LEED 2009 for Commercial Interiors                                                                              Project Name
                      Project Checklist                                                                                                      Date


   0    0    0        Sustainable Sites                                                         Possible Points:   21
    Y    ?   N                                                                                                               Notes:
                  d   Credit 1     Site Selection                                                                  1 to 5
                                        Option 1: Select a LEED Certified Building                                 5
                                        OR
                                        Path 1: Brownfield Redevelopment                                           1
                                        Path 2: Stormwater Design—Quantity Control                                 1
                                        Path 3: Stormwater Design—Quality Control                                  1
                                        Path 4: Heat Island Effect—Nonroof                                         1
                                        Path 5: Heat-Island Effect—Roof                                            1
                                        Path 6: Light Pollution Reduction                                          1
                                        Path 7: Water Efficient Landscaping—Reduce by 50%                          2
                                        Path 8: Water Efficient Landscaping—No Potable Water Use or Irrigation     2
                                        Path 9: Innovative Wastewater Technologies                                 2
                                        Path 10: Water Use Reduction—30% Reduction                                 1
                                        Path 11: On-site Renewable Energy                                          2
                                        Path 12: Other Quantifiable Environmental Performance                      1
                  d   Credit 2     Development Density and Community Connectivity                                  6
                  d   Credit 3.1   Alternative Transportation—Public Transportation Access                         6
                  d   Credit 3.2   Alternative Transportation—Bicycle Storage and Changing Rooms                   2
                  d   Credit 3.3   Alternative Transportation—Parking Availability                                 2


   0    0    0        Water Efficiency                                                          Possible Points:   11
    Y    ?   N                                                                                                               Notes:
   Y              d   Prereq 1     Water Use Reduction—20% Reduction
                  d   Credit 1     Water Use Reduction                                                             6 to 11




LEED 2009 for Commercial Interiors Project Checklist                                                                                                 1 of 5
0    0    0        Energy and Atmosphere                                                 Possible Points:   37
    Y    ?   N                                                                                                           Notes:
   Y              C   Prereq 1     Fundamental Commissioning of Building Energy Systems
   Y              d   Prereq 2     Minimum Energy Performance
   Y              d   Prereq 3     Fundamental Refrigerant Management
                  d   Credit 1.1   Optimize Energy Performance—Lighting Power                                  1 to 5
                                       15% Reduction                                                           1
                                       20% Reduction                                                           2
                                       25% Reduction                                                           3
                                       30% Reduction                                                           4
                                       35% Reduction                                                           5
                  d   Credit 1.2   Optimize Energy Performance—Lighting Controls                               1 to 3
                                       Daylight Controls for Daylit Areas                                      1
                                       Daylight Controls for 50% of the Lighting Load                          1
                                       Occupancy Sensors for 75% of the Connected Lighting Load                1
                  d   Credit 1.3   Optimize Energy Performance—HVAC                                            5 to 10
                                       Equipment Efficiency                                                    5
                                       Zoning Controls                                                         5
                                       OR
                                       Reduce Design Energy Cost and 15% Improvement                           5
                                       Reduce Design Energy Cost and 30% Improvement                           10
                  d   Credit 1.4   Optimize Energy Performance—Equipment and Appliances                        1 to 4
                                       70% ENERGY STAR                                                         1
                                       77% ENERGY STAR                                                         2
                                       84% ENERGY STAR                                                         3
                                       90% ENERGY STAR                                                         4
                  C   Credit 2     Enhanced Commissioning                                                      5
                  d   Credit 3     Measurement and Verification                                                2 to 5
                                       Install Sub-Metering Equipment                                          2
                                       Tenant Pays for Energy                                                  3
                                       OR
                                       Metering, Measurement and Payment Accountability                        5
                  d   Credit 4     Green Power                                                                 5




LEED 2009 for Commercial Interiors Project Checklist                                                                              2 of 5
0    0    0        Materials and Resources                                            Possible Points:   14
    Y    ?   N                                                                                                       Notes:
   Y              d   Prereq 1     Storage and Collection of Recyclables
                  d   Credit 1.1   Tenant Space—Long-Term Commitment                                        1
                  d   Credit 1.2   Building Reuse                                                           1 to 2
                                       40% Reuse                                                            1
                                       60% Reuse                                                            2
                  C   Credit 2     Construction Waste Management                                            1 to 2
                                       Divert 50% from Disposal                                             1
                                       Divert 75% from Disposal                                             2
                  C   Credit 3.1   Materials Reuse                                                          1 to 2
                                       5% Reuse                                                             1
                                       10% Reuse                                                            2
                  C   Credit 3.2   Materials Reuse—Furniture and Furnishings                                1
                  C   Credit 4     Recycled Content                                                         1 to 2
                                       10% of Content                                                       1
                                       20% of Content                                                       2
                  C   Credit 5     Regional Materials                                                       1 to 2
                                       20% of Materials Manufactured                                        1
                                       20% of Materials Manufactured and 10% Extracted                      2
                  C   Credit 6     Rapidly Renewable Materials                                              1
                  C   Credit 7     Certified Wood                                                           1




LEED 2009 for Commercial Interiors Project Checklist                                                                          3 of 5
0    0    0         Indoor Environmental Quality                                          Possible Points:   17
    Y    ?   N                                                                                                           Notes:
   Y               d   Prereq 1     Minimum IAQ Performance
   Y               d   Prereq 2     Environmental Tobacco Smoke (ETS) Control
                   d   Credit 1     Outdoor Air Delivery Monitoring                                             1
                   d   Credit 2     Increased Ventilation                                                       1
                  C    Credit 3.1   Construction IAQ Management Plan—During Construction                        1
                  C    Credit 3.2   Construction IAQ Management Plan—Before Occupancy                           1
                  C    Credit 4.1   Low-Emitting Materials—Adhesives and Sealants                               1
                  C    Credit 4.2   Low-Emitting Materials—Paints and Coatings                                  1
                  C    Credit 4.3   Low-Emitting Materials—Flooring Systems                                     1
                  C    Credit 4.4   Low-Emitting Materials—Composite Wood and Agrifiber Products                1
                  C    Credit 4.5   Low-Emitting Materials—Systems Furniture and Seating                        1
                   d   Credit 5     Indoor Chemical & Pollutant Source Control                                  1
                   d   Credit 6.1   Controllability of Systems—Lighting                                         1
                   d   Credit 6.2   Controllability of Systems—Thermal Comfort                                  1
                   d   Credit 7.1   Thermal Comfort—Design                                                      1
                   d   Credit 7.2   Thermal Comfort—Verification                                                1
                   d   Credit 8.1   Daylight and Views—Daylight                                                 1 to 2
                                         75% of Spaces                                                          1
                                         90% of Spaces                                                          2
                   d   Credit 8.2   Daylight and Views—Views for Seated Spaces                                  1


   0    0    0         Innovation and Design Process                                         Possible Points:   6
    Y    ?   N                                                                                                           Notes:
                  d/C Credit 1.1    Innovation in Design: Specific Title                                        1
                  d/C Credit 1.2    Innovation in Design: Specific Title                                        1
                  d/C Credit 1.3    Innovation in Design: Specific Title                                        1
                  d/C Credit 1.4    Innovation in Design: Specific Title                                        1
                  d/C Credit 1.5    Innovation in Design: Specific Title                                        1
                   d   Credit 2     LEED Accredited Professional                                                1


   0    0    0         Regional Priority Credits                                             Possible Points:   4
    Y    ?   N                                                                                                           Notes:
                  d/C Credit 1.1    Regional Priority: Specific Credit                                          1
                  d/C Credit 1.2    Regional Priority: Specific Credit                                          1
                  d/C Credit 1.3    Regional Priority: Specific Credit                                          1
                  d/C Credit 1.4    Regional Priority: Specific Credit                                          1




LEED 2009 for Commercial Interiors Project Checklist                                                                              4 of 5
0    0    0        Total                                                                                    Possible Points: 110
                              Certified 40 to 49 points   Silver 50 to 59 points   Gold 60 to 79 points   Platinum 80 to 110




LEED 2009 for Commercial Interiors Project Checklist                                                                                  5 of 5

More Related Content

What's hot

Conferencia Cintia Gates - Primer ForoTICRAEE
Conferencia Cintia Gates - Primer ForoTICRAEE Conferencia Cintia Gates - Primer ForoTICRAEE
Conferencia Cintia Gates - Primer ForoTICRAEE ComputadoresparaEducar10
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1djk447
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1djk447
 
Encouraging Sustainability: Use of LEED to Enhance Focus on Sustainability
Encouraging Sustainability: Use of LEED to Enhance Focus on SustainabilityEncouraging Sustainability: Use of LEED to Enhance Focus on Sustainability
Encouraging Sustainability: Use of LEED to Enhance Focus on SustainabilityDaniel Haddock
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFThe Design Partnership
 
NAHB Green Building
NAHB Green BuildingNAHB Green Building
NAHB Green Buildingtrekie66
 
Presentation dental room 121011
Presentation dental room 121011Presentation dental room 121011
Presentation dental room 121011crf123
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12greenbuilding
 
LEED Sustainable Projects
LEED Sustainable ProjectsLEED Sustainable Projects
LEED Sustainable Projectsjpetr0s
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley BrochureNathanSproule
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009scottbrooker
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer Bilal Mohamed
 

What's hot (20)

LEED
LEEDLEED
LEED
 
Conferencia Cintia Gates - Primer ForoTICRAEE
Conferencia Cintia Gates - Primer ForoTICRAEE Conferencia Cintia Gates - Primer ForoTICRAEE
Conferencia Cintia Gates - Primer ForoTICRAEE
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1
 
Encouraging Sustainability: Use of LEED to Enhance Focus on Sustainability
Encouraging Sustainability: Use of LEED to Enhance Focus on SustainabilityEncouraging Sustainability: Use of LEED to Enhance Focus on Sustainability
Encouraging Sustainability: Use of LEED to Enhance Focus on Sustainability
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
NAHB Green Building
NAHB Green BuildingNAHB Green Building
NAHB Green Building
 
Presentation dental room 121011
Presentation dental room 121011Presentation dental room 121011
Presentation dental room 121011
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
 
Building LIFE
Building LIFEBuilding LIFE
Building LIFE
 
LEED Sustainable Projects
LEED Sustainable ProjectsLEED Sustainable Projects
LEED Sustainable Projects
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley Brochure
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009
 
Leed ga answer
Leed ga answerLeed ga answer
Leed ga answer
 
Green Building
Green BuildingGreen Building
Green Building
 
Occupying Green
Occupying GreenOccupying Green
Occupying Green
 
Finley Hospital
Finley HospitalFinley Hospital
Finley Hospital
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 

Similar to Leed 2009 for commercial interiors ci2009 checklist-details

Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Congress for the New Urbanism
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated ManualTom_Pritscher
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Designemilydean
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green buildingMamdooh Amin
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGeoffrey Lewis
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Morgan
 
2012 Reenergize the Americas 1B: John Peichel
2012 Reenergize the Americas  1B: John Peichel2012 Reenergize the Americas  1B: John Peichel
2012 Reenergize the Americas 1B: John PeichelReenergize
 
Momentum Technology Centers
Momentum Technology CentersMomentum Technology Centers
Momentum Technology Centersejp436
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklistimaduddin91
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksVikki Jacobs
 
green building technology
green building technologygreen building technology
green building technologyJohn A Herbert
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical StoryDolphinMC
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
DSI - Energy Solutions Provider
DSI - Energy Solutions ProviderDSI - Energy Solutions Provider
DSI - Energy Solutions Providerjmayer33
 

Similar to Leed 2009 for commercial interiors ci2009 checklist-details (20)

Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated Manual
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Design
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green building
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
 
The Cost of Building Green
The Cost of Building GreenThe Cost of Building Green
The Cost of Building Green
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
 
2012 Reenergize the Americas 1B: John Peichel
2012 Reenergize the Americas  1B: John Peichel2012 Reenergize the Americas  1B: John Peichel
2012 Reenergize the Americas 1B: John Peichel
 
Momentum Technology Centers
Momentum Technology CentersMomentum Technology Centers
Momentum Technology Centers
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklist
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risks
 
green building technology
green building technologygreen building technology
green building technology
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical Story
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
BUDMA 2011
BUDMA 2011BUDMA 2011
BUDMA 2011
 
Philippines - stregthening institutional capacity
Philippines - stregthening institutional capacityPhilippines - stregthening institutional capacity
Philippines - stregthening institutional capacity
 
Leed nd drcog
Leed nd drcogLeed nd drcog
Leed nd drcog
 
DSI - Energy Solutions Provider
DSI - Energy Solutions ProviderDSI - Energy Solutions Provider
DSI - Energy Solutions Provider
 

More from Fathi Nada

خطة للتخفيض 2013
خطة للتخفيض 2013خطة للتخفيض 2013
خطة للتخفيض 2013Fathi Nada
 
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراء
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراءرئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراء
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراءFathi Nada
 
Leed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bLeed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bFathi Nada
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htmFathi Nada
 
خطة للتخفيض
خطة للتخفيضخطة للتخفيض
خطة للتخفيضFathi Nada
 

More from Fathi Nada (6)

خطة للتخفيض 2013
خطة للتخفيض 2013خطة للتخفيض 2013
خطة للتخفيض 2013
 
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراء
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراءرئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراء
رئيس الوزراء الهولندي اثناء دخوله مقر رئاسة الوزراء
 
دمووع
دمووعدمووع
دمووع
 
Leed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bLeed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9b
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htm
 
خطة للتخفيض
خطة للتخفيضخطة للتخفيض
خطة للتخفيض
 

Recently uploaded

National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxAlecAnidul
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyJaime Brown
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designGOWSIKRAJA PALANISAMY
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.rrimika1
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasanasabutalha2013
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..GB Logo Design
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationJaime Brown
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfSudhanshuMandlik
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfJon Freach
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxadityakushalsaha
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisPeclers Paris
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentationssuser8fae18
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Remy Rey De Barros
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themmadhavlakhanpal29
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designerbitwgin12
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionPixel poets
 

Recently uploaded (16)

National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive design
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers Paris
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designer
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 

Leed 2009 for commercial interiors ci2009 checklist-details

  • 1. LEED 2009 for Commercial Interiors Project Name Project Checklist Date 0 0 0 Sustainable Sites Possible Points: 21 Y ? N Notes: d Credit 1 Site Selection 1 to 5 Option 1: Select a LEED Certified Building 5 OR Path 1: Brownfield Redevelopment 1 Path 2: Stormwater Design—Quantity Control 1 Path 3: Stormwater Design—Quality Control 1 Path 4: Heat Island Effect—Nonroof 1 Path 5: Heat-Island Effect—Roof 1 Path 6: Light Pollution Reduction 1 Path 7: Water Efficient Landscaping—Reduce by 50% 2 Path 8: Water Efficient Landscaping—No Potable Water Use or Irrigation 2 Path 9: Innovative Wastewater Technologies 2 Path 10: Water Use Reduction—30% Reduction 1 Path 11: On-site Renewable Energy 2 Path 12: Other Quantifiable Environmental Performance 1 d Credit 2 Development Density and Community Connectivity 6 d Credit 3.1 Alternative Transportation—Public Transportation Access 6 d Credit 3.2 Alternative Transportation—Bicycle Storage and Changing Rooms 2 d Credit 3.3 Alternative Transportation—Parking Availability 2 0 0 0 Water Efficiency Possible Points: 11 Y ? N Notes: Y d Prereq 1 Water Use Reduction—20% Reduction d Credit 1 Water Use Reduction 6 to 11 LEED 2009 for Commercial Interiors Project Checklist 1 of 5
  • 2. 0 0 0 Energy and Atmosphere Possible Points: 37 Y ? N Notes: Y C Prereq 1 Fundamental Commissioning of Building Energy Systems Y d Prereq 2 Minimum Energy Performance Y d Prereq 3 Fundamental Refrigerant Management d Credit 1.1 Optimize Energy Performance—Lighting Power 1 to 5 15% Reduction 1 20% Reduction 2 25% Reduction 3 30% Reduction 4 35% Reduction 5 d Credit 1.2 Optimize Energy Performance—Lighting Controls 1 to 3 Daylight Controls for Daylit Areas 1 Daylight Controls for 50% of the Lighting Load 1 Occupancy Sensors for 75% of the Connected Lighting Load 1 d Credit 1.3 Optimize Energy Performance—HVAC 5 to 10 Equipment Efficiency 5 Zoning Controls 5 OR Reduce Design Energy Cost and 15% Improvement 5 Reduce Design Energy Cost and 30% Improvement 10 d Credit 1.4 Optimize Energy Performance—Equipment and Appliances 1 to 4 70% ENERGY STAR 1 77% ENERGY STAR 2 84% ENERGY STAR 3 90% ENERGY STAR 4 C Credit 2 Enhanced Commissioning 5 d Credit 3 Measurement and Verification 2 to 5 Install Sub-Metering Equipment 2 Tenant Pays for Energy 3 OR Metering, Measurement and Payment Accountability 5 d Credit 4 Green Power 5 LEED 2009 for Commercial Interiors Project Checklist 2 of 5
  • 3. 0 0 0 Materials and Resources Possible Points: 14 Y ? N Notes: Y d Prereq 1 Storage and Collection of Recyclables d Credit 1.1 Tenant Space—Long-Term Commitment 1 d Credit 1.2 Building Reuse 1 to 2 40% Reuse 1 60% Reuse 2 C Credit 2 Construction Waste Management 1 to 2 Divert 50% from Disposal 1 Divert 75% from Disposal 2 C Credit 3.1 Materials Reuse 1 to 2 5% Reuse 1 10% Reuse 2 C Credit 3.2 Materials Reuse—Furniture and Furnishings 1 C Credit 4 Recycled Content 1 to 2 10% of Content 1 20% of Content 2 C Credit 5 Regional Materials 1 to 2 20% of Materials Manufactured 1 20% of Materials Manufactured and 10% Extracted 2 C Credit 6 Rapidly Renewable Materials 1 C Credit 7 Certified Wood 1 LEED 2009 for Commercial Interiors Project Checklist 3 of 5
  • 4. 0 0 0 Indoor Environmental Quality Possible Points: 17 Y ? N Notes: Y d Prereq 1 Minimum IAQ Performance Y d Prereq 2 Environmental Tobacco Smoke (ETS) Control d Credit 1 Outdoor Air Delivery Monitoring 1 d Credit 2 Increased Ventilation 1 C Credit 3.1 Construction IAQ Management Plan—During Construction 1 C Credit 3.2 Construction IAQ Management Plan—Before Occupancy 1 C Credit 4.1 Low-Emitting Materials—Adhesives and Sealants 1 C Credit 4.2 Low-Emitting Materials—Paints and Coatings 1 C Credit 4.3 Low-Emitting Materials—Flooring Systems 1 C Credit 4.4 Low-Emitting Materials—Composite Wood and Agrifiber Products 1 C Credit 4.5 Low-Emitting Materials—Systems Furniture and Seating 1 d Credit 5 Indoor Chemical & Pollutant Source Control 1 d Credit 6.1 Controllability of Systems—Lighting 1 d Credit 6.2 Controllability of Systems—Thermal Comfort 1 d Credit 7.1 Thermal Comfort—Design 1 d Credit 7.2 Thermal Comfort—Verification 1 d Credit 8.1 Daylight and Views—Daylight 1 to 2 75% of Spaces 1 90% of Spaces 2 d Credit 8.2 Daylight and Views—Views for Seated Spaces 1 0 0 0 Innovation and Design Process Possible Points: 6 Y ? N Notes: d/C Credit 1.1 Innovation in Design: Specific Title 1 d/C Credit 1.2 Innovation in Design: Specific Title 1 d/C Credit 1.3 Innovation in Design: Specific Title 1 d/C Credit 1.4 Innovation in Design: Specific Title 1 d/C Credit 1.5 Innovation in Design: Specific Title 1 d Credit 2 LEED Accredited Professional 1 0 0 0 Regional Priority Credits Possible Points: 4 Y ? N Notes: d/C Credit 1.1 Regional Priority: Specific Credit 1 d/C Credit 1.2 Regional Priority: Specific Credit 1 d/C Credit 1.3 Regional Priority: Specific Credit 1 d/C Credit 1.4 Regional Priority: Specific Credit 1 LEED 2009 for Commercial Interiors Project Checklist 4 of 5
  • 5. 0 0 0 Total Possible Points: 110 Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 LEED 2009 for Commercial Interiors Project Checklist 5 of 5