary, although executive compensations based on reported results may have behavioral impacts Introduction to management accounting, Bhimani et al, Pearson, p 3
  • 38.
    Management accounting • Discussionaround different methodology of costs calculation and their managerial implications
  • 39.
    Different systems • Determinatedthe system of cost accounting it’s a managerial act and not only a mater of technic. • Each method aims to strengthen some specific value levers
  • 40.
    Absorption costing • Primary goals: a classical method wich leads to – Separation between direct costs (in direct relation with production volumes) and indirect ones (not involved in the act of production) – Allocate direct costs relevant to each sub-units involved in the production process – Maintain the relationship between activity level and profit – Identify and control volumetric indicators relevant to each sub part of the organisation Levers of value Critics and limitations : Maintaining the relation between costs and production Secondary centers (the ones wich are not directly involved in the production) are not under control Focusing on the indicators wich leads to the growth of costs Leads to a stiff organisation A device not in accordance with the rise of indirect costs (marketing, IT, …)
  • 41.
    Absorption costing (fullcosts) • Diagram of absorption costings Direct cost drivers Material Factory labour Administrative labour Variable and fixed overhead Sub units involved in production (principal centers) Finished goods W. I.P. Indirect Cost drivers Sub units not involved in production (secondary centers) Incomes Costs of goods sold P.N.L.
  • 42.
    Example of value-chainfunction, ressource costs and cost drivers Value chain function and ressource costs Example of indirect cost drivers Example of direct cost drivers Research and development Costs of market survey Salaries of product and process engineers Number of new product proposal Complexity of proposed products Design of products, services and processes Salaries of product and process engineers Costs of computer-aided design equipment used to develop prototype of product for testing Number of of engineering hours Number of distinct part per product Administrative costs Financial administration HR Budget per service Number of people Production Labour wages Supervisory salaries Maintenance wages Depreciation of plant and machinery, supplies Energie costs Labour hours Labour hours Number of mechanic hours Number of machine hours Kilowatt hours Marketing Advertisements Salary of marketing personnel, travel costs… Number of advertissements Sales euros Distribution Wages of shipping personnel Transportation costs (eg depreciation of vehicles and fuel) Labour hours Weight of items delivered Customer services Salaries of service personnel Labour hours Costs of supplies, travel Number of service calls Introduction to Management accounting - Pearson
  • 43.
    Influences of strategyon accounting systems Analyse impact of invest in profitabily Reckon the exact costs •Allocation of costs from non mature units •Analyse the way to reduce costs •If choice of invests during the Market share increase periood give the means for the developpment transfert costs to cows units •Organise the output of the units be carefull of the transfert the fixe costs to other units
  • 44.
    Example of strategicalcosts allocation How allocate Holding fees ? High Low cost stategy of holding fees low rate Market dynamic High quality strategy / development of the mark increase the quality, low rate of holding fees Maintain the profitability average rate of holding fees (mix of market growth and competitive pressure) Cash cows holding fees high level of Low Low Profitability High
  • 45.
    Target costing andhow to improve economic value • Target costing – Identification of market price (level of price accepted by market) – Analyse of the value chain activities necessary for value and costs needed for this activities – Determine production standards for each activity (level of costs required) according to market price Levers of value : Enhance value chain within companie Externalisation of activities outside the value chain Critics and limitations : A system leading to downsizing and (sometime) ununployment Difficulties to valorize qualititative activities A device adapted to industries but hard to implement in service business
  • 46.
    Target costing andvalue chain in luxury business Intern opérations Extern opérations A total transformation of an industry Third party Physical flows Information flows Textil components Création Marketing Garment assembly Logistic wholesale retail Consumers Wholesalers Quality control Consumers Former process directly owned by industrials D’après Dominique JACOMET - AUDENCIA - 18 septembre 2012 Current process internalised
  • 47.
    ABC / ABM •Activity based costing / AB Management – The modelisation of the process by the identification of each activity involved – Produced items are determined by the volumes of activities engaged for their realisation – The relationship between the volumes of activity commited and the production determines the costs drivers. Levers of value : Critics and limitations : Costs calculation by the real volume of activities involved A method quite difficult to implement due to the reorganisation needed A method that allows deep change in organisation : transversality, better flexibility and orientation to qualitative objectives Frequent change in costs inductors and instability in costs calculation
  • 48.
    Classical absorption costingapproach Administration VP Finance and Management Budget per division Marketing Global management Production Indirect costs Sales Direct costs Number of product developped Number of sales Number of production http://fr.edrawsoft.com/
  • 49.
    ABC / ABMmanagement Objectives Product focused process Sales Mkt Mkt Market surveys Customers observatory Mkt Production Finance Design and production Pricing planification Product design Growth of relative market share Customers satisfaction Customers focused process Mkt Brand management Ventes Sales action Production Ventes Advisory and implementation Finance and mngt Custormers loyalty Billing and accountability Example of cost drivers for former support function : Invoices recovery times
  • 50.
    Direct costing andthe relation between costs and volumes • This method aims to analyze costs behaviour and cost-volume relationships : – Two kinds of costs : variable and fixed If cost driver level increases Type of cost Total cost Cost per unit Fixed costs No change for the same production structure Change step by step Decrease Variable costs Increase in proportion to level of production No change except for price impact or productivity gains "Variable costs," which increase directly in proportion to the level of sales in dollars or units sold. Depending on your type of business, some examples would be cost of goods sold, sales commissions, shipping charges, delivery charges, costs of direct materials or supplies, wages of part-time or temporary employees and sales or production bonuses. "Fixed costs," which remain the same regardless of your level of sales. Depending on your type of business, some typical examples would be rent, interest on debt, insurance, plant and equipment expenses, business licenses and salary of permanent full-time workers. http://www.bizfilings.com
  • 51.
    Examples of variableand fixed costs Beta Sales Company Contribution Format Income Statement Labour costs For Year Ended December 31, 201X Sales $ 462,452 Less Variable Costs: Cost of Goods Sold $ 230,934 Sales Commissions $ 58,852 Delivery Charges $ 13,984 Total Variable Costs $ 303,770 Contribution Margin $ 158,682 Less: Fixed Costs: Advertising $ 1,850 Depreciation $ 13,250 Insurance $ 5,400 Payroll Taxes $ 8,200 Rent $ 9,600 Utilities $ 17,801 Wages $ 40,000 Total Fixed Costs $ 96,101 Net Operating Income $ 62,581 34%
  • 52.
    Direct costing implication • Contributionmargin and break-even point – By analyzing the variable and fixed costs, managers can derteminated the level of activity required to be profitable – The sum of contribution of each production (calculated by the variance between the incomes and the variable cost allocated) must cover up the global fixed costs
  • 53.
    Break even point •The lever of activity for which the variable margin matches the fixed costs is the break even point the volume of activity seted for a profit egal to 0. Calculation Two expression of break even point : Sales – variable expenses – fixed expenses = 0 Per unit (Unit sales price x number of units) – (unit variable costs x numbers of units) – fixed expenses = 0 Unit contribution margin x number of units – fixed expenses = 0 Break even point = fixed expenses / unit contribution margin Global Rate of contibution margin x Turnover – fixed expenses = 0 Break even point = fixed expenses / rate of contribution margin
  • 54.
    Break even point– graphic presentation
  • 55.
    Case Break evenpoint Assume that the financial statements for Lillian's Bakery indicate that the bakery's fixed costs are $49,000, and its variable costs per unit of production (loaf of raisin coffee cake) are $.30. Further assume that its sales revenue is $1.00 per loaf. Q: 1) Calculate the break even point 2) What commercial strategy Lillian’s Bakery can manage when the B.E point is reach
  • 56.
    Break even pointand strategical decision Philips focused on design and marketing From LUC MATHIEU - Publié le 26 janvier 2006 | L'Usine Nouvelle n° 2994 Design • By focusing on the outsourcing of assembly and supply components, Philips has restated results of its consumer electronics. And takes advantage of its renewed growth to adjust its perimeter. The origin of this reassessment, the division "Consumer Electronics". Dying only three years ago, she recorded a growth of 6% ​​(for an operating margin of 6.7%) over the quarter, while the branches "Lighting" and "Household" peaked at 1 and 3%. Evidence that the current restructuring is beginning to bear fruit. Since 2001, the Dutch group has completely revamped the organization of its subsidiary. With a clear strategy: to abandon the vertical model for a horizontal structure. In other words, be confined to the design and marketing of products and hand assembly and component manufacturing to subcontractors. Original choices ... to minimize fixed costs
  • 57.
    Fixed and variablecosts evolution Fixed costs are not so fixe Variable cost varie much more than expected Variable costs per unit Where management controler must control Various strategies to steer the costs : standardisation, spare decision of investment from operational action, budget and variance analyse…
  • 58.
    Examples of controlstrategy to steer costs – the case of industrial sector Control system Impact Limits Standardisation of production Control variable costs in each production Control fixed cost by planification of invests Rigidification of production and processes Difficulties if need for adaptation of the production Production budget (fixe and variable costs) and variance analyse Freedom inside the budget (confidence in the responsability a priori) – control a posteriori Ongoing amelioration Bias because of costs calculation based on past situation – could generate difficulties if needs for change Sparing the decision between operational actions and invest The operational actors are focused on maintaining variable costs at the estimated level Fixed costs are steering at a different level Could generate difficulties in the adaptation of invests to the level of production
  • 59.
    From the microlevel to the macro level • Cost accounting leads to a micro vision of each business unit within the entire organization – To steer a company it’s necessary to match micro to macro level it means to understand the way the economic balance are respected
  • 60.
    The evolution inperformance analyse • Various Business Units BU 1 By the allowance of cost and incomes, cost accounting leads to a control within B.U. BU 2 BU 3 BU … The necessity of a global control to mastered the economic balance of the global company
  • 61.
    Steering cash flow •Controling costs and profitability is necessary for a company. But companies are carried out to banckruptcy because of lack in cash rather than in profitability. • Therefore, steering cash flow is a question of life • Much more, establishing relationship between profitability and cash is a crucial issue.
  • 62.
    Explain the difficultiesof this companies Turnover Contribution margin Fixed costs Accounts receivable Inventories Accounts payable N 1 230 450,00 € 430 657,50 € 233 453,00 € 307 612,50 € 123 045,00 € 307 612,50 € N+1 1 345 056,00 € 470 769,60 € 234 500,00 € 497 670,72 € 201 758,40 € 295 912,32 € N+2 1 434 345,00 € 502 020,75 € 243 221,00 € 530 707,65 € 358 586,25 € 258 182,10 € Treasurery 1/1 12/31 - € 74 159,50 € 74 159,50 € 29 957,30 € 29 957,30 € 61 162,05 € N+3 1 450 455,00 € 507 659,25 € 248 085,42 € 725 227,50 € 435 136,50 € 217 568,25 € 61 162,05 € 9 051,93 € - N+4 1 463 621,00 € 512 267,35 € 253 047,13 € 804 991,55 € 585 448,40 € 146 362,10 € 9 051,93 € 33 009,95 €
  • 63.
    Profit – Cashflow’s relationship From Business ressource Zions Bank
  • 64.
    Global cash flowstatement and the financial strategy
  • 65.
    From operating todiscretionary cash flow From standard’s and poor
  • 66.
    The growing placeof cash flow management
  • 67.
    Cash flow andchange in behaviour • With the developpment of financial economy and the place of lenders in the financement of corporates, the attention on financial structure and cash flow issues increased. This lead to deep change in corporate strategy and control system. Focus 1980 Turnover Sales and commercial processes 1990 Ebit -ebitda Global profit 2000 Roce - Roe + Ebitda Economic value and financial structure 2009 Free cash flow + Roce + Ebitda Cash flow management
  • 68.
    Economic performance EBIT orEBITDA: a global vision of economic performance Statement of Income — Example (figures in thousands) Revenue Sales Revenue $20,438 Operating Expenses Cost of goods sold $7,943 Selling, general and administrative expenses $8,172 Depreciation and amortization Other expenses Total operating expenses Operating income Non-operating income Earnings before Interest and Taxes (EBIT) Net interest expense/income Earnings before income taxes Income taxes Net Income $960 $138 $17,213 $3,225 $130 $3,355 $145 $3,210 $1,027 $2,183 EBITDA = EBIT + Depreciation and Amortization
  • 69.
    Economic performance EBIT: avision of economic global performance regardless of financial company’s policy and income tax impact. EBITDA : by supressing impact of non calculated expenses EBITDA leads to a vision of ability to get cash by is own activity. It’s also an indicator of economic performance ignoring changes in working capital.
  • 70.
  • 71.
    From profit tocash flow •Macro Hard case
  • 72.
    ROCE (Return OnCapital Employed) Capital employed Fixed assets Activity / turnover Currents assets – currents liabilities (operating working capital) Net operating profit after tax (NOPAT) ROCE = NOPAT (or EBIT) / Capital employed
  • 73.
    Structure of ROCE NOPAT Capitalemployed Could be shared NOPAT TURNOVER Sales profitability X TURNOVER CAPITAL EMPLOYED Assets efficiency
  • 74.
    Analyzing the ROCEand financial strategy Sales profitability Profitability strategy 10% 5% ROCE = 10 % Volume strategy 2% 1% 1 2 5 10 Assests efficiency
  • 75.
    Understand performance strategyvia ROCE High sales profit. Low sales profit. Low assets efficiency High assets efficiency
  • 76.
    Financial performance ina market perspective • EVA = Net Operating Profit After Tax - (Capital Invested x WACC) WACC = ((E/V) * Re) + [((D/V) * Rd)*(1-T)] E = Market value of the company's equity D = Market value of the company's debt V = Total Market Value of the company (E + D) Re = Cost of Equity Rd = Cost of Debt T= Tax Rate EVA is a trademark of Stern Stewart & Co weighted average cost of capital
  • 77.
    EVA : anexample • XYZ Consolidated XYZ Consolidated is an example of a manufacturing company operating in a capital intensive industry. Over five years, revenue grew at a compound annual growth rate (CAGR) of 9.6%. At the same time, operating earnings expanded at a CAGR of 9.0%. The company also invested approximately 86¢ in new fixed assets for each $1.00 of incremental sales. Year 1 2 3 4 5 EBIT 10 228 5 687 9 359 13 677 14 598 EBITDA 19 979 14 847 18 336 22 887 24 315 Sales Growth 14,4% -4,9% 8,2% 13,0% 18,9% Operating Earnings Growth 50,3% -45,8% 65,8% 49,1% 15,1% Net Profit Growth -21,4% -54,1% 95,6% 56,3% 6,1% Operating Margin 7,9% 4,5% 6,9% 9,1% 8,8% Net Profit Margin 4,2% 2,0% 3,7% 5,1% 4,6%
  • 78.
    XYZ Consolidated :PnL statement Summary Profit and Loss Statement Year Sales Sales Growth 1 2 3 4 5 130 984 124 530 134 801 152 327 181 173 14,4% -4,9% 8,2% 13,0% 10,0% Cost of Sales 95 749 93 425 100 293 111 953 137 567 Gross Profit 35 235 31 105 34 509 40 374 43 606 26,9% 25,0% 25,6% 26,5% 24,1% 15 256 9 602 16 258 9 225 16 173 9 016 17 487 8 995 19 291 8 322 10 377 5 622 9 320 13 892 15 993 7,9% 4,5% 6,9% 9,1% 8,8% 1 813 150 1 823 (65) 1 802 (39) 1 869 215 2 064 1 395 8 414 3 863 7 557 11 808 12 534 Tax Expense 2 861 1 314 2 569 4 015 4 262 Net Profit 5 554 2 550 4 988 7 794 8 272 4,2% 2,0% 3,7% 5,1% 4,6% 19 830 14 912 18 375 22 672 22 920 15,1% 12,0% 13,6% 14,9% 12,7% Gross Margin S, G & A Depreciation & Amortization Operating Profit Operating Margin Interest Expense Other (Income) Expense Pre-tax Profit Net Profit Margin EBITDA EBITDA Margin
  • 79.
    XYZ Consolidated :Balance sheet Summary Balance Sheet Year 1 2 3 4 5 Cash Trading Assets 7 084 14 072 9 208 12 472 10 071 13 262 14 428 18 028 5 190 19 358 21 156 21 681 23 333 32 457 24 548 95 430 (45 169) 103 596 (54 180) 113 045 (60 283) 122 537 (68 120) 136 762 (72 286) 50 261 49 416 52 763 54 417 64 476 1 074 - 1 964 - 1 472 - 1 398 - 3 623 - 72 491 73 061 77 568 88 272 92 647 3 892 11 195 1 177 3 574 12 093 1 198 3 846 12 805 62 5 950 19 056 3 679 4 759 14 706 3 638 16 263 16 865 16 713 28 685 23 103 34 072 724 33 215 929 33 077 1 065 29 395 1 522 25 408 1 865 21 432 22 052 26 712 28 670 42 270 72 491 73 061 77 568 88 272 92 647 Total Current Assets Property & Equipment Less: Accumulated Depreciation Net Property & Equipment Deposits an Other Assets Goodwill Total Assets Bank Credit Line Accounts Payable Other Accrued Liabilities Current Portion of Long-term Debt Total Current Liabilities Long Term Debt, less current portion Other LT Liabilities Net Worth Total Liabilities & Net Worth
  • 80.
    NOPAT Net Operating ProfitAfter Taxes Year 1 2 Operating Profit 10 377 3 4 5 13 892 15 993 5 622 9 320 - - - - (150) 65 39 (215) - - - Research & Development 335 (150) (89) Operating Lease Expense 3 257 Adjustments: Depreciation Other Expense LIFO Adjustment Miscellaneous Taxes NOPAT - 3 224 - 3 412 - (1 395) 1 041 (376) 18 (80) 3 471 - 3 218 - (4 699) (2 979) (4 312) (6 190) (5 902) 9 121 5 782 8 370 12 017 11 458
  • 81.
    WAAC Total Invested Capitaland Cost of Capital Year Capital Employed: Debt Equity Book Value of Capital 1 2 3 4 5 35 249 21 432 34 413 22 052 33 139 26 712 33 074 28 670 29 046 36 942 56 681 56 465 59 851 61 744 65 989 6 901 6 751 6 662 6 680 6 600 Adjustments: Capitalized R&D Depreciation - - - - - Goodwill - - - - - Present Value of Operating Leases 10 558 12 645 11 678 9 700 7 400 Total Adjusted Capital 74 140 75 860 78 191 78 123 79 988 Cost of Capital: Debt (Kd) Equity Weighted Average (Kw) Tax Rate Pre-Tax 6,5% 20,0% 12,6% 34,0% After-Tax 4,3% 20,0% 11,4% Weighting 55% 45%
  • 82.
    EVA Economic Value Added Year 1 2 3 4 5 NOPAT 9121 5 782 8 370 12 017 11 458 Capital Cost 8 441 8 636 8 902 8 894 9 106 681 (2 854) (532) 3 123 2 351 Annual EVA
  • 83.
  • 84.
    From economic steeringto strategic management • Management control doesn’t only focused on financial topics, but it’s main goal it’s to build a strategical steering system • Management control results on strategy, like strategy resutls on management control system
  • 85.
    PSA case • Givingthe performance indicators followed by PSA steering committee, established the strategical objectives of this company
  • 86.
    Global sales 2007 benchmark (in thousand unity) +3,0% +4,1% -0,7% +7,9% +5,5% +6,5% +8,0% -0,2% +1,9% +2,1% +12,9% +9,2% +7,1% +2,0%
  • 87.
    Turnover 2007 –Automotive activity (in billions of €) +11,4% +3,9% +7,8% +3,4% +20,2% +9,8% +1,9% +6,7% +11,8% +1,6% +3,7% +17,6% +23,2%
  • 88.
    Operational margin ACTIVITES INDUS.& COMMERCIALES Chiffre d’Affaires Coûts d’acquisition 52 683 - 40 558 Frais généraux et commerciaux Frais d’études, de R&D - 2 098 Marge Opérationnelle ACTIVITES DE FINANCEMENT - 8 250 1 777 Chiffre d’Affaires 1 724 Charges opérationnelles -1 306 Marge Opérationnelle 418 Marge Opérationnelle Groupe Frais fi, autres produits&charges, éléments except 2 195 120 Résultat avant impôts 2 315 Impôts - 685 Minoritaires, MEE, Goodwill - 133 Résultat net du Groupe 1 497
  • 89.
    Operational margin 2007/ 2006 – automotive 2006 2007 La moyenne des taux de ROC des constructeurs ressort à 3,5% en 2006 et à 4,9% en 2007
  • 90.
    Free Cash flow 1999 2 000 2 001 2 002 2 003 Res. Net des sociétés intégrées Dotations nettes aux amortissements Variation du BFR Autres Flux financier d'exploitation 670 1 771 1 322 254 4 017 1 354 1 877 -238 -10 2 983 1 653 1 974 -422 -187 3 018 1 643 2 165 330 251 4 389 1 339 2 214 -223 -6 3 324 Acquisition d'immobilisations corporelles Cessions d'immobilisations corporelles Acquisitions nettes sociétés et titres Changement de périmètre et autres Flux financiers lié aux opérations d'investissements -1 971 180 -177 -91 -2 059 -2 897 99 -128 -133 -3 059 -2 938 443 -1 584 55 -4 024 -2 790 172 -76 -268 -2 962 -3 007 142 -238 -20 -3 123 FREE CASH FLOW APRES INVESTISSEMENTS 1 958 -76 -1 006 1 427 200 Dividendes versés aux actionnaires de PSA Dividendes intra-groupe Dividendes versés aux minoritaires des sociétés intégrées Variation d'actions propres Variation de conversion Autres Flux des opérations financières -73 4 -11 -953 21 -200 -1 212 -118 77 -12 -257 -13 149 -174 -217 0 -13 -458 -18 -206 -912 -294 41 -12 -517 -15 475 -322 -325 127 -14 -147 9 119 -231 VARIATION DE LA POSITION FINANCIERE NETTE 746 -250 -1 918 1 105 -31 POSITION FINANCIERE NETTE (début de période) 911 1 657 1 407 -511 594 1 657 1 407 -511 594 563 en ME POSITION FINANCIERE NETTE (fin de période)
  • 91.
  • 92.
    From the dashboardto strategic objectives Sales dynamic Strategic parameters •Production cost •Commercial productivity •Asset efficiency Operating margin Operating margin / Turnover ROCE Profitability according to competitors performance Relative market share Turnover Strategic parameters : •Market ‘s growth dynamic •Competitor’s commercial performance Strategic parameters •Financial market atractivity •Funders return on investment •Investement capacity Cash flow Free cash flow Solvency
  • 93.
    The double alignementof management control • Building strategic control system Strategical level alignement Operational level alignement Operational objectives Strategic system Strategic outcomes Sub-unit economic performance Economic system Global economic goals Process ongoing continuous improvment Technical system Strategic competencies acquisition
  • 94.
    From strategy tomanagement control : achieve an ongoing strategic alignement Intention Operationnalisation Company strategic goals Alignement 1 Alignement 5 Measurement Improvement KPIs Alignement 3 Alignement 2 Operational objectives Processes improvement Alignement 4
  • 95.
    Alignement 1 :Strategical map
  • 96.
    Alignement 1 :from strategical intention to operationnal objectives • Building operational objectives
  • 97.
    Alignement 2 :Key Performance Indicators What are KPIs D1 : Key Performance Indicators (KPI) are measurable factors that relate to an organisation's objectives. For example, if a company wanted to improve customer retention, and had noticed a high level of complaints about delivery, then deliveries made on time over a set period of time would be a KPI. D2 : Key Performance Indicators (KPIs) are quantitative and qualitative measures used to review an organisation's progress against its goals. These are broken down and set as targets for achievement by departments and individuals. The achievement of these targets is reviewed at regular intervals. • What are not KPIs All kind of measurable information disconnected from organizationnal’s goals Information not linked with an assesment device Indicators non relevant with action or not specific for the users
  • 98.
    Alignement 2 :Key Performance Indicators Bauer, K 2004, KPIs - The Metrics that Drive Performance Management, Information Management and SourceMedia Inc., Brookfield USA, viewed 8 October 2009, Objectives KPIs Scale value Presentation
  • 99.
    Alignement 2 :Key Performance Indicators as a measurement system UK gas provider Scale value through comparisions Targets give the goals to achieve
  • 100.
    Alignement 2 :Key Performance Indicators as a measurement system Performance and improvement within the company
  • 101.
    Alignement 3 :From objectives to process improvment 101
  • 102.
    Alignement 3 :Process management continuous loop • A continuous improvement a
  • 103.
    Alignement 3 :The methodology
  • 104.
    Alignement 3 :Example of ISO 9001 chart
  • 105.
    Alignement 4 and5 : monitoring the strategic system the strategic planification solution
  • 106.
    Alignement 4 and5 : Organizing the coordination through KPIs Coordinate collective action Efficiency measurement Managers Results Efficacity measurement Triangle of the goals Activities Means Economy measurement Operationals Financials The need for alignement within the different organizational levels
  • 107.
    MCS et ITstrategy Management control system depends strongly on information and IT process. Organizing MCS means structuring information system. The quality of a good information system to implement MCS : •The capability to merge different nature of datas coming from different sources of information •The capability to represent different levels of information from detail to synthesis •The capability to conduct in deep analysis by crossing several datas
  • 108.
    MCS et ITstrategy Enterprise Resource Planning system IS as a global database
  • 109.
    MCS et ITstrategy Business Intelligence IS as cognitive system
  • 110.
    Alignement 4 and5 : The difficulty of alignement within organization •Could your organization improve its performance if you could somehow better communicate to your employees what your strategy is? •Do you have employees whose hard work is actually running counter to the organization’s goals because they have a different understanding of what you are trying to accomplish? •Do various departments in your organization focus on activities within their own silo more than on how they support the organization’s mission and vision?
  • 111.
    A global system: Introduction to balanced scorecard The balanced scorecard is a strategic planning and management system that is used extensively in business and industry, government, and nonprofit organizations worldwide to align business activities to the vision and strategy of the organization, improve internal and external communications, and monitor organization performance against strategic goals. It was originated by Drs. Robert Kaplan (Harvard Business School) and David Norton as a performance measurement framework that added strategic non-financial performance measures to traditional financial metrics to give managers and executives a more 'balanced' view of organizational performance. ]
  • 112.
    BSC and strategicsystem Integrate the mesearument system in strategical perspectives
  • 113.
    Four perspectives –four categories of KPIs
  • 114.
    Four perspectives –four categories of KPIs example an
  • 115.
    From Bsc tostrategy map
  • 116.
    Strategy map :a question of adaptation
  • 117.
    Strategy map :a question of adaptation
  • 118.
    Balanced Score Card: cas •Wich are the main interest for FMC corp to implement a BSC system ? •Wich are the limits of such a system ? •What methodology followed to implement BSC ?
  • 119.
  • 120.
    Management control • Managementcontrol is not only a mater of tools and measure, but has to be seen like a global system establish link between strategy, operational processes and economy. • It fits into a cultural and managerial context and can’t be separate from. • It’s a dynamic system in continuous change wich search a balance between several tensions wich structure the management and for that it could activate four levers
  • 121.
    Four levers ofcontrol : according to Simons
  • 122.
  • 123.
    Relevant bibliographie For thosewho are interest on going a step further • Kaplan and Norton – The Balanced Scorecard: Measures That Drive Performance, with David P. Norton. Harvard Business Review, January–February 1992. – The Balanced Scorecard: Translating Strategy Into Action, with David Norton. Harvard Business School Press, 1996. – The Strategy-Focused Organization: How Balanced Scorecard Companies Thrive in the New Business Environment, with David P. Norton. Harvard Business School Press, 2000. – Alignment: Using the Balanced Scorecard to Create Corporate Synergies, with David P. Norton. Harvard Business School Press, 2006. • Simons, R. – Levers of Control: How Managers Use Innovative Control Systems to Drive Strategic Renewal. Boston: Harvard Business School Press, 1995. • The art of Management Control : Issues and Practices : under the coordination of F. Giraud and Oliver Saulpic. Pearson 2011 • Introductin to management accounting : Bhimani and al. Pearson 2011
  • 124.