VET4e-inclusion
Project
Training curriculum for trainers of
efacilitators
VET4e-inclusion project
2
This document describes the training curriculum for trainers of
efacilitators that was developed during the VET4e-inclusion
project.
This curriculum is specialised in topics that concern the daily
work of promoters of digital competences (e-facilitators).
Some modules are dedicated to vulnerable target groups as
visitors of telecentres; some focus on technical others on
pedagogical skills.
Experience shows that some modules or units require more
processing time since the topics are very extensive. Therefore all
units give a mandatory and a recommended time frame according
to the experience of the pilot testing. Still, deadlines in which units
have to be completed are recommended in order to finish a
module in an appropriate time.
During the project VET4e-inclusion the curriculum was tested in
e-learning trainings.
1. Building a network culture
2. Auxiliary resources to optimize activities in telecentres /
ICT centres / libraries
3. Telecentre sustainability
4. Promoting ICT for elferly at the telecentre
5. Promoting ICT with migrants at the ICT centre
6. Getting familiar with Office tools (Open/MS) for
developing digital literacy workshops
7. Developing a digital photography workshop in the
telecentre
8. Facilitating job seeking in the telecentre
9. Planning a digital literacy workshop
10. Telematic Procedures - facilitating access to e-services
VET4e-inclusion project
Module 1 & 12 Building a network culture
Position within the curriculum:
Stage 3 (mature) / Category 1 (management and organization)
Profile entrance of students:
Professional profile midium, minimum of 4 months being
an e-facilitator
Knowledge:
Knowledge of the telecentre.
Knowledge in working with groups and in the
management and implementation of the cross lines.
Skills:
Technology standard skills (office, multimedia)
Relationship skills in dealing with the groups
involved.
Competencies:
Standard telecenter management skills.
Skills in planning activities for key groups.
Skills in cross-project planning
Output Profile of students
Profile of a social network driver
Knowledge:
Knowledge of the importance of advancing towards in
developing a culture of networking in social
organizations and the key concepts in the way of
building a network.
Skills:
Acquire skills in the course of collaborative work.
Management skills of essential technological tools.
Competences:
Management skills of essential technological tools.
VET4e-inclusion project
2
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Opening
Module Unit
Introducing
Module
1 week Acquire knowledge and
abilities in managing the
learning environment
Information about how to
the use of the platform.
We offer to the student the
opportunity to access to the
platform a few days before the
start of the module in order to
provide him/her relevant
information about the course
and module in order to
facilitate the further
development of learning units.
The first action we ask to
students is to introduce
themselves to the group and
read messages from other
students.
Modules presentation:
Goals of the module.
Contents of the module.
Target of the module.
Module structure and methodology
Personal and technical requirements
Tutorship of the Module
Forums
Module plan
Information about how to the use of the
platform.
Short guide about the Use of Moodle
platform.
Guide to retouch the photo of your profile.
Bulletin board and news
 Forum presentation of the students and
tutors
Students and tutors It isn’t an evaluation
unit.
It serves to connect
students to the training
process.
VET4e-inclusion project
3
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 1:
Network spirit
5 hours of
mandator
y
minimum
commitm
ent.
1 week
Acquire knowledge about the
significance of networking.
Assess positively the reasons
for incorporating the
networking to the task of the
telecenter.
Knowing a possible route to
build a network among
associations.
Learn about social
movements and their use of
networks.
Networking elements.
Reasons to incorporate a
culture of network in the
world of the social.
Charting the way in the
construction of associative
networks.
Linking social movements
and the Network
It is offered to the student an
individual task of reflection
and consciousness raising on
key aspects of networking.
Video "Three brothers"
Likewise, the student must
contribute with some news
related to networks into forum
of the course.
Reading and vídeo: “Los tres hermanos”
Introducing Forum where it is asked to the
student to answer why he/she think he/she
needs to do this course. It is also asked to
write some relevant information about the
organization where students work.
Reading: Diez Razones para trabajar en red.
URL: Web de Telecentre.org (english)
URL: Web de Telecentre.org (español)
Reading: El trabajo en red, tejer
complicidades y fortalezas.
Reading: Etapas en el camino de
construcción de redes asociativas.
URL: Crac, Centro de recursos de Cádiz y la
Bahía
Task: Analysis of experience in networking.
Forum of news (for exclusive use of the
tutor).
------------
Extra Reading: El deseo de enredarse y el
peligro de liarse.
Extra Reading: Movimientos sociales,
globalización, educación popular y trabajo
en red.
Students and tutors Task 1: Analysis of
experience in
networking.
Task 2: Introduce
oneself into the
Introducing Forum.
Task 3: Participation in
the Forum News.
Task 4: Access to
materials and readings.
Self Evaluation Unit 1
VET4e-inclusion project
4
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 2:
Weaving the
net
5 hours of
mandator
y
minimum
commitm
ent.
1 week
Acquire practical knowledge
and skills in the use,
management and use of a
social network
Know the online social
networks and communities.
Practice in building a
community with a social tool.
Knowing the importance of
the blog.
Make the community
“Building a network culture”
take contact with the
community technology
training in Grouply, created
especially for that module.
The module invite the
students to interact in a real
social network:
• Build their own profile.
• Participate in the spaces
offered: open forums,
discussion groups, etc..
• Use this space to share
ideas, experiences and issues
overexposed in the reading
"Tareas fundamentales que
hay que resolver en una red".
• Use the spaces of
participation to know what
are the communities of
practice and collaborative
working groups on Internet.
The unit focuses on making
contact and enlarging the
acquisition of knowledge
about the use of social
networks based in Grouply.
Each student receives the
indication to entry. Part of the
activity is shifted from the
Moodle training to the
entertainment Social Network.
Reading: Tareas fundamentales que hay
que resolver en una red.
Task: Virtual Communities.
URL: Web Voluntariado.net
URL: Web IRC Hispano – Chat.
URL: Web Sindominio.net
Reading: Utilizar la comunidad virtual
Grouply.
URL: Wikipedia: Virtual Community
URL: Comunidad Virtual Redes Asociativas
------------
Extra-Video: ¿Qué es un blog?
Extra-URL: sedic.es
Extra-Reading: Taller de urbanidad y buenas
maneras en los blogs.
Students and tutors Task 1: To participate in
the entertainment
Social Network of the
module, edit a profile,
post into the blog,
participate into the
forum.
Task 2: Access to the
content and readings.
Self Evaluation Unit 2
VET4e-inclusion project
5
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 3
The potential
2.0
5 hours of
mandator
y
minimum
commitm
ent.
1 week
Understand the meaning of
the concept web 2.0
Participate in the social
network of the training
module.
List, explain and see
examples of the main ICT
tools.
Reflect on the use of ICT
tools in the field of social
organizations.
Develop an "ICT Toolkit" for
networking.
Enumeration, explanation
and examples of the largest
and most useful ICT tools.
Use of ICT tools in the field of
so-cial organizations.
Development of a "kit of ICT
tools" to work in a network.
The unit aims to analyze useful
resources for networking and
building with them an
essential toolkit 2.0.
Tutor proposes to students
building their own toolkit 2.0
and discuss about the process
in the social network module.
The intensity of work is
distributed between e-learning
platform and social network
module.
Video: La Web 2.0, la revolución social de
Internet
URL: Concept web 2.0 Wikipedia
Reading: Herramientas y buenas prácticas
para las organizaciones no lucrativas en el
uso de las tecnologías de la información y la
comunicación.
Task: Tools and Resources.
----------
Extra-Reading: El poder de las redes. David
de Ugarte.
Extra-URL: Blog de David de Ugarte
Extra-URL: Sociedad de las Indias
Electrónicas
Students and tutors Task 1: Identify which
tools and resources
from ICT (specially
social web or 2.0)
students can use and
develop in their
organization to enlarge
networking.
Task 2: Participate in
grouply network.
Self Evaluation Unit 3
VET4e-inclusion project
6
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 4
Building
Networks
5 hours of
mandator
y
minimum
commitm
ent.
1 week
Know and analyze real-world
examples of different types
of social network.
Acquire skills in evaluation
and diagnosis of a social
network.
Network of Organizations:
How does a Social forum
work?
Conversation with Jordi Calvo
from the Catalonia’s Social
Forum.
Involvement into the
community of Associative
Networks.
Questionnaire to evaluate
the student’s organization’s
network.
The unit tries to specific the
experience of students by
establishing a dialogue with
two active social actors with a
forum of questions and
answers with each of them.
Each represents a different
type of social network.
It also seeks to bring the
lessons learned to the
student's daily practice,
proposing an analysis of social
network next to the student.
Video: “Homenaje a Cataluña II", an
investigation about networks.
URL: Foro Social Mundial.
Reading: Social forums, from Jordi Calvo.
Asking & answering Forum with Jordi Calvo
from the Catalonia’s Social Forum.
Task: Evaluation of the situation of our
network.
-------------
Extra-URL: Link: Associative Networks
Virtual Community
Video: Web 2.0 and some fun.
Students and tutors
Representatives of
two social networks
Task 1: Diagnosis
questionnaire of a
social network.
Task 2: Participation in
asking & answering
Forum.
Self Evaluation Unit 4
Closing
module Unit
Forum and
evaluation
questionnaire
1 week Become aware of the
achievements of the module
Evaluation Forum.
Evaluation Questionnaire.
Students will be proposed to
answer a questionnaire
evaluation of the module and
to participate in a dialogue-
forum evaluation.
Evaluation Forum.
Evaluation Questionnaire.
Final Exam.
Students Final Exam
VET4e-inclusion project
7
Module 2
Auxiliary resources to
optimize activities in
Telecenters / ICT Centers / Libraries
Position within the curriculum:
Stage 3 (mature) / Category 1 (management and organization)
Profile entrance of students:
Professional profile basic, minimum of 2 months being an e-
facilitator
Knowledge:
Knowledge of the telecentre, ICT center or
Libraries.
Skills:
Basic operational ICT skills.
Competencies:
Standard telecentre/ICT Centre/Libraries management
skills.
Skills in planning activities for target groups.
Output Profile of students
Profile of a social network driver
Knowledge:
Knowledge of the importance resources
Skills:
Acquire skills in the course of collaborative work.
Management skills of essential technological tools.
Competences:
Management skills of essential technological tools.
VET4e-inclusion project
8
Title of the
Learning
Units
Duratio
n
Learnings
aims/outcom
e
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Opening
Module
Unit
Introducin
g Module
1 week Acquire
knowledge and
abilities in
managing the
learning
environment
Information about how
to the use of the
platform.
We offer to the student the opportunity to
access to the platform a few days before the
start of the module in order to provide him/her
relevant information about the course and
module in order to facilitate the further
development of learning units.
The first action we ask to students is to
introduce themselves to the group and read
messages from other students.
Modules presentation:
Goals of the module. / Contents of the module. / Target of
the module. / Module structure and methodology /
Personal and technical requirements / Tutorship of the
Module
Forums
Module plan
Information about how to the use of the platform.
Short guide about the Use of Moodle platform.
Guide to retouch the photo of your profile.
Bulletin board and news
Forum presentation of the students and tutors
Students and tutors It isn’t an evaluation
unit.
It serves to connect
students to the training
process.
VET4e-inclusion project
9
Title of the
Learning
Units
Duratio
n
Learnings
aims/outcom
e
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 1:
Introductio
n and Tools
5 hours
of
mandato
ry
minimu
m
commit
ment.
1 week
Acquire
knowledge
about the
determining the
resources
needed for daily
work in
Telecentre/ICT
center/Libraries.
Learn about
analyze, design
and develop of
main learning
and
representative
content.
Introduction to
organizational and
administrative
resources.
Using computer-based
technologies to
manipulate, create and
store of Word
Processing and
Graphics content.
Using computer-based
technologies to locate,
access, evaluate, store
and retrieve
information and to
express ideas and
communicate with
others.
It is offered adequate training focuses on
preparing the trainee to implement ICT skills
and acquired knowledge in an instructional
setting.
Proactively harnessing the available
technologies and how they might be able to
influence further developments of content.
Likewise, the student must contribute with
some news related to networks into forum of
the course.
Introducing Forum where it is asked to the student to
answer why he/she think he/she needs to do this course.
It is also asked to write some relevant information about
the organization where students work.
Reading: Introduction.
URL: www.manualesgratis.com (English)
URL: www.solotutoriales.com (English)
URL: www.e-manuales.com (English)
URL: www.aulafacil.com (English)
Reading: Image processing
URL: gimp.hit.bg/gimp.html (Bulgarian)
uroci.net/uroci/12/Gimp.html.(Bulgarian)
Reading: Word processing
URL: www.openoffice.org (English)
URL: www.typetester.org (English)
URL: http://freelancefolder.com (English)
URL: uroci.net/uroci/20/Microsoft-Word.html (Bulgarian)
Task 1: Create an organizational document (schedule,
certificate, poster, calendar or other)
Task 2: Forum - What kind of services do you offer in
your Tcenter/ICT center/Library?
Students and tutors Task 1: Creating a
precise and functional
model of document.
Task 2: Participation in
the Forum.
Task 3: Access to
materials and readings.
Self Evaluation Unit 1
VET4e-inclusion project
10
Title of the
Learning
Units
Duratio
n
Learnings
aims/outcom
e
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 2:
Creation
of resource
s
5 hours
of
mandato
ry
minimu
m
commit
ment.
1 week
Acquire main
guidelines for
creating
effective docum
ents.
Understand
the different
file formats
and learn how
to select the
most
appropriate.
Knowing the
aspects
and combinatio
ns of computer-
based tools for
creating speciali
zed materials
Introduction to file
formats, purpose and
using.
Using computer-based
technologies to
manipulate, create and
store of organizational,
learning and
presentation content.
Using computer-based
technologies to locate,
access, evaluate, edit
and store of photos.
The unit focuses on creating sharable
components of content that would have
relevance and
applicability.
Each student receives knowledge about expands
the flexibility and features by adding more
elaborate text uses and shared curriculum
content capabilities.
Reading: Efficiency and usability.
Reading: Lay out the text in a document.
Reading: File formats.
URL: www.hellopdf.com/ (English)
URL: docx-converter.com/ (English)
URL: audacity.sourceforge.net/ (English)
URL: www.mediaconverter.org/ (English)
URL: www.zamzar.com/ (English)
URL: www.media-convert.com. (English)
URL: format-factory.en.softonic.com
URL: winff.org/html_new/ (English)
Task: Image processing
Students and tutors Task 1: Creating a
precise and functional
model of image.
Task 2: Access to the
content and readings.
Self Evaluation Unit 2
VET4e-inclusion project
11
Title of the
Learning
Units
Duratio
n
Learning
aims/outcom
e
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 3
Create ma
nuals,
tutorials
and exercis
es
5 hours
of
mandato
ry
minimu
m
commit
ment.
1 week
Understanding
the basics of
copyright and its
implementation
in the creation
of resources.
Developing man
uals
and exercises to
facilitate learnin
g process.
Know and
analyze
licensing
of content.
Enumeration,
explanation and
examples of most
usefully practical
guides, manuals,
tutorials and etc..
Using of Copyrights in
the field of learning
process.
The unit aims access and understanding of the
resources which contain a syllabus, course
readings or articles, innovative in their online
design and delivery
of online education.
Tutor proposes to students building their own
creative style and discuss about the process in
licensing of copyright.
Reading: Creating exercises and tutorials
Reading: Copyright and Licensing
URL: http://cc.isoc.bg/ (Bulgarian)
URL: http://creativecommons.org/ (English)
Task 1: Create a user guide.
Task 2: Forum - What is the way to get photos for your
exercises, tutorials, documents and etc.
Students and tutors Task 1: Identify which
tools and resources
from ICT, students can
use and develop in
their organization to
create content.
Task 2: Participation in
the Forum.
Task 3: Access to the
content and readings.
Self Evaluation Unit 3
VET4e-inclusion project
12
Unit 4
Specialized
tools and
resources
5 hours
of
mandato
ry
minimu
m
commit
ment.
1 week
Know and
learn how to
create audio-
visual lessons.
Acquire main
guidelines of
using of
computer-based
resources to
develop
new integrated
services.
Introduction to video
converters and
applications - purpose
and using.
Using computer-based
technologies to
manipulate, create,
store, uploading and
sharing of video
tutorials.
Enumeration,
explanation and
examples of most
usefully practical
software on the
internet.
The unit tries to understand the role theory in of
learning the design and function of specialized
activities.
It also seeks constructivist approach employs
technology to engage the student, facilitate
reciprocal communication, and foster an
interactive learning environment.
Reading: Audio-visual resources
Video: Capture of desktop with WINK 2.0
Video: Installing of WINK 2.0
Video: Content folder and shortcut of WINK
Video: Camstudio - basic settings
URL: www.youtube.com (English)
URL: www.vbox7.com (Bulgarian)
URL: www.debugmode.com (English)
URL: www.screencastle.com (English)
URL: www.camstudio.org (English)
Reading: Useful software
URL: http://clic.xtec.cat/es/jclic (English)
URL: http://hotpot.uvic.ca (English)
URL: http://webardora.net (English)
Task 1: Forum - Create video tutorial to explain some
basic functions in the operating system and share it here.
Task 2: Wiki – Share here other online resources that
you already used in your work.
Students and tutors Task 1: Participation in
the Forum.
Task 2: Participation in
Wiki.
Self Evaluation Unit 4
Closing
module
Unit
Forum and
evaluation
questionna
ire
1 week Become aware
of the
achievements of
the module
Evaluation Forum.
Evaluation
Questionnaire.
Students will be proposed to answer a
questionnaire evaluation of the module and to
participate in a dialogue-forum evaluation.
Evaluation Forum.
Evaluation Questionnaire.
Final Exam.
Students Final Exam
VET4e-inclusion project
13
Module 3 & 11 Telecenter sustainability
Position within the curriculum:
Stage 2 (consolidation) / Category 1 (management and
organization)
Profile entrance of students:
Professional profile midium, minimum of 4
months being an e-facilitator
Knowledge:
Knowledge of the telecenter.
Knowledge in working with groups and in the management and
implementation of the cross lines.
Skills:
Technology standard skills (office, multimedia)
Relationship skills in dealing with the groups involved.
Competencies:
Standard telecenter management skills.
Skills in planning activities for key groups.
Skills in cross-project planning
Output Profile of students
Profile of a social network driver
Knowledge:
Knowledge of the importance of advancing towards in developing a
culture of sustainability in social organizations and the key concepts
in the way of thinking, creating, opening and developing a
telecenter taking in account the future of the project and the
funding necessary for its operations.
Skills:
Acquire skills in the course of sustainable work.
Management skills of essential technological tools.
Competences:
Management skills of essential technological tools.
VET4e-inclusion project
14
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Opening
Module Unit
Introducing
Module
1 week Acquire knowledge and
abilities in managing the
learning environment
Information about how to the
use of the platform.
We offer to the student the
opportunity to access to the
platform a few days before the
start of the module in order to
provide him/her relevant
information about the course
and module in order to
facilitate the further
development of learning units.
The first action we ask to
students is to introduce
themselves to the group and
read messages from other
students.
Modules presentation:
Goals of the module.
Target of the module.
Contents of the module.
Module structure and methodology
Evaluation and certification.
Personal and technical requirements
Tutorship of the Module
Forums
Module plan
Information about how to the use of the
platform.
Short guide about the Use of Moodle
platform.
Guide to retouch the photo of your profile.
Bulletin board and news
 Forum presentation of the students and
tutors
Students and tutors It isn’t an evaluation
unit.
It serves to connect
students to the training
process.
VET4e-inclusion project
15
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 1:
The
commitment
to a
sustainable
organization
5 hours of
mandatory
minimum
commitment.
1 week
Our commitment is to build
sustainable organizations and
projects.
Our goal is to learn how to do
it on the term "sustainability",
learning it from sustainable
initiatives and reading
opinions of experts (and our
own) through an online tool.
Introduce the participants in
this training module and
recognize each other as
builders of the knowledge
that will be generated during
these weeks.
Define the concept of
sustainability and learn about
its history and currents.
Learn about the different
aspects or facets that make a
project sustainable.
Identify sustainable initiatives
in the social field and analyze
the cases.
Learn to use the Google Docs.
As staff, volunteer or manager
of a telecenter, whatever
position or degree of
participation, everybody in a
telecenter is an essential part
of it, one way or another, and
everybody can help to make it
up and keep running.
Reading: La apuesta por una organización
sostenible.
Reading: La importancia de la sostenibilidad
en las organizaciones sociales.
Task 1: Identify and analyze a case of
sustainable entrepreneurship.
Task 2: Put in Google Docs files from the
activity.
Forum of news (for exclusive use of the
tutor).
------------
Extra Video: Las cuatro ecologías de
Leonardo Boff.
Help documentation: Google Docs.
Students and tutors Task 1: Identify and
analyze a case of
sustainable
entrepreneurship.
Task 2: Put in Google
Docs files from the
activity.
Self-Evaluation Unit 1
VET4e-inclusion project
16
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 2:
Telecentres
with future
5 hours of
mandatory
minimum
commitment.
1 week
Make a basic analysis of
students telecenters'
sustainability as well as
analyze the telecenter status
in order to look forward
seeking allies and resources to
improve the potential of the
telecentre.
Learn about the situation of
telecenter networks' in Spain
and also in other countries.
Understand the concept of
the telecenter, its types and
functions.
Approach the concept of
sustainability in the
telecenter.
Analyze the telecenter status
in regards to sustainability.
Reflecting on the figure of
telecenter facilitator as a key
element of the future of the
telecenters.
Learn about virtual
communities or social
networks of telecenters.
The experience of thinking,
creating, opening and
developing a telecenter must
look forward to ensuring the
continuity of the project, taking
into account that facilitators
are developing a social
initiative, aimed primarily at
people with special difficulties
in accessing ICT.
Reading: Telecentros, modelos y
sostenibilidad.
Task: Analyse your telecenter.
Forum: The facilitator role.
URL: Telecentre.org community.
URL: Comunidad Conecta community.
------------
Extra-Video: La sostenibilidad en el
telecentro.
Extra-URL: Telecentros POETA
Extra-Reading: “Las redes de telecentros en
España. Una historia por contar”. Karma
Peiró.
Students and tutors Task 1: Analyse your
telecenter.
Self-Evaluation Unit 2
VET4e-inclusion project
17
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 3
Seeking
funding
5 hours of
mandatory
minimum
commitment.
1 week
How to be related to the
telecenter's environment to
get funding.
Identify potential
relationships and
contributors, as well as
various funding models for
social organizations and the
possible consequences of
implementing these models.
Focus on the importance of
diversifying the sources of
funding as a guarantee of
sustainability.
Provide the essential
knowledge to help students to
define a fundraising strategy.
Identify major sources of
funding for social
organizations.
Learn about the different
funding models for
organizations and the
consequences of
implementing these models.
Emphasize the importance of
diversifying sources of funding
as a guarantee of
sustainability.
Outline a plan to raise funds
in a telecenter.
One of the indispensable
conditions for telecenters is
having the funding necessary
for its operations.
Students will try to answer
some questions in order to
understand the goal of this
Unit:
What do companies want to
obtain from their relationships
with social institutions?, What
are the limits when working
with companies? What are the
different forms of
collaboration?, How can you
present your projects and make
them attractive?, Why is a
project supported or rejected?
What are the benefits for
companies?
Reading: Fuentes de financiación.
Reading: Comunicación y captación de
fondos.
Task: Funding Sources in your telecenter
from public and private entities.
Forum: Raise funds by holding events, the
sale of services and product sales.
Students and tutors Task 1: Funding Sources
in your telecenter from
public and private
entities.
Self-Evaluation Unit 3
VET4e-inclusion project
18
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 4
Saving and
making best
use of
resources
5 hours of
mandatory
minimum
commitment.
1 week
Review the main points
related to the construction of
a green space, taking into
account that the telecenter is
a place similar to an office.
We'll begin from the motto
"Reduce, Recycle, Reuse",
which is the basis of
environmental sustainability.
Focus attention on recruiting
of volunteers in the telecenter
that will help us meet our
objectives with their solidarity
work.
Collect ideas and resources to
improve time management.
We'll elaborate further on the
issue of sponsorship with a
practical exercise that will
serve to exercise you in
searching resources.
Apply sustainability criteria to
each of the spaces and
resources of the telecenter as
a place of work.
Share ideas and resources on
time management at the
telecenter.
Learn about one resource for
seeking sponsorship and use it
for your project.
In the last learning unit of this
module we'll approach three
essential issues for sustainable
management of an
organization, a telecenter:
environmental sustainability,
time management and human
resources.
Reading: Cuidar el planeta desde el
Telecentro.
Reading: Gestión del tiempo.
Task: Presentation of your telecenter and a
project to a company.
Forum: Volunteering at the telecenter.
-------------
Extra-Reading: Conclusiones de los talleres
sobre voluntariado corporativo
Extra-task or ressource: Find sponsors in
www.tupatrocinio.com
Students and tutors
Representatives of
two social networks
Task 1: Presentation of
your telecenter and a
project to a company.
Self Evaluation Unit 4
VET4e-inclusion project
19
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
(How)
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Closing module
Unit
Forum and
evaluation
questionnaire
1 week Become aware of the
achievements of the module
Evaluation Forum.
Evaluation Questionnaire.
Students will be proposed to
answer a questionnaire
evaluation of the module and
to participate in a dialogue-
forum evaluation.
Evaluation Forum.
Evaluation Questionnaire.
Final Exam.
Students Final Exam
VET4e-inclusion project
20
Module 4
Promoting ICT for the elderly at the
telecentre
Position within the curriculum:
Stage 2 (consolidation) / Category 2 (Methodological skills in
working with groups of participants)
Entrance Profile of students:
Minimum 6 months experience in a
job/volunteer engagement with elderly
people and/or
Minimum 6 months experience as e-
facilitator for social inclusion
Knowledge:
Basic knowledge of ICT centres environment
Basic knowledge of elderly-related main issues
Skills:
ICT standard skills (office, multimedia)
Basic team-working skills
Competences:
Basic target-oriented/intercultural
communication skills
Capability to plan activities for vulnerable groups
Output Profile of students:
e-facilitator for elderly social inclusion
Knowledge:
Basic knowledge of elderly situation, needs, resources, opportunities
Basic knowledge on present data, information, analysis related to elderly people
Basic knowledge of the local context and elderly-related actions/opportunities
Knowledge of the potential role of an ICT center in promoting elderly integration
and personal development
Basic knowledge of ICT devices/programmes/software devoted to elderly people
Skills:
Ability to identify and analyze digital gaps/ICT barriers
of elderly people
Ability to perform e-facilitation tasks focused on
elderly-public
Ability to facilitate elderly access to services and
learning opportunities through ICT
Ability to use simple software focused on elderly
needs/interests
Competences:
Critical analysis of the available sources of
information on elderly-related topics
Design, realization and promotion of ICT
activities/digital literacy programmes addressed
to elderly people
Teaching to elderly people how to use ICT tools
for personal development and interests
VET4e-inclusion project
21
Title of the
Learning
Units
Duration Learning aims/outcome Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Introductio
n Unit
1 week
available
1 hour of
mandatory
minimum
dedication
- To familiarize with the
learning environment:
- To familiarize with the
platform and its functions;
- To understand the overall
objectives, contents and
methodology of the module;
- To understand tutor's role;
- To understand the
evaluation system and
criteria.
- use of the platform
- how to complete student
personal profile;
- management of interactive
tools;
- relational skills for the
communication with students
and tutor.
We offer to the student the opportunity to
access to the platform a few days before the
starting of the module, in order to provide
him/her relevant information about the
functioning of the platform and the structure
of the module. The Introduction Unit is a start-
up unit aimed at facilitating the learning
process that starts with Unit 1.
The only mandatory tasks of the Introduction
Unit are: Introduce oneself in the
“Introduction Forum”; Complete ones personal
profile; Consult the Bulletin Board and the
Introduction forum to read the messages from
the tutor/other students.
Tutor's role: the tutor is present in the
platform and has to introduce him/herself in
the Introduction forum and to post a Welcome
message in the Bulletin Board. Nonetheless, it
is suggested to avoid direct interactions with
the students in order to encourage their
spontaneous participation (see also the
Evaluation column).
READINGS:
Methodologic readings:
- Goals of the module
- Target of the module
- Module structure and methodology
- Tutorship of the Module
Overview of the learning contents
readings:
- Module plan
- Contents of the module
Technical readings
- Platform users' guide
- Detailed instructions on how to
complete the profile
- Forums
- Personal and technical requirements
COMMUNICATION AND INTERACTIVE
TOOLS:
- Bulletin board and news
- Presentation forum
Students and
tutors
No evaluation is foreseen.
The Introduction Unit is a
start-up unit aimed at
facilitating the learning
process that starts with Unit
1.
It is also an instrument to
verify students' motivation in
order to prevent drop-outs.
Therefore, selected students
that don't access the platform
during the Introduction week
are substituted with enrolled
students in the waiting list.
VET4e-inclusion project
22
Title of the
Learning
Units
Duration Learning aims/outcome Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Unit 1
Our
elderly: a
general
overview
1 week
available
5 hours of
mandatory
minimum
commitment
- To provide a reference
framework on elderly
situation and needs
- To know better the local
context and
actions/opportunities
devoted to the elderly
- How to do a good context
analysis
- Elderly people:
characteristics, feelings and
needs.
- Presentation of the most
relevant information and
resources useful to support
old population
- Basic elements on
telecentre’s activities and
potential
- Present data on Italian old
population according to
CENSIS and IRP
- Basic elements on the Third
Age Universities: aims and
concrete examples
- Italian population and ICT:
main data and general
overview
This Unit is built on a three levels
methodological approach:
1.Theoretical/Didactic: it provides neutral
context-based information
2.Interpretational: it provides oriented
positions on the phenomenon and elements to
deconstruct them
3.Critical: it stimulates context-based
elaboration
Reading: Gli anziani: sentimenti e
bisogni (The elderly: feelings and
needs)
Reading: Il contesto e le risorse
disponibili (The context and the
resources available)
Reading: Il telecentro e le sue
potenzialità (The telecentre and its
potential)
------------
Optional Article: Anziani, una ricchezza
trascurata (The elderly: a careless
resource)
Optional Article: Anziani di ieri e di oggi
(Past and present elderly)
Optional Reading: Per vivere la terza
età (To live the third age)
Optional Article: Terza età: da forza
lavoro a forza cultura (Third age: from
workfroce to “cultureforce”)
Optional Reading: Indagine ISTAT 2010:
cittadini e nuove tecnologie (ISTAT
survey 2010: citizens and ICT)
Students and
tutors
Task 1: Il territorio e il
telecentro (Your territory and
the telecentre): individual
work aimed at describing the
local context, as related to
the elderly.
Forum: I bisogni degli anziani
nel tuo territorio (Elderly
needs in your territory):
sharing and exchange of
experiences and opinions.
Self Evaluation Questionnaire
Unit 1.
VET4e-inclusion project
23
Title of the
Learning
Units
Duration Learning aims/outcome Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Unit 2
Personal
and digital
competenc
es and
skills
1 week
available
5 hours of
mandatory
minimum
commitment
-To identify elderly people
digital gap/barriers
- To identify adaptation
procedures/opportunities of
ICT
devices/software/contents/re
sources for elderly people
- To develop strategies and
actions to promote ICT use to
elderly people
- To define role/tasks of the
e-facilitator for social
inclusion in this context
- Examples and ideas of ICT
uses for elderly people
- Main barriers between
elderly people and ICT
- Basic elements to customize
ICT
devices/software/contents/res
ources to elderly people needs
and difficulties
- Overview on facilitator’s
characteristics, skills and tasks
- Examples on elderly people
motivation to learn and use
ICT
- Examples of ICT learning
opportunities for elderly
people
- Examples of broadband use
for e-services access
Unit 2 contents are closely linked to practical
work in learning contexts with elderly people.
The pedagogical approach is practical-
theoretical and aimed at encouraging the use
of ICT to achieve personal development.
Reading: Non è solo il computer (It’s
not only the PC)
Reading: Superare i pregiudizi
(Overcoming predjudices)
Video: PC e anziani: qualche riflessione
(PC and elderly people: some
refelctions)
Reading: Il ruolo del facilitatore
(Facilitator’s role)
Reading: Semplificare i materiali
didattici (How to simplify didactic
resources)
------------
Optional Video: Ma ora si che ho
l’età...per il PC (It’s the good age to
learn ... the PC)
Optional Reading: Gli anziani e le
opportunità di apprendimento delle TIC
(Elderly people and ICT learning
opportunities)
Optional Reading: Gli anziani e la banda
larga (Elderly people and the
broadband)
Students and
tutors
Task 1: Incoraggiare gli
anziani (Encouraging elderly
people): individual work
aimed at define
strategies/ideas to encourage
elderly people in using ICT.
Forum: Pregiudizi e soluzioni
(Prejudices and solutions):
sharing and exchange of
experiences on how to
overcome prejudices and
identify solutions.
Self Evaluation Questionnaire
Unit 2.
VET4e-inclusion project
24
Title of the
Learning
Units
Duration Learning aims/outcome Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Unit 3
Training on
ICTs
1 week
available
5 hours of
mandatory
minimum
commitment
- To learn how to adapt
computer, hardware and
software to elderly people
abilities and needs
- To define a digital literacy
training programme
- To use simple software
devoted to elderly needs
- Basic controls and functions
to customize hardware and
software
- Basic elements of field
researches on elderly training
needs and abilities
- Basic elements and criteria to
design a training programme
- Practical elements for PC use
- Examples of software (ELDY
and Genealogia)
Unit 3 provides a logical scheme presenting
the process of designing targeted activities
starting from users' needs.
It encourages a customized use of the
resources available, stimulating personal
elaboration.
Reading: Adattare e configurare
hardware and software (How to adapt
hardware and software)
Reading: L’apprendimento delle TIC
per gli anziani (ICT learning for elderly
people)
Reading: Progettare un programma
formativo (How to design a training
programme)
------------
Optional Video: Eldy: il computer
diventa facile (Eldy: PC becomes easy!)
Optional Reading: Guida pratica al PC
(Practical guide to PC use)
Optional Link: Costruire un albero
genealogico (Building a genealogical
tree): free software to build
genealogical trees
Students and
tutors
Mandatory tasks
Task 1: Progettare un’attività
formativa per le persone
anziane (To design a training
activity for elderly people):
individual work aimed at
designing a
workshop/training
programme on ICT for elderly
people
Task 2: Wiki: materiali di
apprendimento per persone
anziane (Wiki: training
materials for elderly people):
find ICT learning
materials/resources, etc. and
add them to the Wiki, in
order to achieve a group
result
Forum: La formazione nel tuo
telecentro (Training in your
telecentre): sharing and
exchange of good practices of
training activities in the
telecentres
Self Evaluation Questionnaire
Unit 3
VET4e-inclusion project
25
_______
Optional task:
Costruisci l’albero genalogico
della tua famiglia! (Build your
family tree!): individual work
using the software
“Genealogia”
Unit 4
ICT
training
programm
es for
elderly
people
1 week
available
5 hours of
mandatory
minimum
commitment
- To learn how ICT can
become resources for elderly
personal development
- To design an ICT programme
for the elderly
- Examples of ICT workshops
and projects in the Telecentres
- Guidelines of the project
“Grandfathers on-line”
- Examples of projects for
elderly digital literacy
Unit 4 moves a step forward toward the
process of designing targeted activities starting
from users' needs (practical and customized
application of the knowledge acquired)
Reading: Progetti sulle TIC per gli
anziani (ICT training programmes for
the elderly)
Reading: Nonni su Internet
(Grandfathers on-line)
------------
Optional Link: InformaNonni.it
Optional Link: Apprendere con le
tecnologie (Learning with technologies)
Students and
tutors
Mandatory tasks
Task 1: Il mio progetto sulle
TIC per gli anziani (My project
on ICT for elderly people):
individual work aimed at
designing a training project in
your telecentre for elderly
people
Task 2: Wiki: Progetti per gli
anziani (Wiki: projects for
elderly people): share in the
Wiki your experiences of ICT
projects devoted to the
elderly, in order to achieve a
group result
Forum: Altri progetti e
workshops (Other projects
and workshops): sharing and
exchange of ideas on
workshops and activities in
the telecentres
Self Evaluation Questionnaire
Unit 4
VET4e-inclusion project
26
Title of the
Learning
Units
Duration Learning aims/outcome Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Closing
Unit
10 days
available
5 hours of
mandatory
minimum
commitment
- To assess knowledge/skills
acquired
- To apply in a critical and
transversal way
knowledge/skills acquired
during the whole learning
path
- To evaluate the
adequateness of the learning
module according to students
- Final exam
- Feedback Forum
- Evaluation Questionnaire
The final exam consists in a
collaborative/cooperative learning exercise
allowing the assessment of students' capability
to use skills and competences acquired in each
learning unit in an integrated and transversal
way.
It is aimed at evaluating work related skills
(more than theoretical knowledge).
The exercise has to be realized in groups of 5.
The students themselves have to select their
"final exam mates" during the 4 weeks of
training (to foster interchange during the
training and allow the constitution of groups of
people sharing the same
interests/ideas/projects/work contexts).
After the deadline each group has to present
its product to the virtual class and the tutor in
the framework of a face to face session and/or
online interactive session.
Moreover, students will be proposed to
answer a evaluation questionnaire on the
module and to participate in a feedback forum.
Final Exam: Imagine to design "the ideal
centre for elderly people" and provide
its "business plan". In particular,
answer to the following points: a.
context analysis; b. target description
and target's expected needs; c. general
and specific objectives; d. activities to
develop; e. methodologies to use; f.
equipment/human resources/budget
requirements; g. expected results and
impact; h. sustainability and
transferability.
Feedback Forum: Students are invited
to share their final impressions on the
module and say good-bye to other
students and to the tutor.
Evaluation Questionnaire: Students are
asked to fill in a semi-structured
questionnaire evaluating the following
dimensions of the received training:
learning outcomes; role and career
development; overall satisfaction with
the module.
Students and
tutors
The final exam counts for 50%
of the final note. This 50% has
to be attributed on the bases
of the following criteria:
coherence with the learning
inputs (15 points),
valorization of ICT based
methodologies/tools (15
points), innovativeness and
creativity (10 points), quality
of the presentation (10
points).
The remaining 50% is
attributed on the basis of
participation during the
training (tasks submission and
forum interventions).
VET4e-inclusion project
27
Module 5
Promoting ICT with migrants in the
ICT centre
Position within the curriculum:
Stage 2 (consolidation) / Category 2 (Methodological skills in working
with groups of participants)
Entrance Profile of students:
Minimum 6 months experience in a job/volunteer
engagement with migrants/refugees and/or
Minimum 6 months experience as e-facilitator for social
inclusion
Knowledge:
Basic knowledge of ICT centres environment
Basic knowledge of immigration-related main issues
Skills:
ICT standard skills (office, multimedia)
Basic team-working skills
Competences:
Basic target-oriented/intercultural communication skills
Capability to plan activities for vulnerable groups
Output Profile of students:
e-facilitator for migrants social inclusion
Knowledge:
Basic knowledge of the international and national
migratory history and present context
Knowledge of the potential role of an ICT center in
promoting migrants' integration and intercultural
dialogue
Basic knowledge on conflict management in intercultural
contexts
Basic knowledge of immigration laws and administrative
procedures, integration processes and available services
Intermediate knowledge of migrant women integration
processes: difficulties, needs and opportunities
Skills:
Ability to analyze the available sources of information on
migration-related topics
Ability to perform e-facilitation tasks with an
intercultural approach
Ability to facilitate migrants access to services through
ICT
Ability to integrate a gender-mainstreaming approach in
performing e-facilitation tasks
Competences:
Critical use of the available sources of information on
migration-related topics
Design, realization and promotion of ICT activities
addressed to migrants
Teaching how to use ICT tools for immigration-related
administrative procedures and e-services
VET4e-inclusion project
28
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning
Unit Actors
(Who)
Evaluation
Introductio
n Unit
1 week
available
1 hour of
mandatory
minimum
dedication
- To familiarize with
the learning
environment:
- To familiarize with
the platform and its
functions;
- To understand the
overall objectives,
contents and
methodology of the
module;
- To understand
tutor's role;
- To understand the
evaluation system
and criteria.
- use of the platform
- how to complete
student personal profile;
- management of
interactive tools;
- relational skills for the
communication with
students and tutor.
We offer to the student the opportunity
to access to the platform a few days
before the starting of the module, in
order to provide him/her relevant
information about the functioning of the
platform and the structure of the
module. The Introduction Unit is a start-
up unit aimed at facilitating the learning
process that starts with Unit 1.
The only mandatory tasks of the
Introduction Unit are: Introduce oneself
in the “Introduction Forum”; Complete
ones personal profile; Consult the
Bulletin Board and the Introduction
forum to read the messages from the
tutor/other students.
Tutor's role: the tutor is present in the
platform and has to introduce
him/herself in the Introduction forum
and to post a Welcome message in the
Bulletin Board. Nonetheless, it is
suggested to avoid direct interactions
with the students in order to encourage
their spontaneous participation (see also
the Evaluation column).
READINGS:
Methodologic readings:
- Goals of the module
Target of the module
- Module structure and methodology
Tutorship of the Module
Overview of the learning contents readings:
- Module plan
- Contents of the module
Technical readings
- Platform users' guide
- Detailed instructions on how to complete the profile
- Forums
- Personal and technical requirements
COMMUNICATION AND INTERACTIVE TOOLS:
- Bulletin board and news
- Presentation forum
Students and
tutors
No evaluation is
foreseen.
The Introduction Unit is
a start-up unit aimed at
facilitating the learning
process that starts with
Unit 1.
It is also an instrument to
verify students'
motivation in order to
prevent drop-outs.
Therefore, selected
students that don't
access the platform
during the Introduction
week are substituted
with enrolled students in
the waiting list.
VET4e-inclusion project
29
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning
Unit Actors
(Who)
Evaluation
Unit 1:
Migration:
getting
oriented
and
developing
critical
thinking
1 week
available
5 hours of
mandatory
minimum
commitme
nt
- To provide a
reference
framework on
international
migration and to
introduce the
national situation
- To evaluate the
reliability of sources
of information and
analyse data and to
use of e-tools to
build a set of reliable
sources of
information
- To develop a
critical thinking,
distinguishing
“real/actual” facts
from
“mediatic/political”
ones
- History of migratory
phenomena, typologies,
trends, policies and
problems.
- National migratory
history and context,
highlighting similarities
and differences with the
international one
- Analysis of the
arguments most
commonly used “in
favor” and “against”
immigration
- Presentation of the
most common
stereotypes and
prejudices on
immigration/migrants
- Concrete elements,
data, facts to invalidate
each of these
stereotypes and
prejudices
This Unit is built on a three levels
methodological approach:
1.Theoretical/Didactic: it provides
neutral context-based information
2.Interpretational: it provides oriented
positions on the phenomenon and
elements to deconstruct them
3.Critical: it stimulates personal
interpretation and elaboration
Reading: Il fenomeno delle migrazioni internazionali (The
international migrations phenomenon)
Reading: L'immigrazione in Italia (Immigration in Italy)
Video: Immigrazione in Italia: è una risorsa o una minaccia
(Immigration in Italy: is it a added value or a threat?)
Reading: Mandiamoli a casa, i luoghi comuni (Send them back
home, the prejudices)
Reading: I media e la guerra alle migrazioni (Media and war on
migrations)
Video: Tutorial Delicious
------------
Optional Reading: Manifesto del FSMM (Final declaration of the
WSFM)
Optional Video: La puntata “Migranti” del programma “Presa
Diretta” (the episode “Migrants” of the TV show “Presa Diretta”)
Students and
tutors
Task 1: Costruire un
network con Delicious
(Building a network
though Delicious): group
work aimed at bulding a
data base of reliable
sources of information
and useful links.
Task 2: L'immigrazione
nei media (Immigration in
the media): individual
work asking to explain
how the mediatic
perception of
immigration affects the
daily work in the ICT
center.
Forum: Le notizie più
attuali (The most recent
news): Select and share
the most recent news on
immigration
Self Evaluation
Questionnaire Unit 1
VET4e-inclusion project
30
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning
Unit Actors
(Who)
Evaluation
Unit 2:
Let's meet!
1 week
available
5 hours of
mandatory
minimum
commitme
nt
- To develop
targeted promotion
strategies for the ICT
center
- To refine the role
of the e-facilitator
for social inclusion in
an intercultural
context/with an
intercultural
approach
- To promote an
exchange among
students on conflict
management
strategies
- Examples and ideas of
customized social and
cultural activities
- Techniques for
promotion and
advertising of the ICT
centre's activities
- Guidelines on how to
act as e-facilitator with
migrant users
- Techniques for conflict
management in
intercultural context
Unit 2 contents are closely linked to
everyday work in intercultural ICT
centre.
The pedagogical approach is practical-
theoretical and aimed at encouraging the
exchange of good practices and the
collaborative learning.
For each theme (promotion strategies,
role of the e-facilitator, conflict
management) the unit provides an
introductory reading presenting the
main concepts and concrete examples,
followed by a task and/or forum to apply
knowledge/skills acquired.
Reading: Elementi di marketing interculturale (Basic notions of
intercultural marketing)
Reading: Il cinema, un linguaggio multiculturale (Cinema, a
multicultural language)
Video: Intervista a Dagmawi Yimer (An interview to Dagmawi
Yimer)
Reading: I facilitatori, un supporto all'inclusione digitale (The
facilitators, a support to e-Inclusion)
Reading: da “Gestione dei conflitti e mediazione interculturale”
– Conflitti e comunicazione interculturale (Parte III): La gestione
dei conflitti in chiave interculturale e La comunicazione
interculturale attraverso il cinema (from “Conflict Management
and Intercultural mediation” - Conflict and intercultural
communication (Part III): Conflict management with an
intercutural view and Intercultural communication through
cinema.
------------
Optional Reading: L'educazione interculturale verso l'educazione
transculturale (The intercultural education towards transcultural
education)
Optional Reading: La musica: uno strumento per approcciare le
nuove tecnologie da una prospettiva interculturale (Music: an
instrument to approach ICT in an intercultural perspective)
Optional Reading: Radio 2.0, audio e podcast (Radio 2.0, audio
and podcast)
Optional Video: Introduzione ad Audacity (Introduction to
Students and
tutors
Mandatory tasks
Task 1: Promuovere il
centro TIC (To promote
the ICT Centre):
individual work aimed at
elaborating a targeted
strategy to promote the
center among migrants
Forum: Risoluzione dei
conflitti (Conflict
management): sharing
and exchange of good
practices
Self Evaluation
Questionnaire Unit 2
------------
Optional Task: Creare de
editare video (To create
and edit videos):
individual work aimed at
creating a video and
uploading it on the
module's youtube
channel
Optional Task: Podcast:
VET4e-inclusion project
31
Audacity) uno strumento di
apprendimento (Podcast:
a learning tool): Realise
an activity with at leat 1
out of 4 podcast software
presented in the optional
reading
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning
Unit Actors
(Who)
Evaluation
Unit 3
Identify
and meet
migrants'
specific
needs
through
ICT
1 week
available
5 hours of
mandatory
minimum
commitme
nt
- To identify
migrants' integration
needs
- To elaborate viable
responses to these
needs within the ICT
center
- To use ICT to
simplify the e-
facilitator task of
supporting migrants
access to services
- Schematic process on
how to plan and design
the ICT centre activities
on the bases of users'
needs
- List of the most
common migrants'
integration needs,
related to administrative
procedures and access to
services
- List of e-sources of
legal/administrative
information
- Concrete examples of
ICT tools to be used by
the e-facilitator/the
migrant user
First of all, the unit provides a logical
scheme presenting the process of
designing targeted activities starting
from users' needs.
After that, the overall pedagogic
approach is based on the idea that
delicate issues as the immigration
administrative procedures and the
access to services imply the direct
involvement of the final user.
Therefore, the unit aims at giving to e-
facilitators:
 a general overview of the
immigration legislation and
administrative procedures +
sources of information
 suggestions on how to
systematize these information
through ICT
Reading: Identificare bisogni e difficoltà e modalità con cui il
centro TIC può contribuire a soddisfarli/risolverli (Identify needs
and difficulties and how the ICT centre may meet/solve them)
Reading: Il computer facilita il lavoro su cartaceo: 1. I bisogni
più comuni degli utenti migranti; 2. Procedure amministrative
che il centro TIC può accompagnare; 3. Strumenti TIC e fonti di
informazione online (How PC may help paper-based activities: 1.
Migrant users most common needs; 2. Administrative
procedures that may be addressed in the ICT centres; 3. ICT
tools and e-sources of information)
URL: Il blog del circolo Arci Thomas Sankara: esempio di come
spiegare le modalità di consultazione del portale immigrazione
del Ministero dell'Interno attraverso screenshots (The blog of
the Arci club Thomas Sankara: example of explaination of the
procedure to consult the immigration portal of the Ministry of
Interiors through screenshots)
Video: L'iniziativa di Africa Insieme: Intervista ad un operatore di
Africa Insieme relativa a un incontro di formazione volto ad
Students and
tutors
Mandatory tasks
Task 1: Opportunità del
territorio (Local existing
opportunities): on the
bases of the analysis of
migrants' needs, compile
a list of the existing
opportunities and
services to be used both
by e-facilitators and by
migrant users themselves
Task 2: La tecnologia
nella vita quotidiana
(Technology in daily life):
on the bases of 2
concrete situation, design
of an activity where ICT
learning helps to solve an
everyday problem
VET4e-inclusion project
32
 instruments to make migrant
final users aware and
autonomous in the use of ICT
tools
insegnare a lavoratori migranti e datori di lavoro come accedere
alla procedura on-line del decreto flussi (The initiative by Africa
Insieme: interview to an operator of Africa Insieme relating
about a training initiative aimed at teaching to migrant workers
and employers how to access the online regularization
procedure)
Forum: Identificare
bisogni e difficoltà
(Identify needs and
difficulties): Sharing of
knowledge and practices
on migrant users' specific
needs and activities to
meet them
Self Evaluation
Questionnaire Unit 3
_______
Optional task: Attività per
apprendere le lingue
(Activities to learn
languages): Design of a
concrete activity to learn
Italian using ICT and list
of e-sources to be added
to the Delicious used in
Unit 1
Optional Forum: Kit di
strumenti per la ricerca di
lavoro (Kit of tools for job
seeking): Collaborative
learning exercise aimed
at realizing a kit of useful
instruments to facilitate
migrants' job seeking in
the ICT centre
VET4e-inclusion project
33
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning
Unit Actors
(Who)
Evaluation
Unit 4
Immigratio
n, gender
and ICT
1 week
available
5 hours of
mandatory
minimum
commitme
nt
- To integrate a
gender perspective
in the context of ICT
intercultural centres
- To become aware
of the non-neutrality
of ICT in a gender
perspective
- To explore the links
between migrant
women
employability and
ICT skills
- Overview of the history
of women rights in the
public and international
debate on human rights
- Analysis of the so-called
“feminilization” trend of
international migration
with a focus on the
national situation
- The condition of
migrant women: the
concepts of “double
exclusion” and “double
exploitation”
- Diachronic overview of
main schools of thought
on women and
technology
- Results of a cross-
country research on: 1.
ICT skills and socio-
economic integration of
migrant women; 2. The
role played by ICT
trainings in the
acquisition of other
socio-cultural key skills;
Unit 4 is based on the idea that a gender
approach is crucial in designing and
realizing any social and cultural activity.
Therefore, it provides a consistent historical
framework aimed at orienting and
supporting e-facilitators in integrating a
gender-mainstreaming approach in their
daily activities with migrant users.
For this reason, the Unit doesn't include any
content/task related to specific activities
addressed to migrant women. Otherwise,
the Unit intends to promote a spontaneous
debate among the students on how to
integrate the acquired knowledge in their
everyday practice.
Reading: I diritti delle donne sono diritti umani (Women
rights are human rights)
Reading: Donne migranti (Migrant women)
Reading: Genere e TIC (Gender and ICT)
Reading: Donne migranti, TIC e occupabilità (Migrant women,
ICT and employability)
Students and
tutors
Forum: Prospettiva di
genere (Gender
perspective): exchange of
ideas on gender,
immigration and ICT
Self Evaluation
Questionnaire Unit 4
VET4e-inclusion project
34
3. The role played by
third-sector
organizations in the life
of migrant women
Closing
Unit
10 days
available
5 hours of
mandatory
minimum
commitme
nt
- To assess
knowledge/skills
acquired
- To apply in a
critical and
transversal way
knowledge/skills
acquired during the
whole learning path
- To evaluate the
adequateness of the
learning module
according to
students
- Final exam
- Feedback Forum
- Evaluation
Questionnaire
The final exam consists in a
collaborative/cooperative learning exercise
allowing the assessment of students'
capability to use skills and competences
acquired in each learning unit in an
integrated and transversal way.
It is aimed at evaluating work related skills
(more than theoretical knowledge).
The exercise has to be realized in groups of
5.
The students themselves have to select
their "final exam mates" during the 4 weeks
of training (to foster interchange during the
training and allow the constitution of
groups of people sharing the same
interests/ideas/projects/work contexts).
After the deadline each group has to
present its product to the virtual class and
the tutor in the framework of a face to face
session and/or online interactive session.
Moreover, students will be proposed to
answer a evaluation questionnaire on the
module and to participate in a feedback
forum.
Final Exam: Imagine to design "the ideal job guidance
program" addressed to migrant women and provide its
"business plan". In particular, answer to the following points:
a. context analysis; b. target description and target's
expected needs; c. general and specific objectives; d.
activities to develop; e. methodologies and tools to use; f.
equipment/human resources/budget
Feedback Forum: Students are invited to share their final
impressions on the module and say good-bye to other
students and to the tutor.
Evaluation Questionnaire: Students are asked to fill in a semi-
structured questionnaire evaluating the following dimensions
of the received training: learning outcomes; role and career
development; overall satisfaction with the module.
Students and
tutors
The final exam counts for
50% of the final note.
This 50% has to be
attributed on the bases
of the following criteria:
coherence with the
learning inputs (15
points), valorization of
ICT based
methodologies/tools (15
points), innovativeness
and creativity (10 points),
quality of the
presentation (10 points).
The remaining 50% is
attributed on the basis of
participation during the
training (tasks submission
and forum interventions).
VET4e-inclusion project
35
Module 6
Getting familiar with Office tools
(Open/MS) for developing digital
literacy workshops
Position within the curriculum:
Stage 1 (entrustment) / Category 4 (Competence in the use of technical
tools as a basis and support of methodological actions)
Entrance Profile of students:
Minimum 6 months experience in a job/volunteer
engagement within a telecentre or similar body
and/or
Minimum 6 months experience in organizing
workshops/laboratories within informal contexts (Third
Sector bodies)
Knowledge:
Basic knowledge of telecentres environment
Basic knowledge of animation
methodologies/techniques in informal contexts
Skills:
ICT basic skills (computer, Internet browsing and at-a-
distance communication tools)
Basic team-working skills
Basic communication skills
Competences:
Capability to plan animation laboratories/workshops in
the telecentre and in the local context
Output Profile of students:
e-facilitator for digital literacy
Knowledge:
Good knowledge of Open Office suite
Intermediate knowledge of Open Office suite’s
potential for personal and working needs
Skills:
Ability to facilitate digital literacy access in the
telecentres and/or similar bodies
Ability to design digital literacy workshop/laboratories
in informal learning contexts
Ability to develop communication tools to promote the
telecentre in the local context
Competences:
Ability to use and adapt the tools acquired to personal
and working needs
Teaching how to use Open Office to different target
groups
Ability to modify/adapt/integrate the learning contents
in relation to learners’ needs
VET4e-inclusion project
36
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Introductio
n Unit
1 week
available
1 hour of
mandatory
minimum
dedication
- To familiarize
with the learning
environment:
- To familiarize
with the platform
and its functions;
- To understand
the overall
objectives,
contents and
methodology of
the module;
- To understand
tutor's role;
- To understand
the evaluation
system and
criteria.
- use of the platform
- how to complete
student personal profile;
- management of
interactive tools;
- relational skills for the
communication with
students and tutor.
We offer to the student the opportunity to
access to the platform a few days before
the starting of the module, in order to
provide him/her relevant information
about the functioning of the platform and
the structure of the module. The
Introduction Unit is a start-up unit aimed
at facilitating the learning process that
starts with Unit 1.
The only mandatory tasks of the
Introduction Unit are: Introduce oneself in
the “Introduction Forum”; Complete ones
personal profile; Consult the Bulletin
Board and the Introduction forum to read
the messages from the tutor/other
students.
Tutor's role: the tutor is present in the
platform and has to introduce him/herself
in the Introduction forum and to post a
Welcome message in the Bulletin Board.
Nonetheless, it is suggested to avoid direct
interactions with the students in order to
encourage their spontaneous participation
(see also the Evaluation column).
READINGS:
Methodologic readings:
- Goals of the module
Target of the module
- Module structure and methodology
Tutorship of the Module
Overview of the learning contents readings:
- Module plan
- Contents of the module
Technical readings
- Platform users' guide
- Detailed instructions on how to complete the profile
- Forums
- Personal and technical requirements
COMMUNICATION AND INTERACTIVE TOOLS:
- Bulletin board and news
- Presentation forum
Students and tutors No evaluation is foreseen.
The Introduction Unit is a
start-up unit aimed at
facilitating the learning
process that starts with Unit
1.
It is also an instrument to
verify students' motivation
in order to prevent drop-
outs. Therefore, selected
students that don't access
the platform during the
Introduction week are
substituted with enrolled
students in the waiting list.
VET4e-inclusion project
37
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 1:
OpenOffice
Writer I:
the word
processor
1 week
available
4 hours of
mandatory
minimum
commitment
- To use Open
Office Writer basic
functions: open,
write and save
documents; how
to edit and format
texts.
- To do editing
basic operations:
cut, copy/paste,
correct.
- To understand
how to use Open
Office Writer as a
tool to develop
digital literacy
workshops.
- Basic knowledge on
Writer’s potential.
- Procedures to
download and install
Open office suite.
- Writer main window,
toolbars and their main
functions.
- Procedures to open and
save documents.
- Various editing
functions: correct
mistakes,
copy/cut/paste, format
texts.
This Unit is built on a theoretical/didactic
approach: it intends to provide the learner
with basic notions on the topic faced, in
order to help him to familiarize with it.
Reading: Cos’è Open Office Writer e cosa ti permette
di fare (What is Open Office and what you can do with
it).
Reading: Scaricare ed installare Open Office (How to
download and install Open Office).
Reading: La finestra principale di Writer (Writer’s
main window).
Reading: L’apertura ed il salvataggio dei documenti
(How to open and save documents).
Reading: Editing di base. Correggere gli errori (Editing
1: how to correct mistakes).
Reading: Editing di base. Copia, taglia ed incolla
(Editing 2: copy, cut and paste).
Reading: Editing di base. Formattare il testo (Editing 3:
how to format texts).
-----------
OPTIONAL MATERIALS
Reading: Esempio di documento elaborato con Writer
(Example of a document elaborated with Writer).
Reading: Un altro esempio di documento redatto con
Writer (Another example).
Reading:Comandi veloci da tastiera (Quick keyboard
functions).
Reading: Selezione testo (Text selection).
Students and tutors Task 1: Crea un documento
con Writer (Create a
document with Writer):
individual work aimed at
applying and testing the
knowledge acquired during
the Unit 1.
Forum: La lezione dell’unità
(Lesson learnt): share and
exchange with the other
students
difficulties/ideas/suggestion
s experienced during the
Unit 1.
Self Evaluation
Questionnaire Unit 1
VET4e-inclusion project
38
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 2:
OpenOffice
Writer II:
deeper into
the word
processor
1 week
available
5 hours of
mandatory
minimum
commitment
- To go deeper into
Writer functions.
- To understand
Writer templates
utility.
- To insert tables in
text documents.
- To practice with
fontwork.
- Use of TABS.
- Knowledge on styles
and formatting.
- Procedures to create
and manage tables.
- Utility, use and
customization of Writer’s
templates.
- Utility, use and
customization of
wizards.
- Utility, use and
customization of
fontwork.
- Basic knowledge of
Open Clip Art Library.
This Unit is built on a two level
methodological approach:
1. theoretical/didactic, providing deeper
notions on the topic faced in the previous
Unit.
2. Practical and context-based, stimulating
a personal and contextualized use of the
skills acquired.
Reading: Tabulazioni (TABS).
Reading: Stili e formattazioni (Styles and formatting).
Reading: Tabelle (Tables).
Reading: Modelli (Templates).
Reading: Lavorare con le procedure guidate (How to
use wizards).
Reading: Cos’è fontwork? (What is fontwork?).
Reading: Creare e modificare oggetti (How to create
and modify objects).
Reading: Open Clip Art Library.
-----------
OPTIONAL MATERIALS
Video: Tutorial sull’utilizzo dei fontwork (Tutorial on
fontworks use).
Students and tutors Mandatory tasks
Task 1: Crea una brochure
per il tuo telecentro
utilizzando tutte le funzioni
di Writer apprise durante
l’unità 2 (Create a brochure
for your telecentre, using all
Writer’s function learnt in
Unit 2): individual work
aimed at applying, testing
and customize the
knowledge acquired during
the Unit 2.
Forum: La promozione del
telecentro: materiali
pubblicitari e informativi
(Telecentre’s promotion:
advertising and information
materials): sharing and
exchange of ideas, tools and
strategies to promote your
telecentre in the local
context.
Self Evaluation
Questionnaire Unit 2
------------
VET4e-inclusion project
39
Optional Task: Crea un
manifesto pubblicitario del
tuo telecentro da affiggere
nelle strade della tua città
(Create an advertisement of
your telecentre to be put up
on the walls): individual
work aimed at deepen
communication strategies
for your telecentre.
VET4e-inclusion project
40
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 3
OpenOffice
Calc, the
spreadshee
t
1 week
available
5 hours of
mandatory
minimum
commitment
- To use Open
Office Calc basic
elements: rows,
columns, cells. The
concept of
“range”.
- To apply the most
common basic Calc
operations.
- To create graphs
with Calc.
- To understand
how to use Open
Office Calc as a
tool to develop
digital literacy
workshops.
- Basic knowledge on
Calc main screen.
- Basic knowledge on
Calc data typologies.
- Basic knowledge of the
concept of “range”.
- Procedures on how to
insert the most common
Calc operations.
- Procedures on how to
format Calc cells.
- Procedures on how to
create and customize
Calc graphs.
This Unit is built on a two level
methodological approach:
1. theoretical/didactic, providing deeper
notions on the topic faced in the Unit.
2. Practical and customized, encouraging a
personal use of the skills acquired to
support everyday tasks.
Reading: La schermata di calc (Calc main screen).
Reading: Tipi di dati (Calc data typologies).
Reading: Il concettto di estensione (The concept of
“range”).
Reading: Le formule più comuni (The most basic
operations).
Reading: Formattazione celle (How to format cells).
Reading: Creare grafici con Calc (How to create graphs
with Calc).
-----------
OPTIONAL MATERIALS
Reading: Esempio di attività: come personalizzare un
foglio di calcolo di contabilità domestica (Activity
example: how to customize a household accounting
spreadsheet).
Video: Tutorial sull’utilizzo di Calc (Tutorial on Calc
use).
Students and tutors Mandatory tasks
Task 1: Crea il tuo foglio di
contabilità domestica
annual (Create your own
household accounting yearly
spreadsheet): individual
work aimed at encouraging
a useful and conscious use
of the skills acquired.
Forum: La lezione dell’unità
(Lesson learnt): share and
exchange with the other
students difficulties and
suggestions experienced
during the Unit 3. If you
need, ask for help to the
most skilled students!
Self Evaluation
Questionnaire Unit 3
VET4e-inclusion project
41
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Unit 4
Impress:
presentatio
ns with
OpenOffice
1 week
available
5 hours of
mandatory
minimum
commitment
- To use Open
Office Impress
basic functions:
open, modify and
save
presentations.
- To insert texts,
images and objects
in your slides.
- To personalize
and make more
attractive your
presentations.
- To understand
how to use Open
Office Impress as a
tool to develop
digital literacy
workshops.
- Overview of Impress
work environment.
- Procedures for creating
a presentation through
wizard .
- Knowledge on the main
operations to build
Impress slides.
- Procedures for inserting
images in your slides.
- Procedures for adding
and deleting slides.
- Basic knowledge on
slides effects.
- Procedures to export
your presentation in
other extensions.
This Unit is built on a two level
methodological approach:
1. theoretical/didactic, providing deeper
notions on the topic faced in the Unit.
2. Practical, context-based and critical,
encouraging the learners to become more
and more independent in interpreting the
local context/networks.
Reading: L’ambiente di lavoro di Impress (Impress
work environment).
Reading: Creare una presentazione (How to create a
presentation).
Reading: Lavorare con le slide (How to work with the
slides).
Reading: Inserire immagini (How to insert images).
Reading: Aggiungere ed eliminare slide (How to add
and eliminate slides).
Reading: Inserire gli effetti (How to insert effects).
Reading: Transizione delle slide (Slides transition).
Reading: Esportare in altri formati (How to export
your slides in other extensions).
-----------
OPTIONAL MATERIALS
Reading: Manuale di Impress (Impress user’s guide).
Video: Tutorial sull’utilizzo di Impress (Tutorial on
Impress use).
Students and tutors Mandatory tasks
Task 1: Crea una
presentazione con Impress,
finalizzata a promuovere il
tuo telecentro presso enti
locali e strutture private nel
tuo territorio di riferimento
(Create your own Impress
presentation, aimed at
promoting your telecentre
to local public/private
bodies within your
reference context).
Forum: Telecentro e rete
territoriale (Telecentre and
local network): sharing and
exchange of ideas and good
practices on how to involve
and stimulate local actors
within telecentres activities.
Self Evaluation
Questionnaire Unit 4
VET4e-inclusion project
42
Title of the
Learning
Units
Duration Learning
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and Materials Learning Unit
Actors (Who)
Evaluation
Closing
Unit
10 days
available
5 hours of
mandatory
minimum
commitment
- To assess
knowledge/skills
acquired
- To apply in a
customized,
contextualized and
transversal way
knowledge/skills
acquired during
the whole learning
path
- To evaluate the
adequateness of
the learning
module according
to students
- Final exam
- Feedback Forum
- Evaluation
Questionnaire
The final exam consists in a group
exercise, aimed at assessing students'
capability to use skills and competences
acquired in each learning unit in an
integrated and transversal way. It aims at
evaluating work related skills (more than
theoretical knowledge).
The exercise has to be realized in groups
of 5.
The students themselves have to select
their "final exam mates" during the 4
weeks of training (to foster interchange
during the training and allow the
constitution of groups of people sharing
the same interests/ideas/projects/work
contexts).
A longer time should be foreseen for the
realization of the exercise (10 days). After
the deadline each group should present its
product to the virtual class and the tutor
in the framework of a face to face session
or an online interactive session.
Moreover, students will be proposed to
answer an evaluation questionnaire on
the module and to participate in a
feedback forum.
Final exam: imagine to start-up a restaurant and
create:
a. the menu of the week, using writer;
b. a communication tool (ex. flyer, brochure etc),
using impress;
c. the weekly cash flow, using calc.
Feedback Forum: Students are invited to share their
final impressions on the module and say good-bye to
other students and to the tutor.
Evaluation Questionnaire: Students are asked to fill in
a semi-structured questionnaire evaluating the
following dimensions of the received training:
learning outcomes; role and career development;
overall satisfaction with the module.
Students and tutors The final exam counts for
50% of the final note. This
50% should be attributed on
the bases of the following
criteria: coherence with the
learning inputs (15 points),
valorization of ICT based
methodologies/tools (15
points), innovativeness and
creativity (10 points), quality
of the presentation (10
points).
The remaining 50% is
attributed on the basis of
participation during the
training (tasks submission
and forum interventions).
VET4e-inclusion project
43
Module 7
Developing a digital photography
workshop in the telecentre
Position within the curriculum:
Stage 2 (consolidation step) / Category 4 (Competence in the use of
technical tools as a basis and support of methodological actions)
Profile entrance of students:
Minimum of 4 months of professional or volunteer
experience accompanying different types of users
and especially vulnerable groups (in a training /
guidance and / or socio-animation contexts)
and / or
Minimum of 4 months of professional or volunteer
experience as e-facilitator in a telecentrecentre
Knowledge:
Basic knowledge of telecentres
Basic knowledge of social animation and / or professional guidance processes
Basic knowledge of digital photography and photography material and softwares
Basic knowledge of digital photography uses in relation to web 2.0 tools
Skills:
Technology standard skills (office,
multimedia)
Relationship skills in dealing with
the groups involved
Relationship skills in creating a
group interaction around a
creative activity
Competences:
Planning activities for key groups.
Animating collective and individual creative
activity workshops (face to face and / or at
distance)
Output Profile of students
Profile of e-facilitator for social inclusion facilitating
creative workshops with groups and / or individuals
in the telecentre
(through facilitating access of various publics,
including vulnerable groups, to creative activity
resources –notably with web 2.0, the e-facilitator is
actively involved in missions of social inclusion using
ICT sources and advanced web 2.0 tools)
Knowledge:
Knowledge of basic and advanced digital photography material and techniques to take good
pictures
Knowledge of web 2.0 – based techniques for sharing digital photographies on line and
taking part in photoblogging communities
Knowledge of web 2.0 – based techniques and softwares for retouching pictures
Knowledge of the added value of social media for promoting inclusion of publics through a
creative activity, and more specifically, vulnerable target groups
Knowledge of the local environment for connecting the work done in the telecentre to local
realities and needs (i.e. developing photo-creation activities to enhance local democratic
participation)
Skills:
Acquire skills in the course of
collaborative work.
Management skills of essential
technological tools.
Organization skills for developing
creative workshop
Skills in dealing with groups of
potentially different level of ICT
knowledge
Competences:
Management skills of essential technological
tools.
Management of basic digital photography
tools, notably by using web 2.0 on-line tools
Management of web 2.0 tools for facilitating
digital photography uses of various target
groups
Organizing photo workshops in the telecentre,
from basic to advanced levels
VET4e-inclusion project
44
Title of the
Learning Units
Duration Learnings aims/outcome Learning
Contents
(What is taught)
Pedagogies and Educational Methods Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Opening
Module Unit
Introducing
Module
1 week
available
1 hour of
mandator
y
minimum
dedication
 To familiarize with the
learning environment:
 To familiarize with the
platform and its functions;
 To understand the
overall objectives, contents
and methodology of the
module;
 To understand tutor's
role;
 To understand the
evaluation system and
criteria.
 To use the
platform
 To complete
student personal
profile;
 To manage
interactive tools;
 To manage the
communication with
students and tutor.
We offer the students the opportunity to
access the platform a few days before the start
of the module in order to provide him/her with
relevant information about the course and
module in order to facilitate his / her access to
resources and participation in the module
activities in the following units.
The only mandatory tasks of the Introduction
Unit are: Introduce oneself in the
“Introduction Forum”; Complete ones personal
profile; Consult the Bulletin Board and the
Introduction forum to read the messages from
the tutor/other students.
Module presentation:
Module objectives
Module contents
Module target
Module structure and methodology
Personal and technical requirements
Tutorship of the Module
Forums
Module plan
Information about how to use the
platform:
Short guide about the Use of Moodle
platform.
Guide to retouch the photo of your profile.
Bulletin board and news
Forum presentation of the students and
tutors
Informative and participative forums:
o The Bulletin Board (tutor’s informative
messages only)
o The Introduction Forum (interactive
introduction of students and tutor)
Students and
tutors
No evaluation is foreseen.
The Introduction Unit is a start-up
unit aimed at facilitating the
learning process that starts with
Unit 1.
It is also an instrument to check
students' motivation in order to
prevent drop-outs. Therefore,
selected students that don't access
the platform during the Introduction
week are substituted with enrolled
students in the waiting list.
VET4e-inclusion project
45
Unit 1:
Taking pictures
5 hours of
mandator
y
minimum
dedication
.
1 week
 To know about the main
functions of digital photo
cameras
 To acquire knowledge on
the essential concepts of
digital photography so as to
take quality pictures
 To learn about
the characteristics
of digital cameras
and to understand
the mechanisms
useful to improve
the quality of the
pictures
 To familiarize
with the lexical field
of photography and
to understand how
to play with the
cameras’
parameters to
improve the quality
of the pictures
 To learn about
the commonly used
techniques so as to
make quality
pictures
The students are here offered the possibility to
familiarize with the essential aspects of a
digital camera. This first technical part
provides the students with some useful
concepts and techniques to understand how
the camera works.
In a second time, the students get familiar with
technical terms and functions of the camera
that may improve their capacity to take good
pictures (speed, light, etc.).
Also, the students deal with a more practical
part of the digital photography by studying
basic techniques commonly used by
professionals to take good pictures (tips and
rules to apply when they use the camera).
The exercise of the unit 1 gives the students
the chance to put into practice their new
knowledge on photo techniques since they
have to take their own pictures and comment
on it through the forum to discuss this first
exercise.
Finally, the students have the possibility to go
deeper in the subject by consulting links to
photo blogs and on-line tutorials helping them
composing a picture and have a critical eye in
front of an image.
Reading 1 : “Prenons quelques photos”
[The reading is made of 2 parts, from which
one is about the technical components of a
digital photo camera and the types of
digital cameras available. In this part the
students get familiar with some technical
terms and functions that may improve their
capacity of taking good pictures. The second
part is about the parameters and
techniques to play with so as to get the
ideal picture. Some tips are offered to the
trainees].
URL (integrated in the reading as an
optional reading): “Wikibook Photographie”
[The link drives the students to a wikibook
dedicated to photography].
------------
Extra URL:“Tutoriel sur la composition d’une
image”
[Tutorial on the picture composition]
Extra URL: “Tutoriel pour comprendre,
analyser et savoir critiquer une photo”
[Tutorial to know how to understand,
analyse and criticize a photo]
Extra-Resource: Glossary of technical terms
Students and
tutors
 Task 1: Let’s take pictures.
The students take pictures according
to the tips indicated in the exercise’s
instructions.
 Task 2: Participation to the forum:
feedback on the exercise
 Task 3: Participation in the
discussion forum “Les techniques de
photo: quelle initiation pour les
publics du centre multimédia?”
[Discussion on “photography
techniques: how to initiate the
publics of the telecentre?”]
Self Evaluation Unit 1
VET4e-inclusion project
46
Title of the
Learning Units
Duration Learnings aims/outcome Learning
Contents
(What is taught)
Pedagogies and Educational Methods Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Unit 2:
What to do
with the
pictures?
5 hours of
mandator
y
minimum
dedication
.
1 week
 To know about the
possibilities offered to treat
your pictures
 Discover Internet web sites
that offer on-line sharing of
pictures
• To learn to
storage the digital
pictures
• To learn how to
enjoy the pictures
• To learn how to
share pictures on-
line by creating a
Flickr account and
familiarizing with
this web 2.0 tool
The unit focuses on the ways to take best
advantage of one’s digital pictures.
The students learn about the different
techniques used to download images from the
camera to the computer, as well as on various
types of devices / supports (CD Rom, USB stick,
external disc, etc.). At this level, they can learn
in a practical way the possibilities to save their
pictures under an appropriate format (see
extra resources).
The students familiarize with ways to storage
their own pictures: different possibilities are
presented.
Finally, the students learn about a new way to
enjoy one’s picture, by discovering a web 2.0
on-line tool that enables to share the pictures
on-line. The students learn about this on-line
tool called Flickr and learn how to create their
own online Flick account.
Reading 1: “Que faire avec ses photos?”
[What to do with our pictures? The reading
presents all the existing ways to download,
storage, develop and share the pictures]
------------
Extra-URL 1: Picasa application
Extra-URL 2: Tutorial on the formats to save
pictures on the computer
Extra-URL 3: Tutorial to lighten the weight
of pictures
Extra-URL 4: Panodia application to make
photo creation
Students and
tutors
 Task 1 : Exercise : Create a
Flickr account
 Task 2 : Exercise : Upload
your pictures on Flickr
 Task 3 : Exercise : Create an
Internet address to access your
Flickr account and pictures
 Task 4 : Forum : « what to do
with our pictures ? »
Self Evaluation Unit 2
VET4e-inclusion project
47
Title of the
Learning Units
Duration Learnings aims/outcome Learning
Contents
(What is taught)
Pedagogies and Educational Methods Techniques, Instruments and
Materials
Learning
Unit Actors
(Who)
Evaluation
Unit 3
Retouching
pictures
5 hours of
mandator
y
minimum
dedication
.
1 week
 To acquire elementary
knowledge on retouching
picture
 To learn most usable
techniques for retouching
pictures
 To learn how to use a
software of on-line pictures
edition
 To learn what the
commonly used
filters to modify and
correct pictures are
 To learn about an
on-line tool that
retouches pictures:
Picnik.
 To learn how to
create interesting
effects and / or
transform pictures
in an entertaining
way
 In this unit, students are making a step
ahead and discover how to modify the pictures
they took in the previous units:
 The students learn about technical terms
related to the field of retouching pictures.
They also get to know some softwares and
applications, amongst which Picnik.
 The students learn how use Picnik, an on-line
free editing tool that proposes many filters to
apply on the images.
 The students can discuss together on the
possibility to use the retouching tool in the
telecentre for initiating their publics on how to
retouch pictures
Reading 1: “Retoucher des photos”
[Retouching pictures]
----------
Extra-Video: Apply filters on your Picture
(with Photo Filtre)
Extra-Resource: Download Photo-filtre
Extra-Resource: Filters with Gimp
Students and
tutors
 Task 1: Exercise: Retouch
pictures
 Task 2: Forum: activities of
retouching pictures in the
telecentre
 Task 3: Wiki : collect
resources / tutorials useful to
apply filtres on your pictures
Self Evaluation Unit 3
VET4e-inclusion project
48
Unit 4:
Sharing
pictures
5 hours of
mandator
y
minimum
dedication
.
1 week
 To discover web 2.0
environment of existing
communities in matter of
digital photography
 To know more about
the advantages of taking part
in on-line communities
 To learn how to share
pictures on-line
 To learn what the
possibilities offered to the
users so as to publish their
pictures on-line are
 To learn how to plan
and animate a digital
photography workshop
 To familiarize with
photobloggers’ communities
as web 2.0 tools to increase
the attractivity of digital
photography
 The students are
applying all the knowledge
and skills he or she acquired
from the previous units:
 They reach a level
where they can learn to share
their work on-line and
participate in photobloggers
communities.
 The possibilities offered
enable the students to
organize their pictures in
coherent albums and
collections, using web 2.0
tools such as tags and
geotags.
 They are planning
activities of photo workshops
adapted to the publics of the
telecentre and come up with
a workshop programme.
 They discover the
possibilities offered to protect
their photos using an
adequate licence (see extra-
resource).
Reading 1: “Le partage des photos” [Sharing
pictures]
-------------
Extra-resources 1: Link to an on-line article
“Les photographes n’ont pas encore
apprivoisé Internet” [“Photographs haven’t
familiarized with Internet yet”].
Extra-resources 2: link to the Creative
Commons web site.
Students and tutors  Task 1: Exercice: search on Flickr
 Task 2: Exercise: join a group on
Flickr
 Task 3: Forum: how to
programme a digital photography
workshop in the telecentre
 Task 4: wiki: collect some useful
resources to prepare a digital
photo workshop
Self Evaluation Unit 4
VET4e-inclusion project
49
Title of the
Learning Units
Duration Learnings aims/outcome Learning Contents
(What is taught)
Pedagogies and
Educational Methods
Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Closing Unit:
10 days
available
1 hour of
mandatory
minimum
dedication
To assess knowledge/skills
acquired
The final exam is a 12
questions quiz which is to be
complemented in a limited
amount of time (12 minutes).
The questions asked concern
the 4 units of the course.
 Final exam
 Feedback forum
 Evaluation Questionnaire
Students and tutors  Task 1: Final Exam
 Task 2: Final forum
 Task 3: Evaluation
questionnaire
VET4e-inclusion project
50
Module 8
Facilitating job seeking in the
telecentre
Position within the curriculum:
Stage 2 (consolidation step) / Category 3 (Methodological skills in the
development of transversal projects)
Profile entrance of students:
Minimum of 4 months of professional or volunteer
experience accompanying vulnerable groups in a job
guidance process and / or
Minimum of 4 months of professional or volunteer
experience as e-facilitator in an on-line centre
Knowledge:
Basic knowledge of on-line centres
Basic knowledge of classic job seeking and / or professional guidance processes
Basic knowledge of job market and employment policies at local, regional and
national levels
Basic knowledge of employment characteristics on the territory where he / she
operates
Skills:
Technology standard skills (office,
multimedia)
Relationship skills in dealing with the
groups involved
Relationship skills in approaching relevant
local actors promoting employment
Competencies:
Standard on-line centre management skills.
Planning activities for key groups.
Animating training sessions (face to face and /
or at distance)
Output Profile of students
Profile of e-facilitator for social inclusion facilitating
job seeking pathway of groups and / or individuals in
the on-line centre
(through the accompaniment of job seekers in an
employability improvement path –notably with web
2.0, the e-facilitator is actively involved in missions of
social inclusion using ICT sources and advanced web
2.0 tools)
Knowledge:
Knowledge of basic and advanced job seeking and / or job guidance tools and
processes
Knowledge of web 2.0 – based techniques of job guidance
Knowledge of the added value of social media for promoting employability of job
seekers and more specifically, vulnerable target groups
Knowledge of the local environment for connecting the work done in the on-line
centre to local realities, and existing expertises and actors.
Skills:
Acquire skills in the course of collaborative
work.
Management skills of essential
technological tools.
Skills in dealing with groups of potentially
different level of ICT knowledge
Competences:
Management skills of essential technological
tools.
Management of basic job research tools
Management of web 2.0 tools for facilitating
employability improvement
Planning job guidance workshops in the on-
line centre, from basic to advanced levels
VET4e-inclusion project
51
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Opening
Module Unit
Introducing
Module
1 week
available
1 hour of
mandator
y
minimum
dedication
 To familiarize with the
learning environment:
 To familiarize with the
platform and its functions;
 To understand the
overall objectives, contents
and methodology of the
module;
 To understand tutor's
role;
 To understand the
evaluation system and
criteria.
 To use the platform
 To complete student
personal profile;
 To manage interactive
tools;
 To manage the
communication with
students and tutor.
We offer the student the opportunity to access the
platform a few days before the start of the module
in order to provide him/her with relevant
information about the course and module in order
to facilitate his / her access to resources and
participation in the module activities in the
following units.
The only mandatory tasks of the Introduction Unit
are: Introduce oneself in the “Introduction
Forum”; Complete ones personal profile; Consult
the Bulletin Board and the Introduction forum to
read the messages from the tutor/other students.
Module presentation:
Module objectives.
Module contents.
Module target.
Module structure and methodology
Personal and technical requirements
Tutorship of the Module
Forums
Module plan
Information about how to the use
the platform:
Short guide about the Use of Moodle
platform.
Guide to retouch the photo of your
profile.
Bulletin board and news
Forum presentation of the students
and tutors
Informative and participative forums:
o The Bulletin Board (tutor’s
informative messages only)
o The Introduction Forum (interactive
introduction of students and tutor)
o
Students and
tutors
No evaluation is
foreseen.
The Introduction Unit is
a start-up unit aimed at
facilitating the learning
process that starts with
Unit 1.
It is also an instrument
to check students'
motivation in order to
prevent drop-outs.
Therefore, selected
students that don't
access the platform
during the Introduction
week are substituted
with enrolled students in
the waiting list.
VET4e-inclusion project
52
Unit 1:
Defining,
assessing and
diagnosing the
situation
5 hours of
mandator
y
minimum
dedication
.
1 week
 To think about the issue of
job seeking and / or
guidance in the on-line
centre
 Getting familiar with
assessment tools that will be
used with the users and
identify assets of the on-line
centres for facilitating job
research
 To acquire necessary
competences to use
assessment and diagnosis
tools
 Defining the concept of
“employability” and its use in a
context of on-line job research
 Identifying the assets of the
on-line centre to promote
employability and its role in the
local environment
 Defining the role of the e-
facilitator (what he / she is/is not)
 Evaluating the user’s
situation when he / she enters
the on-line centre
 Identifying the resources
available in the local
environment to promote
employability
 Identifying of the possible use
of the assessment tool, notably
considering the diverse
typologies of job seekers
publics of the on-line centre
A prior definition of the term “employability”
is needed to better appropriate the tools, the
methods and the whole process of “facilitating
job seeking in the on-line centre”.
It is offered to the students an individual task
of thinking and awareness rising on key aspects
of employment in the local environment.
This first task enables each student to
professionalize the process of facilitating job
seeking in the on-line centre (task / exercise:
draft a report on the environment where she /
he operates).
Then the students are gradually invited to
bring their reflection up to the group by
collecting resources available at local, regional
and national level related to employability
improvement (contribution to a wiki).
The gradual and logical methodology of this
unit enable the students to define their own
role (role of e-facilitator) in relation to the
promotion of employability and the facilitation
of job seeking for groups and / or individuals in
the on-line centre.
Finally, the students are provided a key tool
for diagnosticating the user’s level and ability to
get to know and use basic and / or advanced
tools for job search and employability
improvement, through the discovery of the ICT
Barometer for employability.
Reading 1 : Définir, évaluer et
diagnostiquer l’environnement
Reading 2 : Le point de départ de
l’utilisateur
Reading 3 : Le rôle de l’animateur
multimédia
URL: Baromètre TIC
------------
Extra Reading: L’employabilité : de la
politique de l’emploi à la gestion des
compétences
Extra URL: Test d’orientation
Extra Reading: Questions pour
identifier le point de départ de
l’utilisateur
Extra Reading: Guide pour agir Pole
Emploi – Comment élaborer des
projets professionnels
Extra Resource : Forum on technical
vocabulary
Students and
tutors
 Task 1: Write a report
on the local
environment of the on-
line centre in relation
with employment
 Task 2: Discover, try
for oneself the ICT
Barometer for
employability and
share your views on the
Forum
 Task 3: Participation in
the discussion forum
“Le Centre multimédia,
l’Animateur et
l’Utilisateur”
 Task 4: Compile
available relevant
resources (links) in
terms of employability
in your environement
and add it on the wiki.
Self Evaluation Unit 1
VET4e-inclusion project
53
Unit 2:
Developping
employability:
some basic
resources
5 hours of
mandator
y
minimum
dedication
.
1 week
 Getting familiar with
tools that users will
need in order to
develop basic digital
competences
• To learn to define some
objectives with the users and
to refine the profile of the
users as job seekers, using
appropriate tools
• To deal with the basic tools:
CV and cover letter.
Distinguish different kinds of
CV for different uses. Study
cover letters. Study of the
content they both should
provide.
• To facilitate an initiation to
office tools for the users to
create a CV and a cover letter
(with Microsoft Office and
Linux)
• To put the user in situation
by making a fake job
interview
The unit focuses on dealing with the essential
documents the users will have to use to get ready for
seeking for a job: CV, cover letter, and the interview.
Before dealing with these resources, the students
learn to define objectives and of professional profiles
with the users
The students are, in this unit, working on a programme
for basic training of the users for their employability.
Using appropriate tools, they learn to apply methods
and advices in a step by step pathway, personalized
depending on the public. It also integrates the
resources available on-line for employability in the
local context.
They finally get familiar with job interviews simulation
techniques, as the ultimate step of the unit training.
Reading 1: Ressources personnelles
élémentaires pour la recherche
d’emploi
Reading 2: Conditions requises et
connaissances élémentaires pour la
recherche d’emploi sur Internet
Reading 3: La lettre de motivation
Reading 4: Le Curriculum Vitae – CV
Reading 5: L’entretien d’embauche
------------
Extra-Reading 1: Formation Windows
– créez votre premier document Word
7
Extra-Reading 2: Principes du
traitement de texte sous Linux
Extra-Resources: Exemples et trames
de CV et lettres de motivation
Extra-Resources: Exemples de lettres
de motivation (assistante
commerciale)
Extra-Resources: Exemples de CV
Extra-Resources: Trame de CV
chronologique inversé
Extra-Resources: Trame de CV
thématique
Extra-Resources: Trame de CV
européen
Extra-Resources: Exercice de
simulation pour l’entretien
d’embauche. Jeu de rôle
Extra-Resources: Glossaire de termes
Students and
tutors
 Task 1 : elaborate
a programme of basic
training for
employability
 Task 2 : Forum :
feedback on the exercice
done
 Task 3 : Wiki : List
of resources for
improving abilities and
competences of the
users
 Task 4 : Forum :
activities promoting
basic employability
Self Evaluation Unit 2
VET4e-inclusion project
54
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods Techniques, Instruments and
Materials
Learning Unit
Actors (Who)
Evaluation
Unit 3
Internet
resources for
employability
5 hours of
mandator
y
minimum
dedicatio
n.
1 week
 To manage efficiently
resources for job research on
Internet
 To discover advanced
resources and web 2.0 –
based tools for on-line job
seeking.
• To facilitate both passive
and active activities for users
to search for a job on
Internet
 To manage an on-line job
research data base
 To facilitate and to guide
users in uploading their CV
on professional networks
 To facilitate the access to
job offers using RSS flux
(syndication of contents)
 To manage the users’
digital identity and raise
awareness on this topic
 The students are dealing with advanced
techniques and tools for managing job research in
the on-line centre.
 By manipulating job data bases and on line
professional networks, they are provided with a
supplementary level of job research in relation
with ICT.
 The Web 2.0 dimension of the job research is
analyzed in this unit: that means that students get
familiar with concepts of RSS flux / syndication of
contents, but also, respect and protection of users’
digital identity.
 The Web 2.0 tools are integrated in the
employability resources of their on-line centre.
Reading 1: Ressources et banques
d’emploi
Reading 2: Réseaux sociaux
professionnels
Reading 3: l’identité numérique
URL: un jeu en ligne pour alerter sur
l’importance de l’identité numérique
----------
Extra-Reading: Linux et les outils
Internet
Extra-Reading: La syndication des
contenus
Extra-Reading: Présentation de Gmail
Extra-Reading: Syndication d’offres
d’emploi sur Keljob
Extra-Reading: S’inscrire sur les
réseaux sociaux et partager les outils
Web 2.0
Extra-URL: Aide pour surfer sur le net
avec Internet Explorer
Extra-URL: CV créatifs
Students and
tutors
 Task 1: make a
guide for the users to
know how to start a job
research on-line
 Task2: Forum:
feedback about the
exercice
 Task 3: Wiki :
collect advanced
employability resources
on Internet
 Task 4: Forum:
discussion on digital
identity
Self Evaluation Unit 3
VET4e-inclusion project
55
Unit 4
Monitor the
process: organize
a job research
workshop in the
on-line centre
5 hours of
mandator
y
minimum
dedication
.
1 week
 To organise job research
workshops
 To manage a data
base for job research
 To manage resources for
job seeking (studied during
the previous units) to think of
a scheduled session of job
research
 To manage identified
steps for an optimized job
research to plan a job
research workshop
 To animate a job
research workshop and plan
follow up of users
 The students are
applying all the knowledge
and skills he or she acquired
from the previous units:
 They collect all the
datas and resources available
in a “cabinet for
employability” and put it in
shape by creating a practical
guide
 They are planning
activities of guidance of the
users by working on the
organization of job research
workshops
 They learn how to
integrate follow up and
evaluation, using appropriate
tools, of the users’ pathway.
Reading 1: « L’armoire employabilité »
Reading 2: Guide des bonnes pratiques de la
recherche d’emploi
Reading 3: Ressource intéressante: atelier
en 7 étapes pour faciliter la recherche
d’emploi en centre multimédia
-------------
Extra-resources 1: Trame de planning
Extra-resources 2: Fiche de suivi
Students and tutors  Task 1: Exercice: collect resources
to be used for the « employment
cabinet » of your on-line centre
 Task 2: Forum: feedback about
the exercice
 Task 3: Forum: working on
methodologies to be implemented
in order to promote employability
in the on-line centre.
Self Evaluation Unit 4
Closing module
Unit
Forum and
evaluation
questionnaire
10 days
available
1 hour of
mandator
y
minimum
dedication
 To assess knowledge/skills
acquired The final exam is a 12
questions quiz which is to be
complemented in a limited
amount of time (12 minutes).
The questions asked concern
the 4 units of the course.
 Final exam
 Feedback forum
 Evaluation Questionnaire
Students and tutors
 Task 1: Final Exam
 Task 2: Final forum
 Task 3: Evaluation
questionnaire
VET4e-inclusion project
56
Module 9
Planning a digital literacy
workshop
Position within the curriculum:
Stage 1 (entrustment) / Category 2 (Methodological skills in working with
groups of participants)
Profile entrance of students:
Professional profile low, up to 4
months being an e-facilitator.
Knowledge:
Knowledge of the telecenter and its users.
Skills:
Technology standard skills (office, multimedia)
Relationship skills in dealing with the groups involved.
Competencies:
Standard telecenter facilitator skills.
Skills in ICT technologies and tools
Output Profile of students:
Profile of a facilitator.
Knowledge:
Learning the concept of digital literacy and digital divide.
Learn what a telecentre and what is its mission.
Diagnose learning needs. Mark objectives. Workshop
tools for digital literacy and assessment.
Skills:
Acquire skills of essential technological tools.
Acquire skills to organize optimal courses.
Competences:
Basics of our work in the telecenter and the elements it is based.
Empowerment of the essential concepts of a facilitator.
VET4e-inclusion project
57
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
Evaluation
Opening
Module Unit
Introducing
Module
1 week -Acquire knowledge and
abilities in managing the
learning environment
-To use of the platform
-To complete student personal
profile;
-To manage interactive tools;
-To manage the communication
with students and tutor.
We offer to the student the opportunity to
access to the platform a few days before the
start of the module in order to provide
him/her relevant information about the
course and module in order to facilitate the
further development of learning units.
The only mandatory tasks of the Introduction
Unit are: Introduce oneself in the
“Introduction Forum”; Complete ones
personal profile; Consult the Bulletin Board
and the Introduction forum to read the
messages from the tutor/other students.
Modules presentation:
Goals of the module.
Contents of the module.
Target of the module.
Module structure and methodology
Personal and technical requirements
Tutorship of the Module
Forums
Module plan
Information about how to the use of
the platform.
Short guide about the Use of Moodle
platform.
Guide to retouch the photo of your
profile.
Bulletin board and news
 Forum presentation of the students
and tutors
Students and
tutors
It isn’t an evaluation
unit.
It serves to connect
students to the training
process.
VET4e-inclusion project
58
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
Evaluation
Unit 1:
Digital literacy
and
telecenters
5 hours of
mandatory
minimum
commitment.
1 week
- Understand what is the
digital divide and how to
translate that global concept
to the local reality of the
telecenter.
- Understand the concept of
digital literacy.
- To know what is a digital
literacy workshop.
-Learn the concept of digital
literacy and digital divide.
- Learn what a telecenter and
what is its mission.
- Learn key concepts of the
facilitator's job: digital
inclusion, dinamization,...
-Bringing the concepts learned
to the reality of each telecenter
and community.
It offers the student a global definition of the
concept of digital divide, digital literacy and
telecenter. Once these global concepts are
assumed, we will make students to bring it
closer to the reality they live in their
telecenters.
To carry out this exercise, we propose the
student to share with the rest of students his
own definition of the concept through the
forum. With the contribution of the
definitions of all group members and the
help of the facilitator, we will create a
definition of global concepts and see how
they can be adapted to the reality of the
students.
As a task of the unit, students the tutor will
ask students to make a proposal of 10 tools
to work with digital literacy in their
telecenters.
Reading: El reto de la alfabetización
digital.
Reading: ¿Alfabetización digital =
Conocimientos técnicos?
Reading: Estrategias y elementos de
Alfabetización Digital
Reading: ¿Pero qué hacemos en un
taller de Alfabetización Digital?
------------
Extra Reading: ¿Qué es la brecha
digital?
Extra Reading: Las cifras: ¡una
pincelada!
Extra Reading: : ¿Cómo superar la
brecha digital?
Extra Reading: ¿Qué es un telecentro?
¿Qué se puede hacer en él?
Extra Reading: Las tres líneas de
trabajo
Extra Reading: ¿Quiénes son los
protagonistas de un telecentro?
Extra Reading: List of resources
collected in Task "10 proposals“
Extra forum: Unit 1: Doubts forum.
Students and
tutors Task 1 - Forum: Share
with the group your
definition of digital
literacy.
Task 2: 10 proposals for
digital literacy tools.
Self Evaluation Unit 1
VET4e-inclusion project
59
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
Evaluation
Unit 2:
Analyze the
context and
define
objectives
5 hours of
mandatory
minimum
commitment.
1 week
-Understand the importance
of planning the training,
make a diagnosis and
defining the objectives in a
consistent manner based on
identified needs.
- Learn to make a diagnosis of
the needs and characteristics of
the target.
- Learn how to define the
objectives of the workshop in a
manner consistent with the
previously identified needs.
The unit focus on enlarging the acquisition of
Knowledge about making a specific diagnosis
to identify needs of the users of a Telecenter.
We will help students to learn to do that,
analysing a practical case. Tutor will ask to do
that as a first task.
This exercise Will help students to learn to
define the objectives of the workshop in a
manner consistent with the previously
identified needs.
The tutor Will suggest to deliver a second
task the student WHERE Should Develop the
design of a Digital Literacy Workshop.
Students will have the support of some
written material, apart from the forum that
will be moderated by the tutor through the
Moodle platform.
Reading: La importancia de analizar el
contexto.
Reading: Análisis de las características
de los participantes.
Reading: El entorno en el que
desarrollamos nuestro taller de
alfabetización.
Reading: ¿Qué es un objetivo?
Reading: Cómo definir los objetivos.
Reading: ¡Que cansancio! ¿Es necesario
formular los objetivos?
Reading: ¿Cómo debe redactarse un
objetivo?
Reading: Ejemplo de objetivos de un
taller de alfabetización digital.
------------
Extra forum: Unit 2: Doubts forum.
Students and
tutors
Task 1 - Forum: Análisis
de un caso práctico.
Task 2: Primeros pasos
para diseñar el Taller de
Alfabetización Digital:
¿A quién nos
dirigiremos? ¿Cuáles
son nuestros objetivos?
Self Evaluation Unit 2
VET4e-inclusion project
60
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
Evaluation
Unit 3
To plan the
Workshop.
The Eassy
Computer tool.
5 hours of
mandatory
minimum
commitment.
1 week
-Learning to know the
aspects that must be taken
into account when planning
a digital literacy workshop
(materials, timing, content
...)
-Knowing the resource Easy
Computer as a tool for
digital literacy work with
telecenter users.
-Learn to plan a workshop on
digital literacy.
-Learn to use the tool Easy
Computer as a teaching support
material of digital literacy
workshops.
-Learn and gain confidence
with the uses and applications
of Easy Computer in a
classroom.
Tutor proposes to students work with the
Easy Computer tool in order to know how it
works, how can they use it with final users
and how useful are learning-sheets of Easy
Computer.
After haven seen and used this tool, tutor
will ask students to discuss about the criteria
of a good methodological organization of
digital literacy workshop in a Forum.
After that and using as a base this tool, each
student will design and develop and design a
plan and structure the organization of a
workshop on digital literacy.
Students will have the possibility to share
their tasks with the rest of students through
an specific forum.
Students will have the support of some
written material, apart from the forum that
will be moderated by the tutor through the
Moodle platform.
Reading: ¿Qué es el Ordenador
Práctico?
Reading: ¿Para qué sirve el Ordenador
Práctico?
Reading: ¿En qué consiste el
Ordenador Práctico?
Reading: ¿Cómo funciona el Ordenador
Práctico?
Reading: ¿Cómo utilizo el Ordenador
Práctico en el Telecentro?
Reading: Superando límites
------------
Extra forum: Unit 3: Doubts forum.
Extra forum: Let’s share Task 2.
Students and
tutors
Task 1 - Forum: Criteria
for methodological
organization of digital
literacy workshop.
Task 2: Planning and
structuring the
organization of a
workshop on digital
literacy.
Self-Evaluation Unit 3
VET4e-inclusion project
61
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational Methods
(How)
Techniques, Instruments and
Materials
Learning
Unit Actors
Evaluation
Unit 4
The
evaluation, as
a GPS of
facilitators.
5 hours of
mandatory
minimum
commitment.
1 week
- Understand the
importance of evaluation as
a system to improve future
applications.
-Learn the phases of the
evaluation:
a) Prior to the workshop at
the telecentre, to detect the
starting point: initial
assessment and diagnosis.
b) During the workshop to
see where we go and adapt if
necessary.
c) After the workshop to see
if we have achieved what we
have designed.
- Get the tools and strategies
to evaluate the activities.
The unit tries to make see students how
important is the evaluation during a training.
This is why the tutor will make students to
suggests and discuss about dynamics of
evaluation in a Forum.
The second task that will be asked to do is to
design a evaluation questionnaire in order to
see how different could be a evaluation
developped at the beginning of a training, a
midium or a final evaluation.
Students will have the possibility to share
their tasks with the rest of students through
an specific forum.
Students will have the support of some
written material, apart from the forum that
will be moderated by the tutor through the
Moodle platform.
Reading: Fases de la Evaluación
Reading: Estrategias de la Evaluación
Reading: Instrumentos y dinámicas
Reading: Cuestionarios en la web
------------
Extra Resource: Example of evaluation
questionnaire.
Extra forum: Unit 3: Doubts forum.
Students and
tutors
Task 1 - Forum:
Dynamic evaluation for
workshops and courses.
Task 2: Design an
evaluation
questionnaire.
Self-Evaluation Unit 4.
VET4e-inclusion project
62
Closing module
Unit
Forum and
evaluation
questionnaire
1 week Become aware of the
achievements of the module
Evaluation Forum.
Evaluation Questionnaire.
Students will be proposed to answer a
questionnaire evaluation of the module and
to participate in a dialogue-forum evaluation.
Evaluation Forum and Good bye.
Evaluation Questionnaire.
Final Exam.
Students Final Exam
VET4e-inclusion project
63
Module 10
Telematic Procedures - facilitating
access to e-services
Position within the curriculum:
Stage 1 (entrustment) / Category 3 (Methodological skills in the
development of transversal projects).
Profile entrance of students:
Professional profile low, up to 4 months being an e-
facilitator.
Knowledge:
Knowledge of the telecenter and needs of its users.
Skills:
Technology standard skills (use of word processor,
multimedia and Internet browsing)
Good relation dealing with groups: good listener,
empathetic,…
Competencies:
Standard telecenter facilitator skills.
Skills in ICT technologies and tools.
Output Profile of students:
Profile of a facilitator.
Knowledge:
It's about learning to be developed to facilitate the
incorporation of citizens to practical uses of the
Internet, introducing personal value to the use
made of the network.
Online procedures arise as enabling tools to the
user's life and also as a channel for community
participation.
Skills:
Being able to realize telematic transactions using
telematic media that are at their disposal.
Competences:
-To identify the knowledge needed to use telematics.
-To identify the basic steps to use easy telematics procedures in our
community.
-To know the characteristics of users of the telecentre.
-To know to identify the role of telecenters in telematics.
-Understand the legal framework in which telematics are realized.
-Know the basic tools of telematic procedures.
-To learn to disseminate telematic procedures.
VET4e-inclusion project
64
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and
Materials
Learning
Unit
Actors
Evaluation
Opening
Module Unit
Introducing
Module
1 week -Acquire knowledge and
abilities in managing the
learning environment
-To use of the platform
-To complete student personal
profile;
-To manage interactive tools;
-To manage the
communication with students
and tutor.
We offer to the student the opportunity to
access to the platform a few days before
the start of the module in order to provide
him/her relevant information about the
course and module in order to facilitate the
further development of learning units.
The only mandatory tasks of the
Introduction Unit are: Introduce oneself in
the “Introduction Forum”; Complete ones
personal profile; Consult the Bulletin Board
and the Introduction forum to read the
messages from the tutor/other students.
Modules presentation:
Goals of the module.
Contents of the module.
Target of the module.
Module structure and methodology
Personal and technical
requirements
Tutorship of the Module
Forums
Module plan
Information about how to the use of
the platform.
Short guide about the Use of
Moodle platform.
Guide to retouch the photo of your
profile.
Bulletin board and news
 Forum presentation of the students
and tutors
Students and
tutors
It isn’t an evaluation
unit.
It serves to connect
students to the
training process.
VET4e-inclusion project
65
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and
Materials
Learning
Unit
Actors
Evaluation
Unit 1:
Telematics.
5 hours of
mandatory
minimum
commitment.
1 week
-To know the concept of
telematics.
-To identify the knowledge
needed to use telematics.
-To identify the basic steps
tp use easy telematics
procedures in our
community.
-To know the
characteristics of users of
the telecentre.
-To know to identify the
role of telecenters in
telematics.
-Telematic procedures.
-Environment and community.
-Users and their needs.
-The role of a telecenter.
This unit will be able to define telematics,
identify the skills needed to carry them out,
identify those that are essential to our
environment, understand the specific
caracteristics of our telecentre users and
identify which role should play telecenters
here.
Students will have the support of some
written material, apart from the forum that
will be moderated by the tutor through the
Moodle platform. Students will have to
deliver two tasks.
Reading: Las gestiones
telemáticasReading: Nuestro
entorno.
Reading: Nuestros usuarios.
Reading: El papel del telecentro.
------------
Extra Reading: Yo rehuso a la
empresa y el profesional no
telemático.
Extra Reading: Obligatorio hacer
todos tus trámites por Internet.
Extra Reading: : Sólo el 30% de los
ciudadanos confía en...
Extra Video: Muchos ayuntamientos
facilitan...
Extra Reading: Datos recientes sobre
el uso...
Extra Reading: Los ayuntamientos
apenas permiten...
Extra Reading: Administración
electrónica municipal
Students and
tutors Task 1: Ventajas de
realizar gestiones
telemáticamente.
Task 2 - Forum: ¿Están
todas?
Self Evaluation Unit 1
VET4e-inclusion project
66
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and
Materials
Learning
Unit
Actors
Evaluation
Unit 2:
Security and
tools.
5 hours of
mandatory
minimum
commitment.
1 week
-Understand the basic
principles to managing
telematics with a minimum
of security.
-Understand the legal
framework in which
telematics are realized.
-Know the basic tools to do
telematic procedures in
public administration.
-Telematics procedures
(Certificate and digital
signature, Electronic ID.
Internet Payment,...).
-Safety and telematics
procedures
-National and European
legislation about security in
telematic procedures.
This unit will give to facilitators dynamic
information about the basic principles to
managing telematics with a minimum of
security taking into account the legal
framework.
The unit will offer some additional tools
and resources to complement the contents
given by on it.
This unit will also offer the possibility to see
some examples os telematic procedures.
Students will have the support of some
written material, apart from the forum that
will be moderated by the tutor through the
Moodle platform. Students will have to
deliver two tasks.
Reading: La seguridad y las gestiones
telemáticas.
Video: Certificado y firma digitales.
DNI electrónico.
Reading: Formas de pago por
Internet.
Reading: Normativa nacional y
europea.
------------
Extra Video: Pago de impuestos
Extra Video: Contraseñas seguras
Extra Video: Pishing
Extra Video: Paypal
Extra Reading: Guía de los derechos
de los usuarios TIC
Extra Reading: Seguridad en la red
Extra Reading: La Ley de Internet fácil
Extra Reading: Ley 11/2007, de
acceso electrónico de los ciudadanos
a los Servicios Públicos.
Students and
tutors Task 1: Consejos de
seguridad.
Task 2 - Forum: DNI,
certificados y firmas
Self Evaluation Unit 2
VET4e-inclusion project
67
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and
Materials
Learning
Unit
Actors
Evaluation
Unit 3
Directory of
telematic
procedures.
5 hours of
mandatory
minimum
commitment.
1 week
-To know basic steps on
telematic procedures.
-To know to create a
technical sheet to teach
telematics procedures.
-To create a directory of
telematic procedures.
-Key points of telematic
procedures.
-How to create a technical
sheet to teach telematics
procedures.
-Preparation and classification
of technical sheets on
telematics procedures to
facilitate the learning of future
end users.
Entering fully in telematics issues, students
will learn how to make technical sheets to
teach telematic procedures to facilitate the
learning of future end users.
Students will also prepare and classify
these technical sheets using a wiki, where
they will work this issue collaboratively for
the creation of an extensive directory of
telematic procedures.
Students Will Have the support of some
written material, apart from the forum and
the wiki that Will be moderated by the
tutor through the Moodle platform.
Reading: Puntos clave de una gestión
telemática
Reading: La ficha de una gestión
telemática
Reading: Ficha ejemplo
Reading: Gestiones telemáticas
básicas.
------------
Extra Reading: Manual de
supervivencia en la Administración
electrónica.
Extra Website: www.comopuedo.net
Extra Reading: Trámites y solicitudes
Extra Reading: Guía práctica
Extra Website: Portal ciudadano
Junta de Extremadura
Students and
tutors
Task 1 - Wiki:
Gestiones telemáticas
Task 2: Foro:
Atemporalidad de las
fichas
Self-Evaluation Unit 3
VET4e-inclusion project
68
Title of the
Learning Units
Duration Learnings
aims/outcome
Learning Contents
(What is taught)
Pedagogies and Educational
Methods (How)
Techniques, Instruments and
Materials
Learning
Unit
Actors
Evaluation
Unit 4
Dissemination
5 hours of
mandatory
minimum
commitment.
1 week
-To learn to disseminate
telematic procedures.
-Learn to disseminate
telematic procedures through
posters, blogs, websites, social
networks and also trought the
telecenter.
-Provide interactive spaces for
discussion and to share
experiences and knowledge
with among facilitators
(students) of the course.
In this unit, it will be given indications
about how to disseminate telematic
procedures apart from giving some
indications about which knowledges and
skills are necessary to do them.
Dissemination will be suggested to do
through posters, blogs, websites, social
networks, etc...
Students Will Have the support of some
written material, apart from the forum and
the wiki that Will be moderated by the
tutor through the Moodle platform.
Reading: Cómo hacer la difusión
------------
Extra Resource: Manual de compra
en línea.
Extra Resource: Cómo puedo
Extra Website: Tutoriales
interactivos. Diputaicón de Burgos.
Extra Resource: Decálogo seguridad.
Extra Resource: Piensa antes de
publicar.
Extra Resource: Coslada, Ciudad
Digital.
Students and
tutors
Task 1 : Un ejemplo de
difusión
Task 2- Foro:
Seguimiento
Self-Evaluation Unit 4.
Closing
module Unit
Forum and
evaluation
questionnaire
1 week Become aware of the
achievements of the
module
Evaluation Forum.
Evaluation Questionnaire.
Students will be proposed to answer a
questionnaire evaluation of the module
and to participate in a dialogue-forum
evaluation.
Evaluation Forum and Good bye.
Evaluation Questionnaire.
Final Exam.
Students Final Exam

Learning program design of vet4ei inclusion project

  • 1.
  • 2.
    VET4e-inclusion project 2 This documentdescribes the training curriculum for trainers of efacilitators that was developed during the VET4e-inclusion project. This curriculum is specialised in topics that concern the daily work of promoters of digital competences (e-facilitators). Some modules are dedicated to vulnerable target groups as visitors of telecentres; some focus on technical others on pedagogical skills. Experience shows that some modules or units require more processing time since the topics are very extensive. Therefore all units give a mandatory and a recommended time frame according to the experience of the pilot testing. Still, deadlines in which units have to be completed are recommended in order to finish a module in an appropriate time. During the project VET4e-inclusion the curriculum was tested in e-learning trainings. 1. Building a network culture 2. Auxiliary resources to optimize activities in telecentres / ICT centres / libraries 3. Telecentre sustainability 4. Promoting ICT for elferly at the telecentre 5. Promoting ICT with migrants at the ICT centre 6. Getting familiar with Office tools (Open/MS) for developing digital literacy workshops 7. Developing a digital photography workshop in the telecentre 8. Facilitating job seeking in the telecentre 9. Planning a digital literacy workshop 10. Telematic Procedures - facilitating access to e-services
  • 3.
    VET4e-inclusion project Module 1& 12 Building a network culture Position within the curriculum: Stage 3 (mature) / Category 1 (management and organization) Profile entrance of students: Professional profile midium, minimum of 4 months being an e-facilitator Knowledge: Knowledge of the telecentre. Knowledge in working with groups and in the management and implementation of the cross lines. Skills: Technology standard skills (office, multimedia) Relationship skills in dealing with the groups involved. Competencies: Standard telecenter management skills. Skills in planning activities for key groups. Skills in cross-project planning Output Profile of students Profile of a social network driver Knowledge: Knowledge of the importance of advancing towards in developing a culture of networking in social organizations and the key concepts in the way of building a network. Skills: Acquire skills in the course of collaborative work. Management skills of essential technological tools. Competences: Management skills of essential technological tools.
  • 4.
    VET4e-inclusion project 2 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Opening Module Unit Introducing Module 1 week Acquire knowledge and abilities in managing the learning environment Information about how to the use of the platform. We offer to the student the opportunity to access to the platform a few days before the start of the module in order to provide him/her relevant information about the course and module in order to facilitate the further development of learning units. The first action we ask to students is to introduce themselves to the group and read messages from other students. Modules presentation: Goals of the module. Contents of the module. Target of the module. Module structure and methodology Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to the use of the platform. Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news  Forum presentation of the students and tutors Students and tutors It isn’t an evaluation unit. It serves to connect students to the training process.
  • 5.
    VET4e-inclusion project 3 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1: Network spirit 5 hours of mandator y minimum commitm ent. 1 week Acquire knowledge about the significance of networking. Assess positively the reasons for incorporating the networking to the task of the telecenter. Knowing a possible route to build a network among associations. Learn about social movements and their use of networks. Networking elements. Reasons to incorporate a culture of network in the world of the social. Charting the way in the construction of associative networks. Linking social movements and the Network It is offered to the student an individual task of reflection and consciousness raising on key aspects of networking. Video "Three brothers" Likewise, the student must contribute with some news related to networks into forum of the course. Reading and vídeo: “Los tres hermanos” Introducing Forum where it is asked to the student to answer why he/she think he/she needs to do this course. It is also asked to write some relevant information about the organization where students work. Reading: Diez Razones para trabajar en red. URL: Web de Telecentre.org (english) URL: Web de Telecentre.org (español) Reading: El trabajo en red, tejer complicidades y fortalezas. Reading: Etapas en el camino de construcción de redes asociativas. URL: Crac, Centro de recursos de Cádiz y la Bahía Task: Analysis of experience in networking. Forum of news (for exclusive use of the tutor). ------------ Extra Reading: El deseo de enredarse y el peligro de liarse. Extra Reading: Movimientos sociales, globalización, educación popular y trabajo en red. Students and tutors Task 1: Analysis of experience in networking. Task 2: Introduce oneself into the Introducing Forum. Task 3: Participation in the Forum News. Task 4: Access to materials and readings. Self Evaluation Unit 1
  • 6.
    VET4e-inclusion project 4 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: Weaving the net 5 hours of mandator y minimum commitm ent. 1 week Acquire practical knowledge and skills in the use, management and use of a social network Know the online social networks and communities. Practice in building a community with a social tool. Knowing the importance of the blog. Make the community “Building a network culture” take contact with the community technology training in Grouply, created especially for that module. The module invite the students to interact in a real social network: • Build their own profile. • Participate in the spaces offered: open forums, discussion groups, etc.. • Use this space to share ideas, experiences and issues overexposed in the reading "Tareas fundamentales que hay que resolver en una red". • Use the spaces of participation to know what are the communities of practice and collaborative working groups on Internet. The unit focuses on making contact and enlarging the acquisition of knowledge about the use of social networks based in Grouply. Each student receives the indication to entry. Part of the activity is shifted from the Moodle training to the entertainment Social Network. Reading: Tareas fundamentales que hay que resolver en una red. Task: Virtual Communities. URL: Web Voluntariado.net URL: Web IRC Hispano – Chat. URL: Web Sindominio.net Reading: Utilizar la comunidad virtual Grouply. URL: Wikipedia: Virtual Community URL: Comunidad Virtual Redes Asociativas ------------ Extra-Video: ¿Qué es un blog? Extra-URL: sedic.es Extra-Reading: Taller de urbanidad y buenas maneras en los blogs. Students and tutors Task 1: To participate in the entertainment Social Network of the module, edit a profile, post into the blog, participate into the forum. Task 2: Access to the content and readings. Self Evaluation Unit 2
  • 7.
    VET4e-inclusion project 5 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 The potential 2.0 5 hours of mandator y minimum commitm ent. 1 week Understand the meaning of the concept web 2.0 Participate in the social network of the training module. List, explain and see examples of the main ICT tools. Reflect on the use of ICT tools in the field of social organizations. Develop an "ICT Toolkit" for networking. Enumeration, explanation and examples of the largest and most useful ICT tools. Use of ICT tools in the field of so-cial organizations. Development of a "kit of ICT tools" to work in a network. The unit aims to analyze useful resources for networking and building with them an essential toolkit 2.0. Tutor proposes to students building their own toolkit 2.0 and discuss about the process in the social network module. The intensity of work is distributed between e-learning platform and social network module. Video: La Web 2.0, la revolución social de Internet URL: Concept web 2.0 Wikipedia Reading: Herramientas y buenas prácticas para las organizaciones no lucrativas en el uso de las tecnologías de la información y la comunicación. Task: Tools and Resources. ---------- Extra-Reading: El poder de las redes. David de Ugarte. Extra-URL: Blog de David de Ugarte Extra-URL: Sociedad de las Indias Electrónicas Students and tutors Task 1: Identify which tools and resources from ICT (specially social web or 2.0) students can use and develop in their organization to enlarge networking. Task 2: Participate in grouply network. Self Evaluation Unit 3
  • 8.
    VET4e-inclusion project 6 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 4 Building Networks 5 hours of mandator y minimum commitm ent. 1 week Know and analyze real-world examples of different types of social network. Acquire skills in evaluation and diagnosis of a social network. Network of Organizations: How does a Social forum work? Conversation with Jordi Calvo from the Catalonia’s Social Forum. Involvement into the community of Associative Networks. Questionnaire to evaluate the student’s organization’s network. The unit tries to specific the experience of students by establishing a dialogue with two active social actors with a forum of questions and answers with each of them. Each represents a different type of social network. It also seeks to bring the lessons learned to the student's daily practice, proposing an analysis of social network next to the student. Video: “Homenaje a Cataluña II", an investigation about networks. URL: Foro Social Mundial. Reading: Social forums, from Jordi Calvo. Asking & answering Forum with Jordi Calvo from the Catalonia’s Social Forum. Task: Evaluation of the situation of our network. ------------- Extra-URL: Link: Associative Networks Virtual Community Video: Web 2.0 and some fun. Students and tutors Representatives of two social networks Task 1: Diagnosis questionnaire of a social network. Task 2: Participation in asking & answering Forum. Self Evaluation Unit 4 Closing module Unit Forum and evaluation questionnaire 1 week Become aware of the achievements of the module Evaluation Forum. Evaluation Questionnaire. Students will be proposed to answer a questionnaire evaluation of the module and to participate in a dialogue- forum evaluation. Evaluation Forum. Evaluation Questionnaire. Final Exam. Students Final Exam
  • 9.
    VET4e-inclusion project 7 Module 2 Auxiliaryresources to optimize activities in Telecenters / ICT Centers / Libraries Position within the curriculum: Stage 3 (mature) / Category 1 (management and organization) Profile entrance of students: Professional profile basic, minimum of 2 months being an e- facilitator Knowledge: Knowledge of the telecentre, ICT center or Libraries. Skills: Basic operational ICT skills. Competencies: Standard telecentre/ICT Centre/Libraries management skills. Skills in planning activities for target groups. Output Profile of students Profile of a social network driver Knowledge: Knowledge of the importance resources Skills: Acquire skills in the course of collaborative work. Management skills of essential technological tools. Competences: Management skills of essential technological tools.
  • 10.
    VET4e-inclusion project 8 Title ofthe Learning Units Duratio n Learnings aims/outcom e Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Opening Module Unit Introducin g Module 1 week Acquire knowledge and abilities in managing the learning environment Information about how to the use of the platform. We offer to the student the opportunity to access to the platform a few days before the start of the module in order to provide him/her relevant information about the course and module in order to facilitate the further development of learning units. The first action we ask to students is to introduce themselves to the group and read messages from other students. Modules presentation: Goals of the module. / Contents of the module. / Target of the module. / Module structure and methodology / Personal and technical requirements / Tutorship of the Module Forums Module plan Information about how to the use of the platform. Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news Forum presentation of the students and tutors Students and tutors It isn’t an evaluation unit. It serves to connect students to the training process.
  • 11.
    VET4e-inclusion project 9 Title ofthe Learning Units Duratio n Learnings aims/outcom e Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1: Introductio n and Tools 5 hours of mandato ry minimu m commit ment. 1 week Acquire knowledge about the determining the resources needed for daily work in Telecentre/ICT center/Libraries. Learn about analyze, design and develop of main learning and representative content. Introduction to organizational and administrative resources. Using computer-based technologies to manipulate, create and store of Word Processing and Graphics content. Using computer-based technologies to locate, access, evaluate, store and retrieve information and to express ideas and communicate with others. It is offered adequate training focuses on preparing the trainee to implement ICT skills and acquired knowledge in an instructional setting. Proactively harnessing the available technologies and how they might be able to influence further developments of content. Likewise, the student must contribute with some news related to networks into forum of the course. Introducing Forum where it is asked to the student to answer why he/she think he/she needs to do this course. It is also asked to write some relevant information about the organization where students work. Reading: Introduction. URL: www.manualesgratis.com (English) URL: www.solotutoriales.com (English) URL: www.e-manuales.com (English) URL: www.aulafacil.com (English) Reading: Image processing URL: gimp.hit.bg/gimp.html (Bulgarian) uroci.net/uroci/12/Gimp.html.(Bulgarian) Reading: Word processing URL: www.openoffice.org (English) URL: www.typetester.org (English) URL: http://freelancefolder.com (English) URL: uroci.net/uroci/20/Microsoft-Word.html (Bulgarian) Task 1: Create an organizational document (schedule, certificate, poster, calendar or other) Task 2: Forum - What kind of services do you offer in your Tcenter/ICT center/Library? Students and tutors Task 1: Creating a precise and functional model of document. Task 2: Participation in the Forum. Task 3: Access to materials and readings. Self Evaluation Unit 1
  • 12.
    VET4e-inclusion project 10 Title ofthe Learning Units Duratio n Learnings aims/outcom e Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: Creation of resource s 5 hours of mandato ry minimu m commit ment. 1 week Acquire main guidelines for creating effective docum ents. Understand the different file formats and learn how to select the most appropriate. Knowing the aspects and combinatio ns of computer- based tools for creating speciali zed materials Introduction to file formats, purpose and using. Using computer-based technologies to manipulate, create and store of organizational, learning and presentation content. Using computer-based technologies to locate, access, evaluate, edit and store of photos. The unit focuses on creating sharable components of content that would have relevance and applicability. Each student receives knowledge about expands the flexibility and features by adding more elaborate text uses and shared curriculum content capabilities. Reading: Efficiency and usability. Reading: Lay out the text in a document. Reading: File formats. URL: www.hellopdf.com/ (English) URL: docx-converter.com/ (English) URL: audacity.sourceforge.net/ (English) URL: www.mediaconverter.org/ (English) URL: www.zamzar.com/ (English) URL: www.media-convert.com. (English) URL: format-factory.en.softonic.com URL: winff.org/html_new/ (English) Task: Image processing Students and tutors Task 1: Creating a precise and functional model of image. Task 2: Access to the content and readings. Self Evaluation Unit 2
  • 13.
    VET4e-inclusion project 11 Title ofthe Learning Units Duratio n Learning aims/outcom e Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Create ma nuals, tutorials and exercis es 5 hours of mandato ry minimu m commit ment. 1 week Understanding the basics of copyright and its implementation in the creation of resources. Developing man uals and exercises to facilitate learnin g process. Know and analyze licensing of content. Enumeration, explanation and examples of most usefully practical guides, manuals, tutorials and etc.. Using of Copyrights in the field of learning process. The unit aims access and understanding of the resources which contain a syllabus, course readings or articles, innovative in their online design and delivery of online education. Tutor proposes to students building their own creative style and discuss about the process in licensing of copyright. Reading: Creating exercises and tutorials Reading: Copyright and Licensing URL: http://cc.isoc.bg/ (Bulgarian) URL: http://creativecommons.org/ (English) Task 1: Create a user guide. Task 2: Forum - What is the way to get photos for your exercises, tutorials, documents and etc. Students and tutors Task 1: Identify which tools and resources from ICT, students can use and develop in their organization to create content. Task 2: Participation in the Forum. Task 3: Access to the content and readings. Self Evaluation Unit 3
  • 14.
    VET4e-inclusion project 12 Unit 4 Specialized toolsand resources 5 hours of mandato ry minimu m commit ment. 1 week Know and learn how to create audio- visual lessons. Acquire main guidelines of using of computer-based resources to develop new integrated services. Introduction to video converters and applications - purpose and using. Using computer-based technologies to manipulate, create, store, uploading and sharing of video tutorials. Enumeration, explanation and examples of most usefully practical software on the internet. The unit tries to understand the role theory in of learning the design and function of specialized activities. It also seeks constructivist approach employs technology to engage the student, facilitate reciprocal communication, and foster an interactive learning environment. Reading: Audio-visual resources Video: Capture of desktop with WINK 2.0 Video: Installing of WINK 2.0 Video: Content folder and shortcut of WINK Video: Camstudio - basic settings URL: www.youtube.com (English) URL: www.vbox7.com (Bulgarian) URL: www.debugmode.com (English) URL: www.screencastle.com (English) URL: www.camstudio.org (English) Reading: Useful software URL: http://clic.xtec.cat/es/jclic (English) URL: http://hotpot.uvic.ca (English) URL: http://webardora.net (English) Task 1: Forum - Create video tutorial to explain some basic functions in the operating system and share it here. Task 2: Wiki – Share here other online resources that you already used in your work. Students and tutors Task 1: Participation in the Forum. Task 2: Participation in Wiki. Self Evaluation Unit 4 Closing module Unit Forum and evaluation questionna ire 1 week Become aware of the achievements of the module Evaluation Forum. Evaluation Questionnaire. Students will be proposed to answer a questionnaire evaluation of the module and to participate in a dialogue-forum evaluation. Evaluation Forum. Evaluation Questionnaire. Final Exam. Students Final Exam
  • 15.
    VET4e-inclusion project 13 Module 3& 11 Telecenter sustainability Position within the curriculum: Stage 2 (consolidation) / Category 1 (management and organization) Profile entrance of students: Professional profile midium, minimum of 4 months being an e-facilitator Knowledge: Knowledge of the telecenter. Knowledge in working with groups and in the management and implementation of the cross lines. Skills: Technology standard skills (office, multimedia) Relationship skills in dealing with the groups involved. Competencies: Standard telecenter management skills. Skills in planning activities for key groups. Skills in cross-project planning Output Profile of students Profile of a social network driver Knowledge: Knowledge of the importance of advancing towards in developing a culture of sustainability in social organizations and the key concepts in the way of thinking, creating, opening and developing a telecenter taking in account the future of the project and the funding necessary for its operations. Skills: Acquire skills in the course of sustainable work. Management skills of essential technological tools. Competences: Management skills of essential technological tools.
  • 16.
    VET4e-inclusion project 14 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Opening Module Unit Introducing Module 1 week Acquire knowledge and abilities in managing the learning environment Information about how to the use of the platform. We offer to the student the opportunity to access to the platform a few days before the start of the module in order to provide him/her relevant information about the course and module in order to facilitate the further development of learning units. The first action we ask to students is to introduce themselves to the group and read messages from other students. Modules presentation: Goals of the module. Target of the module. Contents of the module. Module structure and methodology Evaluation and certification. Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to the use of the platform. Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news  Forum presentation of the students and tutors Students and tutors It isn’t an evaluation unit. It serves to connect students to the training process.
  • 17.
    VET4e-inclusion project 15 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1: The commitment to a sustainable organization 5 hours of mandatory minimum commitment. 1 week Our commitment is to build sustainable organizations and projects. Our goal is to learn how to do it on the term "sustainability", learning it from sustainable initiatives and reading opinions of experts (and our own) through an online tool. Introduce the participants in this training module and recognize each other as builders of the knowledge that will be generated during these weeks. Define the concept of sustainability and learn about its history and currents. Learn about the different aspects or facets that make a project sustainable. Identify sustainable initiatives in the social field and analyze the cases. Learn to use the Google Docs. As staff, volunteer or manager of a telecenter, whatever position or degree of participation, everybody in a telecenter is an essential part of it, one way or another, and everybody can help to make it up and keep running. Reading: La apuesta por una organización sostenible. Reading: La importancia de la sostenibilidad en las organizaciones sociales. Task 1: Identify and analyze a case of sustainable entrepreneurship. Task 2: Put in Google Docs files from the activity. Forum of news (for exclusive use of the tutor). ------------ Extra Video: Las cuatro ecologías de Leonardo Boff. Help documentation: Google Docs. Students and tutors Task 1: Identify and analyze a case of sustainable entrepreneurship. Task 2: Put in Google Docs files from the activity. Self-Evaluation Unit 1
  • 18.
    VET4e-inclusion project 16 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: Telecentres with future 5 hours of mandatory minimum commitment. 1 week Make a basic analysis of students telecenters' sustainability as well as analyze the telecenter status in order to look forward seeking allies and resources to improve the potential of the telecentre. Learn about the situation of telecenter networks' in Spain and also in other countries. Understand the concept of the telecenter, its types and functions. Approach the concept of sustainability in the telecenter. Analyze the telecenter status in regards to sustainability. Reflecting on the figure of telecenter facilitator as a key element of the future of the telecenters. Learn about virtual communities or social networks of telecenters. The experience of thinking, creating, opening and developing a telecenter must look forward to ensuring the continuity of the project, taking into account that facilitators are developing a social initiative, aimed primarily at people with special difficulties in accessing ICT. Reading: Telecentros, modelos y sostenibilidad. Task: Analyse your telecenter. Forum: The facilitator role. URL: Telecentre.org community. URL: Comunidad Conecta community. ------------ Extra-Video: La sostenibilidad en el telecentro. Extra-URL: Telecentros POETA Extra-Reading: “Las redes de telecentros en España. Una historia por contar”. Karma Peiró. Students and tutors Task 1: Analyse your telecenter. Self-Evaluation Unit 2
  • 19.
    VET4e-inclusion project 17 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Seeking funding 5 hours of mandatory minimum commitment. 1 week How to be related to the telecenter's environment to get funding. Identify potential relationships and contributors, as well as various funding models for social organizations and the possible consequences of implementing these models. Focus on the importance of diversifying the sources of funding as a guarantee of sustainability. Provide the essential knowledge to help students to define a fundraising strategy. Identify major sources of funding for social organizations. Learn about the different funding models for organizations and the consequences of implementing these models. Emphasize the importance of diversifying sources of funding as a guarantee of sustainability. Outline a plan to raise funds in a telecenter. One of the indispensable conditions for telecenters is having the funding necessary for its operations. Students will try to answer some questions in order to understand the goal of this Unit: What do companies want to obtain from their relationships with social institutions?, What are the limits when working with companies? What are the different forms of collaboration?, How can you present your projects and make them attractive?, Why is a project supported or rejected? What are the benefits for companies? Reading: Fuentes de financiación. Reading: Comunicación y captación de fondos. Task: Funding Sources in your telecenter from public and private entities. Forum: Raise funds by holding events, the sale of services and product sales. Students and tutors Task 1: Funding Sources in your telecenter from public and private entities. Self-Evaluation Unit 3
  • 20.
    VET4e-inclusion project 18 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 4 Saving and making best use of resources 5 hours of mandatory minimum commitment. 1 week Review the main points related to the construction of a green space, taking into account that the telecenter is a place similar to an office. We'll begin from the motto "Reduce, Recycle, Reuse", which is the basis of environmental sustainability. Focus attention on recruiting of volunteers in the telecenter that will help us meet our objectives with their solidarity work. Collect ideas and resources to improve time management. We'll elaborate further on the issue of sponsorship with a practical exercise that will serve to exercise you in searching resources. Apply sustainability criteria to each of the spaces and resources of the telecenter as a place of work. Share ideas and resources on time management at the telecenter. Learn about one resource for seeking sponsorship and use it for your project. In the last learning unit of this module we'll approach three essential issues for sustainable management of an organization, a telecenter: environmental sustainability, time management and human resources. Reading: Cuidar el planeta desde el Telecentro. Reading: Gestión del tiempo. Task: Presentation of your telecenter and a project to a company. Forum: Volunteering at the telecenter. ------------- Extra-Reading: Conclusiones de los talleres sobre voluntariado corporativo Extra-task or ressource: Find sponsors in www.tupatrocinio.com Students and tutors Representatives of two social networks Task 1: Presentation of your telecenter and a project to a company. Self Evaluation Unit 4
  • 21.
    VET4e-inclusion project 19 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Closing module Unit Forum and evaluation questionnaire 1 week Become aware of the achievements of the module Evaluation Forum. Evaluation Questionnaire. Students will be proposed to answer a questionnaire evaluation of the module and to participate in a dialogue- forum evaluation. Evaluation Forum. Evaluation Questionnaire. Final Exam. Students Final Exam
  • 22.
    VET4e-inclusion project 20 Module 4 PromotingICT for the elderly at the telecentre Position within the curriculum: Stage 2 (consolidation) / Category 2 (Methodological skills in working with groups of participants) Entrance Profile of students: Minimum 6 months experience in a job/volunteer engagement with elderly people and/or Minimum 6 months experience as e- facilitator for social inclusion Knowledge: Basic knowledge of ICT centres environment Basic knowledge of elderly-related main issues Skills: ICT standard skills (office, multimedia) Basic team-working skills Competences: Basic target-oriented/intercultural communication skills Capability to plan activities for vulnerable groups Output Profile of students: e-facilitator for elderly social inclusion Knowledge: Basic knowledge of elderly situation, needs, resources, opportunities Basic knowledge on present data, information, analysis related to elderly people Basic knowledge of the local context and elderly-related actions/opportunities Knowledge of the potential role of an ICT center in promoting elderly integration and personal development Basic knowledge of ICT devices/programmes/software devoted to elderly people Skills: Ability to identify and analyze digital gaps/ICT barriers of elderly people Ability to perform e-facilitation tasks focused on elderly-public Ability to facilitate elderly access to services and learning opportunities through ICT Ability to use simple software focused on elderly needs/interests Competences: Critical analysis of the available sources of information on elderly-related topics Design, realization and promotion of ICT activities/digital literacy programmes addressed to elderly people Teaching to elderly people how to use ICT tools for personal development and interests
  • 23.
    VET4e-inclusion project 21 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Introductio n Unit 1 week available 1 hour of mandatory minimum dedication - To familiarize with the learning environment: - To familiarize with the platform and its functions; - To understand the overall objectives, contents and methodology of the module; - To understand tutor's role; - To understand the evaluation system and criteria. - use of the platform - how to complete student personal profile; - management of interactive tools; - relational skills for the communication with students and tutor. We offer to the student the opportunity to access to the platform a few days before the starting of the module, in order to provide him/her relevant information about the functioning of the platform and the structure of the module. The Introduction Unit is a start- up unit aimed at facilitating the learning process that starts with Unit 1. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Tutor's role: the tutor is present in the platform and has to introduce him/herself in the Introduction forum and to post a Welcome message in the Bulletin Board. Nonetheless, it is suggested to avoid direct interactions with the students in order to encourage their spontaneous participation (see also the Evaluation column). READINGS: Methodologic readings: - Goals of the module - Target of the module - Module structure and methodology - Tutorship of the Module Overview of the learning contents readings: - Module plan - Contents of the module Technical readings - Platform users' guide - Detailed instructions on how to complete the profile - Forums - Personal and technical requirements COMMUNICATION AND INTERACTIVE TOOLS: - Bulletin board and news - Presentation forum Students and tutors No evaluation is foreseen. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. It is also an instrument to verify students' motivation in order to prevent drop-outs. Therefore, selected students that don't access the platform during the Introduction week are substituted with enrolled students in the waiting list.
  • 24.
    VET4e-inclusion project 22 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1 Our elderly: a general overview 1 week available 5 hours of mandatory minimum commitment - To provide a reference framework on elderly situation and needs - To know better the local context and actions/opportunities devoted to the elderly - How to do a good context analysis - Elderly people: characteristics, feelings and needs. - Presentation of the most relevant information and resources useful to support old population - Basic elements on telecentre’s activities and potential - Present data on Italian old population according to CENSIS and IRP - Basic elements on the Third Age Universities: aims and concrete examples - Italian population and ICT: main data and general overview This Unit is built on a three levels methodological approach: 1.Theoretical/Didactic: it provides neutral context-based information 2.Interpretational: it provides oriented positions on the phenomenon and elements to deconstruct them 3.Critical: it stimulates context-based elaboration Reading: Gli anziani: sentimenti e bisogni (The elderly: feelings and needs) Reading: Il contesto e le risorse disponibili (The context and the resources available) Reading: Il telecentro e le sue potenzialità (The telecentre and its potential) ------------ Optional Article: Anziani, una ricchezza trascurata (The elderly: a careless resource) Optional Article: Anziani di ieri e di oggi (Past and present elderly) Optional Reading: Per vivere la terza età (To live the third age) Optional Article: Terza età: da forza lavoro a forza cultura (Third age: from workfroce to “cultureforce”) Optional Reading: Indagine ISTAT 2010: cittadini e nuove tecnologie (ISTAT survey 2010: citizens and ICT) Students and tutors Task 1: Il territorio e il telecentro (Your territory and the telecentre): individual work aimed at describing the local context, as related to the elderly. Forum: I bisogni degli anziani nel tuo territorio (Elderly needs in your territory): sharing and exchange of experiences and opinions. Self Evaluation Questionnaire Unit 1.
  • 25.
    VET4e-inclusion project 23 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2 Personal and digital competenc es and skills 1 week available 5 hours of mandatory minimum commitment -To identify elderly people digital gap/barriers - To identify adaptation procedures/opportunities of ICT devices/software/contents/re sources for elderly people - To develop strategies and actions to promote ICT use to elderly people - To define role/tasks of the e-facilitator for social inclusion in this context - Examples and ideas of ICT uses for elderly people - Main barriers between elderly people and ICT - Basic elements to customize ICT devices/software/contents/res ources to elderly people needs and difficulties - Overview on facilitator’s characteristics, skills and tasks - Examples on elderly people motivation to learn and use ICT - Examples of ICT learning opportunities for elderly people - Examples of broadband use for e-services access Unit 2 contents are closely linked to practical work in learning contexts with elderly people. The pedagogical approach is practical- theoretical and aimed at encouraging the use of ICT to achieve personal development. Reading: Non è solo il computer (It’s not only the PC) Reading: Superare i pregiudizi (Overcoming predjudices) Video: PC e anziani: qualche riflessione (PC and elderly people: some refelctions) Reading: Il ruolo del facilitatore (Facilitator’s role) Reading: Semplificare i materiali didattici (How to simplify didactic resources) ------------ Optional Video: Ma ora si che ho l’età...per il PC (It’s the good age to learn ... the PC) Optional Reading: Gli anziani e le opportunità di apprendimento delle TIC (Elderly people and ICT learning opportunities) Optional Reading: Gli anziani e la banda larga (Elderly people and the broadband) Students and tutors Task 1: Incoraggiare gli anziani (Encouraging elderly people): individual work aimed at define strategies/ideas to encourage elderly people in using ICT. Forum: Pregiudizi e soluzioni (Prejudices and solutions): sharing and exchange of experiences on how to overcome prejudices and identify solutions. Self Evaluation Questionnaire Unit 2.
  • 26.
    VET4e-inclusion project 24 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Training on ICTs 1 week available 5 hours of mandatory minimum commitment - To learn how to adapt computer, hardware and software to elderly people abilities and needs - To define a digital literacy training programme - To use simple software devoted to elderly needs - Basic controls and functions to customize hardware and software - Basic elements of field researches on elderly training needs and abilities - Basic elements and criteria to design a training programme - Practical elements for PC use - Examples of software (ELDY and Genealogia) Unit 3 provides a logical scheme presenting the process of designing targeted activities starting from users' needs. It encourages a customized use of the resources available, stimulating personal elaboration. Reading: Adattare e configurare hardware and software (How to adapt hardware and software) Reading: L’apprendimento delle TIC per gli anziani (ICT learning for elderly people) Reading: Progettare un programma formativo (How to design a training programme) ------------ Optional Video: Eldy: il computer diventa facile (Eldy: PC becomes easy!) Optional Reading: Guida pratica al PC (Practical guide to PC use) Optional Link: Costruire un albero genealogico (Building a genealogical tree): free software to build genealogical trees Students and tutors Mandatory tasks Task 1: Progettare un’attività formativa per le persone anziane (To design a training activity for elderly people): individual work aimed at designing a workshop/training programme on ICT for elderly people Task 2: Wiki: materiali di apprendimento per persone anziane (Wiki: training materials for elderly people): find ICT learning materials/resources, etc. and add them to the Wiki, in order to achieve a group result Forum: La formazione nel tuo telecentro (Training in your telecentre): sharing and exchange of good practices of training activities in the telecentres Self Evaluation Questionnaire Unit 3
  • 27.
    VET4e-inclusion project 25 _______ Optional task: Costruiscil’albero genalogico della tua famiglia! (Build your family tree!): individual work using the software “Genealogia” Unit 4 ICT training programm es for elderly people 1 week available 5 hours of mandatory minimum commitment - To learn how ICT can become resources for elderly personal development - To design an ICT programme for the elderly - Examples of ICT workshops and projects in the Telecentres - Guidelines of the project “Grandfathers on-line” - Examples of projects for elderly digital literacy Unit 4 moves a step forward toward the process of designing targeted activities starting from users' needs (practical and customized application of the knowledge acquired) Reading: Progetti sulle TIC per gli anziani (ICT training programmes for the elderly) Reading: Nonni su Internet (Grandfathers on-line) ------------ Optional Link: InformaNonni.it Optional Link: Apprendere con le tecnologie (Learning with technologies) Students and tutors Mandatory tasks Task 1: Il mio progetto sulle TIC per gli anziani (My project on ICT for elderly people): individual work aimed at designing a training project in your telecentre for elderly people Task 2: Wiki: Progetti per gli anziani (Wiki: projects for elderly people): share in the Wiki your experiences of ICT projects devoted to the elderly, in order to achieve a group result Forum: Altri progetti e workshops (Other projects and workshops): sharing and exchange of ideas on workshops and activities in the telecentres Self Evaluation Questionnaire Unit 4
  • 28.
    VET4e-inclusion project 26 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Closing Unit 10 days available 5 hours of mandatory minimum commitment - To assess knowledge/skills acquired - To apply in a critical and transversal way knowledge/skills acquired during the whole learning path - To evaluate the adequateness of the learning module according to students - Final exam - Feedback Forum - Evaluation Questionnaire The final exam consists in a collaborative/cooperative learning exercise allowing the assessment of students' capability to use skills and competences acquired in each learning unit in an integrated and transversal way. It is aimed at evaluating work related skills (more than theoretical knowledge). The exercise has to be realized in groups of 5. The students themselves have to select their "final exam mates" during the 4 weeks of training (to foster interchange during the training and allow the constitution of groups of people sharing the same interests/ideas/projects/work contexts). After the deadline each group has to present its product to the virtual class and the tutor in the framework of a face to face session and/or online interactive session. Moreover, students will be proposed to answer a evaluation questionnaire on the module and to participate in a feedback forum. Final Exam: Imagine to design "the ideal centre for elderly people" and provide its "business plan". In particular, answer to the following points: a. context analysis; b. target description and target's expected needs; c. general and specific objectives; d. activities to develop; e. methodologies to use; f. equipment/human resources/budget requirements; g. expected results and impact; h. sustainability and transferability. Feedback Forum: Students are invited to share their final impressions on the module and say good-bye to other students and to the tutor. Evaluation Questionnaire: Students are asked to fill in a semi-structured questionnaire evaluating the following dimensions of the received training: learning outcomes; role and career development; overall satisfaction with the module. Students and tutors The final exam counts for 50% of the final note. This 50% has to be attributed on the bases of the following criteria: coherence with the learning inputs (15 points), valorization of ICT based methodologies/tools (15 points), innovativeness and creativity (10 points), quality of the presentation (10 points). The remaining 50% is attributed on the basis of participation during the training (tasks submission and forum interventions).
  • 29.
    VET4e-inclusion project 27 Module 5 PromotingICT with migrants in the ICT centre Position within the curriculum: Stage 2 (consolidation) / Category 2 (Methodological skills in working with groups of participants) Entrance Profile of students: Minimum 6 months experience in a job/volunteer engagement with migrants/refugees and/or Minimum 6 months experience as e-facilitator for social inclusion Knowledge: Basic knowledge of ICT centres environment Basic knowledge of immigration-related main issues Skills: ICT standard skills (office, multimedia) Basic team-working skills Competences: Basic target-oriented/intercultural communication skills Capability to plan activities for vulnerable groups Output Profile of students: e-facilitator for migrants social inclusion Knowledge: Basic knowledge of the international and national migratory history and present context Knowledge of the potential role of an ICT center in promoting migrants' integration and intercultural dialogue Basic knowledge on conflict management in intercultural contexts Basic knowledge of immigration laws and administrative procedures, integration processes and available services Intermediate knowledge of migrant women integration processes: difficulties, needs and opportunities Skills: Ability to analyze the available sources of information on migration-related topics Ability to perform e-facilitation tasks with an intercultural approach Ability to facilitate migrants access to services through ICT Ability to integrate a gender-mainstreaming approach in performing e-facilitation tasks Competences: Critical use of the available sources of information on migration-related topics Design, realization and promotion of ICT activities addressed to migrants Teaching how to use ICT tools for immigration-related administrative procedures and e-services
  • 30.
    VET4e-inclusion project 28 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Introductio n Unit 1 week available 1 hour of mandatory minimum dedication - To familiarize with the learning environment: - To familiarize with the platform and its functions; - To understand the overall objectives, contents and methodology of the module; - To understand tutor's role; - To understand the evaluation system and criteria. - use of the platform - how to complete student personal profile; - management of interactive tools; - relational skills for the communication with students and tutor. We offer to the student the opportunity to access to the platform a few days before the starting of the module, in order to provide him/her relevant information about the functioning of the platform and the structure of the module. The Introduction Unit is a start- up unit aimed at facilitating the learning process that starts with Unit 1. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Tutor's role: the tutor is present in the platform and has to introduce him/herself in the Introduction forum and to post a Welcome message in the Bulletin Board. Nonetheless, it is suggested to avoid direct interactions with the students in order to encourage their spontaneous participation (see also the Evaluation column). READINGS: Methodologic readings: - Goals of the module Target of the module - Module structure and methodology Tutorship of the Module Overview of the learning contents readings: - Module plan - Contents of the module Technical readings - Platform users' guide - Detailed instructions on how to complete the profile - Forums - Personal and technical requirements COMMUNICATION AND INTERACTIVE TOOLS: - Bulletin board and news - Presentation forum Students and tutors No evaluation is foreseen. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. It is also an instrument to verify students' motivation in order to prevent drop-outs. Therefore, selected students that don't access the platform during the Introduction week are substituted with enrolled students in the waiting list.
  • 31.
    VET4e-inclusion project 29 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1: Migration: getting oriented and developing critical thinking 1 week available 5 hours of mandatory minimum commitme nt - To provide a reference framework on international migration and to introduce the national situation - To evaluate the reliability of sources of information and analyse data and to use of e-tools to build a set of reliable sources of information - To develop a critical thinking, distinguishing “real/actual” facts from “mediatic/political” ones - History of migratory phenomena, typologies, trends, policies and problems. - National migratory history and context, highlighting similarities and differences with the international one - Analysis of the arguments most commonly used “in favor” and “against” immigration - Presentation of the most common stereotypes and prejudices on immigration/migrants - Concrete elements, data, facts to invalidate each of these stereotypes and prejudices This Unit is built on a three levels methodological approach: 1.Theoretical/Didactic: it provides neutral context-based information 2.Interpretational: it provides oriented positions on the phenomenon and elements to deconstruct them 3.Critical: it stimulates personal interpretation and elaboration Reading: Il fenomeno delle migrazioni internazionali (The international migrations phenomenon) Reading: L'immigrazione in Italia (Immigration in Italy) Video: Immigrazione in Italia: è una risorsa o una minaccia (Immigration in Italy: is it a added value or a threat?) Reading: Mandiamoli a casa, i luoghi comuni (Send them back home, the prejudices) Reading: I media e la guerra alle migrazioni (Media and war on migrations) Video: Tutorial Delicious ------------ Optional Reading: Manifesto del FSMM (Final declaration of the WSFM) Optional Video: La puntata “Migranti” del programma “Presa Diretta” (the episode “Migrants” of the TV show “Presa Diretta”) Students and tutors Task 1: Costruire un network con Delicious (Building a network though Delicious): group work aimed at bulding a data base of reliable sources of information and useful links. Task 2: L'immigrazione nei media (Immigration in the media): individual work asking to explain how the mediatic perception of immigration affects the daily work in the ICT center. Forum: Le notizie più attuali (The most recent news): Select and share the most recent news on immigration Self Evaluation Questionnaire Unit 1
  • 32.
    VET4e-inclusion project 30 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: Let's meet! 1 week available 5 hours of mandatory minimum commitme nt - To develop targeted promotion strategies for the ICT center - To refine the role of the e-facilitator for social inclusion in an intercultural context/with an intercultural approach - To promote an exchange among students on conflict management strategies - Examples and ideas of customized social and cultural activities - Techniques for promotion and advertising of the ICT centre's activities - Guidelines on how to act as e-facilitator with migrant users - Techniques for conflict management in intercultural context Unit 2 contents are closely linked to everyday work in intercultural ICT centre. The pedagogical approach is practical- theoretical and aimed at encouraging the exchange of good practices and the collaborative learning. For each theme (promotion strategies, role of the e-facilitator, conflict management) the unit provides an introductory reading presenting the main concepts and concrete examples, followed by a task and/or forum to apply knowledge/skills acquired. Reading: Elementi di marketing interculturale (Basic notions of intercultural marketing) Reading: Il cinema, un linguaggio multiculturale (Cinema, a multicultural language) Video: Intervista a Dagmawi Yimer (An interview to Dagmawi Yimer) Reading: I facilitatori, un supporto all'inclusione digitale (The facilitators, a support to e-Inclusion) Reading: da “Gestione dei conflitti e mediazione interculturale” – Conflitti e comunicazione interculturale (Parte III): La gestione dei conflitti in chiave interculturale e La comunicazione interculturale attraverso il cinema (from “Conflict Management and Intercultural mediation” - Conflict and intercultural communication (Part III): Conflict management with an intercutural view and Intercultural communication through cinema. ------------ Optional Reading: L'educazione interculturale verso l'educazione transculturale (The intercultural education towards transcultural education) Optional Reading: La musica: uno strumento per approcciare le nuove tecnologie da una prospettiva interculturale (Music: an instrument to approach ICT in an intercultural perspective) Optional Reading: Radio 2.0, audio e podcast (Radio 2.0, audio and podcast) Optional Video: Introduzione ad Audacity (Introduction to Students and tutors Mandatory tasks Task 1: Promuovere il centro TIC (To promote the ICT Centre): individual work aimed at elaborating a targeted strategy to promote the center among migrants Forum: Risoluzione dei conflitti (Conflict management): sharing and exchange of good practices Self Evaluation Questionnaire Unit 2 ------------ Optional Task: Creare de editare video (To create and edit videos): individual work aimed at creating a video and uploading it on the module's youtube channel Optional Task: Podcast:
  • 33.
    VET4e-inclusion project 31 Audacity) unostrumento di apprendimento (Podcast: a learning tool): Realise an activity with at leat 1 out of 4 podcast software presented in the optional reading Title of the Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Identify and meet migrants' specific needs through ICT 1 week available 5 hours of mandatory minimum commitme nt - To identify migrants' integration needs - To elaborate viable responses to these needs within the ICT center - To use ICT to simplify the e- facilitator task of supporting migrants access to services - Schematic process on how to plan and design the ICT centre activities on the bases of users' needs - List of the most common migrants' integration needs, related to administrative procedures and access to services - List of e-sources of legal/administrative information - Concrete examples of ICT tools to be used by the e-facilitator/the migrant user First of all, the unit provides a logical scheme presenting the process of designing targeted activities starting from users' needs. After that, the overall pedagogic approach is based on the idea that delicate issues as the immigration administrative procedures and the access to services imply the direct involvement of the final user. Therefore, the unit aims at giving to e- facilitators:  a general overview of the immigration legislation and administrative procedures + sources of information  suggestions on how to systematize these information through ICT Reading: Identificare bisogni e difficoltà e modalità con cui il centro TIC può contribuire a soddisfarli/risolverli (Identify needs and difficulties and how the ICT centre may meet/solve them) Reading: Il computer facilita il lavoro su cartaceo: 1. I bisogni più comuni degli utenti migranti; 2. Procedure amministrative che il centro TIC può accompagnare; 3. Strumenti TIC e fonti di informazione online (How PC may help paper-based activities: 1. Migrant users most common needs; 2. Administrative procedures that may be addressed in the ICT centres; 3. ICT tools and e-sources of information) URL: Il blog del circolo Arci Thomas Sankara: esempio di come spiegare le modalità di consultazione del portale immigrazione del Ministero dell'Interno attraverso screenshots (The blog of the Arci club Thomas Sankara: example of explaination of the procedure to consult the immigration portal of the Ministry of Interiors through screenshots) Video: L'iniziativa di Africa Insieme: Intervista ad un operatore di Africa Insieme relativa a un incontro di formazione volto ad Students and tutors Mandatory tasks Task 1: Opportunità del territorio (Local existing opportunities): on the bases of the analysis of migrants' needs, compile a list of the existing opportunities and services to be used both by e-facilitators and by migrant users themselves Task 2: La tecnologia nella vita quotidiana (Technology in daily life): on the bases of 2 concrete situation, design of an activity where ICT learning helps to solve an everyday problem
  • 34.
    VET4e-inclusion project 32  instrumentsto make migrant final users aware and autonomous in the use of ICT tools insegnare a lavoratori migranti e datori di lavoro come accedere alla procedura on-line del decreto flussi (The initiative by Africa Insieme: interview to an operator of Africa Insieme relating about a training initiative aimed at teaching to migrant workers and employers how to access the online regularization procedure) Forum: Identificare bisogni e difficoltà (Identify needs and difficulties): Sharing of knowledge and practices on migrant users' specific needs and activities to meet them Self Evaluation Questionnaire Unit 3 _______ Optional task: Attività per apprendere le lingue (Activities to learn languages): Design of a concrete activity to learn Italian using ICT and list of e-sources to be added to the Delicious used in Unit 1 Optional Forum: Kit di strumenti per la ricerca di lavoro (Kit of tools for job seeking): Collaborative learning exercise aimed at realizing a kit of useful instruments to facilitate migrants' job seeking in the ICT centre
  • 35.
    VET4e-inclusion project 33 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 4 Immigratio n, gender and ICT 1 week available 5 hours of mandatory minimum commitme nt - To integrate a gender perspective in the context of ICT intercultural centres - To become aware of the non-neutrality of ICT in a gender perspective - To explore the links between migrant women employability and ICT skills - Overview of the history of women rights in the public and international debate on human rights - Analysis of the so-called “feminilization” trend of international migration with a focus on the national situation - The condition of migrant women: the concepts of “double exclusion” and “double exploitation” - Diachronic overview of main schools of thought on women and technology - Results of a cross- country research on: 1. ICT skills and socio- economic integration of migrant women; 2. The role played by ICT trainings in the acquisition of other socio-cultural key skills; Unit 4 is based on the idea that a gender approach is crucial in designing and realizing any social and cultural activity. Therefore, it provides a consistent historical framework aimed at orienting and supporting e-facilitators in integrating a gender-mainstreaming approach in their daily activities with migrant users. For this reason, the Unit doesn't include any content/task related to specific activities addressed to migrant women. Otherwise, the Unit intends to promote a spontaneous debate among the students on how to integrate the acquired knowledge in their everyday practice. Reading: I diritti delle donne sono diritti umani (Women rights are human rights) Reading: Donne migranti (Migrant women) Reading: Genere e TIC (Gender and ICT) Reading: Donne migranti, TIC e occupabilità (Migrant women, ICT and employability) Students and tutors Forum: Prospettiva di genere (Gender perspective): exchange of ideas on gender, immigration and ICT Self Evaluation Questionnaire Unit 4
  • 36.
    VET4e-inclusion project 34 3. Therole played by third-sector organizations in the life of migrant women Closing Unit 10 days available 5 hours of mandatory minimum commitme nt - To assess knowledge/skills acquired - To apply in a critical and transversal way knowledge/skills acquired during the whole learning path - To evaluate the adequateness of the learning module according to students - Final exam - Feedback Forum - Evaluation Questionnaire The final exam consists in a collaborative/cooperative learning exercise allowing the assessment of students' capability to use skills and competences acquired in each learning unit in an integrated and transversal way. It is aimed at evaluating work related skills (more than theoretical knowledge). The exercise has to be realized in groups of 5. The students themselves have to select their "final exam mates" during the 4 weeks of training (to foster interchange during the training and allow the constitution of groups of people sharing the same interests/ideas/projects/work contexts). After the deadline each group has to present its product to the virtual class and the tutor in the framework of a face to face session and/or online interactive session. Moreover, students will be proposed to answer a evaluation questionnaire on the module and to participate in a feedback forum. Final Exam: Imagine to design "the ideal job guidance program" addressed to migrant women and provide its "business plan". In particular, answer to the following points: a. context analysis; b. target description and target's expected needs; c. general and specific objectives; d. activities to develop; e. methodologies and tools to use; f. equipment/human resources/budget Feedback Forum: Students are invited to share their final impressions on the module and say good-bye to other students and to the tutor. Evaluation Questionnaire: Students are asked to fill in a semi- structured questionnaire evaluating the following dimensions of the received training: learning outcomes; role and career development; overall satisfaction with the module. Students and tutors The final exam counts for 50% of the final note. This 50% has to be attributed on the bases of the following criteria: coherence with the learning inputs (15 points), valorization of ICT based methodologies/tools (15 points), innovativeness and creativity (10 points), quality of the presentation (10 points). The remaining 50% is attributed on the basis of participation during the training (tasks submission and forum interventions).
  • 37.
    VET4e-inclusion project 35 Module 6 Gettingfamiliar with Office tools (Open/MS) for developing digital literacy workshops Position within the curriculum: Stage 1 (entrustment) / Category 4 (Competence in the use of technical tools as a basis and support of methodological actions) Entrance Profile of students: Minimum 6 months experience in a job/volunteer engagement within a telecentre or similar body and/or Minimum 6 months experience in organizing workshops/laboratories within informal contexts (Third Sector bodies) Knowledge: Basic knowledge of telecentres environment Basic knowledge of animation methodologies/techniques in informal contexts Skills: ICT basic skills (computer, Internet browsing and at-a- distance communication tools) Basic team-working skills Basic communication skills Competences: Capability to plan animation laboratories/workshops in the telecentre and in the local context Output Profile of students: e-facilitator for digital literacy Knowledge: Good knowledge of Open Office suite Intermediate knowledge of Open Office suite’s potential for personal and working needs Skills: Ability to facilitate digital literacy access in the telecentres and/or similar bodies Ability to design digital literacy workshop/laboratories in informal learning contexts Ability to develop communication tools to promote the telecentre in the local context Competences: Ability to use and adapt the tools acquired to personal and working needs Teaching how to use Open Office to different target groups Ability to modify/adapt/integrate the learning contents in relation to learners’ needs
  • 38.
    VET4e-inclusion project 36 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Introductio n Unit 1 week available 1 hour of mandatory minimum dedication - To familiarize with the learning environment: - To familiarize with the platform and its functions; - To understand the overall objectives, contents and methodology of the module; - To understand tutor's role; - To understand the evaluation system and criteria. - use of the platform - how to complete student personal profile; - management of interactive tools; - relational skills for the communication with students and tutor. We offer to the student the opportunity to access to the platform a few days before the starting of the module, in order to provide him/her relevant information about the functioning of the platform and the structure of the module. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Tutor's role: the tutor is present in the platform and has to introduce him/herself in the Introduction forum and to post a Welcome message in the Bulletin Board. Nonetheless, it is suggested to avoid direct interactions with the students in order to encourage their spontaneous participation (see also the Evaluation column). READINGS: Methodologic readings: - Goals of the module Target of the module - Module structure and methodology Tutorship of the Module Overview of the learning contents readings: - Module plan - Contents of the module Technical readings - Platform users' guide - Detailed instructions on how to complete the profile - Forums - Personal and technical requirements COMMUNICATION AND INTERACTIVE TOOLS: - Bulletin board and news - Presentation forum Students and tutors No evaluation is foreseen. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. It is also an instrument to verify students' motivation in order to prevent drop- outs. Therefore, selected students that don't access the platform during the Introduction week are substituted with enrolled students in the waiting list.
  • 39.
    VET4e-inclusion project 37 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 1: OpenOffice Writer I: the word processor 1 week available 4 hours of mandatory minimum commitment - To use Open Office Writer basic functions: open, write and save documents; how to edit and format texts. - To do editing basic operations: cut, copy/paste, correct. - To understand how to use Open Office Writer as a tool to develop digital literacy workshops. - Basic knowledge on Writer’s potential. - Procedures to download and install Open office suite. - Writer main window, toolbars and their main functions. - Procedures to open and save documents. - Various editing functions: correct mistakes, copy/cut/paste, format texts. This Unit is built on a theoretical/didactic approach: it intends to provide the learner with basic notions on the topic faced, in order to help him to familiarize with it. Reading: Cos’è Open Office Writer e cosa ti permette di fare (What is Open Office and what you can do with it). Reading: Scaricare ed installare Open Office (How to download and install Open Office). Reading: La finestra principale di Writer (Writer’s main window). Reading: L’apertura ed il salvataggio dei documenti (How to open and save documents). Reading: Editing di base. Correggere gli errori (Editing 1: how to correct mistakes). Reading: Editing di base. Copia, taglia ed incolla (Editing 2: copy, cut and paste). Reading: Editing di base. Formattare il testo (Editing 3: how to format texts). ----------- OPTIONAL MATERIALS Reading: Esempio di documento elaborato con Writer (Example of a document elaborated with Writer). Reading: Un altro esempio di documento redatto con Writer (Another example). Reading:Comandi veloci da tastiera (Quick keyboard functions). Reading: Selezione testo (Text selection). Students and tutors Task 1: Crea un documento con Writer (Create a document with Writer): individual work aimed at applying and testing the knowledge acquired during the Unit 1. Forum: La lezione dell’unità (Lesson learnt): share and exchange with the other students difficulties/ideas/suggestion s experienced during the Unit 1. Self Evaluation Questionnaire Unit 1
  • 40.
    VET4e-inclusion project 38 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: OpenOffice Writer II: deeper into the word processor 1 week available 5 hours of mandatory minimum commitment - To go deeper into Writer functions. - To understand Writer templates utility. - To insert tables in text documents. - To practice with fontwork. - Use of TABS. - Knowledge on styles and formatting. - Procedures to create and manage tables. - Utility, use and customization of Writer’s templates. - Utility, use and customization of wizards. - Utility, use and customization of fontwork. - Basic knowledge of Open Clip Art Library. This Unit is built on a two level methodological approach: 1. theoretical/didactic, providing deeper notions on the topic faced in the previous Unit. 2. Practical and context-based, stimulating a personal and contextualized use of the skills acquired. Reading: Tabulazioni (TABS). Reading: Stili e formattazioni (Styles and formatting). Reading: Tabelle (Tables). Reading: Modelli (Templates). Reading: Lavorare con le procedure guidate (How to use wizards). Reading: Cos’è fontwork? (What is fontwork?). Reading: Creare e modificare oggetti (How to create and modify objects). Reading: Open Clip Art Library. ----------- OPTIONAL MATERIALS Video: Tutorial sull’utilizzo dei fontwork (Tutorial on fontworks use). Students and tutors Mandatory tasks Task 1: Crea una brochure per il tuo telecentro utilizzando tutte le funzioni di Writer apprise durante l’unità 2 (Create a brochure for your telecentre, using all Writer’s function learnt in Unit 2): individual work aimed at applying, testing and customize the knowledge acquired during the Unit 2. Forum: La promozione del telecentro: materiali pubblicitari e informativi (Telecentre’s promotion: advertising and information materials): sharing and exchange of ideas, tools and strategies to promote your telecentre in the local context. Self Evaluation Questionnaire Unit 2 ------------
  • 41.
    VET4e-inclusion project 39 Optional Task:Crea un manifesto pubblicitario del tuo telecentro da affiggere nelle strade della tua città (Create an advertisement of your telecentre to be put up on the walls): individual work aimed at deepen communication strategies for your telecentre.
  • 42.
    VET4e-inclusion project 40 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 OpenOffice Calc, the spreadshee t 1 week available 5 hours of mandatory minimum commitment - To use Open Office Calc basic elements: rows, columns, cells. The concept of “range”. - To apply the most common basic Calc operations. - To create graphs with Calc. - To understand how to use Open Office Calc as a tool to develop digital literacy workshops. - Basic knowledge on Calc main screen. - Basic knowledge on Calc data typologies. - Basic knowledge of the concept of “range”. - Procedures on how to insert the most common Calc operations. - Procedures on how to format Calc cells. - Procedures on how to create and customize Calc graphs. This Unit is built on a two level methodological approach: 1. theoretical/didactic, providing deeper notions on the topic faced in the Unit. 2. Practical and customized, encouraging a personal use of the skills acquired to support everyday tasks. Reading: La schermata di calc (Calc main screen). Reading: Tipi di dati (Calc data typologies). Reading: Il concettto di estensione (The concept of “range”). Reading: Le formule più comuni (The most basic operations). Reading: Formattazione celle (How to format cells). Reading: Creare grafici con Calc (How to create graphs with Calc). ----------- OPTIONAL MATERIALS Reading: Esempio di attività: come personalizzare un foglio di calcolo di contabilità domestica (Activity example: how to customize a household accounting spreadsheet). Video: Tutorial sull’utilizzo di Calc (Tutorial on Calc use). Students and tutors Mandatory tasks Task 1: Crea il tuo foglio di contabilità domestica annual (Create your own household accounting yearly spreadsheet): individual work aimed at encouraging a useful and conscious use of the skills acquired. Forum: La lezione dell’unità (Lesson learnt): share and exchange with the other students difficulties and suggestions experienced during the Unit 3. If you need, ask for help to the most skilled students! Self Evaluation Questionnaire Unit 3
  • 43.
    VET4e-inclusion project 41 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 4 Impress: presentatio ns with OpenOffice 1 week available 5 hours of mandatory minimum commitment - To use Open Office Impress basic functions: open, modify and save presentations. - To insert texts, images and objects in your slides. - To personalize and make more attractive your presentations. - To understand how to use Open Office Impress as a tool to develop digital literacy workshops. - Overview of Impress work environment. - Procedures for creating a presentation through wizard . - Knowledge on the main operations to build Impress slides. - Procedures for inserting images in your slides. - Procedures for adding and deleting slides. - Basic knowledge on slides effects. - Procedures to export your presentation in other extensions. This Unit is built on a two level methodological approach: 1. theoretical/didactic, providing deeper notions on the topic faced in the Unit. 2. Practical, context-based and critical, encouraging the learners to become more and more independent in interpreting the local context/networks. Reading: L’ambiente di lavoro di Impress (Impress work environment). Reading: Creare una presentazione (How to create a presentation). Reading: Lavorare con le slide (How to work with the slides). Reading: Inserire immagini (How to insert images). Reading: Aggiungere ed eliminare slide (How to add and eliminate slides). Reading: Inserire gli effetti (How to insert effects). Reading: Transizione delle slide (Slides transition). Reading: Esportare in altri formati (How to export your slides in other extensions). ----------- OPTIONAL MATERIALS Reading: Manuale di Impress (Impress user’s guide). Video: Tutorial sull’utilizzo di Impress (Tutorial on Impress use). Students and tutors Mandatory tasks Task 1: Crea una presentazione con Impress, finalizzata a promuovere il tuo telecentro presso enti locali e strutture private nel tuo territorio di riferimento (Create your own Impress presentation, aimed at promoting your telecentre to local public/private bodies within your reference context). Forum: Telecentro e rete territoriale (Telecentre and local network): sharing and exchange of ideas and good practices on how to involve and stimulate local actors within telecentres activities. Self Evaluation Questionnaire Unit 4
  • 44.
    VET4e-inclusion project 42 Title ofthe Learning Units Duration Learning aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Closing Unit 10 days available 5 hours of mandatory minimum commitment - To assess knowledge/skills acquired - To apply in a customized, contextualized and transversal way knowledge/skills acquired during the whole learning path - To evaluate the adequateness of the learning module according to students - Final exam - Feedback Forum - Evaluation Questionnaire The final exam consists in a group exercise, aimed at assessing students' capability to use skills and competences acquired in each learning unit in an integrated and transversal way. It aims at evaluating work related skills (more than theoretical knowledge). The exercise has to be realized in groups of 5. The students themselves have to select their "final exam mates" during the 4 weeks of training (to foster interchange during the training and allow the constitution of groups of people sharing the same interests/ideas/projects/work contexts). A longer time should be foreseen for the realization of the exercise (10 days). After the deadline each group should present its product to the virtual class and the tutor in the framework of a face to face session or an online interactive session. Moreover, students will be proposed to answer an evaluation questionnaire on the module and to participate in a feedback forum. Final exam: imagine to start-up a restaurant and create: a. the menu of the week, using writer; b. a communication tool (ex. flyer, brochure etc), using impress; c. the weekly cash flow, using calc. Feedback Forum: Students are invited to share their final impressions on the module and say good-bye to other students and to the tutor. Evaluation Questionnaire: Students are asked to fill in a semi-structured questionnaire evaluating the following dimensions of the received training: learning outcomes; role and career development; overall satisfaction with the module. Students and tutors The final exam counts for 50% of the final note. This 50% should be attributed on the bases of the following criteria: coherence with the learning inputs (15 points), valorization of ICT based methodologies/tools (15 points), innovativeness and creativity (10 points), quality of the presentation (10 points). The remaining 50% is attributed on the basis of participation during the training (tasks submission and forum interventions).
  • 45.
    VET4e-inclusion project 43 Module 7 Developinga digital photography workshop in the telecentre Position within the curriculum: Stage 2 (consolidation step) / Category 4 (Competence in the use of technical tools as a basis and support of methodological actions) Profile entrance of students: Minimum of 4 months of professional or volunteer experience accompanying different types of users and especially vulnerable groups (in a training / guidance and / or socio-animation contexts) and / or Minimum of 4 months of professional or volunteer experience as e-facilitator in a telecentrecentre Knowledge: Basic knowledge of telecentres Basic knowledge of social animation and / or professional guidance processes Basic knowledge of digital photography and photography material and softwares Basic knowledge of digital photography uses in relation to web 2.0 tools Skills: Technology standard skills (office, multimedia) Relationship skills in dealing with the groups involved Relationship skills in creating a group interaction around a creative activity Competences: Planning activities for key groups. Animating collective and individual creative activity workshops (face to face and / or at distance) Output Profile of students Profile of e-facilitator for social inclusion facilitating creative workshops with groups and / or individuals in the telecentre (through facilitating access of various publics, including vulnerable groups, to creative activity resources –notably with web 2.0, the e-facilitator is actively involved in missions of social inclusion using ICT sources and advanced web 2.0 tools) Knowledge: Knowledge of basic and advanced digital photography material and techniques to take good pictures Knowledge of web 2.0 – based techniques for sharing digital photographies on line and taking part in photoblogging communities Knowledge of web 2.0 – based techniques and softwares for retouching pictures Knowledge of the added value of social media for promoting inclusion of publics through a creative activity, and more specifically, vulnerable target groups Knowledge of the local environment for connecting the work done in the telecentre to local realities and needs (i.e. developing photo-creation activities to enhance local democratic participation) Skills: Acquire skills in the course of collaborative work. Management skills of essential technological tools. Organization skills for developing creative workshop Skills in dealing with groups of potentially different level of ICT knowledge Competences: Management skills of essential technological tools. Management of basic digital photography tools, notably by using web 2.0 on-line tools Management of web 2.0 tools for facilitating digital photography uses of various target groups Organizing photo workshops in the telecentre, from basic to advanced levels
  • 46.
    VET4e-inclusion project 44 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Opening Module Unit Introducing Module 1 week available 1 hour of mandator y minimum dedication  To familiarize with the learning environment:  To familiarize with the platform and its functions;  To understand the overall objectives, contents and methodology of the module;  To understand tutor's role;  To understand the evaluation system and criteria.  To use the platform  To complete student personal profile;  To manage interactive tools;  To manage the communication with students and tutor. We offer the students the opportunity to access the platform a few days before the start of the module in order to provide him/her with relevant information about the course and module in order to facilitate his / her access to resources and participation in the module activities in the following units. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Module presentation: Module objectives Module contents Module target Module structure and methodology Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to use the platform: Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news Forum presentation of the students and tutors Informative and participative forums: o The Bulletin Board (tutor’s informative messages only) o The Introduction Forum (interactive introduction of students and tutor) Students and tutors No evaluation is foreseen. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. It is also an instrument to check students' motivation in order to prevent drop-outs. Therefore, selected students that don't access the platform during the Introduction week are substituted with enrolled students in the waiting list.
  • 47.
    VET4e-inclusion project 45 Unit 1: Takingpictures 5 hours of mandator y minimum dedication . 1 week  To know about the main functions of digital photo cameras  To acquire knowledge on the essential concepts of digital photography so as to take quality pictures  To learn about the characteristics of digital cameras and to understand the mechanisms useful to improve the quality of the pictures  To familiarize with the lexical field of photography and to understand how to play with the cameras’ parameters to improve the quality of the pictures  To learn about the commonly used techniques so as to make quality pictures The students are here offered the possibility to familiarize with the essential aspects of a digital camera. This first technical part provides the students with some useful concepts and techniques to understand how the camera works. In a second time, the students get familiar with technical terms and functions of the camera that may improve their capacity to take good pictures (speed, light, etc.). Also, the students deal with a more practical part of the digital photography by studying basic techniques commonly used by professionals to take good pictures (tips and rules to apply when they use the camera). The exercise of the unit 1 gives the students the chance to put into practice their new knowledge on photo techniques since they have to take their own pictures and comment on it through the forum to discuss this first exercise. Finally, the students have the possibility to go deeper in the subject by consulting links to photo blogs and on-line tutorials helping them composing a picture and have a critical eye in front of an image. Reading 1 : “Prenons quelques photos” [The reading is made of 2 parts, from which one is about the technical components of a digital photo camera and the types of digital cameras available. In this part the students get familiar with some technical terms and functions that may improve their capacity of taking good pictures. The second part is about the parameters and techniques to play with so as to get the ideal picture. Some tips are offered to the trainees]. URL (integrated in the reading as an optional reading): “Wikibook Photographie” [The link drives the students to a wikibook dedicated to photography]. ------------ Extra URL:“Tutoriel sur la composition d’une image” [Tutorial on the picture composition] Extra URL: “Tutoriel pour comprendre, analyser et savoir critiquer une photo” [Tutorial to know how to understand, analyse and criticize a photo] Extra-Resource: Glossary of technical terms Students and tutors  Task 1: Let’s take pictures. The students take pictures according to the tips indicated in the exercise’s instructions.  Task 2: Participation to the forum: feedback on the exercise  Task 3: Participation in the discussion forum “Les techniques de photo: quelle initiation pour les publics du centre multimédia?” [Discussion on “photography techniques: how to initiate the publics of the telecentre?”] Self Evaluation Unit 1
  • 48.
    VET4e-inclusion project 46 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 2: What to do with the pictures? 5 hours of mandator y minimum dedication . 1 week  To know about the possibilities offered to treat your pictures  Discover Internet web sites that offer on-line sharing of pictures • To learn to storage the digital pictures • To learn how to enjoy the pictures • To learn how to share pictures on- line by creating a Flickr account and familiarizing with this web 2.0 tool The unit focuses on the ways to take best advantage of one’s digital pictures. The students learn about the different techniques used to download images from the camera to the computer, as well as on various types of devices / supports (CD Rom, USB stick, external disc, etc.). At this level, they can learn in a practical way the possibilities to save their pictures under an appropriate format (see extra resources). The students familiarize with ways to storage their own pictures: different possibilities are presented. Finally, the students learn about a new way to enjoy one’s picture, by discovering a web 2.0 on-line tool that enables to share the pictures on-line. The students learn about this on-line tool called Flickr and learn how to create their own online Flick account. Reading 1: “Que faire avec ses photos?” [What to do with our pictures? The reading presents all the existing ways to download, storage, develop and share the pictures] ------------ Extra-URL 1: Picasa application Extra-URL 2: Tutorial on the formats to save pictures on the computer Extra-URL 3: Tutorial to lighten the weight of pictures Extra-URL 4: Panodia application to make photo creation Students and tutors  Task 1 : Exercise : Create a Flickr account  Task 2 : Exercise : Upload your pictures on Flickr  Task 3 : Exercise : Create an Internet address to access your Flickr account and pictures  Task 4 : Forum : « what to do with our pictures ? » Self Evaluation Unit 2
  • 49.
    VET4e-inclusion project 47 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Retouching pictures 5 hours of mandator y minimum dedication . 1 week  To acquire elementary knowledge on retouching picture  To learn most usable techniques for retouching pictures  To learn how to use a software of on-line pictures edition  To learn what the commonly used filters to modify and correct pictures are  To learn about an on-line tool that retouches pictures: Picnik.  To learn how to create interesting effects and / or transform pictures in an entertaining way  In this unit, students are making a step ahead and discover how to modify the pictures they took in the previous units:  The students learn about technical terms related to the field of retouching pictures. They also get to know some softwares and applications, amongst which Picnik.  The students learn how use Picnik, an on-line free editing tool that proposes many filters to apply on the images.  The students can discuss together on the possibility to use the retouching tool in the telecentre for initiating their publics on how to retouch pictures Reading 1: “Retoucher des photos” [Retouching pictures] ---------- Extra-Video: Apply filters on your Picture (with Photo Filtre) Extra-Resource: Download Photo-filtre Extra-Resource: Filters with Gimp Students and tutors  Task 1: Exercise: Retouch pictures  Task 2: Forum: activities of retouching pictures in the telecentre  Task 3: Wiki : collect resources / tutorials useful to apply filtres on your pictures Self Evaluation Unit 3
  • 50.
    VET4e-inclusion project 48 Unit 4: Sharing pictures 5hours of mandator y minimum dedication . 1 week  To discover web 2.0 environment of existing communities in matter of digital photography  To know more about the advantages of taking part in on-line communities  To learn how to share pictures on-line  To learn what the possibilities offered to the users so as to publish their pictures on-line are  To learn how to plan and animate a digital photography workshop  To familiarize with photobloggers’ communities as web 2.0 tools to increase the attractivity of digital photography  The students are applying all the knowledge and skills he or she acquired from the previous units:  They reach a level where they can learn to share their work on-line and participate in photobloggers communities.  The possibilities offered enable the students to organize their pictures in coherent albums and collections, using web 2.0 tools such as tags and geotags.  They are planning activities of photo workshops adapted to the publics of the telecentre and come up with a workshop programme.  They discover the possibilities offered to protect their photos using an adequate licence (see extra- resource). Reading 1: “Le partage des photos” [Sharing pictures] ------------- Extra-resources 1: Link to an on-line article “Les photographes n’ont pas encore apprivoisé Internet” [“Photographs haven’t familiarized with Internet yet”]. Extra-resources 2: link to the Creative Commons web site. Students and tutors  Task 1: Exercice: search on Flickr  Task 2: Exercise: join a group on Flickr  Task 3: Forum: how to programme a digital photography workshop in the telecentre  Task 4: wiki: collect some useful resources to prepare a digital photo workshop Self Evaluation Unit 4
  • 51.
    VET4e-inclusion project 49 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Closing Unit: 10 days available 1 hour of mandatory minimum dedication To assess knowledge/skills acquired The final exam is a 12 questions quiz which is to be complemented in a limited amount of time (12 minutes). The questions asked concern the 4 units of the course.  Final exam  Feedback forum  Evaluation Questionnaire Students and tutors  Task 1: Final Exam  Task 2: Final forum  Task 3: Evaluation questionnaire
  • 52.
    VET4e-inclusion project 50 Module 8 Facilitatingjob seeking in the telecentre Position within the curriculum: Stage 2 (consolidation step) / Category 3 (Methodological skills in the development of transversal projects) Profile entrance of students: Minimum of 4 months of professional or volunteer experience accompanying vulnerable groups in a job guidance process and / or Minimum of 4 months of professional or volunteer experience as e-facilitator in an on-line centre Knowledge: Basic knowledge of on-line centres Basic knowledge of classic job seeking and / or professional guidance processes Basic knowledge of job market and employment policies at local, regional and national levels Basic knowledge of employment characteristics on the territory where he / she operates Skills: Technology standard skills (office, multimedia) Relationship skills in dealing with the groups involved Relationship skills in approaching relevant local actors promoting employment Competencies: Standard on-line centre management skills. Planning activities for key groups. Animating training sessions (face to face and / or at distance) Output Profile of students Profile of e-facilitator for social inclusion facilitating job seeking pathway of groups and / or individuals in the on-line centre (through the accompaniment of job seekers in an employability improvement path –notably with web 2.0, the e-facilitator is actively involved in missions of social inclusion using ICT sources and advanced web 2.0 tools) Knowledge: Knowledge of basic and advanced job seeking and / or job guidance tools and processes Knowledge of web 2.0 – based techniques of job guidance Knowledge of the added value of social media for promoting employability of job seekers and more specifically, vulnerable target groups Knowledge of the local environment for connecting the work done in the on-line centre to local realities, and existing expertises and actors. Skills: Acquire skills in the course of collaborative work. Management skills of essential technological tools. Skills in dealing with groups of potentially different level of ICT knowledge Competences: Management skills of essential technological tools. Management of basic job research tools Management of web 2.0 tools for facilitating employability improvement Planning job guidance workshops in the on- line centre, from basic to advanced levels
  • 53.
    VET4e-inclusion project 51 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Opening Module Unit Introducing Module 1 week available 1 hour of mandator y minimum dedication  To familiarize with the learning environment:  To familiarize with the platform and its functions;  To understand the overall objectives, contents and methodology of the module;  To understand tutor's role;  To understand the evaluation system and criteria.  To use the platform  To complete student personal profile;  To manage interactive tools;  To manage the communication with students and tutor. We offer the student the opportunity to access the platform a few days before the start of the module in order to provide him/her with relevant information about the course and module in order to facilitate his / her access to resources and participation in the module activities in the following units. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Module presentation: Module objectives. Module contents. Module target. Module structure and methodology Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to the use the platform: Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news Forum presentation of the students and tutors Informative and participative forums: o The Bulletin Board (tutor’s informative messages only) o The Introduction Forum (interactive introduction of students and tutor) o Students and tutors No evaluation is foreseen. The Introduction Unit is a start-up unit aimed at facilitating the learning process that starts with Unit 1. It is also an instrument to check students' motivation in order to prevent drop-outs. Therefore, selected students that don't access the platform during the Introduction week are substituted with enrolled students in the waiting list.
  • 54.
    VET4e-inclusion project 52 Unit 1: Defining, assessingand diagnosing the situation 5 hours of mandator y minimum dedication . 1 week  To think about the issue of job seeking and / or guidance in the on-line centre  Getting familiar with assessment tools that will be used with the users and identify assets of the on-line centres for facilitating job research  To acquire necessary competences to use assessment and diagnosis tools  Defining the concept of “employability” and its use in a context of on-line job research  Identifying the assets of the on-line centre to promote employability and its role in the local environment  Defining the role of the e- facilitator (what he / she is/is not)  Evaluating the user’s situation when he / she enters the on-line centre  Identifying the resources available in the local environment to promote employability  Identifying of the possible use of the assessment tool, notably considering the diverse typologies of job seekers publics of the on-line centre A prior definition of the term “employability” is needed to better appropriate the tools, the methods and the whole process of “facilitating job seeking in the on-line centre”. It is offered to the students an individual task of thinking and awareness rising on key aspects of employment in the local environment. This first task enables each student to professionalize the process of facilitating job seeking in the on-line centre (task / exercise: draft a report on the environment where she / he operates). Then the students are gradually invited to bring their reflection up to the group by collecting resources available at local, regional and national level related to employability improvement (contribution to a wiki). The gradual and logical methodology of this unit enable the students to define their own role (role of e-facilitator) in relation to the promotion of employability and the facilitation of job seeking for groups and / or individuals in the on-line centre. Finally, the students are provided a key tool for diagnosticating the user’s level and ability to get to know and use basic and / or advanced tools for job search and employability improvement, through the discovery of the ICT Barometer for employability. Reading 1 : Définir, évaluer et diagnostiquer l’environnement Reading 2 : Le point de départ de l’utilisateur Reading 3 : Le rôle de l’animateur multimédia URL: Baromètre TIC ------------ Extra Reading: L’employabilité : de la politique de l’emploi à la gestion des compétences Extra URL: Test d’orientation Extra Reading: Questions pour identifier le point de départ de l’utilisateur Extra Reading: Guide pour agir Pole Emploi – Comment élaborer des projets professionnels Extra Resource : Forum on technical vocabulary Students and tutors  Task 1: Write a report on the local environment of the on- line centre in relation with employment  Task 2: Discover, try for oneself the ICT Barometer for employability and share your views on the Forum  Task 3: Participation in the discussion forum “Le Centre multimédia, l’Animateur et l’Utilisateur”  Task 4: Compile available relevant resources (links) in terms of employability in your environement and add it on the wiki. Self Evaluation Unit 1
  • 55.
    VET4e-inclusion project 53 Unit 2: Developping employability: somebasic resources 5 hours of mandator y minimum dedication . 1 week  Getting familiar with tools that users will need in order to develop basic digital competences • To learn to define some objectives with the users and to refine the profile of the users as job seekers, using appropriate tools • To deal with the basic tools: CV and cover letter. Distinguish different kinds of CV for different uses. Study cover letters. Study of the content they both should provide. • To facilitate an initiation to office tools for the users to create a CV and a cover letter (with Microsoft Office and Linux) • To put the user in situation by making a fake job interview The unit focuses on dealing with the essential documents the users will have to use to get ready for seeking for a job: CV, cover letter, and the interview. Before dealing with these resources, the students learn to define objectives and of professional profiles with the users The students are, in this unit, working on a programme for basic training of the users for their employability. Using appropriate tools, they learn to apply methods and advices in a step by step pathway, personalized depending on the public. It also integrates the resources available on-line for employability in the local context. They finally get familiar with job interviews simulation techniques, as the ultimate step of the unit training. Reading 1: Ressources personnelles élémentaires pour la recherche d’emploi Reading 2: Conditions requises et connaissances élémentaires pour la recherche d’emploi sur Internet Reading 3: La lettre de motivation Reading 4: Le Curriculum Vitae – CV Reading 5: L’entretien d’embauche ------------ Extra-Reading 1: Formation Windows – créez votre premier document Word 7 Extra-Reading 2: Principes du traitement de texte sous Linux Extra-Resources: Exemples et trames de CV et lettres de motivation Extra-Resources: Exemples de lettres de motivation (assistante commerciale) Extra-Resources: Exemples de CV Extra-Resources: Trame de CV chronologique inversé Extra-Resources: Trame de CV thématique Extra-Resources: Trame de CV européen Extra-Resources: Exercice de simulation pour l’entretien d’embauche. Jeu de rôle Extra-Resources: Glossaire de termes Students and tutors  Task 1 : elaborate a programme of basic training for employability  Task 2 : Forum : feedback on the exercice done  Task 3 : Wiki : List of resources for improving abilities and competences of the users  Task 4 : Forum : activities promoting basic employability Self Evaluation Unit 2
  • 56.
    VET4e-inclusion project 54 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods Techniques, Instruments and Materials Learning Unit Actors (Who) Evaluation Unit 3 Internet resources for employability 5 hours of mandator y minimum dedicatio n. 1 week  To manage efficiently resources for job research on Internet  To discover advanced resources and web 2.0 – based tools for on-line job seeking. • To facilitate both passive and active activities for users to search for a job on Internet  To manage an on-line job research data base  To facilitate and to guide users in uploading their CV on professional networks  To facilitate the access to job offers using RSS flux (syndication of contents)  To manage the users’ digital identity and raise awareness on this topic  The students are dealing with advanced techniques and tools for managing job research in the on-line centre.  By manipulating job data bases and on line professional networks, they are provided with a supplementary level of job research in relation with ICT.  The Web 2.0 dimension of the job research is analyzed in this unit: that means that students get familiar with concepts of RSS flux / syndication of contents, but also, respect and protection of users’ digital identity.  The Web 2.0 tools are integrated in the employability resources of their on-line centre. Reading 1: Ressources et banques d’emploi Reading 2: Réseaux sociaux professionnels Reading 3: l’identité numérique URL: un jeu en ligne pour alerter sur l’importance de l’identité numérique ---------- Extra-Reading: Linux et les outils Internet Extra-Reading: La syndication des contenus Extra-Reading: Présentation de Gmail Extra-Reading: Syndication d’offres d’emploi sur Keljob Extra-Reading: S’inscrire sur les réseaux sociaux et partager les outils Web 2.0 Extra-URL: Aide pour surfer sur le net avec Internet Explorer Extra-URL: CV créatifs Students and tutors  Task 1: make a guide for the users to know how to start a job research on-line  Task2: Forum: feedback about the exercice  Task 3: Wiki : collect advanced employability resources on Internet  Task 4: Forum: discussion on digital identity Self Evaluation Unit 3
  • 57.
    VET4e-inclusion project 55 Unit 4 Monitorthe process: organize a job research workshop in the on-line centre 5 hours of mandator y minimum dedication . 1 week  To organise job research workshops  To manage a data base for job research  To manage resources for job seeking (studied during the previous units) to think of a scheduled session of job research  To manage identified steps for an optimized job research to plan a job research workshop  To animate a job research workshop and plan follow up of users  The students are applying all the knowledge and skills he or she acquired from the previous units:  They collect all the datas and resources available in a “cabinet for employability” and put it in shape by creating a practical guide  They are planning activities of guidance of the users by working on the organization of job research workshops  They learn how to integrate follow up and evaluation, using appropriate tools, of the users’ pathway. Reading 1: « L’armoire employabilité » Reading 2: Guide des bonnes pratiques de la recherche d’emploi Reading 3: Ressource intéressante: atelier en 7 étapes pour faciliter la recherche d’emploi en centre multimédia ------------- Extra-resources 1: Trame de planning Extra-resources 2: Fiche de suivi Students and tutors  Task 1: Exercice: collect resources to be used for the « employment cabinet » of your on-line centre  Task 2: Forum: feedback about the exercice  Task 3: Forum: working on methodologies to be implemented in order to promote employability in the on-line centre. Self Evaluation Unit 4 Closing module Unit Forum and evaluation questionnaire 10 days available 1 hour of mandator y minimum dedication  To assess knowledge/skills acquired The final exam is a 12 questions quiz which is to be complemented in a limited amount of time (12 minutes). The questions asked concern the 4 units of the course.  Final exam  Feedback forum  Evaluation Questionnaire Students and tutors  Task 1: Final Exam  Task 2: Final forum  Task 3: Evaluation questionnaire
  • 58.
    VET4e-inclusion project 56 Module 9 Planninga digital literacy workshop Position within the curriculum: Stage 1 (entrustment) / Category 2 (Methodological skills in working with groups of participants) Profile entrance of students: Professional profile low, up to 4 months being an e-facilitator. Knowledge: Knowledge of the telecenter and its users. Skills: Technology standard skills (office, multimedia) Relationship skills in dealing with the groups involved. Competencies: Standard telecenter facilitator skills. Skills in ICT technologies and tools Output Profile of students: Profile of a facilitator. Knowledge: Learning the concept of digital literacy and digital divide. Learn what a telecentre and what is its mission. Diagnose learning needs. Mark objectives. Workshop tools for digital literacy and assessment. Skills: Acquire skills of essential technological tools. Acquire skills to organize optimal courses. Competences: Basics of our work in the telecenter and the elements it is based. Empowerment of the essential concepts of a facilitator.
  • 59.
    VET4e-inclusion project 57 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Opening Module Unit Introducing Module 1 week -Acquire knowledge and abilities in managing the learning environment -To use of the platform -To complete student personal profile; -To manage interactive tools; -To manage the communication with students and tutor. We offer to the student the opportunity to access to the platform a few days before the start of the module in order to provide him/her relevant information about the course and module in order to facilitate the further development of learning units. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Modules presentation: Goals of the module. Contents of the module. Target of the module. Module structure and methodology Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to the use of the platform. Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news  Forum presentation of the students and tutors Students and tutors It isn’t an evaluation unit. It serves to connect students to the training process.
  • 60.
    VET4e-inclusion project 58 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 1: Digital literacy and telecenters 5 hours of mandatory minimum commitment. 1 week - Understand what is the digital divide and how to translate that global concept to the local reality of the telecenter. - Understand the concept of digital literacy. - To know what is a digital literacy workshop. -Learn the concept of digital literacy and digital divide. - Learn what a telecenter and what is its mission. - Learn key concepts of the facilitator's job: digital inclusion, dinamization,... -Bringing the concepts learned to the reality of each telecenter and community. It offers the student a global definition of the concept of digital divide, digital literacy and telecenter. Once these global concepts are assumed, we will make students to bring it closer to the reality they live in their telecenters. To carry out this exercise, we propose the student to share with the rest of students his own definition of the concept through the forum. With the contribution of the definitions of all group members and the help of the facilitator, we will create a definition of global concepts and see how they can be adapted to the reality of the students. As a task of the unit, students the tutor will ask students to make a proposal of 10 tools to work with digital literacy in their telecenters. Reading: El reto de la alfabetización digital. Reading: ¿Alfabetización digital = Conocimientos técnicos? Reading: Estrategias y elementos de Alfabetización Digital Reading: ¿Pero qué hacemos en un taller de Alfabetización Digital? ------------ Extra Reading: ¿Qué es la brecha digital? Extra Reading: Las cifras: ¡una pincelada! Extra Reading: : ¿Cómo superar la brecha digital? Extra Reading: ¿Qué es un telecentro? ¿Qué se puede hacer en él? Extra Reading: Las tres líneas de trabajo Extra Reading: ¿Quiénes son los protagonistas de un telecentro? Extra Reading: List of resources collected in Task "10 proposals“ Extra forum: Unit 1: Doubts forum. Students and tutors Task 1 - Forum: Share with the group your definition of digital literacy. Task 2: 10 proposals for digital literacy tools. Self Evaluation Unit 1
  • 61.
    VET4e-inclusion project 59 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 2: Analyze the context and define objectives 5 hours of mandatory minimum commitment. 1 week -Understand the importance of planning the training, make a diagnosis and defining the objectives in a consistent manner based on identified needs. - Learn to make a diagnosis of the needs and characteristics of the target. - Learn how to define the objectives of the workshop in a manner consistent with the previously identified needs. The unit focus on enlarging the acquisition of Knowledge about making a specific diagnosis to identify needs of the users of a Telecenter. We will help students to learn to do that, analysing a practical case. Tutor will ask to do that as a first task. This exercise Will help students to learn to define the objectives of the workshop in a manner consistent with the previously identified needs. The tutor Will suggest to deliver a second task the student WHERE Should Develop the design of a Digital Literacy Workshop. Students will have the support of some written material, apart from the forum that will be moderated by the tutor through the Moodle platform. Reading: La importancia de analizar el contexto. Reading: Análisis de las características de los participantes. Reading: El entorno en el que desarrollamos nuestro taller de alfabetización. Reading: ¿Qué es un objetivo? Reading: Cómo definir los objetivos. Reading: ¡Que cansancio! ¿Es necesario formular los objetivos? Reading: ¿Cómo debe redactarse un objetivo? Reading: Ejemplo de objetivos de un taller de alfabetización digital. ------------ Extra forum: Unit 2: Doubts forum. Students and tutors Task 1 - Forum: Análisis de un caso práctico. Task 2: Primeros pasos para diseñar el Taller de Alfabetización Digital: ¿A quién nos dirigiremos? ¿Cuáles son nuestros objetivos? Self Evaluation Unit 2
  • 62.
    VET4e-inclusion project 60 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 3 To plan the Workshop. The Eassy Computer tool. 5 hours of mandatory minimum commitment. 1 week -Learning to know the aspects that must be taken into account when planning a digital literacy workshop (materials, timing, content ...) -Knowing the resource Easy Computer as a tool for digital literacy work with telecenter users. -Learn to plan a workshop on digital literacy. -Learn to use the tool Easy Computer as a teaching support material of digital literacy workshops. -Learn and gain confidence with the uses and applications of Easy Computer in a classroom. Tutor proposes to students work with the Easy Computer tool in order to know how it works, how can they use it with final users and how useful are learning-sheets of Easy Computer. After haven seen and used this tool, tutor will ask students to discuss about the criteria of a good methodological organization of digital literacy workshop in a Forum. After that and using as a base this tool, each student will design and develop and design a plan and structure the organization of a workshop on digital literacy. Students will have the possibility to share their tasks with the rest of students through an specific forum. Students will have the support of some written material, apart from the forum that will be moderated by the tutor through the Moodle platform. Reading: ¿Qué es el Ordenador Práctico? Reading: ¿Para qué sirve el Ordenador Práctico? Reading: ¿En qué consiste el Ordenador Práctico? Reading: ¿Cómo funciona el Ordenador Práctico? Reading: ¿Cómo utilizo el Ordenador Práctico en el Telecentro? Reading: Superando límites ------------ Extra forum: Unit 3: Doubts forum. Extra forum: Let’s share Task 2. Students and tutors Task 1 - Forum: Criteria for methodological organization of digital literacy workshop. Task 2: Planning and structuring the organization of a workshop on digital literacy. Self-Evaluation Unit 3
  • 63.
    VET4e-inclusion project 61 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 4 The evaluation, as a GPS of facilitators. 5 hours of mandatory minimum commitment. 1 week - Understand the importance of evaluation as a system to improve future applications. -Learn the phases of the evaluation: a) Prior to the workshop at the telecentre, to detect the starting point: initial assessment and diagnosis. b) During the workshop to see where we go and adapt if necessary. c) After the workshop to see if we have achieved what we have designed. - Get the tools and strategies to evaluate the activities. The unit tries to make see students how important is the evaluation during a training. This is why the tutor will make students to suggests and discuss about dynamics of evaluation in a Forum. The second task that will be asked to do is to design a evaluation questionnaire in order to see how different could be a evaluation developped at the beginning of a training, a midium or a final evaluation. Students will have the possibility to share their tasks with the rest of students through an specific forum. Students will have the support of some written material, apart from the forum that will be moderated by the tutor through the Moodle platform. Reading: Fases de la Evaluación Reading: Estrategias de la Evaluación Reading: Instrumentos y dinámicas Reading: Cuestionarios en la web ------------ Extra Resource: Example of evaluation questionnaire. Extra forum: Unit 3: Doubts forum. Students and tutors Task 1 - Forum: Dynamic evaluation for workshops and courses. Task 2: Design an evaluation questionnaire. Self-Evaluation Unit 4.
  • 64.
    VET4e-inclusion project 62 Closing module Unit Forumand evaluation questionnaire 1 week Become aware of the achievements of the module Evaluation Forum. Evaluation Questionnaire. Students will be proposed to answer a questionnaire evaluation of the module and to participate in a dialogue-forum evaluation. Evaluation Forum and Good bye. Evaluation Questionnaire. Final Exam. Students Final Exam
  • 65.
    VET4e-inclusion project 63 Module 10 TelematicProcedures - facilitating access to e-services Position within the curriculum: Stage 1 (entrustment) / Category 3 (Methodological skills in the development of transversal projects). Profile entrance of students: Professional profile low, up to 4 months being an e- facilitator. Knowledge: Knowledge of the telecenter and needs of its users. Skills: Technology standard skills (use of word processor, multimedia and Internet browsing) Good relation dealing with groups: good listener, empathetic,… Competencies: Standard telecenter facilitator skills. Skills in ICT technologies and tools. Output Profile of students: Profile of a facilitator. Knowledge: It's about learning to be developed to facilitate the incorporation of citizens to practical uses of the Internet, introducing personal value to the use made of the network. Online procedures arise as enabling tools to the user's life and also as a channel for community participation. Skills: Being able to realize telematic transactions using telematic media that are at their disposal. Competences: -To identify the knowledge needed to use telematics. -To identify the basic steps to use easy telematics procedures in our community. -To know the characteristics of users of the telecentre. -To know to identify the role of telecenters in telematics. -Understand the legal framework in which telematics are realized. -Know the basic tools of telematic procedures. -To learn to disseminate telematic procedures.
  • 66.
    VET4e-inclusion project 64 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Opening Module Unit Introducing Module 1 week -Acquire knowledge and abilities in managing the learning environment -To use of the platform -To complete student personal profile; -To manage interactive tools; -To manage the communication with students and tutor. We offer to the student the opportunity to access to the platform a few days before the start of the module in order to provide him/her relevant information about the course and module in order to facilitate the further development of learning units. The only mandatory tasks of the Introduction Unit are: Introduce oneself in the “Introduction Forum”; Complete ones personal profile; Consult the Bulletin Board and the Introduction forum to read the messages from the tutor/other students. Modules presentation: Goals of the module. Contents of the module. Target of the module. Module structure and methodology Personal and technical requirements Tutorship of the Module Forums Module plan Information about how to the use of the platform. Short guide about the Use of Moodle platform. Guide to retouch the photo of your profile. Bulletin board and news  Forum presentation of the students and tutors Students and tutors It isn’t an evaluation unit. It serves to connect students to the training process.
  • 67.
    VET4e-inclusion project 65 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 1: Telematics. 5 hours of mandatory minimum commitment. 1 week -To know the concept of telematics. -To identify the knowledge needed to use telematics. -To identify the basic steps tp use easy telematics procedures in our community. -To know the characteristics of users of the telecentre. -To know to identify the role of telecenters in telematics. -Telematic procedures. -Environment and community. -Users and their needs. -The role of a telecenter. This unit will be able to define telematics, identify the skills needed to carry them out, identify those that are essential to our environment, understand the specific caracteristics of our telecentre users and identify which role should play telecenters here. Students will have the support of some written material, apart from the forum that will be moderated by the tutor through the Moodle platform. Students will have to deliver two tasks. Reading: Las gestiones telemáticasReading: Nuestro entorno. Reading: Nuestros usuarios. Reading: El papel del telecentro. ------------ Extra Reading: Yo rehuso a la empresa y el profesional no telemático. Extra Reading: Obligatorio hacer todos tus trámites por Internet. Extra Reading: : Sólo el 30% de los ciudadanos confía en... Extra Video: Muchos ayuntamientos facilitan... Extra Reading: Datos recientes sobre el uso... Extra Reading: Los ayuntamientos apenas permiten... Extra Reading: Administración electrónica municipal Students and tutors Task 1: Ventajas de realizar gestiones telemáticamente. Task 2 - Forum: ¿Están todas? Self Evaluation Unit 1
  • 68.
    VET4e-inclusion project 66 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 2: Security and tools. 5 hours of mandatory minimum commitment. 1 week -Understand the basic principles to managing telematics with a minimum of security. -Understand the legal framework in which telematics are realized. -Know the basic tools to do telematic procedures in public administration. -Telematics procedures (Certificate and digital signature, Electronic ID. Internet Payment,...). -Safety and telematics procedures -National and European legislation about security in telematic procedures. This unit will give to facilitators dynamic information about the basic principles to managing telematics with a minimum of security taking into account the legal framework. The unit will offer some additional tools and resources to complement the contents given by on it. This unit will also offer the possibility to see some examples os telematic procedures. Students will have the support of some written material, apart from the forum that will be moderated by the tutor through the Moodle platform. Students will have to deliver two tasks. Reading: La seguridad y las gestiones telemáticas. Video: Certificado y firma digitales. DNI electrónico. Reading: Formas de pago por Internet. Reading: Normativa nacional y europea. ------------ Extra Video: Pago de impuestos Extra Video: Contraseñas seguras Extra Video: Pishing Extra Video: Paypal Extra Reading: Guía de los derechos de los usuarios TIC Extra Reading: Seguridad en la red Extra Reading: La Ley de Internet fácil Extra Reading: Ley 11/2007, de acceso electrónico de los ciudadanos a los Servicios Públicos. Students and tutors Task 1: Consejos de seguridad. Task 2 - Forum: DNI, certificados y firmas Self Evaluation Unit 2
  • 69.
    VET4e-inclusion project 67 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 3 Directory of telematic procedures. 5 hours of mandatory minimum commitment. 1 week -To know basic steps on telematic procedures. -To know to create a technical sheet to teach telematics procedures. -To create a directory of telematic procedures. -Key points of telematic procedures. -How to create a technical sheet to teach telematics procedures. -Preparation and classification of technical sheets on telematics procedures to facilitate the learning of future end users. Entering fully in telematics issues, students will learn how to make technical sheets to teach telematic procedures to facilitate the learning of future end users. Students will also prepare and classify these technical sheets using a wiki, where they will work this issue collaboratively for the creation of an extensive directory of telematic procedures. Students Will Have the support of some written material, apart from the forum and the wiki that Will be moderated by the tutor through the Moodle platform. Reading: Puntos clave de una gestión telemática Reading: La ficha de una gestión telemática Reading: Ficha ejemplo Reading: Gestiones telemáticas básicas. ------------ Extra Reading: Manual de supervivencia en la Administración electrónica. Extra Website: www.comopuedo.net Extra Reading: Trámites y solicitudes Extra Reading: Guía práctica Extra Website: Portal ciudadano Junta de Extremadura Students and tutors Task 1 - Wiki: Gestiones telemáticas Task 2: Foro: Atemporalidad de las fichas Self-Evaluation Unit 3
  • 70.
    VET4e-inclusion project 68 Title ofthe Learning Units Duration Learnings aims/outcome Learning Contents (What is taught) Pedagogies and Educational Methods (How) Techniques, Instruments and Materials Learning Unit Actors Evaluation Unit 4 Dissemination 5 hours of mandatory minimum commitment. 1 week -To learn to disseminate telematic procedures. -Learn to disseminate telematic procedures through posters, blogs, websites, social networks and also trought the telecenter. -Provide interactive spaces for discussion and to share experiences and knowledge with among facilitators (students) of the course. In this unit, it will be given indications about how to disseminate telematic procedures apart from giving some indications about which knowledges and skills are necessary to do them. Dissemination will be suggested to do through posters, blogs, websites, social networks, etc... Students Will Have the support of some written material, apart from the forum and the wiki that Will be moderated by the tutor through the Moodle platform. Reading: Cómo hacer la difusión ------------ Extra Resource: Manual de compra en línea. Extra Resource: Cómo puedo Extra Website: Tutoriales interactivos. Diputaicón de Burgos. Extra Resource: Decálogo seguridad. Extra Resource: Piensa antes de publicar. Extra Resource: Coslada, Ciudad Digital. Students and tutors Task 1 : Un ejemplo de difusión Task 2- Foro: Seguimiento Self-Evaluation Unit 4. Closing module Unit Forum and evaluation questionnaire 1 week Become aware of the achievements of the module Evaluation Forum. Evaluation Questionnaire. Students will be proposed to answer a questionnaire evaluation of the module and to participate in a dialogue-forum evaluation. Evaluation Forum and Good bye. Evaluation Questionnaire. Final Exam. Students Final Exam