Vincent Gerald Lee
5/8/2015
Contact Number 083-648-8878
Address 23 Cole Street, Kensington
Marital Status Divorced
Dependents 1
Emaill Leevin1960@gmail.com
S K I L L S
 Over 23 years of experience as a Draughtsman mainly
contracting for specific projects then move on to next project.
 3 years project coordinating and project management
 26 Years in engineering experience ,Mining infrastructure,
Piping, Mechanical , Structural and Manufacturing
 Conversant with most SABS, BS and ISO Drawing Standards
 Adaptable to changing responsibilities and targets
 Can work under pressure
 Enthusiastic and a quick learner
E D U C A T I O N
 NTC6
o Power Machines, Mechanical Drawing and Design,
Strength of Materials and Structures, Mechano-technics.
 Draughting Course (6 months)
 System Administrator Courses
 AutoCAD Courses – Various
 AutoCAD R2014
 AutoCAD 3D Modeling
 Windows, MS Office, Excel etc
Vincent Gerald Lee
Page 2
 Microstation V8.
 Inventor 2014
 Project Management Professional thru College SA
 MS Projects
J O B D E S C R I P T I O N A N D R E S P O N S I B I L I T I E S
E X P E R I E N C E
D e sign D r aughtsman.
May 2015 to Current.
Working from home doing layouts Drawings and shop detailing
of structures and buildings for Engineering firms doing work in
Africa as and when they require my services.
D e sign D r aughtsman & P r ojec t M anagement A b out
A i r P o llution.
July 2014 to March 2015
1. Great 3D layout drawing of bag houses and all Ducking for
various plants
2. Put project together from Tenders, Manufacturing to site
installation.
3. KT Wash project running project from weekly meeting with
client to Fabrication and installations of ducting and 14 dust
extraction units as a project manager.
D e sign D r aughtsman & P r ojec t S ite C o ordinator
| S C AW M E TAL S
Vincent Gerald Lee
Page 3
September 2013 to July 2014
Job Description and Responsibilities
1. Update Wheel Plant layout and add new Line for increased
production of Train Wheels.
2. Problem Solving of existing Equipment to eliminate breakdowns.
3. High chrome Ball plant 3d layout of new gas Furnace for heat
treatment of Chrome balls for ball Mills.
4. Create budget for new gas Plant Furnace from Civil,
Structural , Mechanical to instrumentation, Complete project.
Communicate with Supplies(Local & overseas ) , Engineers and High
Chrome plant Managers to put Project together.
D e sign D r aughtsman | B usbar I ns tallation
July 2013 to Aug 2013
Job Description and Responsibilities
3d model of bus bars from transformers to mcc for the mines.
Generate 2d drawing for manufacturing of bus bars & trunking .
D e sign a n d L ayout D r aughtsman W or ley P ar sons
T W P
January 2011–June 2013
Job Description and Responsibilities
 Project: Twickenham Platinum Mine
Twickenham & Hackney decline Shaft Surface and
Underground Mining
o Decline Conveyors, Transfer Points, Chair Lifts, Ore
Vincent Gerald Lee
Page 4
Passes, Equipment & Structures.
o 3D Layout of Chutes and Transfer Point for Materials
Flow Simulation Packages.
 Project: Mogalakwena North – MNC de Bottlenecking
o Materials Handling for Dry Section Pre-Crushing and
Screening
o Generate Layouts & General Arrangements of
Conveyors & Equipment for the Plant Including Site
Visits.
o Existing Plant Running at 340 tons per hour
Objective: To Increase to 700-900 tons per hour for
FEL3 phase of project.
S e nior Me chanical D e sig ner | T A G GART J HDA
July 2010 – Jan 2011
Job Description and Responsibilities
 Projects: Various small Projects for Coal Mining
Companies (Xstrata &Exxaro).
 Materials handling.
 Plate work.
 Conveyor and general layouts.
M e chanical S tr uctur al D r aughtsman|SANDVIK
December 2009 – July 2010
Job Description and Responsibilities
 Project: Trekkopje.
 Detailing and Drawing Conveyors.
 Bulk Materials and Minerals Handling Equipment.
 GeneralPlant Layouts and Arrangements.
 Layouts, GeneralArrangements & Details of
Vincent Gerald Lee
Page 5
Conveyors..
D e sign a n d L ayout D r aughtsman |MINER O M INING
C O .
July 2009 – November 2009
Job Description and Responsibilities
 3D Layouts Screening Building Conveyors, Crushing
Plants & Silos.
 Generate General Arrangements of all Equipment,
Structures& Mine Infrastructure for Zinc Mine.
M e chanical D e signer|RSVENCO
August 2008 – June 2009
Job Description and Responsibilities
 Plant Layouts for a Coal Mine.
 From Tip, Crushing, Conveyors, Washing Plant to
Local & Export Stockpiles & pumps with piping to
surface.
 Mine Infrastructure Buildings, Pollution Control
Dams, Piping Pump Houses, etc.
D e sign a n d L ayout D r aughtsman |SENET
June 2008 – July 2008 (Reason for leaving: Project placed on hold)
Job Description and Responsibilities
 Layout of Gold Plants.
D e sign a n d L ayout D r aughtsman |SANDVIK
Vincent Gerald Lee
Page 6
August 2006 – May 2008
Job Description and Responsibilities
 2D & 3D Conveyor Layouts(Above & Under Ground).
 Transfer Tower, Screening & Crushing Buildings (for
Anglo).
 Generate General Arrangements & Details of
Conveyors, Chutes.
 Screening & Crushing Buildings.
 3D Models of Plants for Tender Purposes.
D e sign D r aughtsman & P r ojec t S ite
C o or dinator|SCAW M ETAL S
January 2003 – July 2006
Job Description and Responsibilities
 Project: High Chrome 3 Ball Plant
o Layout of High Chrome 3 Plant (Value R 130 M)
o Consisting of Sand Plant, Foundry, Ball Sorting,
Cooling Pump Station, Transformer Rooms, Control
Rooms, Arc Furnaces, Cranes, Buildings, Roads,
Storm Water Dam & Culverts, Dust Extraction, Furnex
Storage Hoppers, Heat Treatment & Storage.
o Design & Model Plant in 3D for Ball Sorting Area.
o Generate Fabrication Drawings from 3D Model.
 Structural
o Main Building 25,000 m², Link to Existing Buildings
with a 35 m Spanned Bridge, Hoppers, Connecting
Walkways & Platforms between Equipment.
o Support Structure for Equipment & Stairs.
o Conveyors (Troughed & Pocket Belts), Structure &
Chutes.
 Mechanical
Vincent Gerald Lee
Page 7
o Conveyor Drivers, Pulley Shafts, etc.
o Pumps, Vibrating Feeders, Breaker & Shaker Drums.
o Design Conveyors using Helix Design Program.
o Liaison with InternationalSuppliers Placing their
Equipment in Plant Layout.
o Position, Pipe Routing, Civil Foundation, etc.
o Liaison with Engineers, Project Engineers, Sub-
Contractors, Local Suppliers and Operators &
Checking of Tenders.
 Project
o Charge Preparation for Furnaces (Value R 15 M)
o Various ingredients to be Fed into Ladles to Charge
Arc Furnaces.
o 3D Layout of Equipment & Pit (Various Options).Have
Layouts Approved.
o Compile Budgets for Funds Approval
o Consisting of Feeders, Conveyors, Weighing Hoppers
&trackingLadles to make sure right recipe go to right
arc furnaces.
 Project: Ge-Bogie Frames (Value R 19 M)
o Various parts of the plant to be upgraded to meet
new orders - Foundry, Fettling, Heat Treatment, MPI
& X-ray inspection, Machine Shop, Dispatch,
Buildings, Cranes
o Layout of Equipment & Process Flow Diagrams.
o Obtain Quotes & Put Budget Together.
o Run Project until Signed off by various Departments.
 Project: Ge Bogie Frames Phase Two (Value R 35 M)
o Various parts of the plant to be upgraded to meet
new orders - Foundry, Fettling, Heat Treatment, MPI
& X-ray inspection.
o Machine Shop, Dispatch, Buildings, Cranes
Vincent Gerald Lee
Page 8
o Layout of Equipment & Process Flow Diagrams.
o Obtain Quotes & Put Budget Together.
o Run Project until Signed off by various Departments.
D e sign D r aughtsman- o n S ite|COL UMB US S T AINLESS
S T EEL
June 2002 – December 2002
Job Description and Responsibilities
 Project: Picking Plant for Stainless Steel Sheeting
o Design & model table conveyor lines in 3D.
o Generate fabrication drawings from 3D model.
o Hydraulic cylinder for lifting & rotating tables.
o Structural table frames, walkways, crawl beams, etc.
o Mechanical drive rollers& roller shafts, chains &
sprockets, etc.
D e sign D r aughtsman - o n S i te|RICHARDS B A Y
M I NERAL S
February 2001– May 2002
Job Description and Responsibilities
 Project: Secondary Dredge on Mining Pond C
o Model dredge in 3D and generate fabrication
drawings from 3D model.
o Plate work, sponsan tanks, control rooms, etc.
o Structural, mechanical, pumps & Piping
D e signer|BAYDR AFT ( Se lf E mployed)
January1999 – Jan 2001
Vincent Gerald Lee
Page 9
Job Description and Responsibilities
 Drafting & problem solving for Bayside and Hillside
Aluminum as well as Various Engineering Companies in
Richards Bay
D r aw ing O f fice D e signer |DAVID H EATH
December1997– December1998
Job Description and Responsibilities
 Projects: Draughtsman for various clients.
o Bayside and Hillside Aluminum
o Various Engineer companies around Richard Bay
area.
o Manager for David Heath Drawing Office for one
year.
D e sign D r aughtsman – O n - Site|AL USAF H IL LSIDE
S M EL TER
October1995 – November1997
Job Description and Responsibilities
 Projects: Design and modification of mechanical, structural
and piping of existing and new projects.
o Involved with projects from conceptual design stage
to commissioning.
o Commissioning, Liaison with Engineers, Project
Engineers, Sub-Contractors, Suppliers and
Operators.
D e tail D r aughts man o n B o ar d|ENVIR OTECH
Vincent Gerald Lee
Page 10
May1988 – September1995
Job Description and Responsibilities
o CAD Draughtsman (4.5 years)
o Mechanical Layouts and detailing of mechanical
components and equipment (drives, lifting devices,
shafts, etc.).
o Applying close tolerances, geometric tolerances,
limits and fits where applicable.
o Structural layouts and detailing of structural
components (bridges, walkways, stairways, tanks,
etc.).
o Civil layouts of civil foundations for elevated
buildings, thickeners, etc.
o Layouts from distribution box to large sand filter
tanks with interconnecting wears, utilizing hydraulic
heads to create flow of liquids.
o Foundation layouts and detailing for pumps, plinths,
tanks, etc.
o Piping layouts of interconnecting piping between
various parts of equipment, tanks, valves, etc. from
layouts to generating piping Isometric drawings.
o Computer Maintenance of CAD stations (hardware
and software).
o Problem solving.
o Training drawing office personnel on CAD.
o Assisting Engineers and Sales Personnelwith
presentations, using scanners, PC projectors, etc.
o Keeping abreast of new technology to increase
productivity and making recommendations to
management.
o Generaldrawing office duties i.e. assisting Project
Engineers, Manufacturers, etc.
Vincent Gerald Lee
Page 11
o Turnkey projects.
o Plant layouts (from tender to completed project).
o Schematic flow diagrams and P&ID’s.
o Design and detailing of rubber mill liners and molds.
o Working from Engineers sketches and instructions
liaising telephonically with suppliers regarding price
and availability of equipment, etc.
o Site and sub-contractor visits.
o Equipment Knowledge.
o Thickeners, shriver presses, drum- disk and sand
filters, delta stacks, flotation machines, HMS drums,
classifiers and clarifiers.
o Generalprocess equipment – pump valves,
conveyors, etc.
E le ctr ical C o ntr acting |SELF -EMPLOYED
Mar 1986 – April1988
Job Description and Responsibilities
o Electrical Contracting
M e chanical I n spector|PUTC O
February1985 – February 1986
Job Description and Responsibilities
o Responsible for vehicle inspection and maintenance.
.

VG_Lee_CV_2015_1

  • 1.
    Vincent Gerald Lee 5/8/2015 ContactNumber 083-648-8878 Address 23 Cole Street, Kensington Marital Status Divorced Dependents 1 Emaill Leevin1960@gmail.com S K I L L S  Over 23 years of experience as a Draughtsman mainly contracting for specific projects then move on to next project.  3 years project coordinating and project management  26 Years in engineering experience ,Mining infrastructure, Piping, Mechanical , Structural and Manufacturing  Conversant with most SABS, BS and ISO Drawing Standards  Adaptable to changing responsibilities and targets  Can work under pressure  Enthusiastic and a quick learner E D U C A T I O N  NTC6 o Power Machines, Mechanical Drawing and Design, Strength of Materials and Structures, Mechano-technics.  Draughting Course (6 months)  System Administrator Courses  AutoCAD Courses – Various  AutoCAD R2014  AutoCAD 3D Modeling  Windows, MS Office, Excel etc
  • 2.
    Vincent Gerald Lee Page2  Microstation V8.  Inventor 2014  Project Management Professional thru College SA  MS Projects J O B D E S C R I P T I O N A N D R E S P O N S I B I L I T I E S E X P E R I E N C E D e sign D r aughtsman. May 2015 to Current. Working from home doing layouts Drawings and shop detailing of structures and buildings for Engineering firms doing work in Africa as and when they require my services. D e sign D r aughtsman & P r ojec t M anagement A b out A i r P o llution. July 2014 to March 2015 1. Great 3D layout drawing of bag houses and all Ducking for various plants 2. Put project together from Tenders, Manufacturing to site installation. 3. KT Wash project running project from weekly meeting with client to Fabrication and installations of ducting and 14 dust extraction units as a project manager. D e sign D r aughtsman & P r ojec t S ite C o ordinator | S C AW M E TAL S
  • 3.
    Vincent Gerald Lee Page3 September 2013 to July 2014 Job Description and Responsibilities 1. Update Wheel Plant layout and add new Line for increased production of Train Wheels. 2. Problem Solving of existing Equipment to eliminate breakdowns. 3. High chrome Ball plant 3d layout of new gas Furnace for heat treatment of Chrome balls for ball Mills. 4. Create budget for new gas Plant Furnace from Civil, Structural , Mechanical to instrumentation, Complete project. Communicate with Supplies(Local & overseas ) , Engineers and High Chrome plant Managers to put Project together. D e sign D r aughtsman | B usbar I ns tallation July 2013 to Aug 2013 Job Description and Responsibilities 3d model of bus bars from transformers to mcc for the mines. Generate 2d drawing for manufacturing of bus bars & trunking . D e sign a n d L ayout D r aughtsman W or ley P ar sons T W P January 2011–June 2013 Job Description and Responsibilities  Project: Twickenham Platinum Mine Twickenham & Hackney decline Shaft Surface and Underground Mining o Decline Conveyors, Transfer Points, Chair Lifts, Ore
  • 4.
    Vincent Gerald Lee Page4 Passes, Equipment & Structures. o 3D Layout of Chutes and Transfer Point for Materials Flow Simulation Packages.  Project: Mogalakwena North – MNC de Bottlenecking o Materials Handling for Dry Section Pre-Crushing and Screening o Generate Layouts & General Arrangements of Conveyors & Equipment for the Plant Including Site Visits. o Existing Plant Running at 340 tons per hour Objective: To Increase to 700-900 tons per hour for FEL3 phase of project. S e nior Me chanical D e sig ner | T A G GART J HDA July 2010 – Jan 2011 Job Description and Responsibilities  Projects: Various small Projects for Coal Mining Companies (Xstrata &Exxaro).  Materials handling.  Plate work.  Conveyor and general layouts. M e chanical S tr uctur al D r aughtsman|SANDVIK December 2009 – July 2010 Job Description and Responsibilities  Project: Trekkopje.  Detailing and Drawing Conveyors.  Bulk Materials and Minerals Handling Equipment.  GeneralPlant Layouts and Arrangements.  Layouts, GeneralArrangements & Details of
  • 5.
    Vincent Gerald Lee Page5 Conveyors.. D e sign a n d L ayout D r aughtsman |MINER O M INING C O . July 2009 – November 2009 Job Description and Responsibilities  3D Layouts Screening Building Conveyors, Crushing Plants & Silos.  Generate General Arrangements of all Equipment, Structures& Mine Infrastructure for Zinc Mine. M e chanical D e signer|RSVENCO August 2008 – June 2009 Job Description and Responsibilities  Plant Layouts for a Coal Mine.  From Tip, Crushing, Conveyors, Washing Plant to Local & Export Stockpiles & pumps with piping to surface.  Mine Infrastructure Buildings, Pollution Control Dams, Piping Pump Houses, etc. D e sign a n d L ayout D r aughtsman |SENET June 2008 – July 2008 (Reason for leaving: Project placed on hold) Job Description and Responsibilities  Layout of Gold Plants. D e sign a n d L ayout D r aughtsman |SANDVIK
  • 6.
    Vincent Gerald Lee Page6 August 2006 – May 2008 Job Description and Responsibilities  2D & 3D Conveyor Layouts(Above & Under Ground).  Transfer Tower, Screening & Crushing Buildings (for Anglo).  Generate General Arrangements & Details of Conveyors, Chutes.  Screening & Crushing Buildings.  3D Models of Plants for Tender Purposes. D e sign D r aughtsman & P r ojec t S ite C o or dinator|SCAW M ETAL S January 2003 – July 2006 Job Description and Responsibilities  Project: High Chrome 3 Ball Plant o Layout of High Chrome 3 Plant (Value R 130 M) o Consisting of Sand Plant, Foundry, Ball Sorting, Cooling Pump Station, Transformer Rooms, Control Rooms, Arc Furnaces, Cranes, Buildings, Roads, Storm Water Dam & Culverts, Dust Extraction, Furnex Storage Hoppers, Heat Treatment & Storage. o Design & Model Plant in 3D for Ball Sorting Area. o Generate Fabrication Drawings from 3D Model.  Structural o Main Building 25,000 m², Link to Existing Buildings with a 35 m Spanned Bridge, Hoppers, Connecting Walkways & Platforms between Equipment. o Support Structure for Equipment & Stairs. o Conveyors (Troughed & Pocket Belts), Structure & Chutes.  Mechanical
  • 7.
    Vincent Gerald Lee Page7 o Conveyor Drivers, Pulley Shafts, etc. o Pumps, Vibrating Feeders, Breaker & Shaker Drums. o Design Conveyors using Helix Design Program. o Liaison with InternationalSuppliers Placing their Equipment in Plant Layout. o Position, Pipe Routing, Civil Foundation, etc. o Liaison with Engineers, Project Engineers, Sub- Contractors, Local Suppliers and Operators & Checking of Tenders.  Project o Charge Preparation for Furnaces (Value R 15 M) o Various ingredients to be Fed into Ladles to Charge Arc Furnaces. o 3D Layout of Equipment & Pit (Various Options).Have Layouts Approved. o Compile Budgets for Funds Approval o Consisting of Feeders, Conveyors, Weighing Hoppers &trackingLadles to make sure right recipe go to right arc furnaces.  Project: Ge-Bogie Frames (Value R 19 M) o Various parts of the plant to be upgraded to meet new orders - Foundry, Fettling, Heat Treatment, MPI & X-ray inspection, Machine Shop, Dispatch, Buildings, Cranes o Layout of Equipment & Process Flow Diagrams. o Obtain Quotes & Put Budget Together. o Run Project until Signed off by various Departments.  Project: Ge Bogie Frames Phase Two (Value R 35 M) o Various parts of the plant to be upgraded to meet new orders - Foundry, Fettling, Heat Treatment, MPI & X-ray inspection. o Machine Shop, Dispatch, Buildings, Cranes
  • 8.
    Vincent Gerald Lee Page8 o Layout of Equipment & Process Flow Diagrams. o Obtain Quotes & Put Budget Together. o Run Project until Signed off by various Departments. D e sign D r aughtsman- o n S ite|COL UMB US S T AINLESS S T EEL June 2002 – December 2002 Job Description and Responsibilities  Project: Picking Plant for Stainless Steel Sheeting o Design & model table conveyor lines in 3D. o Generate fabrication drawings from 3D model. o Hydraulic cylinder for lifting & rotating tables. o Structural table frames, walkways, crawl beams, etc. o Mechanical drive rollers& roller shafts, chains & sprockets, etc. D e sign D r aughtsman - o n S i te|RICHARDS B A Y M I NERAL S February 2001– May 2002 Job Description and Responsibilities  Project: Secondary Dredge on Mining Pond C o Model dredge in 3D and generate fabrication drawings from 3D model. o Plate work, sponsan tanks, control rooms, etc. o Structural, mechanical, pumps & Piping D e signer|BAYDR AFT ( Se lf E mployed) January1999 – Jan 2001
  • 9.
    Vincent Gerald Lee Page9 Job Description and Responsibilities  Drafting & problem solving for Bayside and Hillside Aluminum as well as Various Engineering Companies in Richards Bay D r aw ing O f fice D e signer |DAVID H EATH December1997– December1998 Job Description and Responsibilities  Projects: Draughtsman for various clients. o Bayside and Hillside Aluminum o Various Engineer companies around Richard Bay area. o Manager for David Heath Drawing Office for one year. D e sign D r aughtsman – O n - Site|AL USAF H IL LSIDE S M EL TER October1995 – November1997 Job Description and Responsibilities  Projects: Design and modification of mechanical, structural and piping of existing and new projects. o Involved with projects from conceptual design stage to commissioning. o Commissioning, Liaison with Engineers, Project Engineers, Sub-Contractors, Suppliers and Operators. D e tail D r aughts man o n B o ar d|ENVIR OTECH
  • 10.
    Vincent Gerald Lee Page10 May1988 – September1995 Job Description and Responsibilities o CAD Draughtsman (4.5 years) o Mechanical Layouts and detailing of mechanical components and equipment (drives, lifting devices, shafts, etc.). o Applying close tolerances, geometric tolerances, limits and fits where applicable. o Structural layouts and detailing of structural components (bridges, walkways, stairways, tanks, etc.). o Civil layouts of civil foundations for elevated buildings, thickeners, etc. o Layouts from distribution box to large sand filter tanks with interconnecting wears, utilizing hydraulic heads to create flow of liquids. o Foundation layouts and detailing for pumps, plinths, tanks, etc. o Piping layouts of interconnecting piping between various parts of equipment, tanks, valves, etc. from layouts to generating piping Isometric drawings. o Computer Maintenance of CAD stations (hardware and software). o Problem solving. o Training drawing office personnel on CAD. o Assisting Engineers and Sales Personnelwith presentations, using scanners, PC projectors, etc. o Keeping abreast of new technology to increase productivity and making recommendations to management. o Generaldrawing office duties i.e. assisting Project Engineers, Manufacturers, etc.
  • 11.
    Vincent Gerald Lee Page11 o Turnkey projects. o Plant layouts (from tender to completed project). o Schematic flow diagrams and P&ID’s. o Design and detailing of rubber mill liners and molds. o Working from Engineers sketches and instructions liaising telephonically with suppliers regarding price and availability of equipment, etc. o Site and sub-contractor visits. o Equipment Knowledge. o Thickeners, shriver presses, drum- disk and sand filters, delta stacks, flotation machines, HMS drums, classifiers and clarifiers. o Generalprocess equipment – pump valves, conveyors, etc. E le ctr ical C o ntr acting |SELF -EMPLOYED Mar 1986 – April1988 Job Description and Responsibilities o Electrical Contracting M e chanical I n spector|PUTC O February1985 – February 1986 Job Description and Responsibilities o Responsible for vehicle inspection and maintenance. .