SlideShare a Scribd company logo
1 of 29
LOAD SHEDDING IN
KARACHI
CAUSES,SOLUTIONS,EFFECTS AND
CONCLUSION
Presented By:
Asad Riaz
Muhammad Minhal raza
Touseef Ahmed Alvi
What is Load Shedding?
INTRODUCTION
What is Load Shedding?
 When there is not enough electricity is available
to meet the demands of all consumers.
 It could be necessary to interrupt the supply of
certain areas.
 This is called Load Shedding.
http://tribune.com.pk/story
/15509/no-respite-in-
loadshedding-billing-for-
karachi/
What are the causes of Load Shedding?
CAUSES OF LOAD SHEDDING
WHY LOAD SHEDDING?
 The total power generation
capacity of Pakistan is (including
all sources) 21,143 MW .
 And the electricity demand (as of
April 2010) is 14,500 MW and
PEPCO is merely generating
10,000 MW.
CAUSES OF LOAD SHEDDING
What are the causes of Load Shedding? Take a look
on Them :
1.No WaterIn Dams
2.Aging Of Generation Equipment
3.Increasing Cost Of Fuel
4. Inability of WAPDA and KE
Let discuss them one by one http://autism.lovetoknow.com/Possible_Ca
uses_of_Autism
1. NO WATER IN DAMS
 We have low water
level in our dams which
is a source of
hydroelectric power.
 India has constructed
the baglehar dam on
river Chenab by which
our water level
decreasing.
 Recently 12 units
from the tarbela dams http://www.maine.gov/dep/water/dams-hydro/
2. AGING OF GENERATION
EQUIPMENTS
Age=aging (grow old or older.)
 The equipment which is used for the
production of electricity is out of date.
 Its become older and the duration of
these equipments is also expired.
 It cannot work properly and cannot
produce the sufficient amount of
electricity.
The transformer are to old .
 It was installed in the 1990s to
provide to
ten homes with each having four fans,
Reference
http://tribune.com.pk/story/914458/the-load-
shedding-saga-k-electric-still-stuck-in-its-trenches
3. INCREASING COST OF FUEL
 The cost of fuel is increasing day by day.
It means that the generation from thermal
plants are costing high price.
 WAPDA and KE when purchasing
electricity on higher cost may not be selling
it on low price. It should be a great loss.
 Major portion of electricity is produced
form oil, gas, coal this method is called
thermal power.
The production cost is 18 RS per Unit but
it is  supplied at 12 RS Per unit.
So that govt is unable to set up the new
plant due to inadequacy of finance
References: http://www.stateofpakistan.org/how-to-solve-
pakistans-energy-crisis
http://www.darethinkers.com/2012/06/08/load-shedding-in-pakistan/
4. INABILITY OF KE AND
WAPDA
 WAPDA and KE are two
generation and dispatch units in
Pakistan.
 It is fact that they have poor
services and are not able to
complete the electricity
requirement.
 Private sector should be given a
chance and allowed to install the
power plants and settle to electricity
consumers'.
http://paperpk.com/blog/index.php/tag/wapda-jobs/,
http://news247.com.pk/7481/karachi/k-electric-restores-electricity-
in-karachi.html
POWER THEFTING
Usually power utility is blamed
for load shedding and power
suspension; however,
consumers are also equally
involved behind prolong load-
shedding and unusual power
suspension who are involved in
power theft and non-payments
of bills.
http://www.pakistantoday.com.pk/2015/05/08/comment/po
wer-theft/
How the Load Shedding Effects Our Life?
EFFECTS OF LOAD SHEDDING
EFFECTS OF LOAD SHEDDING
Who are effected from Load Shedding and how?
 Effects On People
 Effects On Economy
 Effects On Circumstances
Let see them one by one
http://www.groupin.pk/bl
og/energy-crisis-in-
pakistan-effects-on-
business-and-it-industry/
EFFECTS ON PEOPLE
 Students are facing problem
during their exams and they are
unable to obtain their desired goals.
They cannot complete their
assignment also on time.
 Patients are also the victims of
load shedding they are facing
problem during their treatment
process.
 Daily life work also disturbed from
load shedding. People facing
https://www.google.com.pk/search?
q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ved=0CA
YQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isch&q=load+sh
EFFECTS ON ECONOMY
Industries are setting off and our economy is very much destroy form load shedding.
Following are the some reason which cause of downfall of our economy:
 Productivity when performing various tasks has also decreased rapidly.
 Time management is also a big issue
 Commodities kept for preservation in cold storages gets spoiled
 Farmers fail to water their field on time which cause shortage.
EFFECTS ON ECONOMY
 Economy of Pakistan is going
down.
Due to rise in price of Coal ,Gas ,
fuel.
http://www.sbp.org.pk/r
eports/annual/arFY12/c
omplete.pdf
EEFECTS ON
CIRCUMSTANCES
 People protested against power outage
by burning tires and blocking the road.
 Patients face problem to reach Hospital.
 Student face problem to reach School
because roads are block.
How to reduce Load Shedding?
SOLUTIONS
SOLUTIONS
What measure step should be taken for reduce the load shedding?
Solar Panels
Nuclear Energy
Wind Turbines
 Hyderal Energy
Lets Have A Look On Them
SOLAR PANELS/SOLAR
ENERGY
 Solar energy is derived from the sun in the
form of uv rays.
 Pakistan has a great gift of God “Sun-Light".
It should be installed in the hottest areas like
sibi,jacobabad.
 It should be also installed on a town levels in
Karachi where there is much shortage of
electricity.
 Cottage industry and power looms are also
WIND ENERGY/WIND
TURBINES
 The power, which produce
through the energy in winds, is
called wind energy.
 Pakistan is blessed with a
large resource of wind
corridor. According to wind
map of Pakistan a strong wind
corridor is found at Sindh
costal areas.
Government should pay
attention in this resource.
https://www.google.com.pk/search?
q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ved=0CAYQ_AUoAWoVC
hMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isch&q=wind+energy
HYDEL ENERGY
 Water flowing in the river has kinetic
energy, which is used to drive the turbine and
produce electricity the power generated as
Hydel Energy.
 This is the cheapest source of electricity
and it is used as major source of electricity in
Pakistan
 Although we cannot build big and large
dams but we should construct small dams for
industrial sector.
https://www.google.com.pk/search?
q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ve
d=0CAYQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isc
h&q=hydroelectric+energy
NUCLEAR ENERGY
 Energy which produce by emission of
radiation from the nucleus of atom.
Pakistan is in need of energy very badly and
urgently. Pakistan should look for nuclear
energy possibilities.
Pakistan is one of the seven countries who
has a great ability to operate nuclear power
plant for last 40 years .
 Government should work on development of
this resource.
https://www.google.com.pk/search?
q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=
X&ved=0CAYQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAx
G#tbm=isch&q=Nuclear+energy
What we have discussed till now?
SUMMARY
SUMMARY
 Electricity is short not only in Karachi but also in Pakistan and as a result electric load
shedding ,breakdowns,power,outages and blackouts are common features in the city.
 There are many factors behind the load shedding shortage of river water, power
theft,dismanagement,defective planning of WAPDA and KE,corruption and in completing
projects.
 Load Shedding is a great curse. Its disturbs the people belonging all walk of life like
student,patients,bussinessman,farmers,doctors
,industrialists,mechanices,housewives,laborers and etc.
Pakistan can not make any progress in any field in the presence of load shedding.
Government should take all the possible measure to end the load shedding from the country.
What are we doing and what to do?
What we have learned from this presentation and what are the responsibilities that Belong
to us?
CONCLUSION
CONCLUSION
 We all know that our country is in critical condition and we are looking for international
aid. Therefore it is not easy to start these projects immediately .
If we want to get the rid off this crisis, we have to change our life style. We should
definitely learn the saving of energy. The unnecessary use of energy should be stopped.
Unfortunately we should spent luxurious life style. We should spent a simple life.
 In last 10 years not a single mega watt was added. Blame games ,seminars,
conferences and events on energy issues in Pakistan are not necessary as compare to
do something practical.
“Nothing Endures But Change”
(Heraclites 540 BC-480 BC)
SOURCES
 Wikipedia
 Slide Share
 Google Images
 Turbine Express
ITS TIME FOR YOUR QUESTION NOW?

More Related Content

What's hot

Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)Ikfar Ashique
 
Congestion issues and its related management
Congestion issues and its related managementCongestion issues and its related management
Congestion issues and its related managementalpna1808
 
Energy crisis in Pakistan and its economical solution By Alina Baber
Energy crisis in Pakistan and its economical solution By Alina BaberEnergy crisis in Pakistan and its economical solution By Alina Baber
Energy crisis in Pakistan and its economical solution By Alina BaberAlina Baber
 
seminar report on optimal placement and optimal sizing of DG
seminar report on optimal placement and optimal sizing of DGseminar report on optimal placement and optimal sizing of DG
seminar report on optimal placement and optimal sizing of DGkhemraj298
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistanUSMAN TARIQ
 
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...Hatem Seoudy
 
Extraction of electricity from speed breakers
Extraction of electricity from speed breakersExtraction of electricity from speed breakers
Extraction of electricity from speed breakersPranav Preman
 
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...Pradeep Avanigadda
 
Energy crisis in pakistan (1)
Energy crisis in pakistan (1)Energy crisis in pakistan (1)
Energy crisis in pakistan (1)Nomi50
 
report on automatic tracking solar power system
report on automatic tracking  solar power system report on automatic tracking  solar power system
report on automatic tracking solar power system Yuvraj Singh
 
Energy Crisis in Pakistan
Energy Crisis in PakistanEnergy Crisis in Pakistan
Energy Crisis in PakistanEmaan Khan
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatchvikram anand
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villagesiosrjce
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction Systemsahotaharman
 

What's hot (20)

Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Congestion issues and its related management
Congestion issues and its related managementCongestion issues and its related management
Congestion issues and its related management
 
Energy crisis in Pakistan and its economical solution By Alina Baber
Energy crisis in Pakistan and its economical solution By Alina BaberEnergy crisis in Pakistan and its economical solution By Alina Baber
Energy crisis in Pakistan and its economical solution By Alina Baber
 
seminar report on optimal placement and optimal sizing of DG
seminar report on optimal placement and optimal sizing of DGseminar report on optimal placement and optimal sizing of DG
seminar report on optimal placement and optimal sizing of DG
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistan
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...
ADVANCED CONTROL TECHNIQUES FOR WIND POWER GENERATOR SYSTEM UNDER VARIABLE SP...
 
Energy project report on hydropower
Energy project report on hydropowerEnergy project report on hydropower
Energy project report on hydropower
 
Extraction of electricity from speed breakers
Extraction of electricity from speed breakersExtraction of electricity from speed breakers
Extraction of electricity from speed breakers
 
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
 
Energy crisis in pakistan (1)
Energy crisis in pakistan (1)Energy crisis in pakistan (1)
Energy crisis in pakistan (1)
 
Pakistan's energy sector and reform priorities
Pakistan's energy sector and reform priorities Pakistan's energy sector and reform priorities
Pakistan's energy sector and reform priorities
 
report on automatic tracking solar power system
report on automatic tracking  solar power system report on automatic tracking  solar power system
report on automatic tracking solar power system
 
Energy Crisis in Pakistan
Energy Crisis in PakistanEnergy Crisis in Pakistan
Energy Crisis in Pakistan
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Unemployment
UnemploymentUnemployment
Unemployment
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 

Viewers also liked

Load shedding problem in Bangladesh
Load shedding problem in BangladeshLoad shedding problem in Bangladesh
Load shedding problem in Bangladeshusernameleon
 
Final traffic presentation
Final traffic presentationFinal traffic presentation
Final traffic presentationgiap0083
 
Energy Crisis of Pakistan
Energy Crisis of PakistanEnergy Crisis of Pakistan
Energy Crisis of Pakistansaadbinasghar
 
Water Shortages Crisis in Karachi : Causes and Consequences
Water Shortages Crisis in Karachi : Causes and ConsequencesWater Shortages Crisis in Karachi : Causes and Consequences
Water Shortages Crisis in Karachi : Causes and Consequencesshehricbe
 
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARD
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARDWATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARD
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARDshehricbe
 
Water supply and sanitation analysis of sectors E and F, Islamabad - december...
Water supply and sanitation analysis of sectors E and F, Islamabad - december...Water supply and sanitation analysis of sectors E and F, Islamabad - december...
Water supply and sanitation analysis of sectors E and F, Islamabad - december...Noor Ain
 
Pakistan demography and health
Pakistan demography and health Pakistan demography and health
Pakistan demography and health Jawad Ullah
 
Hamara Karachi: an informative presentation
Hamara Karachi: an informative presentationHamara Karachi: an informative presentation
Hamara Karachi: an informative presentationInqilab Patel
 
Pakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsPakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsAmad Ali
 
Solid & Municipal Waste Management of Local Area Of Karachi
Solid & Municipal Waste Management of Local Area Of KarachiSolid & Municipal Waste Management of Local Area Of Karachi
Solid & Municipal Waste Management of Local Area Of KarachiEngineer Muhaamad Umer Hasan
 
ENERGY CRISIS
ENERGY CRISISENERGY CRISIS
ENERGY CRISISSVCE
 

Viewers also liked (20)

Load shedding problem in Bangladesh
Load shedding problem in BangladeshLoad shedding problem in Bangladesh
Load shedding problem in Bangladesh
 
Load shedding
Load sheddingLoad shedding
Load shedding
 
Final traffic presentation
Final traffic presentationFinal traffic presentation
Final traffic presentation
 
Load Shedding
Load SheddingLoad Shedding
Load Shedding
 
Energy Crisis of Pakistan
Energy Crisis of PakistanEnergy Crisis of Pakistan
Energy Crisis of Pakistan
 
Energy Crisis In Pakistan
Energy Crisis In PakistanEnergy Crisis In Pakistan
Energy Crisis In Pakistan
 
Shedding light on scleroderma - cause and mechanism
Shedding light on scleroderma - cause and mechanismShedding light on scleroderma - cause and mechanism
Shedding light on scleroderma - cause and mechanism
 
Water Shortages Crisis in Karachi : Causes and Consequences
Water Shortages Crisis in Karachi : Causes and ConsequencesWater Shortages Crisis in Karachi : Causes and Consequences
Water Shortages Crisis in Karachi : Causes and Consequences
 
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARD
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARDWATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARD
WATER SUPPLY ISSUES IN KARACHI – APPRAISAL AND WAY FORWARD
 
Water supply and sanitation analysis of sectors E and F, Islamabad - december...
Water supply and sanitation analysis of sectors E and F, Islamabad - december...Water supply and sanitation analysis of sectors E and F, Islamabad - december...
Water supply and sanitation analysis of sectors E and F, Islamabad - december...
 
Pakistan demography and health
Pakistan demography and health Pakistan demography and health
Pakistan demography and health
 
load shedding
load sheddingload shedding
load shedding
 
Energy Crisis
Energy CrisisEnergy Crisis
Energy Crisis
 
Hamara Karachi: an informative presentation
Hamara Karachi: an informative presentationHamara Karachi: an informative presentation
Hamara Karachi: an informative presentation
 
Presentation For KESC
Presentation For KESCPresentation For KESC
Presentation For KESC
 
Pakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsPakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutions
 
Under voltage load shedding
Under voltage load sheddingUnder voltage load shedding
Under voltage load shedding
 
Energy Crisis Of Pakistan
Energy Crisis Of PakistanEnergy Crisis Of Pakistan
Energy Crisis Of Pakistan
 
Solid & Municipal Waste Management of Local Area Of Karachi
Solid & Municipal Waste Management of Local Area Of KarachiSolid & Municipal Waste Management of Local Area Of Karachi
Solid & Municipal Waste Management of Local Area Of Karachi
 
ENERGY CRISIS
ENERGY CRISISENERGY CRISIS
ENERGY CRISIS
 

Similar to Load shedding in karachi(updated)

Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In PakistanFarooq Saeed
 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantSulaman Muhammad
 
E N E R G Y M A N A G E M E N T
E N E R G Y  M A N A G E M E N TE N E R G Y  M A N A G E M E N T
E N E R G Y M A N A G E M E N Tsajid ghafoor
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistanShehzad Imran
 
Global warming: A Case Study of Renewable Energy in India
Global warming: A Case Study of Renewable Energy in IndiaGlobal warming: A Case Study of Renewable Energy in India
Global warming: A Case Study of Renewable Energy in IndiaAnthonyNimelyCheaJr1
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2Faraz Ahmed
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistanSmag Subzwari
 
Energy crisis in pakistan real
Energy crisis in pakistan realEnergy crisis in pakistan real
Energy crisis in pakistan realSamia Dogar
 
IRJET- A Review: Overcoming of Electrical Energy Crises in Pakistan
IRJET- A Review: Overcoming of Electrical Energy Crises in PakistanIRJET- A Review: Overcoming of Electrical Energy Crises in Pakistan
IRJET- A Review: Overcoming of Electrical Energy Crises in PakistanIRJET Journal
 
Power potential in Pakistan
Power potential in PakistanPower potential in Pakistan
Power potential in PakistanErum Ahmed
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Projectanwaar azad
 

Similar to Load shedding in karachi(updated) (20)

Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
Presentation of energy crisis in pakistan
Presentation of energy crisis in pakistanPresentation of energy crisis in pakistan
Presentation of energy crisis in pakistan
 
Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In Pakistan
 
Renewable Energy_Lecture02
Renewable Energy_Lecture02Renewable Energy_Lecture02
Renewable Energy_Lecture02
 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power Plant
 
E N E R G Y M A N A G E M E N T
E N E R G Y  M A N A G E M E N TE N E R G Y  M A N A G E M E N T
E N E R G Y M A N A G E M E N T
 
Energy
EnergyEnergy
Energy
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistan
 
Global warming: A Case Study of Renewable Energy in India
Global warming: A Case Study of Renewable Energy in IndiaGlobal warming: A Case Study of Renewable Energy in India
Global warming: A Case Study of Renewable Energy in India
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2
 
power plants and working
power plants and workingpower plants and working
power plants and working
 
Hep
HepHep
Hep
 
Hep
HepHep
Hep
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistan
 
Energy crisis in pakistan real
Energy crisis in pakistan realEnergy crisis in pakistan real
Energy crisis in pakistan real
 
Energy slides
Energy slidesEnergy slides
Energy slides
 
IRJET- A Review: Overcoming of Electrical Energy Crises in Pakistan
IRJET- A Review: Overcoming of Electrical Energy Crises in PakistanIRJET- A Review: Overcoming of Electrical Energy Crises in Pakistan
IRJET- A Review: Overcoming of Electrical Energy Crises in Pakistan
 
Power potential in Pakistan
Power potential in PakistanPower potential in Pakistan
Power potential in Pakistan
 
Energy sector in pakistan
Energy sector in pakistanEnergy sector in pakistan
Energy sector in pakistan
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Project
 

Recently uploaded

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Recently uploaded (20)

Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

Load shedding in karachi(updated)

  • 1. LOAD SHEDDING IN KARACHI CAUSES,SOLUTIONS,EFFECTS AND CONCLUSION Presented By: Asad Riaz Muhammad Minhal raza Touseef Ahmed Alvi
  • 2. What is Load Shedding? INTRODUCTION
  • 3. What is Load Shedding?  When there is not enough electricity is available to meet the demands of all consumers.  It could be necessary to interrupt the supply of certain areas.  This is called Load Shedding. http://tribune.com.pk/story /15509/no-respite-in- loadshedding-billing-for- karachi/
  • 4. What are the causes of Load Shedding? CAUSES OF LOAD SHEDDING
  • 5. WHY LOAD SHEDDING?  The total power generation capacity of Pakistan is (including all sources) 21,143 MW .  And the electricity demand (as of April 2010) is 14,500 MW and PEPCO is merely generating 10,000 MW.
  • 6. CAUSES OF LOAD SHEDDING What are the causes of Load Shedding? Take a look on Them : 1.No WaterIn Dams 2.Aging Of Generation Equipment 3.Increasing Cost Of Fuel 4. Inability of WAPDA and KE Let discuss them one by one http://autism.lovetoknow.com/Possible_Ca uses_of_Autism
  • 7. 1. NO WATER IN DAMS  We have low water level in our dams which is a source of hydroelectric power.  India has constructed the baglehar dam on river Chenab by which our water level decreasing.  Recently 12 units from the tarbela dams http://www.maine.gov/dep/water/dams-hydro/
  • 8. 2. AGING OF GENERATION EQUIPMENTS Age=aging (grow old or older.)  The equipment which is used for the production of electricity is out of date.  Its become older and the duration of these equipments is also expired.  It cannot work properly and cannot produce the sufficient amount of electricity. The transformer are to old .  It was installed in the 1990s to provide to ten homes with each having four fans, Reference http://tribune.com.pk/story/914458/the-load- shedding-saga-k-electric-still-stuck-in-its-trenches
  • 9. 3. INCREASING COST OF FUEL  The cost of fuel is increasing day by day. It means that the generation from thermal plants are costing high price.  WAPDA and KE when purchasing electricity on higher cost may not be selling it on low price. It should be a great loss.  Major portion of electricity is produced form oil, gas, coal this method is called thermal power. The production cost is 18 RS per Unit but it is  supplied at 12 RS Per unit. So that govt is unable to set up the new plant due to inadequacy of finance References: http://www.stateofpakistan.org/how-to-solve- pakistans-energy-crisis http://www.darethinkers.com/2012/06/08/load-shedding-in-pakistan/
  • 10. 4. INABILITY OF KE AND WAPDA  WAPDA and KE are two generation and dispatch units in Pakistan.  It is fact that they have poor services and are not able to complete the electricity requirement.  Private sector should be given a chance and allowed to install the power plants and settle to electricity consumers'. http://paperpk.com/blog/index.php/tag/wapda-jobs/, http://news247.com.pk/7481/karachi/k-electric-restores-electricity- in-karachi.html
  • 11. POWER THEFTING Usually power utility is blamed for load shedding and power suspension; however, consumers are also equally involved behind prolong load- shedding and unusual power suspension who are involved in power theft and non-payments of bills. http://www.pakistantoday.com.pk/2015/05/08/comment/po wer-theft/
  • 12. How the Load Shedding Effects Our Life? EFFECTS OF LOAD SHEDDING
  • 13. EFFECTS OF LOAD SHEDDING Who are effected from Load Shedding and how?  Effects On People  Effects On Economy  Effects On Circumstances Let see them one by one http://www.groupin.pk/bl og/energy-crisis-in- pakistan-effects-on- business-and-it-industry/
  • 14. EFFECTS ON PEOPLE  Students are facing problem during their exams and they are unable to obtain their desired goals. They cannot complete their assignment also on time.  Patients are also the victims of load shedding they are facing problem during their treatment process.  Daily life work also disturbed from load shedding. People facing https://www.google.com.pk/search? q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ved=0CA YQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isch&q=load+sh
  • 15. EFFECTS ON ECONOMY Industries are setting off and our economy is very much destroy form load shedding. Following are the some reason which cause of downfall of our economy:  Productivity when performing various tasks has also decreased rapidly.  Time management is also a big issue  Commodities kept for preservation in cold storages gets spoiled  Farmers fail to water their field on time which cause shortage.
  • 16. EFFECTS ON ECONOMY  Economy of Pakistan is going down. Due to rise in price of Coal ,Gas , fuel. http://www.sbp.org.pk/r eports/annual/arFY12/c omplete.pdf
  • 17. EEFECTS ON CIRCUMSTANCES  People protested against power outage by burning tires and blocking the road.  Patients face problem to reach Hospital.  Student face problem to reach School because roads are block.
  • 18. How to reduce Load Shedding? SOLUTIONS
  • 19. SOLUTIONS What measure step should be taken for reduce the load shedding? Solar Panels Nuclear Energy Wind Turbines  Hyderal Energy Lets Have A Look On Them
  • 20. SOLAR PANELS/SOLAR ENERGY  Solar energy is derived from the sun in the form of uv rays.  Pakistan has a great gift of God “Sun-Light". It should be installed in the hottest areas like sibi,jacobabad.  It should be also installed on a town levels in Karachi where there is much shortage of electricity.  Cottage industry and power looms are also
  • 21. WIND ENERGY/WIND TURBINES  The power, which produce through the energy in winds, is called wind energy.  Pakistan is blessed with a large resource of wind corridor. According to wind map of Pakistan a strong wind corridor is found at Sindh costal areas. Government should pay attention in this resource. https://www.google.com.pk/search? q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ved=0CAYQ_AUoAWoVC hMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isch&q=wind+energy
  • 22. HYDEL ENERGY  Water flowing in the river has kinetic energy, which is used to drive the turbine and produce electricity the power generated as Hydel Energy.  This is the cheapest source of electricity and it is used as major source of electricity in Pakistan  Although we cannot build big and large dams but we should construct small dams for industrial sector. https://www.google.com.pk/search? q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa=X&ve d=0CAYQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAxG#tbm=isc h&q=hydroelectric+energy
  • 23. NUCLEAR ENERGY  Energy which produce by emission of radiation from the nucleus of atom. Pakistan is in need of energy very badly and urgently. Pakistan should look for nuclear energy possibilities. Pakistan is one of the seven countries who has a great ability to operate nuclear power plant for last 40 years .  Government should work on development of this resource. https://www.google.com.pk/search? q=wapda&biw=1366&bih=667&source=lnms&tbm=isch&sa= X&ved=0CAYQ_AUoAWoVChMIrYLJqLf7xgIV5CxyCh1_dAx G#tbm=isch&q=Nuclear+energy
  • 24. What we have discussed till now? SUMMARY
  • 25. SUMMARY  Electricity is short not only in Karachi but also in Pakistan and as a result electric load shedding ,breakdowns,power,outages and blackouts are common features in the city.  There are many factors behind the load shedding shortage of river water, power theft,dismanagement,defective planning of WAPDA and KE,corruption and in completing projects.  Load Shedding is a great curse. Its disturbs the people belonging all walk of life like student,patients,bussinessman,farmers,doctors ,industrialists,mechanices,housewives,laborers and etc. Pakistan can not make any progress in any field in the presence of load shedding. Government should take all the possible measure to end the load shedding from the country.
  • 26. What are we doing and what to do? What we have learned from this presentation and what are the responsibilities that Belong to us? CONCLUSION
  • 27. CONCLUSION  We all know that our country is in critical condition and we are looking for international aid. Therefore it is not easy to start these projects immediately . If we want to get the rid off this crisis, we have to change our life style. We should definitely learn the saving of energy. The unnecessary use of energy should be stopped. Unfortunately we should spent luxurious life style. We should spent a simple life.  In last 10 years not a single mega watt was added. Blame games ,seminars, conferences and events on energy issues in Pakistan are not necessary as compare to do something practical. “Nothing Endures But Change” (Heraclites 540 BC-480 BC)
  • 28. SOURCES  Wikipedia  Slide Share  Google Images  Turbine Express
  • 29. ITS TIME FOR YOUR QUESTION NOW?