Public Procurement
of Goods
Legal & Procedural
Framework
Legal & procedural framework
• Constitution of India
• Indian Contract Act
• Sale of Goods Act
• Indian Arbitration & Conciliation Act
• Procurement Rules contained in GFR, if applicable
• Procurement Guidelines formulated by CVC
• Procurement Guidelines of the Department/PSU
concerned
GFR 2017
An Overview
GFR Journey
•GFR 1947
•GFR 1963
•GFR 2005
•GFR 2017
Basic Learning Rationale
Personal purchase
v/s
Govt Purchase
Working under GoI norms & policy
framework
Facts of Process
Financer determines the Process – GoI
• Prescription, policy & rules of GoI
• Lawful process
• Power – Delegation of authority
• Open competition – Opportunity to all
• Need based purchase – No speculation
Contract is the basis for procurement
Needs time, knowledge and Planning
Why GFR
• Rules and orders of Government of India while
dealing with matters involving public finances
• Principles of accountability
• Procedures of financial discipline and
administrative due diligence
• Manage business in a financially prudent
manner without compromising flexibility to deal
with varied situations
• Promoting simplicity and transparency in the
government financial system and procedures
Regulatory Principles
• Public Procurements of Govt of India
are governed by the General Financial
Rules 2017 (GFR 2017)
• While dealing with matters involving
public finances, these have to be
followed
• Issued by Dept of Expenditure, Ministry
of Finance, Government of India
GFR for Procurement of Goods
Chapter 2 General System of Financial
Management
Chapter 6 Procurement of Goods and Services
I. Procurement of Goods
II. Procurement of Services
Chapter 7 Inventory Management
Chapter 8 Contract Management
Appendix 11 Formula for PVC
Form GFR 10 Report of Surplus, Obsolete
and Unserviceable Stores for Disposal
Form GFR 11 Sale Account
GFR 2017: Rule 21 - Standards of financial propriety
In summary
For expenditure from public moneys
To Ensure that financial rules and
regulations are observed
Apply ordinary prudence as for own money
Not more than the occasion demands
No self sanction for own advantage
Not for benefit of particular person/section
unless:
Claim can be enforced in a Court of Law
For recognized policy or custom
GFR 2017: Rule 21 - Standards of financial propriety
Every officer incurring or authorizing expenditure from public moneys
should be guided by high standards of financial propriety. Every
officer should also enforce financial order and strict economy and see
that all relevant financial rules and regulations are observed, by his
own office and by subordinate disbursing officers. Among the principles
on which emphasis is generally laid are the following :-
(i) Every officer is expected to exercise the same vigilance in respect
of expenditure incurred from public moneys as a person of ordinary
prudence would exercise in respect of expenditure of his own money.
(ii) The expenditure should not be prima facie more than the occasion
demands.
(iii) No authority should exercise its powers of sanctioning expenditure to
pass an order which will be directly or indirectly to its own advantage.
(iv) Expenditure from public moneys should not be incurred for the
benefit of a particular person or a section of the people, unless –
(a) a claim for the amount could be enforced in a Court of Law, or
(b) the expenditure is in pursuance of a recognized policy or custom.
Rule 144 Fundamental principles of public buying
Every authority delegated with powers has
responsibility and accountability to
• Bring efficiency, economy and transparency
• Fair and equitable treatment of suppliers
• Promotion of competition in public
procurement
– Right & unbiased Description of goods
– Right Quantity, Right Procedure,
– Right Source (capable & reliable),
– Right Price
GFR-Procurement procedure- Quality
• The description of the subject matter of
procurement to the extent practicable should be
objective, functional, generic and measurable
and specify technical, qualitative and
performance characteristics
• It should not indicate a requirement for a
particular trade-mark, trade-name or brand .
Rule144(i)
GFR-Procurement procedure- Quality
• The specifications (in terms of quality, type etc.)
should be formulated keeping in view the
specific needs.
• The specifications should meet the basic needs
without including superfluous and non-essential
features, which may result in unwarranted
expenditure. Rule144(ii)
GFR-Procurement procedure- Quantity
• Care should also be taken to avoid
purchasing quantities in excess of
requirement to avoid Inventory
Carrying Costs (ICC). Rule 144(iv)
GFR-Proc procedure-Tendering & selecting offer
• Offers should be invited following a fair,
transparent and reasonable procedure.
Rule144(v)
• The procuring authority should be satisfied that
the selected offer adequately meets the
requirement in all respects. Rule 144(vi)
GFR-Procurement procedure - Price
• The procuring authority should satisfy itself
that the price of the selected offer is
reasonable and consistent with the quality
required. Rule 144(vii)
GFR-Proc procedure -Reasoned Decision
• At each stage of procurement the
procuring authority must place on record,
in precise terms, the considerations which
weighed with it while taking the
procurement decision. Rule 144(viii)
Description of Goods
Be objective, functional, generic and measurable and
specify technical, qualitative and performance
characteristics
not indicate a requirement for a particular trade mark,
trade name or brand
specifications & quantity be
clearly spelt out for specific needs,
meet the basic needs without superfluous and non-
essential features, for minimum expenditure
technical specifications shall be based on national
standards and in their absence, on the relevant
international standards
avoid purchasing excess quantities than required to
avoid inventory carrying costs
GFR-Procurement procedure- Quality
• The description of the subject matter of
procurement to the extent practicable should be
objective, functional, generic and measurable
and specify technical, qualitative and
performance characteristics
• It should not indicate a requirement for a
particular trade-mark, trade-name or brand .
Rule144(i)
GFR-Procurement procedure- Quality
• The specifications (in terms of quality, type etc.)
should be formulated keeping in view the
specific needs.
• The specifications should meet the basic needs
without including superfluous and non-essential
features, which may result in unwarranted
expenditure. Rule144(ii)
GFR-Procurement procedure- Quantity
• Care should also be taken to avoid
purchasing quantities in excess of
requirement to avoid Inventory
Carrying Costs (ICC). Rule 144(iv)
GFR-Proc procedure-Tendering & selecting offer
• Offers should be invited following a fair,
transparent and reasonable procedure.
Rule144(v)
• The procuring authority should be satisfied that
the selected offer adequately meets the
requirement in all respects. Rule 144(vi)
GFR-Procurement procedure - Price
• The procuring authority should satisfy itself
that the price of the selected offer is
reasonable and consistent with the quality
required. Rule 144(vii)
GFR-Proc procedure -Reasoned Decision
• At each stage of procurement the
procuring authority must place on record,
in precise terms, the considerations which
weighed with it while taking the
procurement decision. Rule 144(viii)
Rule 149 Government e-Market place (GeM).
• Agency authorized by the Government will host an online Government e-
Marketplace (GeM) for common use Goods and Services
• Procurement on GeM mandatory for Goods or Services available on GeM
– Credentials of suppliers on GeM shall be certified by GeM
– Procuring authorities will certify the reasonability of rates using the
Business Analytics (BA) tools available on GeM including the Last
Purchase Price on GeM, Department’s own Last Purchase Price etc
– The GeM portal shall be utilized for direct on-line purchases as under,
meeting requisite quality, specification and delivery requirement
 Up to Rs.25,000/- through any of the available suppliers on GeM
 Rs.25,000/- to Rs.5 Lakh through Seller having lowest price, of at least three different
manufacturers. The tools for online bidding and online reverse auction can be used
 Above Rs.5 Lakh through supplier having lowest price after mandatorily obtaining bids,
using online bidding or reverse auction tools
 Demand not to be split to avoid procurement through L-1 Buying / bidding / reverse
auction on GeM
 The depts shall project their Annual Procurement Plan of goods and services on GeM
portal within 30 days of Budget approval
Other GFR 2017 Rules
• Rule 151 Debarment from bidding after giving reasonable opportunity
• Rule 153 Reserved Items and other Purchase/ Price Preference Policy
– all items of hand spun and hand-woven textiles (khadi goods) for exclusive
purchase from Khadi Village Industries Commission (KVIC)
– all items of handloom textiles exclusive purchase from KVIC and/or the
notified handloom units of Association of Corporations and Apex Societies of
Handlooms (ACASH)
– Ministry of Micro, Small and Medium Enterprises (MSME) procurement
policy
– preference to bidders on the grounds of promotion of locally manufactured
goods or locally provided services, Make in India
• Rule 154 Purchase of goods without quotation
– Purchase upto Rs. 25,000 without inviting quotations on a certificate by CA
“I,, am personally satisfied that these goods purchased are of the requisite quality and
specification and have been purchased from a reliable supplier at a reasonable price.”
• Rule 155 Purchase of goods by Purchase Committee
– Purchase above Rs. 25,000 and upto Rs.2,50,000/- by Local Purchase
Committee of three members as decided by the HOD, “Certified that we, members
of the purchase committee are jointly and individually satisfied that the goods recommended for
purchase are of the requisite specification and quality, priced at the prevailing market rate and the
supplier recommended is reliable and competent to supply the goods in question, and it is not
debarred by Department of Commerce or Ministry/ Department concerned.
Other GFR 2017 Rules
• Rule 158 Purchase of goods by obtaining bids
– following the standard method of obtaining bids in:
(i) Advertised Tender Enquiry
(ii) Limited Tender Enquiry
(iii) Two-Stage Bidding
(iv) Single Tender Enquiry
(v) Electronic Reverse Auctions
• Rule 159 E-Publishing
– mandatory to publish their tender enquiries, corrigenda thereon and details of bid
awards on the Central Public Procurement Portal (CPPP)
– applies to all Tender Enquiries, Requests for Proposals, Requests for Expressions of
Interest, Notice for pre Qualification/ Registration or any other notice
• Rule 160 E-Procurement
– mandatory to receive all bids through e-procurement
– may use e-procurement solution developed by NIC
• Rule 161 Advertised Tender Enquiry
– for procurement value of Rs. 25 lakhs and above
– to promote wider participation and ease of bidding, no cost of tender document for
the tender documents downloaded by the bidders
– minimum time for submission of bids should be three weeks for Domestic tenders
and four weeks where deptt contemplates obtaining bids from abroad
Other GFR 2017 Rules
• Rule 162 Limited Tender Enquiry
– For purchase value up to Rs 25 Lakh. Copies of the bidding
document should be sent directly by speed post/registered
post/courier/ email to firms borne on the list of registered
suppliers
– The number of supplier firms in LT Enquiry should be more than
three. Efforts be made to identify higher number of approved
suppliers to obtain more responsive bids on competitive basis.
– The unsolicited bids should not be accepted
– Spl LT where value > Rs 25 Lakh when
• the demand is urgent & certified that additional expenditure involved by
not procuring through advertised tender enquiry is justified
• Sources of supply are known and possibility of fresh sources is remote
• Rule 163 Two bid system (simultaneous receipt of separate
technical and financial bids)
• Rule 164 Two-Stage Bidding
• Rule 166 Single Tender Enquiry
• Rule 167 Electronic Reverse Auction
Other GFR 2017 Rules
• Rule 168 Contents of Bidding Document
– Chapter – 1: Instructions to Bidders
– Chapter – 2: Conditions of Contract
– Chapter – 3: Schedule of Requirements
– Chapter – 4: Specifications and allied Technical Details
– Chapter – 5: Price Schedule (to be utilised by the bidders
for quoting their prices)
– Chapter – 6: Contract Form
– Chapter – 7: Other Standard Forms, if any, to be utilized by
the purchaser and the bidders
• Rule 169 Maintenance Contract
• Rule 170 Bid Security
• Rule 171 Performance Security
• Rule 172 (1) Advance payment to supplier
• Rule 172 (2) Part payment to suppliers
Other GFR 2017 Rules
• Rule 173 Transparency, competition, fairness and elimination of arbitrariness in the procurement
process
– to secure best value for money
– bidding document - self-contained and comprehensive without any ambiguities
– All essential information, for responsive bid, should be clearly spelt out in simple language
– The condition of prior turnover and prior experience may be relaxed for Startups (as defined by Department of
Industrial Policy and Promotion) subject to meeting of quality & technical specifications and making suitable
provisions in the bidding document
– Bidding Document must have
(a) Description and Specifications of goods including the nature, quantity, time and place or places of delivery
(b) the criteria for eligibility and qualifications to be met by the bidders such as minimum level of experience, past performance,
technical capability, manufacturing facilities and financial position etc or limitation for participation of the bidders, if any
(c) eligibility criteria for goods indicating any legal restrictions or conditions about the origin of goods etc which may required to be met
by the successful bidder
(d) the procedure as well as date, time and place for sending the bids
(e) date, time and place of opening of the bid. (e) Criteria for evaluation of bids
(f) special terms affecting performance, if any
(g) Essential terms of the procurement contract
• Suitable provision for settlement of disputes
• The bidding document should indicate that the contract will be under Indian Laws
• The specifications of the required goods should be clearly stated without any ambiguity
• to attract sufficient number of bidders, the specification should be broad based
• Pre-bid conference: In case of turnkey contract(s) or contract(s) of special nature for procurement of sophisticated and costly equipment or
wherever felt necessary, a suitable provision is to be kept in the bidding documents for one or more rounds of pre-bid conference for
clarifying issues and clearing doubts, if any, about the specifications and other allied technical details of the plant, equipment and
machinery etc. projected in the bidding document. The date, time and place of pre-bid conference should be indicated in the bidding
document. This date should be sufficiently ahead of bid opening date. The records of such conference shall be intimated to all bidders and,
shall also be exhibited on the website(s) where tender was published
•Rule 174
Efficiency, Economy and Accountability in
Public Procurement System
•Rule 176
Buy-Back Offer
Other GFR 2017 Rules
CVC Guidelines
Meaning of Vigilance Angle
• Demanding / accepting gratification other than
legal remuneration in respect of an official act
• Obtaining valuable things without consideration
from a person with whom has or likely to have
official dealings
• Possession of assets disproportionate to
known sources of income
• Obtaining any valuable things by corrupt or
illegal means by abusing his official position
CVC Guidelines
• Applicable to all Central entities
• Issue of guidelines by CVC either
Sue Moto or on review / examination
of various complaints
• Guidelines focuses on integrity of
public servants
Causes of Corruption
Santhanam Committee identified four
major causes of corruption:
• Administrative delays
• Personal discretion in the exercise of power
• Cumbersome procedure
• Lack of knowledge with regard to rules &
guidelines
CVC guidelines- Mode of Proc
• In order to generate enough competition and to
avoid favoritism, issue of advertised/global
tender inquiries should be resorted to and
published in journals and national newspapers
giving adequate time to the prospective bidders.
• As per latest guidelines publishing on
Department’s website and CPPP is mandatory.
CVC guidelines- Tender Enquiry
• Important clauses relating to earnest money,
delivery schedule, payment terms, performance
bank guarantee, warrantee, pre-despatch
inspection, arbitration, liquidated damages and
penalty for the delayed supplies to be
incorporated in the T/E .
CVC guidelines- Changes in tender specs etc
• In order to give equal opportunity to all bidders
and to maintain sanctity of tendering system, it is
of paramount importance that any change in
tender terms & conditions, specifications and
tender opening date etc. be notified to all the
bidders, sufficiently in advance of the revised
tender opening date.
CVC guidelines- Reasonableness of Price
• Purchase organisations must establish the
reasonableness of prices on the basis of
estimated rates, prevailing market rates, last
purchase prices, economic indices of the raw
material / labour, other input costs and intrinsic
value etc., before award of the contract.
CVC guidelines- Awarding of contract
• Once it has been established that the offers
meet the laid down specifications, the question
of ‘grading’ as well as any ‘pick and choose’
should not arise.
• The contract needs to be awarded to the
lowest bidder meeting the laid down
specifications.
CVC guidelines -Drafting of contract
• Specific delivery period for supply as per the
terms of delivery such as for station of despatch
/ destination and for completion of installation
with the necessary provision for liquidated
damages / penalty clause in the event of delay in
supplies/ installation needs to be incorporated in
the contract.
CVC guidelines- Contract Mgmt
• After conclusion of the contract, any relaxation in
the contract terms / specifications should be
severely discouraged. However, in exceptional
cases where the modifications/amendments are
considered to be absolutely essential, the same
should be allowed after taking into account the
financial implications for the same.
CVC guidelines- Contract Mgmt
• It is essential to accord priority to the post
contract follow up. The delivery period should be
extended on bonafide request and not in a
routine and casual manner.
• After expiry of delivery period, the consignees
should be refrained from exchanging
correspondence with the supplier. In case of
delay in supplies by the supplier, the liquidated
damages to the extent possible need to be
recovered.
Negotiation- CVC
• As post tender negotiations are the main source
of corruption, post tender negotiations are
banned with immediate effect except in the case
of negotiations with L-1 (lowest acceptable
tenderer).
• The instructions/ guidelines circulated by cvc on
post tender negotiations only with L-1 need to be
strictly followed.
• Subsequently L-1 has been defined as
Lowest bidder found suitable for bulk
quantity order
 CVC Guidelines on Procurement /
Contract Management
Negotiation with L-1
a. No post tender negotiation normally except in certain
exceptional circumstances viz proprietary items, items
with limited source of supply,
b. Counter offer to L-1 amounts to negotiation
c. Counter offer to L-2, L-3 etc at the rates accepted by L-
1 in case of splitting of quantities as pre disclosed in
the tender not to be treated as negotiation
Contd…
 CVC Guidelines on Procurement
/ Contract Management
Award of Contract on nomination basis
a. Supreme Court of India in Nagar Nigam Meerut versus Faheem
Meat Export Private Limited decided that contract can be awarded
on nomination basis in the following circumstances only.
i. During natural calamities and emergency declared by
Government where the procurement possible from a single
source only
ii. Where the supplier has exclusive rights in respect of goods &
services and no reasonable alternative exist.
iii. When an auction held several times but no bidders
came forward or bids offered were very low
b. All works awarded on nomination basis to be brought to the notice
of board of PSUs for information
c. Posting of details on award of tenders on websites
Contd…
CVC Guidelines on Procurement /
Contract Management
Voluntary adoptionof integritypact
in major Government Procurement
Contd…
What is integrity Pact?
Integrity Pact
Integrity Pact
Doing right things Agreement
Preventive vigilance- IP
• IP is an agreement entered into by the
Principal and the Vendor for each contract
• Independent External Monitor (IEM) is
appointed for monitoring its
implementation
Principal Vendor
CVC Guidelines on Procurement/
Contract Management
Mobilization advance
a. To be backed by bank guarantee
b. Not to be paid in less than two installments
c. Interest bearing as per prevailing market rates
Contd…
CVC Guidelines on Procurement/
Contract Management
Short comings in bid documents
Pre Qualification, evaluation criteria be
stipulated in tender document itself
Contd…
CVC Guidelines on Procurement/
Contract Management
Undertaking by members of tender
committee
Committee members are required to
disclose their personal interests in the
tender
Contd…
CVC Guidelines on Procurement/
Contract Management
Time bound processing of Procurement
Fixation of period for validity of the offers with
atmost care & extension of validity be rare and in
exceptional circumstances
 Preventive Vigilance
Preventive Vigilance based on theme
‘Prevention is better than cure’
Major steps in preventive vigilance
• Analysis of rules & regulations & other administrative
orders of the organization
• Identifying procedures & systems which need to be
simplified
• Identification of sensitive areas
• Organizing vigilance awareness program
• Rotation of officials working in sensitive areas
• Surprise checks & inspections
 Preventive Vigilance
Case Study
Shortcoming observed during preventive inspection of a PSU (in the
business of handling of containers through handling contractor)
• No. of trailers & handling equipment in numbers less than the contract
provides
• Deployed trailers/equipment not meeting vintage year criteria
• Original registration certificate of the vehicles not available
• Breakdown register for the trailers/equipment not maintained in proper
format
• Failure to issue job orders
• Permits not issued through computerized system (gate in & gate out passes)
• Equipment utilized for movement in another contract
• Contract on adhoc basis
Corrective Action
Detailed guidelines issued on these inspection points of vigilance
To Minimize Corruption
• Reduce Monopoly & Discretionary powers
• Increase Accountability, Transparency,
Efficiency
C = M + D – (A+T+E)
• The breakeven for corruption needs to
made higher by raising Risk levels for
those involved – Ex CVC, Sh Vithal
Preventive vigilance
-Enhance Transparency
• Publicize charter of duties
• Make procedures public
• Provide guidance to the public
• Make senior officers accessible
Preventive vigilance
-Enforce Accountability
• Make clear demarcation of areas of work
• Make delegation of power clear
• Establish an overarching body
• Hold authority concerned accountable
Thank You

More Related Content

What's hot

Maharashtra - Package scheme of incentive
Maharashtra - Package scheme of incentiveMaharashtra - Package scheme of incentive
Maharashtra - Package scheme of incentiveTaxadviceindia .com
 
Bid Evaluation
Bid EvaluationBid Evaluation
Bid EvaluationVj NiroSh
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Michael Audu
 
Purchase of inventory items
Purchase of inventory itemsPurchase of inventory items
Purchase of inventory itemsBeverly Erigan
 
Indian contract act, 1872
Indian contract act, 1872Indian contract act, 1872
Indian contract act, 1872Preet Gill
 
Payment-of-wages-1936
Payment-of-wages-1936Payment-of-wages-1936
Payment-of-wages-1936shashank37y
 
Public procurement regularity authority (ppra)
Public procurement regularity authority (ppra)Public procurement regularity authority (ppra)
Public procurement regularity authority (ppra)TaseerBaloch1
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Agency - Indian Contract Act 1956
 Agency - Indian Contract Act 1956 Agency - Indian Contract Act 1956
Agency - Indian Contract Act 1956Akash Kejriwal
 
Pre Qualification Disqualification as per PPRA Rules 2004.pptx
Pre Qualification Disqualification as per PPRA Rules 2004.pptxPre Qualification Disqualification as per PPRA Rules 2004.pptx
Pre Qualification Disqualification as per PPRA Rules 2004.pptxFayyaz Khan
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
1. WAPDA E&D-RULE.doc
1. WAPDA E&D-RULE.doc1. WAPDA E&D-RULE.doc
1. WAPDA E&D-RULE.docAli Asad Sahu
 
Purchase procedure 9thJuly 2019 at iitb
Purchase procedure 9thJuly 2019 at iitbPurchase procedure 9thJuly 2019 at iitb
Purchase procedure 9thJuly 2019 at iitbGanesh Bhorkade
 
Terminology for pay fixation 15.07.2011
Terminology for pay fixation   15.07.2011Terminology for pay fixation   15.07.2011
Terminology for pay fixation 15.07.2011Mukut Deori
 
Wapda Rules Summarized
Wapda Rules SummarizedWapda Rules Summarized
Wapda Rules SummarizedAli Asad Sahu
 

What's hot (20)

Maharashtra - Package scheme of incentive
Maharashtra - Package scheme of incentiveMaharashtra - Package scheme of incentive
Maharashtra - Package scheme of incentive
 
Bid Evaluation
Bid EvaluationBid Evaluation
Bid Evaluation
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Gfr 2017
Gfr 2017Gfr 2017
Gfr 2017
 
Standing orders
Standing ordersStanding orders
Standing orders
 
Purchase of inventory items
Purchase of inventory itemsPurchase of inventory items
Purchase of inventory items
 
Indian contract act, 1872
Indian contract act, 1872Indian contract act, 1872
Indian contract act, 1872
 
Payment-of-wages-1936
Payment-of-wages-1936Payment-of-wages-1936
Payment-of-wages-1936
 
Public procurement regularity authority (ppra)
Public procurement regularity authority (ppra)Public procurement regularity authority (ppra)
Public procurement regularity authority (ppra)
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Agency - Indian Contract Act 1956
 Agency - Indian Contract Act 1956 Agency - Indian Contract Act 1956
Agency - Indian Contract Act 1956
 
Pre Qualification Disqualification as per PPRA Rules 2004.pptx
Pre Qualification Disqualification as per PPRA Rules 2004.pptxPre Qualification Disqualification as per PPRA Rules 2004.pptx
Pre Qualification Disqualification as per PPRA Rules 2004.pptx
 
Contract management
Contract managementContract management
Contract management
 
Transfer of title
Transfer of titleTransfer of title
Transfer of title
 
1. WAPDA E&D-RULE.doc
1. WAPDA E&D-RULE.doc1. WAPDA E&D-RULE.doc
1. WAPDA E&D-RULE.doc
 
Purchase procedure 9thJuly 2019 at iitb
Purchase procedure 9thJuly 2019 at iitbPurchase procedure 9thJuly 2019 at iitb
Purchase procedure 9thJuly 2019 at iitb
 
Terminology for pay fixation 15.07.2011
Terminology for pay fixation   15.07.2011Terminology for pay fixation   15.07.2011
Terminology for pay fixation 15.07.2011
 
Bid propsl evaluation
Bid propsl evaluation Bid propsl evaluation
Bid propsl evaluation
 
Wapda Rules Summarized
Wapda Rules SummarizedWapda Rules Summarized
Wapda Rules Summarized
 

Similar to Legal-Procedural Framework.pdf

Orientation programme on purchase procedure
Orientation programme on purchase procedureOrientation programme on purchase procedure
Orientation programme on purchase procedureGanesh Bhorkade
 
Purchase procedure
Purchase procedurePurchase procedure
Purchase procedureMukut Deori
 
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATION
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATIONTYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATION
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATIONGanesh Bhorkade
 
Orientation programme on purchase procedure
Orientation programme on purchase procedureOrientation programme on purchase procedure
Orientation programme on purchase procedureGanesh Bhorkade
 
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...UbongAkpekong1
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSGanesh Bhorkade
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering proceduresRotich Kimaru
 
purchasingandprocurement-210514131047.pptx
purchasingandprocurement-210514131047.pptxpurchasingandprocurement-210514131047.pptx
purchasingandprocurement-210514131047.pptxitzgaya
 
127 icai - price is sole consideration for supply
127   icai - price is sole consideration for supply127   icai - price is sole consideration for supply
127 icai - price is sole consideration for supplyDeepak Kumar Jain
 
127 icai - price is sole consideration for supply
127   icai - price is sole consideration for supply127   icai - price is sole consideration for supply
127 icai - price is sole consideration for supplyDeepak Kumar Jain
 
Tendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxTendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxAshishMishra416872
 
Supply and property management
Supply and property managementSupply and property management
Supply and property managementJosephCarreon6
 
PUBLIC PROCUREMENT REGIME & AN OVERVIEW OF PUBLIC PROCUREMENT RULES, 2004
PUBLIC PROCUREMENT REGIME  & AN OVERVIEW OF PUBLIC  PROCUREMENT   RULES, 2004 PUBLIC PROCUREMENT REGIME  & AN OVERVIEW OF PUBLIC  PROCUREMENT   RULES, 2004
PUBLIC PROCUREMENT REGIME & AN OVERVIEW OF PUBLIC PROCUREMENT RULES, 2004 Nadeem Khan
 
Demystifying Regulatory Rules of Business Valuation
Demystifying Regulatory Rules of Business ValuationDemystifying Regulatory Rules of Business Valuation
Demystifying Regulatory Rules of Business ValuationTransique Corporate Advisors
 

Similar to Legal-Procedural Framework.pdf (20)

Public procurement rules 2004
Public procurement rules 2004Public procurement rules 2004
Public procurement rules 2004
 
Orientation programme on purchase procedure
Orientation programme on purchase procedureOrientation programme on purchase procedure
Orientation programme on purchase procedure
 
Purchase procedure
Purchase procedurePurchase procedure
Purchase procedure
 
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATION
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATIONTYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATION
TYPES OF PURCHASES FOR AUTONOMOUS EDUCATIONAL ORGANISATION
 
Orientation programme on purchase procedure
Orientation programme on purchase procedureOrientation programme on purchase procedure
Orientation programme on purchase procedure
 
Purchase and procurement
Purchase and procurementPurchase and procurement
Purchase and procurement
 
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...
OVERVIEW OF PUBLIC PROCUREMENT UNDER THE PUBLIC PROCUREMENT[23058430092159162...
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering procedures
 
GFR.pptx
GFR.pptxGFR.pptx
GFR.pptx
 
purchasingandprocurement-210514131047.pptx
purchasingandprocurement-210514131047.pptxpurchasingandprocurement-210514131047.pptx
purchasingandprocurement-210514131047.pptx
 
127 icai - price is sole consideration for supply
127   icai - price is sole consideration for supply127   icai - price is sole consideration for supply
127 icai - price is sole consideration for supply
 
127 icai - price is sole consideration for supply
127   icai - price is sole consideration for supply127   icai - price is sole consideration for supply
127 icai - price is sole consideration for supply
 
Tendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxTendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptx
 
75689678.pptx
75689678.pptx75689678.pptx
75689678.pptx
 
Ppra rules
Ppra rulesPpra rules
Ppra rules
 
Preparing for the CPSR - A Practical Guide
Preparing for the CPSR - A Practical GuidePreparing for the CPSR - A Practical Guide
Preparing for the CPSR - A Practical Guide
 
Supply and property management
Supply and property managementSupply and property management
Supply and property management
 
PUBLIC PROCUREMENT REGIME & AN OVERVIEW OF PUBLIC PROCUREMENT RULES, 2004
PUBLIC PROCUREMENT REGIME  & AN OVERVIEW OF PUBLIC  PROCUREMENT   RULES, 2004 PUBLIC PROCUREMENT REGIME  & AN OVERVIEW OF PUBLIC  PROCUREMENT   RULES, 2004
PUBLIC PROCUREMENT REGIME & AN OVERVIEW OF PUBLIC PROCUREMENT RULES, 2004
 
Demystifying Regulatory Rules of Business Valuation
Demystifying Regulatory Rules of Business ValuationDemystifying Regulatory Rules of Business Valuation
Demystifying Regulatory Rules of Business Valuation
 

Recently uploaded

The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estateoklahomajudicialproc1
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***Stephen Abram
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36JSchaus & Associates
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptxPaul Smith
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfMohammed325561
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendmentahcitycouncil
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单enbam
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesAndrew Griffith
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930Fahcitycouncil
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单ehbuaw
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...Christina Parmionova
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsStephen Abram
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxILC- UK
 
一比一原版(UniSA毕业证)南澳大学毕业证成绩单
一比一原版(UniSA毕业证)南澳大学毕业证成绩单一比一原版(UniSA毕业证)南澳大学毕业证成绩单
一比一原版(UniSA毕业证)南澳大学毕业证成绩单aveka1
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantageSwapnajitSahoo1
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stopahcitycouncil
 
Hub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfHub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfStephen Abram
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organizationuptheratios
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperityResolutionFoundation
 

Recently uploaded (20)

The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design Inspirations
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
一比一原版(UniSA毕业证)南澳大学毕业证成绩单
一比一原版(UniSA毕业证)南澳大学毕业证成绩单一比一原版(UniSA毕业证)南澳大学毕业证成绩单
一比一原版(UniSA毕业证)南澳大学毕业证成绩单
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantage
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Hub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfHub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdf
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperity
 

Legal-Procedural Framework.pdf

  • 1. Public Procurement of Goods Legal & Procedural Framework
  • 2. Legal & procedural framework • Constitution of India • Indian Contract Act • Sale of Goods Act • Indian Arbitration & Conciliation Act • Procurement Rules contained in GFR, if applicable • Procurement Guidelines formulated by CVC • Procurement Guidelines of the Department/PSU concerned
  • 4. GFR Journey •GFR 1947 •GFR 1963 •GFR 2005 •GFR 2017
  • 5. Basic Learning Rationale Personal purchase v/s Govt Purchase Working under GoI norms & policy framework
  • 6. Facts of Process Financer determines the Process – GoI • Prescription, policy & rules of GoI • Lawful process • Power – Delegation of authority • Open competition – Opportunity to all • Need based purchase – No speculation Contract is the basis for procurement Needs time, knowledge and Planning
  • 7. Why GFR • Rules and orders of Government of India while dealing with matters involving public finances • Principles of accountability • Procedures of financial discipline and administrative due diligence • Manage business in a financially prudent manner without compromising flexibility to deal with varied situations • Promoting simplicity and transparency in the government financial system and procedures
  • 8. Regulatory Principles • Public Procurements of Govt of India are governed by the General Financial Rules 2017 (GFR 2017) • While dealing with matters involving public finances, these have to be followed • Issued by Dept of Expenditure, Ministry of Finance, Government of India
  • 9. GFR for Procurement of Goods Chapter 2 General System of Financial Management Chapter 6 Procurement of Goods and Services I. Procurement of Goods II. Procurement of Services Chapter 7 Inventory Management Chapter 8 Contract Management Appendix 11 Formula for PVC Form GFR 10 Report of Surplus, Obsolete and Unserviceable Stores for Disposal Form GFR 11 Sale Account
  • 10. GFR 2017: Rule 21 - Standards of financial propriety In summary For expenditure from public moneys To Ensure that financial rules and regulations are observed Apply ordinary prudence as for own money Not more than the occasion demands No self sanction for own advantage Not for benefit of particular person/section unless: Claim can be enforced in a Court of Law For recognized policy or custom
  • 11. GFR 2017: Rule 21 - Standards of financial propriety Every officer incurring or authorizing expenditure from public moneys should be guided by high standards of financial propriety. Every officer should also enforce financial order and strict economy and see that all relevant financial rules and regulations are observed, by his own office and by subordinate disbursing officers. Among the principles on which emphasis is generally laid are the following :- (i) Every officer is expected to exercise the same vigilance in respect of expenditure incurred from public moneys as a person of ordinary prudence would exercise in respect of expenditure of his own money. (ii) The expenditure should not be prima facie more than the occasion demands. (iii) No authority should exercise its powers of sanctioning expenditure to pass an order which will be directly or indirectly to its own advantage. (iv) Expenditure from public moneys should not be incurred for the benefit of a particular person or a section of the people, unless – (a) a claim for the amount could be enforced in a Court of Law, or (b) the expenditure is in pursuance of a recognized policy or custom.
  • 12. Rule 144 Fundamental principles of public buying Every authority delegated with powers has responsibility and accountability to • Bring efficiency, economy and transparency • Fair and equitable treatment of suppliers • Promotion of competition in public procurement – Right & unbiased Description of goods – Right Quantity, Right Procedure, – Right Source (capable & reliable), – Right Price
  • 13. GFR-Procurement procedure- Quality • The description of the subject matter of procurement to the extent practicable should be objective, functional, generic and measurable and specify technical, qualitative and performance characteristics • It should not indicate a requirement for a particular trade-mark, trade-name or brand . Rule144(i)
  • 14. GFR-Procurement procedure- Quality • The specifications (in terms of quality, type etc.) should be formulated keeping in view the specific needs. • The specifications should meet the basic needs without including superfluous and non-essential features, which may result in unwarranted expenditure. Rule144(ii)
  • 15. GFR-Procurement procedure- Quantity • Care should also be taken to avoid purchasing quantities in excess of requirement to avoid Inventory Carrying Costs (ICC). Rule 144(iv)
  • 16. GFR-Proc procedure-Tendering & selecting offer • Offers should be invited following a fair, transparent and reasonable procedure. Rule144(v) • The procuring authority should be satisfied that the selected offer adequately meets the requirement in all respects. Rule 144(vi)
  • 17. GFR-Procurement procedure - Price • The procuring authority should satisfy itself that the price of the selected offer is reasonable and consistent with the quality required. Rule 144(vii)
  • 18. GFR-Proc procedure -Reasoned Decision • At each stage of procurement the procuring authority must place on record, in precise terms, the considerations which weighed with it while taking the procurement decision. Rule 144(viii)
  • 19. Description of Goods Be objective, functional, generic and measurable and specify technical, qualitative and performance characteristics not indicate a requirement for a particular trade mark, trade name or brand specifications & quantity be clearly spelt out for specific needs, meet the basic needs without superfluous and non- essential features, for minimum expenditure technical specifications shall be based on national standards and in their absence, on the relevant international standards avoid purchasing excess quantities than required to avoid inventory carrying costs
  • 20. GFR-Procurement procedure- Quality • The description of the subject matter of procurement to the extent practicable should be objective, functional, generic and measurable and specify technical, qualitative and performance characteristics • It should not indicate a requirement for a particular trade-mark, trade-name or brand . Rule144(i)
  • 21. GFR-Procurement procedure- Quality • The specifications (in terms of quality, type etc.) should be formulated keeping in view the specific needs. • The specifications should meet the basic needs without including superfluous and non-essential features, which may result in unwarranted expenditure. Rule144(ii)
  • 22. GFR-Procurement procedure- Quantity • Care should also be taken to avoid purchasing quantities in excess of requirement to avoid Inventory Carrying Costs (ICC). Rule 144(iv)
  • 23. GFR-Proc procedure-Tendering & selecting offer • Offers should be invited following a fair, transparent and reasonable procedure. Rule144(v) • The procuring authority should be satisfied that the selected offer adequately meets the requirement in all respects. Rule 144(vi)
  • 24. GFR-Procurement procedure - Price • The procuring authority should satisfy itself that the price of the selected offer is reasonable and consistent with the quality required. Rule 144(vii)
  • 25. GFR-Proc procedure -Reasoned Decision • At each stage of procurement the procuring authority must place on record, in precise terms, the considerations which weighed with it while taking the procurement decision. Rule 144(viii)
  • 26. Rule 149 Government e-Market place (GeM). • Agency authorized by the Government will host an online Government e- Marketplace (GeM) for common use Goods and Services • Procurement on GeM mandatory for Goods or Services available on GeM – Credentials of suppliers on GeM shall be certified by GeM – Procuring authorities will certify the reasonability of rates using the Business Analytics (BA) tools available on GeM including the Last Purchase Price on GeM, Department’s own Last Purchase Price etc – The GeM portal shall be utilized for direct on-line purchases as under, meeting requisite quality, specification and delivery requirement  Up to Rs.25,000/- through any of the available suppliers on GeM  Rs.25,000/- to Rs.5 Lakh through Seller having lowest price, of at least three different manufacturers. The tools for online bidding and online reverse auction can be used  Above Rs.5 Lakh through supplier having lowest price after mandatorily obtaining bids, using online bidding or reverse auction tools  Demand not to be split to avoid procurement through L-1 Buying / bidding / reverse auction on GeM  The depts shall project their Annual Procurement Plan of goods and services on GeM portal within 30 days of Budget approval
  • 27. Other GFR 2017 Rules • Rule 151 Debarment from bidding after giving reasonable opportunity • Rule 153 Reserved Items and other Purchase/ Price Preference Policy – all items of hand spun and hand-woven textiles (khadi goods) for exclusive purchase from Khadi Village Industries Commission (KVIC) – all items of handloom textiles exclusive purchase from KVIC and/or the notified handloom units of Association of Corporations and Apex Societies of Handlooms (ACASH) – Ministry of Micro, Small and Medium Enterprises (MSME) procurement policy – preference to bidders on the grounds of promotion of locally manufactured goods or locally provided services, Make in India • Rule 154 Purchase of goods without quotation – Purchase upto Rs. 25,000 without inviting quotations on a certificate by CA “I,, am personally satisfied that these goods purchased are of the requisite quality and specification and have been purchased from a reliable supplier at a reasonable price.” • Rule 155 Purchase of goods by Purchase Committee – Purchase above Rs. 25,000 and upto Rs.2,50,000/- by Local Purchase Committee of three members as decided by the HOD, “Certified that we, members of the purchase committee are jointly and individually satisfied that the goods recommended for purchase are of the requisite specification and quality, priced at the prevailing market rate and the supplier recommended is reliable and competent to supply the goods in question, and it is not debarred by Department of Commerce or Ministry/ Department concerned.
  • 28. Other GFR 2017 Rules • Rule 158 Purchase of goods by obtaining bids – following the standard method of obtaining bids in: (i) Advertised Tender Enquiry (ii) Limited Tender Enquiry (iii) Two-Stage Bidding (iv) Single Tender Enquiry (v) Electronic Reverse Auctions • Rule 159 E-Publishing – mandatory to publish their tender enquiries, corrigenda thereon and details of bid awards on the Central Public Procurement Portal (CPPP) – applies to all Tender Enquiries, Requests for Proposals, Requests for Expressions of Interest, Notice for pre Qualification/ Registration or any other notice • Rule 160 E-Procurement – mandatory to receive all bids through e-procurement – may use e-procurement solution developed by NIC • Rule 161 Advertised Tender Enquiry – for procurement value of Rs. 25 lakhs and above – to promote wider participation and ease of bidding, no cost of tender document for the tender documents downloaded by the bidders – minimum time for submission of bids should be three weeks for Domestic tenders and four weeks where deptt contemplates obtaining bids from abroad
  • 29. Other GFR 2017 Rules • Rule 162 Limited Tender Enquiry – For purchase value up to Rs 25 Lakh. Copies of the bidding document should be sent directly by speed post/registered post/courier/ email to firms borne on the list of registered suppliers – The number of supplier firms in LT Enquiry should be more than three. Efforts be made to identify higher number of approved suppliers to obtain more responsive bids on competitive basis. – The unsolicited bids should not be accepted – Spl LT where value > Rs 25 Lakh when • the demand is urgent & certified that additional expenditure involved by not procuring through advertised tender enquiry is justified • Sources of supply are known and possibility of fresh sources is remote • Rule 163 Two bid system (simultaneous receipt of separate technical and financial bids) • Rule 164 Two-Stage Bidding • Rule 166 Single Tender Enquiry • Rule 167 Electronic Reverse Auction
  • 30. Other GFR 2017 Rules • Rule 168 Contents of Bidding Document – Chapter – 1: Instructions to Bidders – Chapter – 2: Conditions of Contract – Chapter – 3: Schedule of Requirements – Chapter – 4: Specifications and allied Technical Details – Chapter – 5: Price Schedule (to be utilised by the bidders for quoting their prices) – Chapter – 6: Contract Form – Chapter – 7: Other Standard Forms, if any, to be utilized by the purchaser and the bidders • Rule 169 Maintenance Contract • Rule 170 Bid Security • Rule 171 Performance Security • Rule 172 (1) Advance payment to supplier • Rule 172 (2) Part payment to suppliers
  • 31. Other GFR 2017 Rules • Rule 173 Transparency, competition, fairness and elimination of arbitrariness in the procurement process – to secure best value for money – bidding document - self-contained and comprehensive without any ambiguities – All essential information, for responsive bid, should be clearly spelt out in simple language – The condition of prior turnover and prior experience may be relaxed for Startups (as defined by Department of Industrial Policy and Promotion) subject to meeting of quality & technical specifications and making suitable provisions in the bidding document – Bidding Document must have (a) Description and Specifications of goods including the nature, quantity, time and place or places of delivery (b) the criteria for eligibility and qualifications to be met by the bidders such as minimum level of experience, past performance, technical capability, manufacturing facilities and financial position etc or limitation for participation of the bidders, if any (c) eligibility criteria for goods indicating any legal restrictions or conditions about the origin of goods etc which may required to be met by the successful bidder (d) the procedure as well as date, time and place for sending the bids (e) date, time and place of opening of the bid. (e) Criteria for evaluation of bids (f) special terms affecting performance, if any (g) Essential terms of the procurement contract • Suitable provision for settlement of disputes • The bidding document should indicate that the contract will be under Indian Laws • The specifications of the required goods should be clearly stated without any ambiguity • to attract sufficient number of bidders, the specification should be broad based • Pre-bid conference: In case of turnkey contract(s) or contract(s) of special nature for procurement of sophisticated and costly equipment or wherever felt necessary, a suitable provision is to be kept in the bidding documents for one or more rounds of pre-bid conference for clarifying issues and clearing doubts, if any, about the specifications and other allied technical details of the plant, equipment and machinery etc. projected in the bidding document. The date, time and place of pre-bid conference should be indicated in the bidding document. This date should be sufficiently ahead of bid opening date. The records of such conference shall be intimated to all bidders and, shall also be exhibited on the website(s) where tender was published
  • 32. •Rule 174 Efficiency, Economy and Accountability in Public Procurement System •Rule 176 Buy-Back Offer Other GFR 2017 Rules
  • 33. CVC Guidelines Meaning of Vigilance Angle • Demanding / accepting gratification other than legal remuneration in respect of an official act • Obtaining valuable things without consideration from a person with whom has or likely to have official dealings • Possession of assets disproportionate to known sources of income • Obtaining any valuable things by corrupt or illegal means by abusing his official position
  • 34. CVC Guidelines • Applicable to all Central entities • Issue of guidelines by CVC either Sue Moto or on review / examination of various complaints • Guidelines focuses on integrity of public servants
  • 35. Causes of Corruption Santhanam Committee identified four major causes of corruption: • Administrative delays • Personal discretion in the exercise of power • Cumbersome procedure • Lack of knowledge with regard to rules & guidelines
  • 36. CVC guidelines- Mode of Proc • In order to generate enough competition and to avoid favoritism, issue of advertised/global tender inquiries should be resorted to and published in journals and national newspapers giving adequate time to the prospective bidders. • As per latest guidelines publishing on Department’s website and CPPP is mandatory.
  • 37. CVC guidelines- Tender Enquiry • Important clauses relating to earnest money, delivery schedule, payment terms, performance bank guarantee, warrantee, pre-despatch inspection, arbitration, liquidated damages and penalty for the delayed supplies to be incorporated in the T/E .
  • 38. CVC guidelines- Changes in tender specs etc • In order to give equal opportunity to all bidders and to maintain sanctity of tendering system, it is of paramount importance that any change in tender terms & conditions, specifications and tender opening date etc. be notified to all the bidders, sufficiently in advance of the revised tender opening date.
  • 39. CVC guidelines- Reasonableness of Price • Purchase organisations must establish the reasonableness of prices on the basis of estimated rates, prevailing market rates, last purchase prices, economic indices of the raw material / labour, other input costs and intrinsic value etc., before award of the contract.
  • 40. CVC guidelines- Awarding of contract • Once it has been established that the offers meet the laid down specifications, the question of ‘grading’ as well as any ‘pick and choose’ should not arise. • The contract needs to be awarded to the lowest bidder meeting the laid down specifications.
  • 41. CVC guidelines -Drafting of contract • Specific delivery period for supply as per the terms of delivery such as for station of despatch / destination and for completion of installation with the necessary provision for liquidated damages / penalty clause in the event of delay in supplies/ installation needs to be incorporated in the contract.
  • 42. CVC guidelines- Contract Mgmt • After conclusion of the contract, any relaxation in the contract terms / specifications should be severely discouraged. However, in exceptional cases where the modifications/amendments are considered to be absolutely essential, the same should be allowed after taking into account the financial implications for the same.
  • 43. CVC guidelines- Contract Mgmt • It is essential to accord priority to the post contract follow up. The delivery period should be extended on bonafide request and not in a routine and casual manner. • After expiry of delivery period, the consignees should be refrained from exchanging correspondence with the supplier. In case of delay in supplies by the supplier, the liquidated damages to the extent possible need to be recovered.
  • 44. Negotiation- CVC • As post tender negotiations are the main source of corruption, post tender negotiations are banned with immediate effect except in the case of negotiations with L-1 (lowest acceptable tenderer). • The instructions/ guidelines circulated by cvc on post tender negotiations only with L-1 need to be strictly followed. • Subsequently L-1 has been defined as Lowest bidder found suitable for bulk quantity order
  • 45.  CVC Guidelines on Procurement / Contract Management Negotiation with L-1 a. No post tender negotiation normally except in certain exceptional circumstances viz proprietary items, items with limited source of supply, b. Counter offer to L-1 amounts to negotiation c. Counter offer to L-2, L-3 etc at the rates accepted by L- 1 in case of splitting of quantities as pre disclosed in the tender not to be treated as negotiation Contd…
  • 46.  CVC Guidelines on Procurement / Contract Management Award of Contract on nomination basis a. Supreme Court of India in Nagar Nigam Meerut versus Faheem Meat Export Private Limited decided that contract can be awarded on nomination basis in the following circumstances only. i. During natural calamities and emergency declared by Government where the procurement possible from a single source only ii. Where the supplier has exclusive rights in respect of goods & services and no reasonable alternative exist. iii. When an auction held several times but no bidders came forward or bids offered were very low b. All works awarded on nomination basis to be brought to the notice of board of PSUs for information c. Posting of details on award of tenders on websites Contd…
  • 47. CVC Guidelines on Procurement / Contract Management Voluntary adoptionof integritypact in major Government Procurement Contd…
  • 48. What is integrity Pact? Integrity Pact Integrity Pact Doing right things Agreement
  • 49. Preventive vigilance- IP • IP is an agreement entered into by the Principal and the Vendor for each contract • Independent External Monitor (IEM) is appointed for monitoring its implementation Principal Vendor
  • 50. CVC Guidelines on Procurement/ Contract Management Mobilization advance a. To be backed by bank guarantee b. Not to be paid in less than two installments c. Interest bearing as per prevailing market rates Contd…
  • 51. CVC Guidelines on Procurement/ Contract Management Short comings in bid documents Pre Qualification, evaluation criteria be stipulated in tender document itself Contd…
  • 52. CVC Guidelines on Procurement/ Contract Management Undertaking by members of tender committee Committee members are required to disclose their personal interests in the tender Contd…
  • 53. CVC Guidelines on Procurement/ Contract Management Time bound processing of Procurement Fixation of period for validity of the offers with atmost care & extension of validity be rare and in exceptional circumstances
  • 54.  Preventive Vigilance Preventive Vigilance based on theme ‘Prevention is better than cure’ Major steps in preventive vigilance • Analysis of rules & regulations & other administrative orders of the organization • Identifying procedures & systems which need to be simplified • Identification of sensitive areas • Organizing vigilance awareness program • Rotation of officials working in sensitive areas • Surprise checks & inspections
  • 55.  Preventive Vigilance Case Study Shortcoming observed during preventive inspection of a PSU (in the business of handling of containers through handling contractor) • No. of trailers & handling equipment in numbers less than the contract provides • Deployed trailers/equipment not meeting vintage year criteria • Original registration certificate of the vehicles not available • Breakdown register for the trailers/equipment not maintained in proper format • Failure to issue job orders • Permits not issued through computerized system (gate in & gate out passes) • Equipment utilized for movement in another contract • Contract on adhoc basis Corrective Action Detailed guidelines issued on these inspection points of vigilance
  • 56. To Minimize Corruption • Reduce Monopoly & Discretionary powers • Increase Accountability, Transparency, Efficiency C = M + D – (A+T+E) • The breakeven for corruption needs to made higher by raising Risk levels for those involved – Ex CVC, Sh Vithal
  • 57. Preventive vigilance -Enhance Transparency • Publicize charter of duties • Make procedures public • Provide guidance to the public • Make senior officers accessible
  • 58. Preventive vigilance -Enforce Accountability • Make clear demarcation of areas of work • Make delegation of power clear • Establish an overarching body • Hold authority concerned accountable