Pierre DuPont 
Construction Site Superintendent 
19477 Elkas, Kirkland, QC H9J 3B4 
Cell 514-996-4810, 
dupontpd@hotmail.com 
Objective 
Find employment in the construction industry as Site Superintendent. My passion for 
construction coupled with my experience in management is the reason for my searching for a 
position in this field. To accomplish a stable, lasting and enriching career in the construction 
industry. 
Areas of Expertise 
With over 25 years of experience in the construction industry, I am proud of my 
accomplishments and advancements. Over the years I have learned not only the hands-on 
aspect of construction, but built and managed successful relationships with clients, architects, 
engineers and sub-trades. Having worked with numerous project managers over the years, I 
found that delivering a project on time and on budget depends a lot on an honest and good 
relationship, which includes communication, cooperation and respect between both parties. I am 
also proud to have been able to adapt to new technologies. I know that in this high tech business 
world, time and precision are very important tools in creating successful projects. I am a good 
learner and I welcome any opportunity for additional studies to better my chances for 
advancements. 
 I work well with minimum supervision. 
 I adapt, create and back-up reports on computer and communicate with the latest tech products on the 
market. I am also bilingual. 
 I am willing and able to go beyond to get things done when needed. 
 I have supervised and managed projects from .5 to 6.5 million$, all with a perfect security and accident free 
record to date by exercising a 0 tolerance attitude. I am a certified first respondent since 2007. 
Last Employment 
Divco Construction Montreal, QC 
Site Superintendent 
Major project of renovation and retro fit of a Zellers store to a Target store in Trois-Rivières, QC. 
 Daily interfacing with Target’s OSR, Project Manager, architect and engineers. 
 Action-oriented, focused on solving immediate problems. Closely coordinated with all sub-trades to ensure 
smooth operation (from 35 to 50 workers). 
 Keeping a perfect security record (no accidents, 0 tolerances) and being a first respondent. 
 Work involved structural, underground, civil, roofing, building envelope and a particular problem regarding 
the fire-proofing of the roof decking. 
 Attacked a challenging issue regarding the reception of materials supplied and shipped from the United 
States by Target. Implemented an inventory control system that managed all shipments from unloading, 
storing, managing and distributing construction materials to the sub-trades following the progression of the 
construction in a timely manner. 
 Kept a clean and organized job site with 5 trailers, 20 closed 40’ containers for storage and 5-40 yard 
containers for demo and construction debris turned over daily. 
 Scheduled and coordinated execution of works resolving punch list after turn over and prolonged my 
presence on site at Target’s request beyond store opening. 
Page 1 of 3,
Employment History 
Candev Construction Inc. Montreal, QC 
Site Superintendent 2011 to 
2012 
Extensive renovations to an elementary school called École du Bout de l’Ile in Ste-Anne-de- 
Bellevue, QC. Built of brick/block, with Fibrocement panel finish, steel framing with Densglass 
walls with a flat membrane roof finish over steel structure, doubling the gymnasium in size. All 
done in day work with client occupancy. 
 Refitted geothermal heating/cooling system with 21 geothermal wells. 
 Worked with very tight schedules and accommodation to the client needs. 
 All done with minimal damage to the environment and the existing landscaping. 
 Added a second floor to part of the existing building and doubling the size of the gym. 
 Keeping a perfect security record (no accidents, 0 tolerances) and being a first respondent. 
 Staying in contact with the client, architects and engineers throughout the project, and resolving 
a multitude of problems due to site conditions and other. 
Additional projects; I.U.G.M. Retrofit a regular cafeteria kitchen into a cooled environment distribution center, 
including extensive work on electrical and mechanical rooms and systems. 
Concordia U. Loyola Campus Retrofit campus dorms with new electro-mechanical systems including new sprinkler, 
plumbing, security systems and new boiler room. 
BEAUWARD SHOPPING CENTRES Ste. Eustache, QC 
Site Superintendent 
2010 
We erected a new 2 storey building of 10,000s.f. It’s called Complex d'Avaugour Phase II in 
Boucherville, QC. Built of brick/block, with steel panel finish, steel framing with Densglass walls 
and 45% curtain wall, and an EPDM roof finish over steel structure, with an Otis elevator and 
270 parking spaces. 
 Planned and negotiated the temporary hydro aerial set-up and the permanent underground electrical 
entrance for the building with Hydro Quebec and the city of Boucherville. 
 Made some on site structural changes to suit the excavation site conditions as per the approval of the 
engineers. Also some steel structure adjustments to the shipping/receiving door frame and architectural 
details. 
 Assisted and supervised tenant fit-ups as the completion of the base building was on-going. 
GERMANO CONSTRUCTION CORPORATION Laval, QC 
Site Superintendent 2006 @ 
2010 
Managed and supervised over 10 bank renovations (HSBC, NBC and Scotia), one new HSBC 
construction and multiple others like McGill (MGH) and Concordia University (Auditoriums and 
Offices) and many more. 
 Managed and supervised unionized workers and sub-trades on our job sites so that the work is 
accomplished as per the plans and specs submitted. 
 Requisitioned supplies and materials to complete construction of our projects. Inspected and reviewed 
construction work to ensure work conforms to specifications. 
 Conferred with professionals to discuss such matters as work procedures, complaints and construction 
problems.
Pierre DuPont Page 2 of 
3, 
SOLTRON REALTY INC. Montreal, QC 
Construction / Maintenance / Foreman 1999 @ 
2004 
Worked hands-on and supervised many projects from tenant fit-ups and base building 
maintenance at Les Cours Mont-Royal downtown Montreal and Soltron Biotech Labs in Dorval, 
QC and amongst others the 6.5K residence of Soltron's owner in Cote St. Luc. 
 Managed and supervised all construction activities of carpenters, electricians, plumbers etc. 
 Scheduled and supervised crews, while maintaining safe working conditions. 
 Worked hands-on and supervised the complex construction of a 4 storey residence with interior pool, golf 
simulator, elevator, roof green house, 5 mechanical rooms and a generator shed in Cote St. Luc. 
DU PONT CONTRACTING CO. Ottawa, ON 
Construction / Project Manager / Owner 1986 to 
1998 
Execute all aspects of owning my own construction company from hands-on work to selling, 
estimating, accounting etc. Scope of projects were from major residential renovations to medium 
size commercial and institutional renovations for example; Nox Cafe at Ottawa University, U.S. 
and Uganda Embassies, Cogéco, Ultramar, Ottawa General Hospital and Nova -Tech (Fire and 
Water Damage Restorations). 
 Prepared bid proposals including material costs, subcontracted work, construction activities and 
requirements, and labor. Computed cost estimates and negotiated with client representatives to obtain 
contracts. 
 Conducted all phases of construction procedures, organizing, and coordinating projects for maximum 
efficiency. 
 Supervising and hiring of sub-contractors and hourly employees. 
 Worked in association with adjusters and insurance companies, prepared estimates and executed repairs. 
Education 
Laurier MacDonald High, St. Leonard, QC 
1974 
Additional Studies 
 General studies of construction under. (Feirer and Hutchings of the Western Michigan University). 
 Studies in techniques of base construction, houses and small buildings under (The U.S. Naval 
Facilities Engineering Command and the U.S. Naval Schools of Construction).
Pierre DuPont Page 3 of 
3.

resume 2014

  • 1.
    Pierre DuPont ConstructionSite Superintendent 19477 Elkas, Kirkland, QC H9J 3B4 Cell 514-996-4810, dupontpd@hotmail.com Objective Find employment in the construction industry as Site Superintendent. My passion for construction coupled with my experience in management is the reason for my searching for a position in this field. To accomplish a stable, lasting and enriching career in the construction industry. Areas of Expertise With over 25 years of experience in the construction industry, I am proud of my accomplishments and advancements. Over the years I have learned not only the hands-on aspect of construction, but built and managed successful relationships with clients, architects, engineers and sub-trades. Having worked with numerous project managers over the years, I found that delivering a project on time and on budget depends a lot on an honest and good relationship, which includes communication, cooperation and respect between both parties. I am also proud to have been able to adapt to new technologies. I know that in this high tech business world, time and precision are very important tools in creating successful projects. I am a good learner and I welcome any opportunity for additional studies to better my chances for advancements.  I work well with minimum supervision.  I adapt, create and back-up reports on computer and communicate with the latest tech products on the market. I am also bilingual.  I am willing and able to go beyond to get things done when needed.  I have supervised and managed projects from .5 to 6.5 million$, all with a perfect security and accident free record to date by exercising a 0 tolerance attitude. I am a certified first respondent since 2007. Last Employment Divco Construction Montreal, QC Site Superintendent Major project of renovation and retro fit of a Zellers store to a Target store in Trois-Rivières, QC.  Daily interfacing with Target’s OSR, Project Manager, architect and engineers.  Action-oriented, focused on solving immediate problems. Closely coordinated with all sub-trades to ensure smooth operation (from 35 to 50 workers).  Keeping a perfect security record (no accidents, 0 tolerances) and being a first respondent.  Work involved structural, underground, civil, roofing, building envelope and a particular problem regarding the fire-proofing of the roof decking.  Attacked a challenging issue regarding the reception of materials supplied and shipped from the United States by Target. Implemented an inventory control system that managed all shipments from unloading, storing, managing and distributing construction materials to the sub-trades following the progression of the construction in a timely manner.  Kept a clean and organized job site with 5 trailers, 20 closed 40’ containers for storage and 5-40 yard containers for demo and construction debris turned over daily.  Scheduled and coordinated execution of works resolving punch list after turn over and prolonged my presence on site at Target’s request beyond store opening. Page 1 of 3,
  • 2.
    Employment History CandevConstruction Inc. Montreal, QC Site Superintendent 2011 to 2012 Extensive renovations to an elementary school called École du Bout de l’Ile in Ste-Anne-de- Bellevue, QC. Built of brick/block, with Fibrocement panel finish, steel framing with Densglass walls with a flat membrane roof finish over steel structure, doubling the gymnasium in size. All done in day work with client occupancy.  Refitted geothermal heating/cooling system with 21 geothermal wells.  Worked with very tight schedules and accommodation to the client needs.  All done with minimal damage to the environment and the existing landscaping.  Added a second floor to part of the existing building and doubling the size of the gym.  Keeping a perfect security record (no accidents, 0 tolerances) and being a first respondent.  Staying in contact with the client, architects and engineers throughout the project, and resolving a multitude of problems due to site conditions and other. Additional projects; I.U.G.M. Retrofit a regular cafeteria kitchen into a cooled environment distribution center, including extensive work on electrical and mechanical rooms and systems. Concordia U. Loyola Campus Retrofit campus dorms with new electro-mechanical systems including new sprinkler, plumbing, security systems and new boiler room. BEAUWARD SHOPPING CENTRES Ste. Eustache, QC Site Superintendent 2010 We erected a new 2 storey building of 10,000s.f. It’s called Complex d'Avaugour Phase II in Boucherville, QC. Built of brick/block, with steel panel finish, steel framing with Densglass walls and 45% curtain wall, and an EPDM roof finish over steel structure, with an Otis elevator and 270 parking spaces.  Planned and negotiated the temporary hydro aerial set-up and the permanent underground electrical entrance for the building with Hydro Quebec and the city of Boucherville.  Made some on site structural changes to suit the excavation site conditions as per the approval of the engineers. Also some steel structure adjustments to the shipping/receiving door frame and architectural details.  Assisted and supervised tenant fit-ups as the completion of the base building was on-going. GERMANO CONSTRUCTION CORPORATION Laval, QC Site Superintendent 2006 @ 2010 Managed and supervised over 10 bank renovations (HSBC, NBC and Scotia), one new HSBC construction and multiple others like McGill (MGH) and Concordia University (Auditoriums and Offices) and many more.  Managed and supervised unionized workers and sub-trades on our job sites so that the work is accomplished as per the plans and specs submitted.  Requisitioned supplies and materials to complete construction of our projects. Inspected and reviewed construction work to ensure work conforms to specifications.  Conferred with professionals to discuss such matters as work procedures, complaints and construction problems.
  • 3.
    Pierre DuPont Page2 of 3, SOLTRON REALTY INC. Montreal, QC Construction / Maintenance / Foreman 1999 @ 2004 Worked hands-on and supervised many projects from tenant fit-ups and base building maintenance at Les Cours Mont-Royal downtown Montreal and Soltron Biotech Labs in Dorval, QC and amongst others the 6.5K residence of Soltron's owner in Cote St. Luc.  Managed and supervised all construction activities of carpenters, electricians, plumbers etc.  Scheduled and supervised crews, while maintaining safe working conditions.  Worked hands-on and supervised the complex construction of a 4 storey residence with interior pool, golf simulator, elevator, roof green house, 5 mechanical rooms and a generator shed in Cote St. Luc. DU PONT CONTRACTING CO. Ottawa, ON Construction / Project Manager / Owner 1986 to 1998 Execute all aspects of owning my own construction company from hands-on work to selling, estimating, accounting etc. Scope of projects were from major residential renovations to medium size commercial and institutional renovations for example; Nox Cafe at Ottawa University, U.S. and Uganda Embassies, Cogéco, Ultramar, Ottawa General Hospital and Nova -Tech (Fire and Water Damage Restorations).  Prepared bid proposals including material costs, subcontracted work, construction activities and requirements, and labor. Computed cost estimates and negotiated with client representatives to obtain contracts.  Conducted all phases of construction procedures, organizing, and coordinating projects for maximum efficiency.  Supervising and hiring of sub-contractors and hourly employees.  Worked in association with adjusters and insurance companies, prepared estimates and executed repairs. Education Laurier MacDonald High, St. Leonard, QC 1974 Additional Studies  General studies of construction under. (Feirer and Hutchings of the Western Michigan University).  Studies in techniques of base construction, houses and small buildings under (The U.S. Naval Facilities Engineering Command and the U.S. Naval Schools of Construction).
  • 4.