for investors
REAL-TIME LOCATION SYSTEM (RTLS)
& LOCATION ANALYTICS
Introduction
47 team members
and growing
Kyiv,
New York, Sunnyvale (CA),
Tel Aviv, Copenhagen
IoT hardware and software,
wireless, indoor positioning
& GIS, Big Data
Advanced
technical expertise
retail analytics, mobile marketing,
smart city, smart parking, venue
security & safety
Emerging
domain expertise
Device demo kits, SDK,
API, demo portal
Quick start —
try today!
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Leantegra is an IoT company developing SOFTWARE-HARDWARE products
for foot traffic engagement and analysis.
Products
CVO PortalWiBeat BLE WiBeat UWB WiRange
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
CVO Platform provides an integrated, based on real-time location data,
stack of SOFTWARE and HARDWARE
CVO Platform Components
Cloud SaaSPowerGateWiRangeWiBeat
UWB/BLE
CVO Portal
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
a battery-powered
location tag based on
Bluetooth LE, iBeacon
and Eddystone
a multi-protocol wireless
gateway for location analytics
and proximity marketing
an application server and big data storage that can
be deployed both on-site or in the cloud providing
access to the CVO Portal (for administrative users),
API (for integration with other systems) and SDKs
(for mobile apps development).
an on-site server for real-time
data processing and secure
cloud connectivity
a centralized web interface
to all information and
administration features of
CVO Platform
Frequently Asked Questions
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
These are the frequently asked questions any company
seeking to deploy RTLS would ask.
What kind of wireless technologies
does RTLS use?
How does Real-time Location
System work?
What are the BLE, Wi-Fi and UWB
RTLS sniffing ranges?
1
2
3
Real-time Location System
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Real Time Location Systemenables
the identification of the real-time indoor location
of an individual or an asset using Wi-Fi,
Bluetooth Low Energy (BLE) and Ultra-Wideband (UWB)
(soon to be released) wireless technologies.
It scales easily, allowing fast integration
with third-party systems (API) and mobile
applications (SDK).
Potential Customers
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
 Business Owners
 Marketing Specialists
 Business Analysts
 Operations Managers
 System Admins
 Security Professionals
 Retail
 Entertainment
 Healthcare
 Manufacturing
 Logistics and Aviation
 Defense and Security
 Management
 Logistics
 Marketing
 Security
 IT
KEY USERS FIELDS INDUSTRIES
Main Goals
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
 Measure and increase operational efficiency
 Improve asset management
 Monitor movements of assets and individuals
 Ensure security of premises and assets
 Improve client service and increase customer
satisfaction
 Optimize the staffing levels required at a particular
area
 Simplify the process of a rental properties’ rates
calculation
MAIN GOALS
25-30 m
WI-FI BLE UWB
40-50 m 90-100 m
Types of RTLS
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Depending on a business case and technical
requirements, Leantegra offers:
BLE RTLS Wi-Fi RTLS UWB RTLS (soon to be released)
Wi-Fi RTLS — How it Works
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
ID
1
2
3
4
Three WiRanges are placed
in a venue
A person enters an area with
a smartphone / tablet
The user’s device is sending
wireless signals / packets
WiRanges detect those
signals / packets along with
the unique identifier of the device
5
6
7
8
After receiving the signals / packets
from the smart device, WiRange passes
this information over to PowerGate
Once per second PowerGate determines
accurate location of a particular
smart device and sends the aggregated
data to the PowerController
PowerController processes
the information received
CVO Portal displays the results, showing
real-time positioning and movement
of an individual on the venue map
Wi-Fi RTLS enables indoor movement tracking of individuals via Wi-Fi, showing 2-4 meters accuracy.
BLE RTLS — How it Works
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
ID
1
2
3
4
Three WiRange devices are placed
in a venue
A person enters an area with
a smartphone / tablet
The user’s device is sending
wireless signals / packets
WiRanges detect those
signals / packets along with
the unique identifier of the device
5
6
7
8
After receiving the signals / packets
from the smart device, WiRange passes
this information over to PowerGate
Once per second PowerGate determines
accurate location of a particular
smart device and sends the aggregated
data to the PowerController
PowerController processes
the information received
CVO Portal displays the results, showing
real-time positioning and movement
of an individual on the venue map
BLE (Bluetooth Low Energy) RTLS enables indoor movement tracking of individuals and assets via
BLE (Bluetooth Low Energy), showing 2-4 meters accuracy.
Mobile RTLS
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Mobile RTLSis an indoor positioning feature
that allows a smartphone user see his / her location
on a mobile application map in real time.
This functionality is based on BLE RTLS where
a smartphone user is not required to maintain
an active Internet connection.
Location Analytics
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Location Analyticsis the process
of real-time location data generation that is
based on people and asset movement,
and aimed at providing key business
service metrics.
Location Analytics Metrics
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Based on Wi-Fi and BLE RTLS, Location Analytics provides deep insights into customer behavior
via user-friendly reports available in CVO Portal:
Location Popularity
shows a number of visitors
attending every mapped area
in real time
Returning / New Visitors
presents the number of new
and returning visitors
Visitors / Passersby
counts Passersby - people
who spent less than three minutes
(for example) in a particular location,
and Visitors - ones who stayed longer
Average Dwell Time
displays the average time spent
by a person in a specific area in a certain
period of time.
Location Analytics
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Customer Auchan (Ukraine), www.auchan.ua
Vertical FMCG Retail
Dates Q2 — 4 2016
Plans for the future After the pilot installation is over, we are planning to supply all Auchan stores in Ukraine with
Proximity Marketing and RTLS solutions.
In addition, Marketing specialists are able to run Proximity campaigns utilizing both the general campaign
targeting options, and Age and Gender parameters supplied by a user during the registration process.
Solutions The Pilot project’s main aim is to evaluate
customer behavior in Auchan. This deploy-
ment includes:
 Proximity Marketing, RTLS and Location
Analytics solutions
 Installation of 4 WiRanges and 180 WiBeats
 Development of an Android mobile appli-
cation with an enabled registration process
Auchan gains an access to the following
fine-grained analytics per customer:
 The time and type of push-notifications re-
ceived / opened by a customer
 Information about the areas visited by a
client
Leantegra Stage 1 installation covers 2000 sq meters with 12 WiRange devices and 1 PowerGate installed.
The customer's goal is to ensure compliance with the standard service quality requirements:
Passenger wait time (in a line)
in front of the Security Control
does not have to exceed
15 minutes
Passenger wait time in front
of the Passport Control does
not have to exceed 15 minutes
Case Study - Boryspil Airport (Terminal D)
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
Project Stage 1 — How it works:
Leantegra RTLS collects non-personified data
via BLE and Wi-Fi from smart devices
The system detects the above devices,
and identifies passengers’ routes
RTLS enables measuring the Dwell Time,
the time a passenger spends in a particular zone
The Leantegra solution performs passenger
calculation in queues
A user can generate real-time and historic location data
reports in CVO Portal, like: Number of Passengers,
Average Dwell Time, and Pass Time etc.
Case Study - Boryspil Airport (Terminal D)
© 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
If you have any questions,
feel free to email us at contact@leantegra.com
THANK YOU!
www.leantegra.com

Leantegra Real-Time Location System

  • 1.
    for investors REAL-TIME LOCATIONSYSTEM (RTLS) & LOCATION ANALYTICS
  • 2.
    Introduction 47 team members andgrowing Kyiv, New York, Sunnyvale (CA), Tel Aviv, Copenhagen IoT hardware and software, wireless, indoor positioning & GIS, Big Data Advanced technical expertise retail analytics, mobile marketing, smart city, smart parking, venue security & safety Emerging domain expertise Device demo kits, SDK, API, demo portal Quick start — try today! © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential Leantegra is an IoT company developing SOFTWARE-HARDWARE products for foot traffic engagement and analysis.
  • 3.
    Products CVO PortalWiBeat BLEWiBeat UWB WiRange © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential CVO Platform provides an integrated, based on real-time location data, stack of SOFTWARE and HARDWARE
  • 4.
    CVO Platform Components CloudSaaSPowerGateWiRangeWiBeat UWB/BLE CVO Portal © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential a battery-powered location tag based on Bluetooth LE, iBeacon and Eddystone a multi-protocol wireless gateway for location analytics and proximity marketing an application server and big data storage that can be deployed both on-site or in the cloud providing access to the CVO Portal (for administrative users), API (for integration with other systems) and SDKs (for mobile apps development). an on-site server for real-time data processing and secure cloud connectivity a centralized web interface to all information and administration features of CVO Platform
  • 5.
    Frequently Asked Questions ©2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential These are the frequently asked questions any company seeking to deploy RTLS would ask. What kind of wireless technologies does RTLS use? How does Real-time Location System work? What are the BLE, Wi-Fi and UWB RTLS sniffing ranges? 1 2 3
  • 6.
    Real-time Location System ©2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential Real Time Location Systemenables the identification of the real-time indoor location of an individual or an asset using Wi-Fi, Bluetooth Low Energy (BLE) and Ultra-Wideband (UWB) (soon to be released) wireless technologies. It scales easily, allowing fast integration with third-party systems (API) and mobile applications (SDK).
  • 7.
    Potential Customers © 2016Leantegra Inc. All Rights Reserved. Proprietary and Confidential  Business Owners  Marketing Specialists  Business Analysts  Operations Managers  System Admins  Security Professionals  Retail  Entertainment  Healthcare  Manufacturing  Logistics and Aviation  Defense and Security  Management  Logistics  Marketing  Security  IT KEY USERS FIELDS INDUSTRIES
  • 8.
    Main Goals © 2016Leantegra Inc. All Rights Reserved. Proprietary and Confidential  Measure and increase operational efficiency  Improve asset management  Monitor movements of assets and individuals  Ensure security of premises and assets  Improve client service and increase customer satisfaction  Optimize the staffing levels required at a particular area  Simplify the process of a rental properties’ rates calculation MAIN GOALS
  • 9.
    25-30 m WI-FI BLEUWB 40-50 m 90-100 m Types of RTLS © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential Depending on a business case and technical requirements, Leantegra offers: BLE RTLS Wi-Fi RTLS UWB RTLS (soon to be released)
  • 10.
    Wi-Fi RTLS —How it Works © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential ID 1 2 3 4 Three WiRanges are placed in a venue A person enters an area with a smartphone / tablet The user’s device is sending wireless signals / packets WiRanges detect those signals / packets along with the unique identifier of the device 5 6 7 8 After receiving the signals / packets from the smart device, WiRange passes this information over to PowerGate Once per second PowerGate determines accurate location of a particular smart device and sends the aggregated data to the PowerController PowerController processes the information received CVO Portal displays the results, showing real-time positioning and movement of an individual on the venue map Wi-Fi RTLS enables indoor movement tracking of individuals via Wi-Fi, showing 2-4 meters accuracy.
  • 11.
    BLE RTLS —How it Works © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential ID 1 2 3 4 Three WiRange devices are placed in a venue A person enters an area with a smartphone / tablet The user’s device is sending wireless signals / packets WiRanges detect those signals / packets along with the unique identifier of the device 5 6 7 8 After receiving the signals / packets from the smart device, WiRange passes this information over to PowerGate Once per second PowerGate determines accurate location of a particular smart device and sends the aggregated data to the PowerController PowerController processes the information received CVO Portal displays the results, showing real-time positioning and movement of an individual on the venue map BLE (Bluetooth Low Energy) RTLS enables indoor movement tracking of individuals and assets via BLE (Bluetooth Low Energy), showing 2-4 meters accuracy.
  • 12.
    Mobile RTLS © 2016Leantegra Inc. All Rights Reserved. Proprietary and Confidential Mobile RTLSis an indoor positioning feature that allows a smartphone user see his / her location on a mobile application map in real time. This functionality is based on BLE RTLS where a smartphone user is not required to maintain an active Internet connection.
  • 13.
    Location Analytics © 2016Leantegra Inc. All Rights Reserved. Proprietary and Confidential Location Analyticsis the process of real-time location data generation that is based on people and asset movement, and aimed at providing key business service metrics.
  • 14.
    Location Analytics Metrics ©2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential Based on Wi-Fi and BLE RTLS, Location Analytics provides deep insights into customer behavior via user-friendly reports available in CVO Portal: Location Popularity shows a number of visitors attending every mapped area in real time Returning / New Visitors presents the number of new and returning visitors Visitors / Passersby counts Passersby - people who spent less than three minutes (for example) in a particular location, and Visitors - ones who stayed longer Average Dwell Time displays the average time spent by a person in a specific area in a certain period of time.
  • 15.
    Location Analytics © 2016Leantegra Inc. All Rights Reserved. Proprietary and Confidential Customer Auchan (Ukraine), www.auchan.ua Vertical FMCG Retail Dates Q2 — 4 2016 Plans for the future After the pilot installation is over, we are planning to supply all Auchan stores in Ukraine with Proximity Marketing and RTLS solutions. In addition, Marketing specialists are able to run Proximity campaigns utilizing both the general campaign targeting options, and Age and Gender parameters supplied by a user during the registration process. Solutions The Pilot project’s main aim is to evaluate customer behavior in Auchan. This deploy- ment includes:  Proximity Marketing, RTLS and Location Analytics solutions  Installation of 4 WiRanges and 180 WiBeats  Development of an Android mobile appli- cation with an enabled registration process Auchan gains an access to the following fine-grained analytics per customer:  The time and type of push-notifications re- ceived / opened by a customer  Information about the areas visited by a client
  • 16.
    Leantegra Stage 1installation covers 2000 sq meters with 12 WiRange devices and 1 PowerGate installed. The customer's goal is to ensure compliance with the standard service quality requirements: Passenger wait time (in a line) in front of the Security Control does not have to exceed 15 minutes Passenger wait time in front of the Passport Control does not have to exceed 15 minutes Case Study - Boryspil Airport (Terminal D) © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
  • 17.
    Project Stage 1— How it works: Leantegra RTLS collects non-personified data via BLE and Wi-Fi from smart devices The system detects the above devices, and identifies passengers’ routes RTLS enables measuring the Dwell Time, the time a passenger spends in a particular zone The Leantegra solution performs passenger calculation in queues A user can generate real-time and historic location data reports in CVO Portal, like: Number of Passengers, Average Dwell Time, and Pass Time etc. Case Study - Boryspil Airport (Terminal D) © 2016 Leantegra Inc. All Rights Reserved. Proprietary and Confidential
  • 18.
    If you haveany questions, feel free to email us at contact@leantegra.com THANK YOU! www.leantegra.com