The flyer advertises Krauck Systems, a company that provides conflict-free engineering services to construction projects. It notes that typical problems in construction include cost overruns and delays due to a lack of coordinated planning between the many trades involved. Krauck Systems aims to solve this by taking overall responsibility for coordinating all specialist planners through their proprietary software and clearing systems, which integrate plans, documents, and schedules. This is intended to enable faster, cheaper projects by eliminating conflicts between plans and ensuring all requirements are fulfilled. The flyer provides examples of Krauck Systems' international experience managing large projects across various industries.
Principles of Enterprise Project ManagementGlen Alleman
the integration of planning, scheduling, cost, and reporting requires a clear and executable system, architecture. This project provides the first step in integrating Microsoft Project Professional with Cost View and wInsight to form an Enterprise Project Management platform.
1st in our Breakfast Seminar programme the Adoddle App libarary and Appbuilder we are the only Corporate Collaboration SAAS provider in the Construction industry delivering this technology
With talks from Graeme King Senior Manager Procurement Operations, TFL and Nathan Doughty COO Asite.
Delivering Asset Management for Infrastructure Projects by Liam Gallagher, Ja...AVEVA Group plc
How do you fully control and manage the development of the non-graphical engineering data connected to the physical assets? Liam Gallagher, Jacobs, discusses ‘Delivering Asset Management for Infrastructure Projects’ and how integrated AVEVA Technologies have enabled JACOBS to have a single source of truth for project data.
Discover how one of the world’s largest and most diverse providers of technical, professional, and construction services use AVEVA to transform their business. Visit www.aveva.com to get more information today.
Principles of Enterprise Project ManagementGlen Alleman
the integration of planning, scheduling, cost, and reporting requires a clear and executable system, architecture. This project provides the first step in integrating Microsoft Project Professional with Cost View and wInsight to form an Enterprise Project Management platform.
1st in our Breakfast Seminar programme the Adoddle App libarary and Appbuilder we are the only Corporate Collaboration SAAS provider in the Construction industry delivering this technology
With talks from Graeme King Senior Manager Procurement Operations, TFL and Nathan Doughty COO Asite.
Delivering Asset Management for Infrastructure Projects by Liam Gallagher, Ja...AVEVA Group plc
How do you fully control and manage the development of the non-graphical engineering data connected to the physical assets? Liam Gallagher, Jacobs, discusses ‘Delivering Asset Management for Infrastructure Projects’ and how integrated AVEVA Technologies have enabled JACOBS to have a single source of truth for project data.
Discover how one of the world’s largest and most diverse providers of technical, professional, and construction services use AVEVA to transform their business. Visit www.aveva.com to get more information today.
The Drone Brothers Construction Playbook details our capabilities in the construction drone industry. Learn how we can help you with your next construction drone photography project to increase cost savings and safety and to improve team collaboration globally.
Preparation of planning documents for instrumentation, power plants and control but also installation and process measuring and control technology are in the competence of the electric design engineer. The common data base permits at any time the access to information about all trades involved in the project such that planning of electrical engineering can be combined with planning of process engineering.
Soaring to New Heights With a PDM Light BackboneAras
Author: Vincent Soumier, Airbus
Aras Innovator was selected as PDM Light backbone of the Airbus application landscape. The needed competence, supply chain and infrastructure is now fully set-up and in operation. The agile and innovative development framework allows Airbus to develop new ideas and match with changing demands of the business. To support the growth of ideas, a Centre of Competence was created and a ‘green house’ was built for rapid prototyping purposes.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment. This approach is called "Conceptual Engineering". The target of CADISON® Project Engineer is to provide the user with data for calculation without large efforts and already at a very early time.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment. This approach is called "Conceptual Engineering". The target of CADISON® Project Engineer is to provide the user with data for calculation without large efforts and already at a very early time.
Plannerly and Dalux for construction system engineeringStephen Au
Yahiaoui et al (2006) argue that adoption of the traditional SE V-diagram during building design and construction process would help optimize the trade offs during building lifecycle since SE V‐diagram allows for transformation of operational needs into a system performance parameters specification and integration of different functionalities requirements and related design parameters.
BIM and DWSS (Digital Works Supervision System) create a digital twin to compare the virtual asset simulation with the physical system performance analysis for system optimization, which is aligned with SE validation process. In the presentation, we will discuss and show how the DWSS & BIM via digital construction technology @Plannerly & @Dalux can enable system engineering approach being applied to the buidling delivery process in building design
CADISON® Project Navigator is the module for viewing of project data within the corporate network. Navigator has been designed for staff members normally not involved in the active planning of a plant but afterwards responsible for operation and maintenance of the plant (i.e. mere data consumers).
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
The Drone Brothers Construction Playbook details our capabilities in the construction drone industry. Learn how we can help you with your next construction drone photography project to increase cost savings and safety and to improve team collaboration globally.
Preparation of planning documents for instrumentation, power plants and control but also installation and process measuring and control technology are in the competence of the electric design engineer. The common data base permits at any time the access to information about all trades involved in the project such that planning of electrical engineering can be combined with planning of process engineering.
Soaring to New Heights With a PDM Light BackboneAras
Author: Vincent Soumier, Airbus
Aras Innovator was selected as PDM Light backbone of the Airbus application landscape. The needed competence, supply chain and infrastructure is now fully set-up and in operation. The agile and innovative development framework allows Airbus to develop new ideas and match with changing demands of the business. To support the growth of ideas, a Centre of Competence was created and a ‘green house’ was built for rapid prototyping purposes.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment. This approach is called "Conceptual Engineering". The target of CADISON® Project Engineer is to provide the user with data for calculation without large efforts and already at a very early time.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment. This approach is called "Conceptual Engineering". The target of CADISON® Project Engineer is to provide the user with data for calculation without large efforts and already at a very early time.
Plannerly and Dalux for construction system engineeringStephen Au
Yahiaoui et al (2006) argue that adoption of the traditional SE V-diagram during building design and construction process would help optimize the trade offs during building lifecycle since SE V‐diagram allows for transformation of operational needs into a system performance parameters specification and integration of different functionalities requirements and related design parameters.
BIM and DWSS (Digital Works Supervision System) create a digital twin to compare the virtual asset simulation with the physical system performance analysis for system optimization, which is aligned with SE validation process. In the presentation, we will discuss and show how the DWSS & BIM via digital construction technology @Plannerly & @Dalux can enable system engineering approach being applied to the buidling delivery process in building design
CADISON® Project Navigator is the module for viewing of project data within the corporate network. Navigator has been designed for staff members normally not involved in the active planning of a plant but afterwards responsible for operation and maintenance of the plant (i.e. mere data consumers).
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
2. The Problem
Skyrocketing costs for
Skylink
Elbphilharmonie, Hamburg
Airport Berlin
ThyssenKrupp-Brasilia
10,000 different plans!
There is a lack of matching plans
It lacks the overall organization for
the planning
The unsolved problem
Construction cost and time overruns?
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 2 2
3. THE
CENTRAL
QUESTION:
„Why do a lot of
construction projects end
up with cost explosions and
time delays?“
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 3 3
4. The Cause
Despite the best planners, project managers, contractors and systems
1 - Architecture
21 - Facility-Management
20 – Renters‘ Fitout *
2 – Structural Work *
3 - Fitout *
19 – Building Site Facilities
4 - Frontage *
18 – Building Automation
5 – Structural Planning
17 - Conveyors*
6 - Formwork-/Reinforce-Planning
16 – Low Voltage Current *
7 - Slot-/Breakthrough-Planning
15 – High Voltage Current *
8 – Fire Prevention *
14 - Coldness *
9 – Outdoor Facilities *
13 - Ventilation*
* Additionally
21 main trades above
50 sub-trades possible!
10 - Sanitary *
12 - Heating *
WWW.KRAUCK-SYSTEMS.COM
11 – Fire-Extinguishing System*
CONFLICT-FREE ENGINEERING
Seite
Page 4 4
5. The Solution
KRAUCK-SYSTEMS takes responsibility of
coordinated plans and leads all specialist
planners like a navigation system through the
project!
1 - Architecture
21 - Facility-Management
2 – Structural Work *
20 – Renters‘ Fitout *
3 - Fitout *
19 – Building Site Facilities
4 - Frontage *
18 – Building Automation
5 – Structural Planning
17 - Conveyors*
16 – Low Voltage Current *
6 - Formwork-/Reinforce-Planning
Clearing by
KRAUCK SYSTEMS
7 - Slot-/Breakthrough-Planning
15 – High Voltage Current *
8 – Fire Prevention *
14 - Coldness *
9 – Outdoor Facilities *
13 - Ventilation*
• Additionally
21 main trades above
50 sub-trades possible!
10 - Sanitary *
12 - Heating *
11 – Fire-Extinguishing System*
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 5 5
6. The Invention
Krauck Systems enables this by:
Our in-house developed software and systems solutions for every phase of the project
Our unique clearing and project coordination system
KS-Systems modules for use in all project phases
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
KS-Real-Dos; Real-Data-Operating-System
KS-Datawall
KS-PCS; Projekt-Coordination-System
KS-Building Owner-Advisor
KS-Real-PM (Project-Management-Project-Controlling)
KS-Legal Project-Management
Claims-Management (Insurances, …)
KS-Quality-Control
KS-Marketing-Portal
KS-Plant-Documentation
KS-Logistic
KS-Total-Planning
KS-Construction Control
KS-Production-Automization
KS-Construction-Management-Prozess Optimizing
KS-Real-FM; Facility Management, Virtually controlled property management and maintenance
KS-Specialist City
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 6 6
7. KS-Datawall
The central clearing house for data
Contents - generated by all parties with
mutual dependencies
Basis for Planning, Construction
Use and Management
Planning(CAD)
Set Target
Simulation of Construction
Building
Owner
ProjectControl
Architect
Specialist
Planner
Construction
Company
User/
Operator
KS-Marketing
Stock Data
Sampling
Construction
Plans
Pre-Production
Facility Management
Correspondence
Safety Engineering
Maintenance
Protocols
Contracts, etc.
Building Automation
Substantive
Examination
With
KS Datawall
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Administration (e.g.. SAP)
Geo-Information-Systems
Virtual Factory
Seite
Page 7 7
8. KRAUCK-SYSTEMS
Integration into the entire project
KRAUCK-SYSTEMS – PHILOSOPHY
OPTIMIZING OF BEGINNING
Properly coordinated plans and marketing materials
Proper tendering documents
No resource requirements for disputes over incorrect
uncoordinated plans
Accelerated processes
Result:
No cost and time overruns
Cheaper construction costs, because elimination of Claims
Everyone benefits
PLANNING PHASE
CONSTRUCTION PHASE
Design - Approval - Marketing –
Implementation planning - Tender
Advantages for the planning process
Responsibility for correct contents and
fulfillment of the tasks
Responsibility for coordinated plans of all
specialist fields
KS-Project Coordination System
KS-Logbook for transparent reporting of all
incidents
Assembly and precast plans
OPERATION
MAINTENANCE
Facility -Management
Benefits for the construction phase
Benefits for the operation phase
Provide timely with correct plans
First correct plans with real data
Accelerate all construction processes
Reduction of maintenance costs
Early precast production based on real data
Reduce downtime by repairs
Drastic reduction of resource requirements for claims
Faster reconstruction during
Stress-free construction progress
operation
Cheaper building costs
Enormous increase in profits
PLANNED = BUILT
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 8 8
9. KS-Datawall-Plan
The central clearing house for data
Original plans of
all planners
Analysis and
set up with
KS-coding
Set up in the KS
model
1:1 site model
Automatic identification of
problem areas
(collisions and guardian)
Send result of the
problems to the planners
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 9 9
10. KS-Datawall-Document
The central clearing house for data
Integration of all text documents
(Protocols, contracts, files / telephone notes,
Beschreibugen, e-mails, letters, faxes, etc.)
Protocol
Analysis / evaluation of
Statements and implications
Text Analysis
Analyze and evaluate the contents of
statements about the knowledge of the
contents from our KS-Model and its
impact on all trades
Document your findings
Assignment of tasks and appointments
Personalized ToDo lists
Todo A
Todo B
Collection of tasks with
deadlines to links of all
associated documents
Todo C
Todo D
Todo E
E-Mail
Guardian functions
Findings from the KS-Model
Guard functions controls the fulfillment of
all requirements of the text documents in
the plan documents
Example:
• Collisions
• Compliance with required spacing
(width, height)
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1010
11. Advantages by KRAUCK SYSTEMS
Independence from project type:
Structural and Civil Engineering
Industrial-Plant
Automotive
Production Plant, etc.
Flexibility in the selection of partners
and we make sure that all required often hundreds of
specialists are coordinated and all tasks to be fulfilled in
a timely and correct way.
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1111
12. KS-Production Automization
Especially the production and precast industry was upgraded with enormous cost
with the latest computerized production machinery.
The clear objective faster and cheaper pre-production with high accuracy
Problem:
• Late faulty un-coordinated data
• Different data suppliers, CAD systems, formats, methods of operation
• No reliable data for direct injection into the production machines
• Stress in taking measurement on site and production until shortly before delivery and installation
• Joint liability by measurements on site and unrecognized deficiencies of the plans
By Krauck Systems, for the first time you have reliable plans
for their preparation work and production machines.
• Production on base of correct plans
• No more measurements on site
• Timely pre-production and logistics
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1212
13. KS-Site Management
Obtain the current project data via the PCS
About the KS-PCS the supervisor will directly be
supplied with the actual and proofed plans in 2d and
3d during the construction progress benefit
• No tiresome search for right plans for all specialist
fields for the respective construction progress
• Complete visibility and no missing of components
and other elements
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1313
14. KS-Site Management
Obtain the current project data via the PCS
Support the construction management for the
process planning by simulation of real
construction sequence!
Avoiding surprises at the construction site!
Saves time by eliminating the tedious and
impossible plan checks on all trades
Reduction of claims management
Construction schedule as planned without the
usual disabilities
Complete visibility and control via the
subcontractor
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1414
15. KS-References
Worldwide unique References in Conflict-Free Engineering
KRAUCK-SYSTEMS offers regardless of the type of project,
the world's only solution, and an international reputation for
Conflict-Free Engineering.
Over 25 years experience
Over 10 Mio. m² floor area
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 1515
22. References
Realisation by different companies on basis of the technologies of Krauck-Systems
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 2222
23. Transparency in the interest of Principals and Investors
KRAUCK SYSTEMS
World leading company
in the holistic project management
Thank you for your attention!
WWW.KRAUCK-SYSTEMS.COM
CONFLICT-FREE ENGINEERING
Seite
Page 2323