08/10/2024
Class Expectations
• Class participation – Your input is needed for good
discussion
• Keep up with reading material
• Complete assignments and projects on time
• Submit clean, organized, and concise work
• Brush up prior knowledge
• Follow academic integrity code
Iragaba john
08/10/2024 Iragaba john
Lecture Etiquette
• Be on time (if you are late enter the class quietly)
• Your ring-tone is not that great! (cell phones off or
muted)
• You can do without Facebook / YouTube / twitter for
2-3hrs - If you have to, don’t disturb your peers
• Interrupt for questions – there is no dumb question
08/10/2024 Iragaba john
Key to Success
• Attendance
– Pay attention to lecturers and keep extra notes
– Ask questions
• Effort
– Do homework on your own. It’s ok to ask others, but make your
own effort
– Read extra material on your own. Wealth of information available
(library books, online articles, research papers)
• Consistency
– Keep up with the class pace
08/10/2024 Iragaba john
INTRODUCTION TO
OPERATING SYSTEMS
08/10/2024 Iragaba john
Overview of a computer
• A computer is an electronic device that
manipulates information, or "data." It has the
ability to store, retrieve, and process data.
You can use a computer to type documents,
send email, and surf the Internet. You can also
use it to handle spreadsheets, accounting,
database management, presentations, games,
and more.
08/10/2024 Iragaba john
Overview Cont’d
Whether you realize it or not, computers play an important role
in our lives;
When you withdraw cash from an ATM, scan groceries at the
store, or use a calculator, you're using a type of computer.
All types of computers consist of two basic parts:
• Hardware is any part of your computer that has a physical
structure, such as the computer monitor or keyboard.
• Software is any set of instructions that tells the hardware what
to do. It is what guides the hardware and tells it how to
accomplish each task. Some examples of software are web
• browsers, games, and word processors.
08/10/2024 Iragaba john
Overview Cont’d
Software is grouped into:
User software
 User applications
 Editors
 Compilers
 Shells
System Software
 Operating System
08/10/2024 Iragaba john
What is an Operating System?
An operating system is a program that acts as an intermediary
between the user of a computer and the computer hardware.
• It is a software program that manages the hardware and
software resources of a computer.
• The purpose of an operating system is to provide an
environment in which a user can execute programs in a
convenient and efficient manner.
• The operating system must ensure the correct operation of the
computer system.
08/10/2024 Iragaba john
What is an Operating System? Cont’d
Operating systems have been developed over
the past 45 years for two main purposes.
First, the operating system attempts to schedule
computational activities to ensure good
performance of the computing system.
Second, it provides a convenient environment
for the development and execution of programs
08/10/2024 Iragaba john
08/10/2024 Iragaba john
08/10/2024 Iragaba john
The History of Operating Systems
• The first computers did not have operating systems. However,
software tools for managing the system and simplifying the
use of hardware appeared very quickly afterwards, and
gradually expanded in scope.
• “Preparing ENIAC for a series of runs was an incredibly
involved process. First, detailed instructions had to be written
defining the problem and a procedure for solving it.
• These instructions were programmed by adjusting switches
manually and inserting thousands of cables into as many as
forty large plug boards.
• A team of five operators might work several days on the
external wiring and many more days searching for errors and
correcting them.”
08/10/2024 Iragaba john
08/10/2024 Iragaba john
History Cont’d
• By the early 1960s, commercial computer vendors were
supplying quite extensive tools for streamlining the
development, scheduling, and execution of jobs on batch
processing systems.
Examples were produced by UNIVAC and Control Data
Corporation, amongst others.
• Through the 1960s, several major concepts were developed,
driving the development of operating systems. The
development of the IBM System/360 produced a family of
mainframe computers available in widely differing capacities
and price points, for which a single operating system OS/360
was planned
08/10/2024 Iragaba john
History Cont’d
• Another key development was the concept of time-sharing: the idea of
sharing the resources of expensive computers amongst multiple computer
users interacting in real time with the system. Time sharing allowed all of
the users to have the illusion of having exclusive access to the machine;
the Multics timesharing system was the most famous of a number of new
operating systems developed to take advantage of the concept.
• Multics, particularly, was an inspiration to a number of operating systems
developed in the 1970s, notably Unix. Another commercially-popular
minicomputer operating system was VMS.
• The first microcomputers did not have the capacity or need for the
elaborate operating systems that had been developed for mainframes and
minis; minimalistic operating systems were developed.
• One notable early operating system was CP/M, which was supported on
many early microcomputers and was largely cloned in creating MS-DOS,
which became wildly popular as the operating system chosen for the IBM
PC
08/10/2024 Iragaba john
History Cont’d
• By the 1990s, the microcomputer had evolved to the point where, as well as extensive
GUI facilities, the robustness and flexibility of operating systems of larger computers
became increasingly desirable.
• Microsoft's response to this change was the development of Windows NT, which
served as the basis for Microsoft's entire operating system line starting in 1999.
• Apple rebuilt their operating system on top of a Unix core as Mac OS X, released in
2001.
• Hobbyist-developed reimplementations of Unix, assembled with the tools from the
GNU project, also became popular; versions based on the Linux kernel are by far the
most popular, with the BSD derived UNIXes holding a small portion of the server
market.
Today
• Command line interface (or CLI) operating systems can operate using only the keyboard
for input.
• Modern OS's use a mouse for input with a graphical user interface (GUI) sometimes
implemented as a shell. The appropriate OS may depend on the hardware architecture,
specifically the CPU, with only Linux and BSD running on almost any CPU
08/10/2024 Iragaba john
Types of operating systems
The 2 major types of operating systems are :
 Standalone OS / Desktop OS
 Single user OS which are generally used by personal
users for desktop applications, e.g. DOS, Windows 3x,
Windows 9x, Windows xp, windows 7, etc.
 Network OS
 They are multi-user and time-sharing OS. The entire
network operating system support multiprocessing and
multitasking features, e.g. UNIX, Novell, Windows NT,
Windows 2000/2003/2005/2008 server, etc.
08/10/2024 Iragaba john
Compare Operating Systems
Terms often used when comparing operating systems:
• Multi-user – Two or more users can work with programs and
share peripheral devices, such as printers, at the same time.
• Multi-tasking – The computer is capable of operating multiple
applications at the same time.
• Multi-processing – The computer can have two or more central
processing units (CPUs) that programs share.
• Multi-threading – A program can be broken into smaller parts
that can be loaded as needed by the operating system. Multi-
threading allows individual programs to be multi-tasked.
Compare Operating Systems Cont’d
Desktop Operating
System
• Supports a single user
• Runs single-user
applications
• Shares files and folders
• Shares peripherals
• Used on a small network
• Supports multiple users
• Runs multi-user
applications
• Is robust and redundant
• Provides increased security
• Used on a network
Network Operating
System
08/10/2024 Iragaba john
Standalone / Desktop OS
• Desktop operating systems:
– Microsoft Windows: Windows XP
– Macintosh: Mac OS X
– Linux: Fedora, Ubuntu, and others
– UNIX : free BSD
• A desktop OS has the following
characteristics:
– Supports a single user
– Runs single-user applications
– Shares files and folders on a small
network with limited security
08/10/2024 Iragaba john
Network Operating Systems (NOS)
• Common NOS include:
– Novell Netware
– Microsoft Windows Server
– Linux
– UNIX
• A network OS has the following
characteristics:
– Supports multiple users
– Runs multi-user applications
– Is robust and redundant
– Provides increased security compared to
desktop operating systems
08/10/2024 Iragaba john
Roles of an Operating System
• All computers rely on an operating system (OS) to
provide the interface for interaction between users,
applications, and hardware.
• The operating system boots the computer and manages
the file system.
• Almost all modern operating systems can support more
than one user, task, or CPU.
• The operating system has four main roles:
– Control hardware access
– Manage files and folders
– Provide user interface
– Manage applications
08/10/2024 Iragaba john
Roles of an Operating System Cont’d
• Control hardware access - The operating system manages the interaction between
applications and the hardware. To access and communicate with the hardware, the
operating system installs a device driver for each hardware component. A device
driver is a small program written by the hardware manufacturer and supplied with
the hardware component. The process of assigning system resources and installing
drivers can be performed with Plug and Play (PnP). The operating system
automatically detects the PnP-compatible hardware and installs the driver for that
component. The operating system then configures the device and updates the
registry, which is a database that contains all the information about the computer.
• NOTE: The registry contains information about applications, users, hardware,
network settings, and file types.
• Manage files and folders - The operating system creates a file structure on the
hard disk drive to allow data to be stored. A file is a block of related data that is
given a single name and treated as a single unit. Program and data files are
grouped together in a directory. The files and directories are organized for easy
retrieval and use. Directories can be kept inside other directories. These nested
directories are referred to as subdirectories. Directories are called folders in
Windows operating systems, and subdirectories are called subfolders.
08/10/2024 Iragaba john
Roles of an Operating System Cont’d
• User interface - The operating system enables the user to interact with
software and hardware. There are two types of user interfaces:
– Command Line Interface (CLI) – The user types commands at a
prompt.
– Graphical User Interface (GUI) – The user interacts with menus and
icons.
• Most operating systems, such as Windows 2000 and Windows XP, include
both a GUI and a CLI.
• Application management - The operating system manages all programs to
ensure that the correct resources are allocated to the applications. The
operating system locates an application and loads it into the RAM of the
computer. Applications are software programs, such as word processors,
databases, spreadsheets, games, and many other applications. The
operating system ensures that each application has adequate system
resources. Application programming interface (API) is a set of guidelines
used by programmers to ensure that the application they are developing is
compatible with an operating system.
08/10/2024 Iragaba john
Characteristics of Operating Systems
• Control hardware access
– OS automatically discovers and configures the PnP hardware
• File and folder management
• User interface
– Command line interface (CLI)
– Graphical user interface (GUI)
• Application management
– Open Graphics Library (OpenGL)
– DirectX
08/10/2024 Iragaba john
Types of Operating System Interfaces
• Graphical User Interface (GUI): The
user interacts with menus and
icons.
 Command Line Interface (CLI): The
user types commands at a prompt.
Most operating systems include both a GUI and a CLI.
The User Interface (UI) is the component of the OS that the user interacts with.
The UI is like an interpreter, translating user keystrokes, mouse clicks, or other
input for the appropriate programs.
08/10/2024 Iragaba john
Operating systems requirements
• Operating systems require a certain amount of hardware resources.
These resources are specified by the manufacturer and include such
things as:
• Amount of RAM
• Hard disk space required
• Processor type and speed
• Video resolution
• Manufacturers often specify both a minimum and recommended
level of hardware resources.
• System performance at the minimum specified hardware
configuration is usually poor and only sufficient to support the OS
and no other functionality. The recommended configuration is
usually the better option and is more likely to support standard
additional applications and resources.
08/10/2024 Iragaba john
End of Lecture 1
Thanks

Lecture 1 - Windows operating system concepts.pptx

  • 1.
    08/10/2024 Class Expectations • Classparticipation – Your input is needed for good discussion • Keep up with reading material • Complete assignments and projects on time • Submit clean, organized, and concise work • Brush up prior knowledge • Follow academic integrity code Iragaba john
  • 2.
    08/10/2024 Iragaba john LectureEtiquette • Be on time (if you are late enter the class quietly) • Your ring-tone is not that great! (cell phones off or muted) • You can do without Facebook / YouTube / twitter for 2-3hrs - If you have to, don’t disturb your peers • Interrupt for questions – there is no dumb question
  • 3.
    08/10/2024 Iragaba john Keyto Success • Attendance – Pay attention to lecturers and keep extra notes – Ask questions • Effort – Do homework on your own. It’s ok to ask others, but make your own effort – Read extra material on your own. Wealth of information available (library books, online articles, research papers) • Consistency – Keep up with the class pace
  • 4.
  • 5.
    08/10/2024 Iragaba john Overviewof a computer • A computer is an electronic device that manipulates information, or "data." It has the ability to store, retrieve, and process data. You can use a computer to type documents, send email, and surf the Internet. You can also use it to handle spreadsheets, accounting, database management, presentations, games, and more.
  • 6.
    08/10/2024 Iragaba john OverviewCont’d Whether you realize it or not, computers play an important role in our lives; When you withdraw cash from an ATM, scan groceries at the store, or use a calculator, you're using a type of computer. All types of computers consist of two basic parts: • Hardware is any part of your computer that has a physical structure, such as the computer monitor or keyboard. • Software is any set of instructions that tells the hardware what to do. It is what guides the hardware and tells it how to accomplish each task. Some examples of software are web • browsers, games, and word processors.
  • 7.
    08/10/2024 Iragaba john OverviewCont’d Software is grouped into: User software  User applications  Editors  Compilers  Shells System Software  Operating System
  • 8.
    08/10/2024 Iragaba john Whatis an Operating System? An operating system is a program that acts as an intermediary between the user of a computer and the computer hardware. • It is a software program that manages the hardware and software resources of a computer. • The purpose of an operating system is to provide an environment in which a user can execute programs in a convenient and efficient manner. • The operating system must ensure the correct operation of the computer system.
  • 9.
    08/10/2024 Iragaba john Whatis an Operating System? Cont’d Operating systems have been developed over the past 45 years for two main purposes. First, the operating system attempts to schedule computational activities to ensure good performance of the computing system. Second, it provides a convenient environment for the development and execution of programs
  • 10.
  • 11.
  • 12.
    08/10/2024 Iragaba john TheHistory of Operating Systems • The first computers did not have operating systems. However, software tools for managing the system and simplifying the use of hardware appeared very quickly afterwards, and gradually expanded in scope. • “Preparing ENIAC for a series of runs was an incredibly involved process. First, detailed instructions had to be written defining the problem and a procedure for solving it. • These instructions were programmed by adjusting switches manually and inserting thousands of cables into as many as forty large plug boards. • A team of five operators might work several days on the external wiring and many more days searching for errors and correcting them.”
  • 13.
  • 14.
    08/10/2024 Iragaba john HistoryCont’d • By the early 1960s, commercial computer vendors were supplying quite extensive tools for streamlining the development, scheduling, and execution of jobs on batch processing systems. Examples were produced by UNIVAC and Control Data Corporation, amongst others. • Through the 1960s, several major concepts were developed, driving the development of operating systems. The development of the IBM System/360 produced a family of mainframe computers available in widely differing capacities and price points, for which a single operating system OS/360 was planned
  • 15.
    08/10/2024 Iragaba john HistoryCont’d • Another key development was the concept of time-sharing: the idea of sharing the resources of expensive computers amongst multiple computer users interacting in real time with the system. Time sharing allowed all of the users to have the illusion of having exclusive access to the machine; the Multics timesharing system was the most famous of a number of new operating systems developed to take advantage of the concept. • Multics, particularly, was an inspiration to a number of operating systems developed in the 1970s, notably Unix. Another commercially-popular minicomputer operating system was VMS. • The first microcomputers did not have the capacity or need for the elaborate operating systems that had been developed for mainframes and minis; minimalistic operating systems were developed. • One notable early operating system was CP/M, which was supported on many early microcomputers and was largely cloned in creating MS-DOS, which became wildly popular as the operating system chosen for the IBM PC
  • 16.
    08/10/2024 Iragaba john HistoryCont’d • By the 1990s, the microcomputer had evolved to the point where, as well as extensive GUI facilities, the robustness and flexibility of operating systems of larger computers became increasingly desirable. • Microsoft's response to this change was the development of Windows NT, which served as the basis for Microsoft's entire operating system line starting in 1999. • Apple rebuilt their operating system on top of a Unix core as Mac OS X, released in 2001. • Hobbyist-developed reimplementations of Unix, assembled with the tools from the GNU project, also became popular; versions based on the Linux kernel are by far the most popular, with the BSD derived UNIXes holding a small portion of the server market. Today • Command line interface (or CLI) operating systems can operate using only the keyboard for input. • Modern OS's use a mouse for input with a graphical user interface (GUI) sometimes implemented as a shell. The appropriate OS may depend on the hardware architecture, specifically the CPU, with only Linux and BSD running on almost any CPU
  • 17.
    08/10/2024 Iragaba john Typesof operating systems The 2 major types of operating systems are :  Standalone OS / Desktop OS  Single user OS which are generally used by personal users for desktop applications, e.g. DOS, Windows 3x, Windows 9x, Windows xp, windows 7, etc.  Network OS  They are multi-user and time-sharing OS. The entire network operating system support multiprocessing and multitasking features, e.g. UNIX, Novell, Windows NT, Windows 2000/2003/2005/2008 server, etc.
  • 18.
    08/10/2024 Iragaba john CompareOperating Systems Terms often used when comparing operating systems: • Multi-user – Two or more users can work with programs and share peripheral devices, such as printers, at the same time. • Multi-tasking – The computer is capable of operating multiple applications at the same time. • Multi-processing – The computer can have two or more central processing units (CPUs) that programs share. • Multi-threading – A program can be broken into smaller parts that can be loaded as needed by the operating system. Multi- threading allows individual programs to be multi-tasked.
  • 19.
    Compare Operating SystemsCont’d Desktop Operating System • Supports a single user • Runs single-user applications • Shares files and folders • Shares peripherals • Used on a small network • Supports multiple users • Runs multi-user applications • Is robust and redundant • Provides increased security • Used on a network Network Operating System
  • 20.
    08/10/2024 Iragaba john Standalone/ Desktop OS • Desktop operating systems: – Microsoft Windows: Windows XP – Macintosh: Mac OS X – Linux: Fedora, Ubuntu, and others – UNIX : free BSD • A desktop OS has the following characteristics: – Supports a single user – Runs single-user applications – Shares files and folders on a small network with limited security
  • 21.
    08/10/2024 Iragaba john NetworkOperating Systems (NOS) • Common NOS include: – Novell Netware – Microsoft Windows Server – Linux – UNIX • A network OS has the following characteristics: – Supports multiple users – Runs multi-user applications – Is robust and redundant – Provides increased security compared to desktop operating systems
  • 22.
    08/10/2024 Iragaba john Rolesof an Operating System • All computers rely on an operating system (OS) to provide the interface for interaction between users, applications, and hardware. • The operating system boots the computer and manages the file system. • Almost all modern operating systems can support more than one user, task, or CPU. • The operating system has four main roles: – Control hardware access – Manage files and folders – Provide user interface – Manage applications
  • 23.
    08/10/2024 Iragaba john Rolesof an Operating System Cont’d • Control hardware access - The operating system manages the interaction between applications and the hardware. To access and communicate with the hardware, the operating system installs a device driver for each hardware component. A device driver is a small program written by the hardware manufacturer and supplied with the hardware component. The process of assigning system resources and installing drivers can be performed with Plug and Play (PnP). The operating system automatically detects the PnP-compatible hardware and installs the driver for that component. The operating system then configures the device and updates the registry, which is a database that contains all the information about the computer. • NOTE: The registry contains information about applications, users, hardware, network settings, and file types. • Manage files and folders - The operating system creates a file structure on the hard disk drive to allow data to be stored. A file is a block of related data that is given a single name and treated as a single unit. Program and data files are grouped together in a directory. The files and directories are organized for easy retrieval and use. Directories can be kept inside other directories. These nested directories are referred to as subdirectories. Directories are called folders in Windows operating systems, and subdirectories are called subfolders.
  • 24.
    08/10/2024 Iragaba john Rolesof an Operating System Cont’d • User interface - The operating system enables the user to interact with software and hardware. There are two types of user interfaces: – Command Line Interface (CLI) – The user types commands at a prompt. – Graphical User Interface (GUI) – The user interacts with menus and icons. • Most operating systems, such as Windows 2000 and Windows XP, include both a GUI and a CLI. • Application management - The operating system manages all programs to ensure that the correct resources are allocated to the applications. The operating system locates an application and loads it into the RAM of the computer. Applications are software programs, such as word processors, databases, spreadsheets, games, and many other applications. The operating system ensures that each application has adequate system resources. Application programming interface (API) is a set of guidelines used by programmers to ensure that the application they are developing is compatible with an operating system.
  • 25.
    08/10/2024 Iragaba john Characteristicsof Operating Systems • Control hardware access – OS automatically discovers and configures the PnP hardware • File and folder management • User interface – Command line interface (CLI) – Graphical user interface (GUI) • Application management – Open Graphics Library (OpenGL) – DirectX
  • 26.
    08/10/2024 Iragaba john Typesof Operating System Interfaces • Graphical User Interface (GUI): The user interacts with menus and icons.  Command Line Interface (CLI): The user types commands at a prompt. Most operating systems include both a GUI and a CLI. The User Interface (UI) is the component of the OS that the user interacts with. The UI is like an interpreter, translating user keystrokes, mouse clicks, or other input for the appropriate programs.
  • 27.
    08/10/2024 Iragaba john Operatingsystems requirements • Operating systems require a certain amount of hardware resources. These resources are specified by the manufacturer and include such things as: • Amount of RAM • Hard disk space required • Processor type and speed • Video resolution • Manufacturers often specify both a minimum and recommended level of hardware resources. • System performance at the minimum specified hardware configuration is usually poor and only sufficient to support the OS and no other functionality. The recommended configuration is usually the better option and is more likely to support standard additional applications and resources.
  • 28.
    08/10/2024 Iragaba john Endof Lecture 1 Thanks

Editor's Notes

  • #18 Slide 9 – Compare Operating Systems 5.1.2 Explain operating system concepts To understand the capabilities of an operating system, it is important to understand some basic terms. The following terms are often used when comparing operating systems: Multi-user – Two or more users can work with programs and share peripheral devices, such as printers, at the same time. Multi-tasking – The computer is capable of operating multiple applications at the same time. Multi-processing – The computer can have two or more central processing units (CPUs) that programs share. Multi-threading – A program can be broken into smaller parts that can be loaded as needed by the operating system. Multi-threading allows individual programs to be multi-tasked. Almost all modern operating systems are multi-user and multi-tasking, and they support multi-processing and multi-threading.
  • #20 Slide 12 - Compare Operating Systems 5.2.1 Describe operating systems In the current software market, the most commonly used desktop operating systems fall into four groups: Microsoft Windows: Windows XP Macintosh: Mac OS X Linux: Fedora, Ubuntu, and others UNIX Operating systems have several similarities: GUI interface Standard "look and feel" characteristics Multithreading capabilities Multitasking capabilities Ability to function with most hardware The differences between desktop operating systems are typically related to availability and how much can be accomplished using the GUI: Windows and MAC OS users can perform the majority of tasks through the GUI. Linux and UNIX users must understand and use the CLI to perform some tasks. The code for an operating system will be either open source or proprietary: Open source applications can be read and modified. There are few restrictions on downloading, using, or rewriting open source software. Programmers openly share code with other programmers. Linux distributions are open source. Proprietary applications cannot be read or modified. Proprietary software agreements restrict the use of the software, identifying where and when the software may be used. Microsoft Windows products are proprietary.
  • #21 Slide 15 - Network Operating Systems (NOS) 5.2.2 Describe network operating systems A network OS has the following characteristics: Supports multiple users Runs multi-user applications Is robust and redundant Provides increased security compared to desktop operating systems These are the most common network operating systems: Microsoft Windows – Network operating systems offered by Microsoft are Windows 2000 Server and Windows Server 2003. Windows Server operating systems use a central database called Active Directory to manage network resources. Novell Netware – Novell NetWare was the first OS to meet network OS requirements and enjoy widespread deployment in PC-based LANs back in the 1980s. Linux – Linux operating systems include Red Hat, Caldera, SuSE, Debian, and Slackware. UNIX – Various corporations offered proprietary operating systems, based on UNIX Student Activity: The student course content includes worksheet, 5.2.2 NOS Certifications and Jobs. To complete this worksheet, students will conduct research for three different network operating system certifications. Record the details of each, including Network Operating Systems covered, certification titles, and courses and/or training required to earn certification. Then the students will conduct research for at least two network jobs available in your area. Describe the network jobs and the required certifications needed for the position. Which job would you prefer? List reasons for your selection.
  • #22 Slide 6 - Roles of an Operating System 5.1 Explain the purpose of an operating system All computers rely on an operating system (OS) to provide the interface for interaction between users, applications, and hardware. The operating system boots the computer and manages the file system. Almost all modern operating systems can support more than one user, task, or CPU. The operating system has four main roles: Control hardware access Manage files and folders Provide a user interface Manage applications After completing this section, the students will meet these objectives: Describe characteristics of modern operating systems Explain operating system concepts Teaching Strategy: An operating system is a software program that provides an interface between the user and the computer, and manages thousands of applications.
  • #25 Slide 7 - Characteristics of Operating Systems 5.1.1 Describe characteristics of modern operating systems Regardless of the size and complexity of the computer and the operating system, all operating systems perform the same four basic functions: Control hardware access - The operating system manages the interaction between applications and the hardware. To access and communicate with the hardware, the operating system installs a device driver for each hardware component. A device driver is a small program written by the hardware manufacturer and supplied with the hardware component. The process of assigning system resources and installing drivers can be performed with Plug and Play (PnP). The operating system automatically detects the PnP-compatible hardware and installs the driver for that component. The operating system then configures the device and updates the registry, which is a database that contains all the information about the computer. NOTE: The registry contains information about applications, users, hardware, network settings, and file types. Manage files and folders - The operating system creates a file structure on the hard disk drive to allow data to be stored. A file is a block of related data that is given a single name and treated as a single unit. Program and data files are grouped together in a directory. The files and directories are organized for easy retrieval and use. Directories can be kept inside other directories. These nested directories are referred to as subdirectories. Directories are called folders in Windows operating systems, and subdirectories are called subfolders. User interface - The operating system enables the user to interact with software and hardware. There are two types of user interfaces: Command Line Interface (CLI) – The user types commands at a prompt. Graphical User Interface (GUI) – The user interacts with menus and icons. Most operating systems, such as Windows 2000 and Windows XP, include both a GUI and a CLI. Application management - The operating system manages all programs to ensure that the correct resources are allocated to the applications. The operating system locates an application and loads it into the RAM of the computer. Applications are software programs, such as word processors, databases, spreadsheets, games, and many other applications. The operating system ensures that each application has adequate system resources. Application programming interface (API) is a set of guidelines used by programmers to ensure that the application they are developing is compatible with an operating system. Here are two examples of APIs: Open Graphics Library (OpenGL) – Cross-platform standard specification for multimedia graphics DirectX – Collection of APIs related to multimedia tasks for Microsoft Windows
  • #26 Slide 8 – User Interface 5.1.1 Describe characteristics of modern operating systems The operating system enables the user to interact with software and hardware. There are two types of user interfaces: Command Line Interface (CLI) – The user types commands at a prompt. Graphical User Interface (GUI) – The user interacts with menus and icons. Most operating systems, such as Windows 2000 and Windows XP, include both a GUI and a CLI.