SlideShare a Scribd company logo
1 of 4
Student Workbook Module: Reviewing requirements
Lab 1: Conducting a review
© Copyright IBM Corp. 2013 1
Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
Lab: Conducting a review
Objectives
At the end of this lab you will be able to:
► Create and conduct a formal review
Given
► The JKE Banking Money That Matters project
► The Automated Water Meter (AMR) project
Description
► In this lab, you log in as Bob. You create a formal review of a collection of requirements and assign team
members to participate. Then, you log in as different team members and participate in a formal review. You
log in again as Bob, the review creator, to monitor the review progress and to finalize it after all of the
participants are finished.
Exercise tasks
In this exercise, you complete these tasks:
 Task 1: Creating a review from a collection
 Task 2: Completing a review as an approver
 Task 3: Completing a review as a reviewer
 Task 4: Finalizing a review
Student Workbook Module: Reviewing requirements
Lab 1: Conducting a review
2 © Copyright IBM Corp. 2013
Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
Task 1: Creating a review from a collection
In this task, you create a formal review to solicit input from stakeholders on proposed features to be addressed in an
upcoming release.
1. Open the lab environment at https://jazz-server:9443/rm/web and log in as Bob the analyst by typing bob for
both the user ID and password.
2. On the All Projects page, in the My Projects section, find the JKE Banking (Requirements Management) project
and click Show Artifacts.
3. From the Collections menu, click Browse Collections.
4. Open the edit menu of the Release 1 planning collection and click Create Review from Collection.
Figure 1: The Create Review from Collection menu item in the edit menu
5. Name the review Release 1 initial planning, select Formal as the review type, and then click OK.
The review is created and opens.
6. In the review, specify a due date that is 3 work days from the current date.
7. Include these instructions: Features proposed for Release 1 — please review.
8. In Participants, add these people:
a. Curtis as an approver
b. Ursula as a reviewer
c. Tanuj as an optional reviewer.
To change a participant’s role, select the name, and click Change Participants.
Student Workbook Module: Reviewing requirements
Lab 1: Conducting a review
© Copyright IBM Corp. 2011, 2013 3
Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
Figure 2: Adding participants to the review and specifying their roles
9. Scroll down and view the artifacts that are included in the review.
TIP: If you want to add artifacts to the review, click Add Artifacts.
10. Click Save Review.
11. Click Start Review.
The review is now active. If the email service has been activated on the server, you can click Send email to
automatically send an email notice to all of the review participants. Or, you can start your email program from the
“Send email message” window.
12. Log out of the project.
Next, you log in as Curtis and review the artifacts.
Task 2: Completing a review as an approver
In this task, you log in as Curtis, the product owner, and complete the Release 1 initial planning review.
1. Log in to the Requirements Management (RM) application as Curtis by typing curtis for both the user ID
and password.
2. Navigate to the JKE Banking (Requirements Management) project dashboard.
3. In the Reviews widget, notice that an active review, “Release 1 initial planning,” is listed.
4. Navigate to the project Artifacts page and expand Reviews in the right sidebar. Notice that the Show my Active
Reviews icon is highlighted and that the “Release 1 initial planning review” is listed.
5. Click Release 1 initial planning.
6. Open each artifact, and for each, click one of these options: Approve/Approve with comments;
Disapprove/disapprove with comments; or Abstain/abstain with comments. Comment on at least one of the
artifacts.
Tip: To close an artifact and return to the review, click Release 1 initial planning in the menu bar. You can also
use the Next and Previous arrows to navigate through the artifacts.
7. After you finish the review, click Done. When you are prompted by a message, click Yes.
8. Return to the Artifacts page of the JKE Banking (Requirements Management) project, expand Reviews, and
then hover over the Release 1 initial planning review.
Notice that the icon changed: it now includes a check mark. When you hover over the review, you see the names of
the artifacts that are in the review and the approval status. You can open the review, but you cannot make changes to
the review at this point.
9. Log out of the project.
Task 3: Completing a review as a reviewer
1. Log in to the RM application as Ursula by typing ursula for both the user ID and password. Navigate to the
JKE Banking (Requirements Management) project dashboard.
2. On the project dashboard, in the Reviews widget, hover over the Release 1 initial planning review to read
information about it, and then click to open it.
Ursula’s role in the review is Reviewer, so she can mark each requirement artifact as either Reviewed or Abstain.
3. Either open each artifact as you did in the previous task and mark each artifact as Reviewed, or from the
Review page, select all of the artifacts and then select either Reviewed or Abstain.
Student Workbook Module: Reviewing requirements
Lab 1: Conducting a review
4 © Copyright IBM Corp. 2013
Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
When you select all of the artifacts, you select only the artifacts that are displayed on that page.
4. After you finish the review, click Done. When you are prompted by a message, click Yes.
5. Log out of the project.
Task 4: Finalizing a review
1. Log in to the RM application as Bob, the review creator, and navigate to the JKE Banking (Requirements
Management) project dashboard.
2. In the Reviews widget, notice that the review icon indicates that the Release 1 initial planning review is
complete. Hover over the review icon: the hover message indicates that the review has been completed.
Figure 3: The completed review icon
3. Open the review.
Notice that Tanuj has not yet finished the review. Because he is an optional reviewer, you can finalize the review
without waiting for his response.
4. If necessary, open the right sidebar, and then expand Artifact Comments to look for comments about the
reviewed artifacts.
Notice that Curtis left a comment.
5. On the Review home page, click Finalize Review. In the message window that opens, click Yes.
6. Return to the Artifacts page of the JKE Banking (Requirements Management) project, expand Reviews, and
notice that the “Release 1 initial planning” review is no longer in the My active reviews list or the All active
reviews list.
7. Click the Show all reviews icon.
Figure 4: The Show all reviews icon
Notice that the “Release 1 initial planning” review is listed. The icon indicates that it is a finalized review.
8. Log out of the project.

More Related Content

Viewers also liked

Switchvox - The Best Value in Unified Communications
Switchvox - The Best Value in Unified CommunicationsSwitchvox - The Best Value in Unified Communications
Switchvox - The Best Value in Unified CommunicationsDigium
 
Nicki manij
Nicki manijNicki manij
Nicki manijStunnah
 
An end to-end solution for creating smarter products
An end to-end solution for creating smarter productsAn end to-end solution for creating smarter products
An end to-end solution for creating smarter productsIBM Rational software
 
Blogerzy w społecznościach
Blogerzy w społecznościachBlogerzy w społecznościach
Blogerzy w społecznościachNapoleonCat.com
 
Social Brand Footprint - lipiec 2013
Social Brand Footprint - lipiec 2013Social Brand Footprint - lipiec 2013
Social Brand Footprint - lipiec 2013NapoleonCat.com
 
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...Digium
 
Lab 2: Creating views at the project level in the web client
Lab 2: Creating views at the project level in the web clientLab 2: Creating views at the project level in the web client
Lab 2: Creating views at the project level in the web clientIBM Rational software
 
REST - Why, When and How? at AMIS25
REST - Why, When and How? at AMIS25REST - Why, When and How? at AMIS25
REST - Why, When and How? at AMIS25Jon Petter Hjulstad
 
Raport aktywnosci na facebooku Lipiec 2011
Raport aktywnosci na facebooku Lipiec 2011Raport aktywnosci na facebooku Lipiec 2011
Raport aktywnosci na facebooku Lipiec 2011NapoleonCat.com
 
domhome.pl - reklama, Walentynki 2011
domhome.pl - reklama, Walentynki 2011domhome.pl - reklama, Walentynki 2011
domhome.pl - reklama, Walentynki 2011webmedia83
 
комментарии к макетам
комментарии к макетамкомментарии к макетам
комментарии к макетамSergey Vorobyov
 
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...NapoleonCat.com
 
Ficharevisãoáreas perímetros 01
Ficharevisãoáreas perímetros 01Ficharevisãoáreas perímetros 01
Ficharevisãoáreas perímetros 01Marta Babau
 
Our World: The Razors Edge
Our World: The Razors EdgeOur World: The Razors Edge
Our World: The Razors EdgeKevin Thomason
 
AstriCon 2014 keynote: Russell Bryant
AstriCon 2014 keynote: Russell BryantAstriCon 2014 keynote: Russell Bryant
AstriCon 2014 keynote: Russell BryantDigium
 

Viewers also liked (20)

Switchvox - The Best Value in Unified Communications
Switchvox - The Best Value in Unified CommunicationsSwitchvox - The Best Value in Unified Communications
Switchvox - The Best Value in Unified Communications
 
Nicki manij
Nicki manijNicki manij
Nicki manij
 
Front cover
Front coverFront cover
Front cover
 
Bloger star
Bloger starBloger star
Bloger star
 
An end to-end solution for creating smarter products
An end to-end solution for creating smarter productsAn end to-end solution for creating smarter products
An end to-end solution for creating smarter products
 
Blogerzy w społecznościach
Blogerzy w społecznościachBlogerzy w społecznościach
Blogerzy w społecznościach
 
Social Brand Footprint - lipiec 2013
Social Brand Footprint - lipiec 2013Social Brand Footprint - lipiec 2013
Social Brand Footprint - lipiec 2013
 
Kisi fb xi
Kisi fb xiKisi fb xi
Kisi fb xi
 
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...
Automatic Configuration Management for Kamailio and Asterisk in the era of Pu...
 
Lab 2: Creating views at the project level in the web client
Lab 2: Creating views at the project level in the web clientLab 2: Creating views at the project level in the web client
Lab 2: Creating views at the project level in the web client
 
REST - Why, When and How? at AMIS25
REST - Why, When and How? at AMIS25REST - Why, When and How? at AMIS25
REST - Why, When and How? at AMIS25
 
Phoneix AD
Phoneix ADPhoneix AD
Phoneix AD
 
Raport aktywnosci na facebooku Lipiec 2011
Raport aktywnosci na facebooku Lipiec 2011Raport aktywnosci na facebooku Lipiec 2011
Raport aktywnosci na facebooku Lipiec 2011
 
domhome.pl - reklama, Walentynki 2011
domhome.pl - reklama, Walentynki 2011domhome.pl - reklama, Walentynki 2011
domhome.pl - reklama, Walentynki 2011
 
комментарии к макетам
комментарии к макетамкомментарии к макетам
комментарии к макетам
 
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...
Optymalizacja procesu zarządzania komunikacją marki na platformach społecznoś...
 
360º leadership
360º leadership360º leadership
360º leadership
 
Ficharevisãoáreas perímetros 01
Ficharevisãoáreas perímetros 01Ficharevisãoáreas perímetros 01
Ficharevisãoáreas perímetros 01
 
Our World: The Razors Edge
Our World: The Razors EdgeOur World: The Razors Edge
Our World: The Razors Edge
 
AstriCon 2014 keynote: Russell Bryant
AstriCon 2014 keynote: Russell BryantAstriCon 2014 keynote: Russell Bryant
AstriCon 2014 keynote: Russell Bryant
 

Similar to Lab 1: Conducting a review

Lab 3: Commenting on artifacts and customizing dashboards
Lab 3: Commenting on artifacts and customizing dashboardsLab 3: Commenting on artifacts and customizing dashboards
Lab 3: Commenting on artifacts and customizing dashboardsIBM Rational software
 
Lab 1: Navigating the web client of the Requirements Management application
Lab 1: Navigating the web client of the Requirements Management applicationLab 1: Navigating the web client of the Requirements Management application
Lab 1: Navigating the web client of the Requirements Management applicationIBM Rational software
 
Lesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentLesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentInformatica
 
Lab 2: Optional: Creating requirements information
Lab 2: Optional: Creating requirements informationLab 2: Optional: Creating requirements information
Lab 2: Optional: Creating requirements informationIBM Rational software
 
Lab 3: Optional: Creating views at the module level (web client)
Lab 3: Optional: Creating views at the module level (web client)Lab 3: Optional: Creating views at the module level (web client)
Lab 3: Optional: Creating views at the module level (web client)IBM Rational software
 
Lab 1: Managing requirements by using suspect traceability -module
Lab 1: Managing requirements by using suspect traceability -moduleLab 1: Managing requirements by using suspect traceability -module
Lab 1: Managing requirements by using suspect traceability -moduleIBM Rational software
 
Lab 2: Importing requirements artifacts from a CSV file
Lab 2: Importing requirements artifacts from a CSV file Lab 2: Importing requirements artifacts from a CSV file
Lab 2: Importing requirements artifacts from a CSV file IBM Rational software
 
Lab 1: Generating document-style reports
Lab 1: Generating document-style reportsLab 1: Generating document-style reports
Lab 1: Generating document-style reportsIBM Rational software
 
Lab 1: Import a rich text file and extract linked requirements
Lab 1: Import a rich text file and extract linked requirementsLab 1: Import a rich text file and extract linked requirements
Lab 1: Import a rich text file and extract linked requirementsIBM Rational software
 
Kendo Quick Start Guide V1.pdf
Kendo Quick Start Guide V1.pdfKendo Quick Start Guide V1.pdf
Kendo Quick Start Guide V1.pdfLjubo2
 
Training For Grade Mark V.2
Training For Grade Mark V.2Training For Grade Mark V.2
Training For Grade Mark V.2esyin
 

Similar to Lab 1: Conducting a review (20)

Lab 3: Commenting on artifacts and customizing dashboards
Lab 3: Commenting on artifacts and customizing dashboardsLab 3: Commenting on artifacts and customizing dashboards
Lab 3: Commenting on artifacts and customizing dashboards
 
Lab 1: Creating a project baseline
Lab 1: Creating a project baselineLab 1: Creating a project baseline
Lab 1: Creating a project baseline
 
Lab 2: Creating and applying tags
Lab 2: Creating and applying tagsLab 2: Creating and applying tags
Lab 2: Creating and applying tags
 
Lab 1: Navigating the web client of the Requirements Management application
Lab 1: Navigating the web client of the Requirements Management applicationLab 1: Navigating the web client of the Requirements Management application
Lab 1: Navigating the web client of the Requirements Management application
 
Reviewing requirements
Reviewing requirementsReviewing requirements
Reviewing requirements
 
Lesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentLesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve Content
 
Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3
 
Lab2 RTC Work Items
Lab2 RTC Work ItemsLab2 RTC Work Items
Lab2 RTC Work Items
 
Lab 2: Optional: Creating requirements information
Lab 2: Optional: Creating requirements informationLab 2: Optional: Creating requirements information
Lab 2: Optional: Creating requirements information
 
Lab 3: Optional: Creating views at the module level (web client)
Lab 3: Optional: Creating views at the module level (web client)Lab 3: Optional: Creating views at the module level (web client)
Lab 3: Optional: Creating views at the module level (web client)
 
Lab 1: Managing requirements by using suspect traceability -module
Lab 1: Managing requirements by using suspect traceability -moduleLab 1: Managing requirements by using suspect traceability -module
Lab 1: Managing requirements by using suspect traceability -module
 
Report for SPE
Report for SPEReport for SPE
Report for SPE
 
Lab 2: Importing requirements artifacts from a CSV file
Lab 2: Importing requirements artifacts from a CSV file Lab 2: Importing requirements artifacts from a CSV file
Lab 2: Importing requirements artifacts from a CSV file
 
Lab 1: Generating document-style reports
Lab 1: Generating document-style reportsLab 1: Generating document-style reports
Lab 1: Generating document-style reports
 
Lab 1: Import a rich text file and extract linked requirements
Lab 1: Import a rich text file and extract linked requirementsLab 1: Import a rich text file and extract linked requirements
Lab 1: Import a rich text file and extract linked requirements
 
Kendo Quick Start Guide V1.pdf
Kendo Quick Start Guide V1.pdfKendo Quick Start Guide V1.pdf
Kendo Quick Start Guide V1.pdf
 
Lifecycle of a Product Requirement in RMsis
Lifecycle of a Product Requirement in RMsisLifecycle of a Product Requirement in RMsis
Lifecycle of a Product Requirement in RMsis
 
Training For Grade Mark V.2
Training For Grade Mark V.2Training For Grade Mark V.2
Training For Grade Mark V.2
 
Lifecycle of a Product Requirement in RMsis
Lifecycle of a Product Requirement in RMsisLifecycle of a Product Requirement in RMsis
Lifecycle of a Product Requirement in RMsis
 
Scrum introduc.ppt
Scrum introduc.pptScrum introduc.ppt
Scrum introduc.ppt
 

More from IBM Rational software

DMT-2467 Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...
DMT-2467	Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...DMT-2467	Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...
DMT-2467 Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...IBM Rational software
 
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...IBM Rational software
 
Steer at the Team Level with Rational Team Concert
Steer at the Team Level with Rational Team ConcertSteer at the Team Level with Rational Team Concert
Steer at the Team Level with Rational Team ConcertIBM Rational software
 
UrbanCode Deploy course and product overview slides
UrbanCode Deploy course and product overview slidesUrbanCode Deploy course and product overview slides
UrbanCode Deploy course and product overview slidesIBM Rational software
 
IBM InterConnect Speaker Proposal Tips
IBM InterConnect Speaker Proposal TipsIBM InterConnect Speaker Proposal Tips
IBM InterConnect Speaker Proposal TipsIBM Rational software
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...IBM Rational software
 
IBM DevOps Announcements - June 2014
IBM DevOps Announcements - June 2014IBM DevOps Announcements - June 2014
IBM DevOps Announcements - June 2014IBM Rational software
 
IBM Rational Developer for System z Quick Start Sales Presentation
IBM Rational Developer for System z Quick Start Sales PresentationIBM Rational Developer for System z Quick Start Sales Presentation
IBM Rational Developer for System z Quick Start Sales PresentationIBM Rational software
 
Rational consulting café to go menu
Rational consulting café to go menuRational consulting café to go menu
Rational consulting café to go menuIBM Rational software
 

More from IBM Rational software (20)

DMT-2467 Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...
DMT-2467	Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...DMT-2467	Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...
DMT-2467 Like the Features in Rational DOORS 9? Come Check Them Out in DOORS...
 
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...
Dmt 5899 workshop - Learn to Collaborate, Trace, Review and Reuse Your Requir...
 
Deployment module slides
Deployment module slidesDeployment module slides
Deployment module slides
 
Security
SecuritySecurity
Security
 
Steer at the Team Level with Rational Team Concert
Steer at the Team Level with Rational Team ConcertSteer at the Team Level with Rational Team Concert
Steer at the Team Level with Rational Team Concert
 
Applications lab
Applications lab Applications lab
Applications lab
 
Application slides
Application slidesApplication slides
Application slides
 
Components lab
Components labComponents lab
Components lab
 
UCD components
UCD components UCD components
UCD components
 
Resource lab
Resource labResource lab
Resource lab
 
Resources slides
Resources slidesResources slides
Resources slides
 
UrbanCode Deploy course and product overview slides
UrbanCode Deploy course and product overview slidesUrbanCode Deploy course and product overview slides
UrbanCode Deploy course and product overview slides
 
IBM InterConnect Speaker Proposal Tips
IBM InterConnect Speaker Proposal TipsIBM InterConnect Speaker Proposal Tips
IBM InterConnect Speaker Proposal Tips
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...
 
IBM DevOps Announcements - June 2014
IBM DevOps Announcements - June 2014IBM DevOps Announcements - June 2014
IBM DevOps Announcements - June 2014
 
IBM Rational Developer for System z Quick Start Sales Presentation
IBM Rational Developer for System z Quick Start Sales PresentationIBM Rational Developer for System z Quick Start Sales Presentation
IBM Rational Developer for System z Quick Start Sales Presentation
 
Rational consulting café to go menu
Rational consulting café to go menuRational consulting café to go menu
Rational consulting café to go menu
 
Lab3 RTC Source Control
Lab3 RTC Source ControlLab3 RTC Source Control
Lab3 RTC Source Control
 
Lab4 RTC Builds
Lab4 RTC BuildsLab4 RTC Builds
Lab4 RTC Builds
 
Lab1 RTC Overview
Lab1 RTC OverviewLab1 RTC Overview
Lab1 RTC Overview
 

Recently uploaded

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 

Lab 1: Conducting a review

  • 1. Student Workbook Module: Reviewing requirements Lab 1: Conducting a review © Copyright IBM Corp. 2013 1 Course materials may not be reproduced in whole or in part without the prior written permission of IBM. Lab: Conducting a review Objectives At the end of this lab you will be able to: ► Create and conduct a formal review Given ► The JKE Banking Money That Matters project ► The Automated Water Meter (AMR) project Description ► In this lab, you log in as Bob. You create a formal review of a collection of requirements and assign team members to participate. Then, you log in as different team members and participate in a formal review. You log in again as Bob, the review creator, to monitor the review progress and to finalize it after all of the participants are finished. Exercise tasks In this exercise, you complete these tasks:  Task 1: Creating a review from a collection  Task 2: Completing a review as an approver  Task 3: Completing a review as a reviewer  Task 4: Finalizing a review
  • 2. Student Workbook Module: Reviewing requirements Lab 1: Conducting a review 2 © Copyright IBM Corp. 2013 Course materials may not be reproduced in whole or in part without the prior written permission of IBM. Task 1: Creating a review from a collection In this task, you create a formal review to solicit input from stakeholders on proposed features to be addressed in an upcoming release. 1. Open the lab environment at https://jazz-server:9443/rm/web and log in as Bob the analyst by typing bob for both the user ID and password. 2. On the All Projects page, in the My Projects section, find the JKE Banking (Requirements Management) project and click Show Artifacts. 3. From the Collections menu, click Browse Collections. 4. Open the edit menu of the Release 1 planning collection and click Create Review from Collection. Figure 1: The Create Review from Collection menu item in the edit menu 5. Name the review Release 1 initial planning, select Formal as the review type, and then click OK. The review is created and opens. 6. In the review, specify a due date that is 3 work days from the current date. 7. Include these instructions: Features proposed for Release 1 — please review. 8. In Participants, add these people: a. Curtis as an approver b. Ursula as a reviewer c. Tanuj as an optional reviewer. To change a participant’s role, select the name, and click Change Participants.
  • 3. Student Workbook Module: Reviewing requirements Lab 1: Conducting a review © Copyright IBM Corp. 2011, 2013 3 Course materials may not be reproduced in whole or in part without the prior written permission of IBM. Figure 2: Adding participants to the review and specifying their roles 9. Scroll down and view the artifacts that are included in the review. TIP: If you want to add artifacts to the review, click Add Artifacts. 10. Click Save Review. 11. Click Start Review. The review is now active. If the email service has been activated on the server, you can click Send email to automatically send an email notice to all of the review participants. Or, you can start your email program from the “Send email message” window. 12. Log out of the project. Next, you log in as Curtis and review the artifacts. Task 2: Completing a review as an approver In this task, you log in as Curtis, the product owner, and complete the Release 1 initial planning review. 1. Log in to the Requirements Management (RM) application as Curtis by typing curtis for both the user ID and password. 2. Navigate to the JKE Banking (Requirements Management) project dashboard. 3. In the Reviews widget, notice that an active review, “Release 1 initial planning,” is listed. 4. Navigate to the project Artifacts page and expand Reviews in the right sidebar. Notice that the Show my Active Reviews icon is highlighted and that the “Release 1 initial planning review” is listed. 5. Click Release 1 initial planning. 6. Open each artifact, and for each, click one of these options: Approve/Approve with comments; Disapprove/disapprove with comments; or Abstain/abstain with comments. Comment on at least one of the artifacts. Tip: To close an artifact and return to the review, click Release 1 initial planning in the menu bar. You can also use the Next and Previous arrows to navigate through the artifacts. 7. After you finish the review, click Done. When you are prompted by a message, click Yes. 8. Return to the Artifacts page of the JKE Banking (Requirements Management) project, expand Reviews, and then hover over the Release 1 initial planning review. Notice that the icon changed: it now includes a check mark. When you hover over the review, you see the names of the artifacts that are in the review and the approval status. You can open the review, but you cannot make changes to the review at this point. 9. Log out of the project. Task 3: Completing a review as a reviewer 1. Log in to the RM application as Ursula by typing ursula for both the user ID and password. Navigate to the JKE Banking (Requirements Management) project dashboard. 2. On the project dashboard, in the Reviews widget, hover over the Release 1 initial planning review to read information about it, and then click to open it. Ursula’s role in the review is Reviewer, so she can mark each requirement artifact as either Reviewed or Abstain. 3. Either open each artifact as you did in the previous task and mark each artifact as Reviewed, or from the Review page, select all of the artifacts and then select either Reviewed or Abstain.
  • 4. Student Workbook Module: Reviewing requirements Lab 1: Conducting a review 4 © Copyright IBM Corp. 2013 Course materials may not be reproduced in whole or in part without the prior written permission of IBM. When you select all of the artifacts, you select only the artifacts that are displayed on that page. 4. After you finish the review, click Done. When you are prompted by a message, click Yes. 5. Log out of the project. Task 4: Finalizing a review 1. Log in to the RM application as Bob, the review creator, and navigate to the JKE Banking (Requirements Management) project dashboard. 2. In the Reviews widget, notice that the review icon indicates that the Release 1 initial planning review is complete. Hover over the review icon: the hover message indicates that the review has been completed. Figure 3: The completed review icon 3. Open the review. Notice that Tanuj has not yet finished the review. Because he is an optional reviewer, you can finalize the review without waiting for his response. 4. If necessary, open the right sidebar, and then expand Artifact Comments to look for comments about the reviewed artifacts. Notice that Curtis left a comment. 5. On the Review home page, click Finalize Review. In the message window that opens, click Yes. 6. Return to the Artifacts page of the JKE Banking (Requirements Management) project, expand Reviews, and notice that the “Release 1 initial planning” review is no longer in the My active reviews list or the All active reviews list. 7. Click the Show all reviews icon. Figure 4: The Show all reviews icon Notice that the “Release 1 initial planning” review is listed. The icon indicates that it is a finalized review. 8. Log out of the project.